KR20020090554A - Integrated construction process and cost management system and method, and media for storing program source thereof - Google Patents

Integrated construction process and cost management system and method, and media for storing program source thereof Download PDF

Info

Publication number
KR20020090554A
KR20020090554A KR1020010029444A KR20010029444A KR20020090554A KR 20020090554 A KR20020090554 A KR 20020090554A KR 1020010029444 A KR1020010029444 A KR 1020010029444A KR 20010029444 A KR20010029444 A KR 20010029444A KR 20020090554 A KR20020090554 A KR 20020090554A
Authority
KR
South Korea
Prior art keywords
information
construction
construction cost
viewer
user
Prior art date
Application number
KR1020010029444A
Other languages
Korean (ko)
Inventor
박광규
이근영
김성일
김경우
김진영
김지영
Original Assignee
주식회사 디디알소프트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 디디알소프트 filed Critical 주식회사 디디알소프트
Priority to KR1020010029444A priority Critical patent/KR20020090554A/en
Publication of KR20020090554A publication Critical patent/KR20020090554A/en

Links

Abstract

PURPOSE: A construction process and fund integration management system, method and program are provided to support a viewer which contains construction process table and construction fund. CONSTITUTION: The amount and details calculation program(203) generates amount of materials calculation(204) and details calculation(205). The amount and details calculation program also generates an operation classifying viewer(210) and a 3D model viewer(211). The process manager inputs the fund information using the viewers and the process management program(220) outputs the process plan(222) or process management table(223). The system consists of one or more terminals, which can connect the communication network like the Internet, and web server, which integrates the amount of materials and details. The web server consists of construction integration DB, process manager, and the viewers. The construction integration DB contains the project name, amount of the materials, details information, process information and so on. The operation classifying viewer contains operation classifying system module and operation classifying display module. When the user request to edit processing table, the web server gets the name of the project and displays the viewer on the terminal. The user inputs the information about the process and the web server saves the information and integrates the information.

Description

건설 공정/공사비 통합 관리 시스템 및 방법과 그 프로그램 소스를 기록한 기록 매체{INTEGRATED CONSTRUCTION PROCESS AND COST MANAGEMENT SYSTEM AND METHOD, AND MEDIA FOR STORING PROGRAM SOURCE THEREOF}Integrated process and construction cost management system and method and recording medium recording the program source {INTEGRATED CONSTRUCTION PROCESS AND COST MANAGEMENT SYSTEM AND METHOD, AND MEDIA FOR STORING PROGRAM SOURCE THEREOF}

본 발명은 건설 공정과 공사비를 통합 관리하는 시스템 및 방법과 그 프로그램 소스를 기록한 기록 매체에 관한 것이다.The present invention relates to a system and method for integrating and managing a construction process and a construction cost, and a recording medium recording the program source thereof.

특히, 본 발명은 공사비가 반영된 작업 분류 뷰어 또는 공사비가 반영된 3차원 모델 뷰어를 생성하여, 공정표 편집시 단위 공정 각각에 공사비를 용이하게 통합하여 관리하도록 지원해주는 건설 공정/공사비 통합 관리 시스템 및 방법과 그 프로그램 소스를 기록한 기록 매체에 관한 것이다.Particularly, the present invention provides a construction process / construction cost integrated management system and method for generating a work classification viewer reflecting the cost of construction or a 3D model viewer reflecting the cost of construction, and assisting to easily integrate and manage the cost of construction in each of the unit processes when editing the schedule. A recording medium recording the program source.

도 1은 종래의 공정과 공사비를 통합 관리하는 과정을 나타낸 흐름도이다.1 is a flowchart illustrating a process of integrated management of a conventional process and construction cost.

도 1을 참조하면, 종래의 건설 공사 관리 방법은 적산자(102)가 설계 도면(100)과 시방서(101)등을 토대로 공사에 사용될 재료에 대한 물량 및 내역 정보를 산출하는 적산 단계와, 공정 관리자(110)가 공정 계획에 따라 공정 계획서(112) 및 공정 관리서(113)등을 작성하는 공정 관리 단계로 이루어진다.Referring to FIG. 1, a conventional construction work management method includes an integration step in which an accumulator 102 calculates quantity and breakdown information on materials to be used for construction based on a design drawing 100, a specification 101, and a process. The manager 110 includes a process management step of creating a process plan 112 and a process control book 113 according to the process plan.

상기의 적산 단계에서는 적산자(102)가 설계 도면(100)과 시방서(101)을 보고, 수작업으로 직접 데이터를 물량/내역 산출 프로그램(103)에 입력하면, 상기 물량/내역 산출 프로그램(103)은 자동으로 물량 산출서(104) 및 내역 산출서(105)를 출력해주고, 상기 공정 관리 단계에서는 공정 관리자(110)가 상기 산출된 물량 산출서(104) 및 내역 산출서(105)를 토대로 직접 데이터를 공정 관리 프로그램(111)에 입력하면, 상기 공정 관리 프로그램(111)은 자동으로 상기 공정 계획서(112) 또는 공정 관리서(113)를 작성해준다.In the integration step, when the integrator 102 sees the design drawing 100 and the specification 101 and directly inputs data into the quantity / history calculation program 103 by hand, the quantity / history calculation program 103 Automatically outputs the quantity statement 104 and the detail statement 105, and in the process management step, the process manager 110 directly based on the calculated quantity statement 104 and the detail statement 105. When the data is input to the process management program 111, the process management program 111 automatically generates the process plan 112 or the process control book 113.

그러나, 상기의 프로그램은 서로 정보를 연계해주는 수단이 따로 구비되지 않아서, 상기 건설 공정과 공사비를 통합하고자 하는 경우, 도 1에 도시된 바와 같이, 상기 적산 단계의 상기 물량, 내역 산출 프로그램(103)으로부터 산출된 물량 산출서(104)와 내역 산출서(105)를 바탕으로 상기 공정 관리자(110)가 별도의 공정 관리 프로그램(111)에 공사비에 대한 데이터를 수작업으로 하나 하나 입력하여야 하므로 번거로울 뿐만 아니라, 불필요한 시간 낭비를 초래한다.However, the above program is not provided with a means for linking information with each other, and if you want to integrate the construction process and construction costs, as shown in Figure 1, the quantity of the integration step, the history calculation program 103 Based on the quantity statement 104 and the history statement 105 calculated from the process manager 110 is not only cumbersome because it requires manual input of data on the cost of construction in a separate process management program 111 one by one This leads to unnecessary waste of time.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출한 것으로서, 본 발명의 목적은 상기 물량 및 내역 정보가 할당된 뷰어를 생성하여, 상기 사용자의 공정표 편집시 상기 공사비가 반영된 뷰어를 이용하여 단위 공정에 해당 공사비가 통합되도록 지원함으로써 사용자에게 공정과 공사비를 단 시간 내에 용이하게 통합 관리할 수 있는 기회를 제공하는 데 있다.The present invention has been made to solve the above problems, an object of the present invention is to create a viewer to which the quantity and history information is assigned, the unit process by using the viewer reflecting the construction cost when editing the user's process table By supporting the integration of the construction cost, it provides the user with the opportunity to easily manage the process and construction costs in a short time.

상기의 목적을 달성하기 위한 본 발명의 일 실시 예는, 통신 네트워크에 접속 가능한 사용자 단말기의 요청에 따라, 소정 프로젝트의 물량 및 내역 정보를 산출/제공하고, 공정표 편집 및 관리를 지원하는 시스템에 있어서, 공정 설계 시, 공정표 상의 단위 공정 각각에 대응하는 상기 물량 및 내역 정보를 통합하여 관리하는 웹서버를 포함하여 구성되는 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템을 제공한다.One embodiment of the present invention for achieving the above object, in the system for calculating / providing quantity and history information of a predetermined project, at the request of a user terminal connectable to the communication network, and supports the editing and management of the schedule In the process design, it provides a construction process / construction cost integrated management system comprising a web server for integrating and managing the quantity and history information corresponding to each unit process on the process table.

상기의 목적을 달성하기 위한 본 발명의 다른 실시 예는, 통신 네트워크에 접속한 사용자 단말기에 소정 프로젝트의 물량 또는 내역 정보를 산출/제공하고,공정표 편집 및 관리를 지원하는 시스템에서의 건설 정보 제공 방법에 있어서, 사용자 단말기로부터 공정표 편집 요청에 반응하여, 프로젝트명을 입력받아 초기화된 공정표 편집란을 생성하고, 상기 프로젝트 명에 해당하는 물량 및 내역 정보가 할당된 뷰어를 상기 공정 편집란의 소정의 공간에 디스플레이시키는 제 1단계와; 상기 사용자로부터의 빈 단위 공정 노드 생성 요청에 따라, 상기 공정표 편집란에 빈 단위 공정 노드를 생성시키고, 상기 공정 정보를 입력할 입력란을 디스플레이하여 그에 대응하는 정보를 입력받아 상기 빈 단위 공정 노드의 해당란에 표시되도록 지원하여 단위 공정을 생성하는 제 2 단계와; 상기 뷰어를 이용하여 상기 단위 공정에 해당하는 물량 및 내역 정보를 상기 단위 공정에 통합하는 제 3단계를 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법을 제공한다.Another embodiment of the present invention for achieving the above object, a method for providing construction information in a system for calculating / providing quantity or breakdown information of a predetermined project to a user terminal connected to a communication network and supporting editing and management of a schedule. In response to the process table edit request from the user terminal, generates a process table edit field initialized by receiving the project name, and displays a viewer to which the quantity and details information corresponding to the project name is assigned in a predetermined space of the process edit column Making a first step; In response to a request for creating an empty unit process node from the user, an empty unit process node is created in the process table edit field, a input field for inputting the process information is displayed, and corresponding information is input to the corresponding unit of the empty unit process node. A second step of supporting the display to generate a unit process; And a third step of integrating the quantity and the details information corresponding to the unit process into the unit process using the viewer.

상기의 목적을 달성하기 위한 본 발명의 또 다른 실시 예는, 통신 네트워크에 접속한 사용자 단말기에 소정 프로젝트의 물량 또는 내역 정보를 산출/제공하고, 공정표 편집 및 관리를 지원하는 시스템에서의 건설 정보 제공 프로그램 소스를 기록한 기록 매체에 있어서, 사용자 단말기로부터 공정표 편집 요청에 반응하여, 프로젝트명을 입력받아 초기화된 공정표 편집란을 생성하고, 상기 프로젝트 명에 해당하는 물량 및 내역 정보가 할당된 뷰어를 상기 공정표 편집란의 소정의 공간에 디스플레이시키는 제 1 프로세스와; 상기 사용자로부터의 빈 단위 공정 노드 생성 요청에 따라, 상기 공정표 편집란에 빈 단위 공정 노드를 생성시키고, 상기 공정 정보를 입력할 입력란을 디스플레이하여 그에 대응하는 정보를 입력받아 상기 빈 단위 공정 노드의 해당란에 표시되도록 지원하여 단위 공정을 생성하는 제 2 프로세스와; 상기 뷰어를 이용하여 상기 단위 공정에 해당하는 물량 및 내역 정보를 상기 단위 공정에 통합하는 제 3 프로세스를 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체를 제공한다.Another embodiment of the present invention for achieving the above object, to calculate / provide the quantity or history information of a predetermined project to the user terminal connected to the communication network, providing construction information in a system that supports editing and management of the schedule In a recording medium recording a program source, in response to a process table edit request from a user terminal, a project table input field is generated and an initialized process table edit field is generated, and a viewer to which quantity and description information corresponding to the project name are assigned is displayed in the process table edit field. A first process of displaying in a predetermined space of; In response to a request for creating an empty unit process node from the user, an empty unit process node is created in the process table edit field, a input field for inputting the process information is displayed, and corresponding information is input to the corresponding unit of the empty unit process node. A second process of supporting the display to generate a unit process; And a third process of integrating quantity and breakdown information corresponding to the unit process into the unit process by using the viewer.

도 1은 종래의 공정과 공사비를 통합 관리하는 과정을 나타낸 흐름도.1 is a flow chart showing a process of integrated management of the conventional process and construction costs.

도 2는 본 발명에 따른 공정과 공사비를 통합 관리하는 과정을 나타낸 흐름도.2 is a flow chart showing a process of integrated management of the process and construction costs according to the present invention.

도 3은 본 발명의 건설 공정/공사비 통합 관리 시스템의 전체 구성도.Figure 3 is an overall configuration of the construction process / construction cost integrated management system of the present invention.

도 4는 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 화면의 캡쳐도.4 is a capture diagram of the construction process / construction cost integrated management screen according to an embodiment of the present invention.

도 5는 본 발명의 실시 예에 따른 내역 정보 제공 화면의 캡쳐도.5 is a capture diagram of a history information providing screen according to an embodiment of the present invention.

도 6은 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 방법을 설명하기 위한, 사용자의 공정표 편집 요청에 따른 웹서버의 동작을 도시한 플로우 차트.FIG. 6 is a flowchart illustrating an operation of a web server according to a user's request for editing a schedule for explaining a construction process / construction cost integrated management method according to an exemplary embodiment of the present invention.

도 7은 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 방법을 설명하기 위한, 사용자의 공정 모의 실험 요청에 따른 웹서버의 동작을 도시한 플로우 차트.7 is a flowchart illustrating an operation of a web server according to a process simulation request of a user for explaining a construction process / construction cost integrated management method according to an exemplary embodiment of the present invention.

도 8은 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 방법을 설명하기 위한, 사용자의 기성 관리 요청에 따른 웹서버의 동작을 도시한 플로우 차트.8 is a flowchart illustrating an operation of a web server according to a ready-made management request of a user for explaining a construction process / construction cost integrated management method according to an exemplary embodiment of the present invention.

<도면 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100, 200 : 설계 도면 101, 201 : 시방서100, 200: Design drawing 101, 201: Specifications

102, 202 : 적산자102, 202: Totalizer

103, 203 : 물량/내역 산출 프로그램 104, 204 : 물량 산출서103, 203: Quantity / History calculation program 104, 204: Quantity statement

105, 205 : 내역 산출서 110, 221 : 공정 관리자105, 205: breakdown statement 110, 221: process manager

111, 220 : 공정 관리 프로그램 112, 222 : 공정 계획서111, 220: Process control program 112, 222: Process plan

113, 223 : 공정 관리서 300 : 통신 네트워크113, 223: Process Control 300: Communication Network

310 : 사용자 단말기 320 : 웹서버310: user terminal 320: web server

330 : 건설 통합 DB 340 : 공정 관리부330: construction integration DB 340: process management

341, 400 : 공정표 편집 모듈 342 : 모의 실험 모듈341, 400: process table editing module 342: simulation module

343 : 작업 지시 모듈 344 : 작업 처리 모듈343: work instruction module 344: work processing module

350, 210, 420 : 공사비가 반영된 작업 분류 뷰어350, 210, 420: Job classification viewer reflecting construction cost

351 : 작업 분류 체계 모듈351: Job Taxonomy Module

352 : 작업 분류 표시 모듈352: job classification display module

360, 211 : 공사비가 반영된 3차원 모델 뷰어360, 211: 3D model viewer reflecting construction cost

361 : 3차원 모델링 모듈 362 : 3차원 모델 표시 모듈361: 3D modeling module 362: 3D model display module

410 : 공정표 편집란 430 : 단위 공정 노드410: process table edit column 430: unit process node

500 : 내역 정보창500: History Information Window

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 공정과 공사비를 통합 관리하는 과정을 나타낸 흐름도이다.2 is a flow chart showing a process of integrated management of the process and construction costs according to the present invention.

우선, 본 발명의 이해를 도모하기 위해 도 2를 참조하여 건설 공정/공사비 통합 과정을 도 1과 비교하여 개략적으로 설명하고자 한다.First, in order to understand the present invention, a construction process / construction cost integration process will be schematically described with reference to FIG. 2 with reference to FIG. 2.

도 2를 참조하면, 본 발명의 건설 공정/공사비 통합 관리 방법 또한 도 1과 같이 적산 단계와 공정 관리 단계로 이루어진다.Referring to Figure 2, the construction process / construction cost integrated management method of the present invention also comprises an integration step and a process management step as shown in FIG.

상기 적산 단계에서는 종래와 달리 물량/내역 산출 프로그램(203)이 설계 도면(200)으로부터 자동으로 추출한 도면 수치 데이터와 적산자(202)가 시방서(201)로부터 추가로 입력한 정보를 가지고 물량산출서(204)와 내역산출서(205)를 자동 생성한다.In the integration step, unlike the conventional method, the quantity / history calculation program 203 automatically extracts the drawing numerical data extracted from the design drawing 200 and the information added by the accumulator 202 from the specification 201. 204 and a statement of statements 205 are automatically generated.

상기 물량/내역 산출 프로그램(203)은 상기 산출된 물량 및 내역 정보인 공사비(재료비, 인건비, 제 경비 포함)를 산출하여 작업 분류 체계의 각 해당 항목에 관련된 부분에 공사비를 할당한 공사비가 반영된 작업 분류 뷰어(210)를 생성한다.The quantity / history calculation program 203 calculates a construction cost (including material cost, labor cost, and first expense), which is the calculated quantity and breakdown information, and reflects the construction cost of allocating the construction cost to a part related to each corresponding item of the work classification system. The classification viewer 210 is generated.

상기 물량/내역 산출 프로그램(203)은 상기 산출된 물량 및 내역 데이터인공사비(재료비, 인건비, 제 경비 포함)를 산출하여 3차원 모델링의 각 객체에 관련된 부분에 공사비를 할당한 공사비가 반영된 3차원 모델 뷰어(211)를 생성하게 된다.The quantity / history calculation program 203 calculates the calculated quantity and construction data work costs (including material costs, labor costs, and first expenses) to reflect the construction cost of allocating the construction cost to the part related to each object of the three-dimensional modeling. The model viewer 211 is generated.

상기 공정 관리 단계에서 공정 관리자(221)가 상기 공정 관리 프로그램(220)을 이용하여 공정표를 작성하는 과정은 종래와 동일하나, 상기 공정에 공사비를 통합하는 과정에서 상기 공정 관리자(221)가 상기 공정에 해당하는 공사비 정보를 상기 물량 산출서(204) 및 내역 산출서(205)를 이용하여 수작업으로 직접 입력하지 않고, 공사비가 반영된 작업 분류 뷰어(210) 또는 공사비가 반영된 3차원 모델 뷰어(211)를 사용하여 해당 공정 시공에 필요한 항목을 선택하여 공정에 공사비가 통합되도록 한다.In the process management step, the process manager 221 creates a process table using the process management program 220 as in the related art, but the process manager 221 performs the process in the process of integrating the construction cost into the process. Rather than directly inputting the construction cost information corresponding to the manual using the quantity calculation sheet 204 and the breakdown statement 205, the work classification viewer 210 reflecting the construction cost or the three-dimensional model viewer 211 reflecting the construction cost Use to select the items required for the construction of the process so that the cost is integrated into the process.

그러면, 상기 공정 관리 프로그램(220)은 상기 작성된 공정 설계 내용에 따른 공정 계획서(222)나 공정 관리서(223)를 출력한다.Then, the process management program 220 outputs a process plan 222 or a process control book 223 according to the created process design contents.

이후, 본 발명의 건설 공정/공사비 통합 관리 시스템 및 방법은 상기 적산 단계에서 산출된 물량 및 내역 정보로 이루어진 DB가 생성되고, 상기 공사비가 반영된 작업 분류 뷰어(210) 또는 공사비가 반영된 3차원 모델 뷰어(211)가 생성된 상태에서 구현되는 시스템 및 방법임을 밝혀둔다.Subsequently, in the integrated construction process / construction cost management system and method of the present invention, a DB including a quantity and details information calculated in the integration step is generated, and the work classification viewer 210 reflecting the construction cost or the three-dimensional model viewer reflecting the construction cost It is noted that 211 is a system and method implemented in the generated state.

이하에서의 본 발명은 웹 브라우저를 탑재하여 건설 관리 서비스를 이용할 수 있도록 구현된 사용자 단말기가 통신 네트워크에 연결되고, 상기 통신 네트워크에 상기 건설 관리를 지원하는 웹서버를 연결한 상태의 시스템 구성을 도입하여 설명한다. 이는 상기 웹브라우저 구동 상태에서 상기 웹서버에 접속한 사용자의 공정 관리 요청에 따라 상기 공정/공사비를 용이하게 통합하여 관리할 수 있는 방법 및 그를 지원하도록 구현되는 시스템을 바람직한 실시 예로서 제안한다.In the following invention, a user terminal implemented to use a construction management service with a web browser is connected to a communication network, and a system configuration is introduced in which a web server supporting the construction management is connected to the communication network. Will be explained. This suggests a preferred embodiment of a method and a system implemented to support the process / construction cost easily and integrated according to a process management request of a user accessing the web server in the web browser running state.

또한 본 발명의 바람직한 실시 예는 본 발명 방법을 실행하도록 프로그램된 컴퓨터 시스템 및 컴퓨터 프로그램 제품과 같은 실시 예를 포함한다. 컴퓨터 시스템의 실시 예에 따르면, 방법을 실행하기 위한 명령어 세트는 하나 또는 그 이상의 메모리(램)에 상주하며, 이들 명령어 세트는 컴퓨터 시스템에서 필요로 할 때까지 예를 들어 디스크 드라이브 내의 다른 컴퓨터 메모리에 컴퓨터 프로그램 제품으로써 저장될 수 있다.Preferred embodiments of the invention also include embodiments such as computer systems and computer program products programmed to carry out the methods of the invention. In accordance with an embodiment of a computer system, a set of instructions for carrying out a method resides in one or more memories (RAM), which sets the instruction set to another computer memory in a disk drive, for example, until needed by the computer system. It can be stored as a computer program product.

도 3은 본 발명의 건설 공정/공사비 통합 관리 시스템의 전체 구성도이다.3 is an overall configuration diagram of a construction process / construction cost integrated management system of the present invention.

도 4는 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 화면의 캡쳐도이다.4 is a capture diagram of the construction process / construction cost integrated management screen according to an embodiment of the present invention.

도 5는 본 발명의 실시 예에 따른 내역 정보 제공 화면의 캡쳐도이다.5 is a capture diagram of a history information providing screen according to an embodiment of the present invention.

도 3을 참조하면, 상기 건설 공정/공사비 통합 관리 시스템은 통신 네트워크(300)에 접속 가능한 하나 이상의 사용자 단말기(310)의 요청에 따라 소정 프로젝트의 설계 도면 또는 시방서로부터 산출된 물량 및 내역 정보를 공정 설계 시, 공정표 상의 단위 공정 각각에 통합/관리하는 웹서버(320)를 포함하여 구성된다.Referring to FIG. 3, the construction process / construction cost integrated management system processes the quantity and details information calculated from a design drawing or specification of a predetermined project according to a request of one or more user terminals 310 accessible to the communication network 300. In the design, the web server 320 is configured to include / manage each of the unit processes on the process table.

상기 웹서버(320)는 상기 건설 프로젝트에 관한 건설 정보를 저장하는 건설 통합 DB(330)와, 상기 사용자의 요청에 따라 상기 공정표 편집 기능을 제공하고 관리해주는 공정 관리부(340)와, 상기 건설 통합 DB(330)에서 추출한 공사비 정보가 할당된 뷰어(350, 360)을 포함하여 구성된다.The web server 320 includes a construction integrated DB 330 for storing construction information about the construction project, a process manager 340 for providing and managing the process table editing function at the request of the user, and the construction integration. Construction cost information extracted from the DB 330 is configured to include the viewer (350, 360) assigned.

상기 건설 통합 DB(330)는 상기 소정 프로젝트명과 그에 해당하는 물량 및 내역 정보, 도면 수치 정보, 공정 정보를 저장한다.The construction integration DB 330 stores the predetermined project name, corresponding quantity and history information, drawing numerical information, and process information.

상기 물량 및 내역 정보는 상술한 바와 같이 도 2의 적산 단계에서 상기 소정 프로젝트의 설계 도면(200)과 시방서(201)로부터 추출된 정보를 적산자(202)로부터 입력받아 물량, 내역 산출 프로그램(203)이 산출한 정보이다.As described above, the quantity and the detail information are inputted from the accumulator 202 with the information extracted from the design drawing 200 and the specification 201 of the predetermined project in the integration step of FIG. 2 as described above. ) Is calculated information.

상기 뷰어는 공사비가 반영된 작업 분류 체계를 생성하여 표시하는 공사비가 반영된 작업 분류 뷰어(350)와 공사비가 반영된 3차원 모델링을 생성하여 표시하는 공사비가 반영된 3차원 모델 뷰어(360)를 포함하여 구성된다.The viewer is configured to include a work classification viewer 350 reflecting the construction cost to generate and display the work classification system reflecting the construction cost and a three-dimensional model viewer 360 reflecting the construction cost to generate and display the three-dimensional modeling reflecting the construction cost. .

상기 공사비가 반영된 작업 분류 뷰어(350)는 상기 물량 및 내역 정보로 작업 분류 체계를 생성하는 작업 분류 체계 모듈(351)과, 상기 작업 분류 체계를 사용자 단말기(310)의 화면상에 디스플레이 되도록 지원하는 작업 분류 표시 모듈(352)을 포함하여 구성된다.The job classification viewer 350 reflecting the construction cost supports the job classification system module 351 for generating a job classification system based on the quantity and history information, and displays the job classification system on the screen of the user terminal 310. The job classification display module 352 is configured.

도 4에는 좌측 소정의 공간에 작업 분류 체계의 일 실시예가 도시되어 있다.4 illustrates an embodiment of a job classification scheme in a predetermined space on the left side.

상기 작업 분류 체계 모듈(351)은 기 정의된 작업 분류 체계에 따라 상기 건설 통합 DB(330)에 있는 도면 수치 정보와 물량 정보, 그리고 내역 정보를 사용하여 소정 프로젝트에 해당하는 작업 분류 체계를 생성하고, 각 작업 분류 체계상의 각 작업 분류 항목에 해당하는 물량 및 내역 정보를 할당한다.The work classification system module 351 generates a work classification system corresponding to a predetermined project using drawing numerical information, quantity information, and history information in the construction integration DB 330 according to a predefined work classification system. In addition, quantity and history information corresponding to each task classification item in each task classification system is allocated.

상기 작업 분류 항목에 물량 및 내역 정보를 할당하는 방법으로는 상기 작업분류 항목에 해당하는 코드에 상기 물량 및 내역 정보에 해당하는 코드를 결합시키거나, 상기 작업 분류 항목 정보와 각각에 해당하는 물량 및 내역 정보를 저장한 새로운 DB를 생성하는 방법 등이 있을 수 있다.The method for allocating quantity and history information to the work classification item may include combining the code corresponding to the quantity and the history information with the code corresponding to the work classification item, or the quantity corresponding to the work classification item information and the respective quantity and There may be a method of creating a new DB storing the history information.

상기 작업 분류 표시 모듈(352)은 상기 생성된 작업 분류 체계를 도 4에 도시된 바와 같이 트리 구조 형태로 상기 사용자 단말기(310)의 화면상에 디스플레이 되도록 지원한다.The job classification display module 352 supports the generated job classification system to be displayed on the screen of the user terminal 310 in a tree structure as illustrated in FIG. 4.

상기 작업 분류 표시 모듈(352)는 상기 사용자 단말기(310)가 키입력에 의해 작업 분류 항목을 선택한 후, 상기 작업 분류 항목이 선택된 상태에서 마우스 드래그를 수행하면, 상기 작업 분류 항목이 마우스를 따라 이동되도록 표시할 수 있다.The job classification display module 352 selects a job classification item by key input by the user terminal 310 and then drags the mouse while the job classification item is selected. May be indicated.

상기 공사비가 반영된 작업 분류 뷰어(350)는 상기 사용자로부터 선택받은 작업 분류 항목은 선택되지 않은 다른 작업 분류 항목과 색상을 차별화하여 사용자가 쉽게 구분할 수 있도록 한다.The job classification viewer 350 reflecting the cost of construction allows the user to easily distinguish the job classification items selected from the user by differentiating colors from other job classification items which are not selected.

상기 공사비가 반영된 3차원 모델 뷰어(360)는 소정 프로젝트의 3차원 모델을 생성하고, 그에 해당하는 물량 및 내역 정보를 할당하는 3차원 모델링 모듈(361)과, 상기 생성된 3차원 모델을 디스플레이하는 3차원 모델 표시 모듈(362)을 포함하여 구성된다.The 3D model viewer 360 reflecting the construction cost generates a 3D model of a predetermined project, allocates the quantity and details of the corresponding project, and displays the generated 3D model. And a three-dimensional model display module 362.

상기 3차원 모델링 모듈(361)은 상기 건설 통합 DB(330)에 있는 도면 수치 정보를 이용하여 3차원 모델을 생성한 다음에 각 객체를 시공하는데 필요한 공사비를 물량 정보와 내역 정보를 이용하여 할당하게 된다.The three-dimensional modeling module 361 generates a three-dimensional model using the numerical information of the drawings in the construction integration DB 330, and then allocates the construction cost required for constructing each object using the quantity information and the detail information. do.

상기 3차원 모델의 각 객체와 그를 시공하는데 필요한 공사비를 할당하는 방법은 상기의 작업 분류 항목에 공사비를 할당하는 방법과 동일하거나, 구현 가능한 모든 방법일 수 있다.The method of allocating each object of the 3D model and the construction cost required for constructing the same may be the same as the method of allocating the construction cost to the above-described work classification item, or any method that can be implemented.

상기 3차원 모델 표시 모듈(362)은 상기 3차원으로 모델링한 객체에 공사비를 통합한 결과를 사용자 단말기(310)의 화면상에 디스플레이되도록 지원한다.The 3D model display module 362 supports displaying the result of integrating the construction cost into the 3D modeled object on the screen of the user terminal 310.

상기 3차원 모델 표시 모듈(362)은 상기 사용자 단말기(310)가 키입력에 의해 객체를 선택한 상태에서 마우스 드래그를 수행하면, 상기 객체가 마우스를 따라 이동되도록 표시할 수 있다.When the user terminal 310 performs a mouse drag while the user terminal 310 selects an object by key input, the 3D model display module 362 may display the object to be moved along the mouse.

또한 공사비가 반영된 3차원 모델 뷰어(360)는 공정표 편집이 완료된 후, 사용자로부터의 3차원 모의 실험 요청에 따라, 공정에 해당하는 3차원 모델 시공이 완료된 공정을 시각적으로 선택한 다음에 기성 데이터를 쉽게 입력할 수 있도록 해준다.In addition, the 3D model viewer 360 reflecting the construction cost is visually selected after the completion of the process table editing, the 3D model construction corresponding to the process in response to a request for 3D simulation from the user, and then ready-made data can be easily selected. Allow input.

상기 공정관리부(340)는 공정표 편집란을 제시하여 다수개의 단위 공정을 생성시키는 공정표 편집 모듈(341)과, 상기 설계된 공정 계획에 따라서 3차원 모의 실험하는 모의 실험 모듈(342)과, 작성된 공정표에 따라 공정활동 단위로 작업을 지시하도록 지원하는 작업 지시 모듈(343)과, 지시된 공정활동에 대한 시공이 완료된 다음에 시공 결과를 입력받아 처리하는 작업 처리 모듈(344)을 포함하여 구성된다.The process management unit 340 displays a process table edit field to generate a plurality of unit processes, a process table editing module 341, a simulation module 342 for simulating 3D according to the designed process plan, and a prepared process table It includes a work instruction module 343 for supporting a work order in the process activity unit, and a work processing module 344 for receiving and processing the construction result after construction of the indicated process activity is completed.

상기 공정표 편집 모듈(341)은 사용자의 공정 설계에 따른 공정표 편집 요청에 따라 빈 공정표 편집란을 생성하고, 상기 공정표 편집란에 단위 공정 노드를 생성하고, 상기 뷰어를 이용하여 단위 공정에 해당하는 물량 및 내역 정보를 통합하도록 지원한다.The process table editing module 341 generates an empty process table edit field according to a process table edit request according to a user's process design, creates a unit process node in the process table edit field, and the quantity and details corresponding to the unit process using the viewer. Assist in integrating information.

상기 공정표 편집 모듈(341)의 동작 설명은 후술되는 건설 공정/공사비 통합 관리 방법 설명에서 상세히 하기로 한다.Operation of the process table editing module 341 will be described in detail in the following description of the construction process / construction cost integrated management method.

상기 모의 실험 모듈(342)은 상기 공정 설계 내용을 공정 기간별 또는 공정에 할당된 공사비를 기준으로 하여 3차원 모의 실험하도록 지원한다.The simulation module 342 supports the three-dimensional simulation of the process design content based on the construction cost assigned to each process period or process.

이러한 모의 실험을 통하여 작성된 공정 설계의 적합성과, 각 공정의 시공에 소요될 자금에 대한 예측과 투입 자금에 해당하는 만큼의 공정 작업 결과를 시각적으로 파악할 수 있게 된다.Through this simulation, it is possible to visually grasp the suitability of the process design, the prediction of the funds required for the construction of each process, and the results of the process work corresponding to the input funds.

상기 모의 실험 모듈(342)의 동작 설명은 후술되는 건설 공정/공사비 통합 관리 방법 설명에서 상세히 하기로 한다.The operation description of the simulation module 342 will be described in detail later in the description of the construction process / construction cost integrated management method.

상기 작업 지시 모듈(343)은 상기 공정표 편집 모듈(341)에서 작성된 공정 계획에 따라 공정 활동 단위로 작업을 지시하기 위해, 상기 건설 통합 DB(330)에 공정 활동에 필요한 물량이나 내역 정보 및 공정에 대한 작업 내용을 공사비가 반영된 3차원 모델 뷰어(360)를 통하여 시각적으로 파악할 수 있도록 하며, 또한 작업지시서의 형태로 출력하게 된다.The work instruction module 343 is configured in order to instruct the work in the unit of process activity according to the process plan created in the process table editing module 341, the construction integration DB 330 to the quantity or history information necessary for the process activity and the process It is possible to visually grasp the content of the work through the three-dimensional model viewer 360 reflecting the construction cost, it is also output in the form of work orders.

상기 작업 처리 모듈(344)은 작업 지시 모듈(343)을 통하여 작성된 작업 지시서에 따라 해당 공정을 시공한 다음에 작업결과서를 참조하여 기성을 입력받아 처리한다.The work processing module 344 constructs the process according to the work instruction sheet created by the work instruction module 343 and then receives and processes the ready-made reference with reference to the work result sheet.

상기 작업 처리 모듈(344)은 기성을 입력하는 경우에도 공사비가 반영된 3차원 모델 뷰어(360)를 이용하여 기성을 입력하고자 하는 공정에 속한 객체를 시각적으로 파악할 수 있도록 하여 사용자가 쉽게 기성을 처리할 수 있도록 한다.The job processing module 344 allows the user to easily process the ready-made object by visually identifying an object belonging to the process to input the ready-to-use object using the 3D model viewer 360 reflecting the construction cost even when the ready input is input. To help.

이후, 상기 건설 공정/공사비 통합 관리 시스템의 각 구성 요소들의 동작에 따른 건설 공정/공사비 통합 관리 방법을 설명하기로 한다.Next, the construction process / construction cost integrated management method according to the operation of each component of the construction process / construction cost integrated management system will be described.

상기 웹서버(320)는 사용자 단말기(310)의 통신 네트워크(300)를 통한 접속에 따라, 사용자 단말기(310)에 메인 프레임 페이지를 디스플레이한다.The web server 320 displays a main frame page on the user terminal 310 according to a connection of the user terminal 310 through the communication network 300.

상기 메인 프레임 페이지에는 상술한 적산 단계를 지원하는 적산 항목과, 공정 관리 단계를 지원하는 공정 관리 항목이 포함되어 있다.The main frame page includes an integration item for supporting the above-described integration step and a process management item for supporting the process control step.

상기 웹서버(320)는 사용자 단말기(310)의 키입력에 따른 적산 항목 선택에 따라, 도 2의 물량/내역 산출 프로그램(203)을 구동시켜 상기 소정 프로젝트의 설계 도면과 시방서로부터 추출된 정보를 입력받아 그에 해당하는 물량 및 내역 정보를 산출하여 상기 건설 통합 DB(330)에 저장한다.The web server 320 drives the quantity / history calculation program 203 of FIG. 2 according to selection of integration items according to a key input of the user terminal 310 to obtain information extracted from the design drawings and specifications of the predetermined project. It receives the input and calculates the corresponding quantity and details information and stores in the construction integration DB (330).

상기 웹서버(320)는 상기 사용자 단말기(310)로부터 뷰어 생성 요청에 따라, 또는 자동으로 뷰어를 생성한다.The web server 320 generates a viewer automatically or in response to a viewer creation request from the user terminal 310.

상기 웹서버(320)는 상기 사용자 단말기(310)의 키입력에 따라, 공정 관리 항목 선택 신호를 전송받으면, 상기 공정 관리부(340)를 구동시킨다When the web server 320 receives a process management item selection signal according to a key input of the user terminal 310, the web server 320 drives the process manager 340.

본 발명의 건설 공정/공사비 통합 관리 방법은 사용자로부터 공정 관리 항목을 선택 신호에 따른 동작이므로 도면을 참조하여 상세히 설명하기로 한다.Construction process / construction cost integrated management method of the present invention will be described in detail with reference to the drawings since the operation according to the selection signal to the process management items from the user.

도 6은 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 방법을 설명하기 위한, 사용자의 공정표 편집 요청에 따른 웹서버의 동작을 도시한 플로우 차트를 나타낸다.FIG. 6 is a flowchart illustrating an operation of a web server according to a user's request for editing a process schedule for explaining a construction process / construction cost integrated management method according to an exemplary embodiment of the present invention.

도 6을 참조하면, 본 발명의 건설 공정/공사비 통합 관리 방법은 사용자 단말기로부터 공정표 편집 요청에 반응하여, 프로젝트명을 입력받아 초기화된 공정표 편집란을 생성하고, 상기 프로젝트 명에 해당하는 물량 및 내역 정보가 할당된 뷰어를 상기 공정 편집란의 소정의 공간에 디스플레이시키는 단계(S600~S610)와; 상기 사용자로부터의 빈 단위 공정 노드 생성 요청에 따라, 상기 공정표 편집란에 빈 단위 공정 노드를 생성시키고, 상기 공정 정보를 입력할 입력란을 디스플레이하여 그에 대응하는 정보를 입력받아 상기 빈 단위 공정 노드의 해당란에 표시되도록 지원하여 단위 공정을 생성하는 단계(S615~S620)와; 상기 뷰어를 이용하여 상기 단위 공정에 해당하는 물량 및 내역 정보를 상기 단위 공정에 통합하는 단계(S625~S535)를 포함하여 구성된다.Referring to FIG. 6, in the integrated construction process / construction cost management method of the present invention, in response to a process table edit request from a user terminal, a project table input field is initialized by receiving a project name, and quantity and detail information corresponding to the project name are generated. Displaying the assigned viewer in a predetermined space of the process edit column (S600 to S610); In response to a request for creating an empty unit process node from the user, an empty unit process node is created in the process table edit field, a input field for inputting the process information is displayed, and corresponding information is input to the corresponding unit of the empty unit process node. Generating a unit process by supporting the display (S615 ˜ S620); Integrating the quantity and details information corresponding to the unit process to the unit process using the viewer (S625 ~ S535).

상기 웹서버(320)는 상기 사용자 단말기(310)로부터 공정표 편집 요청 신호가 전송되면(S600), 사용자 단말기(310)에 프로젝트 명 입력란을 디스플레이하여, 프로젝트 명을 입력받는다(S605).When the process table edit request signal is transmitted from the user terminal 310 (S600), the web server 320 displays a project name input box on the user terminal 310 and receives a project name (S605).

상기 웹서버(320)는 상기 입력받은 프로젝트 명에 해당하는 초기화된 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360) 및 새 공정표 편집란을 사용자 단말기(310)에 디스플레이되도록 출력한다(S610).The web server 320 displays the work classification viewer 350 reflecting the initialized construction cost corresponding to the input project name or the three-dimensional model viewer 360 reflecting the construction cost and the new milestone edit field on the user terminal 310. Output (S610).

도면에는 도시되어 있지 않지만, 상기 웹서버(320)는 상기 사용자 단말기(310)로부터 입력받은 프로젝트 명에 해당하는 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360)가 생성되어 있는지를 판단한다.Although not shown in the drawing, the web server 320 is generated by the job classification viewer 350 reflecting the construction cost corresponding to the project name received from the user terminal 310 or the 3D model viewer 360 reflecting the construction cost. Determine if it is.

상기 웹서버(320)는 상기 프로젝트 명에 해당하는 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360)가 생성되어 있지 않을 경우, 상기 프로젝트에 대한 적산 단계를 수행하여 상기 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360) 생성을 요청하는 메시지를 디스플레이한다.When the web server 320 does not generate the job classification viewer 350 reflecting the construction cost corresponding to the project name or the 3D model viewer 360 reflecting the construction cost, the web server 320 performs the integration step for the project. A message for requesting generation of the work classification viewer 350 reflecting the construction cost or the 3D model viewer 360 reflecting the construction cost is displayed.

하기에서는 상기 공정표 편집 모듈(341)과 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360)의 동작으로 설명하기로 한다.Hereinafter, the process table editing module 341 and the work classification viewer 350 reflecting the construction cost or the three-dimensional model viewer 360 reflecting the construction cost will be described.

상기 공정표 편집 모듈(341)은 상기 사용자 단말기(310)로부터 공정 활동을 생성 요청에 따라 상기 공정표 편집란에 빈 단위 공정 노드를 생성하게 된다(S615).The process table editing module 341 generates an empty unit process node in the process table edit field according to a request for generating process activity from the user terminal 310 (S615).

상기 빈 공정 활동 노드에는 공정명과 공정기간을 포함한 공정 정보 입력란이 포함되어 있다.The empty process activity node includes process information input fields including process name and process duration.

상기 공정표 편집 모듈(341)은 상기 빈 공정 활동 노드가 생성됨과 동시에 상기 공정 정보 입력란을 사용자 단말기(310)에 디스플레이하여, 사용자로부터 공정 정보를 입력받는다(S620).The process table editing module 341 simultaneously generates the empty process activity node and displays the process information input field on the user terminal 310 to receive process information from the user (S620).

상기 공정표 편집 모듈(341)은 상기 사용자로부터 입력받은 공정 정보가 상기 빈 공정 활동 노드의 해당란에 표시되도록 지원한다.The process table editing module 341 may support process information input from the user to be displayed in a corresponding column of the empty process activity node.

상기 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360)는 상기 사용자 단말기(310)로부터 상기 단위 공정에 할당할 작업 분류 항목 또는 객체를 선택받는다(S625).The work classification viewer 350 reflecting the construction cost or the 3D model viewer 360 reflecting the construction cost receives a work classification item or an object to be allocated to the unit process from the user terminal 310 (S625).

상기 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360)는 상기 사용자 단말기(310)가 작업 분류 항목을 선택한 후, 마우스 드래그를 수행하는 신호에 따라 상기 작업 분류 항목 또는 객체가 이동되도록 표시한다.The work classification viewer 350 reflecting the construction cost or the 3D model viewer 360 reflecting the construction cost may select the work classification item by the user terminal 310 and then, according to a signal for performing a mouse drag, the work classification item or the object. To move.

상기 공정표 편집 모듈(341)은 상기 사용자 단말기(310)가 마우스 드래그 한 상태에서 상기 단위 공정 위에 마우스 드롭을 수행하면, 상기 마우스 드래그된 작업 분류 항목 또는 객체에 해당하는 코드 정보를 상기 단위 공정에 통합시킨다(S630).The process table editing module 341 integrates code information corresponding to the mouse dragged task classification item or object into the unit process when the user terminal 310 performs a mouse drop on the unit process while the user terminal 310 drags the mouse. (S630).

상기 공사비가 반영된 작업 분류 뷰어(350) 또는 공사비가 반영된 3차원 모델 뷰어(360)는 사용자에 의해 선택되어 상기 단위 공정과 통합된 작업 분류 항목 또는 객체를 기선택되지 않은 다른 작업 분류 항목 또는 객체와 다른 색상으로 표시한다(S635).The work classification viewer 350 reflecting the construction cost or the three-dimensional model viewer 360 reflecting the construction cost may be selected by the user to integrate the work classification items or objects integrated with the unit process with other work classification items or objects that are not previously selected. It is displayed in a different color (S635).

하나의 단위 공정에 공사비를 통합하는 과정은 상술한 바와 같다.The process of integrating the construction cost in one unit process is as described above.

상기 공정표 편집 모듈(341)은 사용자로부터 새 공정 활동 생성 요청 여부를 판단한다(S640).The process table editing module 341 determines whether a request for generating a new process activity is performed from the user (S640).

상기 S640의 판단 결과, 사용자로부터 새로운 공정활동 생성 요청이 있는 경우, 상기 공정표 편집 모듈(341)은 상기 S610 단계부터 재 수행되도록 지원한다.As a result of the determination of S640, when there is a request for creating a new process activity from the user, the process table editing module 341 supports to be performed again from the step S610.

상기 S640의 판단 결과, 사용자로부터 새로운 공정 활동 생성 요청이 없을 경우, 상기 공정표 편집 모듈(341)은 공정활동에 설정된 공사비가 적정한지를 확인한다(S645).As a result of the determination in S640, when there is no request for generating new process activity from the user, the process table editing module 341 checks whether a construction cost set for process activity is appropriate (S645).

상기 공정표 편집 모듈(341)은 사용자로부터 공정 설계 완료 여부를 판단한다(S650).The process table editing module 341 determines whether the process design is completed from the user (S650).

상기 S650의 판단 결과, 공정 설계가 완료되지 않았을 경우, 상기 공정표 편집 모듈(341)은 상기 S610의 단계를 재 수행하도록 지원한다.As a result of the determination of S650, when the process design is not completed, the process table editing module 341 supports to perform the step of S610 again.

상기 S650 단계의 판단 결과, 공정 설계가 완료되었을 경우, 상기 공정표 편집 모듈(341)은 상기 작업 분류 항목이 모두 설정되었는지를 판단한다(S655).As a result of the determination in step S650, when the process design is completed, the process table editing module 341 determines whether all the work classification items are set (S655).

상기 S655 단계의 판단 결과, 아직 설정되지 않은 항목이 있는 경우에는 상기 공정 편집 모듈(341)은 상기 S625의 단계가 재 수행되도록 지원한다.As a result of the determination in step S655, if there is an item not yet set, the process editing module 341 may support the step of S625 to be performed again.

상기 S655 단계의 판단 결과, 작업 분류 항목이 모두 설정된 경우에는 상기 공정표 편집 모듈(341)은 공정활동에 공사비를 통합하는 과정을 종료하게 된다.As a result of the determination in step S655, when all the work classification items are set, the process table editing module 341 ends the process of integrating the construction cost into the process activity.

도 7은 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 방법을 설명하기 위한, 사용자의 공정 모의 실험 요청에 따른 웹서버의 동작을 도시한 플로우 차트이다.7 is a flowchart illustrating an operation of a web server according to a process simulation request of a user for explaining a construction process / construction cost integrated management method according to an exemplary embodiment of the present invention.

웹서버(320)는 사용자 단말기의 3차원 모의 실험 요청에 따라, 상기 모의 실험 모듈(342)를 구동시키고, 공사비가 반영된 3차원 모델 뷰어(360)를 사용자 단말기(310)에 디스플레이한다.In response to the 3D simulation request of the user terminal, the web server 320 drives the simulation module 342 and displays the 3D model viewer 360 reflecting the construction cost on the user terminal 310.

상기 모의 실험 모듈(342)은 상기 사용자 단말기(310)에 모의 실험 범위 입력란을 디스플레이하여, 사용자로부터 선택된 모의 실험 범위를 전송받는다(S700).The simulation module 342 displays the simulation range input field on the user terminal 310 and receives the simulation range selected from the user (S700).

상기 모의 실험 범위는 모의 실험 기간이나, 공정 활동 단위가 될 수 있다.The simulation range may be a simulation period or a process activity unit.

상기 모의 실험 모듈(342)은 모의 실험 금액의 입력란을 디스플레이하여, 사용자 단말기(310)로부터 입력된 모의 실험 금액을 전송받는다(S710).The simulation module 342 displays the input field of the simulation amount, and receives the simulation amount input from the user terminal 310 (S710).

상기 모의 실험 모듈(342)은 모의 실험 대상으로 선택된 공정활동에 통합된 공사비를 차례로 합하면서 모의실험을 진행하다가 상기 설정된 모의 실험 금액에 도달하면 모의실험을 종료한다.The simulation module 342 proceeds with the simulation by adding the construction costs integrated in the process activities selected as the simulation targets, and then ends the simulation when the set simulation amount is reached.

상기 모의 실험 모듈(342)은 상기 선택된 범위에 포함된 공정 활동을 시공 시작 시간별로 차례로 정렬한다(S720).The simulation module 342 sequentially arranges the process activities included in the selected range by construction start time (S720).

상기 모의 실험 모듈(342)은 상기 각 공정 활동에 통합되어 있는 공사비를 계산(S730)한 후, 시공 시작일 순서에 따라 각 공정활동에 대한 3차원 모델 데이터를 생성한 다음에 공사비가 반영된 3차원 모델 뷰어(360)를 통하여 화면에 표시하게 된다(S740).The simulation module 342 calculates the construction cost integrated in each process activity (S730), generates three-dimensional model data for each process activity according to the construction start date order, and then the three-dimensional model reflecting the construction cost It is displayed on the screen through the viewer 360 (S740).

상기 모의 실험 모듈(342)는 상기 설정된 기간, 공정 활동, 공사비 중 초과되는 것이 있는지를 판단한다(S750).The simulation module 342 determines whether there is an excess of the set period, process activity, and construction cost (S750).

상기 S750의 판단 결과, 상기 설정된 기간, 공정 활동, 공사비 중 하나라도 초과하는 것이 있으면, 상기 모의 실험 모듈(342)는 상기 S730 단계를 재수행한다.As a result of the determination in S750, if any one of the set period, process activity, and construction cost exceeds, the simulation module 342 performs step S730 again.

상기 S750의 판단 결과, 상기 설정된 기간, 공정 활동, 공사비 중에서 하나라도 초과하면, 상기 모의 실험 모듈(342)은 상기 모의 실험을 종료한다.As a result of the determination of S750, if any one of the set period, process activity, construction cost is exceeded, the simulation module 342 ends the simulation.

도 8은 본 발명의 실시 예에 따른 건설 공정/공사비 통합 관리 방법을 설명하기 위한, 사용자의 기성 관리 요청에 따른 웹서버의 동작을 도시한 플로우 차트이다.8 is a flowchart illustrating an operation of a web server according to a user's ready-made management request for explaining a construction process / construction cost integrated management method according to an exemplary embodiment of the present invention.

상기 도 8에 도시된 플로우 차트는, 상기 작업 지시 모듈(343)을 통하여 공정에 대한 시공을 지시한 다음에 해당 공정의 시공이 끝난 후에 사용자 단말기(310)로부터 작업결과를 입력받는 과정이다.8 is a process of instructing the construction of the process through the work instruction module 343 and receiving a work result from the user terminal 310 after the construction of the process is completed.

상기 작업 처리 모듈(344)은 기성을 입력할 공정 활동을 선택받는다(S800).The job processing module 344 receives a process activity for inputting ready-made (S800).

상기 작업 처리 모듈(344)은 상기 선택된 공정 활동에 포함되어 있는 객체들에 대응하는 3차원 모델을 생성하여 표시되도록 지원한다(S810).The job processing module 344 supports to generate and display a 3D model corresponding to the objects included in the selected process activity (S810).

상기 작업 처리 모듈(344)은 상기 3차원 모델을 통하여 기성을 입력하고자 하는 객체를 선택받는다(S820).The job processing module 344 receives an object to be inputted through the 3D model in operation S820.

상기 작업 처리 모듈(344)은 상기 객체에 설정된 공사비 정보를 상기 사용자 단말기(310)에 디스플레이한다(S830).The job processing module 344 displays the construction cost information set in the object on the user terminal 310 (S830).

상기 작업 처리 모듈(344)은 실제로 해당 공정활동 또는 객체를 시공하는데 소요된 실제 공사비 내용을 사용자 단말기로부터 입력받는다(S840).The job processing module 344 actually receives input from the user terminal the actual cost of construction required to construct the corresponding process activity or object (S840).

상기 작업 처리 모듈(344)은 상기 선택된 공정활동이나 객체에 대한 기성 데이터 입력이 끝나면 기성 입력을 계속할 것인지 여부를 판단한다(S850).The job processing module 344 determines whether to continue the ready input when the ready data input for the selected process activity or object is finished (S850).

상기 S850의 판단 결과, 기성 데이터 입력을 계속하고자 하는 경우, 상기 작업 처리 모듈(344)는 S820의 단계를 수행한다.As a result of the determination in S850, when the input of the ready data is to be continued, the job processing module 344 performs the step of S820.

상기 S850의 판단 결과, 기성 데이터 입력을 계속하지 않을 경우, 상기 작업 처리 모듈(344)는 상기 공사비가 반영된 3차원 모델 뷰어를 재 초기화한 후 기성관리를 종료하게 된다.As a result of the determination in S850, when the input of the ready data is not continued, the job processing module 344 reinitializes the 3D model viewer reflecting the construction cost and ends the ready management.

이상의 본 발명은 상기에 기술된 실시예들에 의해 한정되지 않고, 당업자들에 의해 다양한 변형 및 변경을 가져올 수 있으며, 이는 첨부된 청구항에서 정의되는 본 발명의 취지와 범위에 포함된다.The present invention is not limited to the embodiments described above, and various modifications and changes can be made by those skilled in the art, which are included in the spirit and scope of the present invention as defined in the appended claims.

이상에서 살펴본 바와 같이, 본 발명은 건설 공정과 공사비를 통합 관리하는데 있어서 공정 수행에 소요되는 공사비를 통합하는데 있어서 공사비가 반영된 작업 분류 뷰어나 공사비가 반영된 3차원 모델 뷰어를 제공함으로 상기 공정과 공사비를 효율적으로 통합할 수 있는 이점이 있다.As described above, the present invention provides a work classification viewer reflecting the construction cost or a three-dimensional model viewer reflecting the construction cost in integrating the construction cost required for the process in the integrated management of the construction process and the construction cost. There is an advantage that can be integrated efficiently.

또한, 작성된 공정 설계 내용을 시공 기간별 또는 시공에 소요되는 공사비를 기준으로 상기 공사비가 반영된 3차원 모델 뷰어를 통하여 사전에 모의 실험함으로써 공정 계획의 적절성이나 공정 진행 단계별 소요되는 공사비를 예측할 수 있는 효과가 있다.In addition, it is possible to predict the adequacy of the process plan or the cost of each stage of the process by simulating the created process design contents in advance through the 3D model viewer reflecting the construction cost based on the construction period or construction cost. have.

또한 작성된 공정 설계 내용에 따라 해당 공정을 시공한 다음에 기성을 입력하는데 있어서 공사비가 반영된 3차원 모델 뷰어를 통하여 시각적으로 기성을 관리할 수 있는 효과가 있다.In addition, the construction of the process according to the contents of the prepared process, and then input the ready-made has the effect that can be managed visually through the three-dimensional model viewer reflecting the construction cost.

Claims (22)

통신 네트워크에 접속 가능한 사용자 단말기의 요청에 따라, 소정의 단위 건설 공사 사업(이하 프로젝트로 표기함)의 물량 및 내역 정보를 산출/제공하고, 공정 편집 및 관리를 지원하는 시스템에 있어서,A system for calculating / providing quantity and breakdown information of a predetermined unit construction project (hereinafter referred to as a project) at the request of a user terminal capable of connecting to a communication network, and supporting process editing and management, 공정 설계 시, 공정표 상의 단위 공정 각각에 대응하는 상기 물량 및 내역 정보를 통합하여 관리하는 웹서버를 포함하여 구성되는 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.In the process design, the integrated construction process / construction cost management system, characterized in that it comprises a web server for integrating and managing the quantity and history information corresponding to each unit process on the process table. 제 1항에 있어서, 상기 웹서버는The method of claim 1, wherein the web server 상기 소정 프로젝트명과 그에 해당하는 물량 및 내역 정보, 도면 수치 정보, 공정 정보를 저장하는 건설 통합 DB와;A construction integrated DB for storing the predetermined project name, corresponding quantity and detail information, drawing numerical information, and process information; 상기 사용자의 요청에 따라 상기 공정표 편집 기능을 제공하고 관리해주는 공정 관리부와;A process manager for providing and managing the process table editing function at the request of the user; 상기 공정표의 각각의 단위 공정 정보와 상기 건설 통합 DB에서 추출한 공사비 정보가 할당된 뷰어를 포함하여 구성되는 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.Construction process / construction cost integrated management system, characterized in that it comprises a viewer assigned to each unit process information of the process table and the construction cost information extracted from the construction integration DB. 제 2항에 있어서, 상기 뷰어는The method of claim 2, wherein the viewer 상기 물량 및 내역 정보를 이용하여 소정의 설계 도면에 대응하는 작업 분류체계를 생성, 각 작업 분류 체계 상의 각 작업 분류 항목 선택에 따라 상기 물량 및 내역 정보가 액세스 되도록 지원하고, 상기 작업 분류 체계를 트리 구조 형태로 디스플레이하는 공사비가 반영된 작업 분류 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.Create a job classification system corresponding to a predetermined design drawing using the quantity and the details information, support the quantity and the details information to be accessed according to the selection of each task classification item on each task classification system, and tree the job classification system Construction process / construction cost integrated management system, characterized in that the work classification viewer reflecting the construction cost displayed in the form of the structure. 제 2항에 있어서, 상기 뷰어는The method of claim 2, wherein the viewer 상기 건설 통합 DB에서 도면 수치 정보를 추출하여 3차원 모델을 생성하고, 상기 3차원 모델의 각 객체의 선택에 따라, 상응하는 물량 및 내역 정보가 액세스되도록 지원하고, 상기 생성된 3차원 모델을 화면상에 디스플레이하는 공사비가 반영된 3차원 모델 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.The 3D model is generated by extracting drawing numerical information from the construction integration DB, and supports corresponding quantity and detail information to be accessed according to selection of each object of the 3D model, and displays the generated 3D model. Construction process / construction cost integrated management system, characterized in that the three-dimensional model viewer reflecting the construction cost displayed on the screen. 제 3항에 있어서, 상기 뷰어는The method of claim 3, wherein the viewer 상기 건설 통합 DB에서 도면 수치 정보를 추출하여 3차원 모델을 생성하고, 상기 3차원 모델의 각 객체의 선택에 따라, 상응하는 물량 및 내역 정보가 액세스되도록 지원하고, 상기 생성된 3차원 모델을 화면상에 디스플레이하는 공사비가 반영된 3차원 모델 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.The 3D model is generated by extracting drawing numerical information from the construction integration DB, and supports corresponding quantity and detail information to be accessed according to selection of each object of the 3D model, and displays the generated 3D model. Construction process / construction cost integrated management system, characterized in that the three-dimensional model viewer reflecting the construction cost displayed on the screen. 제 3항 또는 제 4항 또는 제 5항 중 한 항에 있어서, 상기 공정 관리부는6. The process control according to claim 3 or 4 or 5, wherein the process control unit 상기 사용자의 공정 설계에 따른 공정표 편집 요청에 따라, 화면상의 소정의 공간에 상기 뷰어를 구동시키고, 사용자로부터 선택된 특정 항목 또는 객체가 마우스 드래그 되면, 특정 단위 공정 위에 상기 특정 항목 또는 객체에 해당하는 코드 정보를 이동시키고, 상기 단위 공정 위에 마우스 드롭을 수행하면, 상기 단위 공정 정보에 상기 코드 정보를 포함시켜 상기 공사비가 통합되도록 지원하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.In response to a process table editing request according to the process design of the user, the viewer is driven in a predetermined space on a screen, and when a specific item or object selected by the user is dragged, a code corresponding to the specific item or object on a specific unit process When the information is moved and a mouse drop is performed on the unit process, the construction cost / construction cost integrated management system according to claim 1, wherein the code cost is included in the unit process information to be integrated. 제 6항에 있어서, 상기 뷰어는The method of claim 6, wherein the viewer 상기 사용자에 의해 선택되어 상기 단위 공정과 통합된 작업 분류 항목 또는 객체를 선택되지 않은 다른 작업 분류 항목 또는 객체와 다른 색상으로 표시하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.And displaying a work classification item or object selected by the user and integrated with the unit process in a different color from other work classification items or objects not selected. 제 4항 또는 제 5항에 있어서, 상기 공정 관리부는According to claim 4 or 5, wherein the process control unit 상기 사용자의 상기 공정 설계된 프로젝트의 공정 모의 실험 요청에 따라, 사용자로부터 상기 모의 실험 범위 및 공사비를 입력받고, 상기 공사비가 반영된 3차원 모델 뷰어를 구동시켜 상기 입력된 모의 실험 범위 중에 포함되는 공정에 해당하는 객체를 3차원 모델링하고, 상기 객체에 할당된 물량 및 내역 정보에 따라 공사비를 계산하여 상기 사용자로부터 입력받은 공사비를 초과할 경우 상기 3차원 모델링을 중지하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 시스템.In response to a process simulation request of the process designed project of the user, the user receives the simulation range and construction cost from the user, and drives a 3D model viewer reflecting the construction cost to correspond to a process included in the input simulation range. 3D modeling of the object, and calculates the construction cost according to the quantity and history information assigned to the object, the construction process / construction cost integrated management, characterized in that the three-dimensional modeling stops if the construction cost received from the user exceeds system. 통신 네트워크에 접속한 사용자 단말기에 소정 프로젝트의 물량 또는 내역 정보를 산출/제공하고, 공정표 편집 및 관리를 지원하는 시스템에서의 건설 정보제공 방법에 있어서,A construction information providing method in a system for calculating / providing quantity or breakdown information of a predetermined project to a user terminal connected to a communication network and supporting editing and managing of a schedule 사용자 단말기로부터 공정표 편집 요청에 반응하여, 프로젝트명을 입력받아 초기화된 공정 편집란을 생성하고, 상기 프로젝트 명에 해당하는 물량 및 내역 정보가 할당된 뷰어를 상기 공정표 편집란의 소정의 공간에 디스플레이시키는 제 1단계와;In response to a process table edit request from a user terminal, a project edit field is generated by initializing a project name and displaying a viewer to which quantity and description information corresponding to the project name are displayed in a predetermined space of the process table edit field. Steps; 상기 사용자로부터의 빈 단위 공정 노드 생성 요청에 따라, 상기 공정표 편집란에 빈 단위 공정 노드를 생성시키고, 상기 공정 정보를 입력할 입력란을 디스플레이하여 그에 대응하는 정보를 입력받아 상기 빈 단위 공정 노드의 해당란에 표시되도록 지원하여 단위 공정을 생성하는 제 2 단계와;In response to a request for creating an empty unit process node from the user, an empty unit process node is created in the process table edit field, a input field for inputting the process information is displayed, and corresponding information is input to the corresponding unit of the empty unit process node. A second step of supporting the display to generate a unit process; 상기 뷰어를 이용하여 상기 단위 공정에 해당하는 물량 및 내역 정보를 상기 단위 공정에 통합하는 제 3단계를 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.And a third step of integrating the quantity and the details information corresponding to the unit process into the unit process using the viewer. 제 9항에 있어서, 상기 뷰어는The method of claim 9, wherein the viewer 상기 물량 및 내역 정보를 이용하여 소정의 설계 도면에 대응하는 작업 분류 체계를 생성, 각 작업 분류 체계 상의 각 작업 분류 항목 선택에 따라 상기 물량 및 내역 정보가 액세스 되도록 지원하고, 상기 작업 분류 체계를 트리 구조 형태로 디스플레이하는 공사비가 반영된 작업 분류 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.Generate a job classification system corresponding to a predetermined design drawing using the quantity and the details information, support the quantity and details information to be accessed according to the selection of each job classification item on each job classification system, and tree the job classification system. Construction process / construction cost integrated management method characterized in that the work classification viewer reflecting the construction cost displayed in the form of a structure. 제 9항에 있어서, 상기 뷰어는The method of claim 9, wherein the viewer 상기 건설 통합 DB에서 도면 수치 정보를 추출하여 3차원 모델을 생성하고, 상기 3차원 모델의 각 객체의 선택에 따라, 상응하는 물량 및 내역 정보가 액세스되도록 지원하고, 상기 생성된 3차원 모델을 화면상에 디스플레이하는 공사비가 반영된 3차원 모델 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.The 3D model is generated by extracting drawing numerical information from the construction integration DB, and supports corresponding quantity and detail information to be accessed according to selection of each object of the 3D model, and displays the generated 3D model. Construction process / construction cost integrated management method characterized in that the three-dimensional model viewer reflecting the construction cost displayed on the screen. 제 10항 또는 제 11항 중 한 항에 있어서, 상기 제 2단계는12. The method of claim 10 or 11, wherein the second step is 사용자로부터 작업 분류 항목 또는 객체를 선택받는 단계와;Receiving a job classification item or an object from a user; 상기 선택받은 작업 분류 항목 또는 객체가 마우스 드래그 되면, 상기 생성된 단위 공정 위에 상기 특정 항목 또는 객체에 해당하는 코드 정보를 이동시키는 단계와;Moving code information corresponding to the specific item or object onto the generated unit process when the selected job classification item or object is dragged by a mouse; 상기 단위 공정 위에 마우스 드롭을 수행하면, 상기 단위 공정 정보에 상기 코드 정보를 포함시켜 상기 공사비를 통합시키는 단계를 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.And performing a mouse drop on the unit process, integrating the construction cost by including the code information in the unit process information. 제 12항에 있어서, 상기 제 2단계는The method of claim 12, wherein the second step 상기 사용자에 의해 선택되어 상기 단위 공정과 통합된 작업 분류 항목 또는 객체가, 기선택되지 않은 다른 작업 분류 항목 또는 객체와 구별되는 색상으로 표시 되도록하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.And the work classification items or objects selected by the user and integrated with the unit process are displayed in a color distinguished from other work classification items or objects which are not previously selected. 제 9항에 있어서,The method of claim 9, 상기 사용자의 공정 모의 실험 요청에 따라, 사용자로부터 상기 모의 실험할 공정 시작일과 종료일을 포함하는 모의 실험 범위를 입력받고, 상기 뷰어를 구동시켜 상기 입력된 모의 실험 범위 중에 포함되는 공정에 해당하는 물량 및 내역 정보에 따라 공사비를 계산하여 상기 사용자로부터 입력받은 공사비를 초과할 경우 상기 모의 실험을 중지하는 제 4단계를 더 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.Receiving a simulation range including a process start date and an end date to be simulated by the user according to a process simulation request of the user, and driving the viewer to provide a quantity corresponding to a process included in the input simulation range; And a fourth step of stopping the simulation when the construction cost is calculated according to the details and exceeds the construction cost input from the user. 제 12항에 있어서,The method of claim 12, 상기 사용자의 공정 모의 실험 요청에 따라, 사용자로부터 상기 모의 실험할 공정 시작일과 종료일을 포함하는 모의 실험 범위를 입력받고, 상기 공사비가 반영된 3차원 모델 뷰어를 구동시켜 상기 입력된 모의 실험 범위 중에 포함되는 공정에 해당하는 객체를 선택하여 3차원 모델링하고, 상기 객체에 물량 및 내역 정보에 따라 공사비를 계산하여 상기 사용자로부터 입력받은 공사비를 초과할 경우 상기 3차원 모델링을 중지하는 제 4단계를 더 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 방법.According to the user's process simulation request, the user receives a simulation range including a process start date and an end date to be simulated by the user, and drives a 3D model viewer reflecting the construction cost to be included in the input simulation range. Selecting an object corresponding to the process to three-dimensional modeling, and calculating the construction cost according to the quantity and history information on the object further comprises the fourth step of stopping the three-dimensional modeling if the construction cost input from the user exceeds; Construction process / construction cost integrated management method, characterized in that. 통신 네트워크에 접속한 사용자 단말기에 소정 프로젝트의 물량 또는 내역 정보를 산출/제공하고, 공정 편집 및 관리를 지원하는 시스템에서의 건설 정보 제공 프로그램 소스를 기록한 기록 매체에 있어서,A recording medium which calculates / provides quantity or breakdown information of a predetermined project to a user terminal connected to a communication network, and records a construction information providing program source in a system supporting process editing and management. 사용자 단말기로부터 공정표 편집 요청에 반응하여, 프로젝트명을 입력받아 초기화된 공정 편집란을 생성하고, 상기 프로젝트 명에 해당하는 물량 및 내역 정보가 할당된 뷰어를 상기 공정 편집란의 소정의 공간에 디스플레이시키는 제 1프로세스와;In response to a request for editing a schedule from a user terminal, a first process of generating a process edit field initialized by receiving a project name and displaying a viewer to which quantity and description information corresponding to the project name is assigned in a predetermined space of the process edit field Process; 상기 사용자로부터의 빈 단위 공정 노드 생성 요청에 따라, 상기 공정 편집란에 빈 단위 공정 노드를 생성시키고, 상기 공정 정보를 입력할 입력란을 디스플레이하여 그에 대응하는 정보를 입력받아 상기 빈 단위 공정 노드의 해당란에 표시되도록 지원하여 단위 공정을 생성하는 제 2 프로세스와;In response to a request for creating an empty unit process node from the user, an empty unit process node is created in the process edit field, a field for inputting the process information is displayed, and corresponding information is inputted to the corresponding unit of the empty unit process node. A second process of supporting the display to generate a unit process; 상기 뷰어를 이용하여 상기 단위 공정에 해당하는 물량 및 내역 정보를 상기 단위 공정에 통합하는 제 3프로세스를 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.And a third process of integrating quantity and breakdown information corresponding to the unit process into the unit process by using the viewer. 제 16항에 있어서, 상기 뷰어는The method of claim 16, wherein the viewer 상기 물량 및 내역 정보를 이용하여 소정의 설계 도면에 대응하는 작업 분류 체계를 생성, 각 작업 분류 체계 상의 각 작업 분류 항목 선택에 따라 상기 물량 및 내역 정보가 액세스 되도록 지원하고, 상기 작업 분류 체계를 트리 구조 형태로 디스플레이하는 공사비가 반영된 작업 분류 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.Generate a job classification system corresponding to a predetermined design drawing using the quantity and the details information, support the quantity and details information to be accessed according to the selection of each job classification item on each job classification system, and tree the job classification system. A recording medium recording a construction process / construction cost integrated management program source, characterized in that the work classification viewer reflects the construction cost displayed in the form of a structure. 제 16항에 있어서, 상기 뷰어는The method of claim 16, wherein the viewer 상기 건설 통합 DB에서 도면 수치 정보를 추출하여 3차원 모델을 생성하고, 상기 3차원 모델의 각 객체의 선택에 따라, 상응하는 물량 및 내역 정보가 액세스되도록 지원하고, 상기 생성된 3차원 모델을 화면상에 디스플레이하는 공사비가 반영된 3차원 모델 뷰어인 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.The 3D model is generated by extracting drawing numerical information from the construction integration DB, and supports corresponding quantity and detail information to be accessed according to selection of each object of the 3D model, and displays the generated 3D model. A recording medium for recording a construction process / construction cost integrated management program source, characterized in that the three-dimensional model viewer reflects the construction cost displayed on the screen. 제 17항 또는 제 18항 중 한 항에 있어서, 상기 제 2 프로세스는19. The method of claim 17 or 18, wherein the second process is 사용자로부터 작업 분류 항목 또는 객체를 선택받는 프로세스와;A process for receiving a job classification item or an object from a user; 상기 선택받은 작업 분류 항목 또는 객체가 마우스 드래그 되면, 상기 생성된 단위 공정 위에 상기 특정 항목 또는 객체에 해당하는 코드 정보를 이동시키는 프로세스와;A process of moving code information corresponding to the specific item or object on the generated unit process when the selected job classification item or object is mouse dragged; 상기 단위 공정 위에 마우스 드롭을 수행하면, 상기 단위 공정 정보에 상기 코드 정보를 포함시켜 상기 공사비를 통합시키는 프로세스를 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.And performing a mouse drop on the unit process, incorporating the construction cost by including the code information in the unit process information. 제 19항에 있어서, 상기 제 2 프로세스는20. The method of claim 19, wherein the second process is 상기 사용자에 의해 선택되어 상기 단위 공정과 통합된 작업 분류 항목 또는 객체가, 기선택되지 않은 다른 작업 분류 항목 또는 객체와 구별되는 색상으로 표시되도록하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.And a work classification item or object selected by the user and integrated with the unit process so that the work classification item or object can be displayed in a color distinguished from other work classification items or objects which are not previously selected. Recorded media. 제 16항에 있어서,The method of claim 16, 상기 사용자의 공정 모의 실험 요청에 따라, 사용자로부터 상기 모의 실험할 공정 시작일과 종료일을 포함하는 모의 실험 범위를 입력받고, 상기 뷰어를 구동시켜 상기 입력된 모의 실험 범위 중에 포함되는 공정에 해당하는 물량 및 내역 정보에 따라 공사비를 계산하여 상기 사용자로부터 입력받은 공사비를 초과할 경우 상기 모의 실험을 중지하는 제 4 프로세스를 더 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.Receiving a simulation range including a process start date and an end date to be simulated by the user according to a process simulation request of the user, and driving the viewer to provide a quantity corresponding to a process included in the input simulation range; And a fourth process of stopping the simulation when the construction cost is calculated according to the detail information and the construction cost inputted from the user is exceeded. 제 19항에 있어서,The method of claim 19, 상기 사용자의 공정 모의 실험 요청에 따라, 사용자로부터 상기 모의 실험할 공정 시작일과 종료일을 포함하는 모의 실험 범위를 입력받고, 상기 공사비가 반영된 3차원 모델 뷰어를 구동시켜 상기 입력된 모의 실험 범위 중에 포함되는 공정에 해당하는 객체를 선택하여 3차원 모델링하고, 상기 객체에 해당하는 물량 및 내역 정보에 따라 공사비를 계산하여 상기 사용자로부터 입력받은 공사비를 초과할 경우 상기 3차원 모델링을 중지하는 제 4프로세스를 더 포함하는 것을 특징으로 하는 건설 공정/공사비 통합 관리 프로그램 소스를 기록한 기록 매체.According to the user's process simulation request, the user receives a simulation range including a process start date and an end date to be simulated by the user, and drives a 3D model viewer reflecting the construction cost to be included in the input simulation range. 3D modeling by selecting the object corresponding to the process, calculate the construction cost according to the quantity and history information corresponding to the object and further adds a fourth process for stopping the three-dimensional modeling if the construction cost received from the user exceeds And a recording medium recording a construction process / construction cost integrated management program source.
KR1020010029444A 2001-05-28 2001-05-28 Integrated construction process and cost management system and method, and media for storing program source thereof KR20020090554A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010029444A KR20020090554A (en) 2001-05-28 2001-05-28 Integrated construction process and cost management system and method, and media for storing program source thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010029444A KR20020090554A (en) 2001-05-28 2001-05-28 Integrated construction process and cost management system and method, and media for storing program source thereof

Publications (1)

Publication Number Publication Date
KR20020090554A true KR20020090554A (en) 2002-12-05

Family

ID=27706739

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010029444A KR20020090554A (en) 2001-05-28 2001-05-28 Integrated construction process and cost management system and method, and media for storing program source thereof

Country Status (1)

Country Link
KR (1) KR20020090554A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712050B1 (en) * 2006-04-25 2007-05-02 연세대학교 산학협력단 Management method for risk in construction using analysis of cash flow and apparatus threrof, and management method for risk in construction using analysis of portfolio and apparatus threrof using that
KR100945523B1 (en) * 2007-06-22 2010-03-09 (주)이든넷 On-line construction management method
KR101360686B1 (en) * 2013-03-18 2014-02-07 김유길 Cost-and-time-united schedule management system
KR101628318B1 (en) * 2015-11-18 2016-06-08 (주)옥당산업 Construction project management method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0652183A (en) * 1992-08-03 1994-02-25 Shimizu Corp Managing system for progressive state, defect, and completed amount in construction work
JPH0793408A (en) * 1993-09-22 1995-04-07 Hitachi Ltd Method and device for generating process planning
KR19980026933A (en) * 1996-10-12 1998-07-15 이정국 Process planning method by CAD based process status visualization.
KR19990088345A (en) * 1998-05-12 1999-12-27 메구로 가즈오 Construction management system and construction management method
KR20010008219A (en) * 2000-11-16 2001-02-05 이한동 On-line estmation system and method of Interior
KR20010007819A (en) * 2000-04-27 2001-02-05 김승양 Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0652183A (en) * 1992-08-03 1994-02-25 Shimizu Corp Managing system for progressive state, defect, and completed amount in construction work
JPH0793408A (en) * 1993-09-22 1995-04-07 Hitachi Ltd Method and device for generating process planning
KR19980026933A (en) * 1996-10-12 1998-07-15 이정국 Process planning method by CAD based process status visualization.
KR19990088345A (en) * 1998-05-12 1999-12-27 메구로 가즈오 Construction management system and construction management method
KR20010007819A (en) * 2000-04-27 2001-02-05 김승양 Building And Construction Information Providing Service Method Of Two Dimensional CAD Drawing In Communication Network
KR20010008219A (en) * 2000-11-16 2001-02-05 이한동 On-line estmation system and method of Interior

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712050B1 (en) * 2006-04-25 2007-05-02 연세대학교 산학협력단 Management method for risk in construction using analysis of cash flow and apparatus threrof, and management method for risk in construction using analysis of portfolio and apparatus threrof using that
KR100945523B1 (en) * 2007-06-22 2010-03-09 (주)이든넷 On-line construction management method
KR101360686B1 (en) * 2013-03-18 2014-02-07 김유길 Cost-and-time-united schedule management system
KR101628318B1 (en) * 2015-11-18 2016-06-08 (주)옥당산업 Construction project management method

Similar Documents

Publication Publication Date Title
US5539869A (en) Method and system for processing and presenting on-line, multimedia information in a tree structure
US7042468B2 (en) Text overlay for multi-dimensional construction project models
CN105593844B (en) Infrastructure is customized when operation
CN111309315B (en) Automatic configuration method based on industrial Internet of things data and business modeling
CN110807015A (en) Big data asset value delivery management method and system
KR19990023315A (en) Data processing system and method for generating a link map
CN104123502A (en) Mechanical and electrical installation overall-planning system and method based on three-dimensional construction drawing model
CN102160083A (en) Guidance across complex tasks
US6959429B1 (en) System for developing data collection software applications
US7239316B1 (en) Method and apparatus for graphically manipulating data tables
CN104731578A (en) Remote accessory for generating customized and synchronized reference notes for a programmable metrology system
CN107436785B (en) Revit software information interaction system and interaction method based on information system
KR100593716B1 (en) 4D construction management system and construction management information provision method using the same
US20110087614A1 (en) System for representing an organization
CN116382659B (en) Data definition method of code-free development platform
KR20020090554A (en) Integrated construction process and cost management system and method, and media for storing program source thereof
US8209201B1 (en) System and method for correlating objects
EP1302877A1 (en) Circuit design support method and circuit design support system and program recording medium
KR20060114289A (en) Cae analysis navigation system, cae analysis processing program, and computer-readable recording medium containing the program therein
JP2004355326A (en) Software development support program, recording medium with the program recorded thereon and software development support system
CN107220045B (en) Station building method, device, equipment and storage medium based on artificial intelligence
JPH113216A (en) Supporting method and device for scenario-based object-oriented analysis design
JP3129059B2 (en) Computer embedded product development method and device
JPH1166115A (en) Drawing generating device for assembly group by three-dimensional cad
KR20020000593A (en) The System and Method of Automatic Creation of a Test Paper Through Internet

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application