KR20030031304A - Roof tent tension mounting structure and its building method - Google Patents

Roof tent tension mounting structure and its building method Download PDF

Info

Publication number
KR20030031304A
KR20030031304A KR1020010063233A KR20010063233A KR20030031304A KR 20030031304 A KR20030031304 A KR 20030031304A KR 1020010063233 A KR1020010063233 A KR 1020010063233A KR 20010063233 A KR20010063233 A KR 20010063233A KR 20030031304 A KR20030031304 A KR 20030031304A
Authority
KR
South Korea
Prior art keywords
roof membrane
screw shaft
tension
tension screw
roof
Prior art date
Application number
KR1020010063233A
Other languages
Korean (ko)
Other versions
KR100434864B1 (en
Inventor
최승열
Original Assignee
(주)케이돔엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=29564545&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR20030031304(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by (주)케이돔엔지니어링 filed Critical (주)케이돔엔지니어링
Priority to KR10-2001-0063233A priority Critical patent/KR100434864B1/en
Publication of KR20030031304A publication Critical patent/KR20030031304A/en
Application granted granted Critical
Publication of KR100434864B1 publication Critical patent/KR100434864B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • E04B7/102Shell structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/14Suspended roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Tents Or Canopies (AREA)

Abstract

PURPOSE: A tension-installation structure of a roof curtain is provided to install a roof curtain easily, to shorten a period of construction, to simplify maintenance work and not to damage a roof curtain. CONSTITUTION: The tension-installation structure of a roof curtain comprises: many rod members(11) interposed in the frame of a roof curtain(10); a track member(13) provided with a rod fitting hole(13a) and a nut fitting hole(13b) to interpose the rod member(11); several primary fixing nuts(14) interposed in the nut fitting hole(13b) of the track member(13); a tension screw shaft(15) screwed on the primary fixing nut(14) assembled to the track member(13); and a secondary fixing nut(16) screwed on the tension screw shaft(15) to pull the tension screw shaft(15) with an appropriate tensile force.

Description

지붕막의 인장 설치구조 및 그 시공방법{Roof tent tension mounting structure and its building method}Roof tent tension mounting structure and its building method

본 발명은 각종 건축 구조물에 지붕막을 설치하기 위한 인장 지지구조 및 그 시공방법에 관한 것으로, 특히 지붕막을 손상시킴 없이 인장시킬 수 있도록 하고, 지붕막의 시공기간을 단축하고, 유지보수가 뛰어난 지붕막의 인장 설치구조 및 그 시공방법에 관한 것이다.The present invention relates to a tension support structure for installing a roof membrane on various building structures and a construction method thereof, and in particular, to tension the roof membrane without damaging the roof membrane, to shorten the construction period of the roof membrane, and to maintain excellent roof membrane tension. It relates to an installation structure and its construction method.

일예로, 돔형 건축물에 일반적으로 사용되는 지붕막의 설치방법은 다음과 같다.For example, the installation method of the roof membrane generally used in dome-shaped buildings is as follows.

막을 제단한 후 막의 고정부위에 다수의 구멍을 천공하여, 현장에 입고시키고, 현장에서 임시 가공제작한 스프레더(spreader : 막을 감았다가 펼치는데 사용할 수 있도록 제작된 기구)에 감아 설치할 장소까지 크레인을 이용하여 안전하게 운반한다.After the membrane is cut, a large number of holes are drilled in the fixed part of the membrane, and then put into the field, and the crane is temporarily wound on a spreader (machine made to be used for winding and spreading the membrane). Transport safely

설치장소에 막이 운반되면 제위치에 펼친 후 막에 인장을 주어가면서 고정시킬 부분을 지붕막 고정패널까지 인장시켜 지붕막 구멍을 고정패널의 볼트에 삽입 연결시킨 후 덮개(고무판, 알루미늄판 등)를 이용하여 고정시킨다.When the membrane is transported to the installation place, expand it in place and give tension to the membrane to tension the part to be fixed to the roof membrane fixing panel, insert the roof membrane hole into the bolt of the fixing panel, and then attach the cover (rubber plate, aluminum plate, etc.). To fix it.

여기서 사용되는 종래의 인장장치는, 막에 미리 뚫어진 구멍에 인장기구를 걸어 인장시키는 방법으로 균일하지 않은 인장으로 인하여 막이 찢어지거나 손상되는 경우가 발생하였다.In the conventional tensioning apparatus used here, the membrane is torn or damaged due to uneven tensioning by tensioning a tensioning mechanism in a hole pre-drilled in the membrane.

즉, 종래의 막 설치방법에 있어서는 막을 제단후 미리 고정할 구멍을 형성시키고, 인장작업시 미리 막에 뚫은 구멍을 이용하여 인장하게 되어 근본적으로 막의 손상을 방지할 수가 없었다.That is, in the conventional membrane installation method, holes are formed to be fixed in advance after the membrane is cut, and the membranes are tensioned by using holes previously drilled in the membrane during tensioning, so that damage to the membrane cannot be fundamentally prevented.

일단 막이 손상되면 전체를 새것으로 교체해야 하므로 경제적 손실이 크고, 재시공에 따른 공사기간의 연장되는 등의 문제를 가져왔다.Once the membrane is damaged, the whole must be replaced with a new one, resulting in high economic losses and prolonging the construction period due to reconstruction.

본 발명은 상기와 같은 사정을 감안하여 창안된 것으로, 지붕막의 설치가 용이하고, 시공기간이 단축되며, 유지보수가 쉽고 지붕막의 손상이 전혀 안가는 지붕막의 인장 설치구조 및 그 시공방법을 제공함에 그 목적이 있다.The present invention was devised in view of the above circumstances, and provides a roof membrane tension installation structure and a construction method thereof, in which the roof membrane is easily installed, the construction period is shortened, maintenance is easy, and the roof membrane is not damaged at all. There is a purpose.

상기의 목적을 달성하기 위한 본 발명의 지붕막 인장 설치구조에 따르면, 해당 지붕막(10)을 구조물에 인장시켜 고정하기 위한 설치 구조로서,According to the roof membrane tension installation structure of the present invention for achieving the above object, as an installation structure for tensioning and fixing the roof membrane 10 to the structure,

상기 지붕막(10)의 테두리에 삽입된 다수의 로드부재(11)와;A plurality of rod members 11 inserted into an edge of the roof membrane 10;

일측에 상기 로드부재(11)가 삽입되도록 절개된 로드삽입구멍(13a)과, 타측에 절개된 너트삽입구멍(13b)을 길이방향으로 갖는 트랙부재(13)와;A track member (13) having a rod insertion hole (13a) cut in such a manner that the rod member (11) is inserted at one side and a nut insertion hole (13b) cut in the other side in a longitudinal direction;

상기 트랙부재(13)의 너트삽입구멍(13b)에 삽입된 복수개의 제1고정너트(14)와;A plurality of first fixing nuts 14 inserted into the nut insertion holes 13b of the track member 13;

상기 트랙부재(13)에 조립된 제1고정너트(14)에 나사 결합된 인장나사축(15)과;A tension screw shaft 15 screwed to the first fixing nut 14 assembled to the track member 13;

상기 인장나사축(15)을 해당 지붕막(10)이 덮여질 구조물의 지지요소에 삽통시킨 후 인장나사축(15)을 적당한 인장력으로 당김시키기 위해 상기 인장나사축(15)에 나사결합된 제2고정너트(16)를 포함한 것을 특징으로 한다.Inserting the tension screw shaft 15 into the support element of the structure to be covered with the roof membrane 10, and then screwing the tension screw shaft 15 to the tension screw shaft 15 so as to pull the tension screw shaft 15 with an appropriate tension. Characterized in that it comprises a two fixing nuts (16).

또한 본 발명에 따른 지붕막의 인장 설치 시공방법으로서,In addition, as a tensile installation construction method of the roof film according to the present invention,

해당 지붕막(10)의 테두리에 적당한 길이를 갖는 로드부재(11)를 적당한 개수로 끼워넣는 단계와;Inserting an appropriate number of rod members 11 having an appropriate length on the edge of the roof film 10;

상기 로드부재(11)가 삽입된 지붕막(10)의 테두리를 트랙부재(13)의 일측에 끼워넣는 단계와;Inserting the edge of the roof membrane (10) into which the rod member (11) is inserted to one side of the track member (13);

트랙부재(13)의 타측에 다수의 제1고정너트(14)를 삽입하고, 이 다수의 제1고정너트(14)에 일정한 길이의 인장나사축(15)을 각기 결합하여 구조물의 지지요소에 삽통시킨 후 각 인장나사축(15)에 제2고정너트(16)를 각기 나사결합으로 조립하는 단계와;A plurality of first fixing nuts 14 are inserted into the other side of the track member 13, and a plurality of tension screw shafts 15 having a predetermined length are respectively coupled to the plurality of first fixing nuts 14 to the supporting elements of the structure. Assembling the second fixing nut 16 to each of the tension screw shafts 15 by threading after insertion;

상기 복수의 제2고정너트(16)의 조임량을 조절하여 해당 지붕막(10)을 전체적으로 인장시키는 단계를 포함한 것을 특징으로 한다.It characterized in that it comprises the step of tensioning the roof film 10 as a whole by adjusting the tightening amount of the plurality of second fixing nuts (16).

도 1은 본 발명의 실시예에 따른 지붕막 시공 상태의 부분 평면도.1 is a partial plan view of a roof membrane construction state according to an embodiment of the present invention.

도 2는 도 1의 A-A선 단면도.2 is a cross-sectional view taken along the line A-A of FIG.

도 3은 본 발명에 적용되는 지붕막에 로드부재를 삽입하는 예시도.Figure 3 is an illustration of inserting the rod member in the roof film applied to the present invention.

도 4는 본 발명에 적용되는 지붕막을 아이볼트를 이용하여 구조물에 펼치는 작업과정을 설명한 도면.Figure 4 is a view for explaining the operation process of unfolding the roof film applied to the structure to the structure using an eye bolt.

도 5는 본 발명에 적용되는 트랙부재를 연결부재로 연결한 상태를 나타내는 도면.5 is a view showing a state in which the track member is applied to the connection member applied to the invention.

도 6은 본 발명에 따른 지붕막 인장 설치구조의 분리사시도.Figure 6 is an exploded perspective view of the roof membrane tensioning structure according to the invention.

<도면의 주요 부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 지붕막 10a : 포켓10: roof film 10a: pocket

10b : 노치 11 : 로드부재10b: notch 11: rod member

13 : 트랙부재 13a : 로드삽입구멍13 track member 13a rod insertion hole

13b : 너트삽입구멍 13c : 중공부13b: Nut insertion hole 13c: hollow part

14 : 제1고정너트 15 : 인장나사축14: 1st fixing nut 15: tension screw shaft

16 : 제2고정너트 17 : 브래킷16: 2nd fixing nut 17: Bracket

17a : 삽입구멍17a: insertion hole

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 실시예에 따른 지붕막(10) 시공 상태의 부분 평면도로서, 도 1의 A-A선 단면을 나타낸 도 2와 같이 지붕막(10)의 설치 구조는 로드부재(11), 트랙부재(13) 그리고 트랙부재 인장수단을 포함한다.1 is a partial plan view of the construction state of the roof membrane 10 according to the embodiment of the present invention. As shown in FIG. 2 showing the AA line cross section of FIG. 1, the installation structure of the roof membrane 10 includes a rod member 11 and a track. Member 13 and track member tensioning means.

본 발명은 지붕막(10)에 로드부재(11)를 삽입한 후 이 로드부재(11)를 트랙부재(13)에 걸어 트랙부재(13)를 인장수단으로 당김하여 지붕막(10)을 인장시키는설치구조를 갖는다.According to the present invention, the rod member 11 is inserted into the roof membrane 10 and the rod member 11 is hooked on the track member 13 to pull the track member 13 by the tensioning means to tension the roof membrane 10. Has an installation structure.

따라서 상기 지붕막(10)의 테두리에는 로드부재(11)가 삽입될 수 있도록 포켓(10a)이 구비되어 있고, 이 포켓(10a)의 구멍에 다수의 로드부재(11)가 삽입되어 있다. 상기 포켓(10a)에는 로드부재(11)를 중간중간에서 삽입할 수 있도록 일정 폭으로 절개된 노치(10b)가 구비되어 있다.Therefore, a pocket 10a is provided at the edge of the roof membrane 10 so that the rod member 11 can be inserted, and a plurality of rod members 11 are inserted into the holes of the pocket 10a. The pocket 10a is provided with a notch 10b cut in a predetermined width so that the rod member 11 can be inserted in the middle.

상기 로드부재(11)는 본 실시예에서 원형단면이고 탄성력을 갖는 소재 예로, 경질의 수지재로 제작되어 플렉시블한 성질을 갖는다. 따라서 상기 로드부재(11)는 지붕막(10)의 테두리가 곡률로 설치될 경우 그 곡률을 따라 탄성력으로 휨되면서 지붕막(10)을 인장시키게 되어 있다.The rod member 11 is a circular cross-section in the present embodiment and is a material having an elastic force, for example, is made of a hard resin material and has a flexible property. Therefore, the rod member 11 is to be bent by the elastic force along the curvature when the edge of the roof film 10 is installed with a curvature to tension the roof film 10.

상기 트랙부재(13)는 상기 지붕막(10)과 조립되는 부분으로 도 6과 같이 일측에 상기 로드부재(11)를 감싸는 지붕막(10)의 테두리 자켓(10a)부분이 삽입되도록 절개부를 갖는 로드삽입구멍(13a)과, 타측에 또 다른 절개부를 갖는 너트삽입구멍(13b)을 포함하고 있고, 상기 로드삽입구멍(13a)과 너트삽입구멍(13b)은 트랙부재(13)와 같은 길이방향으로 형성되어 있다.The track member 13 is a part assembled with the roof membrane 10 and has a cutout portion to insert the edge jacket 10a portion of the roof membrane 10 surrounding the rod member 11 on one side as shown in FIG. 6. A rod insertion hole 13a and a nut insertion hole 13b having another cutout portion at the other side, wherein the rod insertion hole 13a and the nut insertion hole 13b have the same length direction as the track member 13; It is formed.

그리고 도 2,6과 같이 상기 트랙부재(13)의 너트삽입구멍(13b)에 복수개의 제1고정너트(14)가 삽입되어 있고, 상기 트랙부재(13)에 조립된 제1고정너트(14)에는 인장나사축(15)이 나사 결합되어 있고, 상기 인장나사축(15)은 지붕막(10)이 덮여질 구조물(1)에 입설된 구조물 지지요소(17)에 삽통된 후 제2고정너트(16)에 의해 고정되어 있다.2 and 6, a plurality of first fixing nuts 14 are inserted into the nut insertion holes 13b of the track member 13 and the first fixing nuts 14 assembled to the track member 13. The tension screw shaft (15) is screwed to the shaft, and the tension screw shaft (15) is inserted into the structure support element (17) installed in the structure (1) to be covered with the roof film (10) and then fixed to the second. It is fixed by the nut 16.

따라서 제2고정너트(16)를 잠김시키는 방향으로 조임회전시키면 인장나사축(15)이 직선 이송하고, 인장나사축(15)의 이송력에 의해 트랙부재(13)를 매개로 지붕막(10)이 균일 하중을 받아 인장되게 되어 있다.Accordingly, when the second fixing nut 16 is tightened and rotated in the direction of locking, the tension screw shaft 15 is linearly transferred, and the roof film 10 is transported through the track member 13 by the feed force of the tension screw shaft 15. ) Is tensioned under uniform load.

이때 지붕막(10)이 받는 인장력은 제2고정너트(16)를 얼마 만큼 조임시켜 체결 이송량을 증가시키느냐에 따라 결정된다.At this time, the tensile force received by the roof membrane 10 is determined by how much the second fixing nut 16 is tightened to increase the amount of fastening transfer.

여기서 구조물(1)의 지지요소는 상기 인장나사축(15)이 삽통되는 삽입구멍 (17a)을 갖는 브래킷(17)이 되거나 구조물(1)의 어느 한 부분이 될 수 있다.The support element of the structure 1 can here be a bracket 17 having an insertion hole 17a into which the tension screw shaft 15 is inserted or can be any part of the structure 1.

그리고 상기 트랙부재(13)에는 로드삽입구멍(13a)과 너트삽입구멍(13b)과의 사이에 크랙부재(13)의 강성을 높이기 위해 길이방향으로 관통된 중공부(13c)가 더 형성될 수 있다.In addition, the track member 13 may further include a hollow portion 13c penetrated in the longitudinal direction to increase the rigidity of the crack member 13 between the rod insertion hole 13a and the nut insertion hole 13b. have.

이와 같은 인장 설치구조를 갖는 지붕막의 시공방법을 설명한다.The construction method of the roof film which has such a tension installation structure is demonstrated.

본 실시예에서는 지붕막(10)을 철골구조물의 지붕에 설치할 경우이다.In this embodiment, the roof membrane 10 is installed on the roof of the steel structure.

먼저, 도 4와 같이 해당 지붕막(10)이 말아진 상태에서 구조물(1)의 설치부위측에 올려지면 지붕막(10)의 포켓(10a)내에 삽입된 로드부재(11) 부분을 도 6과 같이 트랙부재(13)의 로드삽입구멍(13a)에 삽입시키고, 트랙부재(13)의 너트삽입구멍(13b)에 제1고정너트(14)를 다수개 삽입한다.First, as shown in FIG. 4, when the roof membrane 10 is rolled up and placed on the installation site of the structure 1, the rod member 11 inserted into the pocket 10a of the roof membrane 10 is illustrated in FIG. 6. As described above, the rod insertion hole 13a of the track member 13 is inserted, and a plurality of first fixing nuts 14 are inserted into the nut insertion hole 13b of the track member 13.

이때 다수의 로드부재(11)를 지붕막(10)에 하나씩 삽입하는 작업과 로드부재 (11)를 트랙부재(13)에 연결하는 작업은 현장 여건에 따라 지붕막(10)을 구조물 위에 올리기 전에 하거나 또는 구조물 위에 올려놓은 상태에서 작업할 수 있다.At this time, the operation of inserting the plurality of rod members 11 into the roof membrane 10 one by one and the operation of connecting the rod member 11 to the track member 13 may be performed before the roof membrane 10 is placed on the structure according to the site conditions. Or work on the structure.

예를 들어, 현장 여건에 따른 작업 공간이 넓을 경우에는 지붕막(10)을 올려놓고 로드부재(11)의 삽입 작업과 트랙부재(13)의 연결작업을 할 수 있고, 비교적좁은 공간인 경우에는 지붕막(10)을 올려놓기 전에 미리 로드부재(11)의 삽입작업과 트랙부재(13)의 연결작업을 완료해 놓을 수 있다.For example, when the work space is large according to the site conditions, the roof membrane 10 may be placed and the rod member 11 may be inserted and the track member 13 may be connected to each other. Before the roof membrane 10 is placed, the insertion work of the rod member 11 and the connection work of the track member 13 may be completed in advance.

그리고 이웃한 트랙부재(13)(13)간의 연결이 필요할 경우에는 도 5와 같이 트랙부재(13)(13)간의 대향하는 부분에 일정한 길이와 사각단면 형상을 갖는 연결부재(18)를 트랙부재(13)(13)의 너트삽입구멍(13b)에 끼워넣어 이웃한 트랙부재 (13)(13)간의 연속된 선형연결을 가능하게 할 수 있다.When the connection between the adjacent track members 13 and 13 is necessary, as shown in FIG. 5, the connecting member 18 having a predetermined length and a square cross-sectional shape at the opposite portion between the track members 13 and 13 is provided as a track member. It can be inserted into the nut insertion hole 13b of (13) and (13) to enable continuous linear connection between adjacent track members (13) and (13).

다음, 제1고정너트(14)에 도 4와 같이 아이볼트(20)를 체결한 후 아이볼트 (20)에 로프(22)를 걸어 인력 또는 기계적으로 잡아당긴다. 이는 지붕막(10)을 서로 마주 보는 방향에서 작업이 이루어진다.Next, after the eye bolt 20 is fastened to the first fixing nut 14 as shown in FIG. 4, the rope 22 is hooked on the eye bolt 20 to pull force or mechanically. This is done in the direction facing the roof film 10 to each other.

이같이 하여 지붕막(10)이 어느 정도 구조물(1)의 고정위치에 가까이 도달되면 또 다른 제1고정너트(14)에 인장나사축(15)을 체결하여 구조물(1)의 지지요소 (17)에 제2고정너트(16)로 고정한다. 이는 지붕막(10)의 전둘레를 돌아가며 인장나사축(15)과 제2고정너트(16)를 조립하여 이루어진다.In this way, when the roof membrane 10 reaches a certain position closer to the fixing position of the structure 1, the tension screw shaft 15 is fastened to another first fixing nut 14 to support the element 17 of the structure 1. To the second fixing nut (16). This is achieved by assembling the tension screw shaft 15 and the second fixing nut 16 around the entire circumference of the roof membrane 10.

그리고 각 제2고정너트(16)를 전동공구 또는 일반적 수동공구로 조임하면, 도 2의 화살표 방향에서와 같이 인장나사축(15)은 후방으로 이동하면서 트랙부재 (13)에 연결된 지붕막(10)이 전체적으로 팽팽하게 인장 설치된다.Then, when each second fixing nut 16 is tightened with a power tool or a general manual tool, as shown in the arrow direction of FIG. 2, the tension screw shaft 15 moves backward and the roof membrane 10 connected to the track member 13. ) Is tensioned overall.

이때 본 발명은 트랙부재(13)가 전 길이에 걸쳐 지붕막(10)을 잡아당기게 되므로 종래와 같이 지붕막에 구멍을 뚫어 잡아당기는 방식에 비해 막의 손상을 방지할 수 있는 것이다.At this time, the track member 13 is to pull the roof membrane 10 over the entire length, so that it is possible to prevent damage to the membrane as compared to the method of drilling a hole in the roof membrane as in the prior art.

이후 본 발명은 상기 인장나사축에 비해 강도와 부식이 뛰어난 예로 스테인레스 재질의 나사축(15)으로 도 2와 같이 교체하면 시공성을 더욱 뛰어나게 마감할 수 있다.Since the present invention, as shown in Figure 2 replaced with a screw shaft 15 made of stainless steel as an excellent strength and corrosion as compared to the tensile screw shaft can be finished more excellent workability.

한편, 본 시공방법에서 인장나사축(15)은 단계적으로 장축에서 단축으로 변경되면서 조립될 수 있다. 이는 최초에 지붕막(10)이 구조물의 고정위치까지의 거리 또는 인장나사축(15)의 후방측 구조물의 구조에 따라 결정된다. 예로, 최초에 지붕막(10)의 테두리로부터 구조물의 고정위치가 대략 50㎝정도의 간격을 가질 때 이 보다 긴 인장나사축을 사용하며 어느 정도 인장나사축이 당김되고 지붕막 테두리와 구조물의 고정위치가 일률적으로 가까워졌을 경우(대략 20∼30㎝정도) 이를 절단하는 방법을 사용하거나 단축의 인장나사축과 교체될 수 있다.On the other hand, the tension screw shaft 15 in the present construction method can be assembled while changing from the long axis to the short axis in stages. This is initially determined according to the distance of the roof membrane 10 to the fixed position of the structure or the structure of the structure behind the tension screw shaft 15. For example, when the fixing position of the structure is spaced approximately 50 cm from the edge of the roof membrane 10, a longer tension screw shaft is used, and the tension screw shaft is pulled to some extent, and the fixing position of the roof membrane frame and the structure. If the uniformly close (approximately 20-30 cm) can be cut or replaced with a single-axis tension screw shaft.

본 실시예는 철골 구조물에 한정하여 설명하였으나 본 발명은 각종 공연장, 스포츠구장, 휴게실, 그늘막, 주차장 등의 모든 구조물에 적용이 가능함은 물론이다.Although the present embodiment has been described with reference to steel structures, the present invention is, of course, applicable to all structures, such as various performance halls, sports stadiums, rest rooms, shade, parking lot.

상술한 바와 같이 본 발명에 따르면, 지붕막이 구조물에 시공될 시 간단한 조립식으로 이루어지므로 지붕막의 설치가 용이하고 시공기간이 단축되며 유지보수가 쉬워진다. 또 균등한 인장력으로 지붕막을 잡아당기므로 막의 손상이 전혀 없는 경제성을 제공한다.As described above, according to the present invention, when the roof membrane is constructed on the structure, it is made of a simple assembly type, so the installation of the roof membrane is easy, the construction period is shortened, and the maintenance is easy. In addition, the roof membrane is pulled with an equal tensile force, thereby providing economical without damaging the membrane.

Claims (7)

지붕막(10)을 구조물에 인장시켜 고정하기 위한 설치 구조로서,As an installation structure for fixing the roof membrane 10 to the structure by fixing, 상기 지붕막(10)의 테두리에 삽입된 다수의 로드부재(11)와;A plurality of rod members 11 inserted into an edge of the roof membrane 10; 일측에 상기 로드부재(11)가 삽입되도록 절개된 로드삽입구멍(13a)과, 타측에 절개된 너트삽입구멍(13b)을 길이방향으로 갖는 트랙부재(13)와;A track member (13) having a rod insertion hole (13a) cut in such a manner that the rod member (11) is inserted at one side and a nut insertion hole (13b) cut in the other side in a longitudinal direction; 상기 트랙부재(13)의 너트삽입구멍(13b)에 삽입된 복수개의 제1고정너트(14)와;A plurality of first fixing nuts 14 inserted into the nut insertion holes 13b of the track member 13; 상기 트랙부재(13)에 조립된 제1고정너트(14)에 나사 결합된 인장나사축(15)과;A tension screw shaft 15 screwed to the first fixing nut 14 assembled to the track member 13; 상기 인장나사축(15)을 해당 지붕막(10)이 덮여질 구조물의 지지요소에 삽통시킨 후 인장나사축(15)을 적당한 인장력으로 당김시키기 위해 상기 인장나사축 (15)에 나사결합된 제2고정너트(16)를 포함한 것을 특징으로 하는 지붕막의 인장 설치구조.Inserting the tension screw shaft 15 into the support element of the structure to be covered with the roof membrane 10 and then screwing the tension screw shaft 15 to the tension screw shaft 15 so as to pull the tension screw shaft 15 with an appropriate tension. Tension mounting structure of the roof membrane, characterized in that it comprises a fixing nut (16). 제 1항에 있어서,The method of claim 1, 상기 로드부재(11)는, 지붕막(10)의 테두리의 곡률을 감안하여 탄성력을 갖는 것을 특징으로 하는 지붕막의 인장 설치구조.The rod member 11 has a tensile installation structure of the roof membrane, characterized in that it has an elastic force in consideration of the curvature of the edge of the roof membrane (10). 제 1항에 있어서,The method of claim 1, 상기 구조물의 지지요소는 상기 인장나사축(15)이 삽통되는 삽입구멍(17a)을 갖는 브래킷(17)임을 특징으로 하는 지붕막의 인장 설치구조.And the supporting element of the structure is a bracket (17) having an insertion hole (17a) into which the tension screw shaft (15) is inserted. 제 1항에 있어서,The method of claim 1, 상기 트랙부재(13)에는 로드삽입구멍(13a)과 너트삽입구멍(13b)과의 사이에 강성을 고려하여 길이방향으로 관통된 중공부(13c)가 더 형성되어 있는 것을 특징으로 하는 지붕막의 인장 설치구조.The track member 13 is further provided with a hollow portion 13c penetrating in the longitudinal direction in consideration of rigidity between the rod insertion hole 13a and the nut insertion hole 13b. Installation structure. 제 1항에 있어서,The method of claim 1, 상기 지붕막(10)의 테두리에는 포켓(10a)이 형성되고, 이 포켓(10a)에는 상기 트랙부재(13)를 삽입하기 위해 중간중간에 절개된 노치(10b)가 형성되어 있는 것을 특징으로 하는 지붕막의 인장 설치구조.A pocket 10a is formed at the edge of the roof membrane 10, and the pocket 10a is formed with a notch 10b cut in the middle to insert the track member 13 therein. Tensile installation structure of roof membrane. 구조물에 해당 지붕막을 인장시켜 시공하기 위한 설치방법으로서,As an installation method for tensioning and constructing the roof membrane on a structure, 해당 지붕막(10)의 테두리에 적당한 길이를 갖는 로드부재(11)를 적당한 개수로 끼워넣는 단계와;Inserting an appropriate number of rod members 11 having an appropriate length on the edge of the roof film 10; 상기 로드부재(11)가 삽입된 지붕막(10)의 테두리를 트랙부재(13)의 일측에 끼워넣는 단계와;Inserting the edge of the roof membrane (10) into which the rod member (11) is inserted to one side of the track member (13); 트랙부재(13)의 타측에 다수의 제1고정너트(14)를 삽입하고, 이 다수의 제1고정너트(14)에 일정한 길이의 인장나사축(15)을 각기 결합하여 구조물의 지지요소에 삽통시킨 후 각 인장나사축(15)에 제2고정너트(16)를 각기 나사결합으로 조립하는 단계와;A plurality of first fixing nuts 14 are inserted into the other side of the track member 13, and a plurality of tension screw shafts 15 having a predetermined length are respectively coupled to the plurality of first fixing nuts 14 to the supporting elements of the structure. Assembling the second fixing nut 16 to each of the tension screw shafts 15 by threading after insertion; 상기 복수의 제2고정너트(16)의 조임량을 조절하여 해당 지붕막(10)을 전체적으로 인장시키는 단계를 포함한 것을 특징으로 하는 지붕막의 인장 설치 시공구조.Tensile installation structure of the roof membrane comprising the step of tensioning the roof membrane 10 as a whole by adjusting the tightening amount of the plurality of second fixing nuts (16). 제 6항에 있어서,The method of claim 6, 상기 인장단계 후에 상기 인장나사축(15)보다 상대적으로 경하고 부식에 강한 짧은 반영구적인 영구나사축(18)을 인장나사축(15)과 하나하나씩 교체하면서 인장 시공작업을 마무리하는 것을 특징으로 하는 지붕막의 인장 설치 시공구조.After the tensioning step, the semi-permanent permanent screw shaft 18, which is relatively harder than the tension screw shaft 15 and resistant to corrosion, is replaced one by one with the tension screw shaft 15, thereby finishing the tension construction work. Tensile installation construction structure of roof membrane.
KR10-2001-0063233A 2001-10-13 2001-10-13 Roof tent tension mounting structure and its building method KR100434864B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0063233A KR100434864B1 (en) 2001-10-13 2001-10-13 Roof tent tension mounting structure and its building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0063233A KR100434864B1 (en) 2001-10-13 2001-10-13 Roof tent tension mounting structure and its building method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020010031296U Division KR200261575Y1 (en) 2001-10-13 2001-10-13 Roof tent tension mounting structure

Publications (2)

Publication Number Publication Date
KR20030031304A true KR20030031304A (en) 2003-04-21
KR100434864B1 KR100434864B1 (en) 2004-06-07

Family

ID=29564545

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0063233A KR100434864B1 (en) 2001-10-13 2001-10-13 Roof tent tension mounting structure and its building method

Country Status (1)

Country Link
KR (1) KR100434864B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100915800B1 (en) * 2008-08-11 2009-09-08 주식회사 동아스트 Apparatus for adjusting tention of membrane structure
KR20160011333A (en) 2014-07-21 2016-02-01 주식회사 타이가 Joint System Of Membrane Structures

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4581860A (en) * 1985-06-20 1986-04-15 Berger Horst L Saddle-shaped cable dome system for large span lightweight roof structures
JPH06346636A (en) * 1993-06-11 1994-12-20 Sanken Kogyo Kk Method for fixing membrane material
JP2808079B2 (en) * 1994-06-24 1998-10-08 太陽工業株式会社 Membrane tension introduction structure
JPH09328932A (en) * 1996-06-10 1997-12-22 Taisei Corp Device for granting tension to outer membrane of double membrane structure
JPH10311168A (en) * 1997-05-14 1998-11-24 Taiyo Kogyo Kk Membrane body fixing jig
KR100397625B1 (en) * 2001-05-25 2003-09-13 (주)케이돔엔지니어링 Roof tent tension device and dome roof tent mounting method used it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100915800B1 (en) * 2008-08-11 2009-09-08 주식회사 동아스트 Apparatus for adjusting tention of membrane structure
KR20160011333A (en) 2014-07-21 2016-02-01 주식회사 타이가 Joint System Of Membrane Structures

Also Published As

Publication number Publication date
KR100434864B1 (en) 2004-06-07

Similar Documents

Publication Publication Date Title
US6161339A (en) Structural tie-down apparatus
US10053863B2 (en) Multi-purpose anchor devices
US6430888B1 (en) Aluminum framing components and component systems for pool, patio and glass enclosures and the like
EP0496616B1 (en) Security closure
EP3775383A1 (en) A pipe and a method for stay cable provided with stressing means
KR100434864B1 (en) Roof tent tension mounting structure and its building method
US6935025B1 (en) Tower reinforcement apparatus and methods
KR200261575Y1 (en) Roof tent tension mounting structure
US6973755B2 (en) Column to structure attachment device
JP2011043025A (en) Method for reinforcing structure using tensional material
US11028595B2 (en) Systems and methods for attaching fabric panels to structures
KR100388079B1 (en) Single cross-arm on the electric-pole
US9885174B2 (en) Sound abatement system and method
KR200242616Y1 (en) Wire fence
KR100457650B1 (en) Bidirectional wire tension device
KR100397625B1 (en) Roof tent tension device and dome roof tent mounting method used it
KR200246333Y1 (en) Roof tent tension device
JPH08134850A (en) Falling preventive device for sound-insulating and windbreak wall board
EP1556565B1 (en) Connection system between electrically welded panels and supporting poles particularly for enclosures
KR20150012188A (en) Timbering site using customized prestressed device and method using this construction method
KR200343576Y1 (en) S.T.I-Beam : Self Tension and Insert Beam
JP2019078037A (en) Terminal end holding tool
KR200257224Y1 (en) Device for reinforcing construction using a tension force of wires
KR200267465Y1 (en) A method of prefab construction for steel house and steel frame
JP2592768B2 (en) How to install diagonal cable

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
J121 Written withdrawal of request for trial
LAPS Lapse due to unpaid annual fee
R401 Registration of restoration
LAPS Lapse due to unpaid annual fee
R401 Registration of restoration
J204 Invalidation trial for patent
J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20130201

Effective date: 20131029

FPAY Annual fee payment

Payment date: 20140527

Year of fee payment: 11

J301 Trial decision

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20140305

Effective date: 20140724

FPAY Annual fee payment

Payment date: 20150526

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20170504

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20181128

Year of fee payment: 15

LAPS Lapse due to unpaid annual fee