KR20010000824U - The container that attached to fixation devices - Google Patents

The container that attached to fixation devices Download PDF

Info

Publication number
KR20010000824U
KR20010000824U KR2019990010954U KR19990010954U KR20010000824U KR 20010000824 U KR20010000824 U KR 20010000824U KR 2019990010954 U KR2019990010954 U KR 2019990010954U KR 19990010954 U KR19990010954 U KR 19990010954U KR 20010000824 U KR20010000824 U KR 20010000824U
Authority
KR
South Korea
Prior art keywords
coupling
meter box
reinforcing bar
present
attached
Prior art date
Application number
KR2019990010954U
Other languages
Korean (ko)
Other versions
KR200238112Y1 (en
Inventor
정상술
Original Assignee
정상술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정상술 filed Critical 정상술
Priority to KR2019990010954U priority Critical patent/KR200238112Y1/en
Publication of KR20010000824U publication Critical patent/KR20010000824U/en
Application granted granted Critical
Publication of KR200238112Y1 publication Critical patent/KR200238112Y1/en

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

본 고안은 고정장치가 부착된 계량기함에 관한것이다.The present invention relates to a meter box with a fixed device.

통상적으로 계량기함은 건축물의 벽면에 매설하며, 원하는 벽면의 정확한 위치에 매설하기 위해서는 고정시키는 장치가 필요하게 되었다. 본 고안에서는 계량기함의 상측면과 하측면으로 일정한 길이의 철근을 견고하게 고정시키도록하는 고정장치를 구성하였고, 계량기함에 고정된 철근을 계량기함 매설위치의 철근과 견고하게 결합시킨후 콘크리트 타설작업을 할수있도록 구성되었다.Typically, the meter box is embedded in the wall of the building, and in order to bury it in the exact position of the desired wall, a fixing device is required. In the present invention, the fixing device is configured to firmly fix reinforcing bars of a certain length to the upper side and the lower side of the meter box. It's configured to do that.

Description

고정장치가 부착된 계량기함{The container that attached to fixation devices}Meter box with fixed device {The container that attached to fixation devices}

본 고안은 건물의 기초공사에서 계량기함을 철근에 부착시키는 장치에 관한 것이다.The present invention relates to a device for attaching the meter box to the reinforcing bar in the building foundation.

종래에는 건물의 기초공사 단계에서 거푸집을 이용하여 계량기함이 삽입될 수있는 공간을 형성하고 콘크리트 타설작업을하여 콘크리트가 굳은후에 콘크리트 벽면에 형성된 공간으로 계량기함을 삽입시켜 콘크리트 못등을 이용하여 고정시키는 방법을 이용하였다.Conventionally, forming the space where the meter box can be inserted by using the formwork at the foundation construction stage of the building and inserting the meter box into the space formed on the concrete wall after the concrete is solidified to fix it using concrete nails, etc. Method was used.

그러나 이러한 시공의 경우에는 계량기함이 삽입될수있는 공간만큼의 거푸집을 별도록 제작해야하며, 이들 거푸집을 이용하여 콘크리트 작업을 할때 콘크리트의 하중에 의하여 거푸집등의 변형이 생길수 있어 원하는 위치에 정확하게 위치되지 못하는 문제점이 발생되기도 하였다. 또한 거푸집을 분리하고 계량기함을 삽입시키기 위하여 콘크리트 벽면을 다듬는 작업이 필요하게되어 작업효율을 낮추는 문제점이 있었으며, 이렇게 형성된 공간으로 계량기함을 삽입시키기고 이를 고정시키기위한 별도의 작업이 필요하게되어 작업효율을 낮추고 공사기간이 연장되는 문제가 있었다.However, in such a case, the formwork should be manufactured to separate the formwork as much as the space where the meter box can be inserted, and when the work is done using the formwork, the formwork may be deformed due to the load of the concrete. There was a problem that could not be. In addition, there is a problem of lowering the work efficiency because it is necessary to trim the concrete wall in order to separate the formwork and insert the meter box.In addition, a separate work is required to insert and fix the meter box into the space thus formed. There was a problem of lowering the efficiency and extending the construction period.

본 고안은 계량기함을 철근에 부착시키는 장치에 관한 것이다.The present invention relates to a device for attaching the meter box to the rebar.

본 고안은 건물의 기초공사에서 철근 작업시에 계량기함을 철근에 부착시킨후에 콘크리트 타설작업을 할 수 있도록 고안된 것이다. 계량기함의 상하측면에 결합홈을 형성하고 별도로 구성된 결합부를 삽입하여 철근과 계량기 보관함이 견고하게 결합되도록 구성하였다.The present invention is designed to allow concrete pouring after attaching the meter box to the reinforcing bar during reinforcing work in the foundation construction of the building. Coupling grooves were formed on the upper and lower sides of the meter box, and a separately configured coupling part was inserted to configure the reinforcing bar and the meter storage box to be firmly coupled.

따라서 건물의 기초공사에서 철근에 견고하게 계량기함을 부착한 상태에서 거푸집을 구성하고 콘크리트타설을 하도록 한 것이다. 따라서 본 고안은 계량기함과 콘크리트면이 견고하게 부착되는 특성을 가지고 있으며, 계량기 보관함을 설치하기위한 별도의 작업을 줄일수 있으므로 작업효율을 높일 수 있도록 구성된 것이다.Therefore, in the foundation construction of the building, formwork and concrete casting were made while the meter box was firmly attached to the rebar. Therefore, the present design has a feature that the meter box and the concrete surface is firmly attached, and can reduce the extra work for installing the meter storage box is configured to increase the work efficiency.

도 1은 본 고안 실시예의 사시도1 is a perspective view of an embodiment of the present invention

도 2는 도 1의 부분확대도2 is an enlarged partial view of FIG.

도 3은 본 고안의 실시예3 is an embodiment of the present invention

도 4는 결합상태의 단면도4 is a cross-sectional view of the coupling state

도 5는 결합상태의 단면도5 is a cross-sectional view of the coupling state

도 6은 본 고안의 다른 실시예6 is another embodiment of the present invention

도 7은 본 고안의 다른 실시예7 is another embodiment of the present invention

〈도면의 주요부분에대한 부호의 설명〉<Explanation of symbols for main parts of drawings>

1. 계량기함 2. 철근1. Meter box 2. Rebar

3. 결합부 4. 결합홈3. Coupling Part 4. Coupling Groove

5. 돌기5. Turning

6a. 철근받침 6b. 철근받침6a. Reinforcing Bar 6b. Rebar support

7. 결합턱7. Joining jaw

8a. 받침부 8b. 받침부8a. Base 8b. Support

9. 철근삽입홈 10. 안내부9. Reinforcement groove 10. Guide part

제 1도는 본 고안의 실시예의 사시도를 나타낸 것이다. 본 고안은 계량기함(1)의 외측으로 결합부(3)가 삽입될 수 있도록 결합홈(4)을 형성하였으며, 결합부(3)에 형성된 결합턱(7)이 결합홈(4)의 내측으로 삽입되도록 구성하였다.1 shows a perspective view of an embodiment of the present invention. The present invention has formed a coupling groove (4) so that the coupling portion 3 can be inserted into the outer side of the meter box (1), the coupling jaw (7) formed in the coupling portion 3 is the inner side of the coupling groove (4) It was configured to be inserted into.

결합부(3)의 내측에 형성된 곡선부분으로 철근(2)을 삽입한 상태에서 결합부(3)를 결합홈(4)의 내부로 밀착시킨것을 나타낸 것이다. 이렇게 철근(2)을 삽입한 상태로 결합부(3)를 밀착시키게되면 계량기함(1)과 철근(2)이 견고하게 부착된 상태로 유지된다. 계량기함(1)에 부착된 철근(2)을 건물의 기초공사를 위하여 조립된 철근에 부착시키게되면 건물에 부착될 계량기함의 위치가 결정된다.It shows that the coupling portion 3 in close contact with the inside of the coupling groove 4 in the state where the reinforcing bar 2 is inserted into the curved portion formed inside the coupling portion 3. When the coupling part 3 is brought into close contact with the reinforcing bar 2 inserted in this way, the meter box 1 and the reinforcing bar 2 are firmly attached. When the reinforcing bar 2 attached to the meter box 1 is attached to the rebar assembled for the foundation work of the building, the position of the meter box to be attached to the building is determined.

시공할때에는 계량기함을 조립된 철근에 부착시키고 계량기함의 주변으로 거푸집을 구성하고 콘크리트 작업을 수행하도록 하였다. 따라서 콘크리트작업이 끝나면 콘크리트면과 계량기함이 밀착되도록 구성하였다.During construction, the weighing box was attached to the assembled rebar, formwork was formed around the weighing box, and concrete work was performed. Therefore, when the concrete work is finished, the concrete surface and the meter box are in close contact.

제 2도는 제 1도의 부분확대도를 나타낸 것이다.2 shows a partial enlarged view of FIG. 1.

결합부(3)의 내측으로 철근(2)을 삽입한 상태에서, 결합부(3)에 형성된 결합턱(7)부분이 계량기함(1)의 측면에 형성된 결합홈(4)과 결합된것을 나타내고있다. 결합부(3)에 형성된 결합턱(7)과 계량기함(1)에 형성된 결합홈(4)은 서로 견고하게 결합되록하여 쉽게 빠져나가지 않도록 구성하였다.In the state where the reinforcing bar 2 is inserted into the coupling part 3, the coupling jaw 7 formed in the coupling part 3 is coupled to the coupling groove 4 formed in the side of the meter box 1. Indicates. Coupling jaw (7) formed in the coupling portion (3) and coupling grooves (4) formed in the meter box (1) is configured to be firmly coupled to each other so as not to easily escape.

제 3도는 본 고안의 실시예를 나타내고 있는 도면이다.3 is a view showing an embodiment of the present invention.

계량기함(1)의 측면 모서리 부분에 철근을 밀착시킨 상태에서 결합부(3)를 결합홈(4)에 삽입하는것을 나타내고 있다. 결합홈(4)은 계량기함(1)에 일체로 형성된 받침부(8a)(8b)의 내측으로 결합부(3) 하단의 결합턱(7)이 삽입되도록 구성하였다. 결합부(3)의 내측에는 철근(2)이 삽입되어 고정될수 있도록 곡선형태로 철근삽입홈(9)을 형성하였다. 또한 결합턱(7)의 상단으로 결합부보다 길이가 긴 안내부(10)를 형성하였으며, 안내부(10)는 경사지게 구성하여 철근(2)을 고정구(9)에 결합한 상태에서 결합부(3)가 계량기함(1)에 삽입될때 계량기함(1)의 측면에 견고하게 밀착할 수 있도록 구성하였다.It shows that the coupling part 3 is inserted into the coupling groove 4 in a state where the reinforcing bar is in close contact with the side edge portion of the meter box 1. The coupling groove 4 is configured such that the coupling jaw 7 of the lower portion of the coupling portion 3 is inserted into the support portions 8a and 8b integrally formed in the meter box 1. The reinforcing bar insertion groove 9 was formed in a curved shape so that the reinforcing bar 2 could be inserted and fixed inside the coupling part 3. In addition, the upper end of the coupling jaw (7) formed a guide portion 10 longer than the coupling portion, the guide portion 10 is configured to be inclined to combine the reinforcing bar (2) to the fixture (9) When it is inserted into the meter box (1) was configured to be in close contact with the side of the meter box (1).

결합부(3)에 형성된 결합턱(7)은 단면이 사다리꼴로 형성되었으며 이와 결합하는 결합홈(4)도 사다리꼴로 형성하여 서로 견고하게 결합되도록 하였다. 결합부(3)의 저면에는 돌기(5)를 형성하여 결합부(3)와 계량기함(1)이 서로 견고하게 결합되었을때 결합부(3)의 후방에서 약간만 충격을 가하면 더욱견고하게 결합되도록 하였다. 초기에 결합할때 결합부(3) 저면의 돌기(5) 만큼의 높이로 인하여 결합턱(7)과 결합홈(4)이 약간 경사지도록 결합되므로 경사면에 의하여 결합부(3)가 더욱 견고하게 박힐 수 있도록 구성한 것이다.Coupling jaw (7) formed in the coupling portion 3 is formed in a trapezoidal cross section and the coupling groove (4) to be coupled to this to form a trapezoidal to be firmly coupled to each other. A protrusion 5 is formed on the bottom of the coupling portion 3 so that when the coupling portion 3 and the meter box 1 are firmly coupled to each other, a small impact is applied from the rear of the coupling portion 3 so as to be more firmly coupled. It was. Since the coupling jaw 7 and the coupling groove 4 are slightly inclined due to the height of the protrusion 5 of the bottom of the coupling portion 3 when the coupling is initially coupled, the coupling portion 3 is more firmly formed by the inclined surface. It is configured to be hit.

제 4도는 결합상태의 단면도를 나타낸 것이다.4 shows a cross-sectional view of the engaged state.

계량기함(1)의 측면에 형성된 결합홈(4)으로 결합부(3)가 결합된 것을 나타내며 결합부(3) 저면에 형성된 돌기(5)로 인하여 돌기높이만큼 경사가 발생하여 더욱 견고하게 밀착시키는것을 나타낸다. 또한 결합부(3) 내측의 곡선부분으로 형성된 고정구(9)에 철근(2)이 견고하게 결합되어 있는 것을 나타내고있다.The coupling part 3 is coupled to the coupling groove 4 formed on the side of the meter box 1, and the inclination is generated by the height of the protrusion due to the protrusion 5 formed on the bottom of the coupling part 3, thereby more closely contacting it. Indicates to In addition, it shows that the reinforcing bar 2 is firmly coupled to the fastener 9 formed by the curved part inside the coupling part 3.

제 5도는 결합상태의 단면도를 나타낸 것이다.5 shows a cross-sectional view of the engaged state.

4도의 위치를 90°회전시켰을때 결합부(3)와 계량기함(1)에 형성되어있는 결합홈(4)의 단면을 나타낸 것이다. 결합부(3)의 결합턱(7) 부분의 단면을 사다리꼴로 형성하여 결합홈(4)에 밀착시킨것을 나타낸다.4 shows the cross section of the coupling groove 4 formed in the coupling part 3 and the meter box 1 when the position of 4 degrees is rotated by 90 °. The cross section of the engaging jaw 7 portion of the engaging portion 3 is formed in a trapezoidal shape to be in close contact with the engaging groove 4.

제 6도는 본 고안의 다른 형태의 실시예를 나타낸 것으로 공사현장에 따른 계량기함의 위치조절이 필요할때, 계량기함(1)과 철근(2)의 간격을 일정간격 이상으로 떨어뜨리기 위하여 사용하는 것으로 결합홈(4)으로 철근받침(6a)을 삽입하고 결합부(3)를 삽입한 것을 나타내고 있다. 공사현장의 여건상 계량기함(1)과 철근(2)의 높이를 조절하고자할때 알맞은 높이로 형성된 철근받침(6a)을 선택적으로 이용할 수 있도록 하였다.6 shows another embodiment of the present invention, when it is necessary to adjust the position of the meter box according to the construction site, combined to use to drop the interval between the meter box (1) and the reinforcing bar (2) more than a predetermined interval The reinforcing bar 6a is inserted into the groove 4 and the coupling part 3 is inserted. In order to adjust the height of the meter box (1) and the reinforcing bar (2) in the condition of the construction site, it was possible to selectively use the reinforcing bar (6a) formed to a suitable height.

제 7도는 본 고안의 다른 형태의 실시예를 나타낸 것으로 계량기함(1)과 철근(2)의 간격을 일정하게 유지하기 위하여 계량기함(1)과 일체형으로 철근받침(6b)을 성형한 것을 나타내고 있다. 일정한 높이로 형성된 철근받침(6b)을 사용하므로 항상 균일한 간격을 유지하는 기능을 갖도록 구성하였다.7 shows another embodiment of the present invention, which shows that the reinforcing bar 6b is integrally formed with the meter box 1 in order to maintain a constant distance between the meter box 1 and the reinforcing bar 2. have. Since the reinforcing bar (6b) formed to a constant height was used to have a function to maintain a uniform interval at all times.

본 고안은 고정장치가 부착된 계량기함에 관한 것으로, 건물의 기초공사중 철근공사를 할때 철근에 부착한후 콘크리트 타설작업이 이루어지도록 한것이며, 이에따라 콘크리트가 굳은후에 계량기함을 부착하기위한 콘크리트벽면의 다듬기 공정및 부가적인 공정이 필요없게되어 작업시간을 단축시키고 작업의 효율을 높일 수 있는 효과가 있다.The present invention relates to a meter box with a fixed device, which is attached to the reinforcing bar when the reinforcing work is carried out during the foundation construction of the building, so that the concrete is placed in place. It eliminates the need for trimming and additional processes, which shortens the working time and increases the efficiency of the work.

Claims (1)

계량기함(1)의 상측과 하측면에는 각각 이들면보다 조금튀어나오고, 마주보는 형태로 두개의 받침부(8a)(8b)가 형성되어 받침부가 마주보는 면에는 경사를 이룬 결합홈(4)이 형성되어있고, 결합홈(4)에 끼워결합되어 철근(2)을 끼워 고정시키는 결합부(3)는 하측면에 경사진 결합턱(4)이 형성되고 저면에 돌기(5)가 돌출형성되었으며, 상측면은 결합턱(7)보다 길게 돌출되어 경사면을 가지는 안내부(10)로 구성되고, 결합턱(7)과 안내부(10)의 사이에는 철근 삽입홈(9)이 형성된것을 특징으로하는 고정장치가 부착된 계량기함.The upper and lower surfaces of the meter box 1 respectively protrude slightly from these surfaces, and two supporting portions 8a and 8b are formed in an opposing form so that the engaging grooves 4 are inclined on the surface facing the supporting portions. It is formed, the coupling portion (3) is fitted into the coupling groove (4) to fit the reinforcing bar (2) is fixed to the lower side of the engaging jaw (4) is formed and the projection (5) formed on the bottom surface The upper side is configured to include a guide portion 10 protruding longer than the coupling jaw 7 and having an inclined surface, and a reinforcement insertion groove 9 is formed between the coupling jaw 7 and the guide portion 10. Weighing box with fixing device.
KR2019990010954U 1999-06-19 1999-06-19 The container that attached to fixation devices KR200238112Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019990010954U KR200238112Y1 (en) 1999-06-19 1999-06-19 The container that attached to fixation devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019990010954U KR200238112Y1 (en) 1999-06-19 1999-06-19 The container that attached to fixation devices

Publications (2)

Publication Number Publication Date
KR20010000824U true KR20010000824U (en) 2001-01-15
KR200238112Y1 KR200238112Y1 (en) 2001-09-29

Family

ID=54764329

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019990010954U KR200238112Y1 (en) 1999-06-19 1999-06-19 The container that attached to fixation devices

Country Status (1)

Country Link
KR (1) KR200238112Y1 (en)

Also Published As

Publication number Publication date
KR200238112Y1 (en) 2001-09-29

Similar Documents

Publication Publication Date Title
US7818925B2 (en) Stay-in-place concrete footing forms
US20070284506A1 (en) Stay-in-place concrete footing forms
KR20060037323A (en) Hookable turnbuckle device
KR200238112Y1 (en) The container that attached to fixation devices
KR200455039Y1 (en) Slab Landfill Anchor Device
KR20010106108A (en) A support member
KR200196745Y1 (en) A concrete wall construction for using reinforcement fixing pin
KR100344689B1 (en) A Corner Member for Constructing a Concrete Structure
EP2006455A1 (en) System for supporting a shuttering
JP2004003168A (en) Fixing metal fitting of concrete form
JP2605350Y2 (en) Reinforcing bar jig
KR200246003Y1 (en) support for construction
KR200271765Y1 (en) Wallform fiyed flat tie
KR200314970Y1 (en) A fixing pin for concrete mould
JP2006138143A (en) Block and fixing method therefor
JP2011074691A (en) Anchor for slope protection frame
KR200221413Y1 (en) Formwork fixing nail
KR200266559Y1 (en) Mold
KR0135882Y1 (en) Flat tie support
JPH0724524Y2 (en) Fixtures for concrete formwork and concrete formwork
KR200374616Y1 (en) Fulcrum member structure of prefabricated panel
JPH0941664A (en) Tool for placing continuous footing base integrally
JP3016908U (en) Concrete formwork
JP3000177U (en) Pipe fitting for forming concrete through holes
JP3014101U (en) Fixing device at the hem of the formwork

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20070608

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee