KR200228624Y1 - Concrete block of water conduit of slope side a road - Google Patents

Concrete block of water conduit of slope side a road Download PDF

Info

Publication number
KR200228624Y1
KR200228624Y1 KR2020010001338U KR20010001338U KR200228624Y1 KR 200228624 Y1 KR200228624 Y1 KR 200228624Y1 KR 2020010001338 U KR2020010001338 U KR 2020010001338U KR 20010001338 U KR20010001338 U KR 20010001338U KR 200228624 Y1 KR200228624 Y1 KR 200228624Y1
Authority
KR
South Korea
Prior art keywords
concrete
shaped groove
hole
concrete block
block
Prior art date
Application number
KR2020010001338U
Other languages
Korean (ko)
Inventor
김진석
Original Assignee
동림건설기술주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동림건설기술주식회사 filed Critical 동림건설기술주식회사
Priority to KR2020010001338U priority Critical patent/KR200228624Y1/en
Application granted granted Critical
Publication of KR200228624Y1 publication Critical patent/KR200228624Y1/en

Links

Landscapes

  • Sewage (AREA)

Abstract

본 고안은 급경사면에 순차적으로 늘어 세워서 수로를 형성하는 U자 홈체의 콘크리트블록에 관한 것으로서, 상기 U자 홈체의 바닥부의 1개소 또는 복수개소에 콘크리트치기 구멍을 뚫고, 이 콘크리트치기 구멍에 맞추어 기초지반쪽에도 콘크리트치기 구멍을 뚫어, 이 양자의 콘크리트치기 구멍에 콘크리트를 쳐서 U자 홈체를 기초지반쪽에 고정하는 것을 특징으로 한다.The present invention relates to a concrete block of U-shaped grooves that form a waterway by sequentially arranged on a steep slope, and drills a concrete punching hole in one or a plurality of bottom portions of the U-shaped groove, and in accordance with the concrete drilling hole A concrete punching hole is also drilled in the ground side, and the concrete is punched in both concrete punching holes to fix the U-shaped groove body on the foundation ground side.

본고안의 콘크리트블록은 시공에 있어서도 현장에서 콘크리트치기 구멍과 콘크리트치기 구멍에 콘크리트를 치는 것만으로 되기 때문에 간단하고 능률적인 동시에 콘크리트치기 구멍을 형성한 만큼 U자 홈체(1)가 경량이 되어 운반등의 물류비용을 절감할 수 있는 뛰어난 효과를 갖는 것이다.As the concrete block in this paper only needs to hit concrete in the construction site and the concrete hole in the construction, the U-shaped groove 1 becomes lightweight because it is simple and efficient and forms the concrete hole. It is to have an excellent effect to reduce the logistics cost.

Description

도로의 경사면 수로 콘크리트블록{CONCRETE BLOCK OF WATER CONDUIT OF SLOPE SIDE A ROAD}Road surface waterway concrete block {CONCRETE BLOCK OF WATER CONDUIT OF SLOPE SIDE A ROAD}

본 고안은 도로의 경사면에 형성되는 U자 홈 형상의 수로용 콘크리트 블록에 관한 것이다.The present invention relates to a U-shaped groove-shaped concrete block formed on the inclined surface of the road.

종래에 U자 홈 블록을 사용하여 늘어 세워서 수로를 형성하는 경우, 평탄한 땅이나 경사면, 산중의 급경사면이더라도 단지 U자 홈 블록을 순차적으로 늘어세워 가는 것에 불과하기 때문에, 급경사면의 경우, 장기간에 있어서 U자 홈 블록이 슬라이딩하게 되어 U자 홈 블록 사이에 간극이 생겨서 수로로서 쓸모가 충분치 않게 되어 버리는 결점이 있었다. 또한, 급경사면이 되면 될수록 그 경향이 강해졌다.Conventionally, when a channel is formed by using a U-shaped groove block to form a waterway, even if the flat ground, a slope, or a steep slope in the mountains, only the U-shaped groove blocks are sequentially stacked, in the case of a steep slope, Therefore, there was a drawback that the U-shaped groove block was slid, so that a gap was formed between the U-shaped groove blocks, so that the U-shaped groove block was not sufficiently used as a water channel. In addition, the tendency became stronger as the steep slope.

본 고안은 상기의 종래의 문제점을 해소하기 위한 콘크리트브록에 관한 것으로서, 본 고안의 목적은 수로에 있어서의 U자 홈 블록의 슬라이딩을 방지하는데 있다.The present invention relates to a concrete block for solving the above conventional problems, the object of the present invention is to prevent the sliding of the U-shaped groove block in the waterway.

도 1은 본 고안에 따른 도로의 경사면 수로 콘크리트 블록을 일부 절결하여 도시한 사시도,1 is a perspective view showing a partially cut concrete block of the inclined surface of the road according to the present invention,

도 2는 2는 본 고안에 따른 도로의 경사면 수로 콘크리트 블록의 다른 실시예로서 일부 절결하여 도시한 사시도,Figure 2 is a perspective view showing a cut away part 2 as another embodiment of the concrete block of the inclined surface of the road according to the present invention,

도 3은 본 고안에 따른 도로의 경사면 수로 콘크리트 블록의 시공 측면도,3 is a side view of the construction of the concrete block of the inclined surface of the road according to the present invention,

도 4는 본 고안에 따른 도로의 경사면 수로 콘크리트 블록의 시공 요부의 단면도이다.Figure 4 is a cross-sectional view of the main construction of the inclined waterway concrete block of the road according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1 : U자 홈체 2 : 수로1: U-shaped groove 2: Waterway

3 : 콘크리트치기 구멍 4 : 기초지반3: concrete cutting hole 4: foundation ground

5 : 콘크리트치기 구멍 6 : 콘크리트5: concrete slab hole 6: concrete

7 : 콘크리트치기 절결부7: concrete cutting notch

상기 목적을 달성하기 위한 본 고안의 콘크리트블록의 구성에 대하여 첨부도면을 참조하여 상세하게 설명하면 다음과 같다. 급경사면에 콘크리트제의 U자 홈체(1)를 순차적으로 늘어 세워서 수로(2)를 형성함에 있어서, U자 홈체(1)의 1개마다 또는 적당한 간격마다의 바닥부에 콘트리트치기 구멍(3)을 형성하고, 이 콘크리트치기 구멍(3)에 맞추어 기초지반(4)(암반)쪽에도 콘크리트치기 구멍(5)을 형성하여, 이 양자의 콘크리트치기 구멍(3, 5)에 콘크리트(6)를 쳐서 U자 홈체(1)를 기초지반(4)쪽에 고정한다.The concrete block of the present invention for achieving the above object will be described in detail with reference to the accompanying drawings. In forming the waterway 2 by sequentially arranging the U-shaped grooves 1 made of concrete on the steep slopes, the concrete punching hole 3 at the bottom of each U-shaped groove 1 or at appropriate intervals. To form the concrete pitting holes (5) on the foundation ground (4) (rock) side in accordance with the concrete pitting holes (3), and hit the concrete (6) to the concrete pitting holes (3, 5) The U-shaped groove body 1 is fixed to the foundation ground 4 side.

도 1은 U자 홈체(1) 바닥부 중앙에 콘크리트치기 구멍(3)을 뚫었을 경우를 도시하며, 도 2는 다른 실시예로서, U자 홈체(1)의 양쪽 끝부에 이웃끼리의 U자 홈체(1)를 맞추면 하나의 콘크리트치기 구멍(3)을 형성하는 콘크리트치기 절결부(7)를 형성한 경우를 도시하고 있다. 또한, 도면은 생략하나 U자 홈체(1)의 길이에 따라서는 콘크리트치기 구멍(3)을 2, 3개로 형성하더라도 좋다.FIG. 1 shows a case where a concrete punching hole 3 is drilled in the center of a bottom portion of a U-shaped groove 1, and FIG. 2 shows U-shaped grooves of neighbors at both ends of the U-shaped groove 1 in another embodiment. When the groove body 1 is matched, the case where the concrete cutting | disconnection cutout part 7 which forms one concrete cutting hole 3 is formed is shown. In addition, although abbreviate | omitted a figure, you may form two or three concrete pitting holes 3 depending on the length of the U-shaped groove body 1. As shown in FIG.

도 3에 나타낸 수로(2)의 시공 정단면도는 U자 홈체(1)의 1개마다 콘크리트치기 구멍(3)을 형성하고 있으나, 급경사면의 기울기에 맞추어 1개 간격이라든가 2개 간격이라든가, 또한 평탄한 땅이 있는 경우에는 그 부분에는 콘크리트치기 구멍(3)을 교번으로 형성하는 등, 고려하여 시공하면 된다.The constructional sectional view of the channel 2 shown in Fig. 3 forms a concrete punching hole 3 for each of the U-shaped grooves 1, but according to the inclination of the steep slopes, one interval or two intervals are used. In the case where there is a flat ground, the construction may be carried out in consideration of the formation of alternating concrete holes 3 in the portion.

본 고안은 상기한 바와 같이 구성하였기 때문에 U자 홈체(1)의 바닥부에 형성한 콘크리트치기 구멍(3)과 이 콘크리트치기 구멍(3)에 합치하는 기초지반(4)쪽의 콘크리트치기 구멍(5)에 콘크리트(6)를 치면 U자 홈체(1)와 기초지반(4)은 개재되는 콘크리트(6)에 의하여 고정되게 된다.Since the present invention is constructed as described above, the concrete punching hole 3 formed in the bottom of the U-shaped groove 1 and the concrete punching hole on the side of the base ground 4 which coincides with the concrete punching hole 3 ( When the concrete 6 is hit 5), the U-shaped groove body 1 and the foundation ground 4 are fixed by the interposed concrete 6.

이 경우, 콘크리트치기 구멍(3)도 기울기에 맞추어 U자 홈체(1) 1개마다 형성하거나 1개 간격으로 형성하거나, 2개 간격으로 형성하거나 하면 된다.In this case, the concrete punching holes 3 may also be formed for each U-shaped groove body 1 at intervals, at intervals of one, or at intervals of two.

이와 같이 하여 U자 홈체(1)를 기초지반(4)쪽에 고정해 감으로써 급경사면이더라도 U자 홈체(1)가 슬라이딩하지 않는 수로(2)를 형성하게 된다.In this way, the U-shaped groove body 1 is fixed to the base ground 4 side, thereby forming a channel 2 in which the U-shaped groove body 1 does not slide even on a steep slope.

따라서, U자 홈체(1)의 슬라이딩이 없어 U자 홈체(1) 사이에 간극이 생기지않기 때문에 누수가 없는 수로(2)를 제공하게 되고, 위치의 변동이 없어 장기적으로 사용이 가능하게 된다.Therefore, since there is no sliding of the U-shaped groove 1 and there is no gap between the U-shaped grooves 1, the water channel 2 without leakage is provided, and there is no change in position, thereby enabling long-term use.

이와 같은 본고안의 콘크리트블록은 시공에 있어서도 현장에서 콘크리트치기 구멍(3)과 콘크리트치기 구멍(5)에 콘크리트(6)를 치는 것만으로 되기 때문에 간단하고 능률적인 동시에 콘크리트치기 구멍(3)을 형성한 만큼만 U자 홈체(1)가 경량이 되어 운반등의 물류비용을 절감할 수 있는 뛰어난 효과를 갖는 것이다.Since the concrete block of this paper only needs to hit the concrete 6 and 6 in the construction site at the time of construction, it is simple and efficient, and at the same time, the concrete block 3 is formed. Only the U-shaped groove (1) is lightweight and has an excellent effect of reducing the logistics cost, such as transport.

Claims (1)

급경사면에 순차적으로 늘어 세워서 수로를 형성하는 U자 홈체의 콘크리트블록에 있어서 ,In the concrete block of the U-shaped groove to form a waterway by sequentially arranged on a steep slope, 상기 U자 홈체(1)의 바닥부의 1개소 또는 복수개소에 콘크리트치기 구멍(3)을 뚫고, 이 콘크리트치기 구멍(3)에 맞추어 기초지반쪽(4)에도 콘크리트치기 구멍(5)을 뚫어, 이 양자의 콘크리트치기 구멍(3,5)에 콘크리트(6)를 쳐서 U자 홈체(1)를 기초지반(4)쪽에 고정하는 것을 특징으로 하는 도로의 경사면 수로 콘크리트블록.The concrete punching hole 3 is drilled in one or a plurality of bottom portions of the U-shaped groove 1, and the concrete punching hole 5 is also drilled in the base ground side 4 in accordance with the concrete punching hole 3, The inclined channel waterway concrete block of the road, characterized by fixing the U-shaped groove body 1 to the base ground 4 by hitting the concrete 6 in both of the concrete slab holes 3 and 5.
KR2020010001338U 2001-01-17 2001-01-17 Concrete block of water conduit of slope side a road KR200228624Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010001338U KR200228624Y1 (en) 2001-01-17 2001-01-17 Concrete block of water conduit of slope side a road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010001338U KR200228624Y1 (en) 2001-01-17 2001-01-17 Concrete block of water conduit of slope side a road

Publications (1)

Publication Number Publication Date
KR200228624Y1 true KR200228624Y1 (en) 2001-06-15

Family

ID=73095117

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010001338U KR200228624Y1 (en) 2001-01-17 2001-01-17 Concrete block of water conduit of slope side a road

Country Status (1)

Country Link
KR (1) KR200228624Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102174082B1 (en) * 2020-07-23 2020-11-04 정품건설산업 주식회사 Construction method of slope drainage ditch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102174082B1 (en) * 2020-07-23 2020-11-04 정품건설산업 주식회사 Construction method of slope drainage ditch

Similar Documents

Publication Publication Date Title
DE60119990D1 (en) paving stone
DK1095189T3 (en) paving
CA2493380A1 (en) A subterranean drainage pattern and a method for drilling ramped wellbores
IT1310120B1 (en) CUTTING ELEMENTS WITH BINDER-FREE CARBIDE LAYERS.
CA2435221A1 (en) Method and system for enhanced access to a subterranean zone
DE60129234D1 (en) CABLE CHANNEL WITH LOTS SIDE PIECES
NO20012956D0 (en) Downhole mud engine transmission
DE19983068T1 (en) drill
DK1114222T3 (en) Mid-term block for a coastal structure as well as method for placing this block
ATE365832T1 (en) TRENCH COVER ELEMENT
CA2411032A1 (en) Cast stone for fixing exterior traffic surfaces
NO20004077D0 (en) Anti-accumulation additives for drilling fluids
WO2006071349A3 (en) Dielectric frame assembly and fuel cell manifold
IT1309084B1 (en) NOZZLES FOR ROCK DRILLING POINTS.
KR200228624Y1 (en) Concrete block of water conduit of slope side a road
WO2005012664A3 (en) Modular trench drain
JP2008546930A (en) Construction kit with multiple paving stones
WO2002092957A3 (en) Drill bit
ATE458942T1 (en) OIL SCRAP RING DIVIDED INTO SEGMENTS
NO20010744L (en) Stabilizing additives for shale rock
ATE381654T1 (en) LOCK-KEY SYSTEM
JP2007162350A (en) Drainage lead-in implement and side-ditch block
DE69936218D1 (en) DRILL FOR UNTIEFE HOLES
PT1095195E (en) BLOCK FOR MASONRY
EA200300786A1 (en) METHOD AND INSTALLATION FOR CONSTRUCTION OF UNDERWATER OIL AND GAS WELLS

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
LAPS Lapse due to unpaid annual fee
T601 Decision on revocation of utility model registration