KR200278392Y1 - Batter board made by using slide type pole assembly multi-pole of different diameter - Google Patents

Batter board made by using slide type pole assembly multi-pole of different diameter Download PDF

Info

Publication number
KR200278392Y1
KR200278392Y1 KR2020020005711U KR20020005711U KR200278392Y1 KR 200278392 Y1 KR200278392 Y1 KR 200278392Y1 KR 2020020005711 U KR2020020005711 U KR 2020020005711U KR 20020005711 U KR20020005711 U KR 20020005711U KR 200278392 Y1 KR200278392 Y1 KR 200278392Y1
Authority
KR
South Korea
Prior art keywords
pole
poles
frame
fixing
different diameters
Prior art date
Application number
KR2020020005711U
Other languages
Korean (ko)
Inventor
서해창
Original Assignee
(주)신성엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)신성엔지니어링 filed Critical (주)신성엔지니어링
Priority to KR2020020005711U priority Critical patent/KR200278392Y1/en
Application granted granted Critical
Publication of KR200278392Y1 publication Critical patent/KR200278392Y1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

여기에 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀이 개시된다. 규준틀의 받침판 양단에 직립한 연결부재에 높이 측정용 치수가 기입된 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체가 삽입되고, 상기 폴 결합체의 소정의 높이에 타이밴드를 사용하여 고정부재를 부착하여 규준판이 설치될 수 있도록 구성한다. 그럼으로 직경이 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀은 조립 및 설치가 간단하여 인건비 및 시간을 줄일 수 있으며 재사용이 가능하여 경제적인 손실도 막을 수 있다.Disclosed is a frame of reference using a pole assembly in which a plurality of poles of different diameters are slide-formed. A pole assembly is formed by inserting a plurality of poles of different poles with different diameters, each having a height measurement dimension, into a connecting member upright on both ends of the support plate of the scaffold frame, and using a tie band at a predetermined height of the pole assembly. Attach the configuration so that the screed plate can be installed. Therefore, the frame using a pole combination with slide poles of different diameters is simple to assemble and install, reducing labor costs and time, and reusable to prevent economic losses.

Description

직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀{Batter board made by using slide type pole assembly multi-pole of different diameter}Batter board made by using slide type pole assembly multi-pole of different diameter}

본 고안은 토공사시 성토부의 각 단계의 수평면 위치를 표시하기 위하여 사용하는 것으로, 구체적으로는 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀을 제공함으로써, 성토부의 측정 및 점검이 간단하며 재사용이 가능하도록 하는 것이다.The present invention is used to mark the horizontal plane position of each stage of the fill section during earthwork. Specifically, by providing a scaffold using a pole combination in which slides of a plurality of poles of different diameters are provided, measurement and inspection of the fill section can be performed. It's simple and reusable.

일반적으로 토공사시 시공기면보다 지면이 낮을 경우 흙을 메워주는 성토작업을 하게 되는데, 상기 성토작업은 표층, 보조기층, 노상, 노체, 위치STA의 각 단계별 수평면 위치를 측량한 후 규준틀을 설치하고, 설치된 규준틀의 규준판에 지시에 따라 성토작업이 이루어진다.In general, when earthwork is lower than the construction surface during earthwork, the soil filling work is carried out. The soil filling work is carried out after surveying the horizontal plane positions of the surface layer, auxiliary base, roadbed, furnace body, and position STA, and then installing a scaffold frame. Filling work is done according to the instructions on the screed plate of the installed screed frame.

상기 성토작업에 사용되는 규준틀(1)은 도 1에서 도시한 바와 같이 복수개의 폴(3a,3b,3c)을 연이어 연결하고 소정의 폭을 형성하도록 각목(7)으로 고정시킨 후채색된 규준판(5)을 측량기사와 측부가 측량한 높이에 결합하여 지면(2)에 설치한다. 여기에 철사 또는 와이어로프(9) 등으로 규준틀(1)이 바람에 넘어가지 않도록 고정한다.The screed frame 1 used for the fill work is connected to the plurality of poles (3a, 3b, 3c) as shown in Figure 1 and fixed by the wood (7) to form a predetermined width after the colored screed plate (5) is installed on the ground (2) by combining the surveying engineer with the surveyed height. Here, the wire or wire rope (9), etc. to fix the frame not to fall over the wind (1).

상기와 같은 종래의 규준틀에는 다음과 같은 문제점을 내포하고 있다.The above-mentioned conventional framework includes the following problems.

규준틀 제작함에 있어서 노임과 시간이 많이 소요되고, 설치시 측량기사 또는 측부가 동원되어야만 하며, 일단 사용한 규준틀은 다른 현장에서 재활용하기가 어려운 점 등 여러 가지 문제점을 지니고 있다.It takes a lot of labor and time to manufacture the scaffold, the surveyor or the side must be mobilized at the time of installation, and the scaffold once used has various problems such as difficult to recycle at other sites.

따라서, 본 고안의 목적은 상술한 제반 문제점을 해결하기 위해 제안된 것으로서 측량기사 또는 측부와 같이 측량에 대한 전문적인 지식이나 기술이 없는 어느 누구나 설치, 점검이 가능하여 인건비의 절감, 공사기간의 단축 및 다른 현장에서도 재사용이 가능함으로 경제적인 손실을 줄일 수 있는 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀을 제공하는데 있다.Therefore, the purpose of the present invention is proposed to solve the above-mentioned problems. Anyone who does not have a specialized knowledge or technology for surveying, such as a surveyor or a surveyor, can install and inspect, thereby reducing labor costs and reducing construction period. And it is possible to reuse in other sites to reduce the economic loss to provide a framework using a pole combination with a slide type of a plurality of poles of different diameters.

도 1은 종래 규준틀에 관한 정면도1 is a front view of a conventional scaffolding frame

도 2는 본 고안의 바람직한 실시예에 따른 규준틀의 정면도2 is a front view of a scaffold frame according to a preferred embodiment of the present invention

도 3은 도 2의 폴 결합체에 관한 사시도3 is a perspective view of the pole assembly of FIG.

도 4는 도 2의 폴 결합체와 베이스 부에 관한 분해 사시도4 is an exploded perspective view of the pole assembly and the base of FIG.

도 5는 도 2의 지시부에 관한 분해 사시도와 부분 확대도5 is an exploded perspective view and a partial enlarged view of the indicating unit of FIG. 2;

도 6은 본 고안의 또 다른 실시예에 따른 규준틀의 정면도6 is a front view of a scaffold frame according to another embodiment of the present invention

도 7은 도 6의 폴 결합체에 관한 사시도7 is a perspective view of the pole assembly of FIG.

도 8은 도 6의 폴 결합체와 베이스 부에 관한 분해 사시도8 is an exploded perspective view of the pole assembly and the base of FIG. 6;

도 9는 도 6의 지시부에 관한 분해 사시도와 부분 확대도9 is an exploded perspective view and a partial enlarged view of the indicating unit of FIG. 6;

도 10은 폴 직경에 따른 다수개의 고정 부재에 관한 사시도10 is a perspective view of a plurality of fixing members according to the pole diameter

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : 베이스부 12 : 받침판10: base portion 12: support plate

14 : 수준기 16 : 연결부재14: level 16: connecting member

17 : 리브 20 : 폴 결합체17: rib 20: pole conjugate

22a~e : 직경이 다른 다수개의 폴 24 : 치수22a ~ e: Multiple poles with different diameters 24: Dimensions

27 : 보울트 결합체 27' : 아이보울트27: bolt conjugate 27 ': eye bolt

28 : 걸림쇠 30 : 지시부28: latch 30: indicator

32 : 고정부재 38 : 규준판32: fixing member 38: screed plate

상술한 바와 같은 본 고안의 목적을 달성하기 위한 본 고안의 일 특징에 의하면, 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 규준틀은; 규준틀을 지면에 고정시키기 위한 받침판; 상기 받침판의 양측에 직립한 연결부재; 상기 연결부재에 삽입되어 고정되는 직경이 서로 다른 다수개의 폴 결합체; 상기 폴 결합체의 직경이 서로 다른 각각의 폴 상·하단에 체결된 보울트, 너트; 상기 폴 결합체에 부착되는 고정부재; 상기 고정부재에 고정되는 규준판을 포함한다.According to one feature of the present invention for achieving the object of the present invention as described above, the frame of the frame made by sliding a plurality of poles of different diameters; Support plate for fixing the screed frame on the ground; A connection member standing upright on both sides of the support plate; A plurality of pole joints having different diameters inserted into and fixed to the connection member; Bolts and nuts fastened to the upper and lower poles of each pole having a different diameter of the pole assembly; A fixing member attached to the pole assembly; It includes a screed plate fixed to the fixing member.

(실시예)(Example)

이하, 본 고안에 따른 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2, 도 3, 도 4, 도 5를 참조하여, 본 고안은 베이스부(10)와 폴 결합체(20), 그리고 지시부(30)로 나누어진다.2, 3, 4, 5, the present invention is divided into the base portion 10, the pole assembly 20, and the indicator portion 30.

상기 베이스부(10)는 규준틀(1)을 핀 또는 못 등을 사용하여 지면(2)에 고정하는 받침판(12)과 상기 규준틀(1)을 수평하게 설치하기 위해 상기 받침판(12)의 상면 중앙에 수준기(14)를 부착한다. 상기 받침판(12)의 상면 중앙에 설치된 상기 수준기(14)를 중심으로 양단에는 원통형의 연결부재(16)가 직립해 있고, 상기 연결 부재(16)의 외주면에는 고정용 보울트(18)가 체결되어 있다. 여기서 상기 연결부재(16)는 리브(17)를 사용하여 상기 받침판(12)과 접합되어 있는데, 상기 리브(17)는 상기 연결부재(16)가 직립할 수 있도록, 그리고 상기 연결부재(16)에 집중되는 응력을 분산시키기 위함이다.The base portion 10 is the center of the upper surface of the support plate 12 to horizontally install the support plate 12 for fixing the scaffold frame 1 to the ground (2) using a pin or nail or the like. Attach the spirit level (14) to the. A cylindrical connecting member 16 is erected upright at both ends, centering on the leveler 14 installed at the center of the upper surface of the support plate 12, and a fixing bolt 18 is fastened to an outer circumferential surface of the connecting member 16. have. Here, the connecting member 16 is joined to the support plate 12 using a rib 17, the rib 17 so that the connecting member 16 can be upright, and the connecting member 16 This is to disperse the stress concentrated in the.

상기 폴 결합체(20)는 길이 조절이 가능하도록 직경이 다른 다수개의 폴(22)을 슬라이드식으로 결합한 것으로써, 상기 받침판(12) 상면에 직립한 연결부재(16)에 각각 삽입되어 상기 고정 보울트(18)에 의해 고정설치된다. 상기 폴 결합체(22)는 각각의 폴(22a~e) 외주면에 높이를 나타낼 수 있도록 치수(24)가 기입되어 있으며 상기 각 폴(22a~e)의 상·하단에는 구멍(26)이 형성되어 있어 각 작업장에서 필요한 소정의 길이만큼 빼내어 보울트 결합체(27)로 고정시킬 수 있도록 되어있다. 각 폴(22a~e)을 고정하기 위해 사용하는 상기 보울트 결합체(27)의 헤드부에는 걸림쇠(28)가 형성되어 있어 와이어로프(29) 등으로 지면(2)에 고정시켜 바람에 넘어지지 않도록 하였다.The pole assembly 20 is a slide coupled to a plurality of poles 22 of different diameters so that the length can be adjusted, each inserted into the connecting member 16 upright on the upper surface of the support plate 12, the fixing bolt It is fixed by 18. The pole assembly 22 has dimensions 24 written on the outer circumferential surfaces of the poles 22a to e, and holes 26 are formed at the upper and lower ends of the poles 22a to e. It can be pulled out by a predetermined length required in each workshop and fixed with the bolt assembly 27. The head portion of the bolt assembly 27 used to fix the poles 22a to e is formed with a latch 28 so that it is fixed to the ground 2 by a wire rope 29 or the like so as not to fall over in the wind. It was.

마지막으로 지시부(30)는 성토부의 각 단계별 수평면(표층, 보조기층, 노상, 노체, 위치STA)을 표시하는 것으로 상기 폴 결합체(22)의 소정의 높이에 고정부재(32)를 타이밴드(36)로 부착하는데 상기 고정부재(32)가 폴 결합체(22)에 밀착할 수 있도록 후면에 반원형의 홈(33)이 형성되어 있다. 또한 상기 고정부재(32)의 상면에 사각홈(34)이 형성되어 있고, 상기 고정부재(32)의 전면에는 보울트(35a)가 체결되어 있어 상기 사각홈(34)에 삽입되는 것을 고정하며 나사부 끝에는 고정물에 흠집이 발생하지 않도록 원형판(35b)이 접합되어 있다. 상기 홈에는 규준판(38)이 거치되어 상기 보울트(35a)에 의해 고정되어지는데 상기 규준판(38)은 일단이 경사지게 절단되어 있고, 상기 절단된 단부에는 야광도료(39)가 채색되어 있어 야간작업이 가능하도록 하였다.Finally, the indicator 30 displays the horizontal plane (surface layer, subbase, roadbed, furnace body, location STA) for each stage of the fill section. The fixing member 32 is tied to the predetermined height of the pole assembly 22 by the tie band 36. The semi-circular groove 33 is formed on the rear surface so that the fixing member 32 can be in close contact with the pawl assembly 22. In addition, a square groove 34 is formed on an upper surface of the fixing member 32, and a bolt 35a is fastened to the front surface of the fixing member 32 to fix the insertion into the square groove 34, and to fix the screw portion. At the end, the circular plate 35b is joined so that a scratch does not generate | occur | produce in a fixture. The groove is fixed to the groove by the reference plate 38 is fixed by the bolt 35a, the end of the reference plate 38 is cut obliquely, the cut end is luminous paint (39) is colored at night Work was made possible.

도 6, 도 7, 도 8, 도 9, 도10은 본 고안의 또 다른 실시예를 도시한 것으로 도면을 참조하여 상세히 설명한다.6, 7, 8, 9, and 10 illustrate another embodiment of the present invention and will be described in detail with reference to the drawings.

상기 또 다른 실시예는 도면에서 보는 바와 같이 폴 결합체(22)의 상·하단에 형성된 구멍(26) 대신 암나사부(26')로 가공하고 상기 가공된 암나사부(26')에 아이보울트(27')를 체결하여 폴 결합체(22)를 고정함과 동시에 철사 또는 와이어로프(29) 등으로 각 폴(22a~e)을 서로 연결하고 지면(2)에 고정하여 규준틀(1)이 바람에 넘어가지 않도록 하였다. 또한 상기 고정부재(32)를 폴 결합체(22)에 부착함에 있어서 일회용 타이밴드(36)가 아닌 웜기어 클램프(36')를 이용하여 재사용이 가능하도록 하였다. 상기 고정부재(32)의 후면에 형성된 반원형(33)의 홈을 각 폴의 크기에 맞춰 직경이 다른 다수개의 고정부재(33a~e)를 제작하여 사용함으로써 설치되는 높이의 폴(22a~e) 직경과 동일한 고정부재(33a~e)를 사용하여 고정할 수 있도록 하였다.Another embodiment of the present invention is to process the female threaded portion 26 'instead of the hole 26 formed in the upper and lower ends of the pawl assembly 22 as shown in the drawing, and the eye bolt 27 to the processed female threaded portion 26'. ') To fasten the pole assembly 22 and at the same time connect the poles 22a to e with wires or wire ropes 29 and the like, and fix them to the ground 2 so that the frame of reference 1 falls over in the wind. I did not go. In addition, in attaching the fixing member 32 to the pole assembly 22, it is possible to reuse by using a worm gear clamp 36 'instead of the disposable tie band 36. Height of the poles 22a to e installed by making and using a plurality of fixing members 33a to e having different diameters according to the size of each pole using the grooves of the semicircular 33 formed on the rear surface of the fixing member 32. Fixing members 33a to e having the same diameter can be fixed.

상술한 바와 같은, 본 고안의 바람직한 실시예에 따른 직경이 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀의 구성 및 작용을 상기한 설명 및 도면에 따라 도시하였지만, 이는 예를 들어 설명한 것에 불과하며 본 고안의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화 및 변경이 가능하다는 것을 이 분야의 통상적인 기술자들은 잘 이해할 수 있을 것이다.As described above, the configuration and operation of the scaffold using a pole assembly in which a plurality of poles of different diameters slide type according to the preferred embodiment of the present invention are shown according to the above description and drawings, Those skilled in the art will appreciate that various changes and modifications can be made without departing from the technical spirit of the present invention.

이상과 같은 본 고안에 의하면, 측량기사 또는 측부와 같이 측량에 대한 전문적인 지식이나 기술이 없는 어느 누구나 설치, 점검이 가능하여 인건비 감축 및 공사기간의 단축이 가능하고, 조립 및 분해가 간단하여 다른 현장에서도 재사용이 가능함으로 경제적인 손실을 줄일 수 있다.According to the present invention as described above, anyone who does not have a specialized knowledge or skills for surveying, such as a surveyor or a side, can install and inspect, so that labor cost can be reduced and construction period can be shortened. Reuse in the field reduces economic losses.

Claims (3)

규준틀을 지면에 고정시키기 위한 받침판;Support plate for fixing the screed frame on the ground; 상기 규준틀을 수평하게 설치하기 위해 상기 받침판 중앙에 부착된 수준기;A level attached to the center of the support plate to horizontally install the scaffolding frame; 상기 수준기를 중심으로 상기 받침판의 양단에 직립한 연결부재;A connection member standing upright at both ends of the support plate around the level; 상기 연결부재에 삽입되고, 외주면에 높이 측정용 치수가 기입되어 있으며 각각의 폴의 상·하단에 체결용 구멍이 형성된 직경이 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체;A pole assembly inserted into the connecting member and having a height measuring dimension written on an outer circumferential surface thereof, and having a plurality of poles of different diameters having a fastening hole formed at an upper and a lower end of each pole; 상기 폴 결합체의 각 폴을 빼내어 고정하기 위해 상·하단에 형성된 구멍에 체결되며 와이어로프 등으로 지면에 고정하기 위해 헤드부에 걸림쇠가 형성된 보울트 결합체(27);A bolt assembly 27 which is fastened to a hole formed at an upper and a lower end to remove and fix each pole of the pole assembly, and has a latch at a head part to be fixed to the ground by a wire rope or the like; 상기 폴 결합체 소정의 위치에 후면에 형성된 홈에 타이밴드를 사용하여 부착하며 상면에 홈이 형성되어 있고, 전면에는 나사부 끝에 원형판이 부착된 고정용 보울트(35a)가 체결된 폴결합체에 밀착할 수 있도록 반원형의 홈이 형성된 고정부재;The pole coupling is attached to the groove formed on the rear side at a predetermined position using a tie band, and a groove is formed on the upper surface, and the front side can be in close contact with the pole coupling to which the fixing bolt 35a attached with a circular plate at the end of the screw portion is fastened. A fixing member in which a semicircular groove is formed to be formed; 상기 고정부재의 상면 홈에 삽입되어 상기 고정용 보울트(35a)에 의해 고정되는 일단이 경사지게 절단된 부분에 야광도료를 도색한 규준판을 포함하는 것을 특징으로 하는 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀.Slide a plurality of poles having different diameters, characterized in that it comprises a scrim plate painted luminous paint in the end portion is inserted into the upper groove of the fixing member is fixed by the fixing bolt (35a) obliquely cut. Standard frame using pole conjugates. 제 1항에 있어서,The method of claim 1, 상기 볼트 결합체는 폴 결합체 각 폴의 상·하단에 형성된 구멍을 암나사부로 가공하여 각 폴의 고정 및 규준틀을 지면에 고정하기 위해 체결한 아이보울트인 것을 특징으로 하는 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀.The bolt assembly slides a plurality of poles with different diameters, characterized in that the eye bolts are fastened to fix the poles and the scaffold frame to the ground by processing holes formed in the upper and lower ends of each pole of the pole assembly with female threads. Standard frame using pole conjugates. 제 1항에 있어서,The method of claim 1, 상기 고정부재에 폴결합체를 고정시키기 위한 고정장치로서 웜기어 클램프인 것을 특징으로 하는 직경이 서로 다른 다수개의 폴을 슬라이드 식으로 한 폴 결합체를 이용한 규준틀.A criterion frame using a pole assembly with a slide type of a plurality of poles of different diameters, characterized in that the worm gear clamp as a fixing device for fixing the pole assembly to the fixing member.
KR2020020005711U 2002-02-26 2002-02-26 Batter board made by using slide type pole assembly multi-pole of different diameter KR200278392Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020005711U KR200278392Y1 (en) 2002-02-26 2002-02-26 Batter board made by using slide type pole assembly multi-pole of different diameter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020005711U KR200278392Y1 (en) 2002-02-26 2002-02-26 Batter board made by using slide type pole assembly multi-pole of different diameter

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0035245A Division KR100457130B1 (en) 2002-06-24 2002-06-24 Batter board made by using slide type pole assembly multi-pole of different diameter

Publications (1)

Publication Number Publication Date
KR200278392Y1 true KR200278392Y1 (en) 2002-06-20

Family

ID=73073708

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020005711U KR200278392Y1 (en) 2002-02-26 2002-02-26 Batter board made by using slide type pole assembly multi-pole of different diameter

Country Status (1)

Country Link
KR (1) KR200278392Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200480578Y1 (en) 2015-05-27 2016-06-09 최윤근 A batter board kit measuring level of fill-up ground for road

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200480578Y1 (en) 2015-05-27 2016-06-09 최윤근 A batter board kit measuring level of fill-up ground for road

Similar Documents

Publication Publication Date Title
US9359756B2 (en) Steel beam support embed and methods of use thereof
US20070257164A1 (en) Pole mounting system and method
KR200278392Y1 (en) Batter board made by using slide type pole assembly multi-pole of different diameter
KR100457130B1 (en) Batter board made by using slide type pole assembly multi-pole of different diameter
KR200400496Y1 (en) A fence connector A easy control appartuss for angle
KR200325868Y1 (en) pipe fixing system
KR20090000651U (en) Base plate for street facilities
KR200314568Y1 (en) A clamping device for safety porch of gang form of construct
KR101670472B1 (en) Pillar for grounding stone fixing device and method using the same
KR20140131648A (en) Coupling apparatus of pile using coupler integrated pc nut
CN210167045U (en) Warning board for power transmission line
KR101026147B1 (en) Railing for sidewalk and assembling method thereof
KR200398184Y1 (en) a fence connector
KR100442721B1 (en) Batter board made by using slide type pole assembly multi-pole of different diameter
CN220037201U (en) Threaded connection fixing piece of unilateral sliding wire
CN211522983U (en) Road signboard
CN218758664U (en) Wall connecting assembly
CN212957567U (en) Assembled enclosure scaffold
CN216305557U (en) Hydraulic rod
CN216239024U (en) Wall connecting piece
CN215888009U (en) Town road crossing is with limit for height device
CN215254751U (en) Positioning device for embedded bolt at top of concrete column and embedded bolt fixing structure
CN215889433U (en) Assembled exterior wall cladding and supporting limb guardrail thereof
KR101011536B1 (en) Post assembly for hanging signal lamp
KR200349935Y1 (en) A steel­form

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20030526

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee