KR20010000883U - A device for testing and preparating hot strip work roll - Google Patents

A device for testing and preparating hot strip work roll Download PDF

Info

Publication number
KR20010000883U
KR20010000883U KR2019990011050U KR19990011050U KR20010000883U KR 20010000883 U KR20010000883 U KR 20010000883U KR 2019990011050 U KR2019990011050 U KR 2019990011050U KR 19990011050 U KR19990011050 U KR 19990011050U KR 20010000883 U KR20010000883 U KR 20010000883U
Authority
KR
South Korea
Prior art keywords
roll
cylinder
wheel bearing
insertion hole
inspection
Prior art date
Application number
KR2019990011050U
Other languages
Korean (ko)
Inventor
김규철
김상욱
황명철
Original Assignee
이구택
포항종합제철 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이구택, 포항종합제철 주식회사 filed Critical 이구택
Priority to KR2019990011050U priority Critical patent/KR20010000883U/en
Publication of KR20010000883U publication Critical patent/KR20010000883U/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B38/00Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B27/00Rolls, roll alloys or roll fabrication; Lubricating, cooling or heating rolls while in use
    • B21B27/06Lubricating, cooling or heating rolls
    • B21B27/10Lubricating, cooling or heating rolls externally
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B28/00Maintaining rolls or rolling equipment in effective condition
    • B21B28/02Maintaining rolls in effective condition, e.g. reconditioning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B38/00Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
    • B21B38/008Monitoring or detecting vibration, chatter or chatter marks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

본 고안은 압연대기롤의 검사 및 준비장치에 관한 것으로, 특히 바닥에 설치되면서 롤초크(2)를 안치하는 롤안치대(10-1)가 스크루(10-4)와 실린더(10-6)에 의해 전후진과 상하강되고, 휠베어링(7)을 안치하는 롤러(10-10)로부터 진동센서(10-13)에서 진동을 측정하면 진동분석기(17)에서 분석하여 휠베어링(7)의 이상유무를 판단하는 롤안치 및 휠베어링검사부(10)와; 차단셔터(12-3)가 개방되면 삽입구(12-1)에 내장된 발열부재(12-7)가 상기 롤안치대(10-1)에 안치된 압연대기롤(1)을 예열하는 롤예열부(12)와; 벽체의 상단에 형성되는 삽입구(18-1)에 차단셔터(18-2)가 삽입되어 압연대기롤(1)을 외부와 차단하는 롤차폐부(18)와; 전후벽체에 설치되면서 스크루(9-3)와 실린더(9-8)에 의해 상하강과 전후진되는 분사노즐(9-11)이 초크라이너(2-1)에 그리스를 도포하는 그리스도포부(9)와; 상기 그리스도포부(9) 사이에 설치되면서 실린더(13-2)에 의해 전후진되는 와이퍼(13-3)를 롤(1)표면에 밀착시키는 롤표면의 이물질제거부(13)와; 좌우벽체에 설치되면서 모터(8-2)와 실린더(8-3)에 의해 회전과 전후진되는 커플링(8-5)이 롤단부(3)에 끼워지는 롤센터조정부(8)와; 상기 롤센터조정부(8)의 양측에 설치되면서 스크루(11-3)와 실린더(11-8)에 의해 상하강과 전후진되는 커플링(11-4)이 작동대(11-13)에 의해 조인트(5)와 자동 단속되는 그리스급지부(11)로 구성되는 것을 특징으로 하는 압연대기롤의 검사 및 준비장치에 관한 것이다.The present invention relates to a device for inspecting and preparing rolling rolls, and in particular, a roll support base (10-1) for mounting a roll choke (2) while being installed on a floor includes a screw (10-4) and a cylinder (10-6). When the vibration is measured by the vibration sensor (10-13) from the roller (10-10), which is placed up and down and up and down, and the wheel bearing (7) is settled, the vibration analyzer (17) analyzes the abnormality of the wheel bearing (7) Roll set and wheel bearing inspection unit 10 to determine the presence and absence; When the shut-off shutter 12-3 is opened, the preheating roll 12 for preheating the rolled air waiting roll 1 placed on the roll rest 10-1 by the heat generating member 12-7 embedded in the insertion hole 12-1. Part 12; A blocking shutter 18-2 inserted into the insertion hole 18-1 formed at the top of the wall to block the rolling standby roll 1 from the outside; Christ gun (9), which is installed on the front and rear walls and which spray nozzles (9-11) are moved up and down and back and forth by the screw (9-3) and the cylinder (9-8) to apply grease to the chokeliner (2-1) Wow; A foreign material removal portion 13 on a roll surface which is installed between the christening portions 9 and closely adheres to the surface of the roll 1 with the wiper 13-3 advancing back and forth by the cylinder 13-2; A roll center adjusting unit 8 fitted to the roll end 3 with a coupling 8-5 which is installed on the left and right walls and rotated and moved forward and backward by the motor 8-2 and the cylinder 8-3; Couplings 11-4, which are installed at both sides of the roll center adjusting unit 8 and moved up and down and back by the screws 11-3 and the cylinders 11-8, are jointed by the operating table 11-13. (5) and the grease feed unit 11 is automatically interrupted, and relates to an inspection and preparation device for a rolled waiting roll.

Description

압연대기롤의 검사 및 준비장치{A DEVICE FOR TESTING AND PREPARATING HOT STRIP WORK ROLL}Inspection and preparation device for rolling waiting rolls {A DEVICE FOR TESTING AND PREPARATING HOT STRIP WORK ROLL}

본 고안은 압연대기롤의 검사 및 준비장치에 관한 것으로, 특히 밀스탠드에 투입하기 전 압연대기롤의 초크에 그리스를 급지하고, 휠베어링을 점검하는 동시에 롤표면을 세척하고 초크라이너에 그리스를 도포하면서 롤의 센터링을 조정하기 위한 압연대기롤의 검사 및 준비장치에 관한 것이다.The present invention relates to an inspection and preparation device for a rolled waiting roll. In particular, the grease is fed to the chalk of the rolled wait roll before being put into the mill stand, the wheel bearing is checked, the surface of the roll is washed, and the grease is applied to the chalk liner. The present invention relates to an inspection and preparation device for a rolled waiting roll for adjusting the centering of the roll.

일반적으로, 도1에 도시한 바와같이 열간압연롤(1)은 밀스탠드에 투입되기 전에 롤안치대(6)에 안치시킨 후, 롤 점검 및 준비작업을 실시하게 된다.In general, as shown in FIG. 1, the hot rolled roll 1 is placed in the roll set 6 before being put into the mill stand, and then roll inspection and preparation work are performed.

즉, 작업자가 커플링(4-1)을 조인트(5)에 연결하여 초크(2)내에 그리스를 급지함으로써 롤지지용 베어링의 소손을 방지하고, 크레인을 이용하여 롤단부(3)의 중심을 밀스탠드의 중심과 일치시켜 언제든지 밀스탠드에 결합될 수 있는 상태로 만들게 된다.In other words, the operator connects the coupling 4-1 to the joint 5 to feed grease into the choke 2 to prevent burn-out of the roll support bearing, and to center the center of the roll end 3 using a crane. By matching the center of the millstand, it is made to be able to engage the millstand at any time.

또한, 압연롤(1)의 표면에 묻어 있는 이물질을 작업자가 걸레로 제거하고, 휠베어링(7)의 이상유무를 작업자가 직접 손으로 돌리면서 점검하며, 작업자가 빗자루에 그리스를 묻혀서 초크라이너(2-1)에 그리스를 도포함으로써 밀스탠드의 하우징라이너와의 마찰을 방지하게 된다.In addition, the worker removes the foreign matter on the surface of the rolling roll (1) with a rag, and the worker checks the abnormality of the wheel bearing (7) by turning the hand by hand, and the worker smears the broom with grease Applying grease to 2-1) prevents the friction between the millstand and the housing liner.

이처럼 종래의 압연대기롤 점검 및 준비작업은 작업부하를 가중시키고, 작업의 효율성을 매우 떨어뜨리며, 여러가지 부작용을 초래하는 문제점이 있다As such, the conventional roll waiting roll inspection and preparation work increases the workload, greatly reduces the work efficiency, and causes various side effects.

본 고안은 밀스탠드에 투입하기 전 압연대기롤의 초크에 그리스를 급지하고, 휠베어링을 점검하는 동시에 롤표면을 세척하고 초크라이너에 그리스를 도포하면서 롤의 센터링을 조정하는 작업을 수행할 수 있는 압연대기롤의 검사 및 준비장치를 제공함에 그 목적이 있다.The present invention can perform the operation of adjusting the centering of the roll while feeding grease to the choke of the rolling standby roll, checking the wheel bearing, washing the roll surface, and applying grease to the chokeliner before entering the mill stand. Its purpose is to provide a device for inspecting and preparing rolling rolls.

도1은 종래의 압연대기롤 검사 및 준비작업상태를 상태도,Figure 1 is a state diagram of the conventional rolling waiting roll inspection and preparation work state,

도2는 본 고안에 따른 압연대기롤의 검사 및 준비장치를 나타내는 사시도,Figure 2 is a perspective view showing an inspection and preparation device of the rolling standby roll according to the present invention,

도3은 본 고안에 따른 압연대기롤의 검사 및 준비장치중 롤센터조정부 및 초크라이너의 그리스도포부를 나타내는 사시도,Figure 3 is a perspective view showing the Christ center of the roll center adjustment unit and the chokeliner of the inspection and preparation device for rolling waiting roll according to the present invention,

도4는 본 고안에 따른 압연대기롤의 검사 및 준비장치중 롤안치 및 휠베어링검사부를 나타내는 사시도,Figure 4 is a perspective view showing a roll settle and wheel bearing inspection of the inspection and preparation device for rolling waiting roll according to the present invention;

도5는 본 고안에 따른 압연대기롤의 검사 및 준비장치중 그리스급지부를 나타내는 사시도,5 is a perspective view showing a grease supply unit of the inspection and preparation device for rolling standby rolls according to the present invention;

도6은 본 고안에 따른 압연대기롤의 검사 및 준비장치중 롤차폐부와 롤예열부, 롤표면의 이물질게거부를 나타내는 사시도,Figure 6 is a perspective view showing the foreign matter removing portion of the roll shield and the roll preheating portion, the roll surface of the inspection and preparation device of the rolling standby roll according to the present invention,

도7은 본 고안에 따른 압연대기롤의 검사 및 준비장치의 작용상태를 나타내는 단면도,Figure 7 is a cross-sectional view showing the operating state of the inspection and preparation device for rolling standby rolls according to the present invention;

도8은 본 고안에 따른 압연대기롤의 검사 및 준비장치의 작용상태를 나타내는 단면도이다.Figure 8 is a cross-sectional view showing the operating state of the inspection and preparation device of the rolling standby roll according to the present invention.

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

1: 열간압연롤 2: 초크 2-1: 초크라이너 3: 롤단부 4-1: 커플링 5: 조인트 6: 롤안치대 8: 롤센터조정부 9: 초크라이너의 그리스도포부 10: 롤안치 및 휠베어링검사부 11; 그리스급지부 12: 롤예열부 13: 롤표면의 이물질제거부 16: 제어부 17: 진동분석기 18: 롤차폐부DESCRIPTION OF SYMBOLS 1: Hot rolled roll 2: Choke 2-1: Choke liner 3: Roll end 4-1: Coupling 5: Joint 6: Roll support stand 8: Roll center adjustment part 9: Christ aspiration of choke liner 10: Roll set and wheel Bearing inspection unit 11; Grease feeding part 12: Roll preheating part 13: Foreign material removal part on roll surface 16: Control part 17: Vibration analyzer 18: Roll shielding part

상기한 목적을 달성하기 위하여 본 고안은 바닥에 설치되면서 롤초크를 안치하는 롤안치대가 스크루와 실린더에 의해 전후진과 상하강되고, 휠베어링을 안치하는 롤러로부터 진동센서에서 진동을 측정하면 진동분석기에서 분석하여 휠베어링의 이상유무를 판단하는 롤안치 및 휠베어링검사부와; 차단셔터가 개방되면 삽입구에 내장된 발열부재가 상기 롤안치대에 안치된 압연대기롤을 예열하는 롤예열부와; 벽체의 상단에 형성되는 삽입구에 차단셔터가 삽입되어 압연대기롤을 외부와 차단하는 롤차폐부와; 전후벽체에 설치되면서 스크루와 실린더에 의해 상하강과 전후진되는 분사노즐이 초크라이너에 그리스를 도포하는 그리스도포부와; 상기 그리스도포부 사이에 설치되면서 실린더에 의해 전후진되는 와이퍼를 롤표면에 밀착시키는 롤표면의 이물질제거부와; 좌우벽체에 설치되면서 모터와 실린더에 의해 회전과 전후진되는 커플링이 롤단부에 끼워지는 롤센터조정부와; 상기 롤센터조정부의 양측에 설치되면서 스크루와 실린더에 의해 상하강과 전후진되는 커플링이 작동대에 의해 조인트와 자동 단속되는 그리스급지부로 구성되는 것을 특징으로 하는 압연대기롤의 검사 및 준비장치를 제공한다.In order to achieve the above object, the present invention is installed on the floor while the roll rest rests the roll choke up and down by the screw and the cylinder, up and down and up and down, and measure the vibration from the vibration sensor from the roller bearing the wheel bearing in the vibration analyzer A roll settle and wheel bearing inspection unit which analyzes and determines whether there is an abnormality of the wheel bearing; A roll preheating unit for preheating the rolling standby roll placed in the roll seat by the heating member embedded in the insertion hole when the blocking shutter is opened; A blocking shield is inserted into an insertion hole formed at an upper end of the wall to block the rolling waiting roll from the outside; A Christobu portion installed on the front and rear walls to apply grease to the chokeliner by spray nozzles that are moved up and down and back and forth by screws and cylinders; A foreign material removal portion of the roll surface which is installed between the christen portions and closely adheres to the roll surface of the wiper which is advanced back and forth by the cylinder; A roll center adjustment unit installed on the left and right walls and having a coupling rotated and moved forward and backward by the motor and the cylinder; It is provided on both sides of the roll center adjustment unit provides a device for inspecting and preparing a rolling waiting roll, characterized in that the coupling is moved up and down and back and forth by the screw and the cylinder is composed of a grease feeder that is automatically intermittent with the joint by the operating table. do.

도면을 참조하여 본 고안의 구성을 설명한다.The configuration of the present invention will be described with reference to the drawings.

도2는 본 고안에 따른 압연대기롤의 검사 및 준비장치를 나타내는 사시도이고, 도3은 본 고안에 따른 압연대기롤의 검사 및 준비장치중 롤센터조정부 및 초크라이너의 그리스도포부를 나타내는 사시도이며, 도4는 본 고안에 따른 압연대기롤의 검사 및 준비장치중 롤안치 및 휠베어링검사부를 나타내는 사시도이고, 도5는 본 고안에 따른 압연대기롤의 검사 및 준비장치중 그리스급지부를 나타내는 사시도이며, 도6은 본 고안에 따른 압연대기롤의 검사 및 준비장치중 롤차폐부와 롤예열부, 롤표면의 이물질제거부를 나타내는 사시도이고, 도7은 본 고안에 따른 압연대기롤의 검사 및 준비장치의 작용상태를 나타내는 단면도이며, 도8은 본 고안에 따른 압연대기롤의 검사 및 준비장치의 작용상태를 나타내는 단면도이다.Figure 2 is a perspective view showing the inspection and preparation device of the rolling standby roll according to the present invention, Figure 3 is a perspective view showing the Christ aspiration of the roll center adjusting unit and the chalk liner of the inspection and preparation device of the rolling standby roll according to the present invention, Figure 4 is a perspective view showing a roll settling and wheel bearing inspection of the inspection and preparation device for rolling standby rolls according to the present invention, Figure 5 is a perspective view showing a grease feeding portion of the inspection and preparation device for rolling standby rolls according to the present invention, 6 is a perspective view showing a roll shielding part, a roll preheating part, and a foreign material removing part of a roll surface in the inspection and preparation device for rolling waiting rolls according to the present invention, and FIG. 7 is an inspection and preparation device for rolling waiting rolls according to the present invention. 8 is a cross-sectional view showing an operating state, Figure 8 is a cross-sectional view showing the operating state of the inspection and preparation device of the rolling standby roll according to the present invention.

롤센터링조정부(8)는 상하 이격되게 형성된 벽체의 삽입구(8-1)에 각각 먼저 모터(8-2)가 삽입 고정되어 있고, 이 모터(8-2)의 동력축에 실린더(8-3)가 체결되어 있으며, 이 실린더의 로드에 회전커플링(8-5)가 조립되어 있다.In the roll centering adjusting unit 8, the motor 8-2 is first inserted into and fixed to the insertion opening 8-1 of the wall spaced up and down, and the cylinder 8-3 is connected to the power shaft of the motor 8-2. ) Is fastened, and a rotary coupling 8-5 is assembled to the rod of this cylinder.

이때, 삽입구(8-1)에 삽입되는 회전커플링(8-5)에는 그 전방에 롤단부(3)를 삽입하는 삽입구(8-4)가 형성되어 있다.At this time, the insertion hole 8-4 for inserting the roll end portion 3 in front of the rotary coupling 8-5 inserted into the insertion hole 8-1 is formed.

그리고, 초크라이너의 그리스도포부(9)는 롤초크(2)의 폭만큼 좌우 이격되게 형성된 벽체의 삽입구(9-1)에 각각 상하축방향의 스크루(9-3)가 모터(9-2)에 의해 회전되도록 삽입되어 있다.In addition, the Christ 9 of the choliner 9, the screw (9-3) in the vertical axis direction in the insertion hole (9-1) of the wall formed to be spaced left and right by the width of the roll choke (2), the motor (9-2) It is inserted to rotate by.

여기서, 스크루(9-3)에는 이송블록(9-7)이 나사결합되어 있고, 이 이송블록에 실린더(9-8)에 의해 전후진되도록 연결블록(9-9)이 설치되어 있으며, 이 연결블록에는 다수의 분사노즐(9-11)을 부착하는 분사통(9-10)이 고정되어 있고, 이 분사통은 그리스라인(9-6)으로부터 그리스를 공급받게 된다.Here, the feed block 9-7 is screwed to the screw 9-3, and the connection block 9-9 is installed on the transfer block so as to be advanced back and forth by the cylinder 9-8. The connection block is fixed with a spray cylinder 9-10 for attaching a plurality of spray nozzles 9-11, and the spray cylinder receives grease from the grease line 9-6.

또한, 롤안치 및 휠베어링검사부(10)는 바닥에 롤초크(2)의 폭만큼 좌우 이격되게 삽입구(10-5)가 형성되어 있고, 이 삽입구(10-5)의 바닥에 전후축방향의 스크루(10-4)가 베어링블록(10-3)에 의해 지지된 상태로 모터(10-2)에 결합되어 있다.In addition, the roll settling and wheel bearing inspection unit 10 has an insertion hole 10-5 formed on the bottom to be spaced left and right by the width of the roll choke 2, and the front and rear axial directions are formed at the bottom of the insertion hole 10-5. The screw 10-4 is coupled to the motor 10-2 in a state supported by the bearing block 10-3.

이때, 스크루(10-4)에 너트홀(10-7)을 통해 나사결합되는 실린더(10-6)는 롤안치대(10-1)를 삽입구(10-5)를 따라 상하이동시키도록 지지하게 된다.At this time, the cylinder (10-6) is screwed to the screw (10-4) through the nut hole (10-7) is supported to move the roll support stand (10-1) along the insertion hole (10-5) Done.

그리고, 롤안치대(10-1)에는 그 전후측면 중단에 각각 검사대(10-8)가 설치되어 있고, 삽입구(10-12)에 베어링(10-11)에 의해 지지되도록 삽입되는 롤러(10-10)는 모터(10-9)에 의해 구동되도록 설치되어 있다.Then, the roll set 10-1 is provided with an inspection table 10-8 at its front and rear side stops, respectively, and a roller 10 inserted into the insertion hole 10-12 so as to be supported by the bearing 10-11. -10 is provided to be driven by the motor 10-9.

여기서, 검사대(10-8)의 센서삽입구(10-14)에 삽입되는 진동센서(10-13)는 롤러(10-10)에서 발생되는 진동을 감지하여 진동분석기(17)에 전송하게 된다.Here, the vibration sensor 10-13 inserted into the sensor insertion hole 10-14 of the inspection table 10-8 detects the vibration generated by the roller 10-10 and transmits the vibration to the vibration analyzer 17.

한편, 롤표면의 이물제거부(13)는 서로 상하이격되는 삽입구(13-1)가 벽체에 삽입구(9-1) 사이에 위치하도록 형성되어 있고, 삽입구(13-1)에 삽입된 실린더(13-1)의 로드에 와이퍼(13-3)가 탈장착이 가능하도록 조립되어 있다.On the other hand, the foreign material removal portion 13 of the roll surface is formed so that the insertion hole 13-1 which is spaced apart from each other is located between the insertion hole 9-1 on the wall, and the cylinder inserted into the insertion hole 13-1 ( The wiper 13-3 is assembled to the rod of 13-1 so that attachment and detachment are possible.

그리고, 롤예열부(12)는 삽입구(10-5)의 사이에 위치하는 삽입구(12-1)에 발열부재(12-7)를 삽입시키고, 다시 삽입구(12-1)의 상단측에 형성되는 삽입홈(12-2)에 차단셔터(12-2)가 삽입되어 있다.The roll preheating part 12 inserts the heat generating member 12-7 into the insertion hole 12-1 positioned between the insertion hole 10-5, and is formed on the upper end side of the insertion hole 12-1. The blocking shutter 12-2 is inserted into the insertion groove 12-2.

이때, 차단셔터(12-2)의 하면에는 래크기어(12-4)가 형성되어 있고, 이 래크기어에는 모터(12-5)에 의해 회전되는 피니언기어(12-6)가 치결합되어 있으며, 이로써 차단셔터(12-2)는 피니언기어의 구동에 따라 삽입구(12-1)를 개폐하게 된다.At this time, a rack gear 12-4 is formed on the lower surface of the shut-off shutter 12-2, and the pinion gear 12-6 rotated by the motor 12-5 is engaged with the rack gear. Thus, the blocking shutter 12-2 opens and closes the insertion port 12-1 according to the drive of the pinion gear.

또한, 롤차폐부(18)에는 벽체의 상단에 형성되는 삽입구(18-1)에 차단셔터(18-2)가 삽입되어 있고, 이 차단셔터(18-2)의 하면에는 래크기어(18-5)가 형성되어 있으며, 이 래크기어에는 모터(18-4)에 의해 회전되는 피니언기어(18-3)가 치결합되어 있으며, 이로써 차단셔터(18-2)는 피니언기어의 구동에 따라 지하에 설치되는 장치를 개폐하게 된다.In addition, a block shutter 18-2 is inserted into the roll shield 18 into an insertion hole 18-1 formed at the upper end of the wall, and a rack gear 18 is disposed on the lower surface of the block shutter 18-2. -5) is formed, the rack gear is engaged with the pinion gear (18-3) rotated by the motor (18-4), thereby blocking the shutter (18-2) to drive the pinion gear. Accordingly, the device installed in the basement is opened and closed.

한편, 그리스급지부(11)는 상하길이방향의 삽입구(11-1)에 각각 모터(11-2)에 의해 회전되는 스크루(11-3)가 삽입되어 있고, 이 스크루(11-3)에는 실린더(11-8)가 이송너트(11-7)에 의해 나사결합되어 있다.On the other hand, the grease feeding part 11 has a screw 11-3, which is rotated by the motor 11-2, inserted into the insertion opening 11-1 in the vertical length direction, and the screw 11-3 has a cylinder. (11-8) is screwed by the transfer nut (11-7).

이때, 실린더(11-8)의 로드에 형성되는 삽입구(11-9)에는 그리스라인(11-10)이 연결되어 있고, 실린더(11-8)의 로드선단에 나사결합되는 커플링(11-4)에는 한쌍의 실린더(11-12)가 지지대(11-11)에 의해 고정 부착되어 있다.At this time, a grease line 11-10 is connected to the insertion hole 11-9 formed in the rod of the cylinder 11-8, and the coupling 11- screwed to the rod end of the cylinder 11-8. 4), a pair of cylinders 11-12 are fixedly attached by the support base 11-11.

여기서, 실린더(11-12)의 로드선단에는 각각 작동대(11-13)가 장착되어 있고, 이 작동대는 실린더의 이동에 따라 헤더(11-5)를 전후진시키게 된다.Here, operating rods 11-13 are mounted on the rod ends of the cylinders 11-12, which move the header 11-5 forward and backward as the cylinder moves.

이하, 본 고안의 작용을 설명한다.Hereinafter, the operation of the present invention.

모터(10-2)를 작동시켜 스크루(10-4)를 회전시키면 실린더(10-6)가 전후이동되면서 롤안치대(10-1)의 중심을 맞추게 되고, 다시 실린더(10-6)를 상승시켜 롤안치대(10-1)의 높낮이를 조절하게 된다.When the screw 10-4 is rotated by operating the motor 10-2, the cylinder 10-6 moves back and forth to center the roll rest 10-1, and then the cylinder 10-6 again. The height of the roll set 10-1 is adjusted by raising.

그리고, 열간압연롤(1)에 조립된 초크(2)를 롤안치대(10-1)에 안치하게 되면 휠베어링(7)이 자동적으로 롤러(10-10) 사이에 올려지게 된다.Then, when the choke 2 assembled to the hot rolling roll 1 is placed on the roll set 10-1, the wheel bearing 7 is automatically raised between the rollers 10-10.

이때, 모터(10-9)를 구동시키게 되면 롤러(10-10)가 회전되면서 휠베어링(7)을 회전시키게 되고, 롤러와 휠베어링 사이에서 발생되는 진동은 진동센서(10-13)에 의해 감지되어 진동분석기(17)로 전송되어 휠베어링의 이상유무를 분석하게 된다.At this time, driving the motor 10-9 rotates the wheel bearing 7 while the roller 10-10 is rotated, and the vibration generated between the roller and the wheel bearing is caused by the vibration sensor 10-13. It is detected and transmitted to the vibration analyzer 17 to analyze the presence or absence of abnormal wheel bearings.

또한, 모터(11-2)를 작동시켜 스크루(11-3)를 회전시키면 실린더(11-8)가 삽입구(11-1)를 따라 상하이동되면서 초크(2)의 조인트(5)와 커플링(11-4)의 중심을 일치시키게 된다.In addition, when the screw 11-3 is rotated by operating the motor 11-2, the cylinder 11-8 is moved along the insertion hole 11-1 and coupled with the joint 5 of the choke 2. (11-4) coincides with the center.

여기서, 실린더(11-12)를 후진시키면서 실린더(11-8)를 전진시키게 되면 조인트(5)가 커플링(4)의 선단에 끼워지게 되고, 다시 실린더(11-12)를 전진시키면 작동대(11-13)에 의해 후진되어 있던 헤더(11-5)가 전진되면서 체결볼(11-6)을 이용하여 조인트(5)를 고정시키게 된다.Here, when the cylinder 11-8 is advanced while reversing the cylinder 11-12, the joint 5 is fitted to the tip of the coupling 4, and when the cylinder 11-12 is advanced again, the operating table As the header 11-5, which has been reversed by 11-13, is advanced, the joint 5 is fixed using the fastening ball 11-6.

이와같이 조인트(5)와 커플링(11-4)이 결합되면 제어부(16)의 조작에 따라 그리스라인(11-10)을 통해 그리스가 공급되고, 다시 이 그리스는 삽입구(11-9)를 통해 커플링과 조인트를 거쳐 초크(2)내의 베어링에 급지된다.When the joint 5 and the coupling 11-4 are coupled in this manner, grease is supplied through the grease line 11-10 according to the operation of the control unit 16, and the grease is supplied through the insertion hole 11-9. It is fed to the bearing in the choke 2 via the coupling and the joint.

한편, 모터(9-2)를 작동시켜 스크루(9-3)를 회전시키게 되면 이송블록(9-7)이 스크루를 따라 상하이동을 하게 되고, 이에 따라 분사노즐(9-11)이 초크라이너(2-1)의 상단에 위치하게 된다.On the other hand, when the screw (9-3) is rotated by operating the motor (9-2), the transfer block (9-7) is moved along the screw, so that the injection nozzle (9-11) the chokeliner It is located at the top of (2-1).

이때, 실린더(9-8)를 전진시키어 분사노즐(9-11)을 초크라이너(2-1)에 접근시키게 되고, 그리스라인(9-6)을 통해 그리스를 공급하면 분사노즐로부터 그리스가 분사되면서 초크라이너에 그리스를 도포하게 된다.At this time, the cylinder 9-8 is advanced to bring the injection nozzle 9-11 to the choliner 2-1, and when grease is supplied through the grease line 9-6, grease is injected from the injection nozzle. The grease is then applied to the chokeliner.

그리고, 모터(8-2)를 이용하여 회전커플링(8-5)을 회전시키면서 삽입구(8-4)를 롤단부(3)와 일치시키고, 삽입구와 롤단부가 일치되면 모터를 정지시킨 상태에서 실린더(8-3)를 전진시키어 삽입구를 롤단부에 결합시키게 된다.Then, while the rotary coupling 8-5 is rotated using the motor 8-2, the insertion port 8-4 coincides with the roll end 3, and when the insertion port and the roll end coincide, the motor is stopped. The cylinder (8-3) is advanced to engage the insertion hole in the roll end.

여기서, 다시 모터(8-2)를 구동시키면 롤단부(3)가 회전되면서 롤(1)이 회전하게 된다.When the motor 8-2 is driven again, the roll 1 rotates while the roll end 3 rotates.

이때, 실린더(13-2)를 전진시키게 되면 와이퍼(13-3)가 각각 상하롤(1)의 표면에 밀착되면서 롤의 표면에 부착된 이물질을 제거하게 된다.At this time, when advancing the cylinder 13-2, the wiper 13-3 is in close contact with the surface of the upper and lower rolls 1, respectively, to remove foreign substances attached to the surface of the roll.

또한, 롤(1)의 표면 이물질제거작업이 완료되면 롤단부(3)의 중심이 밀스탠드의 커플링중심과 일치되도록 모터(8-2)를 조정하여 정지시키게 된다.In addition, when the surface foreign matter removing operation of the roll 1 is completed, the motor 8-2 is adjusted to stop so that the center of the roll end portion 3 coincides with the coupling center of the mill stand.

한편, 압연대기롤(1)의 예열작업은 모터(18-4)의 피니언기어(18-3)를 구동시켜 차단셔터(18-2)를 전진시키어 압연대기롤을 외부와 차단시키고, 다시 모터(12-5)의 피니언기어(12-6)를 회전시키어 차단셔터(12-4)를 개방시키게 된다.On the other hand, the preheating operation of the rolling waiting roll 1 drives the pinion gear 18-3 of the motor 18-4 to advance the shut-off shutter 18-2 to block the rolling waiting roll from the outside, and then again the motor. The pinion gear 12-6 of (12-5) is rotated to open the shut-off shutter 12-4.

그리고, 차단셔터(12-4)에 의해 삽입구(12-1)가 개방되면 발열부재(12-7)를 작동시켜 압연대기롤(1)을 예열시키게 된다.When the insertion hole 12-1 is opened by the blocking shutter 12-4, the heat generating member 12-7 is operated to preheat the rolling standby roll 1.

본 고안은 밀스탠드에 투입하기 전 압연대기롤의 초크에 그리스를 급지하고, 휠베어링을 점검하는 동시에 롤표면을 세척하고 초크라이너에 그리스를 도포하면서 롤의 센터링을 조정하는 작업을 수행할 수 있으며, 대기롤을 예열함으로써 작업의 생산성을 높이고, 롤의 손상을 예방할 수 있는 효과를 제공하게 된다.The present invention can perform the operation of adjusting the centering of the roll while feeding grease to the choke of the rolling standby roll, checking the wheel bearing, washing the roll surface and applying grease to the chokeliner before putting it into the mill stand. By preheating the atmospheric roll, the productivity of the work can be increased and the damage of the roll can be prevented.

Claims (1)

바닥에 설치되면서 롤초크(2)를 안치하는 롤안치대(10-1)가 스크루(10-4)와 실린더(10-6)에 의해 전후진과 상하강되고, 휠베어링(7)을 안치하는 롤러(10-10)로부터 진동센서(10-13)에서 진동을 측정하면 진동분석기(17)에서 분석하여 휠베어링(7)의 이상유무를 판단하는 롤안치 및 휠베어링검사부(10)와;The roll rest table 10-1, which is installed on the floor and settles the roll chocks 2, is moved up and down by the screw 10-4 and the cylinder 10-6, up and down, and the wheel bearing 7 is settled. When the vibration is measured by the vibration sensor (10-13) from the roller (10-10) and roll analysis and the wheel bearing inspection unit 10 for analyzing the vibration analyzer 17 to determine the abnormality of the wheel bearing (7); 차단셔터(12-3)가 개방되면 삽입구(12-1)에 내장된 발열부재(12-7)가 상기 롤안치대(10-1)에 안치된 압연대기롤(1)을 예열하는 롤예열부(12)와;When the shut-off shutter 12-3 is opened, the preheating roll 12 for preheating the rolled air waiting roll 1 placed on the roll rest 10-1 by the heat generating member 12-7 embedded in the insertion hole 12-1. Part 12; 벽체의 상단에 형성되는 삽입구(18-1)에 차단셔터(18-2)가 삽입되어 압연대기롤(1)을 외부와 차단하는 롤차폐부(18)와;A blocking shutter 18-2 inserted into the insertion hole 18-1 formed at the top of the wall to block the rolling standby roll 1 from the outside; 전후벽체에 설치되면서 스크루(9-3)와 실린더(9-8)에 의해 상하강과 전후진되는 분사노즐(9-11)이 초크라이너(2-1)에 그리스를 도포하는 그리스도포부(9)와;Christ gun (9), which is installed on the front and rear walls and which spray nozzles (9-11) are moved up and down and back and forth by the screw (9-3) and the cylinder (9-8) to apply grease to the chokeliner (2-1) Wow; 상기 그리스도포부(9) 사이에 설치되면서 실린더(13-2)에 의해 전후진되는 와이퍼(13-3)를 롤(1)표면에 밀착시키는 롤표면의 이물질제거부(13)와;A foreign material removal portion 13 on a roll surface which is installed between the christening portions 9 and closely adheres to the surface of the roll 1 with the wiper 13-3 advancing back and forth by the cylinder 13-2; 좌우벽체에 설치되면서 모터(8-2)와 실린더(8-3)에 의해 회전과 전후진되는 커플링(8-5)이 롤단부(3)에 끼워지는 롤센터조정부(8)와;A roll center adjusting unit 8 fitted to the roll end 3 with a coupling 8-5 which is installed on the left and right walls and rotated and moved forward and backward by the motor 8-2 and the cylinder 8-3; 상기 롤센터조정부(8)의 양측에 설치되면서 스크루(11-3)와 실린더(11-8)에 의해 상하강과 전후진되는 커플링(11-4)이 작동대(11-13)에 의해 조인트(5)와 자동 단속되는 그리스급지부(11)로 구성되는 것을 특징으로 하는 압연대기롤의 검사 및 준비장치.Couplings 11-4, which are installed at both sides of the roll center adjusting unit 8 and moved up and down and back by the screws 11-3 and the cylinders 11-8, are jointed by the operating table 11-13. (5) and the inspection and preparation device for a rolled waiting roll, characterized in that consisting of a grease paper feeder 11 that is automatically controlled.
KR2019990011050U 1999-06-21 1999-06-21 A device for testing and preparating hot strip work roll KR20010000883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019990011050U KR20010000883U (en) 1999-06-21 1999-06-21 A device for testing and preparating hot strip work roll

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019990011050U KR20010000883U (en) 1999-06-21 1999-06-21 A device for testing and preparating hot strip work roll

Publications (1)

Publication Number Publication Date
KR20010000883U true KR20010000883U (en) 2001-01-15

Family

ID=54764382

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019990011050U KR20010000883U (en) 1999-06-21 1999-06-21 A device for testing and preparating hot strip work roll

Country Status (1)

Country Link
KR (1) KR20010000883U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100770137B1 (en) * 2001-09-21 2007-10-24 주식회사 포스코 Apparatus for safe arrival of skin pass mill roll chock
KR100775487B1 (en) * 2001-12-05 2007-11-12 주식회사 포스코 An apparatus for heating a cold slab in the hot roll utility
KR100815741B1 (en) * 2001-12-19 2008-03-20 주식회사 포스코 An apparatus for detecting roll bearing
KR101417216B1 (en) * 2011-11-16 2014-08-06 주식회사 포스코 Equipment Cover for Strip Mill

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100770137B1 (en) * 2001-09-21 2007-10-24 주식회사 포스코 Apparatus for safe arrival of skin pass mill roll chock
KR100775487B1 (en) * 2001-12-05 2007-11-12 주식회사 포스코 An apparatus for heating a cold slab in the hot roll utility
KR100815741B1 (en) * 2001-12-19 2008-03-20 주식회사 포스코 An apparatus for detecting roll bearing
KR101417216B1 (en) * 2011-11-16 2014-08-06 주식회사 포스코 Equipment Cover for Strip Mill

Similar Documents

Publication Publication Date Title
KR101978111B1 (en) automatic painting apparatus
KR20010000883U (en) A device for testing and preparating hot strip work roll
CN112222818B (en) Flexible automatic assembling production line for oil cylinder
KR101935744B1 (en) shaft working apparatus
KR100969882B1 (en) Loller ass&#39;y maintenance device and maintenance means for steel plate printing machine
US5615612A (en) Apparatus for the cleaning of cylinders of a printing machine
CN114226127A (en) Automatic change magnetic powder and detect spray set
CN112025880B (en) Greasing repairing device and method for surface defects of plates
CN214522779U (en) Multicolor printing machine
CN115672627A (en) Automatic oiling machine capable of rotating for engine assembly line
WO2012148069A1 (en) Steam-blocking apparatus
CN111421626B (en) Automatic veneer bonding equipment for wardrobe panel
CN114051328A (en) PCB that can automatic feed washes trigger to construct
CN113580063A (en) Gearbox dismounting and overhauling bracket
KR101935745B1 (en) shaft working apparatus
CN111922629B (en) Double-end roller dismounting machine
CN112339266A (en) Powder paving and preheating system for laser sintering machine
CN220658473U (en) Device for cleaning calendaring roller of photovoltaic glass calendaring machine
CN116274039B (en) Aluminum plate cleaning equipment with automatic discharging function
CN217512172U (en) PCB board coating equipment
CN217541257U (en) Mechanism for preventing coal feeder from being blocked
CN214516627U (en) Mirror cleaning and drying device
CN219884885U (en) Blowing mechanism and loading attachment
CN217017241U (en) Cleaning-free PUR gluing device
CN220559920U (en) Cylinder body washs and blows integrative automation equipment of sediment

Legal Events

Date Code Title Description
WITN Application deemed withdrawn, e.g. because no request for examination was filed or no examination fee was paid