KR200298108Y1 - Concrete sheeting for building - Google Patents

Concrete sheeting for building Download PDF

Info

Publication number
KR200298108Y1
KR200298108Y1 KR2020020027731U KR20020027731U KR200298108Y1 KR 200298108 Y1 KR200298108 Y1 KR 200298108Y1 KR 2020020027731 U KR2020020027731 U KR 2020020027731U KR 20020027731 U KR20020027731 U KR 20020027731U KR 200298108 Y1 KR200298108 Y1 KR 200298108Y1
Authority
KR
South Korea
Prior art keywords
formwork
support
spacing
hole
building
Prior art date
Application number
KR2020020027731U
Other languages
Korean (ko)
Inventor
김영숙
Original Assignee
김영숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김영숙 filed Critical 김영숙
Priority to KR2020020027731U priority Critical patent/KR200298108Y1/en
Application granted granted Critical
Publication of KR200298108Y1 publication Critical patent/KR200298108Y1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 세파타이에 의해 그 간격이 유지 고정되어 콘크리트가 주입 양생되도록 하는 건축용 거푸집의 시공 및 철거가 신속하게 이루어질 수 있도록 함으로써 공사의 효율성을 향상시킬 수 있도록 구성된 세파타이가 이용되는 건축용 거푸집에 관한 것이다.The present invention relates to a building formwork that uses a sephaty which is configured to improve the efficiency of construction by allowing construction and dismantling of building formwork that allows the concrete to be injected and cured by the Sepha Tie. will be.

본 고안의 특징에 따르면, 세파타이에 의해 그 간격이 유지 고정되는 거푸집에 있어서, 상기 세파타이의 간격유지구가 지지 결합되는 거푸집의 내측판넬에 상기 간격유지구의 암나사공 단부가 지지되는 받침돌출부가 일체로 연이어 돌출 형성되고, 상기 받침돌출부의 중앙에는 상기 간격유지구와 일직선상으로 연이어 결합 분리되는 몸체볼트가 지나도록 진입공이 관통되게 형성되어 구성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집이 제공된다.According to a feature of the present invention, in the formwork, the spacing is maintained by the Sepha Tie, the supporting protrusions are supported by the end of the female screw hole of the spacing retainer to the inner panel of the formwork is supported by the spacing of the Sepha Tie It is integrally formed to protrude, and the center of the support protrusion is provided with a building formwork is used to form a sepa tie is formed so that the entrance hole is formed so as to pass through the body bolt to be separated in a row in a straight line with the spacing. .

Description

세파타이가 이용되는 건축용 거푸집{CONCRETE SHEETING FOR BUILDING}Construction formwork where Sepha Thai is used {CONCRETE SHEETING FOR BUILDING}

본 고안은 세파타이가 이용되는 건축용 거푸집에 관한 것으로, 보다 상세히는 세파타이에 의해 그 간격이 유지 고정되어 콘크리트가 주입 양생되도록 하는 건축용 거푸집의 시공 및 철거가 신속하게 이루어질 수 있도록 함으로써 공사의 효율성을 향상시킬 수 있도록 구성된 세파타이가 이용되는 건축용 거푸집에 관한 것이다.The present invention relates to a building formwork in which Sepha Tie is used, and more particularly, the construction form and the dismantling of the formwork for the concrete is injected and cured by the Sepha Tie so that the efficiency of construction can be achieved quickly. The present invention relates to a building formwork in which a sephaty is configured to improve.

일반적으로 콘크리트를 타설할 경우에는 대부분 합판이나 철판 등과 같은 다수의 판넬로 레미콘이 채워지는 거푸집을 구성하고, 상기 거푸집을 이루는 패널은 세파타이로 상호 지지 고정하여 상기 거푸집에 체워지는 레미콘의 하중에 의해 거푸집이 벌어지거나 변형되는 것을 방지하게 된다.In general, in the case of pouring concrete, most of the panels form a formwork filled with ready-mixed concrete, such as plywood or iron plate, and the panels forming the formwork are sepatyed and fixed to each other by the load of the ready-mixed concrete. It prevents formwork from spreading or deforming.

이와 같은 기능을 갖는 종래에 세파타이의 구성은 대부분 도 1 및 도 2에 도시한 바와 같이 일정길이를 갖는 봉형상으로 일단부에는 쐐기핀(190)을 삽입할 수 있는 핀공(111)과 콘크리트(10) 타설 후 절단하기 위한 절단홀(112)을 갖는 끼움부(113)가 판형상으로 형성되고 타단부에 암나사공(114)이 형성된 간격유지구(110)와, 일정길이를 갖는 봉형상으로 양단부 외주연에 수나사부(121)(122)가 일정구간 형성된 몸체볼트(120)와, 상기 몸체볼트(120)의 일측 수나사부(122)에 체결되는 고정너트(130)와, 거푸집(200) 사이에 배치되는 간격유지구(110)의 암나사공(114) 단부를 지지하는 것으로 내부에 상기 몸체볼트(120)가 지나는 삽입공(141)이 형성된 받침구(140)로 대략 구성된다.In the conventional Sepha Tie having such a function, most of the configuration is a pin-shaped pin-hole 111 and concrete (1) which can be inserted into the wedge pin 190 at one end in a rod shape having a predetermined length as shown in Figs. 10) Spacing holding part 110 having a cutting hole 112 for cutting after pouring is formed in a plate shape and the female thread hole 114 is formed at the other end, and a rod shape having a predetermined length Male bolts 121 and 122 are formed on the outer circumferential edge of both ends, and the fixing bolt 130 is fastened to the male screw portion 122 of one side of the body bolt 120, and the formwork 200 is formed. Supporting the end of the female thread hole 114 of the spacing holding member 110 disposed therebetween roughly consists of a support hole 140 formed with an insertion hole 141 through which the body bolt 120 passes.

이와 같은 종래 구성의 세파타이를 이용한 건축용 거푸집(200)의 설치는 도 1 및 도 2에 도시한 바와 같이 일측 거푸집(200)에 형성된 구멍(250)을 통해 몸체볼트(120)의 일측 수나사부(121)를 진입시키고, 상기 거푸집(200) 내부로 진입된 몸체볼트(120)의 수나사부(121)에는 받침부를 끼우며, 상기 받침구(140)가 끼워진 몸체볼트(120)의 수나사부(121)에는 간격유지구(110)의 암나사공(114)을 체결하여 상기 몸체볼트(120)와 간격유지구(110)가 일직선상으로 연이어지도록 결합한 다음 상기 몸체볼트(120)의 타단부에 형성된 수나사부(122)에 고정너트(130)를 체결하여 상기 간격유지구(110)의 암나사공(114) 단부가 받침구(140)에 지지되면서 간격유지구(110) 및 몸체볼트(120)가 일측 거푸집(200)에 지지 고정되도록 한다.Installation of the building formwork 200 using the Sepha Tie of the conventional configuration as shown in Figs. 1 and 2 through the hole 250 formed in one formwork 200, one side of the body bolt 120 ( 121 is inserted into the male screw portion 121 of the body bolt 120 entered into the formwork 200, the support portion is inserted, the male screw portion 121 of the body bolt 120 is fitted with the support hole 140. ) Is coupled to the female threaded hole 114 of the spacing holding member 110 so that the body bolt 120 and the spacing holding member 110 are connected in a straight line and then formed on the other end of the body bolt 120. The fixing nut 130 is fastened to the threaded portion 122 so that the end of the female thread hole 114 of the spacer 110 is supported by the support 140 so that the spacer 110 and the body bolt 120 are one side. It is to be fixed to the support (200).

이후 상기 간격유지구(110)의 끼움부(113)를 타측 거푸집(200)에 형성된 구멍(250)에 삽입한 다음 상기 구멍(250)을 통과한 끼움부(113)의 핀공(111)에 쐐기핀(190)을 끼우게되면 거푸집(200)의 고정이 완료된다.Thereafter, the fitting portion 113 of the spacer 110 is inserted into the hole 250 formed in the other formwork 200, and then wedged in the pin hole 111 of the fitting portion 113 passing through the hole 250. When the pin 190 is fitted, the fixing of the formwork 200 is completed.

그러나, 이와 같은 종래의 세파타이를 이용한 거푸집(200)의 설치 작업은 반듯이 일측 거푸집(200)에 먼저 간격유지구(110)와 몸체볼트(120)를 지지 고정하되, 상기 간격유지구(110)의 암나사공(114) 단부가 일측 거푸집(200)에 지지된 받침구(140)에 받쳐진 상태로 지지 고정되도록 한 다음 타측 거푸집(200)에 상기 간격유지구(110)의 끼움부(113)가 고정 결합되도록 함으로써 거푸집(200)을 설치하게되는데, 만약 상기 작업의 순서가 바뀌게되면, 세파타이를 이용한 거푸집(200)의 설치가 불가능할 뿐만 아니라 이들 순서가 바뀌어 작업된 세파타이 및 거푸집(200)을 수정하다 보면 많은 시간과 인력이 낭비됨으로 작업 능률이 저하되는 문제점이 있었다.However, the installation work of the formwork 200 using the conventional Sepha Tie is fixed to the gap retainer 110 and the body bolt 120 first to the one side formwork 200, the gap retainer 110 End of the female thread hole (114) of the one side of the formwork 200 to be supported by the support (140) supported by the fixed state and then to the other side of the formwork 200, the fitting portion 113 of the spacing retainer (110) By installing the fixed form 200 is to be installed, if the order of the work is changed, not only the installation of the formwork 200 using the Sepha Thai, but also the order of the sepatai and formwork 200 is changed work As a result of this modification, a lot of time and manpower was wasted, resulting in a decrease in work efficiency.

또한, 거푸집(200)에 주입된 콘크리트(10)가 양생되어 거푸집(200)을 제거할 경우, 즉 도 3에 도시한 바와 같이 세파타이의 몸체볼트(120)에 체결된 고정너트(130)를 해지한 후 몸체볼트(120)를 간격유지구(110)에서 분리시킨 다음 양생된 콘크리트(10)에서 거푸집(200)을 때어 낼 경우 세파타이의 간격유지구(110)뿐만 아니라 상기 간격유지구(110)를 받쳤던 받침구(140) 역시 콘크리트(10)에 부분적으로 매입되어 떨어지지 않게 되는데, 이러한 받침구(140)를 그대로 방치하게되면 콘크리트(10)의 내구성에 악영향을 미치기 때문에 상기 받침구(140)를 양생된콘크리트(10)에서 별도로 분리 제거하는 작업이 병행되어야 함으로 작업의 시간 및 비용이 불필요하게 낭비하게되어 건축시공의 효율성이 떨어지는 문제점이 있었다.In addition, when the concrete 10 injected into the formwork 200 is cured to remove the formwork 200, that is, as shown in FIG. 3, the fixing nut 130 fastened to the body bolt 120 of the Sepha Tie. After removal, the body bolt 120 is separated from the gap retaining zone 110, and when the formwork 200 is struck from the cured concrete 10, the gap retaining zone 110 of the Sepha Tie as well as the gap retaining zone ( The support hole 140 that was supported by 110 is also partially buried in the concrete 10 so that it does not fall off. If the support hole 140 is left as it is, the support hole may have a bad effect on the durability of the concrete 10 ( Since the separate work of separating and removing 140 from the cured concrete 10 must be performed in parallel, the time and cost of the work are unnecessarily wasted and there is a problem in that the efficiency of the construction work is lowered.

본 고안은 상기한 바와 같은 문제점에 착안하여 제안된 것으로, 그 목적은 받침구가 생략된 세파타이에 의해 그 간격이 유지 고정되어 콘크리트가 주입 양생되도록 하는 건축용 거푸집의 시공 및 철거가 신속하게 이루어질 수 있도록 구성된 세파타이가 이용되는 건축용 거푸집을 제공하고자 하는 것이다.The present invention has been proposed in view of the problems described above, the purpose of which can be quickly made construction and dismantling of the building formwork for the concrete is injected and cured by maintaining the interval by the sephaties without the support. It is to provide a building formwork that is used to sephathai configured so that.

이와 같은 목적을 달성하기 위한 본 고안의 특징에 따르면, 세파타이에 의해 그 간격이 유지 고정되는 거푸집에 있어서, 상기 세파타이의 간격유지구가 지지 결합되는 거푸집의 내측판넬에 상기 간격유지구의 암나사공 단부가 지지되는 받침돌출부가 일체로 연이어 돌출 형성되고, 상기 받침돌출부의 중앙에는 상기 간격유지구와 일직선상으로 연이어 결합 분리되는 몸체볼트가 지나도록 진입공이 관통되게 형성되어 구성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집이 제공된다.According to a feature of the present invention for achieving the above object, in the formwork, the spacing is maintained by the Sepha Tie, the female thread hole of the spacing retaining region on the inner panel of the formwork is supported by the spacing of the Sepha Tie Sepament is formed, the end of the supporting protrusions are integrally formed to protrude continuously, the entrance hole is formed in the center of the supporting protrusions so as to pass through the body bolts to be separated in series and in a straight line with the spacing support. There is provided a building formwork for use.

도 1은 종래에 세파타이가 이용되는 건축용 거푸집을 부분적으로 나타낸 분해 사시도.1 is an exploded perspective view partially showing a building formwork in which the Sepha Tie is conventionally used.

도 2는 종래에 세파타이가 이용되는 건축용 거푸집의 시공 상태를 부분적으로 나타낸 단면도.Figure 2 is a cross-sectional view partially showing the construction state of a building formwork in which a conventional Sepha Tie is used.

도 3은 종래에 세파타이가 이용되는 건축용 거푸집이 양생된 콘크리트에서 이탈되는 모습을 나타낸 단면도.Figure 3 is a cross-sectional view showing a state in which the conventional formwork is used in the concrete form cured concrete is separated.

도 4는 본 고안의 실시예에 의한 세파타이가 이용되는 건축용 거푸집을 부분적으로 나타낸 분해 사시도.Figure 4 is an exploded perspective view partially showing a building formwork used sepatai according to an embodiment of the present invention.

도 5는 본 고안인 세파타이가 이용되는 건축용 거푸집의 시공된 상태를 부분적으로 나타낸 단면도.Figure 5 is a partial cross-sectional view showing the construction of the construction formwork used sepatai the present invention.

도 6은 본 고안인 세파타이가 이용되는 건축용 거푸집이 양생된 콘크리트에서 이탈되는 모습을 나타낸 단면도.Figure 6 is a cross-sectional view showing a state in which the building formwork used sepatai the present invention is separated from the cured concrete.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 콘크리트 110 : 간격유지구10: concrete 110: spacing area

111 : 핀공 112 : 절단홀111: pin hole 112: cutting hole

113 : 끼움부 114 : 암나사공113: fitting 114: female thread

115 : 삽입지지부 120 : 몸체볼트115: insertion support 120: body bolt

121 : 수나사부 122 : 수나사부121: male thread portion 122: male thread portion

130 : 고정너트 140 : 받침구130: fixing nut 140: support hole

141 : 삽입공 190 : 쐐기핀141: insertion hole 190: wedge pin

200 : 거푸집 210 : 내측판넬200: formwork 210: inner panel

220 : 받침돌출부 221 : 진입공220: support protrusion 221: entry hole

222 : 받침요홈 250 : 구멍222: support groove 250: hole

이하 본 고안인 세파타이가 이용되는 건축용 거푸집을 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the building formwork used sepatai the present invention is as follows.

도 4는 본 고안의 실시예에 의한 세파타이가 이용되는 건축용 거푸집을 부분적으로 나타낸 분해 사시도이고, 도 5는 본 고안인 세파타이가 이용되는 건축용 거푸집의 시공된 상태를 부분적으로 나타낸 단면도이다.Figure 4 is an exploded perspective view showing a part of the building formwork used sepathai according to an embodiment of the present invention, Figure 5 is a cross-sectional view showing a part of the construction of the building formwork used sepatai the present invention.

도시한 바와 같이 본 고안은 세파타이에 의해 그 간격이 유지 고정되는 거푸집(200)에 있어서, 상기 세파타이의 간격유지구(110)가 지지 결합되는 거푸집(200)의 내측판넬(210)에 상기 간격유지구(110)의 암나사공(114) 단부가 지지되는 받침돌출부(220)가 일체로 연이어 돌출 형성되고, 상기 받침돌출부(220)의 중앙에는 상기 간격유지구(110)와 일직선상으로 연이어 결합 분리되는 몸체볼트(120)가 지나도록 진입공(221)이 관통되게 형성되어 구성된다.As shown in the present invention in the formwork 200 is the gap is maintained fixed by the Sepha Tie, the spacing support 110 of the Sepha Tie on the inner panel 210 of the formwork 200 is coupled to the support A support protrusion 220 supporting the female threaded hole 114 end of the spacer 110 is integrally formed to protrude continuously, and in the center of the support protrusion 220 in a line with the spacer maintaining 110 in a straight line. The entrance hole 221 is formed so as to pass through the body bolt 120 to be separated.

또한, 경우에 따라서는 상기 거푸집(200)의 받침돌출부(220)에 상기 간격유지구(110)의 암나사공(114) 단부가 삽입되어 지지되는 받침요홈(222)이 형성되어 구성될 수 있다.In addition, in some cases, a support recess 222 may be formed in the support protrusion 220 of the formwork 200 in which an end portion of the female threaded hole 114 of the spacer 110 is inserted and supported.

상기 거푸집(200)의 내측판넬(210)에서 연이어 돌출 형성되는 받침돌출부(220)는 반구형상으로 형성되며, 경우에 따라서는 사각형이나 육각형 등과 같은 다각의 콘형상으로 형성될 수 있다.The protruding protrusion 220 successively protruding from the inner panel 210 of the formwork 200 may be formed in a hemispherical shape, and in some cases, may be formed in a polygonal cone shape such as a quadrangle or a hexagon.

또한, 상기 받침돌출부(220)의 단부에 내측으로 함몰되어 형성되는 받침요홈(222)은 원형상으로 형성되며, 경우에 따라서는 사각이나 육각 등과 같은 다각형상으로 형성될 수 있다.In addition, the support recess 222 formed by recessing inwardly at the end of the support protrusion 220 may be formed in a circular shape, and in some cases, may be formed in a polygonal shape such as a square or a hexagon.

이때, 상기 받침요홈(222)에 삽입 지지되는 간격유지구(110)의 암나사공(114) 단부 역시 원형 또는 사각형이나 육각형과 같은 다각형상으로 형성되며, 경우에 따라서는 상기 받침요홈(222)에 삽입 지지될 수 있도록 상기 간격유지구(110)의 암나사공(114) 단부에 원형이나 다각형상의 삽입지지부(115)가 형성되어 구성될 수 있다.At this time, the end of the female threaded hole 114 of the spacing holder 110 inserted into the support recess 222 is also formed in a polygonal shape such as a circle or a square or a hexagon, and in some cases the support recess 222. An insertion support 115 having a circular or polygonal shape may be formed at an end of the female thread hole 114 of the spacer 110 to be inserted and supported.

본 고안인 세파타이가 이용되는 건축용 거푸집은 대량 생산이 가능한 프레스 가공에 의해 내측판넬(210)에서 받침돌출부(220)가 일체로 연이어 돌출 형성될 수 있도록 철재로 제작되는 것이 바람직하며, 경우에 따라서는 사출에 의해 성형될 수 있는 플라스틱 등과 같은 합성수지로 제작될 수 있다.It is preferable that the formwork for construction using the Sepha Thai of the present invention is made of steel so that the support protrusion 220 can be integrally protruded from the inner panel 210 by press processing capable of mass production. It can be made of a synthetic resin such as plastic that can be molded by injection.

이와 같이 구성된 본 고안인 세파타이가 이용되는 건축용 거푸집의 설치는 다음과 같다.Installation of the formwork for construction is used as the Sephatai invented as described above is as follows.

먼저 일측 거푸집(200) 받침돌출부(220)에 간격유지구(110)의 암나사공(114) 단부를 맞댄 상태에서 상기 거푸집(200)의 받침돌출부(220)에 관통되어 형성된 진입공(221)을 통해 몸체볼트(120)를 진입시켜 간격유지구(110)와 결합한 다음 상기 몸체볼트(120)에 고정너트(130)를 체결하여 일측 거푸집(200)에 간격유지구(110)를 고정한다.First, the entry hole 221 formed by penetrating through the support protrusion 220 of the formwork 200 in the state of facing the end of the female thread hole 114 of the spacing support 110 to the one side formwork 200 support protrusion 220. Through the body bolt 120 to enter through the spacing and holding 110, and then fastening the fixing nut 130 to the body bolt 120 to fix the spacing and holding 110 to one side die (200).

이후 상기 간격유지구(110)의 끼움부(113)에 타측 거푸집(200)의 구멍(250)을 끼운 다음 상기 거푸집(200)의 구멍(250)을 통과한 간격유지구(110)의 핀공(111)에 쐐기핀(190)을 끼워 타측 거푸집(200)에 간격유지구(110)를 지지 고정하면 세파타이를 이용한 거푸집(200)의 설치가 완료된다.After inserting the hole 250 of the other formwork 200 into the fitting portion 113 of the spacing retainer 110, the pin hole of the spacing retainer 110 passed through the hole 250 of the formwork 200 ( 111 is inserted into the wedge pin 190 to support the gap holding hole 110 to the other formwork 200, the installation of the formwork 200 using the Sepha Tie is completed.

또한, 경우에 따라서는 먼저 타측 거푸집(200)의 구멍(250)에 간격유지구(110)의 끼움부(113)를 끼운 다음 상기 거푸집(200)의 구멍(250)을 통과한 간격유지구(110)의 핀공(111)에 쐐기핀(190)을 끼워 타측 거푸집(200)에 간격유지구(110)를 지지 고정한다.In addition, in some cases, first inserting the fitting portion 113 of the gap retaining hole 110 into the hole 250 of the other formwork 200, and then passed through the hole 250 of the formwork 200 The wedge pin 190 is inserted into the pin hole 111 of the 110 to support and fix the gap holding hole 110 to the other formwork 200.

이후 간격유지구(110)의 암나사공(114) 단부에 일측 거푸집(200)의 받침돌출부(220)를 맞댄 다음 상기 거푸집(200)의 받침돌출부(220)에 관통되어 형성된 진입공(221)을 통해 몸체볼트(120)를 진입시켜 간격유지구(110)와 결합한 후 상기 몸체볼트(120)에 고정너트(130)를 체결하여 일측 거푸집(200)에 간격유지구(110)를 지지 고정하면 세파타이를 이용한 거푸집(200)의 설치가 완료된다.Thereafter, against the support protrusion 220 of the one side formwork 200 to the end of the female thread hole 114 of the spacing support 110, and then the entrance hole 221 formed through the support protrusion 220 of the formwork 200 After entering the body bolts 120 through the gap retaining zone 110 and then fastening the fixing nut 130 to the body bolts 120 to support and fix the gap retaining holes 110 to one side of the form 200 sepa Installation of the formwork 200 using the tie is completed.

따라서, 본 고안인 세파타이가 이용되는 건축용 거푸집은 시공의 순서에 관계없이 거푸집(200)을 간편하게 설치할 수 있게된다.Therefore, the building formwork using the Sepha Tie of the present invention can be easily installed the formwork 200 regardless of the order of construction.

또한, 상기와 같이 설치된 거푸집(200) 내에 콘크리트(10)를 주입 양생시키고, 이후 도 6에 도시한 바와 같이 상기 세파타이의 몸체볼트(120)에 체결된 고정너트(130)를 해지한 후 몸체볼트(120)를 간격유지구(110)에서 분리시킨 다음 양생된 콘크리트(10)에서 거푸집(200)을 때어 내게되면, 상기 세파타이의 간격유지구(110) 단부를 지지하고 있던 거푸집(200)의 받침돌출부(220)가 동시에 양생된 콘크리트(10)에서 이탈됨으로 종래와 같이 세파타이의 받침구(140)를 양생된 콘크리트(10) 측면에서 별도로 제거했던 작업을 생략할 수 있게된다.In addition, injecting and curing the concrete 10 in the formwork 200 installed as described above, and then release the fixing nut 130 fastened to the body bolt 120 of the Sepha Tie as shown in Figure 6 the body When the bolt 120 is separated from the spacer 110 and then the mold 200 is removed from the cured concrete 10, the mold 200 supporting the end of the spacer 110 of the Sepha Tie. Since the support protrusion 220 is separated from the cured concrete 10 at the same time, it is possible to omit the work of separately removing the support 140 of the Sepha Tie from the side of the cured concrete 10 as in the prior art.

이상에서 설명한 바와 같은 본 고안인 세파타이가 이용되는 건축용 거푸집은 내측판넬에 세파타이의 간격유지구 단부를 받치는 받침돌출부가 일체로 연이어 돌출 형성되어 있음으로 시공의 순서에 관계없이 세파타이를 이용하여 거푸집의 설치를 간편하게 할 수 있는 효과가 있다.As described above, the building formwork used for the Sepha Tie, which is the present invention, uses a Sepha Tie regardless of the order of construction since the projecting protrusions supporting the end portions of the Sepha Tie are integrally protruded on the inner panel. There is an effect that can simplify the installation of the formwork.

또한, 본 고안은 종래에 세파타이의 간격유지구를 받치던 받침구와 같은 기능을 갖는 받침돌출부가 거푸집의 내측판넬에서 일체로 연이어 돌출 형성되어 있음으로 거푸집 내에 주입되어 양생된 콘크리트에서 거푸집을 때어 낼 경우 상기 간격유지구 단부를 받치고 있던 거푸집의 받침돌출부가 동시에 이탈됨으로 종래와 같이 양생된 콘크리트 측면에서 세파타이의 받침구를 별도로 제거했던 작업을 생략할 수 있음으로 작업의 시간 및 비용을 줄일 수 있어 건축시공의 효율성을 향상시킬 수 있는 효과가 있다.In addition, the present invention is because the support protrusions having the same function as the support hole that previously supported the spacing of the Sepha Tie is formed integrally protruding from the inner panel of the formwork so that the formwork is removed from the cured concrete injected into the formwork. In this case, since the projecting part of the formwork supporting the end portion of the gap is detached at the same time, it is possible to reduce the time and cost of the work by separately removing the support of the Sepha thai support from the cured concrete side as in the prior art. There is an effect that can improve the efficiency of the construction.

또한, 본 고안은 받침구가 생략된 세파타이를 이용하여 거푸집을 설치하게 됨으로 세파타이의 원가를 절감할 수 있으로 거푸집의 설치 및 철거 작업의 편의성 및 효율성을 향상시킬 수 있는 효과가 있다.In addition, the present invention is to install the formwork by using the Sepha Tie omitted the base, so that the cost of the Sepha Thai can be reduced, there is an effect that can improve the convenience and efficiency of the installation and demolition work.

Claims (6)

세파타이에 의해 그 간격이 유지 고정되는 거푸집(200)에 있어서, 상기 세파타이의 간격유지구(110)가 지지 결합되는 거푸집(200)의 내측판넬(210)에 상기 간격유지구(110)의 암나사공(114) 단부가 지지되는 받침돌출부(220)가 일체로 연이어 돌출 형성되고, 상기 받침돌출부(220)의 중앙에는 상기 간격유지구(110)와 일직선상으로 연이어 결합 분리되는 몸체볼트(120)가 지나도록 진입공(221)이 관통되게 형성되어 구성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집.In the formwork 200, the spacing is maintained by the Sepha Tie, the spacing retainer 110 of the Sepha Tie on the inner panel 210 of the formwork 200 is coupled to the support of the spacing retainer 110 A support protrusion 220 supporting the end of the female threaded hole 114 is integrally formed to protrude continuously, and the body bolt 120 which is continuously coupled to the gap retaining hole 110 in a straight line in the center of the support protrusion 220. Sepa thai building formwork, characterized in that the entrance hole 221 is formed so as to pass through). 제 1 항에 있어서, 상기 거푸집(200)의 받침돌출부(220)에 상기 간격유지구(110)의 암나사공(114) 단부가 삽입 지지되는 받침요홈(222)이 형성되어 구성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집.The method according to claim 1, wherein the receiving protrusion 220 of the formwork 200, the receiving groove 222 is characterized in that the support groove 222 is formed is inserted into the end of the female thread hole 114 of the spacing holding member 110 is formed. Construction formwork where a tie is used. 제 1 항에 있어서, 상기 받침돌출부(220)는 반구형상으로 형성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집.According to claim 1, wherein the support protrusion 220 is a building formwork is used sepatie, characterized in that formed in a hemispherical shape. 제 1 항에 있어서, 상기 받침돌출부(220)는 다각의 콘형상으로 형성된 것을특징으로 하는 세파타이가 이용되는 건축용 거푸집.The formwork for building according to claim 1, wherein the support protrusion 220 is formed with a polygonal cone shape. 제 2 항에 있어서, 상기 받침요홈(222)은 원형상으로 형성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집.3. The formwork for building according to claim 2, wherein the support recess 222 is formed in a circular shape. 제 2 항에 있어서, 상기 받침홈은 다각형상으로 형성된 것을 특징으로 하는 세파타이가 이용되는 건축용 거푸집.3. The building formwork according to claim 2, wherein the support groove is formed in a polygonal shape.
KR2020020027731U 2002-09-16 2002-09-16 Concrete sheeting for building KR200298108Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020027731U KR200298108Y1 (en) 2002-09-16 2002-09-16 Concrete sheeting for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020027731U KR200298108Y1 (en) 2002-09-16 2002-09-16 Concrete sheeting for building

Publications (1)

Publication Number Publication Date
KR200298108Y1 true KR200298108Y1 (en) 2002-12-12

Family

ID=73079083

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020027731U KR200298108Y1 (en) 2002-09-16 2002-09-16 Concrete sheeting for building

Country Status (1)

Country Link
KR (1) KR200298108Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100475461B1 (en) * 2002-09-28 2005-03-10 주식회사 진성건축사사무소 fixed structure for form to concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100475461B1 (en) * 2002-09-28 2005-03-10 주식회사 진성건축사사무소 fixed structure for form to concrete

Similar Documents

Publication Publication Date Title
KR200298108Y1 (en) Concrete sheeting for building
KR20090113476A (en) Insert for concrete slab
KR100715788B1 (en) Fixing apparatus for mold
KR200451624Y1 (en) Cone nut for keeping distance of flash board and fixing
KR101106160B1 (en) a mold coupler with outside mounting
KR100519804B1 (en) A form tie
KR200405409Y1 (en) fixing bolt
KR200411028Y1 (en) The sepatie of a molding flask
KR101320728B1 (en) An anchor for construction
KR200251827Y1 (en) Concrete sheeting fixing appliance
KR101293672B1 (en) Anchor Device
KR200314984Y1 (en) Separator for concrete form
KR200317282Y1 (en) Separator for concrete form
KR200326109Y1 (en) Clamping apparatus of form for concrete
KR200317497Y1 (en) Supporter for sheeting
KR200345124Y1 (en) Supporter for sheeting
KR200362755Y1 (en) A cut-off member for concrete structure
KR200291482Y1 (en) fixed structure for form to concrete
KR101459419B1 (en) Inserter for insulation
KR200314955Y1 (en) Supporter for sheeting
KR200339366Y1 (en) combination a mold
KR200321433Y1 (en) The sepatie of a mould
KR200349974Y1 (en) Combination member of mould
KR200342269Y1 (en) a joint for a mold
KR20090113479A (en) Fixing instrument for insulating material

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20031201

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee