KR200294650Y1 - Multi-using Indicated Mark for Earthwork - Google Patents

Multi-using Indicated Mark for Earthwork Download PDF

Info

Publication number
KR200294650Y1
KR200294650Y1 KR2020020003195U KR20020003195U KR200294650Y1 KR 200294650 Y1 KR200294650 Y1 KR 200294650Y1 KR 2020020003195 U KR2020020003195 U KR 2020020003195U KR 20020003195 U KR20020003195 U KR 20020003195U KR 200294650 Y1 KR200294650 Y1 KR 200294650Y1
Authority
KR
South Korea
Prior art keywords
height
earthwork
bolt
supporting body
construction
Prior art date
Application number
KR2020020003195U
Other languages
Korean (ko)
Inventor
백진기
Original Assignee
(주) 장맥엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 장맥엔지니어링 filed Critical (주) 장맥엔지니어링
Priority to KR2020020003195U priority Critical patent/KR200294650Y1/en
Application granted granted Critical
Publication of KR200294650Y1 publication Critical patent/KR200294650Y1/en

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

본 고안은, 토공량 공사에서 비탈면의 위치, 노상 및 노체, 포장등의 높이를 표시하기 위해 설치되는 표식장치인 규준틀에 관한 것으로, 본 고안은 측면에 설치되는 볼트의 조작에 따른 구속력으로 인해 항상 일정한 양으로 파이프의 높이를 조절할 수 있어 토공량 공사에서 표식의 정밀도가 향상되는 것을 그 목적으로 한다.The present invention relates to a scaffolding frame, which is a marking device installed to display the position of the slope, the roadbed and the road, the height of pavement in earthworks, the present invention is always constant due to the binding force of the bolt installed on the side Its purpose is to improve the accuracy of the marking in earthworks by adjusting the height of the pipes.

이를 위하여, 지지몸체를 1개의 주지지 몸체(2)와 2개의 보조지지 몸체(4,5)로 구성하여, 쪼임 볼트(3)에 의한 지지몸체의 길이를 조절하며, 세 번째 지지몸체(5)에 합판으로 된 표식장치(6)와 세부쪼임볼트(7), 갈고리(8)를 설치하여 미세한 높이를 조절하며, 주지지 몸체(2) 하단은 기초콘크리트(1)에 매입하여 토공규준틀의 전체 몸체가 공사차량 등으로 진동 등에 의해서 흔들리지 않도록 구성됨을 특징으로 하는 것이다.To this end, the support body is composed of one supporting body (2) and two auxiliary supporting bodies (4,5) to adjust the length of the supporting body by the squeeze bolt (3), the third supporting body (5) ), The plywood marking device (6), the detail bolt (7), the hook (8) is installed to adjust the fine height, and the bottom of the main body (2) is embedded in the foundation concrete (1) The entire body is characterized in that it is configured not to shake due to vibration, such as construction vehicles.

이상과 같은 다단계 토공 규준틀 장치에 의하면, 토공량 공사시 지지몸체의 높이 조절을 통한 기층 표시의 정확도를 높여 착오에 의한 공사비를 절감할 수 있으며, 간편한 조립에 의한 설치, 해체 사용으로 반복사용과 유지보수 비용이 저렴하며, 강재 재질을 의 견고한 몸체 적용으로 내구성이 향상효과를 기대할 수 있다.According to the multi-stage earthwork scaffolding device as described above, it is possible to reduce the construction cost due to error by increasing the accuracy of the base display by adjusting the height of the supporting body during the construction of the earthwork. The cost is low and the durability is improved by applying a solid body of steel material.

Description

다단계 토공 규준틀{Multi-using Indicated Mark for Earthwork}Multi-using Indicated Mark for Earthwork

본 고안은 토공량 공사에서 비탈면의 위치, 노상 및 노체, 포장 등의 높이를 다양한 현장여건에 적합하도록 다양한 높이조절을 통해서, 정확한 표식이 구분될 수 있는 다단계 토공 규준틀 장치에 관한 것이다.The present invention relates to a multi-stage earthwork scaffolding device in which accurate markings can be distinguished through various height adjustments to suit the various site conditions such as the position of the slope, the roadbed, the roadbed, and the pavement in the soil volume construction.

종래에 사용되는 표식장치인 규준틀은 도 1에 도시된바와 같이, 재질이 목재로 이루어져, 내구성이 약하고, 재설치시 조립비용이 과다하며, 공사과정에서의 작업과 강한 바람 등에 의한 손상시 유지보수 및 재시공이 발생하게 되며, 몸체와 표식장치와의 강결된 고정에 의해서 높이조절 및 재할용이 어려운 문제점 등을 가지고 있었다.As shown in Fig. 1, the marking frame used in the related art is made of wood, and the material is made of wood, which is weak in durability, excessive in assembly cost when re-installed, maintenance in case of damage due to work and strong wind in the construction process, and the like. Re-construction occurs, and the rigidity of the body and the marking device is difficult to adjust the height and redeployment.

본 고안은, 이와 같은 종래의 문제점을 해결하기 위해 몸체의 측면에 설치되는 쪼임볼트(3)의 조작에 따른 구속력으로 인해 자유롭게 몸체의 높이를 조절하여 토공량 공사에서 표식이 정확히 이루어지도록 하는 토공 규준틀 장치를 제공함에 있다.The present invention, to solve the conventional problems such as the earthwork scaffolding device to make the mark accurately in the earthwork construction by adjusting the height of the body freely due to the binding force of the operation of the plunge bolt (3) installed on the side of the body In providing.

도1은 종래에 사용되고 있는 토공규준틀 단면도1 is a cross-sectional view of the earthwork frame used in the prior art

도2는 본 고안에 따른 다단계 토공 규준틀 조립단면도Figure 2 is a cross-sectional assembly of multi-stage earthwork scaffold frame according to the present invention

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

1:기초콘크리트 2:주지지 몸체1: Foundation concrete 2: Main body

3:쪼임볼트 8:갈고리3: bolt bolt 8: hook

상기와 같은 목적을 달성하기 위한 본 고안에 따른 다단계 토공 규준틀의 특징은, 종래의 높이조절이 어렵고 재활용이 불가능한 목재 재질의 몸체와 표식장치로 이루어진 규준틀과는 달리 도 2에 도시된바와 같이, 견고하면서 연성이 있는 재질인 강재를 사용하여 지지몸체를 1개의 주지지 몸체(1)와 2개의 보조지지 몸체(4,5)로 구성하여, 쪼임볼트(3)에 의한 지지몸체의 길이를 조절하며, 세 번째 지지몸체(5)에 합판으로 된 표식장치(6)를 고정하며, 이러한 표식장치는 각각 2개의 쪼임볼트(7)로 설치되어 미세한 높이 조절을 할 수 있게 하며, 주지지 몸체(2) 하단은 기초 콘크리트(1)에 매입하여 토공규준틀의 전체 몸체가 공사작업이나 바람등에 의해서 흔들리지 않도록 구성되어진 점에 있다.Characteristic of the multi-stage earthwork scaffold frame according to the present invention for achieving the above object, unlike the conventional scaffold frame made of a wooden body and a marking device that is difficult to adjust the height and is not recycled, as shown in FIG. While the support body is composed of one supporting body (1) and two auxiliary supporting bodies (4,5) by using a ductile steel material, and adjusts the length of the supporting body by the twist bolt (3) And fixing the marking device 6 made of plywood to the third supporting body 5, and each of these marking devices are installed with two twist bolts 7 to allow fine height adjustment, and the supporting body 2 ) The lower part is embedded in the foundation concrete (1) so that the entire body of the earthwork scaffold frame is not shaken by construction work or wind.

이상과 같은 다단계 토공 규준틀 장치에 의하면, 토공량 공사시 지지몸체의 높이 조절을 통한 기층 표시의 정확도를 높여 착오에 의한 공사비를 절감할 수 있으며, 간편한 조립에 의한 설치, 해체 사용으로 반복사용과 유지보수 비용이 저렴하며, 강재 재질을 의 견고한 몸체 적용으로 내구성이 향상효과를 기대할 수 있다.According to the multi-stage earthwork scaffolding device as described above, it is possible to reduce the construction cost due to error by increasing the accuracy of the base display by adjusting the height of the supporting body during the construction of the earthwork. The cost is low and the durability is improved by applying a solid body of steel material.

Claims (1)

강재 PIPE 형태의 주지지몸체(2)를 기초콘크리트(1)에 매입하여 고정시킨 후 동일형태인 2개의 보조지지몸체(4,5)를 주지지몸체(2)에 삽입하여 높이조절이 가능토록 구성하며, 쪼임볼트(3)로 적절한 높이에서 보조지지몸체를 고정한 후 합판으로된 표식장치(6)를 두번째 보조지지몸체(5)에 세부 쪼임볼트(7)로 고정시켜 내구성과 사용편의성, 유지관리성을 크게 향상시킨 다단계 토공규준틀After inserting and fixing the main body of steel (PEPE) into the basic concrete (1), the two auxiliary supporting bodies (4 and 5) of the same shape are inserted into the main body (2) so that the height can be adjusted. After fixing the auxiliary support body at the proper height with the bolts (3), the marker device (6) made of plywood is fixed to the second auxiliary support body (5) with the detailed bolts (7) for durability, ease of use, and maintenance. Multi-level earthwork standard framework greatly improves manageability
KR2020020003195U 2002-01-31 2002-01-31 Multi-using Indicated Mark for Earthwork KR200294650Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020003195U KR200294650Y1 (en) 2002-01-31 2002-01-31 Multi-using Indicated Mark for Earthwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020003195U KR200294650Y1 (en) 2002-01-31 2002-01-31 Multi-using Indicated Mark for Earthwork

Publications (1)

Publication Number Publication Date
KR200294650Y1 true KR200294650Y1 (en) 2002-11-13

Family

ID=73117118

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020003195U KR200294650Y1 (en) 2002-01-31 2002-01-31 Multi-using Indicated Mark for Earthwork

Country Status (1)

Country Link
KR (1) KR200294650Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100457130B1 (en) * 2002-06-24 2004-11-16 (주)신성엔지니어링 Batter board made by using slide type pole assembly multi-pole of different diameter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100457130B1 (en) * 2002-06-24 2004-11-16 (주)신성엔지니어링 Batter board made by using slide type pole assembly multi-pole of different diameter

Similar Documents

Publication Publication Date Title
JP4491030B2 (en) Anchor bolt set device
KR100654170B1 (en) Apparatus for constructing a curbstone
CN101985824B (en) For the embedded part installation device of bridge pad
JPH05214731A (en) Column base fixing device
KR200294650Y1 (en) Multi-using Indicated Mark for Earthwork
CN208949882U (en) The adjustable pile foundation steel pile casting positioning device of a kind of diameter
US6695525B2 (en) Metal curb installation system and method
KR200403255Y1 (en) Indicated Mark for Earthwork
CN110485223B (en) Ballast track subgrade settlement monitoring device and ballast track subgrade settlement monitoring method
CN109371817B (en) Pretreatment method for end-of-bridge vehicle jumping in highway construction
CN104989113B (en) A kind of downcomer built-in fitting center positioning device and method
CN220150113U (en) Novel bridge and culvert reinforced structure
CN218203752U (en) Road surface paving construction hanging wire device
JPH0687409U (en) Formwork support tool for concrete construction of road culvert construction concrete
CN217632288U (en) Road bridge construction drilling support
CN220566907U (en) Observer for earth surface moving observation station
CN209636977U (en) A kind of monitoring bar basis built-in fitting
JPH0119045Y2 (en)
CN203625908U (en) Portable pile foundation construction positioning equipment
JP3740232B2 (en) Anchor bolt mounting bracket
CN217733687U (en) Novel rectangular distributing type supports pavement and struts template precision control device
CN112627226B (en) Tower crane foundation structure
JP3013448U (en) Concrete formwork support equipment
CN210400368U (en) Leveling device for municipal road supporting stand column
KR200300122Y1 (en) Triangle batter board for measurement of road using polyethylene matter

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20111031

Year of fee payment: 10

EXPY Expiration of term