KR20020049788A - Surveillant And Control Method For ATM-PON OLT System - Google Patents
Surveillant And Control Method For ATM-PON OLT System Download PDFInfo
- Publication number
- KR20020049788A KR20020049788A KR1020000079076A KR20000079076A KR20020049788A KR 20020049788 A KR20020049788 A KR 20020049788A KR 1020000079076 A KR1020000079076 A KR 1020000079076A KR 20000079076 A KR20000079076 A KR 20000079076A KR 20020049788 A KR20020049788 A KR 20020049788A
- Authority
- KR
- South Korea
- Prior art keywords
- processing unit
- unit
- management
- ipc
- processor
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
- H04Q11/0067—Provisions for optical access or distribution networks, e.g. Gigabit Ethernet Passive Optical Network (GE-PON), ATM-based Passive Optical Network (A-PON), PON-Ring
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J14/00—Optical multiplex systems
- H04J14/02—Wavelength-division multiplex systems
- H04J14/0227—Operation, administration, maintenance or provisioning [OAMP] of WDM networks, e.g. media access, routing or wavelength allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/54—Store-and-forward switching systems
- H04L12/56—Packet switching systems
- H04L12/5601—Transfer mode dependent, e.g. ATM
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/54—Store-and-forward switching systems
- H04L12/56—Packet switching systems
- H04L12/5601—Transfer mode dependent, e.g. ATM
- H04L2012/5625—Operations, administration and maintenance [OAM]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
- H04Q2011/0079—Operation or maintenance aspects
Abstract
Description
본 발명은 ATM-PON OLT 시스템에서 실시간 계층적 감시 제어 처리 장치 및 방법에 관한 것이다.The present invention relates to a real-time hierarchical monitoring control processing apparatus and method in an ATM-PON OLT system.
ATM-PON OLT 시스템은 ATM 서비스 노드와 ONU 사이에 위치한다. ONU에 연결된 ATM 서비스 가입자는 OLT 시스템을 통하여 각종 ATM 서비스를 제공 받을 수 있다. ATM-PON OLT 시스템을 통해 ATM 서비스 가입자가 제공 받을 수 있는 서비스로는 기존의 POTS 서비스 외에 VOD, 초고속 인터넷, 디지털 CATV 등이 있다. 가입자로부터의 트래픽은 ATM 액세스 시스템에서 다중화되어 ATM 교환기로 전달되고 고속의 ATM 교환기를 통과하여 서비스를 제공하는 서비스 노드로 전달된다.The ATM-PON OLT system is located between the ATM service node and the ONU. ATM service subscribers connected to ONU can receive various ATM services through OLT system. In addition to the existing POTS service, VOD, high-speed Internet, and digital CATV can be provided by ATM service subscribers through ATM-PON OLT system. Traffic from the subscriber is multiplexed in the ATM access system and forwarded to the ATM switch, passing through the high-speed ATM switch to the service node providing the service.
종래의 ATM 액세스 시스템에서는 하나의 제어 프로세서가 시스템 내의 모든 라인 카드들을 제어 하였고 하나의 관리 프로세서가 시스템 내의 모든 관리 업무를 수행하였다. 종래의 시스템에서는 수행해야 하는 감시 제어 기능이 비교적 적은 양이기 때문에 하나의 32비트 CISC 프로세서(예를 들어 MC68030과 같은 프로세서)로 처리할 수 있었고, 관리 프로세서에서 관리해야 하는 시스템 정보가 비교적 적은 양이기 때문에 하나의 32비트 CISC 프로세서(예를 들어 MC68040과 같은 프로세서)로 처리할 수 있었다.In the conventional ATM access system, one control processor controls all line cards in the system and one management processor performs all management tasks in the system. In the conventional system, since the supervisory control function to be performed is relatively small, it can be processed by one 32-bit CISC processor (for example, the processor such as MC68030), and the system information that the management processor needs to manage is relatively small. This allowed one 32-bit CISC processor (such as the MC68040) to process.
본원의 출원인이 1996년 11월 20일 출원하여(출원번호:10-1996-0055822) 1999년 4월 29일 특허등록된 대한민국 특허 제10-0211023호에는 초고속 응용 서비스를 지원하는 ATM 서비스 노드 장치 및 그 운용방법이 기재되어 있는데, 상기 특허에서는 광대역 종합통신망(B-ISDN)의 구성요소인 광대역 단말정합장치(B-TA) 기능을 부분적으로 광대역 망종단장치(B-NT)에 수용하여, 비 B-ISDN 서비스를 추가적인 외부 장치 없이 접속시킬 수 있는 시스템 구조를 제시하고 있다.Korean Patent No. 10-0211023, filed by the applicant of the present application on November 20, 1996 (Application No.:10-1996-0055822), issued April 29, 1999, discloses an ATM service node device supporting an ultra-high speed application service; The operating method is described. In the patent, the B-TA function, which is a component of the B-ISDN, is partially accommodated in the B-NT. System structure that can connect B-ISDN service without additional external device is suggested.
그러나, 액세스 망에 대한 연구가 진행되면서, 새로운 ATM 서비스의 통합적인 도입(VOD, Digital CATV,고속 인터넷 동시 제공)이 요구됨에 따라 ATM 액세스 시스템이 16x16 155M 시스템에서 64x64 155M 또는 16x16 622M 급 시스템으로 확장되고 있다. 이러한 시스템의 확장에 따라 시스템 내에서 실시간으로 처리해야 될 계층 관리 기능이 급격하게 증가 하게 되었다. 또한 관리 해야 할 관리 정보도 급격하게 증가하게 되었다.However, as research on the access network progresses, the ATM access system is expanded from 16x16 155M system to 64x64 155M or 16x16 622M system as the integrated introduction of new ATM service (VOD, Digital CATV, high speed internet simultaneously) is required. It is becoming. As the system expands, the hierarchical management function that needs to be processed in real time within the system is rapidly increased. In addition, the management information to be managed has increased rapidly.
따라서, 기존의 시스템 구조에서 사용하던 방법으로서는 감시 제어 기능의 실시간 처리를 보장할 수 없게 되었을 뿐만 아니라, 기존에 사용하던 감시 제어 기능을 새로 구현하고 유지보수 하는데 많은 비용이 소요될 것으로 예측된다. 그리고, ATM 서비스의 통합적인 도입(VOD, Digital CATV,고속 인터넷 동시 제공)이 되고 있으나 서비스별 선호도나 가입자의 변화에 따라 라인 카드 모듈만 교체함으로써 서비스를 제공할 수 있는 경쟁력 있는 유연한 시스템이 요구된다. 더불어, 저가형의 광 가입자 장비를 구현하는데 있어서 PON 방식을 이용하면 다수의 가입자를 서비스 할 수 있다.Therefore, the method used in the existing system structure is not only able to guarantee the real-time processing of the supervisory control function, but it is also expected to cost a lot of money to implement and maintain the existing supervisory control function. In addition, the introduction of ATM services (VOD, Digital CATV, high-speed Internet at the same time) is being introduced, but a competitive and flexible system is needed to provide services by replacing only the line card module according to service preferences or subscriber changes. . In addition, in implementing low cost optical subscriber equipment, the PON scheme can serve a large number of subscribers.
그러나, ATN-PON 액세스망에서, OLT와 ONU사이의 PON방식의 연결 및 관리 기능은 복잡하며 새롭게 관심과 연구가 되고 있으며, ATM-PON 시스템에 맞는 감시 제어에 많은 연구가 될 것으로 예측된다.However, in the ATN-PON access network, the connection and management functions of the PON method between the OLT and the ONU are complicated and newly studied and studied.
본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로서, ATM-PON OLT 시스템에서 감시 제어 기능을 실시간으로 처리해 주고, 구현 비용도 저렴한 실시간 계층적 감시 제어 처리 장치 및 방법을 제공하며, 서비스별 라인카드를 인식하여 확장성이 뛰어난 감시제어 기능을 제공하는데 그 목적이 있다.The present invention has been made to solve the above problems, and provides a real-time hierarchical supervisory control and processing apparatus and method for processing a supervisory control function in an ATM-PON OLT system in real time, and low in implementation cost, line by service The purpose is to provide a highly scalable supervisory control by recognizing the card.
도 1은 ATM-PON OLT 시스템의 구성도;1 is a block diagram of an ATM-PON OLT system;
도 2는 본 발명에 따른 ATM-PON OLT 시스템의 감시 제어 처리 장치의 일 실시 예시도;2 is an exemplary view illustrating a monitoring control processing apparatus of an ATM-PON OLT system according to the present invention;
도 3은 본 발명에 따른 감시 제어 처리장치 중 초기화 처리부의 처리 절차를 설명하는 흐름도;3 is a flowchart for explaining a processing procedure of an initialization processing unit in the monitoring control processing apparatus according to the present invention;
도 4는 본 발명에 따른 감시 제어 처리장치 중 하드웨어 API 처리부의 처리 절차를 설명하는 흐름도;4 is a flowchart illustrating a processing procedure of a hardware API processing unit of the monitoring control processing apparatus according to the present invention;
도 5는 본 발명에 따른 감시 제어 처리장치 중 인터럽트 처리부의 처리 절차를 설명하는 흐름도;5 is a flowchart illustrating a processing procedure of an interrupt processing unit in the monitoring control processing apparatus according to the present invention;
도 6은 본 발명에 따른 감시 제어 처리장치 중 장애 보고 처리부의 처리 절차를 설명하는 흐름도;6 is a flowchart illustrating a processing procedure of a failure report processing unit in the monitoring control processing apparatus according to the present invention;
도 7은 본 발명에 따른 감시 제어 처리장치 중 장애 관리 처리부의 처리 절차를 설명하는 흐름도;7 is a flowchart illustrating a processing procedure of a failure management processing unit in the monitoring control processing apparatus according to the present invention;
도 8은 본 발명에 따른 감시 제어 처리장치 중 루프백 처리부의 처리 절차를 설명하는 흐름도;8 is a flowchart illustrating a processing procedure of a loopback processing unit in the monitoring control processing apparatus according to the present invention;
도 9는 본 발명에 따른 감시 제어 처리장치 중 PM/CC 활성화 처리부의 처리 절차를 설명하는 흐름도;9 is a flowchart illustrating a processing procedure of a PM / CC activation processing unit in the monitoring control processing apparatus according to the present invention;
도 10은 본 발명에 따른 감시 제어 처리장치 중 성능 보고 처리부의 처리 절차를 설명하는 흐름도;10 is a flowchart for describing a processing procedure of a performance report processing unit in the monitoring control processing apparatus according to the present invention;
도 11은 본 발명에 따른 감시 제어 처리장치 중 성능 관리 처리부의 처리 절차를 설명하는 흐름도;11 is a flowchart for describing a processing procedure of a performance management processing unit in the monitoring control processing apparatus according to the present invention;
도 12는 본 발명에 따른 감시 제어 처리장치 중 초기화 관리 처리부의 처리 절차를 설명하는 흐름도;12 is a flowchart for describing a processing procedure of an initialization management processing unit in the monitoring control processing apparatus according to the present invention;
도 13은 본 발명에 따른 감시 제어 처리장치 중 형상 관리 처리부의 처리 절차를 설명하는 흐름도;13 is a flowchart for describing a processing procedure of a shape management processing unit in the monitoring control processing apparatus according to the present invention;
도 14는 본 발명에 따른 감시 제어 처리장치 중 연결 관리 처리부의 처리 절차를 설명하는 흐름도이고,14 is a flowchart illustrating a processing procedure of a connection management processing unit of the monitoring control processing apparatus according to the present invention;
도 15는 본 발명에 따른 감시 제어 처리장치 중 절체 관리 처리부의 처리 절차를 설명하는 흐름도이다.15 is a flowchart for describing a processing procedure of the switching management processing unit in the monitoring control processing device according to the present invention.
* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings
11 : 초기화 처리부 12 : 하드웨어 API 처리부11: initialization processing unit 12: hardware API processing unit
13 : 인터럽트 처리부 14 : 장애 보고 처리부13: Interrupt Processing Unit 14: Error Reporting Processing Unit
15 : 장애 관리 처리부 16 : 루프백 처리부15: failure management processing unit 16: loopback processing unit
17 : PM/CC 활성화 처리부 18 : 성능 보고 처리부17: PM / CC activation processing unit 18: performance report processing unit
19 : 성능 관리 처리부 20 : 초기화 관리 처리부19: performance management processing unit 20: initialization management processing unit
21 : 형상 관리 처리부 22 : 연결 관리 처리부21: shape management processing unit 22: connection management processing unit
23 : 절체 관리 처리부 100 : 망 관리 Agent23: transfer management processing unit 100: network management agent
200 : 시스템 및 운용 관리부 300 : 가입자측 제어부200: system and operation management unit 300: subscriber side control unit
400 : 망측 제어부 500 : 가입자측 라인카드부400: network side controller 500: subscriber line card unit
600 : 스위치 부 700 : 망측 라인카드부600: switch unit 700: network side line card unit
본 발명의 일 실시예에 따르면, 망 측과 연결되어 ATM 처리를 수행하는 망측 라인카드부를 제어하는 망측 제어부, 및 ONU와 연결되어 ATM 처리를 수행하는 가입자측 라인카드부를 제어하는 가입자측 제어부 및 IPC 처리부를 통해 상기 망측 제어부 및 가입자측과 연결되어 ATM-PON OLT 시스템을 관리하는 운용 관리부를 포함하여 이루어진 ATM-PON OLT 시스템 감시 제어 처리장치에 있어서, 상기 망측 제어부 및 가입자측 제어부는, 상기 망측 라인카드부 및/또는 가입자측 라인카드부를 제어하는 감시 제어기능을 각각 수행하는 복수개의 기능 모듈을 구비하는 것을 특징으로 하는 ATM-PON OLT 시스템 감시 제어 처리장치가 제공된다.According to an embodiment of the present invention, the network side controller connected to the network side to control the network side line card unit performing ATM processing, and the subscriber side controller and IPC connected to the ONU to control the subscriber side line card unit performing ATM processing. In the ATM-PON OLT system monitoring and control processing device comprising an operation management unit for managing the ATM-PON OLT system connected to the network side control unit and subscriber side via a processing unit, wherein the network side control unit and subscriber side control unit, the network side line Provided is an ATM-PON OLT system monitoring control processing apparatus comprising a plurality of function modules each performing a monitoring control function for controlling a card portion and / or a subscriber side line card portion.
이하, 첨부된 도면을 참조하여 본 발명에 따른 일실시 예를 단지 예의 방법으로 상세히 설명하도록 하겠다.Hereinafter, with reference to the accompanying drawings will be described in detail an embodiment according to the present invention by way of example only.
도 2는 본 발명에 따른 실시간 계층 관리 처리 장치의 구체적인 일실시 예시도이다. 상기 실시간 계층적 감시 제어 처리 장치에서 가입자 측 제어부(300) 또는 망측 제어부(400)는, 도 2에 도시된 바와 같이, 하드웨어 처리부(910), 장애 처리부(920), 성능 처리부(930) 및 형상 처리부(940)으로 크게 구분되어 있다.2 is a diagram illustrating a specific embodiment of a real-time layer management processing apparatus according to the present invention. In the real-time hierarchical monitoring control processing apparatus, the subscriber side controller 300 or the network side controller 400 may include a hardware processor 910, a failure processor 920, a performance processor 930, and a shape, as illustrated in FIG. 2. It is largely divided into the processing unit 940.
상기 상기 하드웨어 처리부(910)는, 라인 카드에 대한 초기화 기능을 수행하는 초기화 처리부(11); 라인카드에 대한 하드웨어 API 함수를 수행하는 하드웨어 API 처리부(12); 및 ISR에서 수신된 정보를 바탕으로 감시 제어내의 다른 처리부로 인터럽트를 분배하는 기능을 처리하는 인터럽트 처리부(13)로 구성되어 있다.The hardware processor 910 may include an initialization processor 11 performing an initialization function on a line card; A hardware API processing unit 12 for performing a hardware API function on the line card; And an interrupt processing unit 13 for processing a function of distributing an interrupt to another processing unit in the supervisory control based on the information received from the ISR.
상기 장애 처리부(920)는, 장애 활성화/비활성화 기능을 수행하는 장애 보고 처리부(14); 장애 로그 관리 기능, 장애 등급 관리 기능, 장애 테스트 일부 기능 및 가시 가청 관리 경보 관리 기능을 수행하는 장애 관리 처리부(15); 장애 테스트 기능 중 루프백 기능을 수행하는 루프백 처리부(16); 및 장애 테스트 기능 중 PM/CC 활성화/비활성화 기능을 수행하는 PM/CC 활성화 처리부(17)로 구성되어 있다.The failure processing unit 920 may include a failure report processing unit 14 performing a failure activation / deactivation function; A failure management processing unit 15 for performing a failure log management function, a failure level management function, a failure test part function, and a visible audible management alarm management function; A loopback processor 16 performing a loopback function among the failure test functions; And a PM / CC activation processing unit 17 that performs a PM / CC activation / deactivation function among the failure test functions.
상기 성능 처리부(930)는, 물리 계층, ATM 계층 주기적 성능 보고 기능을 수행하는 성능 보고 처리부(18); 및 물리 계층 현재 성능 조회, 물리 계층 성능 자료 초기화, ATM 계층 현재 성능 조회, ATM 계층 성능 자료 초기화, 성능 누적Threshold 설정 및 조회 기능을 수행하는 성능 관리 처리부(19)로 구성되어 있으며,The performance processor 930 may include a performance report processor 18 that performs a physical layer and ATM layer periodic performance report function; And a performance management processor 19 for performing physical layer current performance inquiry, physical layer performance data initialization, ATM layer current performance inquiry, ATM layer performance data initialization, performance cumulative threshold setting, and inquiry function.
상기 형상 처리부(940)는, 초기화 관련 기능을 수행하는 초기화 관리 처리부(20); 형상 관리 관련 기능을 수행하는 형상 관리 처리부(21); 연결 관리 관련 기능을 수행하는 연결 관리 처리부(22); 절체 관리 관련 기능을 수행하는 절체 처리부(23), IPC 처리부(950), INC 처리부(960)로 구성되어 있다.The shape processor 940 may include an initialization management processor 20 that performs an initialization related function; A shape management processor 21 which performs a shape management related function; A connection management processor 22 which performs a connection management related function; It is composed of a transfer processing unit 23, an IPC processing unit 950, and an INC processing unit 960 that performs a transfer management related function.
도 3은 실시간 감시 제어 처리 장치에서 초기화 처리부(11)의 일실시 예이다. 초기화 처리부(11)는 형상 처리부(940)로부터 초기화 메시지(1102)를 수신한 경우, 초기화 함수 API 함수를 호출(1103)하고 초기화 응답 메시지(1104)를 형상 처리부(940)로 전달하고 초기화 처리를 종료(1105)한다.3 is an embodiment of the initialization processing unit 11 in the real-time monitoring and control processing apparatus. When the initialization processing unit 11 receives the initialization message 1102 from the shape processing unit 940, calls the initialization function API function 1103, transfers the initialization response message 1104 to the shape processing unit 940, and performs initialization processing. End 1105.
도 4는 실시간 감시 제어 처리 장치에서 하드웨어 API 처리부(12)의 일실시 예이다. 하드웨어 API 처리부(12)는 각각의 처리부에서 하드웨어 API처리를 필요로 한 경우 하드웨어 API 함수를 수행(1202)하고 하드웨어 API 처리를 종료(1203)한다.4 is an embodiment of a hardware API processing unit 12 in a real-time monitoring control processing apparatus. The hardware API processing unit 12 performs hardware API functions 1202 when each processing unit requires hardware API processing, and terminates 1203 hardware API processing.
도 5는 실시간 감시 제어 처리 장치에서 인터럽트 처리부(13)의 일실시 예이다. 인터럽트 처리부(13)는 가입자측/망측 라인카드부로부터 인터럽트가 발생(1302)한 경우, 인터럽트 API 함수를 수행(1303)하고 인터럽트 종류를판단(1304)하여 장애 인터럽트인 경우 장애 인터럽트 보고 메시지(1305)를 생성하여 장애처리부(920) 및 형상처리부(940)로 전달하고, OAM 인터럽트인 경우 OAM 인터럽트 보고 메시지(1306)를 생성하여 장애 처리부(920)로 전달하고, 형상 인터럽트인 경우 형상 인터럽트 보고 메시지(1307)를 생성하여 형상 처리부(940)로 전달하고, 1초 인터럽트인 경우 성능 인터럽트 보고 메시지(1308)를 생성하여 성능 처리부(930)로 전달하고, AAL5 인터럽트인 경우 AAL5 인터럽트 보고 메시지(1309)를 생성하여 INC 처리부로 전달하고 인터럽트 처리를 종료(1310)한다.5 is an embodiment of the interrupt processor 13 in the real-time monitoring and control processing apparatus. The interrupt processor 13 performs an interrupt API function 1303 when the interrupt is generated from the subscriber line / network line card unit 1302 and determines the interrupt type (1304). ) Generates and transfers the error processing unit 920 and the shape processing unit 940 and generates an OAM interrupt report message 1306 in the case of an OAM interrupt, and delivers it to the error processing unit 920, and in the case of a shape interrupt, a shape interrupt report message. 1307 is generated and delivered to the shape processor 940, and in the case of 1 second interrupt, a performance interrupt report message 1308 is generated and transmitted to the performance processor 930, and in the case of an AAL5 interrupt, an AAL5 interrupt report message 1309. Is generated and transferred to the INC processing unit, and the interrupt process is terminated (1310).
도 6은 실시간 감시 제어 처리 장치에서 장애 보고 처리부(14)의 일실시 예이다. 장애 보고 처리부(14)는 하드웨어 처리부로부터 장애 인터럽트 보고 메시지(1402)를 수신한 경우, 장애 형태(1403)을 판단하여, 장애 발생의 경우 장애 활성화 절차를 수행(1404)하고, 장애 보고 메시지(1405)를 생성하여 IPC 처리부(24)를 통하여 운용 관리부(200)로 전달하고 장애 보고 처리를 종료(1408)한다. 만일, 장애 형태가 장애 해제인 경우 장에 비활성화 절차를 수행(1406)하고 장애 보고 메시지(1407)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고, 장애 보고 처리를 종료(1408)한다.6 is an embodiment of the failure report processor 14 in the real-time monitoring and control processing device. When the failure report processor 14 receives the failure interrupt report message 1402 from the hardware processor, the failure report 1402 determines a failure type 1403, in the case of a failure, performs a failure activation procedure (1404), and the failure report message (1405). ) Is generated and transmitted to the operation management unit 200 through the IPC processing unit 24, and the failure reporting process is terminated (1408). If the failure type is failure release, the deactivation procedure is performed in operation 1406, a failure report message 1407 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the failure reporting process is terminated (1408). .
도 7은 실시간 감시 제어 처리 장치에서 장애 관리 처리부(15)의 일실시 예이다. 장애 관리 처리부(15)는 운용 관리부(200)로부터 IPC 처리부를 통하여 장애 관리 메시지(1502)를 수신한 경우 관리 메시지(1503)를 판단하여 장애 로그 메시지인 경우 장애 로그 처리 절차를 수행(1504)하고 장애 로그 보고 메시지(1505)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 장애 관리 처를 종료(1512)한다.7 is an embodiment of the failure management processor 15 in the real-time monitoring and control processing device. When the failure management processor 15 receives the failure management message 1502 from the operation manager 200 through the IPC processing unit, the failure management processor 1503 determines the management message 1503 and performs a failure log processing procedure in the case of the failure log message (1504). A failure log report message 1505 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the failure management unit is terminated (1512).
관리 메시지가 장애 등급 메시지인 경우 장애 등급 처리 절차를 수행(1506)하고 장애 등급 보고 메시지를 생성(1507)하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 장애 관리 처리를 종료(1512)한다. 관리 메시지가 장애 테스트 메시지인경우 장애 테스트 처리 절차를 수행(1508)하고 장애 테스트 보고 메시지(1509)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 장애 관리 처리를 종료(1512)한다. 마지막으로, 관리 메시지가 가시가청 메시지인 경우 가시 가청 처리 절차를 수행(1510)하고 가시가청 보고 메시지(1511)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 장애 관리 처리를 종료(1512)한다.If the management message is a failure grade message, a failure grade processing procedure is performed (1506), a failure grade report message is generated (1507), transferred to the operation management unit 200 through the IPC processing unit, and the failure management process is terminated 1512. If the management message is a failure test message, a failure test processing procedure is performed (1508), a failure test report message 1509 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the failure management process is terminated 1512. Finally, if the management message is an audible and audible message, a visible audible processing procedure is performed (1510), a visible and audible report message (1511) is generated and delivered to the operation management unit 200 through the IPC processing unit, and the failure management processing is terminated (1512) )do.
도 8은 실시간 감시 제어 처리 장치에서 루프백 처리부(16)의 일실시 예이다. 루프백 처리부(16)는 운용 관리부(200)로부터 IPC 처리부를 통하여 루프백 메시지(1602)를 수신한 경우 루프백 프로토콜을 수행(1603)하고 루프백 응답 메시지(1604)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 루프백 처리를 종료(1605)한다.8 is an embodiment of the loopback processor 16 in the real-time monitoring and control processing apparatus. When the loopback processing unit 16 receives the loopback message 1602 from the operation management unit 200 through the IPC processing unit, performs the loopback protocol 1603 and generates a loopback response message 1604 to operate the operation management unit 200 through the IPC processing unit. ) And the loopback process ends (1605).
도 9는 실시간 감시 제어 처리 장치에서 PM/CC 활성화 처리부(17)의 일실시예이다. PM/CC 활성화 처리부(17)는 운용 관리부(200)로부터 IPC 처리부를 통하여 PM/CC 활성화 메시지(1702)를 수신한 경우 PM/CC 활성화 프로토콜을 수행(1703)하고 PM/CC 활성화 응답 메시지(1704)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 PM/CC 활성화 처리를 종료(1705)한다.9 is an embodiment of the PM / CC activation processor 17 in the real-time monitoring and control apparatus. When the PM / CC activation processing unit 17 receives the PM / CC activation message 1702 from the operation management unit 200 through the IPC processing unit, performs the PM / CC activation protocol (1703) and the PM / CC activation response message (1704). ) Is generated and transferred to the operation management unit 200 through the IPC processing unit, and the PM / CC activation process is terminated (1705).
도 10은 실시간 감시 제어 처리 장치에서 성능 보고 처리부(18)의 일실시 예이다. 성능 보고 처리부(18)는 하드웨어 처리부(910)로부터 성능 인터럽트 보고 메시지(1802)를 수신한 경우 성능 보고 시간(1803)을 보고, YES인 경우 성능 자료를 수집(1804)하여 성능 보고 메시지(1805)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 성능 보고 처리를 종료(1807)한다. 성능 보고 시간이 NO인 경우 성능 자료를 수집(1806)하고 성능 보고 처리를 종료(1807)한다.10 is an embodiment of the performance report processing unit 18 in the real-time monitoring and control processing device. When the performance report processor 18 receives the performance interrupt report message 1802 from the hardware processor 910, the performance report processor 18 reports the performance report time 1803, and in the case of YES, collects performance data (1804) and reports the performance report message (1805). It generates and delivers to the operation management unit 200 through the IPC processing unit and ends the performance report processing (1807). If the performance report time is NO, performance data is collected (1806) and the performance reporting process ends (1807).
도 11은 실시간 감시 제어 처리 장치에서 성능 관리 처리부(19)의 일실시 예이다. 성능 관리 처리부(19)는 운용 관리부(200)로부터 IPC 처리부를 통하여 성능 관리 메시지(1902)를 수신한 경우 관리 메시지를 판단(1903)하여, 현재 성능 조회 메시지인 경우 현재 성능 수집 절차를 수행(1904)하고 현재 성능 보고 메시지(1905)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 성능 관리 처리를 종료(1910)한다.11 is an embodiment of the performance management processing unit 19 in the real-time monitoring and control processing device. When the performance management processor 19 receives the performance management message 1902 from the management manager 200 through the IPC processing unit (1902), the performance management processor 19 determines a management message, and performs a current performance collection procedure in the case of the current performance inquiry message (1904). Next, a current performance report message 1905 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the performance management process ends (1910).
관리 메시지가 성능 임계(Threshold) 메시지인 경우 성능 임계 절차를 수행(1906)하고 성능 임계 보고 메시지(1907)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달한다. 관리 메시지가 성능 자료 초기화 메시지인 경우 성능 자료 초기화 처리 절차를 수행(1908)하고 성능 자료 초기화 보고 메시지(1909)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달한다.If the management message is a performance threshold message, the performance threshold procedure is performed (1906) and a performance threshold report message 1907 is generated and transmitted to the operation management unit 200 through the IPC processing unit. When the management message is the performance data initialization message, the performance data initialization processing procedure is performed (1908) and a performance data initialization report message 1909 is generated and transmitted to the operation management unit 200 through the IPC processing unit.
도 12는 실시간 감시 제어 처리 장치에서 초기화 관리 처리부(20)의 일실시 예이다. 초기화 관리 처리부는 운용 관리부(200)로부터 IPC 처리부를 통하여 초기화 관리 메시지(2002)를 수신한 경우 초기화 관리 메시지를 판단(2003)하여, 초기화 메시지인 경우 초기화 절차를 수행(2004)하고 초기화 보고 메시지(2005)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 초기화 관리 처리를 종료(2016)한다.12 is an embodiment of the initialization management processor 20 in the real-time monitoring and control processing device. When the initialization management processor receives the initialization management message 2002 from the operation management unit 200 through the IPC processing unit (2003), the initialization management message determines an initialization management message (2003). 2005) is generated and transferred to the operation management unit 200 through the IPC processing unit and ends the initialization management process (2016).
초기화 관리 메시지가 초기 상태 설정 메시지인 경우, 초기 상태 설정 절차를 수행(2006)하고 초기 상태 설정 보고 메시지(2007)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 초기화 관리 처리를 종료(2016)한다. 초기화 관리 메시지가 초기 상태 조회 메시지인 경우, 초기 상태 조회 절차를 수행(2008)하고 초기 상태 조회 보고 메시지(2009)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 초기화 관리 처리를 종료(2016)한다. 초기화 관리 메시지가 동기 클럭원 메시지인 경우 동기 클럭원 절차를 수행(2010)하고 동기 클럭원 보고 메시지(2011)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 초기화 관리 처리를 종료(2016)한다. 초기화 관리 메시지가 현재 시간 메시지인 경우, 현재 시간 절차를 수행(2012)하고 현재 시간 보고 메시지(2013)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 초기화 관리 처리를 종료(2016)한다. 초기화 관리 메시지가 방전 조건 메시지인 경우, 방전 조건 절차를 수행(2014)하고 방전 조건 보고 메시지(2015)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 초기화 관리 처리를 종료(2016)한다.If the initialization management message is an initial state setting message, an initial state setting procedure is performed (2006), an initial state setting report message (2007) is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the initialization management process ends ( 2016). If the initialization management message is an initial status inquiry message, an initial status inquiry procedure is performed (2008), an initial status inquiry report message (2009) is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the initialization management process ends ( 2016). If the initialization management message is a synchronous clock source message, the synchronous clock source procedure is performed (2010), a synchronous clock source report message (2011) is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the initialization management process ends (2016). )do. If the initialization management message is the current time message, the current time procedure is performed (2012), the current time report message 2013 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the initialization management process is terminated (2016). . When the initialization management message is the discharge condition message, the discharge condition procedure is performed (2014), the discharge condition report message 2015 is generated, transferred to the operation management unit 200 through the IPC processing unit, and the initialization management process is terminated (2016). .
도 13은 실시간 감시 제어 처리 장치에서 형상 관리 처리부(21)의 일실시 예이다. 형상 관리 처리부는 운용 관리부(200)로부터 IPC 처리부를 통하여 형상 관리 메시지(2102)를 수신한 경우 형상 관리 메시지를 판단(2103)하여, 현재 형상 조회 메시지인 경우 현재 형상 조회 절차를 수행(2104)하고 현재 형상 조회 보고 메시지(2105)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 형상 관리 처리를 종료(2111)한다.13 is an embodiment of the shape management processing unit 21 in the real-time monitoring and control processing device. When the configuration management processor receives the configuration management message 2102 from the operation management unit 200 through the IPC processing unit (2102), and determines the configuration management message (2103), and performs the current configuration inquiry procedure (2104) in the case of the current configuration inquiry message. The current shape inquiry report message 2105 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the shape management process ends 2111.
형상 관리 메시지가 관리 상태 변경 메시지인 경우, 관리 상태 변경 절차를 수행(2106)하고 관리 상태 변경 보고 메시지(2107)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 형상 관리 처리를 종료(2111)한다. 형상 관리 메시지가 보드 실장 메시지인 경우, 초기화 절차를 수행(2108)하고 보드 실장 보고 메시지(2109)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 형상 관리 처리를 종료(2111)한다. 형상 관리 메시지가 보드 탈장 메시지인 경우, 보드 탈장 보고 메시지(2110)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 형상 관리 처리를 종료(2111)한다.If the configuration management message is a management state change message, the management state change procedure is performed (2106), and a management state change report message 2107 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the configuration management process ends ( 2111). If the configuration management message is a board mounting message, an initialization procedure is performed (2108), a board mounting report message 2109 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the configuration management process is terminated (2111). If the configuration management message is a board detachment message, a board detachment report message 2110 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the configuration management process ends 2111.
도 14는 실시간 감시 제어 처리 장치에서 연결 관리 처리부(22)의 일실시 예이다. 연결 관리 처리부는 운용 관리부(200)로부터 IPC 처리부를 통하여 연결 관리 메시지(2202)를 수신한 경우 연결 관리 메시지를 판단(2203)하여, 연결 정보 조회 메시지인 경우, 연결 정보 조회 절차를 수행(2204)하고 연결 정보 보고 메시지(2205)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 연결 관리 처리를 종료(2212)한다.14 is an embodiment of the connection management processor 22 in the real-time monitoring and control processing device. When the connection management processor receives the connection management message 2202 from the operation manager 200 through the IPC processing unit (2203), and determines the connection management message (2203), and performs a connection information inquiry procedure in the case of the connection information inquiry message (2204). Next, a connection information report message 2205 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the connection management processing ends (2212).
연결 관리 메시지가 연결 설정/해제 메시지인 경우, 연결 설정/해제 절차를 수행(2206)하고 연결 설정/해제 보고 메시지(2207)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 연결 관리 처리를 종료(2212)한다. 연결 관리 메시지가 파티 설정/해제 메시지인 경우, 파티 설정/해제 절차를 수행(2208)하고 파티 설정/해제 보고 메시지(2209)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 연결 관리 처리를 종료(2212)한다. 연결 관리 메시지가 연결 블록/블록해제 메시지인 경우, 연결 블록/블록해제 절차를 수행(2210)하고 연결 블록/블록해제 보고 메시지(2211)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 연결 관리 처리를 종료(2212)한다.If the connection management message is a connection establishment / release message, the connection establishment / release procedure is performed (2206), and a connection establishment / release report message (2207) is generated and transmitted to the operation management unit 200 through the IPC processing unit, and connection management processing. End (2212). If the connection management message is a party setup / release message, the party setup / release procedure is performed (2208) and a party setup / release report message (2209) is generated and delivered to the operation management unit 200 through the IPC processing unit, and the connection management processing is performed. End (2212). If the connection management message is a connection block / blocking message, it performs a connection block / blocking procedure (2210), generates a connection block / blocking report message (2211) and delivers it to the operation management unit 200 through the IPC processing unit. The connection management process ends (2212).
도 15는 실시간 감시 제어 처리 장치에서 절체 관리 처리부(23)의 일실시 예이다. 절체 관리 처리부는 운용 관리부(200)나 하드웨어 처리부(910)로부터 절체 관리 메시지(2302)를 수신한 경우, 절체 관리 메시지를 판단(2303)하여 절체 상태 조회 메시지인 경우 절체 상태 절차를 수행(2304)하고, 절체 상태 보고메시지(2305)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 절체 관리 처리를 종료(2310)한다.15 is an embodiment of the switching management processing unit 23 in the real-time monitoring and control processing device. When the transfer management processor receives the transfer management message 2302 from the operation management unit 200 or the hardware processing unit 910, the transfer management message is determined (2303), and when the transfer state inquiry message is a transfer state inquiry message (2304). In addition, the transfer status report message 2305 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the transfer management process ends (2310).
절체 관리 메시지가 장애 인터럽트 보고 메시지인 경우, 절체 절차를 수행(2306)하고 절체 보고 메시지(2307)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 절체 관리 처리를 종료(2310)한다. 연결 관리 메시지가 보드 탈장 메시지인 경우, 절체 절차를 수행(2308)하고 절체 보고 메시지(2309)를 생성하여 IPC 처리부를 통하여 운용 관리부(200)로 전달하고 절체 관리 처리를 종료(2310)한다.When the transfer management message is the fault interrupt report message, the transfer procedure is performed (2306), the transfer report message 2307 is generated and transmitted to the operation management unit 200 through the IPC processing unit, and the transfer management process is terminated (2310). When the connection management message is a board detachment message, the transfer procedure is performed 2308, the transfer report message 2309 is generated and transferred to the operation management unit 200 through the IPC processing unit, and the transfer management process is terminated 2310.
본 발명에 따른 감시 제어 장치 및 방법에 따르면, 계층적인 제어 기능의 구현과 기능 중심적인 처리부의 분할을 통해 ATM-PON OLT 시스템을 확장하더라도 실시간으로 감시 제어 기능을 제공해주는 있는 효과가 있다.According to the monitoring control apparatus and method according to the present invention, even if the ATM-PON OLT system is extended through the implementation of a hierarchical control function and the division of a function-oriented processing unit, there is an effect of providing a monitoring control function in real time.
또한 감시 제어 기능이 모듈 단위의 라인카드를 제어하게 함으로서, 시스템 확장에 따른 제어 프로세서의 비용을 단축시키는 용이한 효과가 있다.In addition, by allowing the supervisory control function to control the module of the line card, there is an easy effect of reducing the cost of the control processor according to the system expansion.
또한, 감시 제어 기능의 구현에 있어서 핵심 기능 중심으로 모듈화 되기 때문에, 구현 비용과 유지 보수 비용을 단축시키는 용이한 효과가 있다.In addition, since it is modularized around the core functions in the implementation of the supervisory control function, it is easy to reduce the implementation cost and maintenance cost.
지금까지 설명은 본 발명의 이해를 위해 적절한 실시예에 대한 것으로, 본 발명이 이것으로 제한되는 것은 아니며, 당 기술분야의 통상의 지식을 가진 자에게는 첨부한 특허청구범위의 범위 및 정신을 벗어나지 않고 다양한 수정 및 변형이가능함은 명백한 것이다.The description so far is directed to the preferred embodiments for the understanding of the invention, and the invention is not limited thereto, and is intended to those skilled in the art without departing from the scope and spirit of the appended claims. It is apparent that various modifications and variations are possible.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020000079076A KR100597194B1 (en) | 2000-12-20 | 2000-12-20 | Surveillant Control Apparatus For ATM-PON OLT System |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020000079076A KR100597194B1 (en) | 2000-12-20 | 2000-12-20 | Surveillant Control Apparatus For ATM-PON OLT System |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020049788A true KR20020049788A (en) | 2002-06-26 |
KR100597194B1 KR100597194B1 (en) | 2006-07-05 |
Family
ID=27683740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020000079076A KR100597194B1 (en) | 2000-12-20 | 2000-12-20 | Surveillant Control Apparatus For ATM-PON OLT System |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100597194B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100404051B1 (en) * | 2001-12-27 | 2003-11-05 | 한국전자통신연구원 | A Method for Operating and Managing the ATM-PON system based on Web by TCP/IP |
KR20030086786A (en) * | 2002-05-07 | 2003-11-12 | 한국전자통신연구원 | Surveillance and Control Method for the ONU of ATM-PON System |
KR100452888B1 (en) * | 2002-12-12 | 2004-10-14 | 한국전자통신연구원 | Optical transfer network management system and Method thereof |
KR100453823B1 (en) * | 2002-12-07 | 2004-10-20 | 한국전자통신연구원 | Method for operation, administration, and maintenance of multiple Ethernet passive optical network and apparatus therefor |
KR100611902B1 (en) * | 2003-11-25 | 2006-08-11 | 엘지노텔 주식회사 | Apparatus For OLT Churning Processing In ATM PON System |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100195059B1 (en) * | 1995-12-30 | 1999-06-15 | 유기범 | Method of Handling Mounting of Low to Low Speed Subscriber Board in ATM Switching System |
KR100205034B1 (en) * | 1996-11-25 | 1999-06-15 | 이계철 | Error administrating method in dans |
KR20000046393A (en) * | 1998-12-31 | 2000-07-25 | 강병호 | Apparatus for controlling public switched telephone network interface unit in fiber loop carrier-curb system |
KR100289581B1 (en) * | 1998-12-31 | 2001-06-01 | 김진찬 | Alarm display signal cell generator of video subscriber unit in optical termination device of demand dense optical subscriber transmission device |
-
2000
- 2000-12-20 KR KR1020000079076A patent/KR100597194B1/en not_active IP Right Cessation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100404051B1 (en) * | 2001-12-27 | 2003-11-05 | 한국전자통신연구원 | A Method for Operating and Managing the ATM-PON system based on Web by TCP/IP |
KR20030086786A (en) * | 2002-05-07 | 2003-11-12 | 한국전자통신연구원 | Surveillance and Control Method for the ONU of ATM-PON System |
KR100453823B1 (en) * | 2002-12-07 | 2004-10-20 | 한국전자통신연구원 | Method for operation, administration, and maintenance of multiple Ethernet passive optical network and apparatus therefor |
KR100452888B1 (en) * | 2002-12-12 | 2004-10-14 | 한국전자통신연구원 | Optical transfer network management system and Method thereof |
KR100611902B1 (en) * | 2003-11-25 | 2006-08-11 | 엘지노텔 주식회사 | Apparatus For OLT Churning Processing In ATM PON System |
Also Published As
Publication number | Publication date |
---|---|
KR100597194B1 (en) | 2006-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2001510605A (en) | Method and system for protecting equipment and switching functions in a telecommunications system | |
KR100597194B1 (en) | Surveillant Control Apparatus For ATM-PON OLT System | |
US20070286207A1 (en) | Hybrid IP/ATM NT and method of providing hybrid IP/ATM network termination | |
CN100502431C (en) | Voice information system | |
JP6236488B2 (en) | Station side optical line termination device, redundant device switching method, and redundant device switching program | |
KR20030086786A (en) | Surveillance and Control Method for the ONU of ATM-PON System | |
KR20050023703A (en) | System and method for managing and controlling of ethernet passive optical access network | |
KR100299167B1 (en) | Multiplexing method of signalling No.7 link traffic at traveling of signalling No.7 message in public switched telephone network | |
CN111464887A (en) | ONU registration authorization management method and device applied to PON system | |
KR100431192B1 (en) | An EMS for operating a management and operating information of an ATM-PON Access Network | |
US7518981B1 (en) | Method and system for a graceful reroute of connections on a link | |
KR20020051614A (en) | The OA&M Mechanism For ATM-PON Acess Network | |
KR100211023B1 (en) | Atm service node apparatus supporting hyper-speed application service and operating method thereof | |
KR100440589B1 (en) | A Management and Control Method of ONT for ATM-PON System | |
KR100238432B1 (en) | Frame relay pvc management interworking method in an atm switching system | |
KR930006034B1 (en) | Message transfer part system by common channelling method | |
KR100391174B1 (en) | Appararus And Method For Message Processing In Advanced Intelligent Network | |
KR100241355B1 (en) | Real time oam processor | |
KR100233826B1 (en) | Method of accepting connection of call in atm switching system | |
KR100678259B1 (en) | Apparatus and method for switching mixed and equiped boards in fiber loop carrier system | |
KR100216578B1 (en) | Method for controlling starting/restarting of message transfer part level 3 and signal aal in distributed atm exchanger | |
KR100411250B1 (en) | A SYSTEM AND METHOD FOR OPERATING AN ATM-PON(Asynchronous Transfer Mode-Passive Optical Network) | |
KR100366540B1 (en) | Access switching system with distributed no.7 signalling function and initialization and restoration method of sshp in ass-t | |
KR19980027456A (en) | Subscriber Matching Device of Electronic Switching System | |
KR100194816B1 (en) | Call Control Method in Subscriber Unit of Public Communication Network of Asynchronous Transfer Mode Switching System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110609 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |