KR20010103924A - method for executing wall body of building - Google Patents

method for executing wall body of building Download PDF

Info

Publication number
KR20010103924A
KR20010103924A KR1020000025210A KR20000025210A KR20010103924A KR 20010103924 A KR20010103924 A KR 20010103924A KR 1020000025210 A KR1020000025210 A KR 1020000025210A KR 20000025210 A KR20000025210 A KR 20000025210A KR 20010103924 A KR20010103924 A KR 20010103924A
Authority
KR
South Korea
Prior art keywords
layer
spraying
pin
wall
base plate
Prior art date
Application number
KR1020000025210A
Other languages
Korean (ko)
Other versions
KR100363908B1 (en
Inventor
함선수
Original Assignee
함선수
주식회사 피앤티기연
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 함선수, 주식회사 피앤티기연 filed Critical 함선수
Priority to KR1020000025210A priority Critical patent/KR100363908B1/en
Publication of KR20010103924A publication Critical patent/KR20010103924A/en
Application granted granted Critical
Publication of KR100363908B1 publication Critical patent/KR100363908B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/045Means for fastening plaster-bases to a supporting structure

Landscapes

  • Building Environments (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)

Abstract

본 발명은 바탕판면에 폴리우레탄폼을 뿜칠하여 내층을 형성하고, 그 위에 시멘트몰타를 뿜칠하여 외층을 형성함으로서, 접합부없는 완전밀폐 벽체시공으로 내화, 내열, 단열성및 방음성이 우수하고, 시공기간이 짧아 시공성이 우수한 건축물의 벽체 시공방법에 관한 것으로, 바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로보사이에 바탕판을 조립하는 기초단계; 상기 바탕판표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 1차 분사단계; 상기 1차 폴리우레탄층의 복수개소에 앵커핀의 머리부를 압착식으로 삽입고정하는 핀고정단계; 상기 앵커핀이 고정된 1차 폴리우레탄층 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 2차 폴리우레탄층을 형성하는 2차 분사단계; 상기 2차풀리우레탄층 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정한 후에 시멘트몰타르를 뿜칠하여 일정두께를 갖는 시멘트층을 형성하는 뿜칠단계: 및 상기 시멘트층을 미장하거나 페인트로 마감하는 마감단계;를 포함하는 건축물의 벽체 시공방법를 제공한다.The present invention forms an inner layer by spraying a polyurethane foam on the base plate surface, and by forming a outer layer by spraying cement malta on it, it is excellent in fire resistance, heat resistance, heat insulation and soundproofing with a completely sealed wall construction without joints, It relates to a short wall construction method of the excellent construction, comprising: a basic step of assembling a plurality of stringers and crossbeams on the foundation structure installed on the floor surface, and assembling the base plate between the stringers; Spraying polyurethane foam on the surface of the base plate to form a primary polyurethane layer having a predetermined thickness; A pin fixing step of inserting and fixing the head of the anchor pin in a plurality of places of the primary polyurethane layer by pressing; A second injection step of forming a secondary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the surface of the primary polyurethane layer to which the anchor pin is fixed; After fixing the internal structural material to the pin end of the anchor pin exposed on the surface of the secondary pulley urethane layer and spraying cement mortar to form a cement layer having a predetermined thickness: and plastering the cement layer or finishing with paint Provides a construction method of the wall, including the finishing step;

Description

건축물의 벽체 시공방법{method for executing wall body of building}Method for executing wall body of building

본 발명은 건축물의 벽체를 시공하는 방법에 관한 것으로, 보다 상세히는 바탕판면에 폴리우레탄폼을 뿜칠하여 내층을 형성하고, 그 위에 시멘트몰타를 뿜칠하여 외층을 형성함으로서, 접합부없는 완전밀폐 벽체시공으로 내화, 내열, 단열성및 방음성이 우수하고, 시공기간이 짧아 시공성이 우수한 건축물의 벽체 시공방법에 관한 것이다.The present invention relates to a method for constructing a wall of a building, and more specifically, to form an inner layer by spraying a polyurethane foam on the surface of the base plate, and to form an outer layer by spraying cement malta thereon, to a completely sealed wall construction without joints The present invention relates to a wall construction method of a building having excellent fire resistance, heat resistance, heat insulation, sound insulation, and short construction time.

일반적으로 건축물의 벽체를 구축함에 있어서는, 시공하고자 하는 벽체 양면을 구성하도록 바닥면에 수직설치된 세로부재사이의 좌우양측에 거푸집용 패널을 연속하여 조립하고, 간격유지구 등의 철물을 결속하며, 그 양표면에 지지재를 설치하고 거푸집 내에 철근을 배근한 다음 반죽된 콘크리트를 타설함으로써 구축된다.In general, in constructing a wall of a building, formwork panels are continuously assembled on both left and right sides between vertical members vertically installed on the floor so as to constitute both sides of the wall to be constructed, and the hardware such as the interval retaining zone is bound. It is built by installing supporting materials on both surfaces, placing rebar in the formwork, and then pouring kneaded concrete.

그러나, 이러한 일반적인 종래의 방법은 벽체 완성후 지지재 및 간격유지구 등의 가설재를 해체해야 하기 때문에 그 작업에 숙련된 노동력을 필요로 할 뿐만 아니라 공기단축이 어려울 뿐만 아니라, 접합부에서의 단열이 완벽하게 이루어지 않는 문제점이 있었다.However, this general conventional method requires not only skilled labor for the work, but also shortening of air, and perfect insulation at the joints because the temporary materials such as support materials and gap retaining zones have to be dismantled after wall completion. There was a problem that was not made.

이에 따라, 완성된 콘크리트 벽체면에 단열효과를 높일수 있도록 단열재를 시공하기 위해서는, 유리섬유, 스티로품등과 같은 단열재를 설치해야만 하는데 이러한 유리섬유는 시공이 번거롭고, 인체에 해로운 유리가루가 날려 그 사용범위가 극히 제한적이며, 스치로품은 현장에 맞게 재단한 후에 별도의 마감재로 고정해야만 하는 번거로움이 있을 뿐만 아니라 그 이음부위가 단열처리되지 않아 시공후 완벅한 단열효과를 기대하기는 곤란한 문제점이 있었다.Accordingly, in order to construct a heat insulating material to enhance the heat insulating effect on the finished concrete wall surface, it is necessary to install a heat insulating material such as glass fiber or styro product. Such glass fiber is cumbersome in construction and blows off glass powder harmful to human body. It is extremely limited, and the styro product is not only troublesome to be fixed with a separate finishing material after cutting to fit the site, but also because the joints are not insulated, it is difficult to expect a full insulation effect after construction.

따라서, 본 발명은 상기와 같은 종래의 문제점을 해소하기 위하여 제안된 것으로서, 그 목적은, 이음매없는 완전밀폐시공으로 내화,내열, 단열성및 방음성이 우수하고, 코너부에서의 완벽한 단열효과를 얻을수 있는 한편, 시공이 간편하고, 시공기간을 단축할 수 있는 건축물의 벽체 시공방법을 제공하고자 한다.Therefore, the present invention has been proposed in order to solve the conventional problems as described above, the object of which is to achieve a perfect heat-insulating effect at the corner, excellent in fire resistance, heat resistance, heat insulation and soundproofing by seamless and completely sealed construction On the other hand, it is intended to provide a construction method of the wall of the building that can be easy to construction, shortening the construction period.

도 1은 본 발명에 따른 건축물의 벽체 시공방법의 제 1실시예를 도시한 종단면도,1 is a longitudinal sectional view showing a first embodiment of a wall construction method of a building according to the present invention;

도 2는 본 발명에 따른 건축물의 벽체 시공방법의 제 2실시예를 도시한 종단면도,Figure 2 is a longitudinal sectional view showing a second embodiment of the wall construction method of the building according to the present invention,

도 3은 본 발명에 따른 건축물의 벽체 시공방법의 제 3실시예를 도시한 종단면도,3 is a longitudinal sectional view showing a third embodiment of the wall construction method of the building according to the present invention;

도 4(a)(b)(c)(d)(e)는 본 발명에 따른 건축물의 벽체 시공방법의 제 1실시예를 도시한 작업흐름도,Figure 4 (a) (b) (c) (d) (e) is a workflow diagram showing a first embodiment of the wall construction method of the building according to the invention,

도 5(a)(b)(c)(d)(e)는 본 발명에 따른 건축물의 벽체 시공방법의 제 2실시예를 도시한 작업흐름도,Figure 5 (a) (b) (c) (d) (e) is a workflow diagram showing a second embodiment of the wall construction method of the building according to the invention,

도 6(a)(b)는 본 발명에 따른 건축물의 벽체 시공방법의 제 1실시예에 채용되는 앵커핀을 도시한 사시도, 종단면도,Figure 6 (a) (b) is a perspective view, a longitudinal sectional view showing an anchor pin employed in the first embodiment of the wall construction method of the building according to the present invention;

도 7(a)(b)는 본 발명에 따른 건축물의 벽체 시공방법의 제 2실시예에 채용되는 앵커핀을 도시한 사시도, 종단면도,Figure 7 (a) (b) is a perspective view, a longitudinal sectional view showing an anchor pin employed in the second embodiment of the wall construction method of the building according to the present invention;

도 8은 본 발명에 따른 건축물의 벽체 시공방법에 단열재로 사용되는 폴리우레탄폼의 단열성능과 다른 단열재의 단열성능을 비교한 그래프.Figure 8 is a graph comparing the thermal insulation performance of the polyurethane foam used as a heat insulating material in the wall construction method of the building according to the invention and the heat insulating performance of the other heat insulating material.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

11,21,31 ... 기초구조물 12a,22a,32a ... 세로보11,21,31 ... Foundation 12a, 22a, 32a ... Stringer

13,23,33 ... 바탕판 14a ... 1차 폴리우레탄층13,23,33 ... Substrate 14a ... Primary Polyurethane Layer

14b ... 2차 폴리우레탄층 15,25 ... 앵커핀14b ... Secondary polyurethane layer 15,25 ... anchor pin

16,26,36 ... 내부구조재 17,27 ... 시멘트층Internal structure 17,27 ... cement layer 16,26,36

상기와 같은 목적을 달성하기 위한 기술적인 구성으로써, 본 발명은,As a technical configuration for achieving the above object, the present invention,

건축물의 벽체를 시공하는 방법에 있어서,In the method of constructing the wall of the building,

바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로보사이에 바탕판을 조립하는 기초단계;A basic step of assembling a plurality of stringers and horizontal beams on a foundation structure installed on a bottom surface, and assembling a base plate between the stringers;

상기 바탕판표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 1차 분사단계;Spraying polyurethane foam on the surface of the base plate to form a primary polyurethane layer having a predetermined thickness;

상기 1차 폴리우레탄층의 복수개소에 앵커핀의 머리부를 압착식으로 삽입고정하는 핀고정단계;A pin fixing step of inserting and fixing the head of the anchor pin in a plurality of places of the primary polyurethane layer by pressing;

상기 앵커핀이 고정된 1차 폴리우레탄층 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 2차 폴리우레탄층을 형성하는 2차 분사단계;A second injection step of forming a secondary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the surface of the primary polyurethane layer to which the anchor pin is fixed;

상기 2차풀리우레탄층 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정한 후에 시멘트몰타르를 뿜칠하여 일정두께를 갖는 시멘트층을 형성하는 뿜칠단계: 및After the internal structural material is fixed to the pin end of the anchor pin exposed on the surface of the secondary pulley urethane layer by spraying cement mortar to form a cement layer having a predetermined thickness: And

상기 시멘트층을 미장하거나 벽체로 외벽을 마감하는 마감단계;를 포함함을 특징으로 하는 건축물의 벽체 시공방법을 마련함에 의한다.Plastering the cement layer or the finishing step of finishing the outer wall with a wall; by providing a wall construction method of the building comprising a.

또한, 본 발명은 건축물의 벽체를 시공하는 방법에 있어서,Moreover, in this invention, in the method of constructing the wall of a building,

바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로부사이에 바탕판을 조립하는 기초단계;A basic step of assembling a plurality of longitudinal beams and horizontal beams on a foundation structure installed on a bottom surface, and assembling a base plate between the vertical portions;

상기 바탕판 표면의 복수개소에 앵커핀의 머리부를 접착식으로 고정하는 핀고정단계;Pin fixing step of adhesively fixing the head of the anchor pin to a plurality of places on the surface of the base plate;

상기 앵커핀이 고정된 바탕판 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 분사단계;Spraying polyurethane foam onto the surface of the base plate on which the anchor pins are fixed to form a primary polyurethane layer having a predetermined thickness;

상기 2차풀리우레탄층 표면상에 노출된 앵커핀의 핀부 선단에 내부구조재를 고정한 후에 시멘트몰타르를 뿜칠하여 일정두께를 갖는 시멘트층을 형성하는 뿜칠단계: 및After the internal structural material is fixed to the tip of the pin portion of the anchor pin exposed on the surface of the secondary pulley urethane layer by spraying cement mortar to form a cement layer having a predetermined thickness: And

상기 시멘트층을 미장하거나 벽체로 외벽을 마감하는 마감단계;를 포함함을 특징으로 하는 건축물의 벽체 시공방법을 마련함에 의한다.Plastering the cement layer or the finishing step of finishing the outer wall with a wall; by providing a wall construction method of the building comprising a.

또한, 본 발명은 건축물의 벽체를 시공하는 방법에 있어서,Moreover, in this invention, in the method of constructing the wall of a building,

바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로보사이에 바탕판을 조립하는 기초단계;A basic step of assembling a plurality of stringers and horizontal beams on a foundation structure installed on a bottom surface, and assembling a base plate between the stringers;

상기 바탕판 일측면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 1차분사단계;A first injection step of forming a primary polyurethane layer having a predetermined thickness by spraying polyurethane foam on one side of the base plate;

상기 1차 폴리우레탄층의 복수개소에 앵커핀의 머리부를 압착식으로 삽입고정하는 제 1핀고정단계;A first pin fixing step of inserting and fixing the head of the anchor pin by pressing in a plurality of places of the primary polyurethane layer;

상기 바탕판의 타측면 복수개소에 앵커핀의 머리부를 접착식으로 고정하는 제 2핀고정단계;A second pin fixing step of adhesively fixing the head of the anchor pin to a plurality of other side surfaces of the base plate;

상기 앵커핀이 압착고정된 1차 폴리우레탄층 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 2차 폴리우레탄층을 형성하는 2차분사단계;A second injection step of forming a secondary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the surface of the primary polyurethane layer to which the anchor pin is pressed and fixed;

상기 앵커핀이 부착고정된 바탕판의 타측면에 폴리우레탄폼을 분사하여 일정두께를 갖는 3차 폴리우레탄층을 형성하는 3차 분사단계;Tertiary injection step of forming a tertiary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the other side of the base plate is fixed to the anchor pin;

상기 2차 풀리우레탄층 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정하고, 시멘트몰타르를 뿜칠하여 일정두께를 갖는 제 1시멘트층을 형성하는 제 1뿜칠단계:A first spraying step of fixing the internal structural material to the pin end of the anchor pin exposed on the surface of the secondary pulley polyurethane layer, and spraying cement mortar to form a first cement layer having a predetermined thickness:

상기 3차 풀리우레탄층의 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정하고, 시멘트몰타르를 뿜칠하여 일정두께를 갖는 제 2시멘트층을 형성하는 제 2뿜칠단계: 및A second spraying step of fixing the internal structural material to the pin end of the anchor pin exposed on the surface of the tertiary pulley polyurethane layer, and spraying the cement mortar to form a second cement layer having a predetermined thickness; and

상기 제 1,2시멘트층을 미장하거나 벽체로 외벽을 마감하는 마감단계;를 포함함을 특징으로 하는 건축물의 벽체 시공방법을 마련함에 의한다.Plastering the first and second cement layer or finishing the outer wall to the wall; The wall construction method of the building comprising a.

이하, 본 발명을 도면에 따라서 보다 상세히 설명한다.Hereinafter, the present invention will be described in more detail with reference to the drawings.

도 1은 본 발명에 따른 건축물의 벽체 시공방법의 제 1실시예를 도시한 종단면도이고, 도 4(a)(b)(c)(d)(e)는 본 발명에 따른 건축물의 벽체 시공방법의 제 1실시예를 도시한 공정흐름도로서, 도시한 바와같이, 본 발명의 방법은 기초단계, 1차분사단계, 핀고정단계, 2차분사단계, 뿜칠단계 및 마감단계를 거쳐 바탕판(13)의 표면에 앵커핀(15)이 묻히는 복수의 폴리우레탄층(14a)(14b)과 내부구조재(16)가 묻히는 시멘트층(17)을 다층구조로 이음매없이 완전밀폐식으로 시공하여 단열성이 우수한 벽체(10)를 구성하는 것이다.1 is a longitudinal sectional view showing a first embodiment of a wall construction method of a building according to the present invention, Figure 4 (a) (b) (c) (d) (e) is a wall construction of the building according to the invention As a process flow diagram showing a first embodiment of the method, as shown, the method of the present invention comprises a base plate, a first injection step, a pinning step, a second injection step, a spraying step, and a finishing step. A plurality of polyurethane layers 14a and 14b on which the anchor pin 15 is buried on the surface of 13) and a cement layer 17 on which the internal structural material 16 is buried are constructed in a multi-layered structure in a completely closed manner to provide a heat insulating property. This constitutes an excellent wall 10.

즉, 상기 기초단계는 도 4(a)에 도시한 바와같이, 바닥에 설치된 기초구조물(11)상에 복수개의 세로보(12a)와 가로보(12a)를 조립하고, 상기 세로보(12a)사이에 바탕판(13)을 조립하여 기본골격구조를 구성하고, 상기 기초단계후에 수행되는 1차 분사단계는 도 4(b)에 도시한 바와같이, 상기 바탕판(13)의 일측 표면에 접착성이 우수한 1차 폴리우레탄층(14a)을 20 내지 50mm의 일정두께가 될때 까지 작업자가 스프레이장치(gusmer H-2000)를 이용하여 시공하고자 하는 부위에 폴리우레탄폼을 분사한다. 이러한 경우, 분사된 폴리우레탄폼은 바로 발포되어 단열재인 고체상태로 수초내로 급속팽창되어 경화된다.That is, the foundation step is as shown in Figure 4 (a), assembling a plurality of stringers (12a) and crossbeams (12a) on the base structure 11 installed on the floor, and the ground between the stringers (12a) Assembling the plate 13 to form a basic skeleton structure, the first injection step is performed after the foundation step, as shown in Figure 4 (b), excellent adhesion to one surface of the base plate 13 The operator injects the polyurethane foam to the site to be constructed using the spray device (gusmer H-2000) until the primary polyurethane layer 14a has a predetermined thickness of 20 to 50 mm. In this case, the sprayed polyurethane foam is immediately foamed and rapidly expanded to harden in a solid state as a heat insulator and cured.

