KR20030034366A - The exchange simulation method using the oms and thereof system - Google Patents

The exchange simulation method using the oms and thereof system Download PDF

Info

Publication number
KR20030034366A
KR20030034366A KR1020010065275A KR20010065275A KR20030034366A KR 20030034366 A KR20030034366 A KR 20030034366A KR 1020010065275 A KR1020010065275 A KR 1020010065275A KR 20010065275 A KR20010065275 A KR 20010065275A KR 20030034366 A KR20030034366 A KR 20030034366A
Authority
KR
South Korea
Prior art keywords
test
block
oms
selecting
message
Prior art date
Application number
KR1020010065275A
Other languages
Korean (ko)
Other versions
KR100406031B1 (en
Inventor
이의천
전성재
이금영
Original Assignee
엘지전자 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 엘지전자 주식회사 filed Critical 엘지전자 주식회사
Priority to KR10-2001-0065275A priority Critical patent/KR100406031B1/en
Publication of KR20030034366A publication Critical patent/KR20030034366A/en
Application granted granted Critical
Publication of KR100406031B1 publication Critical patent/KR100406031B1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/22Arrangements for supervision, monitoring or testing
    • H04M3/24Arrangements for supervision, monitoring or testing with provision for checking the normal operation
    • H04M3/241Arrangements for supervision, monitoring or testing with provision for checking the normal operation for stored program controlled exchanges
    • H04M3/242Software testing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/455Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M2203/00Aspects of automatic or semi-automatic exchanges
    • H04M2203/05Aspects of automatic or semi-automatic exchanges related to OAM&P

Abstract

PURPOSE: A system of performing exchange simulation using an OMS(Operation Maintenance System) is provided to simulate an interface module test between a developed software block and an undeveloped block with the use of the OMS, thereby enabling a continuous and repeated test. CONSTITUTION: A tester logs in a switching system by initially software block within the switching system, a testing subject(S20). The tester selects a specific software block of a switching system, a tested object(S30). The tester selects a testing group corresponding to functional test items for testing a developed software block(S40). The tester writes a test message to be transmitted to a switching system of one testing group(S50). The tester writes a testing scenario based on a predetermined test procedure document to perform a function test for a tested software block(S60). The tester simulates software of a tested target(S70). The tester stores a tested result in file type(S80).

Description

OMS를 이용한 교환기 시뮬레이션 방법 및 그 시스템{THE EXCHANGE SIMULATION METHOD USING THE OMS AND THEREOF SYSTEM}Exchange simulation method using OMS and its system {THE EXCHANGE SIMULATION METHOD USING THE OMS AND THEREOF SYSTEM}

본 발명은 OMS( OPERATION MAINTENANCE SYSTEM, 운용관리 시스템)을 이용하여 인터페이스 모듈 시험을 시뮬레이션하는 방법에 관한 것으로, 더욱 자세하게는, 개발된 블럭과 미 개발된 블럭을 인터페이스모듈을 사용하여 시뮬레이션하는 방법에 관한 것이다.The present invention relates to a method for simulating an interface module test using an OPERATION MAINTENANCE SYSTEM (OMS), and more particularly, to a method for simulating a developed block and an undeveloped block using an interface module. will be.

일반적으로 의사 및 데이터 정보를 주고받는 두 사람 또는 그 이상의 대상자 사이의 전송 경로를 형성하기 위하여 스위치 회로망의 입선에서 오는 접속 요구를 검출하고 출선을 선택하여 입선-출선 간의 경로를 설정한 다음 입선-출선 상태의 감시, 절단, 요금 부과 등을 하는 일련의 동작. 이것을 실행하는 장치를 교환기라고 한다.In general, in order to form a transmission path between two persons or more persons who send and receive pseudo information and data information, the connection request from the incoming line of the switch network is detected, the outgoing line is selected, and the incoming / outgoing line is established. A series of actions that monitor, cut, or charge a condition. The device that does this is called an exchange.

교환을 통신 정보의 형식에 따라 분류하면 회화(會話)와 같은 음성 형식을 전화 교환, 전문(電文)과 같은 문자 형식을 전신 교환, 화상 정보 형식을 화상 교환이라고 한다. 또한 전신 교환, 화상 교환을 포함하여 기계 처리에 맞는 정보 형식을 데이터 교환이라 한다. 한편 통신을 하는 주체에 유의할 경우 국내 공중 교환, 국제 교환, 구내 교환, 전용선 교환 등으로 분류된다. 교환 목적은 정보 전달의 수단 제공과 회선의 효율적 운용에 있다.When the exchange is classified according to the format of the communication information, the voice format such as conversation is called the telephone exchange, the text format such as the full text is called the telegraph exchange, and the image information format is called the image exchange. In addition, information format suitable for machine processing, including telegraph exchange and image exchange, is called data exchange. On the other hand, if the subject of communication is heeded, it is classified into domestic public exchange, international exchange, premises exchange, and leased line exchange. The purpose of the exchange is to provide the means of information transfer and the efficient operation of the circuit.

어떤 하나의 기능을 개발할 때 , 그 기능이 각 개발 단계마다 시험이 이루어지고, 시험이 완료된 상태에서 다음 단계로 개발이 진행된다.When developing a single feature, the feature is tested at each stage of development, and the development proceeds to the next stage after testing is complete.

일반적으로 모의시험은 모듈시험과 통합시험, 그리고 시스템시험 등으로 구분된다.In general, simulation tests are divided into module test, integrated test, and system test.

상기 모듈시험은 입력/출력을 기본으로 개인용 PC에서 진행되며, 상기 통합시험은 개발자 상호간의 인터페이스나 블럭관계를 시험하는 단계로 진행된다.The module test is conducted on a personal PC based on input / output, and the integrated test is a step of testing interfaces or block relationships between developers.

상기 시스템시험은 서브 시스템 또는 상위개념의 블럭간의 동작상태를 검증하는 것으로 , 기능 구현에 따른 최종적인 시험으로 인식된다.The system test verifies the operation state between the blocks of the sub-system or higher concept, and is recognized as the final test according to the function implementation.

상기 통합시험과 시스템 시험은 하드웨어가 정상적으로 동작하는 상태에서 개발한 소프트웨어가 올바르게 동작되는지를 시험하는 검증단계이다.The integrated test and the system test are verification steps for testing whether the software developed while the hardware is operating normally operates correctly.

상기 시스템시험은 고객이 사용하는 동작 순서를 시험절차서에 사전에 기술하여 해당기능이 실제로 동작하는지를 검사하는 단계이다.The system test is a step for checking whether the corresponding function actually works by describing the operation sequence used by the customer in advance in the test procedure.

도 1은 상기와 같은 종래기술을 나타낸 블럭도이다.Figure 1 is a block diagram showing such a prior art.

개발자는 다른 블럭간의 인터페이스 관계부분을 명확히 제시하여 기능설계서를 작성하고, 작성된 기능설계서를 바탕으로 기능구현을 하는데, 대부분의 시험은 개인용 PC(10)를 이용하여 수행한다.The developer clearly presents the interface relationship between different blocks to create a functional design document, and implements the functional design based on the written functional design document. Most tests are performed using the personal PC 10.

모듈에 대한 시험은 컴퓨터를 이용하여 입력/출력 시험을 수행한다. 이를 위해 개발자는 여러 에뮬레이터에서 제공하는 매크로방식을 사용하거나 시험수행을 이한 별도의 프로그램으로 모듈시험을 수행한다.The test for the module is performed by a computer using input / output tests. To this end, the developer conducts module tests by using a macro method provided by various emulators or by using a separate program.

서로 다른 블럭간의 인터페이스 관련시험은 다른 블럭에서 발생하는 시스템 메세지를 PC에서 수작업으로 작성하고, 작성된 메세지는 개발 블럭의 입력메세지로 사용되어지고, 이에 따라 출력 메세지를 모니터링하여 관련 내용을 시험한다.The interface test between different blocks manually writes system messages from other blocks on the PC, and the written messages are used as input messages to the development block.

외부에서 입력된 데이터를 처리하는 입출력 처리부(21)와, 입출력 처리부(21)를 통해 입력된 데이터를 처리하는 메세지 처리부(22)와, 메시지처리부(22)에서 처리된 데이터를 시뮬레이션하는 개발 S/W블럭(23)과 상대 개발 S/W/블럭(25)으로 이루어진 교환기 시스템(20)과 유선(30)연결되어 모듈시험을 처리하는 PC(10)로 구성되어 진다.Development S / S that simulates data processed by the input / output processing unit 21 for processing data input from the outside, the message processing unit 22 for processing the data input through the input / output processing unit 21, and the message processing unit 22. It is composed of a PC (10) that is connected to the switch system 20 consisting of the W block 23 and the relative development S / W / block 25 and the wired 30 to process the module test.

그러나, 상기와 같이 PC를 사용하여 시뮬레이션을 수행할 때, 시스템 하드웨어에 기초를 둔 시험환경과는 차이가 있어서 그 결과에 오류가 발생하는 문제점이 있다.However, when performing a simulation using a PC as described above, there is a problem that the error occurs in the result because there is a difference from the test environment based on the system hardware.

따라서, 시험 데이터에 대한 신뢰도가 떨어지는 문제점을 야기한다.Thus, a problem arises in that the reliability of the test data is lowered.

위와 같은 문제점을 해소하기 위해 안출된 본 발명은, 개발된 소프트웨어 블럭과 미 개발된 블럭간의 인터페이스 모듈시험을 OMS를 사용하여 시뮬레이션하는 데에 그 목적이 있다.The present invention devised to solve the above problems, an object of the present invention is to simulate the interface module test between the developed software block and the undeveloped block using OMS.

도 1은 종래의 교환기 시뮬레이션 방법을 나타낸 블럭도이다.1 is a block diagram showing a conventional exchanger simulation method.

도 2는 본 발명에 의한 교환기 시뮬레이션 방법을 나타낸 블럭도이다.2 is a block diagram showing a switch simulation method according to the present invention.

도 3은 도 2의 상세 블럭도이다.3 is a detailed block diagram of FIG. 2.

도 4는 본 발명의 동작을 나타낸 흐름도이다.4 is a flowchart illustrating the operation of the present invention.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : PC 20, 200 : 교환기 시스템10: PC 20, 200: exchange system

21,210 : 입출력 처리부 22 : 메시지 처리부21,210: input and output processing unit 22: message processing unit

23 : 개발 S/W블럭 25.250 : 상대 개발 S/W블럭23: Development S / W Block 25.250: Relative Development S / W Block

30 : 연결선 100 : OMS가 내장된 PC30: connection line 100: PC with built-in OMS

230 : 상위 개념의 메시지 처리부230: message processing unit of the higher concept

270 : 다수의 모듈이 포함된 개발 S/W블럭270: Development S / W block including many modules

290 : 하위 개념의 S/W블럭 300 : LAN290: S / W block of subordinate concept 300: LAN

위와 같은 목적을 달성하기 위한 본 발명은, 교환기의 운영 및 유지보수 등의 업무를 수행하고 보조하는 외부장치로서, 교환기에서 발생하는 관련메세지(경보, 장애, 상태)를 수신하고, 운영자가 요구하는 형태의 메세지를 송신하는 역할을 수행하는 응용프로그램 시스템인 OMS(OPERATION MAINTENANCE SYSTEM)를 장착한 PC와, 상기 PC와 LAN으로 연결되어 있으며, OMS와의 인터페이스 부분의 처리를 행하는 외부 인터페이스 처리부, 교환시스템에서 사용되는 메시지를 관리하는 메세지 처리부, 시뮬레이션을 위해 개발된 S/W블럭인 시험대상 S/W블럭, 시험 주체 S/W블럭, 교환기 시스템내의 모든 데이터 입출력을 관리하는 입출력 처리부, 하위 S/W블럭으로 구성되어 있는 교환기 시스템으로 이루어진 것을 특징으로 한다.The present invention for achieving the above object, as an external device for performing and assisting operations such as operation and maintenance of the exchange, receiving the relevant messages (alarm, failure, status) generated in the exchange, the operator In a PC equipped with an OMS (OPERATION MAINTENANCE SYSTEM), an application program system that transmits a message in the form of a message, and an external interface processing unit or exchange system connected to the PC and a LAN and performing an interface part with the OMS. Message processing unit that manages used messages, S / W block that is S / W block developed for simulation, test subject S / W block, I / O processing unit that manages all data I / O in exchange system, and lower S / W block Characterized in that consisting of the exchange system is configured as.

본 발명은 또한, OMS를 사용한 교환기의 시뮬레이션 방법에 있어서, 시험자가 OMS PC에서 교환시스템을 최초 연결하여 로그인(LOG-IN)하는 OMS 연결과정과, 시험주체가 되는 교환시스템 내의 특정 S/W블럭을 선정하는 시험주체 선정과정과, 시험 대상이 되는 교환시스템 내의 특정 S/W 블럭을 선정하는 시험대상 선정과정과, 개발된 S/W블럭을 시험하기 위한 기능시험 항목에 대응되는 시험그룹을 선정하는 시험 메시지 그룹 선정과정과, 하나의 시험 그룹에 대한 교환시스템으로 송신할 시험 메시지를 작성하는 시험 메시지 작성과정과, 시험대상 S/W블럭에 대한 기능 시험을 위해 미리 지정된 시험절차서 문서를 기준으로 시험 시나리오를 작성하는 과정과, 시험대상 S/W에 대해 시뮬레이션을 실행하는 과정을 포함하는 것을 특징으로 한다.The present invention also provides a simulation method of an exchanger using OMS, in which an OMS connection process in which a tester first connects to an exchange system at an OMS PC and logs in, and a specific S / W block in an exchange system that becomes a test subject. Select the test subject to select the test subject, the test subject selection process to select the specific S / W block in the exchange system to be tested, and the test group corresponding to the functional test item to test the developed S / W block. Based on the test message group selection process, the test message preparation process to prepare a test message to be sent to the exchange system for one test group, and the test procedure document specified in advance for the functional test on the S / W block to be tested. It includes a process of creating a test scenario, and a process of executing a simulation for the test target software.

이하 본 발명의 바람직한 일실시예를 첨부된 도면을 참조하여 설명하면 다음과 같다.Hereinafter, a preferred embodiment of the present invention will be described with reference to the accompanying drawings.

도 2와 도 3은 본 발명의 구성을 나타낸 블럭도이다. 도시된 바와 같이, 응용프로그램 시스템인 OMS(OPERATION MAINTENANCE SYSTEM)를 장착하는 PC(100)는 교환기 시스템(200)과 LAN(300)으로 연결되어 있다.2 and 3 are block diagrams showing the configuration of the present invention. As shown, the PC 100 equipped with an application system OMS (OPERATION MAINTENANCE SYSTEM) is connected to the exchange system 200 and the LAN (300).

상기 OMS는 교환기의 운영 및 유지보수 등의 업무를 수행하고 보조하는 외부장치로서, 교환기에서 발생하는 관련메세지(경보, 장애, 상태)를 수신하고, 운영자가 요구하는 형태의 메세지를 송신하는 역할을 수행한다.The OMS is an external device that performs and assists operations such as operation and maintenance of the exchange, and receives related messages (alarm, failure, status) generated from the exchange, and transmits a message in a form requested by the operator. Perform.

상기 교환시스템(200)과 OMS간의 접속은 초기화를 통해 연결된 후, 정해진프로토콜에 의해 메세지를 송수신한다.After the connection between the exchange system 200 and the OMS is initialized, the message is transmitted and received by a predetermined protocol.

상기 교환기 시스템(200)은 인터페이스 처리부(210), 메세지 처리부(230), 시험대상 S/W블럭(250), 시험 주체 S/W블럭(270), 하위 S/W블럭(290)으로 구성되어 있다.The exchange system 200 includes an interface processor 210, a message processor 230, a test target S / W block 250, a test subject S / W block 270, and a lower S / W block 290. have.

상기 인터페이스 처리부(210)는 교환시스템에 연결된 외부 장치들과 관련된 부분을 처리하는 S/W로서, 본 발명에서는 OMS와의 인터페이스 부분의 처리를 행한다.The interface processor 210 is an S / W that processes a part related to external devices connected to an exchange system. In the present invention, the interface part 210 processes an interface part with an OMS.

상기 메시지 처리부(230)는, 교환시스템에서 사용되는 메시지를 관리하는 S/W로서, 시스템 운용과 유지보수를 목적으로 전송되는 시험메시지를 구분할 수 있도록 한다. 또한, 다수의 하위 그룹의 S/W블럭을 선택할 수 있도록 한다.(1A~nA)The message processing unit 230, as a S / W that manages messages used in the exchange system, to distinguish the test messages transmitted for the purpose of system operation and maintenance. Also, it is possible to select S / W blocks of multiple subgroups. (1A to nA)

상기 시험대상 S/W블럭(250)은, 시뮬레이션을 위해 개발된 S/W블럭이며, 시험주체 S/W블럭(270)은, 상기 시험대상 S/W블럭(250)과 관계가 있는 블럭으로 개발이 완료되지 않는 경우도 있다.The test target S / W block 250 is a S / W block developed for simulation, and the test subject S / W block 270 is a block related to the test target S / W block 250. Sometimes development is not complete.

상기 하위 S/W블럭(290)은 개발 S/W블럭을 기준으로 하위 개념의 H/W장치에서 구동하는 S/W블럭으로, 로컬 프로세서나 로컬 라인블럭 등이 있다.The lower S / W block 290 is an S / W block that is driven by an H / W device having a lower concept based on the developed S / W block, and includes a local processor or a local line block.

도 4는 본 발명의 동작을 나타낸 흐름도이다. 도시된 바와 같이, 시험자가 OMS PC에서 교환시스템을 최초 연결하여 로그인(LOG-IN)하는 OMS 연결과정(S10)과, 시험주체가 되는 교환시스템 내의 특정 S/W블럭을 선정하는 시험주체 선정과정(S20)과, 시험 대상이 되는 교환시스템 내의 특정 S/W 블럭을 선정하는 시험대상 선정과정(S30)과, 개발된 S/W블럭을 시험하기 위한 기능시험 항목에 대응되는 시험그룹을 선정하는 시험 메시지 그룹 선정과정(S40)과, 하나의 시험 그룹에 대한 교환시스템으로 송신할 시험 메시지를 작성하는 시험 메시지 작성과정(S50)과, 시험대상 S/W블럭에 대한 기능 시험을 위해 미리 지정된 시험절차서 문서를 기준으로 시험 시나리오를 작성하는 과정(S60)과, 시험대상 S/W에 대해 시뮬레이션을 실행하는 과정(S70) 및 시험 결과를 파일형태로 저장하는 과정(S80)으로 이루어진다.4 is a flowchart illustrating the operation of the present invention. As shown, OMS connection process (S10) in which the tester first connects to the exchange system and logs in from the OMS PC, and a test subject selection process for selecting a specific S / W block in the exchange system to be the test subject. (S20), a test object selection process (S30) for selecting a specific S / W block in the exchange system to be tested, and a test group for selecting a functional test item for testing the developed S / W block. Test message group selection process (S40), a test message preparation process for creating a test message to be sent to the exchange system for one test group (S50), and a predetermined test for the functional test for the S / W block to be tested. Based on the procedure document, a test scenario is created (S60), a simulation is executed on the test target software (S70), and the test results are stored in a file format (S80).

상기 OMS연결 과정(S10)은, 교환시스템이 항상 구동 및 운영되고 있는 상태에서 시험자가 원하는 시점에서 접속을 시도하며, PC에서 OMS를 구동하는 단계와, OMS 기동 ID와 비밀번호를 입력하여 로그인하는 단계와, 시험대상이 되는 교환시스템 IP(INTERNET PROTOCOL)주소를 입력하여 연결하는 단계를 포함한다.In the OMS connection process (S10), the tester attempts to access the desired point of time while the exchange system is always running and operating, driving the OMS on a PC, and logging in by inputting an OMS start ID and password. And inputting an exchange system IP (INTERNET PROTOCOL) address to be tested.

상기 시험주체 선정과정(S20)에서, 선정된 S/W블럭은 OMS에서 보내는 시험메시지의 발신지점이 되는 정보이고, 현재 개발이 완료되지 않은 상태이여도 사용할 수 있으며, 시험주체 항목을 선택하는 단계와, 전체 시스템 형상에서 시험주체 S/W블럭에 해당되는 H/W블럭을 선택하는 단계를 포함한다.In the test subject selection process (S20), the selected S / W block is information that is the origin of the test message sent from the OMS, and can be used even if the current development is not completed, and selecting a test subject item. And selecting the H / W block corresponding to the test subject S / W block in the overall system shape.

상기 시험대상 선정 과정(S30)에서, 선정된 S/W블럭은 OMS에서 보내는 시험메시지의 도착지점(DESTINATION POINT)이 되며, 시험대상이 되는 S/W블럭은 필히 기능개발이 완료된 상태로 교환시스템 내에 존재해야I 한다.In the test object selection process (S30), the selected S / W block becomes the destination point of the test message sent from the OMS, and the S / W block to be the test object must be completed with the functional development. Must exist within

시험대상 선정과정(S30)은 시험대상 항목을 선택하는 단계와, 전체 시스템 형상에서 시험대상 S/W블럭에 해당되는 H/W블럭을 선택하는 단계를 포함한다.The test object selection process (S30) includes selecting a test object item and selecting an H / W block corresponding to the test object S / W block in the overall system shape.

상기 시험메시지 그룹선정 과정(S40)에서, 시험그룹은 정상적인 또는 비정상적인 경우의 수를 고려한 형태로 동작될 수 있도록 하고, 하나의 기능을 시험하더라도 복수개의 시험 그룹을 선정하며, 시험 메시지 그룹을 선택하는 단계와, 기능 시험항목에 대응되는 시험그룹을 선택한 후 특정 이름의 매핑(MAPPING)을 실행하는 단계를 포함한다.In the test message group selection process (S40), the test group can be operated in a form in consideration of the number of normal or abnormal cases, selecting a plurality of test groups even when testing one function, and selecting a test message group And selecting a test group corresponding to the functional test item and executing mapping of a specific name.

상기 시험그룹에 대한 시험 메시지 작성과정(S50)은, OMS에서 각각의 시험 메시지 단위별로 버튼을 할당하여 지정하고, 시험자가 시험을 진행할 때 관련 버튼을 클릭하여 해당 버튼에 지정된 메시지 내용이 교환시스템으로 전송되도록 한다.In the test message writing process (S50) for the test group, a button is assigned to each test message unit in the OMS, and when the tester proceeds to the test, the related message is assigned to the exchange system by clicking a related button. To be transmitted.

시험그룹에 대한 시험 메시지 작성과정(S50)은, 선정된 시험그룹에서 하나의 버튼을 선택하는 단계와, 선택된 버튼에 작성할 시험 APO메시지에 매핑되는 이름으로 버튼이름을 지정하는 단계와, 지정된 버튼 이름에 S/W블럭으로 전송할 메시지의 순수 데이터 영역을 작성하는 단계를 포함한다.The test message creation process (S50) for the test group includes selecting one button from the selected test group, assigning a button name to a name mapped to a test APO message to be written to the selected button, and assigning a specified button name. Creating a pure data area of the message to be sent to the S / W block.

상기 시나리오 작성과정(S60)에서, 시험 시나리오는 시험 절차서 문서를 기준으로 작성하며, 시간적인 차이를 고려한 시나리오 구성이 가능하며, 파일 형태로 OMS에서 보관이 가능하고, 내용의 수정 등과 같은 변경작업을 수행할 수 있다.In the scenario preparation process (S60), the test scenario is written based on the test procedure document, and the scenario can be configured in consideration of the time difference, the file can be kept in the OMS in the form of a file, and modifications such as modification of the contents can be performed. Can be done.

또한, 시험대상 S/W블럭에서 가상으로 수신된 메시지를 고려하여 타이머를 설정할 수 있고, 실제로 기능이 서비스되는 과정을 구분 동작으로 구성할 수도 있다.In addition, a timer may be set in consideration of a message virtually received from the test target S / W block, and a process of actually serving a function may be configured as a division operation.

시나리오 작성과정(S60)은, 시험 시나리오 항목을 선택하는 단계와, 선택된 시나리오 항목별로 이미 작성된 시험 그룹, 시험 버튼 등을 선택하여 작성하는 단계와, 시험 시나리오의 작성이 완료되면 이름을 매핑하는 단계를 포함한다.The scenario creation process (S60) includes selecting a test scenario item, selecting a test group, a test button, and the like that are already created for each selected scenario item, and mapping a name when the test scenario is completed. Include.

상기의 시나리오 작성까지 완료되면 시험을 수행하게 되는데, 시뮬레이션을 실행하는 과정(S70)은, 시험 수행 항목을 선택하는 단계와, 시험할 시험 시나리오를 선택하여 시험을 실시하는 단계와, 시험 결과가 파일 형태로 보관되는 단계(S80)를 포함한다.The test is performed when the above scenario is completed. The process of executing the simulation (S70) includes selecting a test execution item, selecting a test scenario to be tested, and performing a test, and the test result is a file. It is stored in the form (S80).

상기 시험 수행시 사용되는 메시지의 내용은 시험주체 S/W 블록 번호와, 시험 대상 S/W블럭번호와, 메시지 길이와 기능 수행에 필요한 데이터 등의 항목이 포함되어 있다.The contents of the message used when performing the test include items such as a test subject S / W block number, a test subject S / W block number, a message length, and data necessary for performing a function.

본 발명은 시험대상 S/W블럭과 대응되는 다른 개발 S/W블럭이 완성되지 않은 상태에서도 시험을 수행할 수 있으며, 시험 데이터의 구성이 자유롭기 때문에 여러 가지 시나리오에 의한 시험을 수행할 수 있으며, 또한 연속적이고, 반복적인 시험이 가능하므로 LCS(LOCAL CALL SIMULATOR)의 구현이 가능한 효과가 있다.The present invention can perform the test even in a state in which other developed S / W blocks corresponding to the S / W block to be tested are not completed, and the test data can be freely configured to perform tests according to various scenarios. In addition, it is possible to implement LCS (LOCAL CALL SIMULATOR) because continuous and repeatable tests are possible.

또한, 시험결과에 대한 자료가 파일형태로 보관되므로, 효과적인 관리가 이루어진다.In addition, data on the test results are kept in a file format, so that effective management is achieved.

Claims (11)

교환기의 운영 및 유지보수 등의 업무를 수행하고 보조하는 외부장치로서, 교환기에서 발생하는 메세지를 수신하고, 운영자가 요구하는 형태의 메세지를 송신하는 역할을 수행하는 응용프로그램 시스템인 OMS(OPERATION MAINTENANCE SYSTEM)를 장착한 PC와, 상기 PC와 LAN으로 연결되어 있으며, OMS와의 인터페이스 부분의 처리를 행하며, 교환기 시스템내의 모든 데이터 입출력을 관리하는 인터페이스 처리부, 교환시스템에서 사용되는 메시지를 관리하는 메세지 처리부, 시뮬레이션을 위해 개발된 S/W블럭인 시험대상 S/W블럭, 시험 주체 S/W블럭, 하위 S/W블럭으로 구성되어 있는 교환기 시스템으로 이루어진 것을 특징으로 하는 OMS를 이용한 교환기의 시뮬레이션 시스템.OMS (OPERATION MAINTENANCE SYSTEM), an external application system that performs and assists operations such as operation and maintenance of exchanges, and receives application-generated messages and transmits messages in the form required by the operator. Is connected to the PC and LAN, performs interface processing with the OMS, manages all data input and output in the exchange system, manages the messages used in the exchange system, and simulates. Simulation system of the exchanger using OMS, characterized in that the exchange system consisting of the S / W block, the test subject S / W block, the test subject S / W block, the lower S / W block that was developed for. 제 1항에 있어서,The method of claim 1, 상기 메시지 처리부는, 시스템 운용과 유지보수를 목적으로 전송되는 시험메시지를 구분할 수 있도록 하는 것을 특징으로 하는 OMS를 이용한 교환기의 시뮬레이션 시스템.The message processing unit, the simulation system of the exchange using OMS, characterized in that to distinguish the test messages transmitted for the purpose of system operation and maintenance. 제 1항에 있어서,The method of claim 1, 상기 하위 S/W블럭은, 개발 S/W블럭을 기준으로 하위 개념의 H/W장치에서 구동하는 S/W블럭으로, 로컬 프로세서나 로컬 라인블럭 등인 것을 특징으로 하는 OMS를 이용한 교환기의 시뮬레이션 시스템.The lower S / W block is an S / W block driven by a lower concept H / W device based on the developed S / W block and is a local processor or a local line block. . OMS를 사용한 교환기의 시뮬레이션 방법에 있어서,In the simulation method of the exchanger using OMS, 시험자가 OMS PC에서 교환시스템을 최초 연결하여 로그인(LOG-IN)하는 OMS 연결과정과,OMS connection process in which the tester first logs into the exchange system at the OMS PC and logs in, 시험주체가 되는 교환시스템 내의 특정 S/W블럭을 선정하는 시험주체 선정과정과,A test subject selection process for selecting a specific S / W block in an exchange system to be a test subject; 시험 대상이 되는 교환시스템 내의 특정 S/W 블럭을 선정하는 시험대상 선정과정과,A test object selection process for selecting a specific S / W block in an exchange system to be tested; 개발된 S/W블럭을 시험하기 위한 기능시험 항목에 대응되는 시험그룹을 선정하는 시험 메시지 그룹 선정과정과,A test message group selection process for selecting a test group corresponding to a functional test item for testing a developed S / W block; 하나의 시험 그룹에 대한 교환시스템으로 송신할 시험 메시지를 작성하는 시험 메시지 작성과정과,A test message preparation process for preparing a test message to be sent to an exchange system for one test group; 시험대상 S/W블럭에 대한 기능 시험을 위해 미리 지정된 시험절차서 문서를 기준으로 시험 시나리오를 작성하는 과정과,Creating a test scenario based on a predetermined test procedure document for the functional test of the S / W block to be tested; 시험대상 S/W에 대해 시뮬레이션을 실행하는 과정을 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.Switching simulation method using OMS, characterized in that it comprises the step of performing a simulation for the test target S / W. 제 4항에 있어서,The method of claim 4, wherein 상기 OMS연결 과정은, PC에서 OMS를 구동하는 단계와, OMS 기동 ID와 비밀번호를 입력하여 로그인하는 단계와, 시험대상이 되는 교환시스템 IP(INTERNET PROTOCOL)주소를 입력하여 연결하는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The OMS connection process further includes the steps of driving OMS on a PC, logging in by inputting an OMS activation ID and password, and connecting and inputting an exchange system IP (INTERNET PROTOCOL) address to be tested. Exchange simulation method using OMS, characterized in that. 제 4항에 있어서,The method of claim 4, wherein 상기 시험주체 선정 과정은, 시험주체 항목을 선택하는 단계와, 전체 시스템 형상에서 시험주체 S/W블럭에 해당되는 H/W블럭을 선택하는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The test subject selection process includes selecting a test subject item and selecting an H / W block corresponding to the test subject S / W block in the overall system configuration. Way. 제 4항에 있어서,The method of claim 4, wherein 상기 시험대상 선정과정은, 시험대상 항목을 선택하는 단계와, 전체 시스템 형상에서 시험대상 S/W블럭에 해당되는 H/W블럭을 선택하는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The test object selection process may further include selecting an item to be tested and selecting an H / W block corresponding to a test object S / W block in the overall system shape. Way. 제 4항에 있어서,The method of claim 4, wherein 상기 시험메시지 그룹선정 과정은, 시험 메시지 그룹을 선택하는 단계와, 기능 시험항목에 대응되는 시험그룹을 선택한 후 특정 이름의 매핑(MAPPING)을 실행하는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The test message group selection process may further include selecting a test message group, and selecting a test group corresponding to a function test item, and then performing mapping of a specific name. Exchange simulation method. 제 4항에 있어서,The method of claim 4, wherein 상기 시험그룹에 대한 시험 메시지 작성과정은, 선정된 시험그룹에서 하나의 버튼을 선택하는 단계와, 선택된 버튼에 작성할 시험 APO메시지에 매핑되는 이름으로 버튼이름을 지정하는 단계와, 지정된 버튼 이름에 S/W블럭으로 전송할 메시지의 순수 데이터 영역을 작성하는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The process of creating a test message for the test group may include selecting one button from a selected test group, assigning a button name to a name mapped to a test APO message to be written to the selected button, and assigning S to a designated button name. Switch generation simulation method using OMS, characterized in that it further comprises the step of creating a pure data area of the message to be transmitted to / W block. 제 4항에 있어서,The method of claim 4, wherein 상기 시나리오 작성과정은, 시험 시나리오 항목을 선택하는 단계와, 선택된 시나리오 항목별로 이미 작성된 시험 그룹, 시험 버튼 등을 선택하여 작성하는 단계와, 시험 시나리오의 작성이 완료되면 이름을 매핑하는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The scenario creation process may further include selecting a test scenario item, selecting and writing a test group, a test button, etc., which are already prepared for each selected scenario item, and mapping a name when the test scenario is completed. Exchanger simulation method using OMS, characterized in that the. 제 4항에 있어서,The method of claim 4, wherein 상기 시험을 수행하는 과정은, 시험 수행 항목을 선택하는 단계와, 시험할 시험 시나리오를 선택하여 시험을 실시하는 단계와, 시험 결과가 파일 형태로 보관되는 단계를 더 포함하는 것을 특징으로 하는 OMS를 이용한 교환기 시뮬레이션 방법.The process of performing the test may further include selecting an test execution item, selecting a test scenario to be tested to perform a test, and storing the test results in a file form. Exchange simulation method used.
KR10-2001-0065275A 2001-10-23 2001-10-23 The exchange simulation method using the oms and thereof system KR100406031B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0065275A KR100406031B1 (en) 2001-10-23 2001-10-23 The exchange simulation method using the oms and thereof system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0065275A KR100406031B1 (en) 2001-10-23 2001-10-23 The exchange simulation method using the oms and thereof system

Publications (2)

Publication Number Publication Date
KR20030034366A true KR20030034366A (en) 2003-05-09
KR100406031B1 KR100406031B1 (en) 2003-11-17

Family

ID=29565886

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0065275A KR100406031B1 (en) 2001-10-23 2001-10-23 The exchange simulation method using the oms and thereof system

Country Status (1)

Country Link
KR (1) KR100406031B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160133291A (en) * 2015-05-12 2016-11-22 국방과학연구소 Simulation device in distribution environment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR920010412B1 (en) * 1990-06-20 1992-11-27 한국전기통신공사 Hardware installing testing program
JPH05244254A (en) * 1992-02-04 1993-09-21 Nec Corp Central fault supervisory system
KR100208249B1 (en) * 1996-08-19 1999-07-15 유기범 Method for multi-booting in full electronic switching system
KR100476987B1 (en) * 2000-02-25 2005-03-16 엘지전자 주식회사 apparatus and method of maintenance data production/confirmation by using virtual switching system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160133291A (en) * 2015-05-12 2016-11-22 국방과학연구소 Simulation device in distribution environment

Also Published As

Publication number Publication date
KR100406031B1 (en) 2003-11-17

Similar Documents

Publication Publication Date Title
US7117411B2 (en) Methods and systems for testing communications network components
JP3706144B2 (en) Protocol interface gateway
JP3706145B2 (en) UNIX Open System Interconnection Layer Test
US7315807B1 (en) System and methods for storage area network simulation
CN101316196B (en) Method and apparatus for implementing simulation test of service on distributed platform
US7908519B2 (en) Trouble emulator for a rules-based diagnostic system
CN106330483A (en) Information acquiring method, client device and server device
CN108804313A (en) A kind of method, apparatus and server of remote debugging program
JP2005175915A (en) Emulation device and emulation program
Gadre et al. A COS study of OSI interoperability
CN116681013B (en) Simulation verification method, platform, device, equipment and medium of network chip
KR100406031B1 (en) The exchange simulation method using the oms and thereof system
JP3545777B2 (en) Network connection type communication processing system and test system
CN111221687B (en) Cloud storage testing system and method
CN112860560A (en) Remote debugging method and system for field machine, electronic device and electronic equipment
CN106339307A (en) Futures exchange transaction front-end system simulator
JP3722869B2 (en) Exchange software test system and test method
JP2795221B2 (en) Manager verification method
JP2009081566A (en) Testing device, method and program for exchange controller
JPS5960655A (en) System for testing inter-computer communication processing program
KR20000028319A (en) Method for simulating connection management in network management system
JP2000285159A (en) Method and device for managing building group utilizing internet
JP2009294697A (en) Simulation method and simulation program
CN112783776A (en) Interface routing-based test method and device and electronic equipment
KR20190136722A (en) Data distribution service engine test device supporting development and maintenance of dds communication middleware

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121015

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20131016

Year of fee payment: 11

LAPS Lapse due to unpaid annual fee