KR20020005066A - Labor management system and method in construction site - Google Patents
Labor management system and method in construction site Download PDFInfo
- Publication number
- KR20020005066A KR20020005066A KR1020000037194A KR20000037194A KR20020005066A KR 20020005066 A KR20020005066 A KR 20020005066A KR 1020000037194 A KR1020000037194 A KR 1020000037194A KR 20000037194 A KR20000037194 A KR 20000037194A KR 20020005066 A KR20020005066 A KR 20020005066A
- Authority
- KR
- South Korea
- Prior art keywords
- information
- management system
- laborer
- commute
- data
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/14—Digital output to display device ; Cooperation and interconnection of the display device with other functional units
Abstract
Description
본 발명은 건설 현장에서 노무자를 관리하는 시스템 및 방법에 관한 것으로서, 특히 건설 현장에서 일하는 노무자의 출퇴근 시간을 자동적으로 관리함으로서 현장의 인건비의 정확성 및 신뢰성을 높일 수 있는 시스템 및 방법에 대한 것이다.The present invention relates to a system and method for managing laborers at a construction site, and more particularly to a system and method that can increase the accuracy and reliability of labor costs on site by automatically managing the commute time of laborers working at the construction site.
일반적으로, 건설 회사가 특정 사업을 수주하면, 건설 현장은 본사와 거리적으로 떨어져 있는 것이 통례이고, 또한 그 사업에 소요되는 경비의 대부분은 건설 현장에서 발생하는 것이다. 따라서, 건설 회사는 건설 현장의 관리에 엄청난 노력을 기울일 수밖에 없게 된다.In general, when a construction company wins a particular business, it is customary for the construction site to be distanced from the head office, and most of the expenses for the business are incurred at the construction site. Therefore, construction companies are forced to make tremendous efforts in the management of construction sites.
따라서, 건설 현장의 관리는 본사 파견 관리자에 의해서 거의 이루어지게 되는데, 이러한 파견 관리자는 수많은 노무자와 관련된 모든 정보를 일일이 확인하고, 이를 본사로 전달해야 하기 때문에, 현장 관리에 필요한 파견 관리자의 수는 점점 늘어나게 된다. 또한 파견 관리자들이 노무자들의 출퇴근 시간을 정확히 확인한다는 것이 거의 불가능하기 때문에, 근무하는 시간에 대한 비용을 회사가 지출하게 되는 경우도 발생한다. 상술한 바와 같이, 건설 회사가 건설 현장의 관리를 위해 부담하는 인력 및 비용은 상당한 것에 해당한다.Therefore, the management of the construction site is almost done by the head office dispatch manager. Since the dispatch manager must check all the information related to numerous laborers and transmit it to the head office, the number of dispatch managers required for the site management is gradually increasing. Will increase. In addition, it is almost impossible for dispatch managers to accurately check the time of their workers' commute, resulting in companies paying for their time. As mentioned above, the manpower and costs that a construction company bears for the management of a construction site are considerable.
따라서, 이러한 종래 관리 방식의 문제점에 착안한, 본 발명은 현장 파견 관리자의 수를 증가시킴이 없이도, 신뢰성 있는 현장 관리를 가능하게 하는 노무 관리 시스템을 제공하는 것을 목적으로 한다.Accordingly, it is an object of the present invention, which focuses on the problems of the conventional management method, to provide a labor management system that enables reliable field management without increasing the number of field dispatch managers.
본 발명의 또 다른 목적은 건설 현장에서 현장 관리 시스템을 설치하고, 본사에는 중앙 관리 시스템을 설치하며, 현장 관리 시스템과 중앙 관리 시스템은 온라인 또는 오프라인으로 연결되어 데이터 정보를 상호 교환하는 것을 특징으로 하는 노무 관리 시스템을 제공하는 것이다.Still another object of the present invention is to install a site management system at the construction site, install a central management system in the head office, the site management system and the central management system is characterized in that the online or offline connection to exchange data information It is to provide a labor management system.
본 발명의 또 다른 목적은 건설 현장에 설치되는 현장 관리 시스템에는 노무자들의 출퇴근을 자동적으로 확인할 수 있는 수단을 구비하는 것을 특징으로 하는 노무 관리 시스템을 제공하는 것이다.Another object of the present invention is to provide a labor management system, characterized in that the site management system installed on the construction site is provided with a means for automatically checking the commute of laborers.
본 발명의 또 다른 목적은 노무자의 출퇴근을 자동으로 확인하는 수단에는 노무자의 출퇴근 시간 정보 및 이를 입증할 수 있는 노무자의 얼굴 사진을 입수할 수 있도록 것을 특징으로 하는 노무 관리 시스템을 제공하는 것이다.Still another object of the present invention is to provide a labor management system, characterized in that the means for automatically checking the laborer's commute to obtain the laborer's commute time information and a face photo of the laborer who can prove the same.
도 1은 본 발명에 따른 노무 관리 시스템의 전체적인 구성을 도시한 블럭도.1 is a block diagram showing the overall configuration of a labor management system according to the present invention.
도 2는 도 1의 현장 관리 시스템(101)의 세부 구성을 도시한 블럭도.FIG. 2 is a block diagram showing the detailed configuration of the site management system 101 of FIG.
도 3은 현장 관리 시스템(101)에서 중앙 관리 시스템(103)으로 전송되는 데이터 포맷의 기본 정보 내용을 도시한 도면.3 is a diagram showing basic information contents of a data format transmitted from the field management system 101 to the central management system 103. FIG.
도 4는 본 발명에 따른 출퇴근 확인 수단(102)의 세부 구성을 도시한 블럭도.4 is a block diagram showing the detailed configuration of the commute check means 102 according to the present invention.
도 5는 본 발명에 따른 중앙 관리 시스템(103)의 구성을 도시하는 블럭도.5 is a block diagram showing the configuration of the central management system 103 according to the present invention.
도 6은 본 발명에 따른 노무 관리 시스템의 전체적인 동작 관계를 도시한 흐름도.6 is a flow chart showing the overall operational relationship of the labor management system according to the present invention.
도 7은 도 6의 단계 601의 세부 단계를 도시한 흐름도.7 is a flowchart showing the detailed steps of step 601 of FIG.
도 8은 본 발명에 따른 노무 관리 시스템의 동작에 대한 또다른 실시예를 도시한 흐름도.8 is a flowchart illustrating another embodiment of the operation of the labor management system according to the present invention.
이하에서, 도면을 참조하여 본 발명을 자세히 설명할 것이다.Hereinafter, the present invention will be described in detail with reference to the drawings.
도 1은 본 발명에 따른 노무 관리 시스템의 전체적인 구성을 도시하고 있다. 우선, 노무 관리 시스템은 다수의 건설 현장에 각각 설치되는 현장 관리 시스템(101)과 건설 회사 본사에 위치하는 중앙 관리 시스템(103)으로 구분할 수 있으며, 각각의 현장 관리 시스템(101)에는 다수의 출퇴근 확인 수단(102)과 연결되어 있다. 즉, 건설 현장 하나에는 현장 관리 시스템(101)이 하나 설치되어 있지만, 건설 현장의 규모에 따라서, 출퇴근 확인 수단은 두개 이상 둘 수도 있다.1 shows the overall configuration of a labor management system according to the present invention. First, the labor management system may be divided into a site management system 101 installed at each of a plurality of construction sites and a central management system 103 located at a construction company headquarters, and each site management system 101 has a plurality of commute to and from work. It is connected with the confirmation means 102. That is, although one site management system 101 is installed in one construction site, two or more commute checking means may be provided depending on the scale of the construction site.
그 동작을 살펴보면, 건설 현장에서 노무자들은 출퇴근 확인 수단(102)을 통해 자신들의 출근 여부 및 출퇴근 시간에 관한 정보를 제공하고, 이러한 정보는 현장 관리 시스템으로 전송되어 일시 저장되게 된다. 그후, 현장 관리 시스템은 건설 회사의 본사의 중앙 관리 시스템으로 저장한 정보를 전송하게 되고, 이렇게 전송된 정보는 중앙 관리 시스템에서 처리되고 저장된다.Looking at the operation, the laborers at the construction site through the commute check means 102 to provide information about their commute and time to work, such information is transmitted to the site management system is to be temporarily stored. Thereafter, the site management system transmits the stored information to the central management system of the head office of the construction company, and the transmitted information is processed and stored in the central management system.
상술한 동작을 통하여, 건설 회사 측에서는 건설 현장의 노무자들의 출퇴근 관리를 자동적으로 할 수 있게 되며, 또한 수집된 정보를 수작업을 거치지 않고 자동적으로 본사로 전송되게 되므로서, 건설 현장 관리에 들어가는 관리 인력이나 비용의 절감을 가져 올 수 있게 된다.Through the above operation, the construction company can automatically manage the commute of the laborers of the construction site, and the collected information is automatically transferred to the head office without manual work, so that the management personnel who enter the construction site management or This can result in cost savings.
도 2는 도 1의 현장 관리 시스템(101)의 세부 구성을 도시한 블럭도이다. 현장 관리 시스템(101)은 수신부(201), 현장 관리 시스템 처리부(202), 메모리(203), 및 전송 수단(204)으로 구성되어 있다.FIG. 2 is a block diagram showing the detailed configuration of the site management system 101 of FIG. The site management system 101 is composed of a receiver 201, a site management system processing unit 202, a memory 203, and a transmission means 204.
우선, 수신부(201)는 외부로부터 전송되는 데이터 정보를 수신하는 기능을 수행하는 것으로서, 상기 외부라 함은 출퇴근 확인 수단(102) 및 중앙 관리 시스템(103)에 해당한다. 현장 관리 시스템 처리부(202)는 수신부(201)에서 수신한 출퇴근 확인 수단(102)로부터의 정보를 처리하는 기능을 수행하며, 나아가 현장 관리 시스템(101) 전체 구성 요소들을 제어하는 기능도 수행한다.First, the reception unit 201 performs a function of receiving data information transmitted from the outside, and the outside corresponds to the commute confirmation means 102 and the central management system 103. The site management system processing unit 202 performs a function of processing information from the commute check means 102 received by the reception unit 201, and also controls the entire components of the site management system 101.
메모리(203)는 현장 관리 시스템 처리부(202)에서 처리된 정보를 저장하는 기능을 수행한다. 전송 수단(204)은 메모리(203)에 저장된 데이터 정보를 중앙 관리 시스템(103)으로 전송하는 기능을 수행하고, 특히 전송 수단(204)은 중앙 관리 시스템(103)과 온라인으로 연결되어 있을 수도 있고, 필요에 따라서 연결될 수도 있다. 그리고, 전송 수단(204)은 중앙 관리 시스템(103)과 데이터 전송을 위한 정해진 프로토콜을 공유한다.The memory 203 performs a function of storing the information processed by the field management system processing unit 202. The transmitting means 204 performs the function of transmitting the data information stored in the memory 203 to the central management system 103, in particular the transmitting means 204 may be connected to the central management system 103 online. If necessary, it may be connected. Then, the transmission means 204 share a predetermined protocol for data transmission with the central management system 103.
상술한 구성의 전체 동작을 살펴보면, 현장 관리 시스템 처리부(202)는 수신부(201)에서 수신된 데이터 정보를 처리하여, 노무자별로 하나의 데이터 패킷으로 재구성하는데, 본 발명에 따른 바람직한 데이터 패킷은 도 3에 도시된 바와 같다. 데이터 패킷은 노무자의 ID 정보, 노무자의 얼굴 사진 정보, 출퇴근 시간 정보 및 건설 현장의 식별 코드를 반드시 포함하게 된다. 여기서, 노무자의 얼굴 사진 정보를 포함시킨 것은, 해당 노무자 본인이 직접 건설 현장에 있었는지를 확인하는 보조 장치로서 요구하게 된다.Looking at the overall operation of the above-described configuration, the field management system processing unit 202 processes the data information received from the receiving unit 201, and reconstructs one data packet for each laborer, the preferred data packet according to the present invention is shown in FIG. As shown in. The data packet must include the ID information of the laborer, the photograph of the face of the laborer, the commute time information, and the identification code of the construction site. Here, including the face photograph information of the laborer is required as an auxiliary device for confirming whether the laborer himself is at the construction site.
또한, 본 발명의 바람직한 실시예에 따르면, 현장 관리 시스템 처리부(202)는 수신된 데이터를 코딩하거나 암호화하여 메모리(203)에 저장할 수도 있다. 만약, 상기 코딩이 에러 정정 코딩인 경우에는, 전송되는 데이터 정보에 전송상의 에러를 정정할 수 있는 정보가 포함될 수 있다. 또한, 암호화된 경우에는 상기 도 3에서 도시된 전송되는 정보가 물리적으로 구분되지 않을 수도 있다.In addition, according to a preferred embodiment of the present invention, the field management system processing unit 202 may code or encrypt the received data and store it in the memory 203. If the coding is error correction coding, the information for correcting an error in transmission may be included in the transmitted data information. In addition, when encrypted, the transmitted information shown in FIG. 3 may not be physically distinguished.
여기에서, 현장 관리 시스템 처리부(202)는 저장된 데이터를 전송부(204)를 통하여, 중앙 관리 시스템(103)으로 전송하게 되는데, 이 경우에 현장 관리 시스템 처리부(202)가 데이터가 처리됨과 동시에 바로 온 라인으로 전송될 수도 있고, 아니면 여러 노무자에 대한 정보를 수집하여 전송할 수도 있다. 바람직한 실시예에 따르면, 현장 관리 시스템 처리부(202)는 중앙 관리 시스템(103)으로부터의 데이터 정보 전송 요구에 응답하여 메모리(203)에 저장된 데이터 정보를 전송부(204)를 통하여 전송할 수 있다.Here, the site management system processing unit 202 transmits the stored data to the central management system 103 through the transmission unit 204. In this case, the site management system processing unit 202 immediately processes the data. It can be sent online, or it can collect and transmit information on several laborers. According to a preferred embodiment, the field management system processing unit 202 may transmit the data information stored in the memory 203 through the transmission unit 204 in response to a data information transmission request from the central management system 103.
도 4는 본 발명에 따른 출퇴근 확인 수단(102)의 세부 구성을 도시한 블럭도이다. 출퇴근 확인 수단(102)은 카드 입력부(401), 카드 감지부(402), 시간 정보제공부(403), 출퇴근 확인 수단 처리부(404), 카메라 제어 수단(405), 디지털 카메라(406), 출력용 버퍼(407), 및 전송부(408)로 구성된다.4 is a block diagram showing the detailed configuration of the commute check means 102 according to the present invention. The commute confirmation means 102 is a card input unit 401, card detection unit 402, time information providing unit 403, commute confirmation means processing unit 404, camera control means 405, digital camera 406, for output It consists of a buffer 407 and a transmitter 408.
카드 입력부(401)는 노무자 개인에게 건설 회사가 지급한 ID 카드의 정보를 입력받는 수단이다. 본 발명의 바람직한 실시예에 따르면, 상기 ID 카드는 bar-code 카드, 자기 테이프에 정보를 저장한 카드, 정보를 IC 칩에 저장한 IC 칩 카드 등을 포함할 수 있기 때문에, 상기 카드 입력부(401)는 ID 카드의 종류에 따른, 정보 입력 수단을 달리하도록 구성할 수 있다.The card input unit 401 is a means for receiving information on an ID card provided by a construction company to an individual worker. According to a preferred embodiment of the present invention, since the ID card may include a bar-code card, a card storing information on a magnetic tape, an IC chip card storing information on an IC chip, and the like, the card input unit 401 ) May be configured to vary information input means according to the type of ID card.
카드 감지부(402)는 카드 입력부(401)에 ID 카드 정보가 입력되었는가를 감지하는 기능을 하고, ID 카드 정보가 감지된 경우는 출퇴근 확인 수단 처리부(404)로 ID 카드 정보가 전송하고, 또한 출퇴근 확인 수단 처리부(404)에 디지털 카메라(406)를 사용에 노무자의 얼굴 사진을 찍도록 요청하는 신호를 전송한다.The card detecting unit 402 functions to detect whether ID card information is input to the card input unit 401, and if ID card information is detected, transmits the ID card information to the commute checking means processing unit 404. The commute confirmation means processing unit 404 transmits a signal requesting to take a picture of the laborer's face using the digital camera 406.
이 경우에, 출퇴근 확인 수단 처리부(404)는 입력된 ID 카드 정보를 출력용 버퍼(407)에 저장하고, 카메라 제어 수단(405)를 제어하여 디지털 카메라(406)가 동작하도록 한다. 카메라 제어 수단(405)은 출퇴근 확인 수단 처리부(404)로부터 수신된 제어 신호에 응답하여, 디지털 카메라(406)가 노무자의 얼굴 사진을 찍도록 제어하는 기능을 수행하는데, 그 구체적인 기능은 디지털 카메라(406)의 셔터를 동작시키는 방식으로 구성될 수 있다.In this case, the commute checking means processor 404 stores the input ID card information in the output buffer 407 and controls the camera control means 405 so that the digital camera 406 operates. The camera control means 405 controls the digital camera 406 to take a picture of the laborer's face in response to the control signal received from the commute checking means processor 404. 406 may be configured to operate the shutter.
디지털 카메라(406)는 카메라 제어 수단(405)의 제어 하에 노무자의 얼굴 사진을 찍게 되고, 노무자의 얼굴 정보를 담고 있는 디지털 영상 데이터를 출퇴근 확인 수단 처리부(404)로 전송하게 된다. 이렇게 전송된 디지털 영상 데이터는 출력용 버퍼(407)에 저장된다.The digital camera 406 takes a picture of the laborer's face under the control of the camera control means 405, and transmits the digital image data containing the laborer's face information to the commute checking means processor 404. The digital image data thus transmitted is stored in the output buffer 407.
또한, 출퇴근 확인 수단 처리부(404)는 노무자가 ID 카드를 입력하거나, 얼굴 사진을 찍는 시간을 시간 정보 제공부(403)로 부터 전송 받을 수 있고, 이러한 정보는 다른 정보와 마찬가지로 출력용 버퍼(407)에 저장된다.In addition, the commute check means processing unit 404 may receive a time for the laborer to enter the ID card or take a picture of the face from the time information providing unit 403, this information is output buffer 407 like other information Are stored in.
출력용 버퍼(407)에 저장된 정보는 전송부(408)를 거쳐 현장 관리 시스템(101)의 수신부(201)로 전송된다.The information stored in the output buffer 407 is transmitted to the receiver 201 of the field management system 101 via the transmitter 408.
도 5는 본 발명에 따른 중앙 관리 시스템(103)의 구성을 도시하는 블럭도이다. 중앙 관리 시스템(103)은 서버(501), 제어부(502), 설정 입력부(503), 디스플레이 부(504), 및 데이터 베이스(505)로 구성된다.5 is a block diagram showing the configuration of the central management system 103 according to the present invention. The central management system 103 is composed of a server 501, a control unit 502, a setting input unit 503, a display unit 504, and a database 505.
서버(501)는 도 1에서 설명한 바와 같이, 다수의 건설 현장의 현장 관리 시스템(101)과 접속하고, 현장 관리 시스템(101)으로 부터 전송된 데이터 정보를 수신하는 역할을 수행한다.As described with reference to FIG. 1, the server 501 is connected to the site management system 101 of a plurality of construction sites, and serves to receive data information transmitted from the site management system 101.
제어부(502)는 서버(501)에서 수신된 데이터 정보를 처리하여, 이를 데이터 베이스(505)에 저장하는 역할을 수행한다. 데이터 베이스(505)는 건설 현장별로 구분되어 있고, 각각의 건설 현장 내에서는 노무자의 이름 별로 구분되어 있다. 또한, 각각의 노무자 별로 할당된 영역에는 노무자의 기본적인 신상 정보, 즉 주민등록 번호, 주소, 연락처 등의 정보를 저장하고 있으며, 노무자의 얼굴 사진을 저장하고 있다. 또한, 출퇴근 여부 및 출퇴근 시간 등의 정보, 업무 종류, 수당, 근무 년차, 기타 관리 정보를 체계적으로 저장할 수 있는 영역도 설정되어 있다. 본 발명의 바람직한 실시예에 따르면, 데이터 베이스(505)에 저장된 출근 여부 확인정보는 달력 형식의 테이블 형식으로 설정될 수 있고, 매일 매일의 출근 여부 확인 수단으로서, 수신된 노무자의 얼굴 사진을 삽입하는 방식으로 구성될 수 있다.The controller 502 processes the data information received from the server 501 and stores the data information in the database 505. The database 505 is divided by construction sites, and is divided by laborer's name in each construction site. In addition, in the area allocated to each laborer, basic personal information of the laborer, that is, information such as social security number, address, and contact information, is stored, and a face photograph of the laborer is stored. In addition, an area for systematically storing information such as commute time and commute time, work type, allowance, working year, and other management information is also set. According to a preferred embodiment of the present invention, the attendance check information stored in the database 505 may be set in a table format of the calendar form, as a means for checking the daily work attendance, inserting a face photograph of the received laborer Can be configured in a manner.
설정 입력부(503)는 데이터 베이스(505)에 저장된 노무자별 정보의 추가· 수정·삭제를 요청하는 입력 수단으로서, 예를 들어 새로 현장에 투입된 노무자가 있는 경우에는 이를 위한 할당 영역을 구축하도록 제어부(502)에 요청하고, 또한 노무자의 수당에 변화가 생긴 경우에 저장된 수당 치를 변경하도록 요청하는 등의 건설 회사의 관리자가 전체 시스템을 관리하게 위하여 취하는 행위의 입력 수단으로 기능 한다.The setting input unit 503 is an input unit for requesting the addition, modification, and deletion of information for each laborer stored in the database 505. For example, when there is a newly introduced laborer, the setting input unit 503 controls the controller to establish an allocation area therefor. 502) and a manager of a construction company, such as requesting to change a stored allowance value when a worker's allowance is changed, serves as an input means for actions taken to manage the entire system.
또한, 설정 입력부(503)는 데이터 베이스(505)에 저장된 데이터를 디스플레이 부(504)를 통해 보고자 할 경우에 이를 요청하는 기능도 구비하게 되는데, 이러한 요청이 들어온 경우에는 제어부(502)는 데이터 베이스(505)를 검색하여, 필요한 자료를 찾아내고, 이를 필요한 포맷으로 변경하거나 수정하여 디스플레이부(504)에 제공하게 된다. 물론, 디스플레이부(504)에 도시된 정보를 보고, 그 수치의 수정 내지는 삭제를 원할 경우에도 설정 입력부(503)를 통하게 된다.In addition, the setting input unit 503 also has a function for requesting this when the data stored in the database 505 is to be viewed through the display unit 504. When such a request is received, the control unit 502 may include a database. Search 505 to find the necessary material, change or modify it to the required format and provide it to the display unit 504. Of course, when the information shown in the display unit 504 is viewed, and the user wants to correct or delete the numerical value, the setting input unit 503 is passed.
도 6은 도 1 내지 도 5를 참조하여 설명한 노무 관리 시스템의 전체적인 동작 관계를 도시한 흐름도이다.FIG. 6 is a flowchart illustrating an overall operation relationship of the labor management system described with reference to FIGS. 1 to 5.
우선, 노무자들의 출퇴근 여부를 출퇴근 확인 수단을 사용하여 확인하게 되는데, 출퇴근 확인 수단은 노무자들의 정보 제공에 의하여, 노무자들의 인적 사항 및 사진을 포함하는 출퇴근 정보를 수신하게 된다(s601). 그리고, 출퇴근 확인 수단은 수신된 출퇴근 정보에 시간 정보를 더하여, 이를 취합하고 현장 관리 시스템으로 전송하게 된다(s602). 이러한 과정에서는 특정 노무자에 대한 정보를 다른 노무자 정보와 분리하여 전송하게 된다.First, whether or not laborers commute is checked using a commute check means, and the commute check means receives the commute information including personal information and pictures of the laborers by providing the information of the laborers (s601). The commute check means adds time information to the received commute information, collects them, and transmits them to the site management system (S602). In this process, information on a specific laborer is transmitted separately from other laborer information.
현장 관리 시스템은 전송된 데이터를 수신하고, 이에 필요한 처리를 한 후 메모리에 저장하게 되는데(s603), 상기 필요한 처리는 수신된 데이터에 건설 현장의 고유 식별 코드를 부가하는 단계가 포함되고, 나아가 전체 데이터에 대하여 에러 정정 코딩을 위한 에러 체크 비트를 부가할 수도 있으며, 더 나아가 코딩된 데이터를 암호화하는 과정을 포함할 수도 있다.The site management system receives the transmitted data, performs the necessary processing, and stores the stored data in the memory (s603). The necessary processing includes adding a unique identification code of the construction site to the received data. Error check bits for error correction coding may be added to the data, and may further include encrypting the coded data.
현장 관리 시스템은 중앙 관리 시스템의 요청에 응답하여 메모리에 저장된 데이터 정보를 중앙 관리 시스템으로 전송하게 된다(s604). 그리고, 중앙 관리 시스템은 데이터 베이스에 구축된 정보 분류에 알맞게, 수신한 데이터를 처리하고, 이를 데이터 베이스에 저장하게 된다(s605).The site management system transmits the data information stored in the memory to the central management system in response to the request of the central management system (S604). The central management system then processes the received data and stores it in the database in accordance with the classification of information built into the database (S605).
중앙 관리 시스템의 관리자는 데이터 베이스에 저장된 데이터 정보의 추가 ·변경·삭제 권한을 가지게 되고, 이러한 동작을 위해서 중앙 관리 시스템은 설정 입력부를 구비하게 된다. 따라서, 중앙 관리 시스템의 관리자가 설정 입력부에 데이터 정보의 추가,변경 또는 삭제를 요구하는 행위를 한 경우에 있어서는, 이러한 외부 요구에 응답하여 데이터 베이스내의 정보를 추가, 변경 또는 삭제 처리를 하게 된다(s606). 또한, 중앙 관리 시스템의 관리자가 데이터 베이스에 저장된 데이터 정보를 보기를 원하는 경우에는 이를 출력하여 디스플레이 하는 기능도 갖게 된다(s607).The administrator of the central management system has the authority to add, change, and delete data information stored in the database. The central management system includes a setting input unit for such an operation. Therefore, in the case where the administrator of the central management system has requested to add, change or delete the data information to the setting input unit, the information in the database is added, changed or deleted in response to the external request ( s606). In addition, if the administrator of the central management system wants to view the data information stored in the database, it also has a function of outputting and displaying the data (s607).
도 6을 참조하여, 상기에서 설명한 단계 601은 여러 구체적인 단계로 구분될수 있는데, 이러한 세부 단계에 대한 흐름도가 도 7에 도시되어 있다. 이하에서, 구체적인 흐름도를 도 4 및 도 7을 참조하여 설명하겠다.Referring to FIG. 6, the above-described step 601 may be divided into several specific steps, and a flowchart of these detailed steps is illustrated in FIG. 7. Hereinafter, a detailed flowchart will be described with reference to FIGS. 4 and 7.
우선, 노무자들 각자의 신상 명세서를 저장하고 있는 ID 카드 정보를 수신하면(s701), 이에 응답하여 디지털 카메라를 제어해 사진을 찍도록 요청하고, 이미 수신된 ID 카드 정보를 출력용 버퍼에 저장한다(s702). 그 다음은 디지털 카메라가 노무자의 얼굴 사진을 찍게 되고, 이렇게 찍은 이미지 정보를 수신하게 되고, 수신된 이미지 정보는 마찬가지로 출력용 버퍼에 저장된다(s703). 그리고, 이어지는 단계는 노무자가 출근한 시간 즉, ID 카드를 입력하거나, 얼굴 사진을 찍게 된 시간을 입력받게 되는데, 이렇게 입력된 시간 정보도 출력용 버퍼에 저장된다(s704). 그리고, 난후 출력용 버퍼에 저장된 데이터를 모두 현장 관리 시스템으로 전송하게 된다(s705).First, when the laborers receive the ID card information storing their personal details (s701), in response to the control of the digital camera request to take a picture, and stores the already received ID card information in the output buffer ( s702). Next, the digital camera takes a picture of the face of the laborer, receives the image information thus obtained, and the received image information is similarly stored in the output buffer (s703). Subsequently, in the subsequent step, the time at which the laborer goes to work, that is, inputting an ID card or taking a picture of a face, is received. The input time information is also stored in the output buffer (s704). After that, all data stored in the output buffer is transmitted to the field management system (s705).
상기의 5단계를 거쳐서, 도 6에 도시된 단계 601의 출퇴근 확인 수단을 이용해 노무자의 출퇴근 정보를 수신하는 단계가 모두 수행되게 된다.Through the above five steps, all of the steps of receiving the laborer's commute information by using the commute confirmation means of step 601 shown in FIG.
그러나, 여기서, 도 7에 도시된 흐름도 중에서, 단계 704는 일반적으로 ID 카드를 입력한 시간과 디지털 카메라가 작동하여 얼굴 사진을 찍게 되는 시간간의 차이는 거의 존재하지 않기 때문에, 실시예에 따라서, 단계 701과 단계 702 사이에 위치할 수도 있고, 또는 단계 702와 단계 703사이에 위치하도록 구성될 수 있다.However, here, in the flowchart shown in FIG. 7, step 704 is generally a step between the time when the ID card is input and the time when the digital camera is operated to take a face picture, according to an embodiment, according to the embodiment. It may be located between 701 and step 702, or may be configured to be located between step 702 and step 703.
도 8은 본 발명에 따른 노무 관리 시스템의 동작에 대한 또다른 실시예를 도시하고 있다. 전체적인 구성은 기본적으로 도 6 및 도 7에 도시된 내용과 일치하게 되고, 다만 차이가 나는 부분은 도 6에 도시된 단계 603과 단계 604가 또 다른단계로 대체된다는 것이다. 그 이외의 처리 과정은 동일하게 된다.8 shows another embodiment of the operation of the labor management system according to the present invention. The overall configuration basically coincides with the contents shown in Figs. 6 and 7, except that the difference is that step 603 and step 604 shown in Fig. 6 are replaced by another step. The other processes are the same.
특이점만을 살펴보면, 출퇴근 확인 수단에서 수신한 정보는 취합되어 현장 관리 시스템으로 전송되게 되는데(s801, s802), 그 후, 이 데이터를 전송에 알맞은 포맷으로 변환한 후 메모리에 저장하지 않고 바로 중앙 관리 시스템으로 전송하게 된다(s803). 이렇게 바로 전송할 수 있는 것은, 현장 관리 시스템과 중앙 관리 시스템이 온 라인으로 항상 연결되어 있는 구성 하에서 이루어 질 수 있다. 그리고, 현장 관리 시스템이서 수행되는 전송에 알맞은 포맷으로의 변환은 상술한 도 6의 단계 603에서 설명한 코딩 및 암호화를 포함할 수 있다.Looking only at the singularity, the information received from the commute check means is collected and transmitted to the field management system (s801, s802). After that, the data is converted into a format suitable for transmission, and the central management system is not stored in memory. It is transmitted to (s803). This direct transmission can be achieved in a configuration where the field management system and the central management system are always connected online. The conversion to a format suitable for transmission performed by the field management system may include coding and encryption described in step 603 of FIG. 6 described above.
그 후, 이어지는 단계는 도 6에 도시된 단계와 동일하다. 따라서, 도 6과 관련하여 상술한 내용을 참조하면 된다.Thereafter, the following steps are the same as those shown in FIG. Thus, reference may be made to the foregoing description with respect to FIG. 6.
상기에서 설명한 본 발명에 따른 노무 관리 시스템의 구성 및 동작은 본 발명의 요지를 벗어나지 않는 한 당업자에 의해 수정 또는 변경될 수 있다.The configuration and operation of the labor management system according to the present invention described above may be modified or changed by those skilled in the art without departing from the gist of the present invention.
상술한 바와 같이 구성된, 노무 관리 시스템에서는 건설 현장에서 노무자들이 출근 시와 퇴근 시에 자신의 ID 카드를 출퇴근 확인 수단에 입력하고, 이와 동시에 자신의 얼굴 사진을 찍게 되므로, 건설 회사 본사와 거리적으로 멀리 떨어져 있는 건설 현장에서의 노무자들의 출퇴근 여부를 확인할 수 있으며, 또한 출퇴근 시간 정보도 확보할 수 있으므로, 총 근무 시간을 정확히 산정할 수 있어서 수당 등의 급여 체계의 정확성 및 공정성을 기할 수 있게 된다. 나아가, 이렇게 수집된 정보가 건설 회사 본사로 전송되어 자동적으로 저장되기 때문에, 건설 회사가 건설 현장의 관리를 위해 소요되는 경비의 절감을 불러올 수 있다.In the labor management system configured as described above, the laborers at the construction site enter their ID card into the commute to confirm the commute and at the same time take a picture of their face at the construction site, so that the construction company headquarters It is possible to check whether workers are commuting from construction sites far apart, and also to get time information, so that the total working hours can be accurately calculated, allowing the accuracy and fairness of the pay system, such as allowances. Furthermore, since the collected information is transmitted to the construction company headquarters and automatically stored, the construction company can bring about a reduction in expenses required for the management of the construction site.
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020000037194A KR20020005066A (en) | 2000-06-30 | 2000-06-30 | Labor management system and method in construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020000037194A KR20020005066A (en) | 2000-06-30 | 2000-06-30 | Labor management system and method in construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20020005066A true KR20020005066A (en) | 2002-01-17 |
Family
ID=19675434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020000037194A KR20020005066A (en) | 2000-06-30 | 2000-06-30 | Labor management system and method in construction site |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20020005066A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100688115B1 (en) * | 2006-01-11 | 2007-03-02 | (주)이음티앤에스 | System for managing human |
US7890334B2 (en) | 2006-02-14 | 2011-02-15 | Samsung Electronics Co., Ltd. | System and method for controlling voice detection of network terminal |
CN105139110A (en) * | 2015-08-10 | 2015-12-09 | 杭州班博科技有限公司 | Construction enterprise field labor service information synchronization method and system |
KR20170119613A (en) | 2016-04-19 | 2017-10-27 | 김정훈 | Apparatus and method for generating electronic employment contract, and labor management system and method using the electronic employment contract |
WO2018084370A1 (en) * | 2016-11-01 | 2018-05-11 | 순천대학교 산학협력단 | System for identifying worker in smart greenhouse by using beacon |
KR20200006514A (en) | 2019-11-27 | 2020-01-20 | 김정훈 | Labor management method and system for short-time workers |
KR20200111611A (en) * | 2019-03-19 | 2020-09-29 | 김재영 | System for enterprise resource planning comprising workers, works managing function and construction site managing function using computer-implemented calendar |
CN114120462A (en) * | 2021-10-11 | 2022-03-01 | 合肥优尔电子科技有限公司 | Self-adaptive pushing system and method for labor real-name system data based on supervision platform |
KR20220063692A (en) | 2020-11-10 | 2022-05-17 | 주식회사 자버 | Apparatus and method for generating employment contract |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR920013174A (en) * | 1990-12-19 | 1992-07-28 | 정대영 | Time and Attendance System Using Smart Card |
KR950004028A (en) * | 1993-07-10 | 1995-02-17 | 김혁 | Access Control & T & A System |
KR950015107A (en) * | 1993-11-18 | 1995-06-16 | 이재명 | Wireless recognition device for commuting and in-house work management |
JPH08235248A (en) * | 1995-02-23 | 1996-09-13 | Fujita Corp | Labor management system |
KR19980039848A (en) * | 1996-11-28 | 1998-08-17 | 김광호 | Card inquiry device and method that can manage the clerk |
-
2000
- 2000-06-30 KR KR1020000037194A patent/KR20020005066A/en not_active Application Discontinuation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR920013174A (en) * | 1990-12-19 | 1992-07-28 | 정대영 | Time and Attendance System Using Smart Card |
KR950004028A (en) * | 1993-07-10 | 1995-02-17 | 김혁 | Access Control & T & A System |
KR950015107A (en) * | 1993-11-18 | 1995-06-16 | 이재명 | Wireless recognition device for commuting and in-house work management |
JPH08235248A (en) * | 1995-02-23 | 1996-09-13 | Fujita Corp | Labor management system |
KR19980039848A (en) * | 1996-11-28 | 1998-08-17 | 김광호 | Card inquiry device and method that can manage the clerk |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100688115B1 (en) * | 2006-01-11 | 2007-03-02 | (주)이음티앤에스 | System for managing human |
US7890334B2 (en) | 2006-02-14 | 2011-02-15 | Samsung Electronics Co., Ltd. | System and method for controlling voice detection of network terminal |
CN105139110A (en) * | 2015-08-10 | 2015-12-09 | 杭州班博科技有限公司 | Construction enterprise field labor service information synchronization method and system |
KR20170119613A (en) | 2016-04-19 | 2017-10-27 | 김정훈 | Apparatus and method for generating electronic employment contract, and labor management system and method using the electronic employment contract |
WO2018084370A1 (en) * | 2016-11-01 | 2018-05-11 | 순천대학교 산학협력단 | System for identifying worker in smart greenhouse by using beacon |
KR20200111611A (en) * | 2019-03-19 | 2020-09-29 | 김재영 | System for enterprise resource planning comprising workers, works managing function and construction site managing function using computer-implemented calendar |
KR20200006514A (en) | 2019-11-27 | 2020-01-20 | 김정훈 | Labor management method and system for short-time workers |
KR20220063692A (en) | 2020-11-10 | 2022-05-17 | 주식회사 자버 | Apparatus and method for generating employment contract |
KR20220063758A (en) | 2020-11-10 | 2022-05-17 | 주식회사 자버 | System for generating employment contract capable of digital signature and method thereof |
KR20230112593A (en) | 2020-11-10 | 2023-07-27 | 주식회사 자버 | Device for receiving responses from employers and employees regarding the fulfillment of labor contracts, method and program |
CN114120462A (en) * | 2021-10-11 | 2022-03-01 | 合肥优尔电子科技有限公司 | Self-adaptive pushing system and method for labor real-name system data based on supervision platform |
CN114120462B (en) * | 2021-10-11 | 2024-03-01 | 合肥优尔电子科技有限公司 | Self-adaptive pushing system and method for labor service real-name system data based on supervision platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102341836B (en) | Map distribution server, map information terminal, and map distribution system using these map distribution server and map information terminal | |
US9038150B2 (en) | Provisioning device for performing provisioning of a field device | |
EP1107534A3 (en) | Information storage system, server apparatus and information control method | |
US8296202B2 (en) | Task management system | |
KR100696094B1 (en) | Data delivery device and alteration method of data delivery time | |
KR100802510B1 (en) | Enterprise resource planning system connected with entrance and exit data of laborer | |
KR102178873B1 (en) | System for managing working-hours | |
CN110598474B (en) | Block chain-based data acquisition method, system, device and storage medium | |
KR20020005066A (en) | Labor management system and method in construction site | |
US20150142998A1 (en) | Sensor data correlation and analysis platform | |
CN1472939B (en) | Network facsimile device | |
JP2014220726A (en) | Meter reading system | |
JP2006053734A (en) | Attendance data collection system | |
EP1302846A2 (en) | Security tag using security system and office instrument | |
US20070169193A1 (en) | Data processing system | |
JP4457828B2 (en) | DATA OUTPUT DEVICE, DATA OUTPUT MANAGEMENT DEVICE, CONTROL METHOD AND PROGRAM THEREOF | |
JPS638813A (en) | Time standardizing system of local area network | |
JP2002203262A (en) | Work site managing system | |
US20220044512A1 (en) | Ballot processing device, system, and method for secret ballot | |
JP2013012104A (en) | Print information processing program, print information processing device, printing system, and printer driver program to be executed in user terminal | |
JP2003337881A (en) | Entrance/exit management system and terminal | |
JP3965280B2 (en) | Electronic certificate issuance management system and electronic certificate issuance management method | |
JP2009217679A (en) | Attendance information management method and system using portable terminal having short distance wireless communication means with non-contact type ic | |
KR100519599B1 (en) | A device and a method for electronic proof service | |
JP2006323433A (en) | Attendance management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |