KR200152772Y1 - Device for working-up concrete and concrete - Google Patents

Device for working-up concrete and concrete Download PDF

Info

Publication number
KR200152772Y1
KR200152772Y1 KR2019970004792U KR19970004792U KR200152772Y1 KR 200152772 Y1 KR200152772 Y1 KR 200152772Y1 KR 2019970004792 U KR2019970004792 U KR 2019970004792U KR 19970004792 U KR19970004792 U KR 19970004792U KR 200152772 Y1 KR200152772 Y1 KR 200152772Y1
Authority
KR
South Korea
Prior art keywords
concrete
hopper
squeeze
shotcrete
pump
Prior art date
Application number
KR2019970004792U
Other languages
Korean (ko)
Other versions
KR19980060687U (en
Inventor
이도연
Original Assignee
임정삼
주식회사대풍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임정삼, 주식회사대풍 filed Critical 임정삼
Priority to KR2019970004792U priority Critical patent/KR200152772Y1/en
Publication of KR19980060687U publication Critical patent/KR19980060687U/en
Application granted granted Critical
Publication of KR200152772Y1 publication Critical patent/KR200152772Y1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B43/00Machines, pumps, or pumping installations having flexible working members
    • F04B43/12Machines, pumps, or pumping installations having flexible working members having peristaltic action
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

본 고안은 굴착된 터널이나 대공동 지하구조물,댐, 도로공사시 굴착면이나 발파면 등에 형성되는 균열부나 틈새에 콘크리트를 분사시켜 지반의 이완이나 사면(斜面)을 억제하는 지지보강용으로 사용되는 숏 크리트(SHOTCRETE)펌핑기능과, 호퍼를 통해 믹싱상태의 콘크리트를 공급받아 스퀴즈식 펌프를 이용하여 소정의 타설지점까지 압출,이송시키는 스퀴즈식 콘크리트펌핑기능이 하나의 몸체에서 동시에 수행될 수 있도록한 장치에 관한 것으로 특히 콘크리트의 이송용 붐의 상단에는 숏 크리트 분사노즐과 콘크리트 토출노즐이 선택적으로 장착되도록 하고 차량의 프레임에는 숏 크리트(SHOTCRETE)펌핑용의 호퍼와 고압 콤프레서 및 스퀴즈 콘크리트펌핑용의 호퍼와 스퀴즈식 펌프를 동시에 장착,구비하여 두가지 작업을 하나의 장치에서 동시에 수행할 수 있도록 함으로써 작업의 신속, 용이성을 추구하여 작업능률을 개선함과 동시에 장비구입의 경제성추구, 기능의 다양화로 인한 제품의 사용효과를 향상시킬 수 있도록 한 것이다.The present invention is used for supporting reinforcement that suppresses ground loosening or slope by spraying concrete to cracks or gaps formed in excavated tunnels, underground structures, dams, roads, etc. Shotcrete pumping function and squeeze-type concrete pumping function that extrudes and transfers to the predetermined place by using squeeze type pump by receiving mixed concrete through hopper can be performed simultaneously in one body. In particular, the shot blast nozzle and concrete discharge nozzle are selectively mounted on the upper part of the boom for transporting concrete, and the hopper for shotcrete pump and the hopper for high pressure compressor and squeeze concrete pump are mounted on the frame of the vehicle. And squeeze pumps can be installed and installed at the same time In order to improve the work efficiency by pursuing the speed and ease of work, the economic efficiency of equipment purchase and the diversification of functions can be used to improve the effectiveness of the product.

Description

콘크리트 타설기능을 갖는 숏 크리트.Shotcrete with concrete pouring function.

본 고안은 굴착된 터널이나 대공동 지하구조물,댐, 도로공사시 굴착면이나 발파면 등에 형성되는 균열부나 틈새에 콘크리트를 분사시켜 지반의 이완이나 사면(斜面)을 억제하는 지지보강용으로 사용되는 숏 크리트(SHOTCRETE)펌핑기능과, 호퍼를 통해 믹싱상태의 콘크리트를 공급받아 스퀴즈식 펌프를 이용하여 소정의 타설지점까지 압출,이송시키는 스퀴즈식 콘크리트펌핑기능이 하나의 몸체에서 동시에 수행될 수 있도록한 장치에 관한 것으로 특히 콘크리트의 이송용 붐의 상단에는 숏 크리트 분사노즐과 콘크리트 토출노즐이 선택적으로 장착되도록 하고 차량의 프레임에는 숏 크리트(SHOTCRETE)펌핑용의 호퍼와 고압 콤프레서 및 스퀴즈 콘크리트펌핑용의 호퍼와 스퀴즈식 펌프를 동시에 장착,구비하여 두가지 작업을 하나의 장치에서 동시에 수행할 수 있도록 함으로써 작업의 신속, 용이성을 추구하여 작업능률을 개선함과 동시에 장비구입의 경제성추구, 기능의 다양화로 인한 제품의 사용효과를 향상시킬 수 있도록 한 것이다.The present invention is used for supporting reinforcement that suppresses ground loosening or slope by spraying concrete to cracks or gaps formed in excavated tunnels, underground structures, dams, roads, etc. Shotcrete pumping function and squeeze-type concrete pumping function that extrudes and transfers to the predetermined place by using squeeze type pump by receiving mixed concrete through hopper can be performed simultaneously in one body. In particular, the shot blast nozzle and concrete discharge nozzle are selectively mounted on the upper part of the boom for transporting concrete, and the hopper for shotcrete pump and the hopper for high pressure compressor and squeeze concrete pump are mounted on the frame of the vehicle. And squeeze pumps can be installed and installed at the same time In order to improve the work efficiency by pursuing the speed and ease of work, the economic efficiency of equipment purchase and the diversification of functions can be used to improve the effectiveness of the product.

통상적으로 숏 크리트(SHOTCRETE)장치는 차량에 일체로 장착되어 사용되고 있으며, 별도로 외부의 레미콘이나 믹싱장치로부터 믹싱 콘크리트를 공급받아 별도의 고압콤프레샤를 이용하여 붐에 연결된 이송파이프를 통해 굴착된 터널이나 대공동 지하구조물,댐, 도로공사시 굴착면이나 발파면 등에 형성되는 균열부나 틈새에 고압분사시켜 주게되는 것이며, 분사지점의 높은 경우에는 운전자가 기계적조작을 붐의 단부에 고정시킨 노즐을 이용하여 분사시키며 낮은 경우에는 작업자가 직접 노즐을잡고 분사하게 되는 것으로 지반의 이완이나 사면(斜面)을 억제하는 지지보강용으로 사용되는 것이다.In general, the shotcrete device is integrally mounted to a vehicle, and is supplied with a mixing concrete from an external ready-mixed concrete mixer or a mixing device, and a tunnel or large excavated through a transport pipe connected to a boom using a separate high pressure compressor. High pressure spray is applied to cracks or gaps formed in joint underground structures, dams, roads, etc. when excavating or blasting surfaces.In the case of a high spraying point, the operator sprays using a nozzle fixed at the end of the boom. If it is low, the worker directly grabs the nozzle and sprays it, and it is used for supporting reinforcement which suppresses ground loosening or slope.

또한 스퀴즈식 콘크리트펌프장치도 차량에 설치되어 호퍼를 통해 믹싱상태의 콘크리트를 공급받아 스퀴즈식 펌프를 이용하여 타설지점이 높은 경우에는 붐에 연결된 이송파이프를 통해 공급시키며, 지면위치 등과 같이 낮은지점에는 스퀴즈식 펌프의 토출구에 별도의 노즐을 연결시켜 콘크리트를 공급하게 되는 것인바 이와같은 숏 크리트(SHOTCRETE)장치와 스퀴즈 콘크리트펌프장치는 각기 독립적인 단순기능만을 수행할 수 밖에 없는 구조이므로 예를들어 터널굴착공사의 경우 벽과 천장에는 숏 크리트작업이 요구되고 바닥면에는 콘크리트 타설작업이 요구되는 것인바, 이를 수행하기 위해서는 숏 크리트장치와 스퀴즈 콘크리트펌프장치의 두 대의 장치가 필요하게 되는 것으로 장비구입에 경제적부담이 커지는 것이며,In addition, the squeeze type concrete pump device is also installed in the vehicle to supply the mixed concrete through the hopper, and when the pouring point is high by using the squeeze type pump, it is supplied through the transfer pipe connected to the boom. It is to supply concrete by connecting a separate nozzle to the outlet of the squeeze-type pump. The shotcrete device and the squeeze concrete pump device have a structure that can only perform independent functions. In the case of excavation, shotcrete work is required on the wall and ceiling, and concrete placing work is required on the floor. To accomplish this, two equipment, shotcrete device and squeeze concrete pump device, are required. The economic burden is increasing,

작업공정 또한 먼저 숏 크리트장치가 작업을 수행한 차후에 스퀴즈 콘크리트펌프장치가 타설작업을 해야하는 것이므로 작업과정이 번거롭고 시간과 인력의 소모가 많아 작업능률이 저하되는 문제점이 노출되는 것이다.Work process is also because the squeeze concrete pump device is to be placed after the shotcrete device to perform the work first, the work process is cumbersome and the time and manpower consumption is high, the work efficiency is exposed.

본 고안은 상기와 같은 종래구조의 제반 문제점을 해결 보완하기 위하여 안출된 것으로 콘크리트의 이송용 붐의 상단에는 숏 크리트 분사노즐과 콘크리트 토출노즐이 선택적으로 장착되도록 하고 차량의 프레임에는 숏 크리트(SHOTCRETE)펌핑용의 호퍼와 고압 콤프레서 및 스퀴즈 콘크리트펌핑용의 호퍼와 스퀴즈식 펌프를 동시에 장착,구비하여 두가지 작업을 하나의 장치에서 동시에 수행할 수 있도록 함으로써 작업의 신속, 용이성을 추구하여 작업능률을 개선함과 동시에 장비구입의 경제성추구, 기능의 다양화로 인한 제품의 사용효과를 향상시킬 수 있도록 함을 특징으로 하는 것이다.The present invention was devised to solve all the problems of the conventional structure as described above. Shotcrete injection nozzles and concrete discharge nozzles are selectively mounted on the top of the transfer boom for concrete, and shotcrete (SHOTCRETE) is mounted on the vehicle frame. Pumping hopper, high pressure compressor and squeeze hopper and squeeze pump for concrete pump can be installed and equipped at the same time so that two tasks can be performed at the same time to improve work efficiency by pursuing quick and easy work. At the same time, pursuing economic feasibility of purchasing equipment and diversifying functions, it is possible to improve the use effect of the product.

도 1은 숏 크리트펌핑기능을 갖도록 한 본 고안의 구성상태도.1 is a configuration state of the present invention to have a shot creep pumping function.

도 2은 콘크리트 펌핑기능을 갖도록 한 본 고안의 구성상태도.Figure 2 is a configuration of the present invention to have a concrete pumping function.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1: 붐(BOOM) 2: 숏 크리트용 호퍼1: BOOM 2: Shotcrete hopper

3: 고압 콤프레서 4: 콘크리트타설용 호퍼3: high pressure compressor 4: concrete pouring hopper

5: 스퀴즈식 펌프 6: 콘크리트 이송파이프5: squeeze pump 6: concrete conveying pipe

7,8: 개폐밸브7,8: on-off valve

본 고안은 도 1에서와 같이 차량(T)의 프레임(F)상에 고정 착설되며 믹싱 콘크리트의 이송을 임의 지점까지 안내하여 주기위한 붐(1)과;The present invention is fixedly mounted on the frame (F) of the vehicle (T) as shown in Figure 1 and a boom (1) for guiding the transport of the mixing concrete to any point;

상기 프레임(F)상에 고정 착설되며 외부로부터 공급받은 믹싱 콘크리트를 안내 수용하는 숏 크리트용 호퍼(2)와;A shot creek hopper (2) fixedly mounted on the frame (F) and configured to receive the mixing concrete supplied from the outside;

상기 호퍼(2)내의 믹싱 콘크리트를 고압,분사시켜 주기위한 고압 콤프레서(3)와;A high pressure compressor (3) for high pressure and spraying the mixing concrete in the hopper (2);

상기 프레임(F)상에 고정 착설되며 외부로부터 공급받은 믹싱 콘크리트를 안내 수용하는 콘크리트타설용 호퍼(4)와;A concrete placing hopper (4) fixedly installed on the frame (F) to receive and accommodate the mixing concrete supplied from the outside;

상기 호퍼(4)내의 믹싱 콘크리트를 압출,이송시켜 주기위한 스퀴즈식 펌프(5)와;A squeeze pump (5) for extruding and conveying the mixing concrete in the hopper (4);

토출구(6')가 붐(1)의 선단에 위치되는 상태로 숏 크리트용 호퍼(2)와 스퀴즈식 펌프(5)에 연결되는 콘크리트 이송파이프(6)와;A concrete conveying pipe (6) connected to the shotcrete hopper (2) and the squeeze pump (5) with the discharge opening (6 ') located at the tip of the boom (1);

상기 콘크리트 이송파이프(6)상에 설치되며 숏 크리트용 호퍼(2)와 콘크리트타설용 호퍼(4)내의 믹싱 콘크리트의 공급을 선택적으로 제어하기 위한 개폐밸브(7)(8)를 각각 결합 구성하여서 되는 것이다.The opening and closing valve (7) (8) is installed on the concrete conveying pipe (6) to selectively control the supply of the mixed concrete in the shotcrete hopper (2) and the concrete placing hopper (4) Will be.

*도면중 미설명 부호* (10)숏 크리트용 분사노즐이며, (11)는 콘크리트타설용 분사노즐이고, (12)는 굴착면을 보인 것이다.* (Not shown) in the drawings (10) Shotcrete injection nozzle, (11) is a concrete spraying nozzle, (12) is an excavation surface.

이와같이 구성되는 본고안의 작용을 설명하면 다음과 같다.Referring to the operation of the present proposal is configured as follows.

도 1은 숏 크리트작업을 행하기 위한 것으로 콘크리트 이송파이프(6)의 선단에 숏 크리트용 분사노즐(10)을 장착시키고 개폐밸브(7)를 열어 숏 크리트용 호퍼(2)내의 믹싱 콘크리트가 콘크리트 이송파이프(6)로 공급될 수 있도록 하고, 개폐밸브(8)를 잠궈 스퀴즈식 펌프(5)내의 믹싱 콘크리트가 숏 크리트용 호퍼(2)내의 믹싱 콘크리트와 섞이지 못하도록 공급을 차단시킨 상태에서 고압 콤프레서(3)를 동작시켜 주게되면 고압에 의해 호퍼(3)내의 믹싱 콘크리가 콘크리트 이송파이프(6)통해 숏 크리트용 분사노즐(10)로 분사되어 굴착된 터널이나 대공동 지하구조물,댐, 도로공사시 굴착면이나 발파면 등에 형성되는 균열부나 틈새를 도포하게 되는 것이다.FIG. 1 is for carrying out a shot creep operation. The mixing concrete in the shotcrete hopper 2 is installed by mounting the shotcrete injection nozzle 10 at the distal end of the concrete conveying pipe 6 and opening and closing the valve 7. High pressure compressor to supply the feed pipe (6) and shut off the on-off valve (8) so that the mixing concrete in the squeeze-type pump (5) does not mix with the mixing concrete in the shotcrete hopper (2) When operating (3), the mixing concrete in the hopper (3) is injected by the high pressure to the shotcrete injection nozzle (10) through the concrete conveying pipe (6) to excavate the tunnel or large cavity underground structure, dam, road construction When the cracks or gaps are formed in the excavation surface or blast surface.

한편 도 2에서와 같이 콘크리트 타설작업을 행하기 위한 것으로 콘크리트 이송파이프(6)의 선단에서 숏 크리트용 분사노즐(10)을 분리시켜내고 콘크리트 타설용 분사노즐(11)을 장착시키며 개폐밸브(8)를 열어 스퀴즈식 펌프(5)내의 믹싱 콘크리트가 콘크리트 이송파이프(6)로 공급될 수 있도록 하고, 동시에 개폐밸브(7)를 잠궈 숏 크리트용 호퍼(2)내의 믹싱 콘크리트가 스퀴즈식 펌프(5)내의 믹싱 콘크리트와 섞이지 못하도록 공급을 차단시킨 상태에서 스퀴즈식 펌프(5)를 동작시켜 주게되면 로울러식 압출동작에 의해 콘크리트타설용 호퍼(4)내의 믹싱 콘크리가 콘크리트 이송파이프(6)를 통해 콘크리트 타설용 분사노즐(11)로 분사되어 굴착된 터널의 바닥이나 그외의 건물의 바닥구성부위 등에 믹싱 콘크리트를 공급하게 되는 것이다.Meanwhile, as shown in FIG. 2, the spraying nozzle 10 for removing the shotcrete is detached from the distal end of the concrete conveying pipe 6, and the spraying nozzle 11 for placing the concrete is mounted. ) So that the mixing concrete in the squeeze pump (5) can be supplied to the concrete conveying pipe (6), and at the same time the shut-off valve (7) is closed so that the mixing concrete in the shotcrete hopper (2) is squeezing pump (5). When the squeeze type pump (5) is operated while the supply is blocked to prevent mixing with the mixing concrete in the mixing concrete, the mixing concrete in the concrete hopper (4) is moved through the concrete conveying pipe (6) by roller type extrusion operation. It is to supply the mixing concrete to the floor of the tunnel or other floors of the building is sprayed by the injection nozzle for pouring (11).

이상과 같이 본 고안에 의하면 벽과 천장에는 숏 크리트작업이 요구되고 바닥면에는 콘크리트 타설작업이 별도로 요구되는 터널굴착공사의 경우에도 한 대의 장치만으로도 상기 두 가지 기능을 수행할 수 있게 되는 것이므로 작업과정이 신속,간편하여 작업능률이 향상됨은 물론, 장비구입시에도 두 개의 장치를 별도로 구입할 필요가 없는 것이므로 경제적부담을 감소시켜 줄 수 있는 것이며, 두가지 작업을 하나의 장비에서 동시에 수행할 수 있도록 구성함으로써 기능의 다양화로 인한 제품의 사용효과를 향상시킬 수 있는 효과가 있는 것이다.As described above, according to the present invention, in the case of the tunnel excavation work in which shotcrete work is required on the wall and ceiling and concrete placing work is required on the floor, the above two functions can be performed with only one device. This quick and easy operation improves efficiency, and it is possible to reduce the economic burden because there is no need to purchase two devices separately when purchasing equipment. By configuring the two tasks to be performed simultaneously on a single equipment There is an effect that can improve the use effect of the product due to the diversification of functions.

Claims (1)

차량(T)의 프레임(F)상에 고정 착설되며 믹싱 콘크리트의 이송을 임의 지점까지 안내하여 주기위한 붐(1)과;A boom (1) fixedly mounted on the frame (F) of the vehicle (T) and for guiding the transport of the mixing concrete to an arbitrary point; 상기 프레임(F)상에 고정 착설되며 외부로부터 공급받은 믹싱 콘크리트를 안내 수용하는 숏 크리트용 호퍼(2)와;A shot creek hopper (2) fixedly mounted on the frame (F) and configured to receive the mixing concrete supplied from the outside; 상기 호퍼(2)내의 믹싱 콘크리트를 고압,분사시켜 주기위한 고압 콤프레서(3)와;A high pressure compressor (3) for high pressure and spraying the mixing concrete in the hopper (2); 상기 프레임(F)상에 고정 착설되며 외부로부터 공급받은 믹싱 콘크리트를 안내 수용하는 콘크리트타설용 호퍼(4)와;A concrete placing hopper (4) fixedly installed on the frame (F) to receive and accommodate the mixing concrete supplied from the outside; 상기 호퍼(4)내의 믹싱 콘크리트를 압출,이송시켜 주기위한 스퀴즈식 펌프(5)와;A squeeze pump (5) for extruding and conveying the mixing concrete in the hopper (4); 토출구(6')가 붐(1)의 선단에 위치되는 상태로 숏 크리트용 호퍼(2)와 스퀴즈식 펌프(5)에 연결되는 콘크리트 이송파이프(6)와;A concrete conveying pipe (6) connected to the shotcrete hopper (2) and the squeeze pump (5) with the discharge opening (6 ') located at the tip of the boom (1); 상기 콘크리트 이송파이프(6)상에 설치되며 숏 크리트용 호퍼(2)와 콘크리트타설용 호퍼(4)내의 믹싱 콘크리트의 공급을 선택적으로 제어하기 위한 개폐밸브(7)(8)를 각각 결합 구성하여서 됨을 특징으로 하는 콘크리트 타설기능을 갖는 숏 크리트.The opening and closing valve (7) (8) is installed on the concrete conveying pipe (6) to selectively control the supply of the mixed concrete in the shotcrete hopper (2) and the concrete placing hopper (4) Shotcrete having a concrete pouring function characterized in that.
KR2019970004792U 1997-03-14 1997-03-14 Device for working-up concrete and concrete KR200152772Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019970004792U KR200152772Y1 (en) 1997-03-14 1997-03-14 Device for working-up concrete and concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019970004792U KR200152772Y1 (en) 1997-03-14 1997-03-14 Device for working-up concrete and concrete

Publications (2)

Publication Number Publication Date
KR19980060687U KR19980060687U (en) 1998-11-05
KR200152772Y1 true KR200152772Y1 (en) 1999-07-15

Family

ID=19497277

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019970004792U KR200152772Y1 (en) 1997-03-14 1997-03-14 Device for working-up concrete and concrete

Country Status (1)

Country Link
KR (1) KR200152772Y1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101652107B1 (en) * 2015-09-24 2016-08-30 (주) 진흥이엔지 Multi-purpose crane used in concrete pole reinforcement method of construction
CN116537544B (en) * 2023-05-18 2024-01-05 湖南人健宝固高新科技发展有限公司 A guniting device for shotcrete

Also Published As

Publication number Publication date
KR19980060687U (en) 1998-11-05

Similar Documents

Publication Publication Date Title
KR200152772Y1 (en) Device for working-up concrete and concrete
KR101241372B1 (en) The structure of concrete pressurized pipe in shotcrete feeding system
KR101156663B1 (en) Structure of Concrete Pressure Feeding Parts Equipped with Combination Y Pipe and Front Injector in Shotcrete Construction Equipment
CN216440892U (en) Wet type spraying machine
JP2006274794A (en) Mortar or concrete spraying device
KR101216594B1 (en) Particulates and liquid shifting pump for constructing shotcrete
KR100289016B1 (en) Method for adding liquid fastener for wet shotcrete pouring and apparatus therefor
JP2005213732A (en) Mortar or concrete spraying apparatus
KR100663837B1 (en) Excavator with sprinkler
CN210814762U (en) Mixer for sprayed concrete accelerator
JP4274465B2 (en) Mortar or concrete spraying equipment
JP4700649B2 (en) Mortar or concrete spraying equipment
KR100704794B1 (en) Device for spraying mortar or concrete, and method of spraying mortar or concrete by using the device
JP3344965B2 (en) Slope stabilization method
JPH0659434B2 (en) Concrete spraying device
CN210178371U (en) Tunnel rock wall multi-cavity injection device
KR100746376B1 (en) powder material conveying apparatus for shotcrete
JP3881605B2 (en) Air / wet material merging pipe and wet material pressure feeding spray method using the merging pipe
CN218563581U (en) Small-size entry driving machine with dustproof function
JP2002161692A (en) Water spraying method of tunnel working breaker and device
JP2007327329A (en) Mortar or concrete spraying apparatus
CN208347797U (en) The adding set of liquid accelerator in a kind of dry pressure spray process
JPH0629232Y2 (en) Connection pipe structure of mortar concrete spraying machine
KR101216593B1 (en) Mixed branch pipe for shotcrete construction equipment
KR200195329Y1 (en) Apparatus of preventing water hose from cracking due to iceing for concrete pumping car.

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20070419

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee