KR20020057011A KR1020000087241A KR20000087241A KR20020057011A KR 20020057011 A KR20020057011 A KR 20020057011A KR 1020000087241 A KR1020000087241 A KR 1020000087241A KR 20000087241 A KR20000087241 A KR 20000087241A KR 20020057011 A KR20020057011 A KR 20020057011A
Authority
KR
South Korea
Prior art keywords
tunnel
soundproof
explosion
door
frame
Prior art date
Application number
KR1020000087241A
Other languages
Korean (ko)
Other versions
KR100401809B1 (en
Inventor
정우철
Original Assignee
장동립
쌍용건설 주식회사
이영선
남광토건 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장동립, 쌍용건설 주식회사, 이영선, 남광토건 주식회사 filed Critical 장동립
Priority to KR10-2000-0087241A priority Critical patent/KR100401809B1/en
Publication of KR20020057011A publication Critical patent/KR20020057011A/en
Application granted granted Critical
Publication of KR100401809B1 publication Critical patent/KR100401809B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE: A soundproof/explosion-proof device for a tunnel is provided to install easily in a tunnel and to absorb an explosion caused by blasting effectively. CONSTITUTION: The soundproof/explosion-proof device for a tunnel comprises: a bulkhead diaphragm(10) installed in a tunnel to intercept a tunnel and provided with an opening(19), a front lattice plate(11), a rear lattice plate(12) and a primary soundproof member; and an access door(20), where the primary soundproof member is installed, installed to the opening(19).

Description

터널용 방음방폭장치 {Safety Wall and Door for Tunnel}Soundproof explosion protection device for tunnels {Safety Wall and Door for Tunnel}

본 발명은, 터널용 방음방폭문에 관한 것으로서, 터널작업 중에 발파에 의한 폭음을 효과적으로 방음할 수 있는 터널용 방음방폭문에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a soundproof explosion door for tunnels, and more particularly, to a soundproof explosion door for tunnels capable of effectively soundproofing due to blasting during tunnel work.

터널은 도로나 철도가 산이나 언덕 등을 우회하지 않고, 직선으로 통하는 지름길을 건설하기 위해서, 산과 같은 장애물을 관통하여 개설된 통로이다. 일반적으로, 터널을 만들기 위해서는 폭약을 이용하여 발파작업을 하는 것이 필수적이다. 이러한 발파작업 시에는 엄청난 폭음과 분진이 발생하기 때문에 이에 대한 방책으로서, 어느 정도 굴착작업이 진행된 후에는, 터널 입구에 방폭방음장치를 설치하여 폭파작업에 의한 소음을 방음하고 있다. 그리고, 추가하여 터널 내에 개방형 방음벽을 복수로 설치하여 방음효과를 높이기도 한다.A tunnel is a passage opened through an obstacle such as a mountain in order to construct a shortcut that leads to a straight line without a road or railroad bypassing a mountain or a hill. In general, it is essential to blast using explosives to make tunnels. In the case of such blasting work, a tremendous amount of explosion and dust is generated. As a measure for this, after the excavation work is carried out to some extent, the explosion-proof soundproof device is installed at the entrance of the tunnel to prevent noise from the blasting work. In addition, a plurality of open sound barriers may be installed in the tunnel to increase the sound insulation effect.

그런데, 이러한 방폭방음장치는, 터널의 외부에서 차단벽을 설치하기 위해서 이를 지지할 보조 구축물이 필요하고, 터널입구를 폐쇄하기 위해서는 터널의 크기보다 훨씬 거대한 차단벽을 마련하여 설치해야 하므로, 설계에서부터 원자재까지 작업난이도가 높고 경비가 많이 소요되는 단점이 있다. 그리고, 터널의 입구를 완전히 폐쇄시키기 위해서는 추가적인 밀봉작업이 더 필요하다.However, the explosion-proof soundproofing device needs an auxiliary structure to support it in order to install the barrier wall outside the tunnel, and in order to close the tunnel entrance, a barrier wall much larger than the size of the tunnel must be provided and installed. There are disadvantages in that the difficulty of working up to raw materials is high and the expenses are high. Further, additional sealing is needed to completely close the entrance of the tunnel.

따라서, 본 발명의 목적은, 상기의 문제를 해결하고자, 터널 내에 설치가 용이하고 발파작업시 발생하는 폭음을 효과적으로 방음할 수 있는 터널용 방음방폭장치를 제공하는 것이다.Accordingly, an object of the present invention, to solve the above problems, to provide a soundproof explosion-proof device for a tunnel that can be easily installed in the tunnel and effectively soundproof the sound generated during the blasting work.

도 1은 본 발명에 따른 터널용 방음방폭장치의 사시도,1 is a perspective view of a soundproof explosion-proof device for a tunnel according to the present invention,

도 2는 본 발명에 따른 터널용 방음방폭문의 차단벽을 도 1의 II-II선을 따라 절개한 단면도,2 is a cross-sectional view taken along the line II-II of Figure 1, the barrier wall of the soundproof explosion-proof door for tunnels according to the present invention;

도 3은 본 발명에 따른 터널용 방음방폭장치의 출입문 사시도,3 is a perspective view of the door of the soundproof explosion-proof device for a tunnel according to the present invention;

도 4는 도 3의 IV-IV 선을 따라 절개한 단면도,4 is a cross-sectional view taken along the line IV-IV of FIG. 3,

도 5는 본 발명에 따른 출입문의 분해 사시도이다.5 is an exploded perspective view of the door according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

1 - 터널내벽 10 - 차단벽1-Tunnel Inner Wall 10-Barrier Wall

11 - 전면격자판 12 - 후면격자판11-front lattice 12-rear lattice

13 - 연결부 15 - 제1방음부재13-Connecting part 15-First soundproof member

14 - 블록형격자부 16 - 방음부재틀14-Block Type Grid 16-Soundproof Frame

17 - 제1방음재이탈방지부재 18 - 방음재17-First soundproof material separation prevention member 18-Soundproof material

19 - 출입개구부 20 - 출입문19-Access Doors 20-Doors

21 - 전면프레임 23 - 후면프레임21-Front Frame 23-Rear Frame

25 - 측면케이싱 27 - 제2방음부재25-side casing 27-second soundproof member

29 - 제2방음재이탈방지부재 31 - 외형틀29-2nd soundproof material separation prevention member 31-outline frame

33 - 내형틀 41 - 돌출결합부33-inner mold 41-protruding joint

상기 목적은, 본 발명에 따라, 터널에 설치되는 터널용 방음방폭장치에 있어서, 상기 터널 내에 상기 터널을 차단하도록 설치되고 출입개구부를 가지며, 격자구조로 형성되며 상호 평행하게 이격된 전면격자판 및 후면격자판과 제1방음부재를 갖는 차단벽과; 상기 출입개구부에 개폐 가능하게 설치되며 제2방음부재가 설치되는 출입문을 포함하는 것을 특징으로 하는 터널용 방음방폭장치에 의해서 달성된다.In accordance with the present invention, in the tunnel soundproof explosion-proof device is installed in the tunnel, the front grid and the rear is installed to block the tunnel in the tunnel and has an entrance opening, formed in a grid structure and spaced in parallel to each other A barrier wall having a grating plate and a first soundproof member; It is achieved by the soundproof explosion-proof device for a tunnel, characterized in that it is installed to be opened and closed to the access opening and comprises a door for the second soundproof member is installed.

여기서, 상기 차단벽은 터널의 길이방향으로 소정의 거리를 두고 복수로 설치되어 있는 것이 폭파작업시 폭음을 효과적으로 감소시킬 수 있다.Here, the plurality of blocking walls are provided at a plurality of predetermined distances in the longitudinal direction of the tunnel can effectively reduce the sound noise during the blasting operation.

그리고, 상기 제1방음부재는, 상기 전면 및 후면격자판 사이에서 각 격자 내에 각각 배치되며, 상기 제1방음부재는 상기 전면 및 후면격자판을 상호 연결하는 연결부에 의해서 상호 격리되는 것이 격자판 사이의 공간에 방음재를 채울 수 있어 효과적이다.The first soundproof member is disposed in each lattice between the front and rear lattice plates, and the first soundproof member is separated from each other by a connecting portion interconnecting the front and rear lattice plates. It is effective because it can fill sound insulation.

상기 전면 및 후면격자판의 각 격자개구를 차단하는 망상의 제1방음재이탈방지부재를 더 포함하는 것이 방음재의 이탈을 방지하는 효과가 있어 바람직하다.It is preferable to further include a mesh-shaped first soundproof material detachment preventing member for blocking each lattice opening of the front and rear grid plate, there is an effect of preventing the separation of the soundproof material.

한편, 상기 출입문은, 격자구조로 형성되며 상호 평행하게 이격된 전면프레임 및 후면프레임과; 상기 전면프레임과 상기 후면프레임의 측면을 둘러싸는 도어케이싱을 포함하고, 상기 전면프레임과 상기 후면프레임 사이에는 상기 제2방음부재가 개재되어 있는 것이 바람직하다.On the other hand, the door, the front frame and the rear frame formed in a grid structure spaced parallel to each other; It comprises a door casing surrounding the side of the front frame and the rear frame, it is preferred that the second soundproof member is interposed between the front frame and the rear frame.

또한, 상기 전면 및 후면프레임의 격자개구를 차단하는 망상의 제2방음재이탈방지부재를 더 포함하는 것이 상기 제2방음부재의 이탈을 방지할 수 있어 바람직하다.In addition, it is preferable to further include a network-like second soundproof material escape prevention member for blocking the grid opening of the front and rear frame can prevent the separation of the second soundproof member.

이하에서는 첨부도면을 참조하여 본 발명에 대해 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 터널용 방음방폭장치의 사시도를 나타낸 것이다. 여기서 출입문(20)을 중심으로 좌측은 완성된 차단벽(10)을 나타내고 있고, 우측은 차단벽(10)의 골조가 되는 격자구조를 나타내고 있으며, 상세한 설명을 위하여 측면은 다소 과장되게 도시되어 있다. 도시된 바와 같이, 본 발명에 따른 터널용 방음방폭장치는, 터널 내에서 터널의 길이방향에 가로로 터널내벽(1)을 따라 터널을 차단할 수 있도록 설치되며 출입개구부(19)를 가진 차단벽(10)이 있고, 차단벽(10)의 출입개구부(19)에는 양측에 개폐 가능하게 설치되어 차량이 통과할 수 있도록 좌우 한 쌍의 출입문(20)이 형성되어 있다.Figure 1 shows a perspective view of the soundproof explosion-proof device for a tunnel according to the present invention. Here, the left side of the door 20 is shown as a completed blocking wall 10, and the right side shows a grid structure that is a frame of the blocking wall 10, and the side is somewhat exaggerated for detailed description. . As shown, the soundproof explosion-proof device for a tunnel in accordance with the present invention is installed to block the tunnel along the tunnel inner wall (1) horizontally in the longitudinal direction of the tunnel in the tunnel and has a barrier (entrance opening 19) ( 10), the access opening portion 19 of the blocking wall 10 is provided to be opened and closed on both sides is formed with a pair of left and right doors 20 so that the vehicle can pass through.

도 2는 본 발명에 따른 터널용 방음방폭장치의 차단벽을 도 1의 II-II 선에 따라 절개한 단면도이다. 도시된 바와 같이, 차단벽(10)은 터널내벽(1)의 단면에 맞게 거의 반원형으로 형성되어 있고, 각파이프를 이용하여 격자구조로 형성된 전면격자판(11)과, 전면격자판(11)과 소정 거리를 두고 이격하여 전면격자판(11)과 평행하게 배치되며 전면격자판(11)과 같은 격자구조의 후면격자판(12)과, 이들 전면 및 후면격자판(11,12)의 격자사이를 연결하는 봉 형상의 연결부(13)가 설치되어, 전면 및 후면격자판(11,12)을 이중격자 형상으로 결합하고 있다. 이에 의하여 블록형의 격자구조를 갖는 블록형격자부(14)가 형성되고, 이 블록형격자부(14)의 각 격자들에는 제1방음부재(15)가 각각 설치되어 있다.2 is a cross-sectional view of the barrier wall of the soundproof explosion-proof device for tunnels according to the present invention taken along the line II-II of FIG. As shown, the blocking wall 10 is formed in a substantially semi-circular shape in accordance with the cross section of the tunnel inner wall 1, and the front grid plate 11, the front grid plate 11 and the predetermined predetermined lattice structure formed using a square pipe Spaced at a distance and arranged in parallel with the front grid plate 11 and having a rod shape connecting the rear grid plate 12 having the same lattice structure as the front grid plate 11 and the grids of the front and rear grid plates 11 and 12. The connecting portion 13 is installed, and the front and rear grid plates 11, 12 are coupled in a double grid shape. As a result, a block-type lattice portion 14 having a block-type lattice structure is formed, and each of the grids of the block-type lattice portion 14 is provided with a first soundproof member 15.

제1방음부재(15)는, 각 격자의 내측으로 결합될 수 있도록 형성되어 전면을 차단하고 있는 제1방음재이탈방지부재(17)와, 전면 및 후면격자판(11,12)에 부착된 제1방음재이탈방지부재(17) 사이에 형성된 블록형 격자에 맞게 설치되도록 재단된 입방체형의 방음재(18)가 개재되어 있다.The first soundproof member 15 is formed to be coupled to the inside of each grating, the first soundproof material separation prevention member 17 which blocks the front, and the first and the first attached to the rear grid plate (11, 12) The cube-shaped soundproofing material 18 cut so that it may be installed in accordance with the block-type grid | lattice formed between the soundproofing material prevention prevention members 17 is interposed.

제1방음재차단부재(18)는, 각 격자의 내측으로 각파이프를 이용하여 형성된 방음부재틀(16)의 내측연부를 따라서, 소정의 직경을 가진 철사줄로 서로 엮어 사각형의 셀을 갖는 망사형태로 형성되어 있는 네트가 방음부재틀(16)에 맞게 재단되어 용접 등의 방법을 이용하여 결합되어 있다.The first sound insulation blocking member 18 is a mesh form having a rectangular cell by weaving each other with a wire having a predetermined diameter along the inner edge of the soundproof member frame 16 formed by using an angle pipe inside each grid. The net is formed to be cut to fit the soundproof member frame 16 is coupled using a method such as welding.

방음재(18)는 블록형격자의 전면 및 후면격자판(11,12)에 부착된 제1방음재차단부재(18) 사이에 소정의 모양으로 개재되어 결합되어 제1방음재차단부재(18)에 밀착 설치되어 있다. 이러한 방음재(18)는 방음효과를 증대시키기 위해서 압축 스폰지를 사용한다. 방진재(17)를 블록격자부(14)의 방진부재틀(16) 사이에 충진하면, 도 2에서 본 바와 같이, 압축 방향의 측방으로 팽창하여 격자를 이루고 있는 격자블록 사이의 측면 공간을 어느 정도 채워줄 수 있다. 방음재(18)로서는 압축 스폰지 외에도 가공성이 좋은 압축 스티로폴 및 기타 발포성 합성수지를 이용할 수도 있다.The soundproof material 18 is interposed between the first soundproof material blocking member 18 attached to the front and rear grid plates 11 and 12 of the block-shaped lattice in a predetermined shape to be installed in close contact with the first soundproof material blocking member 18. It is. The sound insulation material 18 uses a compressed sponge to increase the sound insulation effect. When the anti-vibration material 17 is filled between the anti-vibration member frames 16 of the block grid portion 14, as shown in Fig. 2, the side spaces between the grating blocks forming the lattice are expanded to the side in the compression direction to some extent. I can fill it. As the sound insulation material 18, compressed styropol and other expandable synthetic resins having good processability in addition to the compressed sponge can also be used.

도 3는 본 발명에 따른 터널용 방음방폭장치의 출입문을 한 쪽만 분리하여도시한 사시도이며, 도 4는 도 3의 IV-IV 선을 따라 절개한 출입문의 단면을 도시한 단면도이고, 도 5는 본 발명에 따른 방음방폭장치의 출입문을 상세히 설명하기 위해서 각 구성요소를 분해하여 도시한 분해 사시도이다. 여기서 출입문(20)은 한 쌍으로 이루어져 있으나 양 측 문이 대칭으로 배치되므로 상세한 설명을 위하여 편의상 출입문(20) 중 한 쪽만 도시하였다. 도시된 바와 같이, 출입문(20)의 전면을 형성하고 있는 전면프레임(21)과, 소정의 간격을 두고 전면프레임과 평행하게 후면을 형성하고 있는 후면프레임(23)과, 전면프레임(21)과 후면프레임(23) 사이에 개재되는 제2방음부재(27)와, 제2방음부재(27)의 측면을 둘러싸고 전면프레임(21)과 후면프레임(23)의 연부에 결합되어 있는 측면케이싱(25)으로 구성되어 있다.Figure 3 is a perspective view showing only one side of the door of the soundproof explosion-proof device for tunnel according to the present invention, Figure 4 is a cross-sectional view showing a cross section of the door cut along the line IV-IV of Figure 3, Figure 5 In order to explain in detail the door of the soundproof explosion-proof device according to the present invention is an exploded perspective view showing the exploded components. Here, the door 20 is composed of a pair, but since both sides of the door are disposed symmetrically, only one side of the door 20 is shown for convenience of description. As shown, the front frame 21 forming the front of the door 20, the rear frame 23 and the front frame 21 to form a rear in parallel with the front frame at a predetermined interval and The second soundproofing member 27 interposed between the rear frame 23 and the side casing 25 which surrounds the side surface of the second soundproofing member 27 and is coupled to the edges of the front frame 21 and the rear frame 23. )

전면프레임(21)은 출입문(20)의 형태에 따라 사각 판 상으로 형성되어 있으며, 관상의 사각파이프로 외형틀(31)을 형성하고 있으며, 외형틀(31)의 내측으로 또 다시 사각파이프를 덧대어 사각 격자형으로 내형틀(33)을 형성하고 있다.The front frame 21 is formed in a rectangular plate shape according to the shape of the door 20, and forms the outer mold 31 with tubular rectangular pipes, and the square pipe again inside the outer mold 31. In addition, the inner mold 33 is formed in a square lattice shape.

외형틀(31)에는 전면프레임(21)의 격자공간을 차단할 수 있도록 망상으로 형성된 제2방음재차단부재(29)가 부착되어 있는데, 이러한 제2방음재차단부재(29)는 소정의 직경을 가진 철사를 마름모꼴로 엮어서 성형하여 제작할 수도 있고, 기타 다른 형태로 마련될 수도 있다.The outer frame 31 is attached with a second sound insulation blocking member 29 formed in a mesh shape to block the grid space of the front frame 21, the second sound insulation blocking member 29 is a wire having a predetermined diameter. It can be produced by weaving the lozenge into a lozenge, or may be provided in other forms.

후면프레임(23)은, 역시, 외형이 전면프레임(21)과 동일한 사각 판상이고, 외형틀(31) 및 내형틀(33)로 구성되어 구조상으로도 동일하게 형성되어 있다. 다만, 제2방음재차단부재(29)가 향하는 방향만 서로 반대로 형성되어 있다.The rear frame 23 also has the same rectangular plate shape as the front frame 21, and is constituted by the outer frame 31 and the inner frame 33 and is formed in the same structure. However, only the direction in which the second sound insulation blocking member 29 faces is formed opposite to each other.

제2방음부재(27)는 전면프레임(21)과 후면프레임(23) 사이에 수용 개재되도록, 방음재를 크기에 맞게 재단하여 형성한다. 이러한 제2방음부재(27)는 압축방음재를 사용하는데, 압축 스폰지 및 입축 스치로폴을 사용하여 제조할 수도 있고 발포성 합성수지 및 고무재를 충진 형식으로 조합하여 사용할 수도 있다.The second soundproof member 27 is formed by cutting the soundproofing material to a size so as to be interposed between the front frame 21 and the rear frame 23. The second soundproof member 27 uses a compression soundproof material, may be manufactured using a compressed sponge and granular styropol, or may be used in combination with a foamed synthetic resin and a rubber material.

한편, 출입문(20)의 상단 및 하단 일측에는 차단벽(10)의 출입개구부(19)에 전면으로 개폐 가능하게 결합될 수 있도록 체결부재가 마련되어 있다. 이러한 체결부재는 출입문(20)에 측면케이싱(25)의 판면으로부터 상향 돌출되어 형성된 돌출결합부(41)와, 차단벽(10)의 출입개구부(19)에 돌출결합부(41)를 수용하여 회동 가능하게 결합할 수 있도록 형성된 수용결합부(미도시)로 형성되어 있다. 이 외에도, 출입문(20)의 측부를 형성하고 있는 측면케이싱(25)에 경첩형식의 체결부재를 설치하여 차단벽(20)의 출입개구부(19)에 결합시켜 설치할 수도 있다.On the other hand, a fastening member is provided at one side of the upper and lower ends of the door 20 so as to be coupled to the entrance opening 19 of the blocking wall 10 to be opened and closed to the front. The fastening member accommodates the protrusion coupling portion 41 protruding upward from the plate surface of the side casing 25 at the door 20 and the protrusion coupling portion 41 at the entrance opening 19 of the blocking wall 10. It is formed of a receiving coupling portion (not shown) formed to be rotatably coupled. In addition, a hinge type fastening member may be installed on the side casing 25 forming the side portion of the door 20 to be coupled to the access opening 19 of the barrier wall 20.

이러한 구성을 가진 본 발명의 터널용 방음방폭장치는, 소정의 거리까지 굴착작업을 하여 소정 길이의 터널을 형성한 후, 터널 내의 적당한 위치에 터널내벽(1)을 따라 터널을 차단하도록 블록격자부(14)를 가진 차단벽(10)의 골조을 설치한 후, 각 격자에 제1방음부재(15)를 결합시켜 차단벽(10)을 완성하고, 차단벽(10)에 형성되어 있는 출입개구부(19)에 출입문(20)을 설치하여 완성함으로써, 터널용 방음방폭장치의 설치는 완성이 된다. 그리고, 필요에 따라 터널 내에 복수의 터널용 방음방폭장치를 적정한 거리로 이격하여 평행하게 나란히 설치함으로써, 폭음에 의한 소음을 더욱 효과적으로 억제할 수 있다.In the tunnel soundproof explosion-proof device of the present invention having such a configuration, after the excavation work to a predetermined distance to form a tunnel of a predetermined length, the block grid portion to block the tunnel along the tunnel inner wall (1) at a suitable position in the tunnel; After the frame of the barrier wall 10 having the 14 is installed, the first soundproof member 15 is coupled to each lattice to complete the barrier wall 10, and the access opening formed in the barrier wall 10 ( By installing the entrance door 20 at 19), the installation of the soundproof explosion-proof device for the tunnel is completed. And, if necessary, by installing a plurality of tunnel soundproof explosion-proof devices in a tunnel side by side in parallel in parallel with each other, it is possible to more effectively suppress the noise caused by the sound.

이와 같이, 본 발명에 따른 터널용 방음방폭장치는, 터널 내의 적정한 위치에 차단벽(10)을 설치하는 것을 비롯하여 설치작업이 조립식으로 비교적 간편하게이루어질 수 있으며, 방음부재를 용이하게 설치할 수 있고, 방음효과를 높이기 위해서 복수의 터널용 방음방폭장치를 임의로 용이하게 설치할 수 있는 장점이 있다.Thus, the soundproof explosion-proof device for a tunnel according to the present invention, including the installation of the blocking wall 10 at an appropriate position in the tunnel, the installation work can be made relatively easy to prefabricated, can easily install the soundproof member, soundproof In order to increase the effect, there is an advantage that can be easily installed a plurality of soundproof explosion-proof devices for tunnels.

한편, 차단벽(10)에 적용된 격자 블록형태를 갖는 블록 격자구조는 출입문(20)에도 적용하여 각 격자마다 방음부재를 설치하여 제작할 수도 있다.On the other hand, the block grating structure having a grating block shape applied to the barrier wall 10 may also be applied to the door 20 to install a soundproof member for each grating.

그리고, 차단벽의 격자구조는 하중에 대한 힘의 분산을 효과적으로 해야할 경우에는, 골조를 트러스 형식의 격자구조로 제작할 수도 있다.In addition, when the grid structure of the barrier wall needs to effectively distribute the force with respect to the load, the frame may be manufactured in the truss type grid structure.

이상 설명한 바와 같이, 본 발명에 따르면, 터널 내에 격자구조의 전면격자판 및 후면격자판에 의해서 형성되는 각 격자에 블록형의 입방체로 제작된 제1빙음부재를 설치한 차단벽을 마련하고 차단벽에 형성된 출입출입개구부에 방음부재가 부착된 출입문을 설치함으로써, 터널공사 중 작업차량의 출입이 가능하고 발파작업 시에 발생하는 폭음을 효과적으로 방음할 수 있는 터널용 방음방폭장치를 제공할 수 있다.As described above, according to the present invention, a barrier wall provided with a first ice sound member made of a block-type cube is formed in each grid formed by the front grid plate and the rear grid plate of the grid structure in the tunnel and formed on the barrier wall. By installing a door with a soundproof member attached to the entrance / exit opening, it is possible to provide a tunnel soundproofing device capable of effectively entering and exiting a vehicle during tunnel construction and effectively sounding the sound generated during blasting work.

Claims (6)

터널에 설치되는 터널용 방음방폭장치에 있어서,In the tunnel soundproof explosion-proof device installed in the tunnel, 상기 터널 내에 상기 터널을 차단하도록 설치되고 출입개구부를 가지며, 격자구조로 형성되며 상호 평행하게 이격된 전면격자판 및 후면격자판과, 제1방음부재를 갖는 차단벽과;A barrier wall installed to block the tunnel in the tunnel and having an entrance and exit portion, formed in a lattice structure, and having a front grid plate and a rear grid plate spaced in parallel to each other, and a first soundproof member; 상기 출입개구부에 개폐 가능하게 설치되며 제1방음부재가 설치되는 출입문을 포함하는 것을 특징으로 하는 터널용 방음방폭장치.Soundproof explosion-proof device for a tunnel, characterized in that it is installed to be opened and closed to the access opening and the door is installed with the first soundproof member. 제1항에 있어서,The method of claim 1, 상기 차단벽은 터널의 길이방향으로 소정의 거리를 두고 복수로 설치되어 있는 것을 특징으로 하는 터널용 방음방폭장치.The shielding wall is a soundproof explosion-proof device for a tunnel, characterized in that a plurality of installed at a predetermined distance in the longitudinal direction of the tunnel. 제1항에 있어서,The method of claim 1, 상기 제1방음부재는, 상기 전면 및 후면격자판 사이에서 각 격자 내에 각각 배치되며, 상기 제1방음부재는 상기 전면 및 후면격자판을 상호 연결하는 연결부에 의해서 상호 격리되는 것을 특징으로 하는 터널용 방음방폭장치.The first soundproofing member is disposed in each lattice between the front and rear lattice plates, respectively, wherein the first soundproofing member is insulated from each other by a connecting portion interconnecting the front and rear lattice plates. Device. 제3항에 있어서,The method of claim 3, 상기 전면 및 후면격자판의 각 격자개구를 차단하는 망상의 제1방음재이탈방지부재를 더 포함하는 것을 특징으로 하는 터널용 방음방폭장치.The soundproof explosion-proof device for a tunnel, characterized in that it further comprises a mesh-like first soundproof material escape prevention member for blocking each grid opening of the front and rear grid plate. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 출입문은,The door is, 격자구조로 형성되며 상호 평행하게 이격된 전면프레임 및 후면프레임과;A front frame and a rear frame formed in a lattice structure and spaced apart from each other in parallel; 상기 전면프레임과 상기 후면프레임의 측면을 둘러싸는 도어케이싱을 포함하고, 상기 전면프레임과 상기 후면프레임 사이에는 상기 제2방음부재가 개재되어 있는 것을 특징으로 하는 터널용 방음방폭장치.And a door casing surrounding side surfaces of the front frame and the rear frame, wherein the second soundproof member is interposed between the front frame and the rear frame. 제5항에 있어서,The method of claim 5, 상기 전면 및 후면프레임의 격자개구를 차단하는 망상의 제2방음재이탈방지부재를 더 포함하는 것을 특징으로 하는 터널용 방음방폭장치.The soundproof explosion-proof device for a tunnel, characterized in that it further comprises a network-like second soundproof material separation prevention member for blocking the grid opening of the front and rear frame.
KR10-2000-0087241A 2000-12-30 2000-12-30 Safety Wall and Door for Tunnel KR100401809B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0087241A KR100401809B1 (en) 2000-12-30 2000-12-30 Safety Wall and Door for Tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0087241A KR100401809B1 (en) 2000-12-30 2000-12-30 Safety Wall and Door for Tunnel

Publications (2)

Publication Number Publication Date
KR20020057011A true KR20020057011A (en) 2002-07-11
KR100401809B1 KR100401809B1 (en) 2003-10-17

Family

ID=27690120

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0087241A KR100401809B1 (en) 2000-12-30 2000-12-30 Safety Wall and Door for Tunnel

Country Status (1)

Country Link
KR (1) KR100401809B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100653616B1 (en) * 2005-08-01 2006-12-08 김숙희 Method and device for decreasing blasting noise
KR101142593B1 (en) * 2009-11-02 2012-05-10 코오롱글로벌 주식회사 Dustproof Device for Tunneling Work with Blocking Wall
KR101314467B1 (en) * 2011-10-21 2013-10-14 최주환 The nature-friendly soundproof equipment
CN107131003A (en) * 2016-02-29 2017-09-05 叶中豹 One kind is used for the new ventilating shaft explosion-proof door in underground

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101138405B1 (en) 2004-04-01 2012-04-26 윤영재 Construction for preventing from noise and muckpile fly of tunnel drilling
KR101027715B1 (en) 2008-07-23 2011-04-12 정동호 A soundproofing apparatus for a tunnel
KR100939495B1 (en) * 2009-06-25 2010-01-29 정병인 A soundproofing apparatus for a tunnel
KR101721887B1 (en) 2016-07-14 2017-03-31 이정호 Soundproof wall structure for tunnel
KR102368370B1 (en) 2020-08-12 2022-03-02 주식회사 신영산업 Tunnel entrance structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2561582Y2 (en) * 1992-01-17 1998-01-28 五洋建設株式会社 Sound barrier for tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100653616B1 (en) * 2005-08-01 2006-12-08 김숙희 Method and device for decreasing blasting noise
KR101142593B1 (en) * 2009-11-02 2012-05-10 코오롱글로벌 주식회사 Dustproof Device for Tunneling Work with Blocking Wall
KR101314467B1 (en) * 2011-10-21 2013-10-14 최주환 The nature-friendly soundproof equipment
CN107131003A (en) * 2016-02-29 2017-09-05 叶中豹 One kind is used for the new ventilating shaft explosion-proof door in underground

Also Published As

Publication number Publication date
KR100401809B1 (en) 2003-10-17

Similar Documents

Publication Publication Date Title
US4143495A (en) Sound-absorbing panel
KR100401809B1 (en) Safety Wall and Door for Tunnel
US6205717B1 (en) Bunker construction
KR20130084430A (en) Sound absorptive assembly applied to sound barrier tunnel for noise reduction
KR101038276B1 (en) Panel for sound proof wall
KR860000455A (en) Soundproofing
JP2015083756A (en) Tunnel low frequency sound reduction device
KR100684358B1 (en) Soundproof pannel assembly
KR101128390B1 (en) Proof panel
JP4845827B2 (en) Water blocking wall and water blocking body constituting the water blocking wall
KR102368370B1 (en) Tunnel entrance structure
KR101027715B1 (en) A soundproofing apparatus for a tunnel
KR101721887B1 (en) Soundproof wall structure for tunnel
JP7441986B2 (en) Explosion sound reduction method and Explosion noise reduction device
CN218346492U (en) Sound-proof fire-proof partition wall
JP2923422B2 (en) Underground wall waterproofing joint
KR101541191B1 (en) Electric power busway duct improved water-proof performance
KR200401091Y1 (en) Assembling-type soundproofing panel
KR200222326Y1 (en) Fiber Reinforced soundproofing walls
JPH10280702A (en) Soundproof panel for temporary work
CN2243520Y (en) Multifunctional door
KR100245661B1 (en) Soundproofing block
CN114000751A (en) Anti-knock wall tip cuts joint-cutting composite section bar
KR200261890Y1 (en) A Noise Prevention for Tunnel Improvement
KR20050057874A (en) Escape tunnel- door wall and escape tunnel- door wall construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120928

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20131001

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20141002

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20151002

Year of fee payment: 13

LAPS Lapse due to unpaid annual fee