KR20030005790A - Business management system - Google Patents

Business management system Download PDF

Info

Publication number
KR20030005790A
KR20030005790A KR1020010041243A KR20010041243A KR20030005790A KR 20030005790 A KR20030005790 A KR 20030005790A KR 1020010041243 A KR1020010041243 A KR 1020010041243A KR 20010041243 A KR20010041243 A KR 20010041243A KR 20030005790 A KR20030005790 A KR 20030005790A
Authority
KR
South Korea
Prior art keywords
plan
work
individual
business
performance
Prior art date
Application number
KR1020010041243A
Other languages
Korean (ko)
Inventor
이재은
조영훈
홍선희
Original Assignee
쌍용정보통신 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 쌍용정보통신 주식회사 filed Critical 쌍용정보통신 주식회사
Priority to KR1020010041243A priority Critical patent/KR20030005790A/en
Publication of KR20030005790A publication Critical patent/KR20030005790A/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: A system for managing a business is provided to increase the productivity and the efficiency of the business through individual man/hour management. CONSTITUTION: The system comprises a plan setting and business allotting part(100), an internal processing part(200), an analysis/estimation part(300) and other system(400) linked with the system. The plan setting and business allotting part(100) manages an individual daily plan and the achievement, the personal information, the job information, and a business code written as a standard of the business, the activity and the job. The internal processing part(200) analyzes and stores the progress by receiving the information for the plan and the achievement, processes an approval and an examination opinion of a middle manager and an arbitrator, and generates and stores the business achievement by collecting the individual achievement of each organization and business. The analysis/estimation part(300) analyzes and estimates the achievement to the plan of each organization, individual and business by using the information for the plan, the achievement and the individual progress, and shows the information graphically.

Description

업무관리 시스템 {Business management system}Business management system

본 발명은 업무관리 시스템에 관한 것으로서, 특히 업무실적 및 생산성을 향상시킬 수 있는 업무관리 시스템에 관한 것이다.The present invention relates to a work management system, and more particularly, to a work management system that can improve work performance and productivity.

현재의 업무관리는 사람에 의한 개인의 문서관리 위주로 수행하고 있어 계획에 대한 실적비교가 어렵고, 개인에 대한 진척율 체크에 있어서도 구두 또는 문서에 의한 관리 형태를 취하고 있다.Current work management is focused on the management of individual documents by humans, making it difficult to compare performance against plans, and taking the form of oral or written management in checking progress rates for individuals.

특히, 기존의 WBS(Work Break-down Structure: 작업분류체계)에 의한 개인별관리는 프로젝트인 경우에 업무에만 한정을 두고 있고, 시간에 대한 포인트를 체크할 수 없었으며, 각 업무에 대한 소요 시간 및 개인에 대한 능력을 제대로 평가할 수 없었다. 또한, 관리 조직인 경우에 업무에 대한 설정이 미흡하여 당해 년도에 대한 사업 수립이 어렵고, 계획에 대한 진척율 및 실적 비교가 제대로 이루어지고 있지 않으며, 개선에 대한 전략이 미흡한 형편이다.In particular, personal management by the existing WBS (Work Break-down Structure) is limited only to tasks in the case of projects, and points cannot be checked for time, and the time required for each task and The ability to the individual could not be properly assessed. In addition, in the case of a management organization, it is difficult to establish a business for the year due to the lack of work setting, and the progress rate and performance comparison of the plan are not performed properly, and the strategy for improvement is insufficient.

이와 같이, 상기 종래의 업무관리방식은 업무 분장이 적절히 이루어지지않으며, 이로 인하여 인건비, 관리비용이 과다로 소요되고 개인별 능력 평가를 위한 기준 수립이 어렵다는 단점을 가진다.As described above, the conventional work management method has a disadvantage in that work division is not properly made, and thus, labor cost and management cost are excessively established and it is difficult to establish a criterion for evaluating individual capabilities.

도 4는 종래의 업무관리 방법을 설명하는 도면이다.4 is a view for explaining a conventional work management method.

먼저, 조직 및 프로젝트팀은 각각 사업계획과 추진계획을 수립하게 되는데, 예를 들어 1년간의 실적을 측정하기 위하여 인력의 진척율 및 투입계획을 수기로 작성하여 사업 계획 및 추진계획에 반영하고 그 자료를 해당 부서에 제출한다. 상기 해당부서는 각 팀의 자료를 수집후 통합된 문서를 작성하여 최고 경영진에게 제출할 자료를 정리하여 보고서 형태로 작성보고 한다.First, the organization and the project team establish a business plan and a promotion plan, respectively. For example, in order to measure the performance of one year, the progress rate and input plan of the workforce are written by hand and reflected in the business plan and the promotion plan. Submit data to the appropriate department. The department collects the data from each team, prepares an integrated document, and prepares and reports the data to be submitted to the top management.

다음에, 사업계획 및 추진계획에 의거하여 업무를 수행한다. 팀장 및 PM(프로젝트 관리자)은 세부 절차의 수립을 위하여 그 내용을 팀원들에게 구두 및 문서의 공람으로 공지한다. 당면한 작업에 대하여 팀원들은 중간검토없이 산출물을 작성하여 보고하고, 수정사항에 대하여 시간 및 일정/진척에 대한 상황을 구두 및 문서에 의해 처리한다. 중간 산출물 검토시 산출물 취합에 있어 산재되어 있는 산출물을 수기로 정리하여 보고서를 작성하고 결과에 대한 위험요인 발생시 구두 및 수기로 정리하여 보고서를 작성하고 다음 일정의 수립에 대한 과정을 문서로 작성하여 공고한다.Next, work is carried out according to the business plan and the promotion plan. The team leader and the project manager (PM) will notify the team members by verbal and documentary presentation of the contents for the establishment of detailed procedures. In the face of immediate work, team members produce and report deliverables without interim review, and deal with the time and schedule / progress of the modifications verbally and in writing. When reviewing intermediate outputs, prepare a report by organizing outputs interspersed in collecting outputs, orally and handwriting in case of risk factors for results, and document the process for the establishment of the next schedule. do.

마지막으로, 최종 산출물 및 연간 결과보고시 산재되어 있는 자료들을 수집하고 누락된 자료에 대한 수정 작업을 실시한다. 상기 최종 산출물 및 경과 보고자료는 취합팀에서 정리하여 임원 및 경영진에게 제출된다. 또한, 계획 대비 실적에 대한 평가는 문서에 의하여 수기로 정리한후 제출한다.Finally, the data gathered during the final output and annual reporting are collected and corrected for missing data. The final deliverables and progress report are collected by the team and submitted to the executives and management. In addition, the evaluation of the performance against the plan shall be submitted after the document is written by hand.

상기한 방식은 업무수행시 산출물에 대한 내용이 전혀 알 수 없는 블랙 박스화 형태를 가지며, 수행에 대한 결과만 알 수 있기 때문에 검토의 기능이 미약하고, 수행시간이 길고 재작업이 많아지며, 위험에 대한 대처 능력이 부족하다는 단점을 가진다.The above method has a black boxed form in which the output of the work is not known at all, and only the result of the performance is known, so the function of the review is weak, the execution time is long, the rework is large, and the risk is high. It has the disadvantage of lacking coping ability.

본 발명은 상기한 과제를 해결하기 위한 것으로, 본 발명의 목적은 개인별 M/H(Man/Hour: 시간당 인건비) 관리를 통하여 생산성 향상과 업무의 효율성을 증대시키는 것이다.The present invention is to solve the above problems, an object of the present invention is to increase productivity and efficiency of work through the management of individual M / H (hours per hour labor).

상기한 목적은 개인별 일일 계획과 실적을 관리하고, 개인정보와 직무정보를 관리하며, 업무, 활동, 작업의 기준으로 작성된 업무코드를 관리하는 계획설정 및 업무할당부; 상기 계획과 실적에 대한 정보를 입력받아 진척율을 분석저장하고, 중간 관리자 및 조정자의 승인 및 검토의견을 처리하고, 상기 개인별 진척율을 조직과 업무별로 취합하여 사업실적으로 생성하고 처리하는 내부 처리부; 및 상기 계획, 실적 및 개인별 진척율에 관한 정보를 이용하여 조직별, 개인별, 업무별로 계획 대비 실적을 분석하고 평가하는 분석평가부를 포함하는 업무관리 시스템을 제공함으로써 달성된다.The above purpose is to manage the daily plan and results for each individual, to manage personal information and job information, plan setting and task assignment to manage the work code written on the basis of tasks, activities, tasks; The internal processing unit that receives the information on the plan and performance, analyzes and stores the progress rate, processes the approval and review opinions of the middle managers and coordinators, collects the individual progress rates by organization and task, and generates and processes them as business results. ; And an analysis and evaluation unit for analyzing and evaluating the performance of the plan by organization, individual, and task by using the information on the plan, the performance, and the individual progress rate.

상기 내부 처리부는 입력자가 활동 및 작업에 대한 계획과 실적을 입력하면 중간 관리자 및 조정자가 승인여부를 입력자에게 전달하는데, 중간 관리자 및 조정자가 승인한 경우에는 산출물 리파지토리에 등록하고 그렇지 않은 경우에는 재작업을 요청하는 것을 특징으로 한다.The internal processing unit, if the inputter enters the plan and performance for the activities and tasks, the intermediary manager and coordinator delivers the approval to the inputter. If the intermediary manager and coordinator approves, the internal processing unit registers in the output repository. It is characterized by requesting work.

또한, 상기 분석평가부는 상기 계획, 실적 및 개인별 진척율에 따라 입력자의 점수를 산출하고, 일에 대한 우선 순위를 정의하며, 상기 점수와 우선순위에 의하여 작업에 대한 시간을 정의하여 각각의 입력자에게 공지하는 것을 특징으로 한다.In addition, the analysis and evaluation unit calculates the score of the inputter according to the plan, performance and individual progress rate, define the priority for work, and define the time for the task based on the score and priority for each inputter Characterized in that known to.

도 1은 본 발명의 업무관리 시스템의 기본 구성을 나타낸 도면.1 is a view showing the basic configuration of the work management system of the present invention.

도 2는 도 1에 따른 시스템의 내부 흐름도.Figure 2 shows an internal flow diagram of the system according to figure 1;

도 3은 본 발명에 따른 업무관리 방법을 설명하는 흐름도.3 is a flowchart illustrating a work management method according to the present invention.

도 4는 종래의 관리부서 및 프로젝트팀의 업무관리 방법을 설명하는 도면.4 is a view for explaining a business management method of a conventional management department and a project team.

※ 도면의 주요부분에 대한 부호의 설명 ※※ Explanation of code about main part of drawing ※

100 : 계획설정 및 업무할당부 200 : 내부처리부100: plan set up and work assignment 200: internal processing

300 : 분석평가부300: Analysis and Evaluation Department

이하, 본 발명의 실시 형태를 도면을 이용하여 상세히 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, embodiment of this invention is described in detail using drawing.

도 1은 본 발명의 업무관리 시스템의 기본 구성을 나타낸 도면이다.1 is a view showing the basic configuration of the work management system of the present invention.

도 1에서, 본 발명의 업무관리 시스템은 계획설정 및 업무할당부(100), 내부처리부(200), 분석평가부(300) 및 상기 업무관리 시스템과 연동하는 타시스템(400)으로 구성되어 있다.In FIG. 1, the work management system of the present invention is composed of a plan setting and work assignment unit 100, an internal processing unit 200, an analysis and evaluation unit 300, and other systems 400 interworking with the work management system. .

계획설정 및 업무할당부(100)는 개인별 일일 계획과 실적을 관리하고, 개인정보와 직무정보를 관리하며, 업무, 활동, 작업의 기준으로 작성된 업무코드를 관리한다.The plan setting and task allocation unit 100 manages individual daily plans and performances, manages personal information and job information, and manages work codes created based on tasks, activities, and tasks.

내부 처리부(200)는 상기 계획과 실적에 대한 정보를 입력받아 진척율을 분석저장하고, 중간 관리자 및 조정자의 승인 및 검토의견을 처리하고, 상기 개인별 진척율을 조직과 업무별로 취합하여 사업실적으로 생성하고 처리한다.The internal processing unit 200 receives the information on the plan and performance, analyzes and stores the progress rate, processes the approval and review opinions of the middle manager and the coordinator, and collects the individual progress rate by the organization and the business. Create and process.

분석평가부(300)는 상기 계획, 실적 및 개인별 진척율에 관한 정보를 이용하여 조직별, 개인별, 업무별로 계획 대비 실적을 분석하고 평가하며, 취합된 정보를 조직별, 개인별, 업무별로 계획 대비 실적을 도식화하여 보여준다.The analysis and evaluation unit 300 analyzes and evaluates the performance of the plan by organization, individual, and task by using the information on the plan, the performance, and the progress rate of the individual, and compares the collected information with the plan by organization, individual, and task. Schematically show results.

바람직하게, 본 발명에 따른 업무관리 시스템은 타시스템(400)과의 연동을 원활히 할 수 있는 형태로 구축함으로써 타시스템의 프로젝트 관리, 문서관리, 형상관리, 요구사항관리, 품질관리, 일정/진척 관리와 연동가능하게 구성한다.Preferably, the work management system according to the present invention is built in a form that can be smoothly linked with other systems 400, project management, document management, configuration management, requirements management, quality management, schedule / progress of other systems Configure to interoperate with management.

경영진은 품질 및 경영 방침을 각 프로젝트에 전달하고 계획 및 실적에 대한 결과를 통보받아 시정 및 개선 사항을 전달한다.Management communicates quality and management policies to each project, informs on the results of plans and performances, and delivers corrections and improvements.

팀장 및 PM은 사업계획을 시스템에서 작성하여 등록한다.The team leader and PM prepare and register the business plan in the system.

품질관리자는 팀원정보 및 업무코드직무를 정의하여 시스템에 등록한다. 또한 각 팀원의 진척율을 확인하고 검토요망건에 대하여 검토하여 재작업 또는 완료된 건을 수시로 조회한다.The quality manager defines team member information and job code duties and registers them in the system. In addition, the progress rate of each team member is checked, the review requirements are reviewed, and the reworked or completed cases are frequently inquired.

팀원은 일일 개인에 대한 계획 및 실적을 작성하여 저장하면 익일 완료되지않은 건이 조회되고 차후계획 및 실적을 작성하여 저장한다.When a team member prepares and saves a plan and results for an individual, the incomplete work is searched for the next day.

도 2는 본 발명에 따른 업무관리 시스템의 구체적인 내부 흐름도이다.2 is a detailed internal flowchart of a business management system according to the present invention.

도 2를 참조하면, 사업계획 및 업무 할당부(100)는 조정자(팀장 및 PM)가 사업계획/년간 인력계획/업무 활동 분류를 작성하고 입력자는 작업 ID분류 및 할당하고 일일 계획을 작성하고 실적을 입력할 준비를 한다.Referring to Figure 2, the business plan and task assignment unit 100, the coordinator (team leader and PM) to write the business plan / year manpower planning / business activity classification, the inputter is to classify and assign the work ID, create a daily plan and the performance Prepare to enter.

내부 처리부(200)는 입력자가 활동 및 작업에 대한 산출물을 계획하고 실적치를 입력하면 중간 관리자 및 조정자가 적절여부를 판단하여 입력자에게 전달한다. 중간 관리자 및조정자가 승인한 경우에는 산출물 리파지토리(Repository )에 등록하고 그렇지 않은 경우에는 재작업을 요청한다. 상기 재작업은 산출물이 타당할 때까지 반복처리된다.The internal processing unit 200 when the inputter plans the outputs for the activities and tasks and inputs the performance values, determines whether the middle manager and the coordinator are appropriate and delivers them to the inputter. If approved by the Intermediate Manager and Coordinator, register with the Output Repository, otherwise request rework. The rework is repeated until the output is justified.

분석/평가부(300)는 입력자의 능력에 대한 가치(즉, 점수)를 부여하고, 일에 대한 우선 순위를 정의하고, 개인에 대한 점수와 우선순위에 의하여 작업에 대한 시간을 정의하여 각각의 입력자에게 공지한다. 또한, 개인 및 작업에 대한 진척율 및 인력을 누적하고 누적결과에 대한 통계치를 자동작성한다. 상기 업무, 팀원, 인력에 대한 통계치는 계획 대비 실적 그래프로 제공된다.The analysis / evaluator 300 assigns a value (ie, a score) to the inputter's ability, defines a priority for the work, and defines a time for the work based on the score and the priority for the individual. Notify the inputter. It also accumulates progress rates and personnel for individuals and work, and automatically generates statistics on cumulative results. Statistics for the tasks, team members, and personnel are provided as graphs of performance against plans.

도 3은 본 발명에 따른 업무관리 방법을 설명하는 흐름도이다.3 is a flowchart illustrating a work management method according to the present invention.

도 3에서 알 수 있는 바와 같이, 전체적인 업무흐름은 작업착수 -> 작업진행 -> 완료보고 1 -> 재작업 -> 완료보고 2 -> 작업완료 순으로 진행된다.As can be seen in Figure 3, the overall work flow proceeds in the order of work initiation-> work progress-> completion report 1-> rework-> completion report 2-> work completion.

작업착수Work undertaken

팀장/승인자가 업무지시를 하면(S10), 상기 업무지시에 따라 작업코드를 선택한다(S12). 이때, 작업코드가 등록되어 있지않다면 시스템 관리자에게 새로운 코드 생성을 의뢰할 수 있다.When the team leader / approver gives a work order (S10), the work code is selected according to the work order (S12). At this time, if the work code is not registered, the system administrator can request a new code generation.

작업진행Work in progress

팀원들은 계획/실적일별 타임시트를 작성한다(S14). 여기에서, 상기 팀장/승인자는 팀원의 타임시트 작성 현황을 체크할 수 있다.Team members write a time sheet for planning / performance days (S14). Here, the team leader / approval can check the current state of the team member timesheet.

다음에, 팀원들은 팀장/승인자에게 중간보고를 하게 되는데(S16), 팀장/승인자는 검토후 수정지시가 필요한지의 여부를 결정한다(S18). 만약 중간보고가 불필요하다면 다음 단계로 진행한다.Next, the team members make an interim report to the team leader / approval (S16), and the team leader / approval decides whether a correction instruction is necessary after the review (S18). If no interim report is required, proceed to the next step.

완료보고 1Report complete 1

팀원들은 진척율이 100%에 도달했는지, 다시 말해서 작업진행의 완료 여부를 판단한다(S22). 작업진행이 완료된 경우에는 승인처리를 요청하며(S24), 그렇지않은 경우에는 단계 S14 내지 S22를 반복한다.Team members determine whether the progress rate has reached 100%, that is, whether the work progress is completed (S22). If the work progress is completed, an approval process is requested (S24), otherwise, steps S14 to S22 are repeated.

상기 승인처리 과정에서, 승인처리 여부에 따라 수정지시 반영 단계(S26) 또는 작업 완료(S38)로 진행한다.In the approval process, it proceeds to the correction instruction reflection step (S26) or work completion (S38) according to the approval process.

재작업rework

상기 승인처리 단계(S24)에서 승인이 이루어지지않은 경우에 한하여 재작업이 진행되는데, 상기 작업진행 단계 S14 내지 S18에서와 동일한 방법으로 수행되기 때문에 단계 S28 내지 S32의 자세한 설명은 생략하기로 한다.The rework is performed only when the approval is not made in the approval processing step (S24), and the detailed description of the steps S28 to S32 will be omitted since the work is performed in the same manner as in the work progress steps S14 to S18.

완료보고 2Complete report 2

작업진행의 완료 여부를 판단한후(S34), 작업진행이 완료된 경우에는 승인처리를 요청하며(S24), 그렇지않은 경우에는 단계 S28 내지 S34를 반복한다.After determining whether work progress is completed (S34), if the work progress is completed, an approval process is requested (S24), otherwise, steps S28 to S34 are repeated.

작업완료Work Complete

상기 승인처리 과정에서(S24 또는 S36), 승인처리가 이루어지면 작업은 완료된다.In the approval process (S24 or S36), the work is completed when the approval process is made.

본 발명에 의하면, 사업계획에 의한 실적관리로 팀의 생산성을 향상시킬 수 있고, 일일업무에 대한 계획 대비 실적을 개인별 능력에 따른 업무 부여가 가능하며, 인건비, 관리비 경감 뿐만 아니라 개인별 능력를 평가할 수 있는 기준 수립이 용이하다는 장점을 가진다.According to the present invention, it is possible to improve the productivity of the team by the performance management according to the business plan, to give the task according to the individual ability to the performance compared to the plan for the daily work, and to reduce the labor cost, management cost as well as to evaluate the individual ability It has the advantage of easy establishment of criteria.

Claims (3)

개인별 일일 계획과 실적을 관리하고, 개인정보와 직무정보를 관리하며, 업무, 활동, 작업의 기준으로 작성된 업무코드를 관리하는 계획설정 및 업무할당부;A plan setting and task assignment department that manages individual daily plans and performances, manages personal information and job information, and manages work codes created based on tasks, activities, and tasks; 상기 계획과 실적에 대한 정보를 입력받아 진척율을 분석저장하고, 중간 관리자 및 조정자의 승인 및 검토의견을 처리하고, 상기 개인별 진척율을 조직과 업무별로 취합하여 사업실적으로 생성하고 처리하는 내부 처리부; 및The internal processing unit that receives the information on the plan and performance, analyzes and stores the progress rate, processes the approval and review opinions of the middle managers and coordinators, collects the individual progress rates by organization and task, and generates and processes them as business results. ; And 상기 계획, 실적 및 개인별 진척율에 관한 정보를 이용하여 조직별, 개인별, 업무별로 계획 대비 실적을 분석하고 평가하는 분석평가부를 포함하는 것을 특징으로 하는 업무관리 시스템.And an analysis and evaluation unit for analyzing and evaluating the performance of the plan by organization, individual, and task by using the information about the plan, the performance, and the individual progress rate. 청구항 1에 있어서, 상기 내부 처리부는 입력자가 활동 및 작업에 대한 계획과 실적을 입력하면 중간 관리자 및 조정자가 승인여부를 입력자에게 전달하는데, 중간 관리자 및 조정자가 승인한 경우에는 산출물 리파지토리에 등록하고 그렇지 않은 경우에는 재작업을 요청하는 것을 특징으로 하는 업무관리 시스템.The method according to claim 1, wherein the internal processing unit when the inputter enters the plan and performance for the activities and tasks, the intermediary manager and coordinator to pass the approval to the inputter, if approved by the intermediary manager and coordinator to register in the output repository If not, the work management system, characterized in that for requesting rework. 청구항 1에 있어서, 상기 분석평가부는 상기 계획, 실적 및 개인별 진척율에 따라 입력자의 점수를 산출하고, 일에 대한 우선 순위를 정의하며, 상기 점수와 우선순위에 의하여 작업에 대한 시간을 정의하여 각각의 입력자에게 공지하는 것을 특징으로 하는 업무관리 시스템.The method according to claim 1, wherein the analysis and evaluation unit calculates the score of the inputter according to the plan, performance and individual progress rate, define the priority for work, and define the time for the work based on the score and priority, respectively Work management system, characterized in that notified to the input of the.
KR1020010041243A 2001-07-10 2001-07-10 Business management system KR20030005790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010041243A KR20030005790A (en) 2001-07-10 2001-07-10 Business management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010041243A KR20030005790A (en) 2001-07-10 2001-07-10 Business management system

Publications (1)

Publication Number Publication Date
KR20030005790A true KR20030005790A (en) 2003-01-23

Family

ID=27714252

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010041243A KR20030005790A (en) 2001-07-10 2001-07-10 Business management system

Country Status (1)

Country Link
KR (1) KR20030005790A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100721877B1 (en) * 2005-09-13 2007-05-28 엄현석 System and for management of low level empolyee
KR100787052B1 (en) * 2007-08-03 2008-01-03 대한민국 Portal system for wlb management and operating method using the same
KR100930208B1 (en) * 2009-09-18 2009-12-07 에스케이씨앤씨 주식회사 Project productivity management system and the method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100721877B1 (en) * 2005-09-13 2007-05-28 엄현석 System and for management of low level empolyee
KR100787052B1 (en) * 2007-08-03 2008-01-03 대한민국 Portal system for wlb management and operating method using the same
KR100930208B1 (en) * 2009-09-18 2009-12-07 에스케이씨앤씨 주식회사 Project productivity management system and the method

Similar Documents

Publication Publication Date Title
Durdyev et al. On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures
Reijers et al. Product-based workflow design
Higgins et al. Manufacturing planning and control: Beyond MRP II
Kontio The riskit method for software risk management, version 1.00
US20090292578A1 (en) Articulation Workload Metrics
De Lucia et al. Assessing the maintenance processes of a software organization: an empirical analysis of a large industrial project
US20050027550A1 (en) Process and method for lifecycle digital maturity assessment
US20030130886A1 (en) System and method for establishing automated resource reduction criteria
Kryukov et al. Assessment of transport enterprise readiness for digital transformation
Gowan et al. Earned value management in a data warehouse project
KR20030005790A (en) Business management system
De Project termination practices in Indian industry: a statistical review
Bok et al. Software engineering productivity measurement using function points: a case study
US8538798B2 (en) System of managing change process
US20030130885A1 (en) System and method for resource reduction hierarchical review
Hanley et al. Putting asset data at the heart of organisational decision-making using an Integrated Workplace Management System
Denagama Vitharanage et al. Process improvement benefits realization: insights from an Australian university
Arcentales-Carrion et al. Process mapping and modeling: a theoretical tool analysis
Becker et al. The influence of the economic crisis on the tasks and roles of management accountants
US20220391852A1 (en) Autonomous calendar system and productivity optimizer
Kangari et al. Building construction primary task models
De Lucia et al. Empirical analysis of massive maintenance processes
Sidney Evaluating the adoption of project management tools and techniques in private construction companies in Nigeria
Couzens et al. Strategic information requirements in contract bidding: framework for development of a decision support system
Sinda Setting the target outturn cost in industrial project alliances

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application