KR200211518Y1 - Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast - Google Patents

Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast Download PDF

Info

Publication number
KR200211518Y1
KR200211518Y1 KR2020000023975U KR20000023975U KR200211518Y1 KR 200211518 Y1 KR200211518 Y1 KR 200211518Y1 KR 2020000023975 U KR2020000023975 U KR 2020000023975U KR 20000023975 U KR20000023975 U KR 20000023975U KR 200211518 Y1 KR200211518 Y1 KR 200211518Y1
Authority
KR
South Korea
Prior art keywords
sand
connection hose
discharge pipe
opening
coupled
Prior art date
Application number
KR2020000023975U
Other languages
Korean (ko)
Inventor
이정우
Original Assignee
주식회사벽진인터내셔날
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사벽진인터내셔날 filed Critical 주식회사벽진인터내셔날
Priority to KR2020000023975U priority Critical patent/KR200211518Y1/en
Application granted granted Critical
Publication of KR200211518Y1 publication Critical patent/KR200211518Y1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 고안은 대단위 해안매립지 초연약지반을 개량하기 위하여 가토제방(호안)과 제방 사이에 성토되는 모래를 효과적으로 포설하기 위한 해안매립지 지반개량용 모래공급이송장치에 관한 것으로 모래를 적재시키고 모래의 공급 및 차단시킬 수 있는 개폐구(1)가 형성된 호퍼(2)를 하우징(H)으로 지지시키고 개폐구(1)의 하단으로 모래배출파이프(3)을 결합시켜서 모래배출파이프(3)의 내부로 에어컴프레셔(A)의 공기압을 전달하는 분배관(4)(4')을 일정간격으로 유지시켜 에어분출구(5)(5')를 이중으로 삽입시키고 모래배출파이프(3)의 선단은 연결호스(6)(6')의 일측단의 퀵 커플링(7)(7')과 결합될수 있게 형성하여 연결호스(6)(6')의 퀵 커플링(7)(7')과 결합가능케 하고 연결호스(6)의 타측단에는 순차적으로 다른 연결호스(6')와 결합시킬 수 있게한 것을 특징으로 하는 해안매립지 지반개량용 모래공급이송장치.The present invention relates to a sand supply transfer device for improving landfill site grounds to effectively install sand deposited between a bank embankment (hoan) and an embankment to improve a large coastal landfill super soft ground. The hopper 2 having the opening and closing opening 1 formed thereon to be blocked is supported by the housing H, and the sand discharge pipe 3 is coupled to the lower end of the opening and closing opening 1 so that the air compressor (3) is inserted into the sand discharge pipe (3). The distribution pipes 4 and 4 ', which deliver the air pressure of A), are maintained at regular intervals so that the air outlets 5 and 5' are inserted in duplicate, and the tip of the sand discharge pipe 3 is connected to the connection hose (6). Formed to be coupled to the quick coupling (7) (7 ') of one end of the (6') to enable the coupling with the quick coupling (7) (7 ') of the connection hose (6) (6') and the connection hose The other end of the (6) is characterized in that it can be sequentially coupled with the other connecting hose (6 ') Sand supply transport device for the coastal landfill ground improvement.

Description

해안매립지 지반개량용 모래공급이송장치{Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast}Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast}

본 고안은 대단위 해안매립지 초연약지반을 개량하기 위하여 가토제방(호안)과 제방 사이에 성토되는 모래를 효과적으로 포설하기 위한 해안매립지 지반개량용 모래공급이송장치에 관한 것으로 더욱 상세하게는 준설매립토의 노반지지력 다짐비가 규정치 이하여서 중장비 및 인력의 투입이 불가능하여 호안에서 모래를 분사 펌핑하기 위하여 모래를 적재할 수 있는 호퍼를 구비하고 에어컴프레셔의 공압을 분배관을 통하여 호퍼의 모래배출파이프 내에 이중삽입시키고 연결호스의 양선단을 연장가능하게 퀵 커플링으로 결합하여 사용할 수 있게한 것이다.The present invention relates to a sand supply transfer device for improving landfill site grounds for effectively laying sand deposited between a bank embankment (hoan) and a bank to improve a large-scale coastal landfill super soft ground. Since the compaction ratio of the bearing capacity is less than the prescribed value, heavy equipment and manpower cannot be inserted, and the hopper is equipped with sand for loading and pumping sand in the lake, and the air pressure of the air compressor is inserted into the sand discharge pipe of the hopper through the distribution pipe. Both ends of the connecting hoses can be combined with the quick coupling to be used.

종래에는 해안매립지와 같은 대단위 매립지(200M×300M이상의 준설블럭)의 준설매립토 상에 모래 및 토사를 성토하기 위해서는 준설매립토의 지내력이 약해서 일측호안에서 덤프트럭에 의해 모래 및 토사를 운송하여 불도우저로 모래 및 토사를 밀어서 타측호안측으로 연장시키면서 진행하여 작업하였다.Conventionally, in order to fill sand and sediment on dredged land of large-scale landfills such as coastal landfills (more than 200M × 300M or more dredging blocks), the soil capacity of dredged landfill is weak. And the soil was pushed forward to work on the other side extending.

상기와 같은 성토는 선행공정으로 준설매립토상에 저면매트로 직포(Polyester Mat)를 포설한 후에 모래 및 토사를 성토하지만 덤프트럭과 불도우저로 일시에 2-3m의 모래 및 토사를 성토시키면서 타측호안으로 작업을 진행시키므로 직포의 허용 인장강도와 준설매립토의 지내력이 약하여 성토된 모래와 토사가 압밀침하되어 성토된 부위의 모래 및 토사가 매립지반의 과도한 측방유동에 의한 재차 성토하여야 함으로 성토량이 증대되는 문제가 있으며 또한 상기방법에 의한 성토작업으로 지반이 개량되어도 요구하는 지내력의 확보가 어렵고 지반이 불안정한 문제점이 있었다.As the above-mentioned filling process, sand and soil are piled up after laying a woven fabric (Polyester Mat) on dredged landfill as a prior process, but dumping 2-3m of sand and soil at a time by dump truck and bulldozer into other side lake As the work progresses, the allowable tensile strength of the woven fabric and the endurance of the dredged landfill soil are weak, so that the sand and earth soil that have been filled are consolidated and the sand and soil of the landfill area have to be filled again due to excessive side flow of the landfill. In addition, it is difficult to secure the required bearing strength and the ground is unstable even when the ground is improved by the fill work according to the above method.

따라서 본 고안은 상기한 종래의 문제점을 개선하기 위한 목적으로 안출된 것으로 해안매립지와 같은 준설매립토 상에 중장비 등을 투입하지 않고 일측호안상에서 모래를 공급이송하여 준설매립토 상에 샌드블랭킷매트를 포설시킬 수 있게하여 안정된 지반개량이 가능케 한 모래공급이송장치를 제공하기 위한 것이다.Therefore, the present invention was devised for the purpose of improving the above-mentioned problems. The sand blanket mat was laid on the dredged landfill by supplying sand from one side of the lake without putting heavy equipment on the dredged land such as coastal landfill. It is to provide a sand feed transfer device that enables a stable ground improvement.

상기한 모래공급이송장치를 제공하기 위하여 모래를 일측 호안에서 연결호스에 의하여 분사 펌핑시킬 수 있게한 것으로 모래를 적재시키고 모래의 공급 및 차단시킬 수 있는 개폐구가 형성된 호퍼를 하우징으로 지지시키고 개폐구에서 연장결합된 모래배출파이프의 내부로 에어컴프레셔의 공기압을 전달하는 분배관을 일정간격으로 유지시켜 에어분출구를 이중으로 삽입시키고 모래배출파이프의 선단은 연결호스의 일측단의 퀵 커플링과 결합될수 있는 구조로 형성하여 연결호스의 퀵 커플링과 결합시킬 수 있게하고 연결호스의 타측단에는 순차적으로 다른 연결호스와 결합시킬 수 있게한 구조로 형성하여 준설매립토 상에 모래를 분사하여 샌드 블랭킷 매트 작업을 수행할 수 있게한 모래공급이송장치를 제공할 수 있는 것이다.In order to provide the above-mentioned sand supply and transfer device, sand can be pumped by a connecting hose in one side of the lake, and a hopper formed with an opening and closing hole for loading and blocking sand and extending from the opening and closing port is provided. Maintain a distribution pipe that delivers the air pressure of the air compressor to the inside of the combined sand discharge pipe at a predetermined interval to insert the air outlet double, and the tip of the sand discharge pipe can be combined with the quick coupling of one end of the connection hose. Sand blanket mat work is performed by spraying sand on dredged landfill to form a structure that can be combined with the quick coupling of the connection hose and the other end of the connection hose can be sequentially connected to the other connection hose. It is possible to provide a sand feeding and feeding device that can make it possible.

도 1 은 본 고안의 장치구조를 설명하기 위한 개념도1 is a conceptual diagram for explaining the device structure of the present invention

도 2 는 본 고안 연결호스의 구조를 설명하기 위한 일부분 분리 사시도Figure 2 is a partially separated perspective view for explaining the structure of the connection hose of the present invention

<도면의 주요부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

(1) 개폐구 (2) 호퍼(1) opening and closing door (2) hopper

(3) 모래배출파이프 (4)(4') 분배관(3) Sand discharge pipe (4) (4 ') distribution pipe

(5)(5') 에어분출구 (6)(6') 연결호스(5) (5 ') Air outlet (6) (6') Connection hose

(7)(7') 퀵 커플링 (H) 하우징(7) (7 ') quick coupling (H) housing

(A) 에어컴프레셔(A) Air compressor

이하 고안의 요지를 첨부된 도면에 연계시켜 그 구성과 작용을 상세히 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 고안의 장치구조를 설명하기 위한 개념도로서 모래호퍼,배출파이프,컴프레셔,분배관,에어분출구 및 연결호스의 결합구조를 도시한 것이고,도 2 는 본 고안 연결호스의 구조를 설명하기 위한 일부분 분리 사시도로서 연결호스간 및 배출파이프와의 퀵커플링의 겹합구조를 도시한 것이다.1 is a conceptual diagram illustrating the structure of the device of the present invention, showing a coupling structure of a sand hopper, an exhaust pipe, a compressor, a distribution pipe, an air outlet, and a connection hose, and FIG. 2 illustrates the structure of the connection hose of the present invention. A partially separated perspective view for illustrating the coupling structure of the quick coupling between the connecting hose and the discharge pipe.

모래를 적재시키고 모래의 공급 및 차단시킬 수 있는 개폐구(1)가 형성된 호퍼(2)를 하우징(H)으로 지지시키고 개폐구(1)의 하단으로 모래배출파이프(3)을 결합시켜서 모래배출파이프(3)의 내부로 에어컴프레셔(A)의 공기압을 전달하는 분배관(4)(4')을 일정간격으로 유지시켜 에어분출구(5)(5')를 이중으로 삽입시키고 모래배출파이프(3)의 선단은 연결호스(6)(6')의 일측단의 퀵 커플링(7)(7')과 결합될수 있게 형성하여 연결호스(6)(6')의 퀵 커플링(7)(7')과 결합가능케 하고 연결호스(6)의 타측단에는 순차적으로 다른 연결호스(6')와 결합시킬 수 있게한 구조로 된 것이다.Support the hopper (2) formed with the opening and closing opening (1) capable of loading the sand and supply and block the sand with the housing (H) and by combining the sand discharge pipe (3) to the lower end of the opening and closing (1) sand discharge pipe ( 3) The distribution pipes 4 and 4 ', which deliver the air pressure of the air compressor A, are maintained at regular intervals to insert the air outlets 5 and 5' in duplicate, and the sand discharge pipe 3 The tip of is formed to be coupled to the quick coupling (7) (7 ') of one end of the connection hose (6) (6'), the quick coupling (7) (7) of the connection hose (6) (6 '). ') Can be coupled to the other end of the connection hose (6) in order to be able to combine with the other connection hose (6') in sequence.

이와같이된 본 고안은 해안매립지 초연약지반을 개량하기 위하여 가토제방(호안)과 제방 사이의 준설매립토 상에 성토되는 모래를 일측 호안에서 연결호스에 의하여 분사 펌핑시킬 수 있게하기 위하여 하우징(H)으로 지지된 개폐구(1)가 형성된 호퍼(2)에 모래를 적재시키고 이때 적재되는 모래의 품질은 NO.200체 통과량이 3%이하이고 투수계수가 2.0×10-2cm/sec이상이며 야적장에서 최소 4일이상의 수분을 배출시킨 모래를 적재시킨다.In this way, the present invention has a housing (H) to enable the sand pumped on the dredged landfill between the embankment (hoan) and the embankment in order to improve the coastal landfill super soft ground into the housing (H) in order to be able to spray pumped by the connection hose in one side of the lake. Sand is loaded into the hopper (2) with the supported opening and closing port (1), and the quality of the sand loaded at this time is NO.200 sieve less than 3%, the permeability coefficient is 2.0 × 10 -2 cm / sec or more, and it is minimum Load sand that has drained more than four days.

상기와 같이 적재된 모래는 에어컴프레셔(A)가 작동하여 공기압이 분배관(4)(4')을 통하여 모래배출파이프(3)의 내부로 일정간격으로 유지시켜서 이중으로삽입 설치된 에어분출구(5)(5')를 통하여 공기압이 전달되면 호퍼(2)의 개폐구(1)를 개방시켜서 호퍼(2)에 적재되어 있던 모래가 배출파이프(3)와 연결호스(6)(6')를 통하여 양측호안 사이의 준설매립토 상에 도포 성토되는 것이다.The sand loaded as described above is air compressor (A) is operated to maintain the air pressure in the sand discharge pipe (3) through the distribution pipe (4) (4 ') at regular intervals inserted into the air outlet (5) When the air pressure is transmitted through the 5 ', the opening and closing hole 1 of the hopper 2 is opened so that the sand loaded in the hopper 2 is discharged through the discharge pipe 3 and the connection hose 6 and 6'. It is applied and deposited on the dredged landfill between both sides.

상기의 배출파이프(3)의 선단과 연결호스(6)(6')의 타측단은 연결호스(6)(6')의 일측단에 설치된 퀵 커플링(7)(7')과 손쉽게 연결,결합시킬 수 있는 것으로 도 2 에 도시된 바와같이 배출파이프(3)와 연결호스(6) 및 연결호스(6)와 연결호스(6')간에 결합시는 연결호스(6)(6')의 일측단에 장착된 퀵 커플링(7)(7')을 상부로 들어서 연결호스(6)(6')간 또는 배출파이프(3)와 연결호스(6)간에 삽입결합시키고 퀵 커플링(7)(7')을 하부로 내리면 쉽게 결합되는 것이고 모래의 도포 및 성토구역에 따라 연결 및 해제시켜서 사용하는 것이다.The front end of the discharge pipe 3 and the other end of the connection hoses 6 and 6 'are easily connected to the quick couplings 7 and 7' installed at one end of the connection hoses 6 and 6 '. As shown in FIG. 2, coupling hoses 6 and 6 'are coupled between the discharge pipe 3 and the connection hose 6 and between the connection hose 6 and the connection hose 6'. Lifting the quick coupling (7) (7 ') mounted on one end of the upper portion of the coupling hose (6) (6') or between the discharge pipe (3) and the connecting hose (6), and coupled to the quick coupling ( When 7) (7 ') is lowered, it is easily combined and used by connecting and releasing according to sand application and fill area.

상기와 같이 형성된 모래공급이송장치는 지내력이 약한 준설매립토 상에 포설하여 성토함에 있어 에어컴프레셔(A)의 공기압을 이용하여 호퍼(2)에 적재된 모래를 준설매립토 상으로 분사 포설시키고 일정면적으로 모래가 포설된 후에는 연결호스(6)(6')를 단계적으로 결합시켜서 순차적으로 모래를 포설시켜 손쉽게 샌드 블랭킷 매트 작업을 수행할 수 있게하여 해안매립지와 같은 연약지반의 지반개량작업을 수행힐 수 있게한 것이다.The sand feed transfer device formed as described above is sprayed and laid on the dredged land by using the air pressure of the air compressor (A) to install on the dredged land with weak bearing capacity. After sand is laid, connecting hoses (6) (6 ') are combined in stages so that sand can be laid out sequentially so that sand blanket mats can be easily carried out. It was made possible.

본 고안은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 고안의 요지를 벗어남이 없이 당해 고안이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and any person having ordinary skill in the art to which the present invention pertains may make various modifications without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

그러므로 본 고안은 해안매립지와 같은 지내력이 약한 준설매립토에 접지압이 과대한 중장비의 투입없이 손쉽게 모래를 분사시켜 샌드 블랭킷 매트작업을 수행할 수 있게 하였으며 이와같은 작업으로 인하여 안정된 지반의 개량작업을 할 수 있게한 효과가 있는 매우 유용한 고안인 것이다.Therefore, the present invention makes sand blanket mat work easy by spraying sand into dredged landfills with low bearing capacity, such as coastal landfills, without excessive heavy equipment, and can perform stable ground improvement work. It is a very useful design that has the effect of making it work.

Claims (1)

모래를 적재시키고 모래의 공급 및 차단시킬 수 있는 개폐구(1)가 형성된 호퍼(2)를 하우징(H)으로 지지시키고 개폐구(1)의 하단으로 모래배출파이프(3)을 결합시켜서 모래배출파이프(3)의 내부로 에어컴프레셔(A)의 공기압을 전달하는 분배관(4)(4')을 일정간격으로 유지시켜 에어분출구(5)(5')를 이중으로 삽입시키고 모래배출파이프(3)의 선단은 연결호스(6)(6')의 일측단의 퀵 커플링(7)(7')과 결합될수 있게 형성하여 연결호스(6)(6')의 퀵 커플링(7)(7')과 결합가능케 하고 연결호스(6)의 타측단에는 순차적으로 다른 연결호스(6')와 결합시킬 수 있게한 것을 특징으로 하는 해안매립지 지반개량용 모래공급이송장치.Support the hopper (2) formed with the opening and closing opening (1) capable of loading the sand and supply and block the sand with the housing (H) and by combining the sand discharge pipe (3) to the lower end of the opening and closing (1) sand discharge pipe ( 3) The distribution pipes 4 and 4 ', which deliver the air pressure of the air compressor A, are maintained at regular intervals to insert the air outlets 5 and 5' in duplicate, and the sand discharge pipe 3 The tip of is formed to be coupled to the quick coupling (7) (7 ') of one end of the connection hose (6) (6'), the quick coupling (7) (7) of the connection hose (6) (6 '). ') Coupled to the other end of the connection hose (6) to the sand supply transfer device for improving the landfill land reclamation, characterized in that it can be combined with the other connection hose (6') in sequence.
KR2020000023975U 2000-08-24 2000-08-24 Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast KR200211518Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000023975U KR200211518Y1 (en) 2000-08-24 2000-08-24 Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000023975U KR200211518Y1 (en) 2000-08-24 2000-08-24 Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast

Publications (1)

Publication Number Publication Date
KR200211518Y1 true KR200211518Y1 (en) 2001-01-15

Family

ID=73053388

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000023975U KR200211518Y1 (en) 2000-08-24 2000-08-24 Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast

Country Status (1)

Country Link
KR (1) KR200211518Y1 (en)

Similar Documents

Publication Publication Date Title
US10443210B2 (en) Digging and backfill apparatus
US10053830B2 (en) Multi-tank onsite flowable fill system and related methods
US5487229A (en) Apparatus for pneumatic excavation
US20060118338A1 (en) Drill base
JP6811469B2 (en) Surface layer collapse prevention mat, surface layer collapse prevention combined greening structure and surface layer collapse prevention combined greening method
JP3694735B2 (en) Underground seepage drainage structure and construction method
KR200211518Y1 (en) Sand supply and transportation apparatus for improvement of ground condition of dredged and reclaimed land in seacoast
US7234252B2 (en) Method and apparatus for beneficiating soils during vacuum excavation
KR20060114468A (en) Sprinkler with pump-car
JP3669288B2 (en) Liquefaction prevention method
JP2837602B2 (en) Sediment transport system for shield method
KR20020024028A (en) Sand spreading apparatus for ground of weakness using air-pressure
KR100382272B1 (en) Installation method of sand blanket mat for improving hyper-soft ground of dredged reclaimed land by spraying and spreading of sand
JP2779888B2 (en) Pulsed pneumatic method and equipment for earth and sand
KR100835584B1 (en) Method for transfering after crushing dredged cohesive soils
JP2001336139A (en) Backfilling method for embedded structure
KR200243143Y1 (en) Dredged sludge sending apparatus
JP2995150B2 (en) Permeability reinforced earth method
JPH11229390A (en) Pneumatic transportation method for soil-containing fine grain, and method for forming layer of soil reinforced by continuous thread
JP3281637B2 (en) High concentration dredging method
JP3513464B2 (en) Spraying method of vegetation base material and its equipment
JPH089953B2 (en) Excavation device for excavated soil in earth pressure type shield method
JPH01198928A (en) Mud pressure method and device thereof
JPH01105824A (en) Mud pressure feed device
JPH0663259B2 (en) Excavation sediment discharge method

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
J206 Request for trial to confirm the scope of a patent right
J204 Request for invalidation trial [patent]
J301 Trial decision

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20051116

Effective date: 20060703

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20051221

Effective date: 20060703

J2X1 Appeal (before the patent court)

Free format text: INVALIDATION

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20060803

Effective date: 20070119

G701 Publication of correction
G701 Publication of correction