KR200200919Y1 - Jig for pulling up a strut - Google Patents

Jig for pulling up a strut Download PDF

Info

Publication number
KR200200919Y1
KR200200919Y1 KR2020000013853U KR20000013853U KR200200919Y1 KR 200200919 Y1 KR200200919 Y1 KR 200200919Y1 KR 2020000013853 U KR2020000013853 U KR 2020000013853U KR 20000013853 U KR20000013853 U KR 20000013853U KR 200200919 Y1 KR200200919 Y1 KR 200200919Y1
Authority
KR
South Korea
Prior art keywords
lifting
copper bar
copper
jig
lifting jig
Prior art date
Application number
KR2020000013853U
Other languages
Korean (ko)
Inventor
하정호
정상민
정봉근
Original Assignee
주식회사한진중공업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사한진중공업 filed Critical 주식회사한진중공업
Application granted granted Critical
Publication of KR200200919Y1 publication Critical patent/KR200200919Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 고안에 따른 동바리 인양용 지그를 이용한 동바리 리프트업 시공 방식은 동바리(Load Tower Type)를 종래의 방식과 같이 계단식으로 쌓아 올리는 것이 아니라, 동바리 인양용 지그를 이용하여 1단씩 동바리를 달아 매어 올라가는 방식이다.The Dongbari lift-up construction method using the Dongbari lifting jig according to the present invention is not a step of stacking the Dongbari (Load Tower Type) like a conventional method, but a method of hanging up the Dongbari by step by using the Dongbari lifting jig. to be.

상기 방식은 H형강을 용접하여 제조한 동바리 인양용 지그에 동바리 1단을 달아매고, 순차적으로 1단씩 지상에서 끼워 맞춰 조립한후 들어올려서 전체 가설 동바리를 완성함으로써 공기 단축은 물론이고 지상에서 작업함에 따라 안전성 및 품질을 확보할 수 있게 된다.The above method attaches one stage to the lifting bar jig manufactured by welding H-shaped steel, and then puts it together on the ground one by one, then assembles it and lifts it up to complete the construction of the entire temporary copper bar. Therefore, safety and quality can be secured.

Description

동바리 인양용 지그{Jig for pulling up a strut}Jig for pulling up a strut}

본 고안은 이동식 크레인을 이용한 가설 동바리 리프트업 시공 방법 및 동바리 인양용 지그에 관한 것이며, 더 구체적으로는 동바리를 설치하기 위한 동바리 인양용 지그 및 상기 동바리 인양용 지그를 이용하여 동바리를 조립 및 설치하기 위한 가설 동바리 리프트업 시공 방법에 관한 것이다.The present invention relates to a construction method for constructing copper bar lift up using a mobile crane, and to the copper bar lifting jig, and more specifically, to install and install the copper bar using the copper bar lifting jig for installing the copper bar and the copper bar lifting jig. Hypothesis for the related art lift-up construction method.

종래의 동바리 조립 및 설치 방법에서는 일반적으로 바닥에 1단의 동바리를 설치하고, 그 동바리에 작업자가 올라가서 아래로부터 양중된 2단의 동바리를 상부에서 기설치된 동바리를 향해 하부로 삽입하여, 양쪽 동바리의 핀 통과 구멍을 일 치시킨후 핀을 관통시켜 고정한 후, 작업자가 다시 2단의 동바리에 올라가서 상기한 작업을 반복적으로 행하도록 되어 있다.In the conventional method of assembling and installing a group of clubs, generally, a single stage club is installed on the floor, and a worker climbs up to the club and inserts two-tiered clubs from below to the bottom of the club. Work the hole through the pin After the pin is fixed, the pin is penetrated and fixed, and then the worker climbs back to the second stage and performs the above operation repeatedly.

즉, 동바리를 계단식으로 쌓아 올라가는 방법을 채용함으로써, 동바리의 높이가 높아지게 되면 작업자의 안전에 문제가 발생될 우려가 있으며, 동바리 자재의 인양과 고소 작업으로 인해 작업 능률이 낮아지게 된다.In other words, by adopting a method of stacking the copper bar by cascading, if the height of the copper bar increases, there is a risk that the safety of the worker may occur, the work efficiency is lowered due to the lifting and aerial work of the copper bar material.

따라서, 상기한 종래의 방법에서는 동바리를 지상으로부터 상부로 쌓아 올라가야 함으로써, 공기가 지연되고, 공사 비용이 증가되며, 안전 사고의 위험 부담이 커지게 되는 단점이 있다.Therefore, the conventional method described above has the disadvantage that the air is delayed, the construction cost is increased, and the risk of a safety accident is increased by stacking up the clubs from the ground.

본 고안에서는 상기한 문제점을 감안하여, 작업자가 지상에서 동바리를 아래에서 위로 삽입하는 방식을 채용함으로써 작업자가 동바리 위로 올라갈 필요없이 계속적으로 지상에서 동바리 조립 작업을 실행할 수 있는 방법 및 이 방법에 이용되는 동바리 동바리 인양용 지그를 제공하려는 것이다.In view of the above problems, the present invention adopts a method in which a worker inserts a clubb from the ground up from the ground, so that the worker can continuously execute the assembly of the clubb on the ground without having to climb up the club, and is used in this method. Dongbari Dongbari is to provide a lifting jig.

상기 목적을 달성하기 위해, 본 고안에서는 동바리와 결합되어 상기 동바리 인양용 지그에 동바리를 연결시키는 작용을 하는 동바리 장착 수단, 상기 동바리 장착 수단을 동바리 인양용 지그에 매달린 상태로 유지시키는 로프, 및 상기 로프를 동바리 인양용 지그의 일 단부측에 걸쳐 있도록 하는 장방형 고리를 포함하는 H형강으로 제조된 동바리 인양용 지그를 제공한다.In order to achieve the above object, in the present invention is coupled to the copper bar and the copper bar mounting means that acts to connect the copper bar to the copper lifting lifting jig, rope for maintaining the copper mounting means to hang the copper lifting device jig, and the Provided is a copper lifting lifting jig made of H-shaped steel including a rectangular ring for extending a rope over one end side of the copper lifting lifting jig.

상기 구성에 따르면, 동바리가 동바리 장착 수단에 결합되어 동바리 인양용 지그에 의해 소정 높이로 양중될 수 있음으로써, 작업자가 지상에서 동바리 조립 작업을 수행할 수 있게 된다.According to the above configuration, the copper barrier is coupled to the copper barrier mounting means and can be lifted to a predetermined height by the copper barr lifting jig, whereby the worker assembles the copper barrier on the ground. You can do your work.

또한, 본 고안의 가설 동바리 리프트업 시공 방법은 : 이동식 크레인에 H형강으로 제조된 동바리 인양용 지그를 부착하는 단계; 동바리 인양용 지그에 매달려 있는 상태의 동바리 장착 수단에 동바리 1단을 하측으로부터 상측으로 삽입하는 단계; 상기 동바리 장착 수단에 삽입된 동바리를 핀으로 고정시키는 단계; 동바리 인양용 지그를 다음 단의 동바리를 삽입할 수 있는 높이까지 들어올리는 단계; 다음 단의 동바리를 먼저 들어올려진 동바리의 내측으로 삽입하여 핀을 이용하여 상하측 동바리들을 고정시키는 단계; 및 상기한 단계들을 반복하여 소정의 높이까지 동바리를 설치하는 단계로 구성된다.In addition, the hypothesis copper bar lift-up construction method of the present invention includes: attaching a copper lifting lifting jig made of H-shaped steel to a mobile crane; Inserting one end of a group of clubb from the bottom to the top of the clubbly mounting means suspended from the clubb lifting jig; Fixing a pin inserted in the circle mounting means with a pin; Lifting the lifting lifting jig to a height at which the next stage can be inserted; Inserting the next group of clubs into the inner group of lifted clubs to fix the upper and lower clubs using pins; And repeating the above steps to install the club to a predetermined height.

상기 방법에 의하면, 동바리 인양용 지그를 이용하여 동바리를 1단씩 순차적으로 상부로 들어올리는 방식이므로, 안전 사고 위험을 예방하고, 공기를 단축하며, 공사 비용을 절감할 수 있게 된다.According to the above method, since the copper bar is lifted up sequentially one by one by using the copper bar lifting jig, the risk of a safety accident can be prevented, the air can be shortened, and construction cost can be reduced.

도 1은 본 고안에 따른 동바리 인양용 지그의 사시도,1 is a perspective view of a lifting jig for lifting according to the present invention,

도 2는 도 1의 동바리 인양용 지그에 동바리를 조립한 상태를 나타낸 확대 사시도,2 is an enlarged perspective view illustrating a state in which a copper bar is assembled to the copper bar lifting jig of FIG. 1;

도 3은 도 2에서 조립된 상태를 구체적으로 나타낸 단면도, 및3 is a cross-sectional view showing in detail the state assembled in Figure 2, and

도 4는 본 고안에 따른 동바리 인양용 지그를 이용한 동바리 리프트업 시공 방법에서의 동바리 조립 과정을 나타낸 정면도이다.Figure 4 is a front view showing the process of assembling the copper barks in the construction method for lifting the copper bar using the lifting barge for lifting according to the present invention.

이하, 첨부 도면들을 참조하여 본 고안을 상세하게 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 고안에 따라 H형강으로 제조된 동바리 인양용 지그(10)를 나타내고, 도 2는 동바리 인양용 지그(10)에 동바리(11) 1단이 달아매진 상태를 나타내며, 도 3은 도 2에 나타낸 상태를 더욱 상세하게 나타낸 단면도이다.1 shows a copper bar lifting jig 10 made of H-shaped steel according to the present invention, Figure 2 shows a state in which one end of the copper bar 11 is attached to the copper bar lifting jig 10, Figure 3 It is sectional drawing which showed the state shown in 2 in more detail.

도 1 및 도 2에 나타낸 바와 같이, 본 고안에 따른 동바리 인양용 지그(10)는 동바리(11)와 결합되어 상기 동바리 인양용 지그에 동바리를 연결시키는 작용을 하는 동바리 장착 수단(12), 상기 동바리 장착 수단(12)을 동바리 인양용 지그(10) 에 매달린 상태로 유지시키는 로프(13), 및 상기 로프(13)를 동바리 인양용 지그(10)의 양 단부측에 걸쳐 있도록 하는 장방형 고리(14)를 포함한다.As shown in Figures 1 and 2, the copper barred lifting jig 10 according to the present invention is coupled to the copper bar 11, the copper bar mounting means 12 which acts to connect the copper bar to the copper bar lifting jig, the said Donggui lifting means jig (10) Rope 13 to be held in a suspended state, and a rectangular ring 14 to allow the rope 13 to extend across both end sides of the lifting jig 10.

상기 장방형 고리(14)는 H형강의 양 단부에서 상기 H형강에 대해 횡방향으로 걸쳐 있는 상태로 일정 간격으로 형성되며, 그의 내측에 타원형 구멍(21)이 형성되고 한쪽 측면의 중앙에는 소정의 간격을 두고 절단된 틈새가 형성되어, 용이하게 상기 동바리 인양용 지그(10)의 H형강의 양 단부측에 장착될 수 있다.The rectangular ring 14 is formed at regular intervals in a state spanning the transverse direction with respect to the H-beams at both ends of the H-beams, an elliptical hole 21 is formed in the inner side and a predetermined interval in the center of one side Clearance is formed to be formed, it can be easily mounted on both end sides of the H-shaped steel of the lifting jig (10).

또한, 상기 동바리 장착 수단(12)에는 도 2 및 도 3에 상세하게 도시된 바와 같이, 그의 상부에 제공된 후크(15), 그의 하부에 제공된 동바리 수용부(17) 및 상기 동바리 수용부(17)에 형성된 핀 구멍(16)이 제공된다. 상기 로프(13)는 동바리 인양용 지그(10)의 장방형 고리(14)에 형성된 구멍(21)을 통과한후, 상기 후크(15)를 통해 동바리 인양용 지그(10)의 길이방향으로 연장되어 있다. 상기 동바리 장착 수단(12)은 일정 간격을 두고 떨어져 있는 상기 장방형 고리(14)들 사이의 중간에 하나씩 배치된다.In addition, as shown in detail in FIGS. 2 and 3, the club mounting means 12 includes a hook 15 provided at an upper portion thereof, a grouped receiver 17 provided at a lower portion thereof, and the grouped receiver 17. There is provided a pin hole 16 formed therein. The rope 13 passes through a hole 21 formed in the rectangular ring 14 of the copper lifting jig 10, and extends in the longitudinal direction of the copper lifting jig 10 through the hook 15. have. The circle mounting means 12 are arranged one by one in the middle between the rectangular rings 14 which are spaced apart from each other.

다음, 도 2 및 도 3에 상세하게 도시된 바와 같이, 각각의 동바리(11)에는 그의 상부 및 하부측에 상기 핀 구멍(16)에 대응하는 구멍(22)이 형성되며, 그의 직경은 상부측에서는 상기 동바리 수용부(17)의 내경보다 약간 작게 형성되고 하부측은 상부측 직경보다 약간 크게 형성된다. 따라서, 상기 동바리 장착 수단(12)의 하부에 제공된 동바리 수용부(17)내로 1단의 동바리(11)가 삽입되면, 상기한 2개의 구멍들(16,22)이 서로 일치된다. 이 상태에서, 핀(18)이 상기 구멍들을 관통하여 삽입됨으로써, 동바리(11)가 동바리 장착 수단(12)에 결합되어 동바리 인양용 지그(10)에 의해 양중될 수 있게 된다.Next, as shown in detail in FIGS. 2 and 3, each circle 11 is formed with a hole 22 corresponding to the pin hole 16 at its upper and lower sides, and its diameter at the upper side. It is formed slightly smaller than the inner diameter of the copper receiving portion 17 and the lower side is formed slightly larger than the diameter of the upper side. Therefore, when the one-sided group 11 is inserted into the grouping unit 17 provided at the bottom of the grouping means 12, the two holes 16 and 22 are coincident with each other. In this state, the pin 18 is inserted through the holes, whereby the group 11 is coupled to the group mounting means 12 to lift the group. It can be lifted by the jig 10.

이하, 본 고안에 따른 동바리 인양용 지그를 이용한 가설 동바리 리프트업 방법에 대해 설명한다.Hereinafter, a description will be given of a temporary copper bar lift up method using a copper bar lifting jig according to the present invention.

먼저, 교각을 설치한 후 동바리를 설치할 하부 지반에 콘크리트를 타설하고, 이동식 크레인에 본 고안에 따른 H형강으로 제조된 동바리 인양용 지그를 부착한다.First, after the bridge is installed, the concrete is placed in the lower ground where the copper bar is to be installed, and the movable crane lifting jig made of H-shaped steel according to the present invention is attached to the mobile crane.

다음, 본 고안에 따른 동바리 조립 상태를 나타낸 도 4에 도시된 바와 같이, 동바리 인양용 지그(10)에 매달려 있는 상태의 동바리 장착 수단(12)에 동바리(11) 1단을 하측으로부터 상측으로 지상에 위치한 작업자에 의해 삽입하여 핀(18)으로 고정시킨다. 그후, 상기한 과정과 동일하게, 동바리 인양용 지그(11)를 다음 단의 동바리(11)를 삽입할 수 있는 높이까지 크레인에 의해 들어올린다. 그후, 다음 단의 동바리(11)를, 지상에 있는 작업자에 의해 하부에서 상부측으로, 먼저 들어올려진 동바리의 내측으로 삽입하며 이때 1단의 동바리의 하부측의 구멍과 다음 단의 동바리의 상부측의 구멍이 일치되며 그 구멍들을 통해 핀(18)을 삽입하여 상하측 동바리들(11,11)을 고정시킨다. 상기한 작업을 반복하여 소정의 높이까지 동바리를 설치한 후 크레인을 다음 위치로 이동시키면 된다.Next, as shown in Fig. 4 showing the assembly state of the club according to the present invention, the first end of the club 11 on the copper bar mounting means 12 in a state hanging on the copper bar lifting jig 10 from the bottom to the top Inserted by an operator located in the pin 18 to be fixed. Thereafter, in the same manner as described above, the lifting lifting jig 11 is lifted by a crane to a height at which the next step 11 can be inserted. Thereafter, the next stage club 11 is inserted by the worker on the ground from the lower side to the upper side, into the inner side of the first raised club, and at this time, the hole at the lower side of the first stage club and the upper side of the next stage club The holes are coincident and the pins 18 are inserted through the holes to fix the upper and lower clubs 11 and 11. After repeating the above operations to install the club to a predetermined height, the crane may be moved to the next position.

상기 H형강으로 제조된 동바리 인양용 지그(10)는 크레인의 용량과 로드타워형 동바리의 개수에 따라 적절한 크기로 제조될 수 있으며, 업체별 동바리 규격의 차이를 감안하여 동바리를 직접 동바리 인양용 지그에 볼트 또는 용접등으로 부착시키지 않고, 동바리 인양용 지그(10)에 동바리(11)를 달아매는 로프를 부착함으로 써 동바리의 규격 또는 간격에 대한 조정을 용이하게 실행할 수 있게 된다.The copper bar lifting jig 10 manufactured by the H-shaped steel may be manufactured in an appropriate size according to the capacity of the crane and the number of the load tower copper bars, and the copper bar is directly bolted to the copper bar lifting jig in consideration of the difference in the size of the copper bar for each company. Or by attaching a rope for fastening the copper 11 to the copper lifting lifting jig 10 without attaching by welding or the like. It is easy to make adjustments to the specifications or spacing of the groups.

한편, 본 고안에 따른 동바리 인양용 지그를 이용한 동바리 리프트업 시공 방법과 종래의 시공 방법을 이용하여, 거리 40m, 높이 25m 및 폭 14m의 동바리 조립 작업을 실시한 결과, 다음과 같은 결과가 얻어졌다.On the other hand, using the copper bar lift-up construction method and the conventional construction method using the copper bar lifting jig according to the present invention, as a result of performing a copper bar assembly operation of a distance of 40m, 25m in height and 14m in width, the following results were obtained.

먼저, 공사 기간은 본 고안의 동바리 인양용 지그를 이용한 방법에서는 9일이 소요되었으나, 종래의 시공 방법으로는 20일이 소요되었다.First, the construction period took 9 days in the method using a copper lifting lifting jig of the present invention, but 20 days in the conventional construction method.

다음, 공사에 투입된 인원 규모는 본 고안에 따른 방법에서는 81명(9일 x 9명/일)이 동원되었으나, 종래의 방법에서는 200명(20일 x 10명/일)의 인원이 필요하였다.Next, the number of personnel put into the construction was 81 people (9 days x 9 people / day) in the method according to the present invention, but 200 people (20 days x 10 people / day) in the conventional method was required.

따라서, 본 고안의 동바리 인양용 지그를 이용한 방법은 동바리 조립시 종래의 방법을 이용한 시공 방식에 비해 투입 비용을 1/2 정도로 절감할 수 있었다.Therefore, the method using the copper lifting lifting jig of the present invention was able to reduce the input cost by about 1/2 compared to the construction method using the conventional method when assembling the copper.

상기한 바와 같이, 본 고안의 동바리 인양용 지그를 이용한 동바리 리프트업 방법에 따르면, 작업자가 동바리에 올라타서 양중된 동바리를 상부에서 삽입하는 종래의 시공 방식에 비해, 동바리 인양용 지그를 이용하여 작업자가 동바리를 지상에 서서 하부로부터 상부측으로 삽입하는 작업을 반복함에 의해 조립하게 됨으로써, 공기가 단축되고, 공사비가 절감되며, 안전사고 위험을 예방할 수 있게 된다.As described above, according to the copper bar lift-up method using the copper bar lifting jig of the present invention, compared to the conventional construction method in which the worker climbs on the copper bar and inserts the lifted copper bar from the top, the worker using the copper bar lifting jig By assembling by repeating the operation of inserting the movable barb from the bottom to the upper side, it is possible to shorten the air, reduce construction costs, and prevent the risk of safety accidents.

또한, 동바리의 설치를 위해 필요한 동바리 인양용 지그를 동바리 열수에 맞게 H형강으로 제조하고, 로프를 매달고 있음으로써 각종 규격 또는 간격으로 동바리를 달아맬 수 있게 된다.In addition, it is possible to hang the copper bar at various specifications or intervals by manufacturing the copper bar lifting jig necessary for the installation of copper bar in H-shaped steel according to the number of copper bars, and hanging the rope.

이상 본 고안을 설명하였지만, 본 고안의 정신과 범위를 벗어나지 않고 여러 가지 방식으로 변경될 수 있을 것이다. 따라서, 본 고안의 범위는 상기 설명된 내용으로 제한되지 않고, 첨부된 특허청구의 범위에 의해 한정되는 것이다.Although the present invention has been described above, it may be changed in various ways without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention is not limited to the above description, but is defined by the appended claims.

Claims (2)

교량 건설 공사에서 상부 슬래브 타설시에 동바리(11)를 조립하도록 이용되는 동바리 인양용 지그(10)에 있어서,In the copper lifting lifting jig 10 used to assemble the copper spinning 11 at the time of placing the upper slab in a bridge construction work, 상기 동바리(11)와 결합되어 상기 동바리 인양용 지그에 동바리(11)를 연결시키는 작용을 하는 동바리 장착 수단(12),Copper bar mounting means (12) coupled to the copper bar (11) to act to connect the copper bar (11) to the copper bar lifting jig, 상기 동바리 장착 수단(12)을 동바리 인양용 지그(10)에 매달린 상태로 유지시키는 로프(13), 및A rope 13 for holding the club mounting means 12 in a state suspended from the club lifting lifting jig 10, and 상기 로프(13)를 동바리 인양용 지그(10)의 양 단부측에 걸쳐 있도록 하는 장방형 고리(14)를 포함하는 동바리 인양용 지그(10).Copper lifting lifting jig (10) comprising a rectangular ring (14) for extending the rope (13) across both end sides of the copper lifting lifting jig (10). 제 1 항에 있어서, 상기 동바리 장착 수단(12)에는 그의 상부에 제공된 후크(15), 그의 하부에 제공된 동바리 수용부(17) 및 상기 동바리 수용부(17)에 형성된 핀 구멍(16)이 제공되는 동바리 인양용 지그(10).The hooking means (12) is provided with a hook (15) provided at an upper portion thereof, a hooking receiver (17) provided at a lower portion thereof, and a pin hole (16) formed at the hooking receiver (17). Clubbing lifting jig (10).
KR2020000013853U 2000-05-16 2000-05-16 Jig for pulling up a strut KR200200919Y1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000026157A KR20010105570A (en) 2000-05-16 2000-05-16 Jig for pulling up a strut and a strut lift-up construction method using the same

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020000026157A Division KR20010105570A (en) 2000-05-16 2000-05-16 Jig for pulling up a strut and a strut lift-up construction method using the same

Publications (1)

Publication Number Publication Date
KR200200919Y1 true KR200200919Y1 (en) 2000-10-16

Family

ID=19668753

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020000026157A KR20010105570A (en) 2000-05-16 2000-05-16 Jig for pulling up a strut and a strut lift-up construction method using the same
KR2020000013853U KR200200919Y1 (en) 2000-05-16 2000-05-16 Jig for pulling up a strut

Family Applications Before (1)

Application Number Title Priority Date Filing Date
KR1020000026157A KR20010105570A (en) 2000-05-16 2000-05-16 Jig for pulling up a strut and a strut lift-up construction method using the same

Country Status (1)

Country Link
KR (2) KR20010105570A (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07103675B2 (en) * 1990-05-22 1995-11-08 明興金属工業株式会社 Scaffolding frame pedestal fittings
JPH0525927A (en) * 1991-07-23 1993-02-02 Yuko Nomura Assembling and disassembling of prefabricated scaffolding
JPH0814198B2 (en) * 1992-04-08 1996-02-14 株式会社福田組 Method for assembling frame scaffold and guide metal fitting for assembling frame scaffold
JPH07122333B2 (en) * 1993-06-30 1995-12-25 塩田工業株式会社 Assembling method of scaffold and assembly table used for this
KR20010037635A (en) * 1999-10-19 2001-05-15 장병돈 Assembling method of scaffold and the device

Also Published As

Publication number Publication date
KR20010105570A (en) 2001-11-29

Similar Documents

Publication Publication Date Title
EP0654571B1 (en) Zone module construction method of steel structure construction
CN112942661B (en) Construction method of stay cable with flexible cable net boundary
EP2250948B1 (en) Outdoor christmas tree assembly
CN113494051B (en) Construction method for block-by-block prefabricated installation of variable-section inclined tower steel reinforcement framework
CN108999290B (en) Combined lifting method for flexible cable net at lower part of cable bearing grid structure
KR200200919Y1 (en) Jig for pulling up a strut
US20020162283A1 (en) Jacking & tipping restraint apparatus and design of communications towers to enable entire tower erection at ground level
CN114908990B (en) Assembly type safety protection system for high-end equipment and construction method thereof
JPH06101274A (en) Method of constructing roof of cable dome
KR100898013B1 (en) Arch bridge constructing method
JP6438931B2 (en) Temporary column, temporary column installation structure, and roof frame construction method
JP6646220B2 (en) Construction method of suspended steel frame for suspended ceiling
CN213622873U (en) Building element lifting device
JP2002201611A (en) Bridge girder temporary expansible support device
CN209797236U (en) Box girder external mold hoisting device
US20090199886A1 (en) Support assembly for a roof element, shelter comprising said support assembly and method to mount said shelter
CN111705930A (en) Auxiliary construction structure and construction method for inverted cone spiral building
JP4372674B2 (en) Dismantling method of ultra-high cylindrical structure
JP2014156731A (en) Form for stand foundation part and stand construction method
JP7033351B1 (en) Scaffolding for dismantling the chimney structure and how to dismantle the chimney structure
KR101052790B1 (en) Large Space Structure Roof Structure Installation Automation Method
KR102597764B1 (en) Dropping prevention net mounted with climbing system and method for mounting the same
JPS6213474B2 (en)
CN210260837U (en) Device for synchronously hoisting multiple purlines on steel structure wall surface
JP3765102B2 (en) Construction method on slopes

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20100127

Year of fee payment: 10

EXPY Expiration of term