KR200141992Y1 - Rail fixing for construction - Google Patents
Rail fixing for construction Download PDFInfo
- Publication number
- KR200141992Y1 KR200141992Y1 KR2019960035985U KR19960035985U KR200141992Y1 KR 200141992 Y1 KR200141992 Y1 KR 200141992Y1 KR 2019960035985 U KR2019960035985 U KR 2019960035985U KR 19960035985 U KR19960035985 U KR 19960035985U KR 200141992 Y1 KR200141992 Y1 KR 200141992Y1
- Authority
- KR
- South Korea
- Prior art keywords
- binding
- hole
- railing
- fixture
- building
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1812—Details of anchoring to the wall or floor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
본 고안은 아파트나 고층건물 건축시 필연적으로 설치해야 되는 가설용 난간을 설치하기 위하여 사용되는 건축용 난간 고정구(1)에 관한 것으로서, 몸체부(10)는 그 일측에 원통형의 결속구(20)가 삽입고정되도록, 이 결속구의 내경과 같은 크기의 통공이 형성되어 있고, 그 상,하단부(11a, 11b)는 일정한 폭으로 결속구(20)가 돌설된 방향과 같은 방향으로 절곡되어 있어서, 이 결속구(20)의 외경과 연접하여 일체를 이루는 부위에서는 결속구고정부(12)를 형성하고 있으며, 이 결속구고정부(12)가 형성되지 아니한 반대편에는 결속구고정편(13)이 형성되어 있고, 몸체부(10)의 다른 일측에는 몸체부(10)를 벽체(W)에 고정시킬 수 있도록 체결공(14)이 형성되어 있으며, 상기 결속구(20)의 상,하부에 천공된 구멍(21a, 22b)에는 너트(22a, 22b)가 부착되어 있어서, 결속구(20)에 삽설되는 수평강관(P)을 나비볼트(23a, 23b)로 결착, 고정시키도록 구성되어 있는 것을 특징으로 하는 건축용 난간 고정구.The present invention relates to a building handrail fixture (1) used to install a temporary handrail that is inevitably installed in the construction of an apartment or a high-rise building, the body portion 10 has a cylindrical binding hole 20 on one side thereof. A hole having the same size as the inner diameter of the binding hole is formed so as to be inserted and fixed, and the upper and lower ends 11a and 11b are bent in the same direction as the direction in which the binding hole 20 protrudes with a constant width. The binding fixture 12 is formed at a portion of the sphere 20 in contact with the outer diameter of the sphere 20, and the binding fixture 13 is formed on the opposite side where the binding fixture 12 is not formed. The other side of the body portion 10 is formed with a fastening hole 14 to fix the body portion 10 to the wall (W), the hole (21a) perforated in the upper and lower portions of the binding hole 20 And 22b, nuts 22a and 22b are attached to the binding port 20. Railing fixture for construction, characterized in that the horizontal steel pipe (P) to be inserted into the butterfly bolt (23a, 23b) to bind and secure.
Description
제1도는 본 고안에 따른 건축용 난간 고정구의 사시도.1 is a perspective view of a building railing fixture according to the present invention.
제2도는 본 고안에 따른 건축용 난간 고정구를 도시한 것으로서,Figure 2 shows a building railing fixture according to the present invention,
(a)는 정면도.(a) is a front view.
(b)는 배면도.(b) is a rear view.
(c)는 제2도(a)의 A - A'선을 따라 절개한 단면도.(c) is sectional drawing cut along the AA 'line of FIG.2 (a).
제3도는 본 고안에 따른 건축용 난간 고정구의 설치상태를 예시한 것으로서 평면에서 본 상태.Figure 3 illustrates the installation state of the building railing fixture according to the present invention as viewed from the plane.
제4도는 본 고안에 따른 건축용 난간 고정구의 설치상태를 예시한 사시도.Figure 4 is a perspective view illustrating the installation state of the building railing fixture according to the present invention.
제5도는 종래의 건축용 난간지주를 도시한 것으로서,5 is a view showing a conventional handrail for construction,
(a)는 사용상태의 정면도.(a) is a front view of the state of use.
(b)는 제5도 (a)의 A - A선에 따른 확대 단면도.(b) is an expanded sectional view along the AA line of FIG.
제6도는 종래의 또 다른 건축용 난간지주를 도시한 것으로서,6 shows another conventional handrail for construction,
(a)는 사시도.(a) is a perspective view.
(b)는 제6도 (a)의 구성요소의 요부인 이동틀을 나타낸 사시도이다.(b) is a perspective view which shows the movement frame which is a principal part of the component of FIG.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
1 : 건축용 난간 고정구 10 : 몸체부1: building railing fixture 10: body
12 : 결속구고정부 13 : 결속구고정편12: Binding District Administration 13: Binding District
14 : 체결공 20 : 결속구14: fastening hole 20: binding hole
21a, 21b : 구멍 22a, 22b : 너트21a, 21b: hole 22a, 22b: nut
23a, 23b : 나비볼트 30 : 앙카볼트23a, 23b: butterfly bolt 30: anchor bolt
P : 수평강관 W : 벽체P: Horizontal steel pipe W: Wall
본 고안은 아파트나 고층건물 건축시 빈번히 발생하고 있는 작업자의 추락 및 실족으로 인한 인명사고 등 안전사고를 미연에 방지하기 위하여 공사현장에 가설용으로 설치되는 난간을 설치하기 위한 난간 고정구에 관한 것으로서, 특히 가설용 난간이 설치될 건축물의 벽체에 고정부착하여 수평강관으로된 난간을 고정시켜주는 건축용 난간 고정구에 관한 것이다.The present invention relates to a handrail fixture for installing a handrail installed on a construction site in order to prevent safety accidents such as a human accident due to a fall and a loss of a worker frequently occurring in the construction of an apartment or a high-rise building. In particular, the present invention relates to a building railing fixture for fixing a railing made of horizontal steel pipe by attaching it to a wall of a building where a temporary railing is installed.
종래에는 건축물의 골조작업후에 안전시설을 갖추기 위해 기 조성된 건축물의 방수턱이나 발코니, 슬라브 등의 구축물에 가설용 난간을 설치할 수 있도록 고안된 추락방지용 난간지주를 사용하여 왔으나, 이러한 경우에는 난간지주의 하단에 부착된 지지틀과 상,하로 이동하는 협지틀 및 협지구를 조작하여 슬라브등 구축물에 난간지주를 고정시키고 나서 난간지주의 상부에 일정간격으로 위치한 걸쇠가 수평강관으로된 난간을 난간지주에 고정시켜 줌으로써 작업자의 안전한 작업을 위한 건축용 가설 난간을 설치하여 왔으나, 이에 수반되는 작업과정이 복잡하고 어려웠을 뿐만 아니라 난간지주의 구조가 복잡하였다.Conventionally, a fall prevention handrail designed to install a temporary railing on a building such as a waterproof jaw, a balcony, or a slab has been used to secure safety facilities after framing a building. After fixing the railing column to the slabs and other structures by manipulating the support frame attached to the lower part and the narrowing frame moving up and down, and then, the railing with the horizontal steel pipe latched at a certain interval on the upper part of the railing column to the railing column. Building temporary construction railings for the safe work of workers by fixing them has been installed, but the accompanying work process was not only complicated and difficult, but also the structure of the railing column was complicated.
이러한 종래의 건축용 추락방지용 난간을 설치하기 위한 난간지주의 예를들면 제5도에 도시된 것과 제6도에 도시된 것과 같은 것들이 있었는데, 제5도에 도시된 종래의 난간지주(100)의 구성은 지주(101)의 하단에 지지틀(102)이 부착되어 있고 슬라브 등 구축물의 상부에 협지되는 협지구(103)가 있으며, 협지구 상부에는 핸들(104)이 있고, 이 협지구(103)를 이동시킬 수 있는 이동틀(105) 등이 있는 매우 복잡한 구조로 구성되어 있었다.Examples of the railing column for installing such a conventional fall prevention railing for construction include those shown in FIG. 5 and that shown in FIG. 6, but the configuration of the conventional railing column 100 shown in FIG. The support frame 102 is attached to the lower end of the silver support 101, and there is a narrowing region 103 that is sandwiched on an upper portion of a structure such as a slab, and a handle 104 is provided on the upper side of the narrowing region. It was composed of a very complex structure, such as a moving frame 105 that can move.
그리고 제6도에 도시한 바와 같은 또 다른 형태의 종래의 난간지주(200)도 역시 지주(201), 지지틀(202), 협지구(203), 핸들(204), 이동틀(205), 걸림판(205a) 등의 복잡한 구조로 구성된 것으로서 상기한 제5도에 도시된 종래의 난간지주(100)의 구성과 대동소이하게 구성되어 있었다.In addition, another type of conventional railing column 200 as shown in FIG. 6 also has a support 201, a support frame 202, a narrow strip 203, a handle 204, a moving frame 205, It was composed of a complicated structure such as a locking plate 205a, and was similar to that of the conventional handrail holder 100 shown in FIG.
이와 같이 종래의 건축용 추락방지 난간지주들은 그 구조가 복잡하게 구성되어 있었을 뿐만 아니라, 실제 사용시에도 실용적이지 못하다는 문제점이 있었다.As described above, the conventional fall prevention handrails for buildings not only have a complicated structure, but also have practical problems in practical use.
즉 첨부된 도면의 제5도에 도시된 종래의 난간지주(100)는 지지틀(102)을 슬라브 등의 구축물 하부에 밀착시키고 이동틀(105)을 적당한 위치로 이동시킨후 이동틀(105)에 장착되어 있는 고정쇠(105a)를 지주(101)의 고정구멍(101a)과 이동틀(105)의 고정구멍(105b)을 일치시킨후 고정쇠(105a)를 끼운 다음 나사선이 형성된 핸들(104)을 감아주면 협지구(103)가 슬라브 등 구축물의 상부에 협착됨으로써 난간지주(100)를 견고하게 고정시키고 지주(101)의 상부에 있는 걸쇠(101b, 101c)에 수평강관으로된 난간을 끼워줌으로써 필요로 하는 난간을 설치하였던 것이다.That is, the conventional railing column 100 shown in FIG. 5 of the accompanying drawings closely adheres the support frame 102 to the lower part of the construction such as slabs, and moves the movable frame 105 to an appropriate position, and then the movable frame 105. Align the fixing bracket 105a of the support 101 with the fixing hole 101a of the support 101 and the fixing hole 105b of the movable frame 105, and then insert the fixing clamp 105a, If the winding is narrowed to the upper part of the structure such as the slab 103 is secured to hold the railing column 100 and necessary by fitting the railings made of horizontal steel pipe to the clasp (101b, 101c) in the upper portion of the support 101 I had to install a railing.
그리고 제6도에 도시한 또 다른 형태의 종래의 난간지주(200)도 상기 제5도의 난간지주와 유사한 방법으로 난간을 설치하도록 되어 있는데, 다만 이동틀(205)의 작용이 다를 뿐이었다.In addition, the conventional railing column 200 shown in FIG. 6 also has a railing in a manner similar to that of the railing column of FIG. 5, except that the operation of the moving frame 205 is different.
즉 지지틀(202)을 슬라브 등의 하부에 밀착시키고 이동틀(205)을 적당한 위치로 이동시킨 다음 핸들(204)을 감아주면 협지구(203)가 슬라브의 상부를 협착시켜주게 되는데, 이때 핸들(204)의 조작에 의하여 협지구(203)에 전달되는 힘이 이동틀(205)로 작용 할 때, 이동틀(205)의 상하로 회동되는 걸림판(205a)의 걸림턱부(205b)가 지주(201)의 일측면을 붙들고 있게 되고 이의 상대적 작용력을 이동틀(205)로 받쳐서 버티게 되도록 하여 지주(201)를 고정시킨후에 이 지주(201)에 있는 걸쇠에 난간을 끼워서 설치하는 것이었다.That is, when the support frame 202 is in close contact with the lower part of the slab, the moving frame 205 is moved to an appropriate position, and then the handle 204 is wound, and the narrow strip 203 narrows the upper part of the slab. When the force transmitted to the narrow strip 203 by the operation of the 204 acts as the moving frame 205, the locking jaw portion 205b of the locking plate 205a that is rotated up and down of the moving frame 205 is a support post. After holding one side of the 201 and supporting its relative action force with the moving frame 205 to hold the support 201, the railings were installed on the latches of the support 201.
이상에서 설명한 바와 같이 종래의 건축용 난간지주(100, 200)는 그 구조가 복잡하였을 뿐만 아니라, 작업시 조작하는 시간이 오래 걸렸으며, 또한 슬라브 등 구축물의 돌설된 외측단부에만 난간지주의 설치가 가능하기 때문에 난간지주가 설치될 수 있는 한정된 위치에서만 난간을 설치할 수밖에 없었다.As described above, the conventional handrail holders 100 and 200 are not only complicated in structure, but also take a long time to operate, and can be installed only at the protruding outer end of the building such as slabs. As a result, the railings had to be installed only in a limited position where the railings could be installed.
그 뿐만 아니라 건축물의 골조작업이 끝나면 건축물의 외부에 마감공사가 이루어 지게되는데, 미장 및 타일 등의 작업시 난간설치를 위한 난간지주가 설치되어 있는 부분은 작업의 진척이 어려웠으며, 따라서 일단 난간지주를 철거한 후에 다시 한번 미장 및 타일 등의 외부작업을 하여야만 되었고, 발코니를 설치하는 과정에서는 더욱 불편을 가져왔으며, 또한 이러한 종래의 난간지주는 슬라브 등 구축물의 외측단부에 설치되기 때문에 난간지주의 지지틀과 협지구가 유동되게 되면 예측할 수 없는 사고가 발생할 수도 있다는 문제점이 있었다.In addition, when the framework is finished, the finishing work is done on the exterior of the building.In the part where the handrail is installed for railing installation during the work of plastering and tiles, the progress of the work was difficult. After dismantling it, it was necessary to perform external work such as plastering and tiles once again, which caused more inconvenience in the process of installing the balconies.In addition, the conventional handrail support is installed at the outer end of the building such as slabs. There was a problem that unpredictable accidents could occur if the framework and narrow area were flowed.
또한 이러한 종래의 난간지주는 슬라브 등에 설치되는 가설용 난간의 용도로만 쓰이는 것으로서, 작업자가 손잡이로 사용하는 핸드레일을 별도로 설치해야만 하였고, 난간지주를 제작하는 과정 및 운반과정에서 소요되는 경비와 난간지주를 설치하는 과정에서 발생하는 인건비 등으로 인하여 건축비용을 상승시킨다는 문제점도 있었다.In addition, such a conventional railing support is used only for the purpose of temporary railings installed in slabs, etc., and the worker had to separately install a handrail used as a handle, and the expenses and handrail support required in the process of manufacturing and transporting the railing support. There was also a problem that increases the construction cost due to labor costs incurred in the installation process.
본 고안은 이러한 종래의 문제점을 해소하기 위해서 고안된 것으로서, 구조가 간단하며 신속하고 견고하게 설치할 수 있는 건축용 난간 고정구를 제공하고자 하는데 그 목적이 있다.The present invention has been devised to solve such a conventional problem, and an object thereof is to provide a construction handrail fixture that is simple in structure and can be installed quickly and robustly.
이하에서 제1도 및 제2도를 참조하면서 본 고안에 의한 건축용 난간 고정구의 구성을 설명하기로 한다.Hereinafter, with reference to FIGS. 1 and 2 will be described the configuration of the building railing fixture according to the present invention.
본 고안에 의한 건축용 난간 고정구는 전체적으로 볼 때 가설용 난간이 설치될 구축물의 벽체(W)에 앙카볼트(30)에 의하여 고정부착되는 몸체부(10)와 이 몸체부(10)의 일측에 돌설되어 있어서 수평강관(P)으로된 가설용 난간이 관통되어서 삽설되도록 통공이 형성된 원통형의 결속구(20) 및 이 결속구(20)의 상,하에서 수평강관(P)을 고정시켜주는 나비볼트(23a, 23b)등으로 구성된 간단한 구조로 되어 있는바, 이를 좀더 상세히 설명하면 다음과 같다.Building handrail fixture according to the present invention as a whole, the body portion 10 is fixed to the wall (W) of the construction on which the construction handrail is to be installed by the anchor bolt 30 and the protrusion on one side of the body portion 10 The cylindrical binding hole 20 has a through-hole formed so that the temporary railing for the temporary steel rail is inserted into the horizontal steel pipe P and the butterfly bolt fixing the horizontal steel pipe P above and below the binding hole 20 ( 23a, 23b) and the like has a simple structure, which will be described in more detail as follows.
즉 본 고안의 건축용 난간 고정구(1)의 몸체부(10)는 그 일측에 수평강관(P)이 관통되어 삽설되는 원통형의 결속구(20)가 삽입, 고정되도록 이 결속구(20)의 내경과 같은 형상과 크기의 통공이 형성되어 있고, 그 상단부(11a)와 하단부(11b)는 일정한 폭으로 결속구(20)가 돌설된 방향과 같은 방향으로 절곡되어 있어서, 이 결속구(20)의 외경과 연접하여 일체를 이루는 부위에 이르러서 결속구고정부(12)를 형성하고 있으며, 이 결속구고정부(12)가 형성되지 아니한 반대편 부위에는 그 일부가 절곡되어 결속구고정편(13)이 형성되어 있고, 몸체부(10)의 다른 일측에는 몸체부(10)자체를 앙카볼트(30)로 벽체(W)에 고정시킬 수 있는 체결공(14)이 형성되어 있으며, 상기 몸체부(10)에 삽입, 고정된 결속구(20)의 상부와 하부에 천공된 구멍(21a, 22b)에는 너트(22a, 22b)가 부착되어 있어서, 결속구(20)에 삽설되는 수평강관(P)을 나비볼트(23a, 23b)로 결착, 고정시켜서 가설용 난간이 설치되도록 구성되어 있다.That is, the body portion 10 of the construction handrail fixture 1 of the present invention is the inner diameter of the fastener 20 so that the cylindrical fastener 20 is inserted and fixed through the horizontal steel pipe (P) is inserted into one side thereof. Through holes of the same shape and size are formed, and the upper end portion 11a and the lower end portion 11b are bent in the same direction as the direction in which the binding port 20 protrudes in a predetermined width, The binding fixing part 12 is formed by connecting to the outer diameter and forming a unitary fixing part 12. A part of the binding fixing part 12 is not bent and the binding fixing part 13 is formed on the opposite side where the binding fixing part 12 is not formed. On the other side of the body portion 10, the body portion 10 is formed with a fastening hole 14 that can fix itself to the wall (W) with an anchor bolt 30, the body portion 10 Nuts 22a and 22b are attached to the holes 21a and 22b drilled in the upper and lower portions of the fastening hole 20 inserted and fixed. In this case, the horizontal steel pipes P inserted into the binding holes 20 are fastened and fixed with the butterfly bolts 23a and 23b so that the temporary railings are installed.
이상에서 설명한 바와 같이 구성된 본 고안의 건축용 난간 고정구의 일실시예를 제3도 및 제4도를 참조하면서 설명하기로 한다.An embodiment of the building railing fixture of the present invention configured as described above will be described with reference to FIGS. 3 and 4.
제3도 및 제4도는 본 고안의 건축용 난간 고정구(1)의 설치상태를 예시한 것으로서, 공사현장에 있는 건축물의 벽체(W)에 난간 고정구(1)를 설치하기 위해서는 먼저 공사현장에 가설용 난간으로 설치하고자 하는 수평강관(P)의 높이와 수평을 이루는 건축물의 벽체(W)에 소정의 간격으로 미리 앙카볼트(30)를 삽설하기 위하여 뚫어 놓은 구멍에 난간 고정구(1) 몸체부(10)의 체결공(14)을 일치시키고 앙카볼트(30)를 삽설한 다음, 와샤(30a)와 너트(30b)로 난간 고정구(1)를 난간의 벽체(W)에 고정부착 하고나서, 결속구(20)에 수평강관을 삽설하고 이 수평강관(P)이 유동되지 못하도록 결속구(20)의 나비볼트(23a, 23b)를 조여주면 가설용 난간이 완성되는 것이다.3 and 4 illustrate the installation state of the building railing fixture 1 of the present invention, and in order to install the railing fixture 1 on the wall W of the building in the construction site, Handrail fixture (1) Body portion (10) in the hole drilled in order to insert the anchor bolt 30 in advance at a predetermined interval to the wall (W) of the building parallel to the height of the horizontal steel pipe (P) to be installed as a railing Align the fastening holes (14) and insert the anchor bolt (30), and then fix the handrail fixture (1) to the wall (W) of the handrail with the washer (30a) and the nut (30b), Insert the horizontal steel pipe (20) and tighten the butterfly bolts (23a, 23b) of the binding holes 20 so that the horizontal steel pipe (P) does not flow, the temporary railings are completed.
이와 같은 설치작업의 순서에 따라서 벽체에 건축공사에 필요한 수량의 가설용 난간을 설치하게 되면 보다 안전한 건축용 가설 난간을 얻을 수 있는 것이다.According to the order of the installation work, if you install a number of temporary railings for the construction work on the wall will be able to obtain a safe construction temporary railings.
이상에서 설명한 바와 같이 본 고안의 건축용 난간 고정구는 건축물 구축시 필연적으로 설치되어야 하는 가설용 난간을 신속하고 견고하게 설치할 수 있는 매우 유용한 것이며, 그 사용효과 면에서도 종래의 건축용 난간 지주와는 뚜렷하게 구별될 수 있는 것이다.As described above, the building railing fixture of the present invention is very useful for quickly and robustly installing a temporary railing that must be installed inevitably when building a building, and in terms of its use effect, it is clearly distinguished from the conventional building railing support. It can be.
또한 본 고안의 건축용 난간 고정구는 건축물의 외부마감 작업시 일정한 작업공간을 확보하여 작업상의 불편함을 방지할 수 있도록 가설용 난간을 벽체의 외측으로 부터 적당한 간격으로 떨어져 설치할 수 있도록 함으로써, 미장 및 타일공사를 일거에 손쉽게 할 수 있으며, 특히 발코니 작업시 불편을 감소시켜줄 뿐만 아니라, 이와 같이 하여 설치된 가설용 난간은 비계 및 핸드레일의 역할을 겸할 수도 있고, 안전표지판이나 건축잔해물의 낙하를 방지하는 낙하방지판을 부착할 수도 있는 등 여러 가지 부수적인 효과도 얻을 수 있는 것이며, 특히 이러한 본 고안에 의한 건축용 난간 고정구는 저렴한 가격으로 제공할 수 있는 매우 경제적인 것이다.In addition, the construction railing fixture of the present invention is to secure a certain working space during the external finishing work of the building so that the installation railings can be installed away from the outside of the wall at appropriate intervals, plastering and tile The construction can be easily done at a time, and in particular, it reduces the inconvenience of working on the balcony, and the temporary railings installed in this way can also serve as a scaffolding and handrail, and fall to prevent falling of safety signs or building debris. Various side effects can also be obtained, such as the possibility of attaching a preventive plate, and in particular, the construction handrail fixture according to the present invention is very economical that can be provided at a low price.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019960035985U KR200141992Y1 (en) | 1996-10-23 | 1996-10-23 | Rail fixing for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019960035985U KR200141992Y1 (en) | 1996-10-23 | 1996-10-23 | Rail fixing for construction |
Publications (2)
Publication Number | Publication Date |
---|---|
KR19980022625U KR19980022625U (en) | 1998-07-25 |
KR200141992Y1 true KR200141992Y1 (en) | 1999-06-01 |
Family
ID=19471108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019960035985U KR200141992Y1 (en) | 1996-10-23 | 1996-10-23 | Rail fixing for construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200141992Y1 (en) |
-
1996
- 1996-10-23 KR KR2019960035985U patent/KR200141992Y1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR19980022625U (en) | 1998-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5678654A (en) | Hanging-scaffold panel and hanging scaffold comprising said panels | |
KR200400993Y1 (en) | Safe support means of parapet for construction's work | |
KR200141992Y1 (en) | Rail fixing for construction | |
KR200205940Y1 (en) | Supporter for form construction | |
KR200232471Y1 (en) | Safety handrail clamp for wall attachment | |
JPH0450352Y2 (en) | ||
KR101596939B1 (en) | Manufacturing method for install bracket of dropping prevention net | |
KR200413775Y1 (en) | Safety structure support of new basement | |
KR940008492Y1 (en) | Post for false railing | |
KR200434150Y1 (en) | Rail of stairs for construction field | |
KR102667337B1 (en) | An anchor apparatus | |
JP4439083B2 (en) | Elevator entrance curing equipment | |
RU67612U1 (en) | SIGNAL PROTECTIVE PROTECTION OF THE FLOOR OF A BUILDING BUILDING | |
JP3024711U (en) | Opening temporary handrail mounting hardware for RC frame construction | |
KR200252406Y1 (en) | Safety Handrail Clamp for Wall Attachment | |
KR100777866B1 (en) | Newel post assembly for construction work | |
JPH0532589Y2 (en) | ||
KR20090007333U (en) | handrail support device | |
JPH0725150U (en) | Temporary roof for construction work | |
KR200489735Y1 (en) | a fixing device of handrail | |
JPH079958Y2 (en) | Temporary stage for construction of blowout parts of wooden houses | |
KR950003703Y1 (en) | Bracket for false railings | |
FR2474570A1 (en) | Scaffolding with integral shelter - uses roof cladding panels spanning longitudinal rails between transoms fixed to scaffold posts | |
KR940008490Y1 (en) | Post for false railing | |
KR970005484Y1 (en) | Safety railing for person uuder the construction of buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20040112 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |