KR200144933Y1 - Assembly structure of door frame - Google Patents

Assembly structure of door frame Download PDF

Info

Publication number
KR200144933Y1
KR200144933Y1 KR2019960014568U KR19960014568U KR200144933Y1 KR 200144933 Y1 KR200144933 Y1 KR 200144933Y1 KR 2019960014568 U KR2019960014568 U KR 2019960014568U KR 19960014568 U KR19960014568 U KR 19960014568U KR 200144933 Y1 KR200144933 Y1 KR 200144933Y1
Authority
KR
South Korea
Prior art keywords
door frame
present
assembly structure
vertical
lower door
Prior art date
Application number
KR2019960014568U
Other languages
Korean (ko)
Other versions
KR970062734U (en
Inventor
안기한
Original Assignee
이종학
한화종합화학주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이종학, 한화종합화학주식회사 filed Critical 이종학
Priority to KR2019960014568U priority Critical patent/KR200144933Y1/en
Publication of KR970062734U publication Critical patent/KR970062734U/en
Application granted granted Critical
Publication of KR200144933Y1 publication Critical patent/KR200144933Y1/en

Links

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

본 고안은 문틀의 조립 구조에 관한 것으로서, 특히 벽체의 내측에 세워 설치되는 한 쌍의 수직 문틀과, 상기 수직 문틀의 상, 하측에 결합되는 상부 및 하부 문틀을 구비하는 문틀에 있어서, 상기 하부 문틀(20)은 수직 문틀(12)(14)의 하측에 체결된 보강재(10)내에 마무리 공사가 완료된 후 삽입 고정되는 것을 특징으로 한다.The present invention relates to an assembly structure of a door frame, and in particular, a door frame having a pair of vertical door frame installed upright inside the wall, and the upper and lower door frame coupled to the upper and lower sides of the vertical door frame, the lower door frame 20 is characterized in that the insert is fixed after the finishing work is completed in the reinforcement (10) fastened to the lower side of the vertical door frame (12) (14).

따라서, 본 고안에 의하면 하부 문틀이 마무리 공사의 완료 유에 미리 체결된 보강재내에 삽입 고정됨에 따라 자재의 이동이나 시공자의 통행 등에 따른 하부 문틀의 파손을 방지함과 동시에 파손된 하부 문틀의 보수 등을 필요로 하지 않으므로 코스트를 현저하게 절감하는 등의 여러 가지 효과가 있다.Therefore, according to the present invention, as the lower door frame is inserted and fixed in the reinforcing material which is fastened in advance to the completion of the finishing work, it is necessary to prevent the damage of the lower door frame due to the movement of materials or the traffic of the contractor, and to repair the damaged lower door frame. Since this is not done, there are various effects such as a significant cost reduction.

Description

문틀의 조립 구조Assembly structure of door frame

제1도는 종래 문틀의 조립 구조를 도시한 개략도.1 is a schematic diagram showing an assembly structure of a conventional door frame.

제2도는 본 고안에 따른 문틀의 조립 구조를 도시한 전체 개략도.Figure 2 is an overall schematic diagram showing the assembly structure of the door frame according to the present invention.

제3도는 본 고안의 요부 사시도.3 is a perspective view of main parts of the present invention.

제4도는 본 고안의 요부 단면도.Figure 4 is a sectional view of the main part of the present invention.

제5도는 본 고안의 조립 상태를 도시한 단면도이다.5 is a cross-sectional view showing an assembled state of the present invention.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

10 : 보강재 12, 14 : 수직 문틀10: reinforcement 12, 14: vertical door frame

16 : 체결수단 18 : 상부 문틀16: fastening means 18: upper door frame

20 : 하부 문틀 W : 벽체20: lower door frame W: wall

본 고안은 문틀의 조립 구조에 관한 것으로서, 특히 하부 문틀의 조립 전에 보강재를 체결하여 마무리 공사 등으로 인한 문틀의 파손을 방지함과 동시에 더욱 깨끗한 외관을 가질 수 있도록 된 문틀의 조립 구조에 관한 것이다.The present invention relates to an assembly structure of a door frame, and more particularly, to an assembly structure of a door frame which is capable of having a cleaner appearance while preventing damage to the door frame due to finishing work by fastening a reinforcing material before assembling the lower door frame.

일반적으로 문틀의 조립 구조는 제1도에 도시한 바와 같이 벽체(W)의 소정 위치에 한 쌍의 수직 문틀(1)(2)의 적정을 간격을 두고 세워 설치되고, 상기 수직 문틀(1)(2)의 상, 하측에는 한 쌍의 수평 문틀(3)(4)이 결합되어 하나의 문틀(5)을 구성하게 되며, 상기 문틀(5)의 내측에는 도어(6)가 개폐 가능하게 결합되어 진다.In general, assembling structure of the door frame is installed in a predetermined position of the wall (W) at a predetermined position at intervals of the appropriate pair of vertical door frame (1), the vertical door frame (1) A pair of horizontal door frames (3) and (4) are coupled to the upper and lower sides of (2) to form one door frame (5), and the door (6) is coupled to the inside of the door frame (5) so as to be opened and closed. It is done.

그러나, 이와 같이 구성된 종래 문틀의 조립 구조는 문틀이 시공된 상태에서 각각의 마무리 공사가 시공됨에 따라 자재의 이동이나 시공자의 부주의 등에 의해 특히 하부 문틀이 심하게 파손되어 재시공을 해야 하는 등의 여러 가지 문제점들이 내재되어 있었다.However, the assembly structure of the conventional door frame configured as described above has various problems, such as the lower door frame is severely damaged due to material movement or negligence of the contractor due to the construction of each finishing work in the state in which the door frame is constructed. Were inherent.

또한, 문틀의 파손을 방지하기 위해 문틀의 시공을 최후에 하는 경우에는 여러 가지 시공 상의 어려움으로 인하여 코스트를 상승시킴은 물론 작업이 매우 불편하다고 하는 등의 문제점들도 내재되어 있었다.In addition, when the last construction of the door frame to prevent the damage of the door frame, there are also problems such as raising the cost and very inconvenient work due to various construction difficulties.

본 고안은 상술한 바와 같은 종래 기술의 문제점들을 해결하기 위하여 안출된 것으로서, 본 고안의 목적은 하부 문틀의 조립을 각 공사가 마무리 된 후 시공토록 하여 문틀의 파손을 방지함과 동시에 재시공 등에 따른 코스트를 절감할 수 있는 문틀의 조립 구조를 제공하는데 있다.The present invention is devised to solve the problems of the prior art as described above, the object of the present invention is to ensure that the construction of the lower door frame after the completion of each construction to prevent damage to the door frame and at the same time the cost of reconstruction To provide an assembly structure of the door frame to reduce the.

이와 같은 목적을 실현하기 위하여 이루어진 본 고안에 따른 문틀의 조립 구조는 벽체의 내측에 세워 설치되는 한 쌍의 수직 문틀과, 상기 수직 문틀의 상, 하측에 결합되는 상부 및 하부 문틀을 구비하는 문틀에 있어서, 상기 하부 문틀은 수직 문틀의 하측에 체결된 보강재내에 마무리 공사가 완료된 후 삽입 고정되는 것을 특징으로 한다.The assembly structure of the door frame according to the present invention made to achieve the above object is a door frame having a pair of vertical door frame installed upright inside the wall, and the upper and lower door frame coupled to the upper and lower sides of the vertical door frame. In the above, the lower door frame is inserted and fixed after finishing the finishing work in the reinforcement fastened to the lower side of the vertical door frame.

따라서, 본 고안에 의하면 하부 문틀이 마무리 공사의 완료 후에 미리 체결된 보강재내에 삽입 고정됨에 따라 자재의 이동이나 시공자의 통행 등에 따른 하부 문틀의 파손을 방지함과 동시에 파손된 하부 문틀의 보수 등을 필요로 하지 않으므로 코스트를 현저하게 절감하는 등의 여러 가지 효과가 있다.Therefore, according to the present invention, since the lower door frame is inserted into and fixed in the reinforcement fastened in advance after the completion of the finishing work, it is necessary to prevent the damage of the lower door frame due to the movement of materials or the traffic of the contractor, and to repair the damaged lower door frame. Since this is not done, there are various effects such as a significant cost reduction.

이하, 본 고안의 바람직한 실시예를 첨부된 도면에 따라서 더욱 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도면 제2도는 본 고안에 의한 문틀의 조립 구조를 도시하는 전체 개략도이고, 제3도는 본 고안의 요부 사시도이며, 제4도는 본 고안의 요부 단면도로서, 부호(10)은 소정의 간격을 두고 벽체(W)의 내측에 세워 설치된 수직 문틀(12)(14)의 하측에 볼트 등의 체결수단(16)으로 체결 고정된 보강재를 나타내고 있다.2 is an overall schematic view showing the assembly structure of the door frame according to the present invention, Figure 3 is a perspective view of the main part of the present invention, Figure 4 is a sectional view of the main part of the present invention, the reference numeral 10 is a wall at a predetermined interval The reinforcement material which was fastened and fixed by the fastening means 16, such as a bolt, is shown in the lower side of the vertical door frames 12 and 14 installed in the inside of (W).

상기 수직 문틀(12)(14)의 상측에는 상부 문틀(18)이 조립되어 있다.An upper door frame 18 is assembled above the vertical door frames 12 and 14.

그리고, 상기 보강재(10)는 대략 ㄷ자 형상으로 형성되며, 재질은 금속재 또는 합성 수지재로 이루어짐이 바람직하다.In addition, the reinforcing material 10 is formed in a substantially U shape, the material is preferably made of a metal material or synthetic resin material.

한편, 상기 수직 문틀(12)(14)의 하측에 보강재(10)가 결합된 상태에서 나머지 마무리 공사의 시공이 이루어지며, 시공이 완료된 후에는 보강재(10)의 내측에 하부 문틀(20)이 삽입 고정된다.On the other hand, the construction of the remaining finishing work is made in the state in which the reinforcing material 10 is coupled to the lower side of the vertical door frame 12, 14, and after the construction is completed, the lower door frame 20 inside the reinforcing material 10 Insert is fixed.

이와 같이 구성된 본 고안에 의한 문틀의 조립 구조는 벽체(W)의 소정 위치에 상측에 상부 문틀(18)을 조립시킨 수직 문틀(12)(14)의 하측에는 보강재(10)가 볼트 등의 체결수단(16)에 의해 체결 고정된다.In the assembly structure of the door frame according to the present invention configured as described above, the reinforcing material 10 is fastened to the lower side of the vertical door frame 12, 14 in which the upper door frame 18 is assembled at a predetermined position of the wall W. It is fastened and fixed by means 16.

그리고, 상기 수직 문틀(12)(14)의 하측에 보강재(10)가 체결된 상태에서 마무리 공사의 시공이 이루어지게 되며, 이때 상기 보강재(10)의 상측으로 자재의 이동이나 시공자 등이 통행을 행하게 된다.And, the construction of the finishing work is made in the state in which the reinforcement 10 is fastened to the lower side of the vertical door frame 12, 14, at this time, the movement of the material or the construction of the construction material to the upper side of the reinforcement (10) Will be done.

한편, 내부의 마무리 공사의 시공이 완료되면 입주자등이 입주하기 전에 상기 보강재(10)의 내측에는 제5도에 도시한 바와 같이 하부 문틀(20)이 삽입 고정된다.On the other hand, when the construction of the internal finishing work is completed, the lower door frame 20 is inserted into the inside of the reinforcing material 10 before the occupant enters, as shown in FIG.

이때, 상기 하부 문틀(20)은 마무리 공사가 완료된 후 조립이 이루어지게 됨에 따라 공사에 필요한 자재의 이동이나 시공자의 통행에 따른 하부 문틀(20)의 파손을 방지하게 되며, 입주시에는 깨끗하고 미려한 외관을 가지게 되는 것이다.At this time, the lower door frame 20 is assembled after the finishing work is completed to prevent the damage of the lower door frame 20 due to the movement of the material required for the construction or the construction of the contractor, clean and beautiful when moving It will have an appearance.

따라서, 본 고안에 의하면 하부 문틀이 마무리 공사의 완료 후에 미리 체결된 보강재내에 삽입 고정됨에 따라 자재의 이동이나 시공자의 통행 등에 따른 하부 문틀의 파손을 방지함과 동시에 파손된 하부 문틀의 보수 등을 필요로 하지 않으므로 코스트를 현저하게 절감하는 등의 여러 가지 효과가 있다.Therefore, according to the present invention, since the lower door frame is inserted into and fixed in the reinforcement fastened in advance after the completion of the finishing work, it is necessary to prevent the damage of the lower door frame due to the movement of materials or the traffic of the contractor, and to repair the damaged lower door frame. Since this is not done, there are various effects such as a significant cost reduction.

상술한 바와 같이 본 고안은 하나의 실시예에 대하여 도시 및 설명하고 있으나 이에 한정하는 것은 아니며, 후술하는 청구범위에 기재된 본 고안의 기술적 사상 내에서 이 고안이 속하는 기술 분야에서 통상의 지식을 가진 자라면 다양한 변경 실시가 가능할 것이다.As described above, the present invention is illustrated and described with respect to one embodiment, but the present invention is not limited thereto, and one of ordinary skill in the technical field of the present invention belongs to the technical idea of the present invention described in the claims below. If so, various changes could be made.

Claims (1)

벽체의 내측에 세워 설치되는 한 쌍의 수직 문틀과 상기 수직 문틀의 상, 하측에 결합되는 상부 및 하부 문틀을 구비하는 문틀에 있어서, 수직 문틀(12)(14)의 하측에 볼트 등의 체결수단에 의하여 ㄷ 형상의 보강재(10)를 체결하고 마무리 공사가 완료된 후 보강재(10)의 내측에 하부문틀(20)을 삽입 고정하는 것을 특징으로 하는 문틀의 조립구조.In a door frame having a pair of vertical door frame installed on the inside of the wall and the upper and lower door frame coupled to the upper and lower sides of the vertical door frame, fastening means such as bolts below the vertical door frame (12) (14) By fastening the c-shaped reinforcement (10) by the assembly structure of the door frame, characterized in that the lower part frame 20 is inserted into the reinforcement (10) after the finishing work is completed.
KR2019960014568U 1996-05-31 1996-05-31 Assembly structure of door frame KR200144933Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019960014568U KR200144933Y1 (en) 1996-05-31 1996-05-31 Assembly structure of door frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019960014568U KR200144933Y1 (en) 1996-05-31 1996-05-31 Assembly structure of door frame

Publications (2)

Publication Number Publication Date
KR970062734U KR970062734U (en) 1997-12-11
KR200144933Y1 true KR200144933Y1 (en) 1999-06-15

Family

ID=60839774

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019960014568U KR200144933Y1 (en) 1996-05-31 1996-05-31 Assembly structure of door frame

Country Status (1)

Country Link
KR (1) KR200144933Y1 (en)

Also Published As

Publication number Publication date
KR970062734U (en) 1997-12-11

Similar Documents

Publication Publication Date Title
US3354586A (en) Door or window frame
US2863180A (en) Self-locking panel
US3889423A (en) Reversible door frame
AU612604B2 (en) A frame for the box-shaped body of a commercial vehicle
US4411111A (en) Window sash assembly
GB2250535A (en) Coupling inner and outer frames in apertures
KR200144933Y1 (en) Assembly structure of door frame
US1922494A (en) Casement window
JPH0828546A (en) Rotary hinge
CN220059121U (en) Tent outer cover
JPS6224705Y2 (en)
CN2437825Y (en) Structure of shower cubicle door
KR940006125Y1 (en) Edge frame for glass door
KR200150584Y1 (en) A fence door
EP0678145B1 (en) Inside lining for edge plates
KR200326614Y1 (en) a window frame
DE4307478A1 (en) Switching cubicle access door with door frame - has extruded aluminium box frame with concealed hinge inside and protruding arm attached to rear of door
SU1482836A1 (en) Mobile repair shop
JPH0714559Y2 (en) Panel gate
JPH0443593Y2 (en)
JPS6025499Y2 (en) Western-style bay window frame
JPS6217596Y2 (en)
JP2631928B2 (en) Bay window
JPS645030Y2 (en)
JPH0620861U (en) Door frame

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20080110

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee