KR20000051940A - Control system simulator device of parallel driving in a generator - Google Patents
Control system simulator device of parallel driving in a generator Download PDFInfo
- Publication number
- KR20000051940A KR20000051940A KR1019990002675A KR19990002675A KR20000051940A KR 20000051940 A KR20000051940 A KR 20000051940A KR 1019990002675 A KR1019990002675 A KR 1019990002675A KR 19990002675 A KR19990002675 A KR 19990002675A KR 20000051940 A KR20000051940 A KR 20000051940A
- Authority
- KR
- South Korea
- Prior art keywords
- signal
- control
- generator
- response signal
- parallel operation
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/25—Pc structure of the system
- G05B2219/25179—Parallel
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
본 발명은 발전기의 병렬 운전 제어시스템 시뮬레이터 장치에 관한 것으로서, 특히 선박에서 운용되고 있는 복수의 발전기 운전을 제어하는 발전기 병렬 운전 제어시스템(PMS; Power Management System)을 시뮬레이터하고자 하는 발전기의 병렬 운전 제어시스템 시뮬레이터 장치에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a parallel operation control system simulator apparatus for a generator, and in particular, a parallel operation control system for a generator to simulate a generator parallel operation control system (PMS) for controlling a plurality of generator operations operated in a ship. Relates to a simulator device.
일반적으로, 발전기의 병렬 운전 제어시스템의 시뮬레이터는 디지탈신호의 입출력과 아날로그신호의 입출력 및 미세전압의 변동을 감시하는 모니터링 기술과 PC의 ISA버스 인터페이스 기술을 필요로 하는 바,In general, a simulator of a parallel operation control system of a generator requires monitoring technology for monitoring digital signal input / output, analog signal input / output, and microvoltage fluctuations, and a PC ISA bus interface technology.
이는 항공 우주 및 군사기기에서는 많이 사용되고 있으나, 선박에 있어서는 그 사용이 없다.It is widely used in aerospace and military equipment, but it is not used in ships.
즉, 종래의 선박에 있어서는 발전기의 병렬 운전 제어시스템을 별도의 의사신호를 발생하는 I/O보드를 통해 작업자의 직접적인 조작으로 그 테스트가 가능한 바, 이에따른 비용과 기능시험 단계의 복잡함 및 불편함으로 인한 제품의 생산성이 크게 저하되는 문제점이 있다.That is, in the conventional ship, the parallel operation control system of the generator can be tested by the operator's direct operation through the I / O board which generates a separate pseudo signal. There is a problem that the productivity of the product is greatly reduced.
따라서, 본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 선박등에서 운용되고 있는 복수의 발전기 운전을 제어하는 발전기의 병렬 운전 제어시스템의 시뮬레이터 장치를 제공하므로서, 시뮬레이터를 통한 발전기의 병렬 운전 제어를 자동으로 진단할수 있도록 하는 한편, 종래와 같이 별도의 의사신호를 발생하는 I/O보드를 통한 기능시험의 단계 복잡성과 불편함을 해소하여 제품에 대한 생산성을 보다 더 향상시키고자 하는데 목적이 있는 것이다.Accordingly, the present invention provides a simulator apparatus of a parallel operation control system of a generator for controlling a plurality of generator operations that are being operated in ships, etc. to solve the conventional problems as described above, thereby automatically controlling the parallel operation control of the generator through the simulator. On the other hand, the purpose of the present invention is to further improve the productivity of the product by eliminating the complexity and inconvenience of the step of the functional test through the I / O board generating a separate pseudo signal as in the prior art.
도 1은 본 발명에 적용되는 발전기의 병렬 운전 제어시스템 시뮬레이터의 구성을 보인 블럭도.1 is a block diagram showing the configuration of a parallel operation control system simulator of a generator applied to the present invention.
도 2는 본 발명에 있어 PMS와 LCP(Local Control Panel)의 관계를 보인 블럭도.Figure 2 is a block diagram showing the relationship between the PMS and LCP (Local Control Panel) in the present invention.
도 3은 본 발명에 있어 PMS와 메인 스위치보드(MSBD)의 관계를 보인 블럭도.Figure 3 is a block diagram showing the relationship between the PMS and the main switchboard (MSBD) in the present invention.
이하, 첨부된 도면에 의거하여 본 발명을 설명하면 다음과 같다.Hereinafter, the present invention will be described with reference to the accompanying drawings.
도 1은 본 발명에 적용되는 발전기의 병렬 운전 제어시스템 시뮬레이터의 구성을 보인 블럭도 이고, 도 2는 본 발명에 있어 PMS와 LCP(Local Control Panel)의 관계를 보인 블럭도이며, 도 3은 본 발명에 있어 PMS와 메인 스위치보드(MSBD)의 관계를 보인 블럭도 이다.1 is a block diagram showing the configuration of a parallel operation control system simulator of a generator applied to the present invention, Figure 2 is a block diagram showing the relationship between the PMS and LCP (Local Control Panel) in the present invention, Figure 3 In the present invention, a block diagram showing a relationship between a PMS and a main switchboard (MSBD) is shown.
도 1 내지 도 3에 도시된 바와같이, 인터페이스를 통한 작업자의 키이신호 또는 가상적인 이벤트신호에 따라 선박엔진의 운전상황과 발전기의 병렬 운전에 대한 제어신호를 출력하는 병렬운전 제어(PMS)부(10)와;1 to 3, the parallel operation control (PMS) unit for outputting a control signal for the operation of the ship engine and the parallel operation of the generator according to the operator's key signal or virtual event signal through the interface ( 10);
상기 PMS부(10)에서 선박엔진의 운전상황에 대한 제어신호 출력시 그에 대응하는 가상의 응답신호를 생성하는 LCP(20)와;LCP (20) for generating a virtual response signal corresponding to the output of the control signal for the operating status of the ship engine in the PMS unit 10;
상기 PMS부(10)에서 발전기의 전력상황을 고려하여 새로운 발전기로의 운전조건에 대한 제어신호를 출력시 그에 대응하는 응답신호를 생성하여 전력공급을 위한 ACB(Air Circuit Brake)(1)를 가상으로 온/오프시키고, 전력선 상황(예: 전력선의 단락 또는 정전)에 대한 가상의 이벤트신호를 발생시키는 메인 스위치보드(30); 로 구성되며,Considering the power condition of the generator in the PMS unit 10 generates a response signal corresponding to the output of the control signal for the operation conditions to the new generator to simulate the ACB (Air Circuit Brake) (1) for power supply A main switch board 30 for generating a virtual event signal for a power line situation (for example, a power line short circuit or power failure); Consists of,
상기 LCP(20)는, 선박엔진의 운전에 대한 응답신호 자동발생 정보를 저장하는 제 1 시퀀스(sequence)메모리(21)와;The LCP (20) includes a first sequence memory (21) for storing response signal automatic generation information about the operation of the ship engine;
상기 제 1 시퀀스메모리(21)에 저장된 정보에 따라 제 1 입력/출력(I/O)모듈(2)을 통해 입력되는 PMS부(10)의 제어신호를 인식하고 그 인식된 제어신호에 대응하는 응답신호를 발생시키도록 제어동작하는 제 1 제어모듈(22)과;Recognizing a control signal of the PMS unit 10 input through the first input / output (I / O) module 2 according to the information stored in the first sequence memory 21 and corresponding to the recognized control signal A first control module (22) which performs a control operation to generate a response signal;
상기 제 1 제어모듈(22)의 제어동작시 선박엔진의 운전상황(예: starter, stopper, governor)에 대한 가상의 응답신호를 생성한 후 PMS부(10)로 출력하는 제 1 응답신호부(23); 를 포함하고 있다.The first response signal unit for generating a virtual response signal for the operation status (eg starter, stopper, governor) of the ship engine during the control operation of the first control module 22 and outputs it to the PMS unit 10 ( 23); It includes.
그리고, 상기 메인 스위칭보드(30)는, 발전기의 병렬운전과 전력선 상황에 대한 응답신호 자동발생 정보를 저장하는 제 2 시퀀스메모리(31)와;The main switching board 30 includes: a second sequence memory 31 for storing parallel operation of a generator and automatic generation of response signal for power line conditions;
상기 제 2 시퀀스메모리(31)에 저장된 정보에 따라 제 2 I/O모듈(3)을 통해 입력되는 PMS부(10)의 제어신호를 인식하고 그 인식된 제어신호에 대응하는 응답신호 또는 가상의 이벤트신호를 발생시키도록 제어동작하는 제 2 제어모듈(32)과;Recognizing a control signal of the PMS unit 10 input through the second I / O module 3 in accordance with the information stored in the second sequence memory 31 and a response signal or a virtual signal corresponding to the recognized control signal. A second control module 32 which performs a control operation to generate an event signal;
상기 제 2 제어모듈(32)의 제어동작에 따라 전력선을 감시하는 모니터링부(33)와;A monitoring unit 33 for monitoring a power line according to a control operation of the second control module 32;
상기 모니터링부(33)에 의해 감시된 전력선의 상황에 대한 가상의 이벤트신호를 발생한 후 이를 PMS부(10)로 출력하는 이벤트발생부(34)와;An event generator 34 for generating a virtual event signal for the situation of the power line monitored by the monitoring unit 33 and outputting the virtual event signal to the PMS unit 10;
상기 제 2 제어모듈(32)의 제어동작시 발전기의 전력선 상황을 고려하여 새로운 발전기로의 운전조건에 대한 응답신호를 생성하는 제 2 응답신호부(35)와;A second response signal unit 35 generating a response signal for an operation condition to a new generator in consideration of the power line situation of the generator during the control operation of the second control module 32;
상기 제 2 제어모듈(32)의 제어동작시 전력을 공급하는 ACB(1)의 온/오프에 대한 가상의 응답신호를 생성하는 제 3 응답신호부(36)와;A third response signal unit 36 for generating a virtual response signal for turning on / off the ACB 1 for supplying power during the control operation of the second control module 32;
PMS부(10)로 이벤트신호가 출력시, 그 이벤트신호에 대하여 상기 PMS부(10)에서 지령하는 제어신호의 응답신호를 생성하는 제 4 응답신호부(37)와;A fourth response signal unit 37 for generating a response signal of a control signal commanded by the PMS unit 10 to the event signal when the event signal is output to the PMS unit 10;
PMS부(10)에서 발전기의 부하변동 상황예측과 판단에 따른 제어신호 출력시 그 응답신호를 생성하는 제 5 응답신호부(38); 를 포함하고 있는 것이다.A fifth response signal unit 38 generating a response signal when the PMS unit 10 outputs a control signal according to the load change situation prediction and determination of the generator; It is to include.
이와같이 구성된 본 발명 발전기의 병렬 운전 제어시스템 시뮬레이터 장치의 작용에 대하여 첨부된 도 1 내지 도 3을 참조하여 설명하면 다음과 같다.The operation of the parallel operation control system simulator apparatus of the present invention configured as described above will be described with reference to FIGS. 1 to 3.
먼저, 인터페이스를 통해 작업자가 PMS부(10)의 선박엔진 운전상황을 시뮬레이터하고자 키이신호를 상기 PMS부(10)에 출력하면, 상기 PMS부(10)에서는 입력되는 키이신호에 따라 선박엔진의 운전상황에 대한 제어신호를 LCP(20)에 출력시키게 되는 바,First, when a worker outputs a key signal to the PMS unit 10 to simulate a ship engine operating situation of the PMS unit 10 through the interface, the PMS unit 10 operates the ship engine according to the input key signal. The control signal for the situation is to be output to the LCP (20),
상기 LCP(20)에서는 입력되는 제어신호에 따라 선박엔진의 운전상황에 대응하는 가상의 응답신호를 생성한 후 이를 상기 PMS부(10)로 출력시키게 된다.The LCP 20 generates a virtual response signal corresponding to the operating situation of the ship engine according to the input control signal and outputs it to the PMS unit 10.
즉, 상기 PMS부(10)에서 선박엔진의 운전상황에 대한 제어신호를 제 1 I/O모듈(2)을 통해 LCP(20)에 입력하면, 상기 LCP(20)에 포함된 제 1 제어모듈(22)은 제 1 시퀀스메모리(21)에 저장된 선박엔진의 운전에 대한 응답신호 자동발생 정보에 따라 PMS부(10)의 제어신호를 인식하고 그 인식된 제어신호에 대응하는 응답신호를 발생시키도록 제 1 응답신호부(23)를 제어하게 되고,That is, when the PMS unit 10 inputs a control signal for the operating status of the ship engine to the LCP 20 through the first I / O module 2, the first control module included in the LCP 20. Recognizing the control signal of the PMS unit 10 according to the information on the automatic generation of the response signal for the operation of the ship engine stored in the first sequence memory 21, and generates a response signal corresponding to the recognized control signal. To control the first response signal unit 23 so that
상기 제 1 응답신호부(23)에서는 제 1 제어모듈(22)의 제어동작시 선박엔진의 운전상황으로서 starter, stopper, governor 에 대한 가상의 응답신호를 생성한 후 이를 PMS부(10)로 출력하여 선박엔진의 운전상황에 대한 가상의 시뮬레이터를 완료하게 되는 것이다.The first response signal unit 23 generates a virtual response signal for the starter, stopper and governor as an operation state of the ship engine during the control operation of the first control module 22 and outputs it to the PMS unit 10. This will complete a virtual simulator of the operating status of the ship engine.
또한, 작업자가 상기 PMS부(10)의 발전기 병렬운전에 대한 시뮬레이터를 하고자 상기 PMS부(10)에 키이신호를 출력하면, 상기 PMS부(10)에서는 발전기의 전력상황을 고려하여 새로운 발전기로의 운전조건에 대한 제어신호를 메인 스위치보드(30)로 출력하게 된다.In addition, when the operator outputs a key signal to the PMS unit 10 to simulate the generator parallel operation of the PMS unit 10, the PMS unit 10 to the new generator in consideration of the power situation of the generator The control signal for the operating condition is output to the main switch board 30.
그리고, 상기 메인 스위치보드(30)에서는 그에 대응하는 응답신호를 생성하여 ACB(1)를 가상으로 온/오프시키고, 전력선 상황(예: 전력선의 단락 또는 정전)에 대한 가상의 이벤트신호를 발생시키게 된다.In addition, the main switch board 30 generates a response signal corresponding thereto to virtually turn on / off the ACB 1 and generate a virtual event signal for a power line situation (for example, a power line short circuit or power failure). do.
즉, 상기 PMS부(10)에서 발전기의 전력상황을 고려하여 새로운 발전기로의 운전조건에 대한 제어신호를 제 2 I/O모듈(3)을 통해 메인스위치보드(30)로 출력시,That is, when the PMS unit 10 outputs the control signal for the operation condition to the new generator in consideration of the power situation of the generator to the main switch board 30 through the second I / O module 3,
상기 메인스위치보드(30)에 포함된 제 2 제어모듈(32)은 제 2 시퀀스메모리(31)에 저장된 발전기의 병렬운전과 전력선 상황에 대한 응답신호 자동발생 정보에 따라 PMS부(10)의 제어신호를 인식하고 그 인식된 제어신호에 대응하는 응답신호 또는 가상의 이벤트신호를 발생시키도록 제어동작을 수행하게 된다.The second control module 32 included in the main switch board 30 controls the PMS unit 10 according to the parallel operation of the generator stored in the second sequence memory 31 and the automatic generation of response signals for power line conditions. The control operation is performed to recognize the signal and generate a response signal or a virtual event signal corresponding to the recognized control signal.
이를 보다 구체적으로 설명하면 다음과 같다.This will be described in more detail as follows.
먼저, PMS부(10)에서 발전기의 병렬운전에 대한 제어신호를 출력시 메인스위치보드(30)의 제 2 응답신호부(35)에서는 제 2 제어모듈(32)의 제어동작에 따라 발전기의 전력선 상황을 고려하여 새로운 발전기로의 운전조건에 대한 응답신호를 생성한 후 이를 PMS부(10)로 출력시키게 된다.First, when the PMS unit 10 outputs a control signal for parallel operation of the generator, the second response signal unit 35 of the main switch board 30 generates power lines of the generator according to the control operation of the second control module 32. In consideration of the situation to generate a response signal for the operating conditions to the new generator and output it to the PMS unit 10.
이때, 상기 PMS부(10)에서는 입력되는 제 2 응답신호부(35)의 응답신호에 따라 다시 발전기의 전력공급을 위한 ACB(1)의 온/오프 제어신호를 메인스위치보드(30)로 출력시키게 되는 바,In this case, the PMS unit 10 outputs the on / off control signal of the ACB 1 to the main switch board 30 again in response to the response signal of the second response signal unit 35 input thereto. Bar let
상기 메인스위치보드(30)에 포함된 제 2 응답신호부(36)에서는 제 2 제어모듈(32)의 제어동작에 따라 ACB(1)의 온/오프에 대한 가상의 응답신호를 생성하게 되는 것이다.The second response signal unit 36 included in the main switch board 30 generates a virtual response signal for the on / off of the ACB 1 according to the control operation of the second control module 32. .
여기서, 상기 메인스위치보드(30)에 포함된 제 5 응답신호부(38)에서는 상기 PMS부(10)에서 발전기의 부하변동 상황예측과 판단에 따른 제어신호 출력시 그 응답신호를 생성하도록 하였으며, 모니터링부(33)에서는 제 2 제어모듈(32)의 제어동작에 따라 전력선을 감시하도록 하였다.Here, the fifth response signal unit 38 included in the main switch board 30 generates the response signal when the PMS unit 10 outputs a control signal according to the load change situation prediction and determination of the generator, The monitoring unit 33 monitors the power line according to the control operation of the second control module 32.
일예로, 상기 모니터링부(33)에 의해 감시된 전력선에 있어 전력선이 단락 또는 정전인 경우,For example, when the power line is a short circuit or a power failure in the power line monitored by the monitoring unit 33,
상기 모니터링부(33)에 의해 감시된 전력선의 상황(단락 또는 정전)에 따라 이벤트발생부(34)에서는 제 2 제어모듈(32)의 제어동작에 따라 상기의 전력선 상황에 대한 가상의 이벤트신호를 발생한 후 이를 PMS부(10)로 출력시키게 된다.In response to the situation (short circuit or power failure) of the power line monitored by the monitoring unit 33, the event generator 34 generates a virtual event signal for the power line situation according to the control operation of the second control module 32. After generation, it is output to the PMS unit 10.
그리고, 상기 PMS부(10)에서는 입력되는 이벤트신호에 따라 ACB(1)를 온 시키기 위한 제어신호를 메인스위치보드(30)로 출력시키고, 상기 메인스위치보드(30)의 제 2 응답신호부(36)에서는 제 2 제어모듈(32)의 제어동작에 따라 ACB(1)의 온/오프에 대한 가상의 응답신호를 생성한 후 이를 상기 PMS부(10)로 출력한다.In addition, the PMS unit 10 outputs a control signal for turning on the ACB 1 according to the input event signal to the main switch board 30, and the second response signal unit of the main switch board 30 ( In operation 36, a virtual response signal for turning on / off the ACB 1 is generated according to the control operation of the second control module 32 and then output to the PMS unit 10.
여기서, 상기 PMS부(10)로 이벤트신호가 출력시, 그 이벤트신호에 대하여 상기 PMS부(10)에서 지령하는 제어신호의 응답신호를 제 4 응답신호부(37)에서 생성하게 되므로서, 상기 PMS부(10)의 지령이 정확하게 인식되었는가를 검사할수 있도록 하였다.Here, when the event signal is output to the PMS unit 10, the fourth response signal unit 37 generates a response signal of the control signal commanded by the PMS unit 10 with respect to the event signal. It was possible to check whether the command of the PMS unit 10 was correctly recognized.
이후, 상기 PMS부(10)에서는 입력되는 ACB의 온/오프 응답신호에 따라 LCP(20)에 선박엔진을 구동시키기 위한 제어신호를 출력시키는 한편, 메인스위치보드(30)에 발전기의 병렬운전에 대한 제어신호를 출력시키게 된다.Subsequently, the PMS unit 10 outputs a control signal for driving the ship engine to the LCP 20 according to the on / off response signal of the input ACB, while the generator is connected to the main switch board 30 in parallel operation. Outputs a control signal.
이때, 상기 메인스위치보드(30)에서는 현재 전력선의 감시정보를 받아서 새로 운전 시작되는 발전기의 전력상황 정보를 함께 고려해서 발전기의 투입조건을 만든 후 ACB(1)를 온시키게 되는 바, 상기 PMS부(10)의 병렬운전 제어에 대한 시뮬레이터가 완료되는 것이다.At this time, the main switch board 30 receives the monitoring information of the current power line to make the input condition of the generator in consideration of the power status information of the generator to be newly started, and then turn on the ACB (1), the PMS unit The simulator for parallel operation control of (10) is completed.
이상에서 설명한 바와같이 본 발명은 선박등에서 운용되고 있는 복수의 발전기 운전을 제어하는 발전기의 병렬 운전 제어시스템의 시뮬레이터 장치를 제공하므로서, 시뮬레이터를 통한 발전기의 병렬 운전 제어를 자동으로 진단할수 있도록 하는 한편, 종래와 같이 별도의 의사신호를 발생하는 I/O보드를 통한 기능시험의 단계 복잡성과 불편함을 해소하여 제품에 대한 생산성을 보다 더 향상시키는 효과가 있는 것이다.As described above, the present invention provides a simulator apparatus of a parallel operation control system of a generator for controlling a plurality of generator operations operated in a ship, and the like, so as to automatically diagnose parallel operation control of a generator through a simulator. As in the prior art, by eliminating the complexity and inconvenience of the step of the functional test through the I / O board to generate a separate pseudo signal has the effect of further improving the productivity for the product.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990002675A KR20000051940A (en) | 1999-01-28 | 1999-01-28 | Control system simulator device of parallel driving in a generator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990002675A KR20000051940A (en) | 1999-01-28 | 1999-01-28 | Control system simulator device of parallel driving in a generator |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20000051940A true KR20000051940A (en) | 2000-08-16 |
Family
ID=19572578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990002675A KR20000051940A (en) | 1999-01-28 | 1999-01-28 | Control system simulator device of parallel driving in a generator |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20000051940A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1960855A1 (en) * | 2005-12-07 | 2008-08-27 | Marine Cybernetics AS | A method and a system for testing of a power management system of a marine vessel |
CN109062174A (en) * | 2018-06-05 | 2018-12-21 | 同济大学 | A kind of extended-range hybrid power system performance test stand system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4090088A (en) * | 1977-02-17 | 1978-05-16 | Encon Systems, Inc. | Power management system |
US4964058A (en) * | 1988-10-13 | 1990-10-16 | Square D Company | Power management and automation system |
US5396635A (en) * | 1990-06-01 | 1995-03-07 | Vadem Corporation | Power conservation apparatus having multiple power reduction levels dependent upon the activity of the computer system |
US5410713A (en) * | 1992-01-02 | 1995-04-25 | Smith Corona/Acer | Power-management system for a computer |
-
1999
- 1999-01-28 KR KR1019990002675A patent/KR20000051940A/en not_active Application Discontinuation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4090088A (en) * | 1977-02-17 | 1978-05-16 | Encon Systems, Inc. | Power management system |
US4964058A (en) * | 1988-10-13 | 1990-10-16 | Square D Company | Power management and automation system |
US5396635A (en) * | 1990-06-01 | 1995-03-07 | Vadem Corporation | Power conservation apparatus having multiple power reduction levels dependent upon the activity of the computer system |
US5410713A (en) * | 1992-01-02 | 1995-04-25 | Smith Corona/Acer | Power-management system for a computer |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1960855A1 (en) * | 2005-12-07 | 2008-08-27 | Marine Cybernetics AS | A method and a system for testing of a power management system of a marine vessel |
EP1960855A4 (en) * | 2005-12-07 | 2013-03-13 | Marine Cybernetics As | A method and a system for testing of a power management system of a marine vessel |
CN109062174A (en) * | 2018-06-05 | 2018-12-21 | 同济大学 | A kind of extended-range hybrid power system performance test stand system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112061093B (en) | Locomotive braking system for realizing automatic driving and realization method thereof | |
CN113589787A (en) | Hardware-in-loop test method, test device, test system and readable storage medium | |
JP3395032B2 (en) | Switchboard switchgear and operation monitoring control system | |
KR20000051940A (en) | Control system simulator device of parallel driving in a generator | |
US7162389B2 (en) | Evaluation device for control unit, simulator, and evaluation system | |
CN113126591A (en) | Test method and device for train controller | |
US6603327B2 (en) | Test module | |
CN212965851U (en) | Motor drive's test system | |
CN109765500A (en) | A kind of power supply analog machine and power supply analogy method | |
CN110262216B (en) | Vibration monitoring system with multiple channels independently judged and redundantly arranged | |
CN109656219B (en) | Distributed ship propulsion centralized control device | |
CN100530042C (en) | Motherboard and power converter of computer for transportation means | |
KR102398455B1 (en) | EMS Test System | |
CN216161011U (en) | Control panel, rack, controller functional test system | |
CN109885024B (en) | Diagnostic test system and diagnostic test method for generator set | |
CN116191653B (en) | Direct-current emergency power supply applying master-slave control mode and control method thereof | |
JP3098456B2 (en) | Phantom power supply health check method for wireless base station equipment | |
SU744847A1 (en) | System for centralized automatic control of electric power system | |
RU2257655C2 (en) | Power supply system for electrical energy users | |
JPH06319201A (en) | Monitoring apparatus for electric rolling stock | |
KR100381367B1 (en) | correspondence controller system of remote | |
JPH10282170A (en) | Method and equipment for testing switchboard | |
CN117724437A (en) | Hardware-in-loop test system and test method based on same | |
KR20230086498A (en) | Apparatus and method for controlling device under test connection in hils | |
KR970002398B1 (en) | The emergency detection method using interrupt handler |