KR200263677Y1 - Warm water division system - Google Patents

Warm water division system Download PDF

Info

Publication number
KR200263677Y1
KR200263677Y1 KR2020010025718U KR20010025718U KR200263677Y1 KR 200263677 Y1 KR200263677 Y1 KR 200263677Y1 KR 2020010025718 U KR2020010025718 U KR 2020010025718U KR 20010025718 U KR20010025718 U KR 20010025718U KR 200263677 Y1 KR200263677 Y1 KR 200263677Y1
Authority
KR
South Korea
Prior art keywords
hot water
valve
distribution header
distribution
control valve
Prior art date
Application number
KR2020010025718U
Other languages
Korean (ko)
Inventor
양창칠
Original Assignee
(주)삼양발브종합메이커
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)삼양발브종합메이커 filed Critical (주)삼양발브종합메이커
Priority to KR2020010025718U priority Critical patent/KR200263677Y1/en
Application granted granted Critical
Publication of KR200263677Y1 publication Critical patent/KR200263677Y1/en

Links

Abstract

본 고안은 온수분배 시스템에 관한 것으로서, 복합적인 기능이 발휘되도록 함과 아울러 시공 작업이 간편하게 이루어질 수 있도록 한 것이다.The present invention relates to a hot water distribution system, and to allow the complex operation to be performed as well as the construction work can be made easily.

본 고안은 주택과 아파트 등의 실내를 난방하기 위하여 보일러 등으로부터 공급되는 온수가 순환되는 온수분배기 본체(1)와, 상기 온수분배기 본체(1)의 하우징(2) 내측 하부에 수평방향으로 고정됨과 아울러 스트레이너(4)와 유량 조절기(5) 및 배출밸브(6)가 일렬로 배치된 상태에서 입구에 스톱밸브(13)가 일체로 형성되는 제 1 분배헤더(3)와, 상기 제 1 분배헤더(3)와 각각의 온수파이프(7)를 통해 독립적으로 연결될 수 있게 제 1 분배헤더(3) 상측에 설치됨과 아울러 유량계(9)와 온도 조절밸브(10), 배출밸브(11), 자동유량 조절밸브(12) 및 정유량밸브(17)가 일체로 형성되는 제 2 분배헤더(8)로 구성된 것이다.The present invention is fixed in the horizontal direction in the hot water distributor body 1, the hot water distributor body 1 is circulated to heat the interior of the house and apartment, and the inside of the housing (2) of the hot water distributor body 1 and In addition, the first distribution header 3 and the first distribution header in which the stop valve 13 is integrally formed at the inlet with the strainer 4, the flow regulator 5, and the discharge valve 6 arranged in a line. (3) and the upper portion of the first distribution header (3) to be connected independently through each hot water pipe (7), flow meter (9), temperature control valve (10), discharge valve (11), automatic flow rate The control valve 12 and the constant flow valve 17 is composed of a second distribution header 8 is formed integrally.

Description

온수분배 시스템 {WARM WATER DIVISION SYSTEM}Hot Water Distribution System {WARM WATER DIVISION SYSTEM}

본 고안은 온수분배 시스템에 관한 것이다.The present invention relates to a hot water distribution system.

일반적으로 알려진 바와 같이 주택과 아파트 등은 난방을 위하여 온수를 사용하는 것으로서, 상기 온수는 보일러에서 히팅된 상태에서 배관을 통해 온수분배기로 공급되고, 상기 온수분배기로 공급된 온수는 온수파이프를 통해 실내 바닥으로 이동하여 실내 바닥을 가열하며, 상기 실내 바닥을 가열한 온수는 온수분배기로 복귀한 후 배관을 통해 보일로 이동되고, 상기 보일러로 귀환된 온수는 보일러에 의해서 가열된 후 상술한 바와 같이 재순환되는 것이다.As is generally known, houses and apartments use hot water for heating. The hot water is supplied to a hot water distributor through a pipe while heated in a boiler, and the hot water supplied to the hot water distributor is heated through a hot water pipe. It moves to the floor and heats the indoor floor, and the hot water heated to the indoor floor is returned to the hot water distributor and then moved to the boil through the pipe, and the hot water returned to the boiler is heated by the boiler and recycled as described above. Will be.

상기 온수분배기는 공급분배체와 환수분배체로 분류되고, 상기 공급분배체는 분배헤더의 측부에 분배노즐을 일체로 형성함과 아울러 상기 분배노즐에 밸브손잡이를 형성하고, 상기 분배노즐에는 온수파이프를 결합하는 것이다. 상기 환수분배체는 분배헤더의 측부에 분배노즐을 일체로 형성함과 아울러 상기 분배노즐에 온수파이프를 결합하는 것이다.The hot water distributor is classified into a supply distributor and a return distributor, wherein the supply distributor integrally forms a distribution nozzle on the side of the distribution header, forms a valve handle on the distribution nozzle, and couples the hot water pipe to the distribution nozzle. will be. The water distribution distributor is to form a distribution nozzle integrally on the side of the distribution header and to couple the hot water pipe to the distribution nozzle.

상기한 분배노즐의 밸브손잡이는 온수파이프로의 온수 공급량을 적절하게 조절하는 것으로서, 상기 밸브손잡이를 이용하여 특정 분배노즐을 차단하면 해당 온수파이프로 온수가 공급되지 않는 것이고, 상기 온수의 비공급으로 인해 특정 룸이 난방되지 않는 것이다.The valve handle of the dispensing nozzle is to properly control the amount of hot water supplied to the hot water pipe. When the specific dispensing nozzle is shut off using the valve handle, the hot water is not supplied to the hot water pipe. Due to this particular room will not be heated.

그리고 상기 온수의 순환은 특정 룸에 설치된 온도조절기에 의해서 이루어지는 것으로서, 상기 온도조절기를 조작하여 해당 룸의 온도를 우선적으로 설정하는 것이다. 상기 온도가 설정되면 보일러의 작동으로 온수가 공급되고, 상기 공급된 온수는 실내를 히팅함으로써 특정 온도가 유지되는 것이며, 상기 설정 온도로 실내가 난방되면 온수의 순환은 자동적으로 정지되고, 상기 온수 순환이 특정룸의 온도에 의해서 정지됨으로써 각룸의 온도가 적정 상태로 균일하게 유지되지 않는 것이다.The circulation of the hot water is performed by a temperature controller installed in a specific room, and the temperature of the room is preferentially set by operating the temperature controller. When the temperature is set, hot water is supplied by the operation of the boiler, and the supplied hot water is maintained at a specific temperature by heating the room.When the room is heated to the set temperature, the circulation of the hot water is automatically stopped, and the hot water circulation By stopping by the temperature of this specific room, the temperature of each room is not maintained uniformly in an appropriate state.

또한 상기 분배헤더로 유입되는 온수는 보일러와 배관을 통해 순환 도중 이물질이 포함되게 되는 것으로서, 상기 생성된 이물질로 인해서 온수 순환이 적정하게 이루어지지 않는 것이다.In addition, the hot water flowing into the distribution header is to include foreign matters during circulation through the boiler and the pipe, the hot water circulation is not properly made due to the generated foreign matter.

상기한 문제점들을 해결하기 위하여 온수분배기의 분배헤더에 온도조절밸브를 설치함과 아울러 공급분배체 일측에 스트레이너를 설치하여 각 룸의 온도 조절 및 온수중의 이물질을 간단하게 제거하는 것이다.In order to solve the above problems, the temperature control valve is installed on the distribution header of the hot water distributor, and a strainer is installed on one side of the supply distributor to easily control the temperature of each room and remove foreign substances in the hot water.

그러나 상기한 온수분배기는, 각각의 기능들을 수행할 수 있도록 하기 위하여 현장 설치시 작업자가 개별적인 특정 부품들을 선택하여 분배헤더에 직접 연결함과 아울러 고정 설치하기 때문에 시공상 설치 작업이 난해하고, 공간적인 제약 등이 수반되는 문제점이 있었다.However, the above-mentioned hot water dispenser is difficult to install in space because the operator selects individual specific parts and connects them directly to the distribution header to fix the installation. There was a problem accompanied by constraints.

본 고안은 상기한 문제점을 시정하여, 복합적인 기능이 발휘되도록 함과 아울러 시공 작업이 간편하게 이루어질 수 있도록 한 온수분배 시스템을 제공하는 것을 목적으로 한다.The object of the present invention is to provide a hot water distribution system to correct the above problems, to allow the complex function to be exhibited and to facilitate the construction work.

상기한 목적을 달성하기 위하여, 본 고안은 온수분배기 본체와, 상기 온수분배기 본체의 하우징 내측 하부에 고정되고 스트레이너와 유량 조절기 및 배출밸브가 일체로 형성됨과 아울러 입구에 스톱밸브가 형성되는 제 1 분배헤더와, 상기 제 1 분배헤더와 온수파이프를 통해 독립적으로 연결될 수 있게 제 1 분배헤더 상측에 설치됨과 아울러 유량계와 온도 조절밸브, 배출밸브, 자동유량 조절밸브 및 정유량밸브가 일체로 형성되는 제 2 분배헤더로 구성된 것이다.In order to achieve the above object, the present invention is the first distribution that is fixed to the inner side of the hot water distributor body, the housing of the hot water distributor body, the strainer, the flow regulator and the discharge valve is integrally formed and the stop valve is formed at the inlet A header, which is installed above the first distribution header so as to be independently connected through the first distribution header and the hot water pipe, and is integrally formed with a flow meter, a temperature control valve, a discharge valve, an automatic flow control valve, and a constant flow valve. It consists of two distribution headers.

도 1은 본 고안의 실시예의 개략도,1 is a schematic diagram of an embodiment of the present invention,

도 2는 본 고안의 실시예의 요부를 나타낸 평단면도,2 is a plan sectional view showing main parts of an embodiment of the present invention;

도 3은 본 고안의 실시예의 제 1 분배헤더를 나타낸 정면도,3 is a front view showing a first distribution header of an embodiment of the present invention;

도 4는 본 고안의 실시예의 제 2 분배헤더를 나타낸 정면도,4 is a front view showing a second distribution header of an embodiment of the present invention,

도 5는 본 고안의 실시예의 온도조절을 개략적으로 나타낸 블럭도이다.Figure 5 is a block diagram schematically showing the temperature control of the embodiment of the present invention.

<도면의 주요부분에 사용된 부호의 설명><Description of the code used in the main part of the drawing>

1: 온수분배기 본체 2: 하우징1: hot water distributor body 2: housing

3: 제 1 분배헤더 4: 스트레이너3: first distribution header 4: strainer

7: 온수파이프 8: 제 2 분배헤더7: hot water pipe 8: second distribution header

10: 온도 조절밸브 12: 자동유량 조절밸브10: temperature control valve 12: automatic flow rate control valve

13: 스톱밸브 17: 정유량밸브13: stop valve 17: constant flow valve

본 고안은 도 1 내지 도 5에 도시한 바와 같이, 주택과 아파트 등의 실내를 난방하기 위하여 보일러 등으로부터 공급되는 온수가 순환되는 온수분배기 본체(1)와, 상기 온수분배기 본체(1)의 하우징(2) 내측 하부에 수평방향으로 고정됨과 아울러 스트레이너(4)와 유량 조절기(5) 및 배출밸브(6)가 일렬로 배치된 상태에서 입구에 스톱밸브(13)가 일체로 형성되는 제 1 분배헤더(3)와, 상기 제 1 분배헤더(3)와 각각의 온수파이프(7)를 통해 독립적으로 연결될 수 있게 제 1 분배헤더(3) 상측에 설치됨과 아울러 유량계(9)와 온도 조절밸브(10), 배출밸브(11), 자동유량 조절밸브(12) 및 정유량밸브(17)가 일체로 형성되는 제 2 분배헤더(8)로 구성된 것이다.1 to 5, the hot water distributor body (1) and the housing of the hot water distributor body 1 is circulated with hot water supplied from the boiler for heating the interior of the house and apartment, etc. (2) A first distribution in which the stop valve 13 is integrally formed at the inlet in a state in which the strainer 4, the flow regulator 5, and the discharge valve 6 are arranged in a line and fixed in the horizontal direction at the inner lower portion thereof. It is installed above the first distribution header 3 so that the header 3, the first distribution header 3 and the respective hot water pipes 7 can be independently connected, and the flow meter 9 and the temperature control valve ( 10), the discharge valve 11, the automatic flow control valve 12 and the constant flow valve 17 is composed of a second distribution header (8) formed integrally.

상기 제 1 분배헤더(3) 입구에 형성된 스톱밸브(13)는 그 후측에 스트레이너(4)를 위치시킴과 아울러 제 1 분배헤더(3) 상측면에 유량 조절기(5)를 설치하고, 상기 제 1 분배헤더(3) 끝단에 공기배출부(14)와 연결부(15) 및 배수구(16)가 형성된 배출밸브(6)를 설치하는 것이다.The stop valve 13 formed at the inlet of the first distribution header 3 positions the strainer 4 at the rear side thereof, and installs a flow regulator 5 on the upper side of the first distribution header 3. 1 At the end of the distribution header 3, an air discharge part 14, a connection part 15, and a discharge valve 6 having a drain port 16 are provided.

상기 스톱밸브(13)는 제 1 분배헤더(3)로 유입되는 온수를 비례적으로 단속하는 것이고, 상기 스트레이너(4)는 온수중의 이물질을 여과하는 것이며, 상기 유량 조절기(5)는 제 1 분배헤더(3)에서 각 룸으로 연결된 온수파이프(7)로의 온수량 이동을 특정시키는 것이고, 상기 배출밸브(6)는 제 1 분배헤더(3) 내부의 공기를 자동적으로 배출함과 아울러 온수를 배수시키는 것이다. 상기 제 1 분배헤더(3)내부 공기는 공기배출부(14)에 의해서 자동적으로 배출되고, 상기 제 1 분배헤더(3) 내부의 온수는 배수구(16)를 통해 배출되는 것이다.The stop valve 13 is to control the hot water flowing into the first distribution header 3 proportionally, the strainer 4 is to filter foreign matter in the hot water, the flow regulator 5 is the first It is to specify the flow of hot water from the distribution header (3) to the hot water pipe (7) connected to each room, and the discharge valve (6) automatically discharges the air inside the first distribution header (3) To drain. The air inside the first distribution header 3 is automatically discharged by the air discharge unit 14, and the hot water inside the first distribution header 3 is discharged through the drain 16.

그리고 상기 제 2 분배헤더(8) 출구에 형성된 정유량밸브(17)는 그 후측에 자동유량 조절밸브(12)를 위치시킴과 아울러 제 2 분배헤더(8) 상측면에 온도 조절밸브(10)를 설치하고, 상기 제 2 분배헤더(8) 끝단에 공기배출부(14)와 연결부(15) 및 배수구(16)가 형성된 배출밸브(11)를 설치하는 것이다. 상기 정유량밸브(17)는 사용된 온수가 보일러의 배관라인으로 귀환될 때 귀환되는 양을 수동조작하는 것이고, 상기 자동유량 조절밸브(12)는 사용중 배관(제 1, 2 분배헤더(3,8) 및 온수파이프(7) 등) 계통의 노후화에 따른 이물질의 침적 등에 의해서 유량 변화가 발생되면 탄력적으로 대응하여 항상 일정량의 유량이 흐를 수 있도록 하는 것이며, 상기 온도 조절밸브(10)는 각 룸의 설정 온도에 따라 자동적으로 작동되면서 해당룸의 온도가 일정하게 유지되도록 하는 것이다. 또한 상기 온도 조절밸브(10) 하측 대향지점인 온수파이프(7) 연결지점에 유량계(9)를 설치함으로써 사용자가 원하는 양의 온수가 순환되는지 확인할 수 있도록 하는 것이다.In addition, the constant flow rate valve 17 formed at the outlet of the second distribution header 8 positions the automatic flow rate control valve 12 at the rear side thereof and the temperature control valve 10 at the upper side of the second distribution header 8. And a discharge valve 11 having an air discharge portion 14, a connection portion 15, and a drain port 16 formed at an end of the second distribution header 8. The constant flow valve 17 is a manual operation of the amount returned when the used hot water is returned to the piping line of the boiler, the automatic flow control valve 12 is a pipe in use (first, second distribution header (3, 8) and hot water pipe (7, etc.) When the flow rate change occurs due to the deposition of foreign matters due to the aging of the system is to elastically respond to a certain amount of flow to always flow, the temperature control valve 10 is in each room It is automatically operated according to the set temperature of to keep the room temperature constant. In addition, by installing the flow meter (9) at the hot water pipe (7) connection point of the lower side facing the temperature control valve 10 to ensure that the user is circulating the desired amount of hot water.

상기한 온도 조절밸브(10)는 개별룸 온도조절기(19)와 전기적으로 연결되는 것으로서, 상기 온도 조절밸브(제 1, 2, 3, 4, 5, 6, 7, n 온도 조절밸브(20))(10)는 각각의 온수파이프(7)와 대응되게 설치되는 것이고, 상기 온도 조절밸브(10)와 각각이 독립적으로 연결되어 작동될 수 있도록 각각의 룸(제 1, 2, 3, 4, 5, 6, 7, n 룸(21))에 개별룸 온도조절기(19)를 설치하여 케이블(22)로 연결하는 것이다. 상기 개별룸 온도조절기(19)는 해당 룸(21) 사용자가 원하는 온도를 설정하면 해당온도 조절밸브(20)가 작동됨으로써 다른 룸(21)과는 독립적으로 온도조절이 가능한 것이다.The temperature control valve 10 is to be electrically connected to the individual room temperature controller 19, the temperature control valves (first, 2, 3, 4, 5, 6, 7, n temperature control valve 20) ) 10 is installed corresponding to each hot water pipe (7), each of the room (first, second, third, fourth, so that the temperature control valve 10 can be connected and operated independently of each other) 5, 6, 7, n room 21) to install the individual room thermostat 19 is connected to the cable (22). The individual room temperature controller 19 is to control the temperature independently of the other room 21 by operating the corresponding temperature control valve 20 when the user set the desired temperature in the room (21).

그리고 상기 제 1, 2 분배헤더(3,8)는 주물 등으로 제작함으로써 그 형상이 주기적으로 라운드지는 것으로서, 상기 라운드지는 부분으로 온수파이프(7)가 접촉된 상태로 설치되는 것이다.(도 2 참조) 상기한 온수파이프(7)의 접촉 설치로 인해 하우징(2)의 폭방향 폭이 좁아지게 되면서 전체적인 크기 축소를 유도할 수 있는 것이다. 상기한 하우징(2)을 시공한 후 도시하지 않은 커버를 하우징(2)에 결합하는 것이다.In addition, the first and second distribution headers 3 and 8 are formed by casting and the like, and their shape is periodically rounded, and the rounded portions are installed in a state where the hot water pipe 7 is in contact with the rounded portion. Ref.) Due to the contact installation of the hot water pipe (7), the width in the width direction of the housing (2) is narrowed to induce an overall size reduction. After the housing 2 is constructed, the cover (not shown) is coupled to the housing 2.

미설명 부호 23은 제 1 분배헤더(3)와 제 2 분배헤더(8)를 연결하여 하우징(2)에 고정시키는 고정핀이고, 24는 배수구(16)를 외부와 차단시키는 캡이다.Reference numeral 23 is a fixing pin that connects the first distribution header 3 and the second distribution header 8 to the housing 2, and 24 is a cap that blocks the drain 16 from the outside.

이상과 같은 본 고안은 복합적인 기능이 발휘되도록 함과 아울러 시공 작업이 간편하게 이루어질 수 있도록 하는 것으로서, 온수분배기 본체(1)의 하우징(2) 내측에 제 1, 2 분배헤더(3,8)를 고정시킴과 아울러 상기 제 1 분배헤더(3)에는 스톱밸브(13)와 스트레이너(4), 유량 조절기(5) 및 배출밸브(6)가 순차적으로 형성되는 것이고, 상기 제 2 분배헤더(8)에는 정유량밸브(17)와 자동유량 조절밸브(12), 온도 조절밸브(10), 유량계(9), 배출밸브(11) 등이 형성되는 것이다.The present invention as described above is to facilitate the construction work as well as to exhibit a complex function, the first and second distribution headers (3, 8) inside the housing (2) of the hot water distributor body (1) In addition, the stop valve 13, the strainer 4, the flow regulator 5 and the discharge valve 6 are sequentially formed in the first distribution header 3, and the second distribution header 8 In the constant flow valve 17, the automatic flow control valve 12, the temperature control valve 10, the flow meter 9, the discharge valve 11 and the like is formed.

상기 각각의 부품들이 제 1 분배헤더(3)와 제 2 분배헤더(8)에 일체로 형성됨으로써 제 1 분배헤더(3)와 제 2 분배헤더(8)의 전체적인 크기가 축소되고, 상기 제 1 분배헤더(3)와 제 2 분배헤더(8)가 하우징(2) 내측에 일체로 고정된 상태로한개의 단품화가 이루어짐에 따라 시공자는 제 1 분배헤더(3)와 제 2 분배헤더(8)가 형성된 온수분배기 본체(1)를 구입하여 배관라인 및 온수파이프(7)와 연결시키면 되는 것이다.The respective parts are integrally formed with the first distribution header 3 and the second distribution header 8 so that the overall size of the first distribution header 3 and the second distribution header 8 is reduced, and the first As a single unitization is made with the dispensing header 3 and the second dispensing header 8 fixedly fixed inside the housing 2, the contractor has a first dispensing header 3 and a second distributing header 8. The hot water distributor body (1) formed is to be connected to the piping line and the hot water pipe (7).

상기 제 1 분배헤더(3)와 제 2 분배헤더(8)의 유량 조절기(5) 및 유량계(9) 대응지점에는 각각의 룸(21)에 해당되는 온수파이프(7)를 연결하는 것이고, 상기 제 1 분배헤더(3)의 스톱밸브(13) 전방에는 보일러 등으로부터 공급되는 온수 배관라인에 연결하며, 상기 제 2 분배헤더(8)의 정유량밸브(17) 전방에는 보일러 등으로 귀환되는 순환 배관라인에 연결되어 온수의 순환이 이루어지도록 하는 것이다.The hot water pipes 7 corresponding to the respective rooms 21 are connected to the corresponding points of the flow regulator 5 and the flow meter 9 of the first distribution header 3 and the second distribution header 8. Circulation that is connected to the hot water pipe line supplied from the boiler, etc. in front of the stop valve 13 of the first distribution header (3), and returned to the boiler, etc. in front of the constant flow valve (17) of the second distribution header (8). Connected to the pipe line is to allow the circulation of hot water.

상기와 같이 작업자가 각각의 부품들을 연결 조립하지 않으면서 작업함에 따라 시공작업이 간단하게 이루어지고, 시공시 작업 공간에 제약을 받지 않는 것이다.As described above, as the worker works without connecting and assembling each part, the construction work is simply made, and the construction space is not limited by the work.

이상과 같이 본 고안은 온수분배기 본체의 하우징 내측에 스톱밸브와 스트레이너, 유량 조절기 및 배출밸브가 순차적으로 형성된 제 1 분배헤더를 고정함과 아울러 정유량밸브와 자동유량 조절밸브, 온도 조절밸브, 유량계, 배출밸브가 일체로 형성된 제 2 분배헤더를 고정시켜 형성함에 따라 온수분배기 본체의 크기가 축소되고, 상기 각각의 부품들이 일체로 형성됨에 따라 시공 작업자가 온수파이프와 배관라인만을 연결시키면서 마무리하게 되면서 작업성이 현저하게 향상되는 것이다.As described above, the present invention fixes the first distribution header in which the stop valve and the strainer, the flow regulator, and the discharge valve are sequentially formed inside the housing of the hot water distributor body, as well as the constant flow valve, the automatic flow control valve, the temperature control valve, and the flow meter. As the discharge valve is formed by fixing the second distribution header formed integrally, the size of the hot water distributor body is reduced, and as the respective parts are integrally formed, the construction worker finishes by connecting only the hot water pipe and the piping line. Workability is remarkably improved.

그리고 제 1, 2 분배헤더에 스톱밸브와 스트레이너, 유량 조절기, 정유량밸브, 자동유량 조절밸브, 온도 조절밸브, 유량계, 배출밸브가 일체로 형성됨에 따라복합적인 기능이 완전하게 발휘되는 것이다.As the first and second distribution headers are formed with a stop valve, a strainer, a flow regulator, a constant flow valve, an automatic flow control valve, a temperature control valve, a flow meter, and a discharge valve, a complex function is fully exhibited.

Claims (4)

온수분배기 본체(1)와;Hot water distributor body (1); 상기 온수분배기 본체(1)의 하우징(2) 내측 하부에 고정되고 스트레이너(4)와 유량 조절기(5) 및 배출밸브(6)가 일체로 형성됨과 아울러 입구에 스톱밸브(13)가 형성되는 제 1 분배헤더(3)와;It is fixed to the inner lower portion of the housing 2 of the hot water distributor body 1, the strainer 4, the flow regulator 5 and the discharge valve 6 is formed integrally, and the stop valve 13 is formed at the inlet 1 distribution header 3; 상기 제 1 분배헤더(3)와 온수파이프(7)를 통해 독립적으로 연결될 수 있게 제 1 분배헤더(3) 상측에 설치됨과 아울러 유량계(9)와 온도 조절밸브(10), 배출밸브(11), 자동유량 조절밸브(12) 및 정유량밸브(17)가 일체로 형성되는 제 2 분배헤더(8)로 구성된 것을 특징으로 하는 온수분배 시스템.It is installed above the first distribution header 3 so that the first distribution header 3 and the hot water pipe 7 can be independently connected, the flow meter 9, the temperature control valve 10, and the discharge valve 11. Hot water distribution system, characterized in that composed of a second distribution header (8) in which the automatic flow rate control valve (12) and the constant flow rate valve (17) are integrally formed. 삭제delete 삭제delete 제1항에 있어서,The method of claim 1, 상기 온도 조절밸브(10)는 개별룸 온도조절기(19)와 전기적으로 연결되는 것을 특징으로 하는 온수분배 시스템.The temperature control valve 10 is hot water distribution system, characterized in that electrically connected with the individual room temperature controller (19).
KR2020010025718U 2001-08-24 2001-08-24 Warm water division system KR200263677Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010025718U KR200263677Y1 (en) 2001-08-24 2001-08-24 Warm water division system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010025718U KR200263677Y1 (en) 2001-08-24 2001-08-24 Warm water division system

Publications (1)

Publication Number Publication Date
KR200263677Y1 true KR200263677Y1 (en) 2002-02-08

Family

ID=73107345

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010025718U KR200263677Y1 (en) 2001-08-24 2001-08-24 Warm water division system

Country Status (1)

Country Link
KR (1) KR200263677Y1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100952957B1 (en) * 2008-01-31 2010-04-15 (주)이씨엘 Header for hot water distributer
KR101063534B1 (en) * 2009-03-20 2011-09-07 신한콘트롤밸브 주식회사 Hot water distribution system with noiseless distributor
KR200461795Y1 (en) 2009-11-23 2012-08-07 홍석기 A hot water distributer
KR101585571B1 (en) 2013-12-03 2016-01-14 김종학 a water allotter in the boiler
KR102074587B1 (en) * 2018-09-12 2020-02-06 지에스건설 주식회사 Hot-water heating system
KR102475059B1 (en) * 2021-12-07 2022-12-07 대창설비(주) Distributor with integrated meter

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100952957B1 (en) * 2008-01-31 2010-04-15 (주)이씨엘 Header for hot water distributer
KR101063534B1 (en) * 2009-03-20 2011-09-07 신한콘트롤밸브 주식회사 Hot water distribution system with noiseless distributor
KR200461795Y1 (en) 2009-11-23 2012-08-07 홍석기 A hot water distributer
KR101585571B1 (en) 2013-12-03 2016-01-14 김종학 a water allotter in the boiler
KR102074587B1 (en) * 2018-09-12 2020-02-06 지에스건설 주식회사 Hot-water heating system
KR102475059B1 (en) * 2021-12-07 2022-12-07 대창설비(주) Distributor with integrated meter

Similar Documents

Publication Publication Date Title
RU2449220C2 (en) Device for distributing water with various temperature
EP3333493B1 (en) Water circulation module and hot water system using the same
KR200263677Y1 (en) Warm water division system
US20090102072A1 (en) Steam humidifier quick liquid connection
US11578864B2 (en) Method of automatically cleaning boiler pipes
KR20130052085A (en) A boiler with cleaning device
KR200484019Y1 (en) Heating Hot Water Distribution Systems
KR200443777Y1 (en) Sink Pipe Connector using Hot Water Distributor
US11408693B2 (en) System for automatically cleaning boiler pipes
CN104633744B (en) Fire pump complementary hot-water system
JP3944434B2 (en) Hot water heating system
KR100701756B1 (en) Method of heating water distribution and one header panel heating system
EP1590607B1 (en) Heating plant control device
KR102236716B1 (en) Water heater
ITTO20070012A1 (en) FLUID DISTRIBUTION UNIT, AND METHOD TO DISTRIBUTE FLUIDS.
KR102583364B1 (en) Household unit with hot water preheating function using bypass function and its control method
WO2021062239A1 (en) Tankless water heater having integrated scale control module
CN204438285U (en) Combustion pump complementary hot-water system
JP3951173B2 (en) Bathroom heating system
WO2022102477A1 (en) A safety configuration in hydroblock systems
JP4359342B2 (en) Water heater and its piping connection system and water supply joint
AU2008100289A4 (en) Water heating system
KR200258100Y1 (en) A valve gear for a heating pip cleaning and heating water exchange in hot-water heating device
RU2188359C1 (en) Apartment heating system
KR101458165B1 (en) Regenerative inverter electric boiler

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
EXPY Expiration of term