그리고, 상기 1차 폴리우레탄층(14a)이 일정시간 경과하여 이음매없는 단열층을 형성한 후에 수행되는 핀고정단계는 도 4(b)와 도 6(a)(b)에 도시한 바와같이, 머리부(15a)와 일정길이를 갖는 핀부(15b)를 일체로 구성한 앵커핀(15)의 상기 머리부(15a)에 돌출형성된 앵커부(15c)를 상기 1차 폴리우레탄층(14a)표면의 복수개소에 압착식으로 삽입하여 상기 핀부(15b)가 1차 폴리우레탄층(14a)에 대하여 수직하게 설치되도록 위치고정한다.In addition, the pinning step performed after the primary polyurethane layer 14a has elapsed for a predetermined time to form a seamless insulating layer, as shown in Figs. 4 (b) and 6 (a) (b), the head A plurality of anchor portions 15c protruding from the head portion 15a of the anchor pin 15 that integrally constitutes the portion 15a and the fin portion 15b having a predetermined length are formed on the surface of the primary polyurethane layer 14a. The pin portion 15b is fixed in position so as to be vertically installed with respect to the primary polyurethane layer 14a.

여기서, 상기 앵커핀(15)은 폴리우레탄층과 같이 견고하게 경화된 부위에 압착삽입될수 있도록 단부가 뾰족한 앵커부(15c)를 일측면에 복수개 돌출형성한 철판부재로 이루어진 머리부(15a)와, 상기 머리부(15a)의 타측면 중앙에 후단이 수직하게 설치되고, 와이어매쉬, 메탈라스및 철근과 같은 내부구조재(16)를 간편하게 고정할수 있도록 선단부에 'U'자형 절곡부(15c)를 굴곡형성한 일정길이의 핀부(15b)를 일체로 갖추어 구성된다.Here, the anchor pin 15 is a head portion 15a made of a steel plate member protruding a plurality of anchor portion (15c) with one end portion to be pressed into the hardened portion, such as a polyurethane layer on one side and The rear end is vertically installed at the center of the other side of the head part 15a, and the 'U'-shaped bent part 15c is provided at the front end to easily fix the internal structural material 16 such as wire mesh, metal lath and reinforcing bars. It is comprised by integrally equipping the fin part 15b of the predetermined length bent.

또한, 상기 머리부(15a)는 각 모서리부분을 상기 핀부(15a)의 정반대쪽으로 절곡하여 단부가 뾰족한 앵커부(15c)를 형성할수 있도록 다각형 철판부재로 구성되어도 바람직하다.In addition, the head portion 15a may be formed of a polygonal iron plate member such that each corner portion is bent toward the opposite side of the pin portion 15a to form an anchor portion 15c having a sharp end.

연속하여, 이러한 앵커핀(15)을 1차 폴리우레탄층(14a)의 표면에 복수개 압착식으로 고정한 후, 경화된 1차 폴리우레탄층(14a)의 표면에 다시 상기 스프레이장치로서 폴리우레탄폼을 분사하여 일정두께 20 내지 200mm를 갖는 2차 폴리우레탄층(14b)을 형성하고, 분사된 폴리우레탄폼에 의해서 형성된 상기 2차 폴리우레탄층(14b)은 일정시간이 경과한 후에 경화된다. 이때, 상기 2차 폴리우텐탄층(14b)의 뿜칠시공시 두께측정이 곤란하기 때문에 상기 핀부(15b)몸체의 길이중간에 별도의 표시부를 표시하여 작업자가 일정한 두께로 뿜칠작업을 수행할수 있도록 하여도 좋다.Subsequently, a plurality of such anchor pins 15 are fixed to the surface of the primary polyurethane layer 14a by pressing, and then the polyurethane foam is again applied to the surface of the cured primary polyurethane layer 14a as the spray device. By spraying to form a secondary polyurethane layer 14b having a predetermined thickness of 20 to 200mm, the secondary polyurethane layer 14b formed by the sprayed polyurethane foam is cured after a predetermined time has elapsed. At this time, since it is difficult to measure the thickness of the secondary polybutene layer 14b during spraying, a separate display part may be displayed in the middle of the length of the pin part 15b so that the operator can perform the spraying operation with a certain thickness. good.

이러한 경우, 상기 1차 폴리우레탄층(14a)에 고정된 앵커핀(15)의 머리부(15a)는 도 4(c)에 도시한 바와같이, 상기 1차 폴리우레탄층(14a)과 2차폴리우레탄층(14b)사이에 배치되고, 상기 앵커핀(15)의 핀부(15b) 대부분은 선단에 형성된 절곡부(15c)를 포함하는 일부가 노출될 때 까지 상기 2차 폴리우레탄층(14b)에 묻히기 때문에, 상기 복수개의 앵커핀(15)은 분사된 후 급속팽창되어 경화되는 1,2차 폴리우레탄층(14a)(14b)과 일체로 고정된다.In this case, the head portion 15a of the anchor pin 15 fixed to the primary polyurethane layer 14a is secondary to the primary polyurethane layer 14a as shown in FIG. 4 (c). The secondary polyurethane layer 14b is disposed between the polyurethane layers 14b, and most of the pin portions 15b of the anchor pins 15 are partially exposed, including the bent portions 15c formed at their ends. Since it is buried in, the plurality of anchor pins 15 are fixed integrally with the primary and secondary polyurethane layers 14a and 14b which are sprayed and then rapidly expanded and cured.

연속하여 상기 2차 풀리우레탄층(14b)이 완전히 경화된 후에 이루어지는 시멘트 뿜칠단계는 도 4(d)(e)에 도시한 바와같이, 상기 2차폴리우레탄층(14b)의 표면상으로 선단이 일부 노출된 앵커핀(15)의 핀부(15b)선단에 형성된 절곡부(15c)의 입구에 와이어매쉬, 메탈라스및 철근등과 같은 내부구조재(16)를 가까이 댄다음, 그 내측으로 밀면, 입구가 좁은 절곡부(15c)내로 내부구조재(16)가 탄력적으로 끼워지고, 다시 오므라드는 좁은 입구에 의해서 상기 내부구조재(16)를 간편하게 1차로 고정조립할수 있는 것이다.The cement spraying step, which is performed after the secondary polyurethane layer 14b is completely cured in succession, has a front end on the surface of the secondary polyurethane layer 14b, as shown in FIG. When the inner structural material 16 such as wire mesh, metal lath, rebar, etc. is brought close to the inlet of the bent portion 15c formed at the tip of the pin portion 15b of the partially exposed anchor pin 15, the inlet is pushed inward. The inner structural member 16 is elastically fitted into the narrow bent portion 15c, and the inner structural member 16 can be easily fixed and assembled primarily by a narrow entrance.

이어서, 상기 절곡부(15c)내에 조립된 내부구조재(16)를 와이어와 같은 결속부재로서 고정한 후에 또다른 스프레이장치로서 반죽된 시멘트몰타르를 상기 내부구조재(16)가 설치된 2차 폴리우레탄층(14b)표면으로 뿜칠하여 상기 내부구조재(16)가 묻힐수 있을 정도의 일정두께를 갖는 시멘트층(17)을 형성한다.Subsequently, after fixing the internal structural member 16 assembled in the bent portion 15c as a binding member such as a wire, cement mortar kneaded as another spray device is provided with the secondary polyurethane layer 14b provided with the internal structural member 16. The cement layer 17 is sprayed onto the surface to form a cement layer 17 having a predetermined thickness such that the internal structural material 16 can be buried.

그리고, 작업자는 상기 시멘트층(17)을 표면이 미려하도록 미장하거나 상기 시멘트층이 굳어진 후에 페인트로서 칠을 하거나 벽체로 외벽을 최종적으로 마감하는 단계를 수행하여 건축물의 벽체(10)를 시공하는 작업을 마무리한다.Then, the worker plasters the cement layer 17 so that the surface is beautiful, or paints it with paint after the cement layer is hardened or finally finishes the outer wall with the wall to construct the wall 10 of the building. To finish.

한편, 도 2는 본 발명에 따른 건축물의 벽체 시공방법의 제 2실시예를 도시한 종단면도이고, 도 5(a)(b)(c)(d)(e)는 본 발명에 따른 건축물의 벽체 시공방법의 제 2실시예를 도시한 공정흐름도로서, 도시한 바와같이 본 발명의 시공방법은기초단계, 핀고정단계, 분사단계, 뿜칠단계 및 마감단계를 거쳐 바탕판(23)의 일측면에 앵커핀(25)이 묻히는 폴리우레탄층(24)과 내부구조재(26)가 묻히는 시멘트층(27)을 다층구조로 이음매없이 완전밀폐식으로 시공하여 단열성이 우수한 벽체(20)를 구성하는 것이다.On the other hand, Figure 2 is a longitudinal sectional view showing a second embodiment of the wall construction method of the building according to the invention, Figure 5 (a) (b) (c) (d) (e) of the building according to the invention As a process flow diagram showing a second embodiment of the wall construction method, as shown, the construction method of the present invention is one side of the base plate 23 through the basic step, pin fixing step, spraying step, spraying step and finishing step The polyurethane layer 24 on which the anchor pins 25 are buried and the cement layer 27 on which the internal structural material 26 is buried are constructed in a multi-layered structure in a completely closed manner to form a wall 20 having excellent heat insulation. .

즉, 상기 기초단계는 도 5(a)에 도시한 바와같이, 바닥에 설치된 기초구조물(21)상에 복수개의 세로보(22a)와 가로보(22b)를 설치하고, 상기 세로보(22a)사이에 바탕판(23)을 조립하여 기본 골격을 구성하는 것이고, 상기 핀고정단계는 도 5(b)에 도시한 바와같이, 상기 바탕판(23)표면의 복수개소에 머리부(25a)와 일정길이를 갖는 핀부(25b)로 이루어진 앵커핀(25)의 머리부(25a)를 접착식으로 상기 바탕판(23)의 표면에 대하여 핀부(25b)가 수직하도록 복수개 위치고정하는 것이다.That is, the foundation step is, as shown in Figure 5 (a), a plurality of stringers 22a and horizontal beams 22b are installed on the foundation structure 21 installed on the floor, and the ground between the stringers 22a The plate 23 is assembled to form a basic skeleton, and the pinning step includes the head 25a and a predetermined length at a plurality of places on the surface of the base plate 23, as shown in FIG. The head portion 25a of the anchor pin 25 made of a pin portion 25b having a plurality of positions is fixed by adhesively so that the pin portion 25b is perpendicular to the surface of the base plate 23.

여기서, 상기 앵커핀(25)은 도 7(a)(b)에 도시한 바와같이, 철판부재로 이루어진 머리부(25a)와, 상기 바탕판(23)과 머리부(25a)사이에서의 열전달을 차단할수 있도록 폴리에칠렌폼, 폴리스치렌보드등과 같은 단열재로 구성되어 상기 머리부(25a)의 일측면에 접착제(p1)를 매개로 부착되는 매개판(25c)과, 상기 매개판(25c)의 외측면에 부착되고, 배지(25d)를 갖는 양면테이프(p2)및, 상기 머리부(25a)의 타측면중앙에 후단이 수직하게 연결되고, 상기 내부구조재(16)를 간편하게 연결할수 있도록 선단에 'U'자형 절곡부(25e)를 절곡형성한 일정길이의 핀부(25b)로 구성된다.Here, the anchor pin 25 is a heat transfer between the head portion 25a made of an iron plate member, and the base plate 23 and the head portion 25a, as shown in Figure 7 (a) (b) It is composed of a heat insulating material such as polyethylene foam, polystyrene board, etc. so as to block the medium plate 25c attached to one side of the head portion 25a through an adhesive p1, and the medium plate 25c. It is attached to the outer side, the double-sided tape (p2) having a medium (25d), and the rear end is vertically connected to the center of the other side of the head portion 25a, and to the front end so that the internal structure 16 can be easily connected It consists of the fin part 25b of the predetermined length which bend | folded the "'" shaped bend part 25e.

이에 따라, 상기와 같은 앵커핀(25)을 설치하는 작업은 먼저 상기 양면테이프(p2)의 배지(25d)를 벗겨내어 노출된 양면테이프(p2)의 접착면을 바탕판(23)에 간편하게 부착하면, 상기 양면테이프(p2)와 머리부(25a)와의 사이에서의 열전달을 차단할수 있도록 일정두께의 단열재(25c)를 장착한 앵커핀(25)을 보다 간편하게 접착식으로 설치할수 있는 것이다.Accordingly, in the installation of the anchor pin 25 as described above, first, the medium 25d of the double-sided tape p2 is peeled off, and the adhesive surface of the exposed double-sided tape p2 is easily attached to the base plate 23. In this case, the anchor pin 25 equipped with a heat insulating material 25c having a predetermined thickness may be more easily adhesively installed to block heat transfer between the double-sided tape p2 and the head 25a.

이러한 접착식 앵커핀(25)은 압착삽입식 앵커핀(15)대신에 폴리우레탄층에 접착식으로 적용할수도 있다.The adhesive anchor pin 25 may be adhesively applied to the polyurethane layer instead of the crimping anchor pin 15.

상기와 같이 앵커핀(25)을 바탕판(23)면에 접착식으로 복수개 고정설치한 후에 이루어지는 폴리우레탄폼을 분사하는 단계는 도 5(c)에 도시한 바와같이, 상기 앵커핀(25)이 복수개 위치고정된 바탕판(23)면측으로 스프레이장치로서 폴리우레탄폼을 상기 앵커핀(25)의 머리부(25a)와 핀부(25b)의 선단 일부를 제외한 대부분이 묻힐 정도로 분사하여 일정두께를 갖는 폴리우레탄층(24)을 형성하는 것이다. 이때, 상기 폴리우텐탄층(24b)의 뿜칠시공시 그 두께측정이 곤란하기 때문에 상기 핀부(25b)몸체의 길이중간에 별도의 표시부를 표시하여 작업자가 일정한 두께로 뿜칠작업을 수행할수 있도록 하여도 좋다.As shown in FIG. 5 (c), the spraying of the polyurethane foam made after the plurality of anchor pins 25 are fixedly installed on the surface of the base plate 23 as described above is performed by the anchor pins 25. Spraying the polyurethane foam as a spray device toward the surface of the plurality of fixed position base plate 23 to the extent that most of the tip except the head portion 25a and the pin portion 25b of the anchor pin 25 is buried to have a predetermined thickness The polyurethane layer 24 is formed. At this time, since it is difficult to measure the thickness of the poly- utentan layer 24b when spraying, a separate display part may be displayed in the middle of the length of the pin portion 25b so that the worker may perform the spraying operation with a certain thickness. .

그리고, 상기 폴리우레탄층(24)이 급속팽창되어 경화된 후에는, 도 5(d)(e)에 도시한 바와같이 상기 폴리우레탄층(24)의 표면상으로 핀부(25b)선단에 형성된 절곡부(25e)를 포함하는 선단일부가 노출됨에 따라, 작업자는 상기 앵커핀(25)의 핀부(25b)에 형성된 절곡부(25e)의 입구에 와이어매쉬, 메탈라스및 철근와 같은 내부구조재(26)를 가까이 댄 다음 내측으로 밀어 이들을 탄력적으로 삽입하여 간편하게 조립하고, 탄력적으로 벌어진후 오므라드는 상기 절곡부(25e)의 입구로서 내부구조재(26)를 1차로 고정한 다음, 이들을 와이어와 같은 결속재로서 확고히 고정한다.After the polyurethane layer 24 is rapidly expanded and cured, bending is formed at the tip of the pin portion 25b on the surface of the polyurethane layer 24 as shown in Fig. 5 (d) (e). As the tip portion including the portion 25e is exposed, the worker may have an internal structural member 26 such as a wire mesh, a metal lath and a reinforcing bar at an inlet of the bent portion 25e formed at the pin portion 25b of the anchor pin 25. Close to and then pushed inwards to insert them elastically for easy assembly, and after opening elastically, Omrad first fixed the internal structural member 26 as the inlet of the bent portion 25e, and then firmly fixed them as a binding material such as wire. Fix it.

이러한 상태에서 또다른 스프레이장치로서 반죽된 시멘트몰타르를 폴리우레탄층(24)으로 뿜칠하여 상기 내부구조재(26)가 묻히도록 일정두께를 갖는 시멘트층(27)을 형성하는 뿜칠단계를 수행한다.In this state, the sprayed cement mortar is sprayed onto the polyurethane layer 24 as another spraying device to form a cement layer 27 having a predetermined thickness so that the internal structural material 26 is buried.

연속하여, 작업자는 상기 시멘트층(27)의 표면을 미려하게 미장하거나 상기 시멘트층이 굳어진 후에 페인트로 칠을 하거나 벽체로 외벽을 최종적으로 마감하는 마감단계를 수행하여 벽체(20)를 완성한다.Subsequently, the operator finishes the wall 20 by beautifully plastering the surface of the cement layer 27 or performing a finishing step of painting or finally finishing the outer wall with a wall after the cement layer is hardened.

도 3은 본 발명에 따른 건축물의 벽체 시공방법의 제 3실시예를 도시한 종단면도로서, 도시한 바와같이, 본 발명의 방법은 기초단계, 1차 분사단계, 제 1핀고정단계, 제 2핀고정단계, 2차 분사단계, 3차 분사단계, 제 1뿜칠단계, 제 2뿜칠단계 및 마감단계를 거쳐 바탕판(33)의 좌우양측면에 앵커핀(15)(25)과 내부구조재(36)(46)가 묻힐수 있도록 복수의 폴리우레탄층(34a)(34b)(44) 및 시멘트층(37)(47)을 다층구조로 이음매없이 완전밀폐식으로 시공하여 벽체(30)를 구성하는 것이다.Figure 3 is a longitudinal sectional view showing a third embodiment of the wall construction method of the building according to the present invention, as shown, the method of the present invention is a basic step, the first injection step, the first pin fixing step, the second The anchor pins 15 and 25 and the internal structural members 36 on the left and right sides of the base plate 33 through pin fixing, secondary spraying, tertiary spraying, first spraying, second spraying and finishing. A plurality of polyurethane layers 34a, 34b, 44, and cement layers 37, 47 are constructed in a multi-layered seamless and completely closed manner to form a wall 30 so as to be buried). will be.

즉, 상기 기초단계는 상기와 마찬가지로 바닥에 설치된 기초구조물(31)상에 복수개의 세로보와 가로보(32b)를 설치하고, 상기 세로보사이에 바탕판(43)을 조립하여 기본골격구조를 구성한다.That is, in the basic step, as described above, a plurality of stringers and horizontal beams 32b are installed on the foundation structure 31 installed on the floor, and the base plate 43 is assembled between the stringers to form a basic skeleton structure.

이어서, 상기 1차분사단계는 상기 바탕판(33)의 일측면에 스프레이장치로서 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층(34a)을 형성하는 것이고, 상기 분사된 1차 폴리우레탄층(34a)이 급속팽창되어 경화된 후에는 상기 1차 폴리우레탄층(34a)표면의 복수개소에 머리부(15a)와 선단에 절곡부(15c)를 형성한 일정길이의 핀부(15b)로 이루어진 앵커핀(15)의 상기 머리부(15a)에 돌출형성된 앵커부(15c)를 압착식으로 삽입함으로서 상기 1차 폴리우레탄층(34a)에 대하여 상기 앵커핀(15)의 핀부(15b)가 수직하도록 고정하는 제 1핀고정단계를 수행한다.Subsequently, the primary spraying step is to spray a polyurethane foam as a spray device on one side of the base plate 33 to form a primary polyurethane layer 34a having a predetermined thickness, and the sprayed primary poly After the urethane layer 34a is rapidly expanded and cured, the fin portion 15b having a predetermined length is formed by forming the head portion 15a and the bent portion 15c at the tip of a plurality of places on the surface of the primary polyurethane layer 34a. The pin portion 15b of the anchor pin 15 with respect to the primary polyurethane layer 34a by inserting the anchor portion 15c protrudingly formed into the head portion 15a of the anchor pin 15 made of a compression type. The first pin fixing step is performed to fix the vertical.

연속하여 상기 1차 폴리우레탄층(34a)을 도포하지 않은 상기 바탕판(33)의 타측면에 양면테이프(p2)의 배지(25d)를 벗기어 접착면이 노출된 머리부(25a)를 부착하여 선단에 절곡부(25e)를 형성한 일정길이의 핀부(25b)를 갖는 앵커핀(25)을 상기 바탕판(33)의 타측면에 접착식으로 복수개 설치하는 제 2고정단계를 수행한다.Continuously peeling the medium 25d of the double-sided tape p2 on the other side of the base plate 33 on which the primary polyurethane layer 34a is not applied, and attaching the head portion 25a on which the adhesive surface is exposed. By performing a second fixing step of installing a plurality of anchor pin 25 having a pin portion (25b) of a predetermined length to form a bent portion (25e) on the other end adhesively on the other side of the base plate (33).

그리고, 상기 2차 분사단계는 복수개의 앵커핀(15)이 표면에 고정된 1차 폴리우레탄층(34a)측으로 상기 앵커핀(15)의 핀부(15b)선단에 형성된 절곡부(15c)를 포함하는 일부가 노출될 때 까지 스프레이장치로서 폴리우레탄폼을 분사하여 일정두께를 갖는 2차 폴리우레탄층 (34b)을 형성하는 것이다.In addition, the secondary spraying step includes a bent portion 15c formed at the tip of the pin portion 15b of the anchor pin 15 toward the primary polyurethane layer 34a having a plurality of anchor pins 15 fixed to the surface thereof. By spraying the polyurethane foam as a spray device until a portion of the exposed portion is to form a secondary polyurethane layer 34b having a predetermined thickness.

연속하여, 상기 3차 분사단계는 상기와 같은 폴리우레탄층이 형성되지 않은 상기 바탕판(33)의 타측면측으로 상기 앵커핀(25)의 핀부(25b)선단에 형성된 절곡부(25e)를 포함하는 일부가 노출될 때 까지 스프레이장치로서 폴리우레탄폼을 분사하여 일정두께를 갖는 3차 폴리우레탄층(44)을 형성하는 것이다.Subsequently, the third spraying step includes a bent portion 25e formed at the tip of the pin portion 25b of the anchor pin 25 toward the other side of the base plate 33 on which the polyurethane layer is not formed. By spraying the polyurethane foam as a spray device until a portion of the exposed portion to form a third polyurethane layer 44 having a predetermined thickness.

그리고, 상기 분사된 2차 폴리우레탄층(34b)이 급속팽창되어 경화된 후에는 그 표면상으로 노출된 앵커핀(15)의 핀부(15b)선단에 형성된 절곡부(15c)에 와이어매쉬, 메탈라스및 철근과 같은 내부구조재(36)를 외부이탈이 곤란하도록 삽입하고, 삽입된 내부구조재(36)를 와이어와 같은 결속재로서 확고히 고정한다. 이러한 상태에서, 또다른 스프레이장치로서 반죽된 시멘트몰타르를 2차 폴리우레탄층(34b)으로 뿜칠하여 상기 내부구조재(36)가 묻히도록 일정두께를 갖는 제 1시멘트층(37)을 형성하는 제 1뿜칠단계를 수행한다.After the sprayed secondary polyurethane layer 34b is rapidly expanded and cured, a wire mesh and metal are formed on the bent portion 15c formed at the tip of the pin portion 15b of the anchor pin 15 exposed on the surface thereof. The internal structural members 36 such as laths and rebars are inserted so as to be difficult to be detached from the outside, and the inserted internal structural members 36 are firmly fixed as a binding member such as a wire. In this state, a first spraying cement mortar is sprayed with a secondary polyurethane layer 34b as another spraying device to form a first cement layer 37 having a predetermined thickness so that the internal structural material 36 is buried. Perform the spraying step.

연속하여, 상기 3차폴리우레탄층(44)이 급속팽창되어 경화된 후에는 그 표면상으로 노출된 앵커핀(25)의 핀부(25b)선단에 형성된 절곡부(25e)에 와이어매쉬, 메탈라스및 철근과 같은 내부구조재(46)를 외부이탈이 곤란하도록 삽입하여 조립하고, 이들은 와이어와 같은 결속재로서 확고히 고정되며, 이러한 상태에서 스프레이장치로서 반죽된 시멘트몰타르를 상기 내부구조재(46)가 묻히도록 상기 3차 폴리우레탄층(44)으로 뿜칠하여 일정두께를 갖는 제 2시멘트층(47)을 형성하는 제 2뿜칠단계를 수행한다.Subsequently, after the tertiary polyurethane layer 44 is rapidly expanded and cured, the wire mesh and metallas are formed on the bent portion 25e formed at the tip of the pin portion 25b of the anchor pin 25 exposed on the surface thereof. And inserting the internal structural members 46 such as reinforcing bars so as to be difficult to deviate from outside, and they are firmly fixed as a binding material such as wire, and in this state, the internal structural members 46 are buried with cement mortar kneaded as a spray device. A second spraying step of forming a second cement layer 47 having a predetermined thickness by spraying the third polyurethane layer 44 is performed.

최종적으로, 상기 바탕판(33)의 좌우양측에 뿜칠되어 내,외부벽을 구성하는 상기 제 1,2시멘트층(37)(47)을 미려하게 미장거나 일정시간 경과후에 굳어진 제 1,2시멘트층(37)(47)의 표면을 페인트로서 칠을 하거나 벽체로 내,외부벽을 마감하는 단계를 수행하여 벽체(30)를 완성한다.Finally, the first and second cements, which are sprayed on the left and right sides of the base plate 33, are beautifully plastered or hardened after a predetermined time after the first and second cement layers 37 and 47 constituting the inner and outer walls. The surfaces of the layers 37 and 47 are painted with paint or the interior and exterior walls of the walls are completed to complete the walls 30.

여기서, 상기 1,2차폴리우레탄층(34a)(34b),제 1시멘트층(37)과 상기 2차 폴리우레탄층(44),제 2시멘트층(47)은 상기 바탕판(33)의 좌우양측면에 내,외부벽을 구성하도록 선택적으로 각각 채용되거나 좌우 동일한 대칭구조로 시공될수도 있다.Here, the primary and secondary polyurethane layers 34a and 34b, the first cement layer 37, the secondary polyurethane layer 44, and the second cement layer 47 are formed of the base plate 33. The inner and outer walls may be selectively employed on both left and right sides, or may be constructed in the same symmetrical structure.

한편, 상술한 바와같은 건축물의 벽체를 시공하는 방법에 있어서, 상기 폴리우레탄층(14a)(14b)(24)(34a)(34b)(44)은 한꺼번에 분사하여 일시에 그 층두께를 올리면, 발포 팽창압에 의해서 들뜰 위험이 있기 때문에, 전체적으로 초벌을 10mm 정도 도포후 일정시간 경과시켜 접착율을 증가시키고 나서, 15 내지 30mm씩 층두께를 올리면서 원하는 두께까지 분사하여 도포하는 것이 바람직하다.On the other hand, in the method of constructing the wall of the building as described above, when the polyurethane layers 14a, 14b, 24, 34a, 34b, 44 are sprayed at once and raise the layer thickness at once, Since there is a risk of lifting due to the expansion pressure of foaming, it is preferable to apply the spraying to the desired thickness while increasing the adhesion rate by increasing the layer thickness by 15 to 30 mm after the initial application of about 10 mm for a certain time.

또한, 상기 폴리우레탄층(14a)(14b)(24)(34a)(34b)(44)과 시멘트층(17)(27) (37)(47)은 상기 바탕판(13)(23)(33)과 각 천장판(5)과의 사이에 코너접합부를 형성하지 않아 단열성을 높일수 있도록 연속적으로 도포/뿜칠하여 구성되는 것이 좋다.Further, the polyurethane layers 14a, 14b, 24, 34a, 34b, 44 and the cement layers 17, 27, 37, 47 are the base plates 13, 23 ( 33) and each ceiling plate (5) do not form a corner joint is preferably configured by applying / spraying continuously to increase the thermal insulation.

그리고, 상기 시멘트층(17)(27)(37)(47)에 묻히는 내부구조재(16)(26)(36) (46)는 시공후 내구성을 높일수 있도록 상기 기초구조물(11)(21)(31)내의 철근과 연결구성되어야 한다.In addition, the internal structures 16, 26, 36, and 46 buried in the cement layers 17, 27, 37, and 47 may be used to increase durability after construction. 31) It must be connected with the reinforcing bar in

상기한 벽체 시공방법에 사용되는 폴리우레탄(POLYURETHANE)은 화학적으로 우레탄결합(NH-CO-O)을 일정량 이상 포함한 고분자 화합물의 총칭이고, 이러한 우레탄결합은 폴리이소시아네이트(POLYISOCYANATE ; NCO)와 폴리올(POLYOL ; OH)과의 부가반응에 의해 얻어지며, 이러한 폴리우레탄은 표 1에 도시한 바와같은 물리적 특성을 가지며, 표 2에 도시한 같이 목재합판, 알루미늄판, 칼라철판, F.R.P.판, 콘크리트, 스테인레스판,스치로폼, 밤라이트및 석고보드과 같은 다양한 종류의 바탕판(13)(23)(33)인 피착제에 부착될 수 있는 자기접착성을 갖는 소재이다.Polyurethane (POLYURETHANE) used in the above-described wall construction method is a generic term for a high molecular compound chemically containing a certain amount or more of a urethane bond (NH-CO-O), such a urethane bond is a polyisocyanate (POLYISOCYANATE; NCO) and polyol (POLYOL) Obtained by addition reaction with OH), and such polyurethane has physical properties as shown in Table 1, and wood plywood, aluminum plate, color steel plate, FRP plate, concrete, stainless plate as shown in Table 2. It is a material having a self-adhesive property that can be attached to the adherend, which is various kinds of base plates 13, 23, 33 such as styrofoam, balmite and gypsum board.

항목Item 물성치Property 시험방법Test Methods 밀도(g/m3)Density (g / m 3 ) 0.025 내지 0.0500.025 to 0.050 KSM3809KSM3809 열전도율(Kcal/mh℃)Thermal Conductivity (Kcal / mh ℃) 0.016 내지 0.0200.016 to 0.020 "" 압축강도(kg/cm2)Compressive strength (kg / cm 2 ) 1.5 내지 4.51.5 to 4.5 "" 인장강도(kg/cm2)Tensile Strength (kg / cm 2 ) 2.5 내지 5.02.5 to 5.0 "" 흡수율()Absorption rate () 3미만Less than 3 KSM3809KSM3809 독립기포율()Independent Bubble Rate () 9090 안전사용온도(℃)Safe operating temperature (℃) -170 내지 100-170 to 100 모세관현상Capillary phenomenon 없음none

피착제Adhesive 접착력(kg/cm2)Adhesive force (kg / cm 2 ) 피착제Adhesive 접착력(kg/cm2)Adhesive force (kg / cm 2 ) 목재합판Wood plywood 1.51.5 알루미늄판Aluminum plate 1.51.5 칼라철판Iron plate 22 F.R.P. 판F.R.P. plate 1.51.5 콘크리트concrete 1.71.7 스테인레스판Stainless plate 1.51.5

상기 표 2에서 알루미늄, FRP, 스테인레스판은 표면처리를 끝낸상태에서 측정한 값이다.In Table 2, aluminum, FRP, and stainless plates are measured values after surface treatment is finished.

또한, 도 4는 본 발명에 따른 건축물의 벽체 시공방법에 단열재로 사용되는 폴리우레탄폼의 단열성능과 다른 단열재의 단열성능을 비교한 그래프로서, 도시한 바와같이, 폴리우레탄폼의 단열성능이 스티로폼, 유리섬유, 퍼라이트판, 시멘트판, 합판및 발포콘크리트와 같은 다른 단열재에 비하여 1.5 내지 7배로 우수하기 때문에 시공된 건축물에서의 열손실을 현저히 줄일수 있는 것이다.In addition, Figure 4 is a graph comparing the thermal insulation performance of the polyurethane foam used as a heat insulating material in the wall construction method of the building according to the present invention and the thermal insulation performance of the other heat insulating material, as shown, the thermal insulation performance of the polyurethane foam is styrofoam It is 1.5 to 7 times better than other insulation materials such as glass fiber, perlite board, cement board, plywood and foam concrete, which can significantly reduce the heat loss in the construction.

그리고, 하기 표 3은 본 발명과 종래기술에 채용되는 자재별 특성을 비교한 한 것이다.And, Table 3 below is a comparison of the characteristics of each material employed in the present invention and the prior art.

항목Item 종래예 1(스티로품 50t +0.5t 칼라강판)Conventional example 1 (styro product 50t + 0.5t color steel sheet) 종래예 2(우레탄 50t 샌드위치판넬)Conventional Example 2 (Urethane 50t Sandwich Panel) 본 발명(우레탄뿜칠 50t +시멘트몰타르 20t)The present invention (urethane spray 50t + cement mortar 20t) 밀도(g/cm2)Density (g / cm 2 ) 0.016 내지 0.0300.016 to 0.030 0.030 내지 0.0700.030 to 0.070 0.028 내지 0.0450.028 to 0.045 열전도율(Kcal/mh℃)Thermal Conductivity (Kcal / mh ℃) 0.030 내지 0.03210.030 to 0.0321 0.018 내지 0.0220.018 to 0.022 0.016 내지 0.0200.016 to 0.020 수분투과율(g/mh mmhg)Moisture Permeability (g / mh mmhg) 0.060.06 0.020.02 0.020.02 압축강도(kg/cm2)Compressive strength (kg / cm 2 ) 1 내지 2.31 to 2.3 1.5 내지 51.5 to 5 1.5 내지 51.5 to 5 시공기간/면적Construction period / area 6인×1일=50m2 6 people × 1 day = 50m 2 3인×1일=100m2 3 persons × 1 day = 100m 2 3인×1일=250m2 3 persons × 1 day = 250m 2

상기 표 3에 나타난 바와같이,본 발명의 열전도율, 수분투과율은 종래예 1,2에 비하여 낮은 반면에 압축강도는 높아 단열성능및 내구성이 우수함을 알수 있고, 시공기간및 면적면에서 종래와 비교하여 보다 적은 작업인원수로서 수배의 면적을 시공할수 있는 작업생산성이 높기 때문에, 시공기간및 인건비를 현저히 줄일수 있다.As shown in Table 3, the thermal conductivity and moisture permeability of the present invention are lower than those of the conventional examples 1 and 2, but the compressive strength is high, so that the thermal insulation performance and durability are excellent. Since the work productivity is high, which can make several times the number of workers with less work force, the construction period and labor cost can be significantly reduced.

즉, 종래에는 시공기간이 길어 많은 작업인력이 투입되어 인건비 지출이 과다하게 소요되고, 효과적인 인력관리가 곤란할 뿐만 아니라 시공면이 직사광선에 장시간 노출되었을때 판의 접합부나 층과 층이 접착력의 약화에 기인하여 박리(박리되는 현상을 발생하는 반면에, 본 발명은 3인 1조로 구성하여 현장에서의 인원관리가 용이하고, 인력운영이 자유롭고, 시공기간이 짧아 인건비를 줄일수 있을 뿐만 아니라 시공일체가 뿜칠로서 이루어져 접합부에서의 접착력약화에 따른 박리현상을 예방할수 있으며, 장시간의 자외선 노출이나 하,동절기의 급격한 온도변화에도 이상이 발생되지 않는다.In other words, in the past, the construction period is long, and many labor force is input, excessive labor cost is required, and effective manpower management is difficult, and when the construction surface is exposed to direct sunlight for a long time, the joints, layers, and layers of the plate are weakened in the adhesive strength. Due to the delamination caused by the separation, the present invention is composed of a group of three people, so that the personnel management in the field is easy, the manpower operation is free, and the construction period is short, thereby reducing labor costs as well as the whole construction. It can be prevented from being peeled off due to weak adhesion at the joint, and no abnormality occurs even when exposed to ultraviolet rays for a long time or a sudden temperature change in winter or winter.

상술한 바와같은 본 발명에 의하면, 폴리우레탄층의 경화속도가 빠르기 때문에 경사면에서도 평면과 같은 발포품 두께를 낼수 있으며, 다른 단열재에 비하여 시공이 빠르고, 뛰어난 접착력으로 다양한 종류의 바탕판에서도 간편한 시공이 가능하며, 폴리우레탄층의 두께를 자유롭게 조절할수 있고, 경화후 두께감소나 수축의 발생이 없다.According to the present invention as described above, since the curing speed of the polyurethane layer is fast, it is possible to give a foamed product thickness such as a flat surface even on the inclined surface, and the construction is faster than other heat insulators, and easy construction on various kinds of base plates with excellent adhesive strength. It is possible to freely adjust the thickness of the polyurethane layer, there is no reduction in thickness or shrinkage after curing.

또한, 바탕판과 천정판이 서로 만나는 코너부에서 이음새없는 연속적인 단열폼을 형성하기 때문에, 완전한 단열및 방수가 가능하고, 동일두께에서 다른 단열재에 비해 3배 내지 5배의 단열효과를 얻을수 있을 뿐만 아니라, 외벽처리 조적, 블록조보다 공기를 절약하고, 시공이 간편하여 전체건축비용을 줄일수 있다.In addition, since a continuous continuous insulation foam is formed at the corners where the base plate and the ceiling plate meet each other, complete insulation and waterproof are possible, and at the same thickness, the insulation effect is three to five times higher than other insulation materials. In addition, it saves air than exterior wall treatment masonry and block masonry, and the construction is simple, which can reduce the overall construction cost.

그리고, 내벽 또는 외벽을 시멘트층으로 마감할수 있기 때문에 내,외벽마감을 다양한 방법(일반 간축물과 같음)으로 시공할수 있으며, 내화벽을 형성하므로 화재에 대한 안정성을 높일수 있는 한편, 내,외벽단열시 시멘트몰타르 공법을 적용함으로서 드라이비트의 공법보다 공기및 시공비용을 절약할수 있으며, 외벽시공을 다양하게 수행할수 있는 효과가 얻어진다.And since the inner or outer wall can be finished with cement layer, the inner and outer wall can be finished in various ways (same as general compact), and the fireproof wall is formed to increase the stability against fire, while the inner and outer wall insulation By applying cement mortar method at the time, air and construction cost can be saved more than dry bit method, and the effect of various external wall construction can be obtained.

Claims (10)

건축물의 벽체를 시공하는 방법에 있어서,In the method of constructing the wall of the building, 바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로보사이에 바탕판을 조립하는 기초단계;A basic step of assembling a plurality of stringers and horizontal beams on a foundation structure installed on a bottom surface, and assembling a base plate between the stringers; 상기 바탕판표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 1차 분사단계;Spraying polyurethane foam on the surface of the base plate to form a primary polyurethane layer having a predetermined thickness; 상기 1차 폴리우레탄층의 복수개소에 앵커핀의 머리부를 압착식으로 삽입고정하는 핀고정단계;A pin fixing step of inserting and fixing the head of the anchor pin in a plurality of places of the primary polyurethane layer by pressing; 상기 앵커핀이 고정된 1차 폴리우레탄층 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 2차 폴리우레탄층을 형성하는 2차 분사단계;A second injection step of forming a secondary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the surface of the primary polyurethane layer to which the anchor pin is fixed; 상기 2차풀리우레탄층 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정한 후에 시멘트몰타르를 뿜칠하여 일정두께를 갖는 시멘트층을 형성하는 뿜칠단계: 및After the internal structural material is fixed to the pin end of the anchor pin exposed on the surface of the secondary pulley urethane layer by spraying cement mortar to form a cement layer having a predetermined thickness: And 상기 시멘트층을 미장하거나 벽체로 외벽을 마감하는 마감단계;를 포함함을 특징으로 하는 건축물의 벽체 시공방법.Plastering the cement layer or finishing the outer wall to finish the wall; Wall construction method of the building comprising a. 제 1항에 있어서,The method of claim 1, 상기 앵커핀은 폴리우레탄층과 같이 견고하게 경화된 부위에 압착삽입될수 있도록 단부가 뾰족한 앵커부를 일측면에 복수개 돌출형성한 철판부재로 이루어진머리부와, 상기 머리부의 타측면 중앙에 후단이 수직하게 설치되고, 와이어매쉬, 메탈라스및 철근과 같은 내부구조재를 간편하게 고정할수 있도록 선단부에 'U'자형 절곡부를 굴곡형성한 일정길이의 핀부를 일체로 갖추어 구성됨을 특징으로 하는 건축물의 벽체 시공방법.The anchor pin is a head portion consisting of a steel plate member protruding a plurality of anchor portions on one side so that the anchor pin can be pressed into a hardened portion, such as a polyurethane layer, the rear end is perpendicular to the center of the other side of the head A method of constructing a wall of a building, comprising: a fin having a predetermined length integrally formed with a curved bent portion at a distal end thereof so as to easily fix internal structural materials such as wire mesh, metal lath, and reinforcing bars. 제 2항에 있어서,The method of claim 2, 상기 머리부는 각 모서리부분을 상기 핀부의 정반대쪽으로 절곡하여 단부가 뾰족한 앵커부를 형성할수 있도록 다각형 철판부재로 구성됨을 특징으로 하는 건축물의 벽체 시공방법.The head is a wall construction method of the building, characterized in that consisting of a polygonal iron plate member so that each corner portion is bent toward the opposite side of the pin portion to form a pointed anchor portion. 건축물의 벽체를 시공하는 방법에 있어서,In the method of constructing the wall of the building, 바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로부사이에 바탕판을 조립하는 기초단계;A basic step of assembling a plurality of longitudinal beams and horizontal beams on a foundation structure installed on a bottom surface, and assembling a base plate between the vertical portions; 상기 바탕판 표면의 복수개소에 앵커핀의 머리부를 접착식으로 고정하는 핀고정단계;Pin fixing step of adhesively fixing the head of the anchor pin to a plurality of places on the surface of the base plate; 상기 앵커핀이 고정된 바탕판 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 분사단계;Spraying polyurethane foam onto the surface of the base plate on which the anchor pins are fixed to form a primary polyurethane layer having a predetermined thickness; 상기 2차풀리우레탄층 표면상에 노출된 앵커핀의 핀부 선단에 내부구조재를 고정한 후에 시멘트몰타르를 뿜칠하여 일정두께를 갖는 시멘트층을 형성하는 뿜칠단계: 및After the internal structural material is fixed to the tip of the pin portion of the anchor pin exposed on the surface of the secondary pulley urethane layer by spraying cement mortar to form a cement layer having a predetermined thickness: And 상기 시멘트층을 미장하거나 벽체로 외벽을 마감하는 마감단계;를 포함함을 특징으로 하는 건축물의 벽체 시공방법.Plastering the cement layer or finishing the outer wall to finish the wall; Wall construction method of the building comprising a. 제 4항에 있어서,The method of claim 4, wherein 상기 앵커핀은 철판부재로 이루어진 머리부와, 상기 바탕판과 머리부사이에서의 열전달을 차단할수 있도록 단열재로 구성되어 상기 머리부의 일측면에 접착제를 매개로 부착되는 매개판과, 상기 매개판의 외측면에 부착되고, 배지를 갖는 양면테이프및, 상기 머리부의 타측면중앙에 후단이 수직하게 연결되고, 상기 내부구조재를 간편하게 연결할수 있도록 선단에 'U'자형 절곡부를 절곡형성한 일정길이의 핀부로 구성됨을 특징으로 하는 건축물의 벽체 시공방법.The anchor pin is composed of a head plate made of a steel plate member, the insulation plate to block heat transfer between the base plate and the head portion is a medium plate attached to one side of the head via an adhesive, and the outside of the medium plate It is attached to the side, the double-sided tape having a medium, the rear end is vertically connected to the center of the other side of the head, and the pin portion of a certain length bent to form a 'U' shaped bent portion at the front end so that the internal structural material can be easily connected Wall construction method of the building, characterized in that configured. 제 5항에 있어서,The method of claim 5, 상기 매개판은 폴리에칠렌폼, 폴리스치렌보드등과 같은 단열소재로 구성됨을 특징으로 하는 건축물의 벽체 시공방법.The intermediate plate is a wall construction method of the building, characterized in that composed of insulation materials such as polyethylene foam, polystyrene board. 건축물의 벽체를 시공하는 방법에 있어서,In the method of constructing the wall of the building, 바닥면에 설치된 기초구조물상에 복수개의 세로보와 가로보를 조립하고, 상기 세로보사이에 바탕판을 조립하는 기초단계;A basic step of assembling a plurality of stringers and horizontal beams on a foundation structure installed on a bottom surface, and assembling a base plate between the stringers; 상기 바탕판 일측면에 폴리우레탄폼을 분사하여 일정두께를 갖는 1차 폴리우레탄층을 형성하는 1차분사단계;A first injection step of forming a primary polyurethane layer having a predetermined thickness by spraying polyurethane foam on one side of the base plate; 상기 1차 폴리우레탄층의 복수개소에 앵커핀의 머리부를 압착식으로 삽입고정하는 제 1핀고정단계;A first pin fixing step of inserting and fixing the head of the anchor pin by pressing in a plurality of places of the primary polyurethane layer; 상기 바탕판의 타측면 복수개소에 앵커핀의 머리부를 접착식으로 고정하는 제 2핀고정단계;A second pin fixing step of adhesively fixing the head of the anchor pin to a plurality of other side surfaces of the base plate; 상기 앵커핀이 압착고정된 1차 폴리우레탄층 표면에 폴리우레탄폼을 분사하여 일정두께를 갖는 2차 폴리우레탄층을 형성하는 2차분사단계;A second injection step of forming a secondary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the surface of the primary polyurethane layer to which the anchor pin is pressed and fixed; 상기 앵커핀이 부착고정된 바탕판의 타측면에 폴리우레탄폼을 분사하여 일정두께를 갖는 3차 폴리우레탄층을 형성하는 3차 분사단계;Tertiary injection step of forming a tertiary polyurethane layer having a predetermined thickness by spraying a polyurethane foam on the other side of the base plate is fixed to the anchor pin; 상기 2차 풀리우레탄층 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정하고, 시멘트몰타르를 뿜칠하여 일정두께를 갖는 제 1시멘트층을 형성하는 제 1뿜칠단계:A first spraying step of fixing the internal structural material to the pin end of the anchor pin exposed on the surface of the secondary pulley polyurethane layer, and spraying cement mortar to form a first cement layer having a predetermined thickness: 상기 3차 풀리우레탄층의 표면상에 노출된 앵커핀의 핀부선단에 내부구조재를 고정하고, 시멘트몰타르를 뿜칠하여 일정두께를 갖는 제 2시멘트층을 형성하는 제 2뿜칠단계: 및A second spraying step of fixing the internal structural material to the pin end of the anchor pin exposed on the surface of the tertiary pulley polyurethane layer, and spraying the cement mortar to form a second cement layer having a predetermined thickness; and 상기 제 1,2시멘트층을 미장하거나 벽체로 외벽을 마감하는 마감단계;를 포함함을 특징으로 하는 건축물의 벽체 시공방법.Plastering the first and second cement layers or finishing the outer wall to the wall; Construction method of the building wall comprising a. 제 7항에 있어서,The method of claim 7, wherein 상기 1,2차폴리우레탄층,제 1시멘트층과 상기 2차 폴리우레탄층,제 2시멘트층은 상기 바탕판의 좌우양측면에 내,외부벽을 구성하도록 선택적으로 각각 채용되거나 좌우 동일한 대칭구조로 시공됨을 특징으로 하는 건축물의 벽체 시공방법.The first and second polyurethane layers, the first cement layer, the second polyurethane layer, and the second cement layer are selectively employed to form inner and outer walls on both left and right sides of the base plate, respectively, or have the same left and right symmetrical structure. Wall construction method of the building, characterized in that the construction. 제 1,4및 7항중 어느 한 항에 있어서,The method according to any one of claims 1, 4 and 7, 상기 시멘트층에 묻히는 내부구조재는 시공후 내구성을 높일수 있도록 상기 기초구조물내의 철근과 연결구성됨을 특징으로 하는 건축물의 벽체 시공방법.The internal structure buried in the cement layer is a wall construction method of the building, characterized in that it is configured to be connected to the reinforcing bar in the basic structure to increase the durability after construction. 제 1,4및 7항중 어느 한 항에 있어서,The method according to any one of claims 1, 4 and 7, 상기 바탕판은 목재합판, 알루미늄판, 칼라철판, F.R.P판, 콘크리트, 스테인레스판, 스치로폼, 밤라이트및 석고보드로 구성됨을 특징으로 하는 건축물의 벽체시공방법.The base plate is a wall construction method of the building, characterized in that consisting of wood plywood, aluminum plate, color iron plate, F.R.P plate, concrete, stainless steel plate, styrofoam, balmite and gypsum board.
KR1020000025210A 2000-05-12 2000-05-12 method for executing wall body of building KR100363908B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000025210A KR100363908B1 (en) 2000-05-12 2000-05-12 method for executing wall body of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000025210A KR100363908B1 (en) 2000-05-12 2000-05-12 method for executing wall body of building

Publications (2)

Publication Number Publication Date
KR20010103924A true KR20010103924A (en) 2001-11-24
KR100363908B1 KR100363908B1 (en) 2002-12-11

Family

ID=45811748

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000025210A KR100363908B1 (en) 2000-05-12 2000-05-12 method for executing wall body of building

Country Status (1)

Country Link
KR (1) KR100363908B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020003053A (en) * 2000-07-01 2002-01-10 명호근 A Method of sound Absorbing and Insulating Material with Lightweight Aerated Concrete
KR100934633B1 (en) * 2008-02-05 2009-12-31 (주)현대종합건축사사무소 Ocher foam for construction
KR101027618B1 (en) * 2009-09-25 2011-04-06 강인선 A Outer Insulating Gang Form, a Method of Construction Outer Wall Concrete of a Building, and a Outer Wall of the Same
CN108849086A (en) * 2018-06-26 2018-11-23 河北省农林科学院经济作物研究所 Combined wall and heliogreenhouse comprising the combined wall
KR20200027332A (en) * 2018-09-04 2020-03-12 김경자 Dome building using autoclaved lighweight concrete block and its construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100755364B1 (en) 2005-12-05 2007-09-04 이철수 construction method for an equipment structure with a chemical resistance and a mechanical strength in a chemical equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58207450A (en) * 1982-05-27 1983-12-02 株式会社タイガ−産業 Lath float applied structure
KR950019070U (en) * 1994-11-19 1995-07-24 유명조 Interior and exterior brick assembly panel
JPH0941613A (en) * 1995-07-31 1997-02-10 Takiron Co Ltd Structure of mortar wall
KR200159645Y1 (en) * 1997-09-25 1999-10-15 이춘오 Wall finishing structure
KR100226654B1 (en) * 1997-10-02 1999-10-15 임광식 Interior and exterior finishing method of a building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020003053A (en) * 2000-07-01 2002-01-10 명호근 A Method of sound Absorbing and Insulating Material with Lightweight Aerated Concrete
KR100934633B1 (en) * 2008-02-05 2009-12-31 (주)현대종합건축사사무소 Ocher foam for construction
KR101027618B1 (en) * 2009-09-25 2011-04-06 강인선 A Outer Insulating Gang Form, a Method of Construction Outer Wall Concrete of a Building, and a Outer Wall of the Same
CN108849086A (en) * 2018-06-26 2018-11-23 河北省农林科学院经济作物研究所 Combined wall and heliogreenhouse comprising the combined wall
KR20200027332A (en) * 2018-09-04 2020-03-12 김경자 Dome building using autoclaved lighweight concrete block and its construction method

Also Published As

Publication number Publication date
KR100363908B1 (en) 2002-12-11

Similar Documents

Publication Publication Date Title
US9151046B1 (en) Concrete slab having integral wall base forms and wall base plates for automated construction and system thereof
US8567153B1 (en) Composite concrete and framing system and method for building construction
US3559355A (en) Building construction system and components therefor
AU2017258845B2 (en) Improved composite concrete and framing system and method for building construction
US20100229489A1 (en) Method of Autoclaved Aerated Concrete (AAC) Wall Construction
US6871466B2 (en) Structure formed of foaming cement and lightweight steel and a structural system and method of forming the structural system
US20110036048A1 (en) Building that uses composite light-weight panels for structure and a construction method therefor
US20050235598A1 (en) Wall construction method
US6151857A (en) Prefabricated composite construction system for internal and/or external building-walls
KR100363908B1 (en) method for executing wall body of building
US6591570B2 (en) Architectural post and beam system
US20020184846A1 (en) Insulated building panel and method
EP1736609B1 (en) System for construction with pre-fabricated panels, and pre-fabricated panel
JPH11193588A (en) Mounting method of fire-resistive material in outside-heat insulation construction method of reinforced-concrete structure
KR20050073708A (en) Monolithic stratiform composite pannel for a wall of building and method for constructing the wall with it
KR20220107496A (en) method for executing wall body of building
US20060283119A1 (en) Building unit and method of constructing buildings therewith
KR20140024135A (en) Architectural board and method for manufacturing and construction process of the same
KR20140032640A (en) Construction method of two-srory building using red clay brick
JPH0478776B2 (en)
WO1990003480A1 (en) Structure panel and a joint between such panels and method of using and manufacturing the panel
JP3015650U (en) Exterior wall repair structure
DE2451143A1 (en) Layered insulating panels for indoor swimming pool buildings etc. - incorporates hard foamed plastic layer coated with aluminium foil
JP3587220B2 (en) Renovation structure
JPH08326270A (en) Exterior wall repairing construction

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee