KR20010111150A - Drying device for swage sludge - Google Patents

Drying device for swage sludge Download PDF

Info

Publication number
KR20010111150A
KR20010111150A KR1020000031302A KR20000031302A KR20010111150A KR 20010111150 A KR20010111150 A KR 20010111150A KR 1020000031302 A KR1020000031302 A KR 1020000031302A KR 20000031302 A KR20000031302 A KR 20000031302A KR 20010111150 A KR20010111150 A KR 20010111150A
Authority
KR
South Korea
Prior art keywords
sludge
drying
furnace
comb
pipe
Prior art date
Application number
KR1020000031302A
Other languages
Korean (ko)
Other versions
KR100340264B1 (en
Inventor
윤병문
Original Assignee
윤병문
서진열공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤병문, 서진열공업 주식회사 filed Critical 윤병문
Priority to KR1020000031302A priority Critical patent/KR100340264B1/en
Publication of KR20010111150A publication Critical patent/KR20010111150A/en
Application granted granted Critical
Publication of KR100340264B1 publication Critical patent/KR100340264B1/en

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

본 발명은 오수슬러지의 건조장치에 관한것으로 건조로를 이중으로하여 로통외부에 공기도입관을 씌워 공기도입로를 형성시킨 건조로 내벽에 스크류돌 스픈형안내편을 다수 고정설치하여 건조재료 슬러지의 이동, 돌입과 분산, 분리가 잘 이루어지게하고 건조로 중간에는 +자형 금망판장치가 지지대의 중심부에 착탈가능하게 삽입설치하여 건조재료의 이송분리 및 금망판에 걸러져서 건조가 효율적으로 되게하고 그 앞쪽에 고속회전의 파쇄장치를 설비하여 건조재료도입과 동시 파쇄시켜 더욱 건조가 잘 이루어지도록하고 또한 건조재료인 슬러지의 운송도입을 용이하게하기 위하여 트럭하차통 밑에 리본스크류콤베어로서 트럭하차통에 주입된 슬러지를 앵글콤베어에 이송하고 또 벨트이송콤베어로서 슬러지저장통에 저장시킨 건조재료슬러지는 리본스크류콤베어로서 슬러지주입통에 원활히 도입하게하고, 건조로(1)의 분진, 유해까스를 제거하기 위하여 각각 1차분진집진기, 소각기, 2차분진집진기, 수분제거기, 여과기와 1차까스이송관, 2차까스이송관, 3차까스이송관, 4차까스이송관으로 까스배기 및 슬러지주입통에 연결설치하여 배기되는 분진 및 유해까스를 정화 제거시켜 청정공기를 배출케하고 또 소각기내의 열교환기에서 순수온열을 로통내로 유입시켜 건조효율을 향상시키도록한 발명이다.The present invention relates to a drying device for sewage sludge, which is formed by moving a plurality of screw-dole-spun guide pieces on the inner wall of a drying furnace in which an air inlet pipe is formed by covering an air inlet pipe outside the furnace and forming a plurality of screw-dole guide pieces. In the middle of the drying furnace, the + -shaped gold panel device is inserted and detachably inserted in the center of the support, so that it can be transported and separated from the dry material and filtered by the gold panel to make the drying efficient. High speed rotation crushing device is installed at the same time with the introduction of dry material and crushing at the same time for better drying. Also, in order to facilitate the introduction of the sludge which is dry material, it is injected into the truck unloading container as ribbon screw comb under the truck unloading container. The sludge dried material is transferred to an angle comb and stored in a sludge storage container as a belt feed comb. In order to smoothly introduce into the sludge inlet as a ribbon screw comb and to remove dust and harmful cutlet in the drying furnace (1), respectively, the primary dust collector, incinerator, secondary dust collector, moisture remover, filter and primary cutlet conveying pipe Connected to the gas exhaust and sludge inlet pipes with the 2nd cut pipe, the 3rd cut pipe, and the 4th cut pipe to purify and remove the exhaust dust and harmful cutlet to discharge clean air and purify the pure air from the heat exchanger in the incinerator. It is an invention to improve the drying efficiency by introducing heat into the furnace.

Description

오수슬러지의 건조장치 {Drying device for swage sludge}Drying device for sewage sludge {Drying device for swage sludge}

본 발명은 오수슬러지의 건조장치에 관한것으로 더욱 상세하게는 슬러지건조작업을 능율적으로 처리할수 있고 또 슬러지건조시 발산되는 유해까스냄새를 완전히 정화제거시키도록 하기위한 것으로 본 발명은 저속회동케된 건조로의 중간부에 파쇄장치와 회전하는 금망판장치에의한 슬러지건조가 원활히 이루어지고 또 건조로 내벽의 스크류돌기 및 다수의 스픈형이송편에 의하여 이송건조가 잘될뿐더러 건조효율을 향상시키도록하고, 슬러지건조시 발산되는 분진 및 유해까스냄새를 분리흡입시켜서 집진기, 소각기 및 여과기를 통과하면서 정화제거시켜 슬러지건조작업시 유해까스가 외부로 발산되지 않게하고 또 열교환기의 순수온열은 건조로에 환수유입시켜 건조효율을 더욱 향상시키게할 목적으로한 발명이다.The present invention relates to a drying apparatus of sewage sludge, and more particularly, to efficiently process sludge drying operations and to completely purify and remove harmful cutlet smells emitted during sludge drying. Sludge drying by crushing device and rotating mesh panel device is smoothly done at the middle part of the furnace, and the drying process is good by screw projection of inner wall of the furnace and a number of spoon type transfer pieces, and it improves the drying efficiency. By separating and inhaling dust and harmful gas smell emitted during sludge drying, purifying and removing it through dust collector, incinerator and filter. It is an invention for the purpose of further improving the drying efficiency.

일반적으로 슬러지건조는 버어너로 가열케된 고정식 건조로 중심부에 건조재료의 이송을 위한 망통과 회전스크류 또는 벨트콤베어를 내입설치한 구조로되어 있거나, 건조실 내부에 여러층의 망판을 시설하여 망판장치가 상,하로 회동하면서 건조열을 받아 건조시키도록한 건조장치가 종래에 이용되었다.In general, sludge drying is a fixed drying furnace heated by burner and has a structure in which a net tube and a rotating screw or a belt comb are installed in the center of the drying material, or a multi-layer panel is installed inside the drying room. BACKGROUND ART A drying apparatus in which the apparatus is rotated up and down to receive drying heat and dried is conventionally used.

이러한 건조장치들은 습기가 많은 슬러지를 용이하게 분산, 분리시키지 못하여 건조시간이 느리고 늦어지므로 원활한 건조작업이 이루어지지못한 어려운 문제점이 있었고 또 건조시설에 비하여 건조능율이 저조하기 때문에 효율적 건조처리를 하지못한 문제점이 있었고 또 슬러지건조시 발산하는 분진 및 유해까스의 제거처리가 불량하여 환경정화에 공해가 되는 문제점이 있었다.These drying devices do not easily disperse and separate the moist sludge, so the drying time is slow and slow, which makes it difficult to perform a smooth drying operation. In addition, there was a problem that the pollution of the dust and harmful cutlet emitted during sludge drying is bad for the environmental purification.

본 발명은 상기한 제반문제점을 개선하고 보다 건조능율을 향상시키도록 함과 동시에 분진 및 유해까스를 정화제거시키도록 한것으로 건조로 외부에 냉각공기유입을 위한 공기도입관을 로통외부로 위설하여 냉각공기유통이되어 건조가 잘 되게하고 건조로 내벽에는 스크류돌기와 스픈형이송편을 다수 고정설치하여 건조재료인 슬러지 이송 도입이 원활하게하고 또 슬러지가 뭉쳐지는 것을 분산, 분리가 잘 이루어지도록하였다. 또 건조로의 중간에는 +자형 금망판장치가 지지대에 의하여 건조로 중심부에서 회전하면서 스픈형이송편에 의하여 슬러지분이 금망판에 담겨지고 다시 회전하면서 떨어지므로 분리가 더욱 잘되어 건조가 잘이루어지고 또 +자형 망판장치는 인출과 조립설치가 용이하여 수세청소가 가능케하고 또 건조로의 건조재료도입측에 슬러지의 파쇄장치를 설치하여 고속회전시키므로 파쇄날이 슬러지를 잘게 파쇄시키게하였다.The present invention is to improve the above-mentioned problems and to improve the drying efficiency, and at the same time to purify and remove dust and harmful cutlet, the air inlet pipe for the introduction of cooling air to the outside of the furnace by laying out the furnace through the cooling air distribution This is to make the drying well and to install a plurality of screw projections and the spun-type transfer piece on the inner wall of the drying furnace to facilitate the introduction of sludge transfer as a dry material and to distribute and separate the sludge aggregated well. In the middle of the drying furnace, the + -shaped gold platen device is rotated at the center of the drying furnace by the supporter, so that the sludge powder is contained in the gold platen by the sludge transfer piece and rotates and falls again. It is easy to take out and assemble and install the shape netting device, and it is possible to clean the water and install the sludge crushing device on the drying material introduction side of the drying furnace so that the crushing blade is finely crushed.

또한 건조재료인 슬러지의 운송도입을 용이하게하기 위하여 트럭하차통 밑에 리본스크류콤베어로서 트럭하차통에 주입된 슬러지를 앵글콤베어에 이송하고 또 벨트이송콤베어로서 슬러지저장통에 저장시킨 건조재료 슬러지는 리본스크류콤베어로서 슬러지주입통에 주입되어 건조로 내부로 용이하게 공급되게하므로 건조재료인 슬러지는 자동공급되어져서 원활한 건조작업이 되도록 하였다.In addition, in order to facilitate the introduction of the sludge, which is a dry material, the sludge injected into the truck unloading container as a ribbon screw comb under the truck unloading container is transferred to the angle comb and the dry material sludge stored in the sludge storage container as a belt conveying comb Is a ribbon screw comb that is injected into the sludge injector so that it can be easily supplied into the drying furnace so that the sludge, which is a dry material, is automatically supplied to allow smooth drying.

또한 본 발명은 건조로내의 분진 및 유해까스는 슬러지주입통을 통해서 상부로 배기되게 구성하고 있으므로 여기 슬러지주입통에 연결설치시킨 리본스크류콤베어에 분진 및 까스의 1차까스이송관, 2차까스이송관, 3차까스이송관 및 4차까스이송관을 통하여 각각의 1차분진집진기, 소각기, 2차분진집진기, 냄새제거기를 위한 여과기를 통과하면서 분진 및 유해까스를 정화제거시키도록 함으로 환경공해에 안전한 슬러지건조장치를 제공할 수 있고 또 소각기는 열교환기를 같이 설비하고 있으므로 열교환기에 의한 순수온열을 환수시켜 건조로내에 유입시키므로 슬러지건조효율을 더욱 향상시키고 또 비용절감을 가져오도록 개선한 새로운 구성의 슬러지 건조장치인 것이다.In addition, in the present invention, since the dust and harmful cutouts in the drying furnace are configured to be exhausted to the upper part through the sludge injector, the primary cutlet feeder of the dust and cutlet, the secondary cutlet feeder, Through the 3rd cutlet and 4th cutlet pipe, the sludge drying device that is safe for environmental pollution is passed through each dust collector, incinerator, secondary dust collector and filter for odor eliminator to purify dust and harmful cutlet. In addition, since the incinerator is equipped with a heat exchanger, it is a sludge drying apparatus of a new configuration that improves the sludge drying efficiency and reduces costs since the pure heat from the heat exchanger is returned to the drying furnace.

이하 본 발명은 첨부도면에 따라 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 개략적 평면도1 is a schematic plan view of the present invention

도 2는 본 발명의 일부를 단면한 측면도2 is a side cross-sectional view of a portion of the present invention;

도 3은 본 발명의 건조로의 확대 단면도3 is an enlarged cross-sectional view of the drying furnace of the present invention.

도 4는 도 3의 A-A선 확대 단면도4 is an enlarged cross-sectional view taken along the line A-A of FIG.

도 5는 도 3의 B-B선 확대 단면도5 is an enlarged cross-sectional view taken along the line B-B of FIG.

도 6은 본 발명에있어 1차분진집진기의 측면도Figure 6 is a side view of the primary dust collector in the present invention

도 7은 도 6의 평면도로 까스가 선회배출상태를보인 도면FIG. 7 is a plan view of FIG. 6 illustrating a state in which the caster is discharged.

도 8은 본 발명에있어 까스소각기 및 열교환기의 단면도8 is a cross-sectional view of the cut incinerator and the heat exchanger according to the present invention.

도 9는 도 8의 종단면도9 is a longitudinal cross-sectional view of FIG.

도 10은 본 발명에 있어서 2차분진집진기, 수분제거기 및 여과기의 측면도10 is a side view of the secondary dust collector, the water remover and the filter in the present invention

도 11은 본 발명에 있어서 냄새제거기의 확대 평단면도11 is an enlarged plan sectional view of the odor remover in the present invention;

도면의 중요부분에 대한 부호의 설명Explanation of symbols for important parts of the drawings

1 : 건조로 2 : 스크류돌기1: drying furnace 2: screw protrusion

3,3′: 스픈형이송편 4 : 로통3,3 ′: Spoon type transfer 4: Roton

5 : 공기도입관 5′: 간격편5: Air introduction pipe 5 ′: spacing

6 : 공기도입로 7 : 까스배기 및 슬러지주입통6: air introduction path 7: gas exhaust and sludge injection container

8 : 건조물배출통 9 : 부라켓8: building drain container 9: racket

10,10′: 원형바퀴 11,11′: 로울10,10 ′: Round wheel 11,11 ′: Roll

14 : 파쇄장치 15,15′: 지지대14: shredding device 15,15 ′: support

16,16′: 금망판 17 : 금망판장치16,16 ′: Gold panel 17: Gold panel

19 : 중심부 21 : 이동바퀴19: center 21: moving wheel

22 : 링판 23 : 안내통22: ring plate 23: guide tube

25 : 버어너 31 : 트럭하차통25: burner 31: truck unloading

32 : 리본스크류콤베어 33 : 호퍼32: ribbon screw combo 33: hopper

34 : 앵글콤베어 35 : 스러지저장통34: angle comb 35: sludge storage container

36 : 리본스크류콤베어 37 : 1차까스이송관36: ribbon screw comb 37: primary cut conveying pipe

37a : 2차까스이송관 37b : 3차까스이송관37a: 2nd cutlet 37b: 3rd cutlet

37c : 4차까스이송관 38 : 1차분진집진기37c: 4th cut conveyer 38: 1st dust precipitator

39 : 소각기 40 : 2차분진집진기39: incinerator 40: secondary dust collector

41 : 수분제거기 42 : 여과기41: water remover 42: filter

46 : 열교환기 48 : 열환수관46: heat exchanger 48: heat return pipe

49 : 공기주입통49: air injection cylinder

원통형 로통(4) 내벽에 통상의 스크류돌기(2)와 스픈형이송편(3)(3′)다수를 형성시키고 외면에는 공기도입관(5)을 간격편(5′)으로 공기도입로(6)가 형성되게 씌워 결합시킨 건조로(1) 양단을 일측은 기대(20)위에 설치시킨 까스배기 및 슬러지주입통(7)과 그 반대측 건조물배출통(8)간에 회동가능하게 설치하고 건조로(1) 중간 양측에는 부라켓(9)으로 원형바퀴(10)(10′)를 고정하여 하부에 접촉회동되게 축설된 로울(11)(11′)과 접촉시키고 또 일측의 로울(11)에는 모우터(M)의 축과 연결하여 동력전달로 접동회전하도록 하였다.On the inner wall of the cylindrical furnace cylinder (4), a number of ordinary screw protrusions (2) and a spoon-shaped feed piece (3) (3 ') are formed, and on the outer surface, an air inlet pipe (5) is provided as a gap piece (5'). 6) Both ends of the drying furnace (1), which are covered and joined together, are rotatably installed between the gas exhaust and sludge inlet (7) installed on the base (20) on the opposite side and the drying outlet (8) on the opposite side. (1) On both sides of the middle, the circular wheels (10) (10 ') are fixed with the bracket (9) to contact with the rolls (11) (11') arranged to be in contact pivot on the lower side. It is connected to the shaft of the motor (M) to make sliding rotation by power transmission.

또한 건조로(1)의 일측에는 모우터(M′)에 의하여 회전케된 회전축(12)을 건조재료도입측내로 연장설치하여 파쇄날(13)을 다수 회전축(12)에 고정한 파쇄장치(14)가 고속회전하면서 건조재료인 슬러지를 파쇄분리시키게하고 그 안쪽에는 도 3의 도시와같이 로통(4) 내벽사방에 길이로 다수의 지지대(15)(15′)를 대향으로 세워 고정한 중심부(19)에 금망판(16)(16′)을 경사로하여 +자형으로 조립시킨 금망판장치(17)를 착탈가능하게 중심부(19)로 삽입설치하여 스픈형이송편(3)(3′)으로 안내유입된 건조재료가 금망판장치(17)의 금망판(16)(16′)에 유입되어 걸러지게하여 분리되도록하고, 건조물배출통(8)은 후진이동이 가능하게 밑에 이동바퀴(21)를 달아 링판(22)제거후 후진시켜 건조로(1)와 분리되게하므로 내부 금망판장치(17)를 꺼내 수세청소가 가능하도록하고 또 안내통(23)내부로 외부 버어너(25)의 화염열이 건조로(1)의 로통(4)내로 안내유입되도록하였다.In addition, on one side of the drying furnace (1), a crushing device (14) in which a rotating shaft (12) rotated by a motor (M ') is installed in the drying material introduction side to fix the crushing blade (13) to a plurality of rotating shafts (12). The core rotates at high speed to separate and separate the sludge, which is a dry material, and inside thereof, a plurality of supports 15, 15 ′ are fixed to the inner wall of the furnace barrel 4 in length as shown in FIG. 3. ) Is installed on the central portion 19 so that the gold mesh plate device 17 assembled in a + shape with a slope of the gold mesh plate 16 (16 ') is inserted into the central portion 19 so as to be guided to the spoon-shaped transfer piece (3) (3'). The introduced drying material is introduced into the mesh panel 16 (16 ') of the mesh panel device 17 to be separated by filtration, and the building discharge container 8 moves the lower wheel 21 to move backward. Detach the ring plate (22) and then back to separate it from the drying furnace (1) to take out the inner mesh panel device (17) to allow washing and washing Guide tube 23 was allowed to flow into the guide rotong 4 of the flame to the heat of the external burner 25 is dried inside (1).

또한 본 발명은 건조재료 슬러지의 운송도입을 위하여 트럭하차통(31) 밑에 리본스크류콤베어(32)를 슬러지저장통(35)에 이송도입시킬수 있게 설치된 앵글콤베어(34)에 연결설치하고 또 벨트이송콤베어(34a)와 슬러지저장통(35)의 호퍼(33)와 까스배기 및 슬러지주입통(7)간에 리본스크류콤베어(36)을 연결설치하여 건조재료가 자동공급되어져서 슬러지주입통(7)내의 안내판(7′)으로 슬러지가 안내되어 로통(4)내로 공급되어지게 하였다.In addition, the present invention is connected to the angle comb 34 is installed to transport the ribbon screw conveyor 32 to the sludge storage container 35 under the truck unloading container 31 for the introduction of dry material sludge transport belt The ribbon screw comb 36 is connected between the transfer comb 34a and the hopper 33 of the sludge storage tank 35 and the gas exhaust and sludge injection cylinder 7 so that the dry material is automatically supplied to the sludge injection cylinder ( The sludge was guided to the guide plate 7 'in 7) to be supplied into the furnace 4.

또한 본 발명은 건조로(1)내의 분진 및 유해까스를 제거하기 위한 수단으로 까스배기 및 슬러지주입통(7)에 연통연결시킨 리본스크류콤베어(36)에 1차까스이송관(37)을 연결시켜 1차분진집진기(38)에서 분진 및 유해까스가 집진분리되어지게하고 또 2차까스이송관(37a)을 통해 소각기(39)에서 각분진과 냄새분진이 소각처리되도록하고 또 3차까스이송관(37b)을 통해 2차분진집진기(40)에서 또한 분진을 수세처리되게하고 4차까스이송관(37c)을 통해서 수분제거기(41)의 필터(41a)에 의거 수분제거되고 활성탄여과막(42a)으로 구성시킨 여과기(42) 내부를 통하여 활성탄여과막(42a)을 통과하면서 유해냄새가 정화되어져서 배출휀(43)에 의하여 배출관(44)으로 청정공기가 배출되어 나가도록 하였다.In addition, the present invention is the means for removing dust and harmful cutlet in the drying furnace (1) is connected to the primary cut conveying pipe (37) to the ribbon screw comb 36 connected to the cutout and sludge injection cylinder (7) Dust and harmful cutlet are collected and separated from the primary dust collector 38, and the incinerator 39 is incinerated through the second cutlet pipe 37a, and the third cutlet pipe ( The dust is washed in the secondary dust collector 40 through 37b), and the water is removed by the filter 41a of the water remover 41 through the fourth cutlet transfer pipe 37c and composed of an activated carbon filtration membrane 42a. The harmful odor was purified while passing through the activated filter medium 42 through the inside of the filter 42, and clean air was discharged to the discharge pipe 44 by the discharge fan 43.

또한 1차분진집진기(38)는 취입구(38a)로 유입된 유해까스는 내부에서 선회되면서 분진은 하부토출구(38c)로 나가고 미처리된 까스는 상부출구(38b)로 나간다. 소각기(39)내에는 열교환기(46)가 내장설치되어있어 열교환기에 의하여 가온된 온열은 환열휀(47)에 의하여 온열환수관(48)으로 공기주입통(49)에 유입하도록 하였다. 소각기(39)는 하부 소각버어너(50)로 연소실(51)을 가열하면 유입구(52)로 들어온 유해까스가 연소실(51)에서 소각 제거되고 그열은 열교환기(46)를 가열시키므로 외부공기주입구(46a)로 유입된 외부공기가 열교환기(46)내에서 더워져서 배열구(46b)로 배출케되므로 열환수관(48)으로 온열이 건조로(1)의 로통(4)내로 공급유입케 된다. 또 2차분진집진기(40)는 물분사에 의한 수세식분진기이며 3차까스이송관(37b)에서 유입구(40a)로 유입된 냄새까스는 내부 여과휠타(40b)와 분사수세기(40c)를 거쳐가는 동안 2차분진이 제거된다. 또 4차까스이송관(37c)으로 유입된 냄새까스는 수분제거기(41)의 내부에 설치한 필터(41a)를 통과하므로 수분제거가 되어지고 내부에 활성탄여과막(42a)이 다층형성한 여과기(42)에서 유해냄새까스가 정화제거케하는 구성으로 이루어진 발명구성이다.In addition, the first dust precipitator 38, while the harmful cutlet introduced into the inlet 38a turns inside, the dust goes out to the lower discharge port 38c and the untreated cut out to the upper outlet 38b. The heat exchanger 46 is installed in the incinerator 39 so that the heat heated by the heat exchanger is introduced into the air inlet 49 through the heat exchanger 47 by the heat exchanger 47. When the incinerator 39 heats the combustion chamber 51 with the lower incineration burner 50, the harmful cutlet entering the inlet 52 is incinerated in the combustion chamber 51, and the heat heats the heat exchanger 46, thereby injecting the external air inlet. Since the outside air introduced into the 46a is heated in the heat exchanger 46 and is discharged to the arranging opening 46b, the heat is supplied into the furnace 4 of the drying furnace 1 by the heat return pipe 48. . In addition, the secondary dust collector (40) is a flush dust by water spray and the odor cutlet introduced into the inlet (40a) from the third cut conveying pipe (37b) is passed through the internal filter filter (40b) and the spray water strength (40c) Secondary dust is removed. In addition, the odor cutlet introduced into the fourth cutlet transfer pipe 37c passes through the filter 41a installed inside the water remover 41, thereby removing water and having a multi-layered activated carbon filtration membrane 42a formed therein. ) Is an invention composition consisting of the configuration to purify and remove the harmful smell cutlet.

이와같이 구성된 본 발명은 외부에 설치시킨 트럭하차통(31)에서 건조재료 슬러치는 리본스크류콤베어(32) 앵글콤베어(34) 벨트이송콤베어(34a)를 통해 슬러지저장통(35)에 저장되었다가 리본스크류콤베어(36)의 가동에 의거하여 까스배기 및 슬러지주입통(7)내의 안내판(7′)에서 안내디어 건조로(1)의 로통(4)내로 자동공급되므로 재료공급이 간편하고 또 건조로(1)는 모우터(M)의 가동으로 로울(11)(11′)과 접촉회전케된 원형바퀴(10)(10′)가 저속회전에 의하여 회동을하고 또 모우터(M′)의 가동으로 파쇄장치(14)가 고속회전을 하므로 위에서 공급된슬러지는 파쇄장치(14)의 파쇄날(13)에 의하여 세분, 분리될 뿐더러 파쇄시키게 되므로 건조가 잘되고 또 파쇄된 건조재료는 로통(4) 내벽에 고정시킨 스크류돌기(2)와 다수의 스픈형이송편(3)(3′)에 의하여 용이하게 이송분리 되어지며 더욱이 로통(4) 중간부에 길게 설치된 금망판장치(17)는 건조로(1)와 함께 회동작용을 하므로 스픈형이송편(3)(3′)에 담겨 이송분리되는 건조재료는 건조로(1)내의 상부위치에서 하부로 연속 분리되면서 금망판(16)(16′)에 쏟아지고 또 금망판(16)(16′)에 담긴 슬러지분은 하부로 쏟아지는 연속작용을 계속적으로 진행하면서 전방의 버어너(25)로부터 받는 화염열을 통과시키므로 건조효율이 우수한 효과가 있다. 또한 공기주입통(49)을 통한 공기는 로통(4)외면에 씌워형성시킨 공기도입관(5) 내의 공기도입로(6)를 통과하면서 더워진 온열이 건조물배출통(8)내의 안내통(23) 외부에서 유입케되므로 버어너(25)의 화력에 의한 건조처리가 더욱 원활한 효과가 있다.In the present invention configured as described above, the dry material sludge in the truck unloading container 31 installed outside is stored in the sludge storage container 35 through the ribbon screw comb 32, the angle comb 34 and the belt feed comb 34a. According to the operation of the ribbon screw comb 36, the material is easily supplied from the guide plate 7 'in the gas exhaust and sludge injection cylinder 7 into the furnace 4 of the guide furnace drying furnace 1. In addition, the drying furnace 1 is rotated by the low speed rotation of the circular wheel 10 (10 ') in contact with the roll 11 (11') by the operation of the motor (M) and the motor (M). Since the crushing device 14 rotates at high speed due to the operation of ′), the sludge supplied from above is subdivided and separated by the crushing blade 13 of the crushing device 14 and is crushed. The screw protrusion (2) fixed to the inner wall of the furnace cylinder (4) and a plurality of spoon-shaped transfer pieces (3) (3 ') Drying material which is separated by conveying and further installed in the middle of the furnace (4) in the middle of the furnace (4) is rotated together with the drying furnace (1), so that the dry material contained in the transfer type (3) (3 ') Is continuously separated from the upper position in the drying furnace 1 to the bottom, and the sludge powder contained in the gold mesh board 16 (16 ') continuously flows downward. While passing the flame heat received from the front burner 25, there is an excellent drying efficiency. In addition, the air passing through the air inlet cylinder 49 passes through the air inlet path 6 in the air inlet pipe 5 formed by covering the outer surface of the furnace cylinder 4, and the warmed heat guide tube in the building discharge cylinder 8 ( 23) Since it is introduced from the outside, the drying treatment by the thermal power of the burner 25 has a more smooth effect.

또한 본 발명은 건조로(1)에서의 건조작업으로 발생되는 슬러지분진 및 유해냄새까스를 1차까스이송관(37) 2차까스이송관(37a) 3차까스이송관(37b) 4차까스이송관(37c)을 통해 배출휀(43)에서 흡인시켜서 1차분진집진기(38) 소각기(39) 2차분진집진기(40) 수분제거기(41) 여과기(42)에서 각각 분진 및 유해냄새를 정화제거시키므로 냄새가 없는 안전한 건조작업을 할수가 있고 또 건조로(1)는 건조물배출통(8)과 결합시킨 링판(22)의 나사를 빼내면 분리가 쉽게되므로 내부 다수의 지지대(15)(15′)의 중심부(19)에 삽입설치한 금망판장치(17)가 손쉽게 빠지므로 꺼내서 수세청소후 다시 삽입조립할 수 있어 사용이 편리한 효과가 있다.In addition, the present invention is the sludge dust and harmful odor cutlet generated during the drying operation in the drying furnace (1) primary cut conveying pipe (37) secondary cut conveying pipe (37a) tertiary cut conveying pipe (37b) quaternary cut conveying pipe (37c) Suction through the discharge 휀 (43) through the primary dust collector (38) incinerator (39) secondary dust collector (40) moisture remover (41) filter 42 to purify and remove dust and harmful odors, respectively. Safe drying operation can be performed and the drying furnace (1) is easily removed by removing the screw of the ring plate (22) combined with the drying container (8), so that the center of the plurality of supports (15, 15 ') Since the gold platen device (17) inserted into (19) is easily removed, it can be removed and reassembled after washing with water, so it is convenient to use.

Claims (3)

원통형 로통(4) 내벽에 스픈형이송편(3)(3′)다수를 형성한 외면에 공기도입관(5)을 결합시킨 건조로(1) 양단을 기대(20)위에 설치한 까스배기 및 슬러지주입통(7)과 건조물배출통(8)사시에 회동가능하게 설치하고 건조로(1)의 양측 외면에 부라켓(9)으로 원형바퀴(10)(10′)를 고정하여 하부 기대(20)위에 축설한 로울(11)(11′)과 접촉 회전할 수 있게하고 건조물배출통(8) 내의 안내통(23)을 향하여 버어너(25)를 설치하여 가열하게하고 로통(4) 중간부에는 다수의 지지대(15)(15′)를 대향으로 세운 중심부(19)에 금망판(16)(16′)을 +자형으로 조립시킨 금망장치(17)를 삽입설치하고 그전망에 파쇄장치(14)를 설비한 건조로(1)와, 트럭하차통(31)의 리본스크류콤베어(32) 및 앵글콤베어(34)과 슬러지저장통(35)의 호퍼(33) 하부 리본스크류콤베어(36)을 까스배기 및 슬러지주입통(7)을 연결하여 건조재료를 도입하게한것과, 건조로(1)의 배기까스를 분진하는 1차분진집진기(38) 소각기(39) 2차분진집진기(40) 수분제거기(41) 여과기(42)를 1차까스이송관(37) 2차까스이송관(37a) 3차까스이송관(37b) 및 4차까스이송관(37c)으로 까스배기 및 슬러지주입통(7)과 연결된 리본스크류콤베어(36)에 연결 설치하여 배기유해까스냄새를 제거하게한 것과, 소각기(39)내의 열교환기(46)의 열환수관(48)을 공기도입관(5) 입구위치에 설치된 공기주입통(49)에 연결하여 온열환수를 하도록 결합한 것을 특징으로 하는 오수슬러지의 건조장치.Cut-out vents having both ends of the drying furnace (1) mounted on the base (20) in which the air inlet pipe (5) is coupled to the outer surface of the cylindrical furnace (4) formed with a plurality of spoon-shaped transfer pieces (3) (3 ') on the inner wall; The sludge injection container (7) and the building discharge container (8) are installed so that they can rotate, and the circular wheels (10) (10 ') are fixed to the outer surfaces of both sides of the drying furnace (1) by the brackets (9). 20) to rotate in contact with the rolls 11 (11 ') laid on the top, and to install and burn the burner 25 toward the guide cylinder 23 in the building discharge container 8 to allow the heater to be heated. In the center, a gold screen device 17 in which the gold mesh boards 16 and 16 'are assembled in a + shape is inserted and installed in the central portion 19 facing the plurality of supports 15 and 15', and the shredding device is installed in the view. Ribbon screw comb bottom of hopper 33 of the drying furnace 1 equipped with 14, the ribbon screw comb 32 of the truck discharging container 31, and the angle comb 34 and the sludge storage container 35. 36. Exhaust and Sludge Injection Can (7) is connected to introduce a dry material, and the dust collector (38) primary dust collector (38) incinerator (39) secondary dust collector (40) moisture remover (41) filter ( 42) a ribbon screw comb (36) connected to a cut-out and sludge inlet (7) by a primary cut feed pipe (37) and a secondary cut feed pipe (37a) and a third cut feed pipe (37b) and a fourth cut pipe feed pipe (37c). To remove the exhaust toxic fumes, and connect the heat return pipe 48 of the heat exchanger 46 in the incinerator 39 to the air inlet 49 installed at the inlet of the air inlet 5. Drying equipment of sewage sludge, characterized in that combined to make a heat return. 제 1항에 있어서 건조물배출통(8)은 하부에 이동바퀴(21)가 부착되어있고 링판(22)으로 건조로(1)와 나사부착되어 링판(22)을 빼내면 건조물배출통(8)이 분리되게한 오수슬러지 건조장치.The dry matter discharge container (8) according to claim 1, wherein the dry discharge container (8) has a moving wheel (21) attached to the lower part, and is attached to the drying furnace (1) with a ring plate (22) to remove the ring plate (22). This sewage sludge drying device. 건조로(1)내의 금망장치(17)는 로통(4)내벽에 다수의 지지대(15)(15′)를 대향으로 세운 중심부(19)에 끼워져서 착탈이 가능하게하고 각각의 금망판(16)(16′)는 경사각으로 고정되고 금망장치(17)는 중심부(19)에서 회동할 수 있게된 오수슬러지의 건조장치.The gold mesh device 17 in the drying furnace 1 is fitted to the central portion 19 with the plurality of supports 15 and 15 'opposed to the inner wall of the furnace 4 so as to be attached and detached, and the respective gold mesh plates 16 16) is fixed to the inclination angle and the gold mesh device 17 is the sewage sludge drying device that can be rotated in the center (19).
KR1020000031302A 2000-06-08 2000-06-08 Drying device for swage sludge KR100340264B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000031302A KR100340264B1 (en) 2000-06-08 2000-06-08 Drying device for swage sludge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000031302A KR100340264B1 (en) 2000-06-08 2000-06-08 Drying device for swage sludge

Publications (2)

Publication Number Publication Date
KR20010111150A true KR20010111150A (en) 2001-12-17
KR100340264B1 KR100340264B1 (en) 2002-06-12

Family

ID=45929800

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000031302A KR100340264B1 (en) 2000-06-08 2000-06-08 Drying device for swage sludge

Country Status (1)

Country Link
KR (1) KR100340264B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100632239B1 (en) * 2004-08-27 2006-10-09 자연과학산업(주) Food Waste Continuous Carbonization Equipment
CN118108390A (en) * 2024-04-23 2024-05-31 生态环境部南京环境科学研究所 Sludge treatment device and method for ecologically treating plain river network area

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100896239B1 (en) 2007-06-28 2009-05-08 한국하이테크 주식회사 An organic waste fragmentation drying apparatus

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6023694U (en) * 1983-07-26 1985-02-18 株式会社クボタ sludge dryer
JPH0544272U (en) * 1991-11-26 1993-06-15 株式会社井上興業 Waste pollution treatment and recycling dryer equipment
JP3335870B2 (en) * 1997-03-28 2002-10-21 株式会社クボタ Rotary drum type heat treatment equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100632239B1 (en) * 2004-08-27 2006-10-09 자연과학산업(주) Food Waste Continuous Carbonization Equipment
CN118108390A (en) * 2024-04-23 2024-05-31 生态环境部南京环境科学研究所 Sludge treatment device and method for ecologically treating plain river network area

Also Published As

Publication number Publication date
KR100340264B1 (en) 2002-06-12

Similar Documents

Publication Publication Date Title
JP3529783B2 (en) Apparatus and method for producing dehydrated particulate material
JPH06341622A (en) Purifying incineration equipment of waste
KR100340264B1 (en) Drying device for swage sludge
CN212005695U (en) A burn device for chemical industry rubbish
CN211424405U (en) Environment-friendly waste incinerator
CN102008889B (en) Compound type exhaust gas purification and deodorization device
CN110454797A (en) A kind of magnetization degradation furnace
KR100952198B1 (en) Filter Assembly for Foodwaste Drying Apparatus
KR101140992B1 (en) Method for absorbing a bad smell in food waste processing apparatus
CN201815240U (en) Combined exhaust gas purifying and deodorizing device
KR20050112481A (en) The combustible bust collector
CN2332905Y (en) Mobile incinerator appts.
CN209893425U (en) Industrial organic waste gas incinerator
CN213119095U (en) Feeding device for solid waste treatment
KR20190031116A (en) High-temperature Incineration Device
CN211822406U (en) Environmental engineering solid waste administers and uses incineration device
CN210079192U (en) Domestic waste pyrolysis device
KR100254707B1 (en) Incinerator of trash
CN111804095A (en) A exhaust treatment device for processing of traditional chinese medicine plaster
CN218709844U (en) Sewage pretreatment area deodorization equipment
CN219713376U (en) Spontaneous combustion type garbage incinerator
CN205832855U (en) A kind of dying setting machine flue gas processing device
KR100366913B1 (en) Fume collector for plasma-arc cutting device
KR100336639B1 (en) A trash burner
CN218147289U (en) Higher belt cleaning device is used in non-woven fabrics production of feature of environmental protection

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120702

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20131127

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee