KR200219926Y1 - The ceiling corner closing stuff - Google Patents

The ceiling corner closing stuff Download PDF

Info

Publication number
KR200219926Y1
KR200219926Y1 KR2020000028765U KR20000028765U KR200219926Y1 KR 200219926 Y1 KR200219926 Y1 KR 200219926Y1 KR 2020000028765 U KR2020000028765 U KR 2020000028765U KR 20000028765 U KR20000028765 U KR 20000028765U KR 200219926 Y1 KR200219926 Y1 KR 200219926Y1
Authority
KR
South Korea
Prior art keywords
ceiling
wall
bricks
plastering
finishing
Prior art date
Application number
KR2020000028765U
Other languages
Korean (ko)
Inventor
김봉근
Original Assignee
김봉근
주식회사한성종합기술단건축사사무소
주식회사동남아태종합건축사사무소
주식회사까치종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김봉근, 주식회사한성종합기술단건축사사무소, 주식회사동남아태종합건축사사무소, 주식회사까치종합건축사사무소 filed Critical 김봉근
Priority to KR2020000028765U priority Critical patent/KR200219926Y1/en
Application granted granted Critical
Publication of KR200219926Y1 publication Critical patent/KR200219926Y1/en

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

본 고안은 실내의 천장과 벽체가 접하는 모서리 부위에 필히 설치되는 마감재를 통상적인 설치방식을 탈피할 수 있도록 벽돌을 쌓는 조적 공사시 동시에 설치를 이룰 수 있도록 변형 제작함은 물론이고, 인접 설치되는 천장판넬 및 미장물과의 연결을 긴밀하고도 견고하게 이룰 수 있도록 기능적으로 변형 제작하여, 벽체상에 견고하게 설치를 이룰 수 있도록 함과 더불어 벽체와 접하는 천장판넬을 지지 고정하는 기능과 벽면에 마감 처리되는 미장물과의 마무리 연결을 긴밀하게 이룰 수 있는 기능을 동시에 이룰 수 있게 한 천장 모서리 마감재에 관한 것으로,The invention devises the finishing materials installed at the corners where the ceiling and the wall are in contact with the interior of the room so that they can be installed at the same time during the construction of masonry to deviate from the usual installation method, as well as the adjacent ceilings. Functionally deformed to make the connection between the panel and the plastered material tightly and firmly, making it possible to install it firmly on the wall, and to support and fix the ceiling panel in contact with the wall and finish the wall. To a ceiling edge finisher that allows for a close connection with the desired plaster at the same time,

특히, 천장판넬과 벽체가 접하는 모서리부를 마감하는 몰딩부재에 있어서,In particular, in the molding member for closing the corner portion where the ceiling panel and the wall contact,

건물을 공사시 벽돌을 쌓는 조적 과정에서 벽돌과 벽돌 사이에 위치시켜 고정설치할 수 있도록 하는 삽입돌기(12)가 내측에 형성되어 있고, 외측 하단에는 조적이 완료된 벽체(24)상에 미장 공사시 미장물(26)과의 연결마감을 긴밀하게 이룰 수 있도록 하는 마감턱(14)이 형성되어 있으며, 외측 상단에는 천장을 마감하는 천장판넬(22)을 삽입 고정할 수 있도록 하는 가이드홈(16)이 일체로 구비되어 있는 마감재(10)가 구성됨을 특징으로 한다.Plastering process for building the bricks during construction of the building is placed between the bricks and bricks in the insertion projections (12) are formed on the inside, the outer bottom of the plastering on the wall (24) where the masonry is finished plastering Finishing jaw 14 is formed to form a close connection with the water (26), the guide groove 16 for inserting and fixing the ceiling panel 22 to close the ceiling at the outer top Characterized in that the finishing material 10 is provided integrally.

Description

천장 모서리 마감재{THE CEILING CORNER CLOSING STUFF}Ceiling corner finisher {THE CEILING CORNER CLOSING STUFF}

본 고안은 천장 모서리 마감재에 관한 것으로, 더욱 상세하게는 실내의 천장과 벽체가 접하는 모서리 부위에 필히 설치되는 마감재를 통상적인 설치방식을 탈피할 수 있도록 벽돌을 쌓는 조적 공사시 동시에 설치를 이룰 수 있도록 변형 제작함은 물론이고, 인접 설치되는 천장판넬 및 미장물과의 연결을 긴밀하고도 견고하게 이룰 수 있도록 기능적으로 변형 제작하여, 벽체상에 견고하게 설치를 이룰 수 있도록 함과 더불어 벽체와 접하는 천장판넬을 지지 고정하는 기능과 벽면에 마감 처리되는 미장물과의 마무리 연결을 긴밀하게 이룰 수 있는 기능을 동시에 이룰 수 있게 한 천장 모서리 마감재에 관한 것이다.The present invention relates to a ceiling corner finishing material, and more particularly, the finishing material that is necessarily installed at the corners of the ceiling and the wall in contact with the room to be installed at the same time during the masonry masonry construction to deviate from the usual installation method In addition to the deformed box, it is functionally deformed to make the connection between the ceiling panels and the plastered products installed adjacently and firmly, making it possible to install it firmly on the wall and to contact the wall. It relates to a ceiling edge finisher which enables both the function of supporting and fixing the panel and the function of making a close connection with the finishing material to be finished on the wall.

일반적으로 천장과 벽체가 마주하는 모서리부에는 실내의 장식이나 마감을 위하여 여러형태의 몰딩부재를 이용하여 모서리부를 처리하고 있다.In general, corners facing the ceiling and the wall are treated with corners by using various types of molding members for interior decoration or finishing.

이러한 몰딩부재는 통상적으로 기본적인 마무리 공사가 종료된 상태 즉, 벽체의 미장공사가 완료되고, 천장판넬이 설치 완료된 상태에서 최종적으로 상술한 바와 같이 천장판넬과 벽체가 마주하는 모서리부에 못과 같은 고정수단을 통해 설치 고정되게 된다.Such a molding member is generally fixed in the corners facing the ceiling panel and the wall as described above in the state in which the basic finishing work is finished, that is, the finishing of the plastering of the wall is completed, and the ceiling panel is completed. Installation is fixed by means.

그러나, 이와 같은 몰딩부재는 단순히 모서리부의 미감을 위하여 외관에만 중점을 두고 설계하여 제공되어 왔기 때문에 인테리어적인 마감 기능 외에는 별다른 기능이 없었다.However, such a molding member has been designed and provided with an emphasis only on the exterior only for the aesthetics of the corners, so there was no other function other than the interior finishing function.

그러므로, 실사용시 겪게되는 여러가지의 문제 현상에 효과적으로 대처할 수 없는 취약점이 있었다.Therefore, there were vulnerabilities that could not effectively cope with various problem phenomena encountered in actual use.

이를 순서에 의거하여 나열하면 다음과 같다.If they are listed in order, they are as follows.

첫째, 상술한 바와 같이 기본적인 마무리 공사가 종료된 상태에서 못과 같은 별도의 고정 수단을 이용하여 설치하게 되므로, 설치를 신속 용이하게 이룰 수 없게 하는 문제가 있었고,First, since the basic finishing work is installed as described above using a separate fixing means such as a nail, there was a problem that can not be quickly and easily installed,

둘째, 수작업에 의해 미장 처리되게 되는 벽면은 사실상 일정한 평면으로 형성되기란 불가능하다는 사실을 고려하지 않아 설치시 벽면과 긴밀하게 부착을 이루지 못해 오히려 실내의 미관을 저해하는 요인을 제공하는 문제가 있었으며,Second, there is a problem in that it does not consider the fact that it is impossible to form a uniform plane, and the wall surface to be plastered by manual work cannot be closely attached to the wall during installation, thus providing a factor that hinders the beauty of the interior.

셋째, 천장판넬과 접하게 되는 벽체 부위에는 별도의 천장판넬의 외곽을 지지 고정할 수 있도록 하는 고정틀을 필히 설치해 주어야 하므로 전반적인 공정을 지연시킴은 물론이고, 작업의 불편을 가중 시키는 문제가 있었고,Third, in the wall part contacting the ceiling panel, a fixing frame for supporting and fixing the outside of the separate ceiling panel must be installed, which delays the overall process and adds inconvenience to the work.

넷째, 장기간 사용하다 보면 부착 상태가 그다지 견고하지 못해 쉽게 이탈되는 등의 문제가 있었다.Fourth, there was a problem such that the attachment state is not very solid and easily released after long-term use.

본 고안은 상술한 종래의 여러 문제점들을 해소하고자 안출한 것으로서,The present invention has been made to solve the various problems described above,

실내의 천장과 벽체가 접하는 모서리 부위에 필히 설치되는 마감재를 통상적인 설치방식을 탈피할 수 있도록 벽돌을 쌓는 조적 공사시 동시에 설치를 이룰 수 있도록 변형 제작함은 물론이고, 인접 설치되는 천장판넬 및 미장물과의 연결을 긴밀하고도 견고하게 이룰 수 있도록 기능적으로 변형 제작하여, 벽체상에 견고하게 설치를 이룰 수 있도록 함과 더불어 벽체와 접하는 천장판넬을 지지 고정하는 기능과 벽면에 마감 처리되는 미장물과의 마무리 연결을 긴밀하게 이룰 수 있는 기능을 동시에 이룰 수 있게 한 천장 모서리 마감재를 제공하는데 그 목적이 있다.The finishing materials installed at the corners where the ceiling and the wall contact the interior of the room must be modified and fabricated so that they can be installed at the same time during the masonry construction to avoid the usual installation method. Functionally transformed to make the connection with water tightly and firmly, making it possible to install it firmly on the wall, and to support and fix the ceiling panel in contact with the wall and the plastering finished on the wall The aim is to provide a ceiling edge finish that allows for the simultaneous functioning of a close connection to the wall.

상술한 목적은, 천장판넬과 벽체가 접하는 모서리부를 마감하는 몰딩부재에 있어서, 건물을 공사시 벽돌을 쌓는 조적 과정에서 벽돌과 벽돌 사이에 위치시켜 고정설치할 수 있도록 하는 삽입돌기가 내측에 형성되어 있고, 외측 하단에는 조적이 완료된 벽체상에 미장 공사시 미장물과의 연결마감을 이룰 수 있도록 하는 마감턱이 형성되어 있으며, 외측 상단에는 천장을 마감하는 천장판넬을 삽입 고정할 수 있도록 하는 가이드홈이 일체로 구비되어 있는 천장 모서리 마감재에 의해 달성될 수 있다.In the above-mentioned object, in the molding member which finishes the corner portion where the ceiling panel and the wall are in contact with each other, an insertion protrusion is formed on the inner side so as to be fixedly positioned between the brick and the brick in the process of masonry building the building. At the bottom of the outer side, a finishing jaw is formed on the wall where the masonry is completed to make a connection with the plaster at the time of plastering, and the guide groove for inserting and fixing the ceiling panel that closes the ceiling is at the outer top. It can be achieved by an integrally provided ceiling edge finish.

도 1은 본 고안인 천장 모서리 마감재의 구성 상태를 도시한 사시도,1 is a perspective view showing the configuration of the ceiling corner finish material of the present invention,

도 2는 본 고안인 천장 모서리 마감재의 설치 상태를 발췌 도시한 요부 단면도,Figure 2 is a main cross-sectional view showing the installation state of the ceiling corner finish material of the present invention,

도 3은 본 고안인 천장 모서리 마감재의 설치 상태를 발췌 도시한 요부 사시도.Figure 3 is a perspective view of the main portion showing the installation state of the ceiling corner finish material of the present invention.

<도면의 주요부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

10 :마감재 12 :삽입돌기10: finishing material 12: insertion protrusion

14 :마감턱 16 :가이드홈14: dead end 16: guide groove

18 :나사공 20 :고정나사18: screw thread 20: fixed screw

22 :천장판넬 24 :벽체22: ceiling panel 24: wall

26 :미장물26: Plaster

이하 첨부도면을 참조하여 본고안에 대하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 고안인 천장 모서리 마감재의 구성 상태를 도시한 사시도이고, 도 2는 본 고안인 천장 모서리 마감재의 설치 상태를 발췌 도시한 요부 단면도이며, 도 3은 본 고안인 천장 모서리 마감재의 설치 상태를 발췌 도시한 요부 사시도이다.1 is a perspective view showing a configuration state of the ceiling corner finish material of the present inventors, Figure 2 is a sectional view showing the main portion extracting the installation state of the ceiling corner finish material of the present invention, Figure 3 is an installation state of the ceiling corner finish material of the present invention Is a perspective view showing the excerpt.

도시된 바와 같이 본 고안은 건물을 공사시 벽돌을 쌓는 조적 과정에서 벽돌과 벽돌 사이에 위치시켜 고정설치할 수 있도록 하는 삽입돌기(12)가 내측에 형성되어 있고, 외측 하단에는 조적이 완료된 벽체(24)상에 미장 공사시 미장물(26)과의 연결마감을 긴밀하게 이룰 수 있도록 하는 마감턱(14)이 형성되어 있으며, 외측 상단에는 천장을 마감하는 천장판넬(22)을 삽입 고정할 수 있도록 하는 가이드홈(16)이 일체로 구비되어 있는 마감재(10)가 형성되어 있다.As shown, the present invention has an insertion protrusion 12 formed on the inside of the building in which the brick is placed between the bricks and bricks in the process of stacking bricks during construction. The finishing jaw 14 is formed on the) to achieve a close connection with the plaster (26) at the time of plastering, and to the top of the outside to insert and fix the ceiling panel 22 to close the ceiling Finishing material 10 which is provided with a guide groove 16 is integrally formed.

한편, 상기 가이드홈(16)의 상부에는 천장판넬(22)을 삽입 고정시 이를 고정나사(20)를 통해 견고히 고정시킬 수 있도록 하는 나사공(18)이 길이방향으로 동간격을 취하며 구성되어 있다.On the other hand, the upper portion of the guide groove 16 is formed with a screw hole (18) taking the same interval in the longitudinal direction so that it can be firmly fixed through the fixing screw 20 when inserting and fixing the ceiling panel 22. have.

이와 같이 구성되어 있는 본 고안의 설치 과정 및 설치 후 본 고안에 의해 발생되는 작용을 상세히 설명하면 다음과 같다.If described in detail the operation generated by the present invention after the installation process and installation of the present invention is configured as described above.

이는 건물 공사시 벽돌을 쌓는 조적 과정에서 실내에 해당하는 벽체(24)상에 삽입 위치시켜 고정 설치를 이루게 된다. 즉, 벽돌을 쌓는 조적 과정에서 통상적으로 마감재(10)가 설치되는 높이 지점에 위치하게 되는 벽돌과 벽돌 사이에 삽입돌기(12)를 위치시켜 마감재(10)의 고정 설치를 이룰 수 있게 되는 것이다.This is a fixed installation by placing the insertion position on the wall 24 corresponding to the interior in the building process of stacking bricks during building construction. That is, in the stacking process of stacking bricks, the insertion protrusion 12 may be positioned between the brick and the brick, which is typically positioned at the height point at which the finishing material 10 is installed, thereby achieving a fixed installation of the finishing material 10.

이와 같이 설치되는 마감재(10)는 상술한 바와 같이 삽입돌기(12)를 이용하여 공사 초기에 설치를 이룰 수 있게 되므로 그 작업을 신속 용이하고도 견고하게 이룰 수 있게 하는 작용을 한다.The finishing material 10 installed as described above is able to achieve the installation in the early stages of construction by using the insertion protrusion 12 as described above, so that the work can be quickly and easily and firmly achieved.

또한, 미장물(26)과의 연결 마감을 마감턱(14)을 통해 긴밀하게 마감할 수 있게 되므로 종래의 경우처럼 마감재(10)와 벽면의 틈이 벌어져 오히려 실내의 미관을 저해하는 요인을 근본적으로 방지할 수 있도록 하는 작용한다.In addition, since the finishing connection with the plaster 26 can be closely finished through the finishing jaw 14, the gap between the finishing material 10 and the wall is widened as in the conventional case, and the fundamental factor that impairs the aesthetics of the room is rather fundamental. It acts to help prevent.

그리고, 가이드홈(16)을 통해 천장판넬(22)을 삽입 고정할 수 있게 되므로, 천장판넬(22)과 접하게 되는 벽체(24)에 천장판넬(22)의 외곽을 지지 고정할 수 있도록 하는 별도의 고정틀을 설치해 주지 않아도 됨에 따라 전반적인 공정을 신속 용이하게 처리할 수 있도록 하는 작용을 한다.In addition, since the ceiling panel 22 can be inserted and fixed through the guide groove 16, a separate unit for supporting and fixing the outer portion of the ceiling panel 22 to the wall 24 which is in contact with the ceiling panel 22. It does not need to install the fixing frame of the function to make the overall process quickly and easily.

한편, 본 고안을 설명하기 위해 도시하고 설명한 천장 모서리 마감재는 단지 예로 들기 위한 기본 형태를 나타낸 것이므로, 본 고안은 유사한 형태와 목적을 가지고 있는 다른 형태의 천장 모서리 마감재를 근본적으로 포함한다 할 수 있다.On the other hand, since the ceiling edge finishing material shown and described to illustrate the present invention is merely to illustrate the basic shape for example, the present invention may be basically included in the ceiling corner finishing material of another type having a similar shape and purpose.

이는 이하의 청구범위에 의해 마련되는 본 고안의 기술적 사상이나 분야를 벗어나지 않는 한도내에서 본 고안이 다양하게 개조 및 변화될 수 있다는 것을 당업계에서 통상의 지식을 가진 자는 용이하게 알 수 있기 때문이다 .This is because those skilled in the art can readily recognize that the present invention can be variously modified and changed without departing from the technical spirit or the field of the present invention provided by the following claims. .

이상에서 살펴 본 바와 같이 본 고안은, 실내의 천장과 벽체가 접하는 모서리 부위에 필히 설치되는 마감재를 통상적인 설치방식을 탈피할 수 있도록 벽돌을 쌓는 조적 공사시 동시에 설치를 이룰 수 있도록 변형 제작함은 물론이고, 인접 설치되는 천장판넬 및 미장물과의 연결을 긴밀하고도 견고하게 이룰 수 있도록 기능적으로 변형 제작하여, 천장 모서리부를 미려하게 마감 처리하고자 제작된 마감재의 근본적인 목적을 충실히 수행할 수 있도록 함과 더불어 부가적인 기능을 이룰 수 있도록 하므로, 설치 부위의 특성을 충분히 고려하지 않고 단순한 기능만을 이룰 수 있도록 제작되었으므로 인해 야기되었던 천장 모서리 마감재의 문제 요인을 근본적으로 방지하는 효과와, 모서리 부위상의 연결을 긴밀하고도 견고하게 이룰 수 있도록 하여 설치 상태의 견고성 및 설치 부위의 미관상태를 향상시켜 줄 수 있도록 하는 효과가 있다.As discussed above, the present invention is to produce a finish to be installed at the corners where the ceiling and the wall in contact with the interior to be installed at the same time during the masonry stacking construction so as to deviate from the usual installation method Of course, the functional deformation is made so that the connection with the adjacent ceiling panel and the plaster can be made tightly and firmly, so that the fundamental purpose of the finishing material manufactured to finish the ceiling edge beautifully can be faithfully performed. In addition, it is possible to achieve additional functions, so that it is possible to achieve simple functions without considering the characteristics of the installation site, thereby effectively preventing the problem of the ceiling edge finish caused by the problem, and to connect the connection on the corner area. Installation to achieve tight and robust Womb to give an effect of improving the aesthetic state of robustness and installation sites.

Claims (1)

천장판넬과 벽체가 접하는 모서리부를 마감하는 몰딩부재에 있어서,In the molding member for closing the corner portion where the ceiling panel and the wall contact, 건물을 공사시 벽돌을 쌓는 조적 과정에서 벽돌과 벽돌 사이에 위치시켜 고정설치할 수 있도록 하는 삽입돌기(12)가 내측에 형성되어 있고, 외측 하단에는 조적이 완료된 벽체(24)상에 미장 공사시 미장물(26)과의 연결마감을 이룰 수 있도록 하는 마감턱(14)이 형성되어 있으며, 외측 상단에는 천장을 마감하는 천장판넬(22)을 삽입 고정할 수 있도록 하는 가이드홈(16)이 일체로 구비되어 있는 마감재(10)가 구성됨을 특징으로 하는 천장 모서리 마감재.Plastering process for building the bricks during construction of the building is placed between the bricks and bricks in the insertion projections (12) are formed on the inside, the outer bottom of the plastering on the wall (24) where the masonry is finished plastering Finishing jaw 14 is formed to achieve the connection with the water 26, the guide groove 16 for inserting and fixing the ceiling panel 22 to close the ceiling is integrally formed on the outer top Ceiling corner finisher, characterized in that the finish is provided 10 is provided.
KR2020000028765U 2000-10-16 2000-10-16 The ceiling corner closing stuff KR200219926Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000028765U KR200219926Y1 (en) 2000-10-16 2000-10-16 The ceiling corner closing stuff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000028765U KR200219926Y1 (en) 2000-10-16 2000-10-16 The ceiling corner closing stuff

Publications (1)

Publication Number Publication Date
KR200219926Y1 true KR200219926Y1 (en) 2001-04-16

Family

ID=73080002

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000028765U KR200219926Y1 (en) 2000-10-16 2000-10-16 The ceiling corner closing stuff

Country Status (1)

Country Link
KR (1) KR200219926Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100621643B1 (en) 2006-01-23 2006-09-07 (주)종합건축사사무소그룹예성 Improvement structure of ceiling for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100621643B1 (en) 2006-01-23 2006-09-07 (주)종합건축사사무소그룹예성 Improvement structure of ceiling for building

Similar Documents

Publication Publication Date Title
KR200219926Y1 (en) The ceiling corner closing stuff
JP2018066151A (en) End surface mounting tool for plate material, wall structure and construction method of plate material
KR101855697B1 (en) Installing structure of finishing materials for assembly panels used in building wall
RU49061U1 (en) DECORATIVE PROFILE FASTENING ASSEMBLY
KR200219927Y1 (en) The ceiling corner closing stuff
KR101854776B1 (en) Finishing materials for tile
KR100964345B1 (en) Fixing Structure of Drain Board for Wall Structure
KR200315869Y1 (en) Finishing molding for building ceiling
KR200301776Y1 (en) Panel for building interior materials
KR100344689B1 (en) A Corner Member for Constructing a Concrete Structure
KR200289684Y1 (en) Panel for a ceiling of a bathroom
JP3204489U (en) Door frame mounting structure
KR200186890Y1 (en) Molding of ceiling board
KR100694176B1 (en) Indoor wall of building
KR20070079709A (en) Assembly type tile
KR102152849B1 (en) Building exterior panel structure with corner attaching member with extended fixture
KR100462148B1 (en) the ceiling support
JPH0547701B2 (en)
KR200305995Y1 (en) support for a window frame
KR200170754Y1 (en) An edge assembly of the built-up ceiling panel
KR960008097Y1 (en) Edge-protecting borders
KR200372505Y1 (en) Panel for architecture
JPH09317035A (en) Dressed girth draining structure
KR200254658Y1 (en) Paritioning Commection Material
KR200185399Y1 (en) an assistance doorframe

Legal Events

Date Code Title Description
N231 Notification of change of applicant
REGI Registration of establishment
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20051215

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee