KR19990064576A - Prefabricated Wall Using Hollow Panel of Sewage Treatment Plant - Google Patents

Prefabricated Wall Using Hollow Panel of Sewage Treatment Plant Download PDF

Info

Publication number
KR19990064576A
KR19990064576A KR1019990013071A KR19990013071A KR19990064576A KR 19990064576 A KR19990064576 A KR 19990064576A KR 1019990013071 A KR1019990013071 A KR 1019990013071A KR 19990013071 A KR19990013071 A KR 19990013071A KR 19990064576 A KR19990064576 A KR 19990064576A
Authority
KR
South Korea
Prior art keywords
wall
concrete structure
sewage treatment
partition wall
shaped steel
Prior art date
Application number
KR1019990013071A
Other languages
Korean (ko)
Other versions
KR100406084B1 (en
Inventor
변무원
Original Assignee
변무원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=37422689&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR19990064576(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 변무원 filed Critical 변무원
Priority to KR1019990013071A priority Critical patent/KR100406084B1/en
Publication of KR19990064576A publication Critical patent/KR19990064576A/en
Application granted granted Critical
Publication of KR100406084B1 publication Critical patent/KR100406084B1/en

Links

Classifications

    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61MDEVICES FOR INTRODUCING MEDIA INTO, OR ONTO, THE BODY; DEVICES FOR TRANSDUCING BODY MEDIA OR FOR TAKING MEDIA FROM THE BODY; DEVICES FOR PRODUCING OR ENDING SLEEP OR STUPOR
    • A61M5/00Devices for bringing media into the body in a subcutaneous, intra-vascular or intramuscular way; Accessories therefor, e.g. filling or cleaning devices, arm-rests
    • A61M5/178Syringes
    • A61M5/20Automatic syringes, e.g. with automatically actuated piston rod, with automatic needle injection, filling automatically
    • A61M5/2033Spring-loaded one-shot injectors with or without automatic needle insertion
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61MDEVICES FOR INTRODUCING MEDIA INTO, OR ONTO, THE BODY; DEVICES FOR TRANSDUCING BODY MEDIA OR FOR TAKING MEDIA FROM THE BODY; DEVICES FOR PRODUCING OR ENDING SLEEP OR STUPOR
    • A61M5/00Devices for bringing media into the body in a subcutaneous, intra-vascular or intramuscular way; Accessories therefor, e.g. filling or cleaning devices, arm-rests
    • A61M5/46Devices for bringing media into the body in a subcutaneous, intra-vascular or intramuscular way; Accessories therefor, e.g. filling or cleaning devices, arm-rests having means for controlling depth of insertion
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61MDEVICES FOR INTRODUCING MEDIA INTO, OR ONTO, THE BODY; DEVICES FOR TRANSDUCING BODY MEDIA OR FOR TAKING MEDIA FROM THE BODY; DEVICES FOR PRODUCING OR ENDING SLEEP OR STUPOR
    • A61M2205/00General characteristics of the apparatus
    • A61M2205/27General characteristics of the apparatus preventing use
    • A61M2205/273General characteristics of the apparatus preventing use preventing reuse, e.g. of disposables

Abstract

본발명은 상·하수처리시설의 신설구조물이나 성능개선을 위해서 콘크리트구조물로 되어있는 침전지, 반응조 등의 내부에 수로를 형성시키거나 구분시키기 위해서 내구성있는 강재로서 간벽틀을 형성하고, 상기 간벽틀 내부에는 내부식성과 내구성있는 중공부패널들을 삽입하여 간단하게 간벽을 조립할 수 있도록 한 것으로, 콘크리트 구조물(100) 내에 간벽(200)을 형성함에 있어서, 상기 간벽(200)은 고밀도 폴리에틸렌의 재질을 사용하여 평활하게 형성되는 한 쌍의 평판(210a) 사이에 폭방향으로 파형단면들이 반복형성 되어지는 파형단판(210b)을 융착시켜 제조하여서 휨 강도가 크며, 내구성 및 내부식성을 가지며, 소정의 크기들로 제작되어지는 중공부패널(210)들과, 내구성 있는 강판으로 그 단면이 ㄷ자로 절곡되는 ㄷ형강재(222)들이 수평방향과 수직방향으로 형성되는 간벽틀(220)과, 내구성 있는 강판으로 그 단면이 ㄱ자로 절곡되는 ㄱ형강재(224)들이 상기 간벽틀(220)의 외곽에 설치되어서 콘크리트 구조물 내부면을 따라서 설치되는 기초틀(230)로 구성되어서, 상기 중공부패널(210)들을 상기 간벽틀(220) 및 기초틀(230)에 체결볼트(240)으로서 체결하고, 상기 기초틀(230)을 콘크리트 구조물의 내부면에 앵커볼트(250)로 고정하여서 콘크리트 구조물 내부에 간벽을 간단하게 조립함으로서,The present invention forms a wall frame as a durable steel to form or distinguish a channel in a sedimentation basin, a reaction tank, etc., which is a concrete structure for improving performance of a water and sewage treatment facility, and inside a partition wall. In order to easily assemble the partition wall by inserting the corrosion resistance and durable hollow panel panels, in forming the partition wall 200 in the concrete structure 100, the partition wall 200 is made of a high-density polyethylene material It is manufactured by fusing the corrugated end plate 210b, in which the corrugated cross sections are repeatedly formed in the width direction between a pair of flat plates 210a smoothly formed, to have a high bending strength, durability and corrosion resistance, and to predetermined sizes. Hollow part panel 210 to be produced, and the c-shaped steel material 222 is bent in the cross-section by a durable steel sheet in the horizontal direction perpendicular to the horizontal direction Base frame 220 formed in the direction, and the a-shaped steel 224, the cross section of which is bent into a letter A with a durable steel plate is installed on the outer surface of the trunk wall 220 to be installed along the inner surface of the concrete structure ( 230, the hollow panel panels 210 are fastened to the trunk wall 220 and the base frame 230 as fastening bolts 240, and the base frame 230 is anchored to an inner surface of the concrete structure. By simply assembling the walls inside the concrete structure by fixing with bolts 250,

콘크리트 구조물에는 거의 손상을 주지 않으면서 간단하게 조립설치 할 수 있어서 경제적으로 시공할 수 있으며, 고밀도 폴리에틸수지 재질의 중공부패널을 이용하여 간벽을 설치하므로 유해한 물질이 발생되지 않으며, 구조적 강도를 충분히 가지면서 비교적 얇은 벽체 두께이므로 내부용량이 증가되어 하수처리장의 성능을 높여주는 것이다.The concrete structure can be easily assembled and installed with almost no damage, so it can be economically constructed. Since the partition wall is installed by using the hollow panel made of high-density polyethylene resin, no harmful substances are generated, and the structural strength is sufficient. It has a relatively thin wall thickness, so the internal capacity is increased to improve the performance of the sewage treatment plant.

Description

하수처리장의 중공부패널을 이용한 조립식 간벽Prefabricated Wall Using Hollow Panel of Sewage Treatment Plant

본 발명은 상·하수처리시설의 신설구조물이나 성능개선을 위해서 콘크리트구조물로 되어있는 침전지, 폭기조, 반응조 등의 내부에 수로를 형성시키거나 구분시키기 위해 설치되는 간벽에 관한 것으로 특히, 구조적강도 및 내부식성을 가지면서 간편하게 조립 설치할 수 있는 하수처리장의 중공부패널을 이용한 조립식 간벽에 관한 것이다.The present invention relates to a partition wall installed to form or distinguish a channel in a sedimentation basin, an aeration tank, a reaction tank, etc., which is made of a concrete structure, for improving the performance of a new structure of water and sewage treatment facilities. The present invention relates to a prefabricated partition wall using a hollow panel of a sewage treatment plant that can be easily assembled and installed while having corrosiveness.

경제가 발전하면서 상수의 필요량이 증가하고 이에 따라 생활하수 및 오·폐수의 방출량도 늘어나면서 기존의 상·하수처리시설로는 그 처리능력이 한계에 도달했다.With the development of the economy, the demand for drinking water has increased and the discharge of domestic sewage and wastewater has also increased, and the existing water and sewage treatment facilities have reached their limits.

이에 새로운 상·하수처리장의 신설 또는 기존의 상·하수처리장을 개량하여 처리방식의 변경이나 처리용량 및 수질의 정화능력을 높여야 되는 필요성이 생기게 되었다.Therefore, there is a need to change the treatment method or to increase the capacity of water treatment and water quality by establishing a new water and sewage treatment plant or improving an existing water and sewage treatment plant.

그리고, 기존 시설을 개량하는 방법으로는 성능개선처리시설을 갖추어 기존의 상·하수처리장의 기능을 개선시키는 방법을 예로 들 수 있다.In addition, a method of improving an existing facility may include a method of improving a function of an existing water and sewage treatment plant by having a performance improvement treatment facility.

여기서, 성능개선처리시설이란, 기존 상·하수 처리시설들이 처음유입수가 유입되어 침전지, 폭기조, 반응조 등을 거치면서 처리되나 유출수의 수질을 유지하기 위하여는 많은 시간과 노력이 요함으로 하수처리장의 하수처리용량의 부족현상이 나타나는 것과, 최종유출수의 수질을 높이기 위하여, 상기 상·하수처리장 내에 다수개의 간벽들을 설치하여 처음 유입된 유입수가 상기 간벽들의 개구부를 통해 미로형태로 흐르면서 외부에서 공기를 주입해주는 공정 등을 거치면서 점차적으로 처리효과를 높이는 방식으로 개선한 것으로, 기존의 방식보다 상·하수의 처리용량을늘려주면서도 처리효과도 함께 높여주어 최종 방류수의 수질은 보다 좋게 개선시켜주는 시설을 말한다.Here, the performance improvement treatment facility means that existing water and sewage treatment facilities are treated through the settling basin, aeration tank, and reaction tank after the first inflow of water is introduced, but it takes a lot of time and effort to maintain the quality of the effluent. In order to increase the quality of the final effluent and to improve the quality of the final effluent, a plurality of partitions are installed in the water and sewage treatment plant, and the first influent flows into the labyrinth through the openings of the walls to inject air from the outside. It is a facility that gradually improves the treatment effect through the process, etc., and it is a facility that improves the water quality of the final discharged water by increasing the treatment effect while increasing the treatment capacity of water and sewage than the existing method.

상기 개구부는 각각의 간벽에 트여진 공간으로 첫 번째 간벽에서 개구부가 하부에 형성되었으면 다음번 간벽에는 상부에 형성되는 식으로 형성되어서 수류를 변경시키는 역할을 하는 것이다.The openings are spaces formed in the respective partition walls, and if the openings are formed in the lower part of the first partition wall, the openings are formed in the upper part in the next partition wall to change water flow.

이때, 상기 개구부가 상부에 형성된 간벽에는 그 하부에 오리피스를 형성시켜야 간벽의 구조를 안정시켜 줄 수 있으며, 저탁도의 침전수를 지내 수류를 흐트러 뜨리지 않고 유출시킬 수 있다.At this time, the orifice is formed in the lower part of the liver wall formed at the upper part of the opening to stabilize the structure of the liver wall, and the low turbidity precipitated water can flow out without disturbing the water flow.

일반적으로 콘크리트 구조물(100)에 간벽을 형성시키는 방법으로는 도1a 및 도1b 의 도시와 같이, 기존 구조물을 파취하여 철근(110)을 연결한 후 신설콘크리트를 타설하여 간벽을 형성하는 방법이 보편적으로 사용되고 있는 실정이다.In general, as a method of forming the partition wall in the concrete structure 100, as shown in Figures 1a and 1b, a method of forming the partition wall by laying the new concrete after connecting the reinforcement 110 by digging the existing structure is common It is being used as.

이러한 종래의 콘크리트 간벽(120)은 하수처리시설의 구조물 대부분이 콘크리트로 되어 있기 때문에 시공관리가 용이하다는 점이 있다.The conventional concrete partition wall 120 has a point that the construction management is easy because most of the structure of the sewage treatment facility is made of concrete.

그러나, 종래의 콘크리트 간벽은However, conventional concrete partition walls

첫째로, 복개구조물 개선시 작업공간이 협소하여 거푸집 설치 및 콘크리트 타설등의 어려움으로 시공성이 떨어지며,First of all, when improving the cover structure, the work space is narrow and the workability is inferior due to difficulties such as formwork and concrete placing.

둘째로는, 신·구 콘크리트 연결시 기존 구조물은 노후화되어 있어서 구 콘크리트를 파취하여 철근을 연결해서 설치하게 되면은 구조물 자체에 손상을 주게 됨은 물론, 기존 콘크리트 간벽을 파취하는 방법으로는 해머 등에 의한 강한 물리적 충격을 사용하게 되어서 기존 구조물 전체에도 손상을 줄 수 있으며,Second, when the new and old concrete is connected, the old structure is aging, so if you install old concrete by connecting the reinforcing bars, it will damage the structure itself. Using a strong physical shock can damage the entire existing structure,

셋째로, 시공기간이 장시간 소요되어서 이로 인해 하수처리시설의 가동이 중단되는 기간이 길어지므로 충분한 예비능력을 갖추지 못할 경우 상하수 처리능력의 저하를 피할 수 없게 되는 문제점이 발생하게 되었다.Third, since the construction period takes a long time, and this leads to a long period in which the operation of the sewage treatment facility is stopped, a problem arises in that the water and sewage treatment capacity cannot be avoided if sufficient reserve capacity is not provided.

따라서, 콘크리트 구조물 내에 간단하게 시공할 수 있으면서도 구조에 큰 손상을 주지 않고, 내구성 및 내부식성을 가지는 간벽이 필요하게 되었다.Therefore, there is a need for an interwall having durability and corrosion resistance that can be easily constructed in a concrete structure and does not significantly damage the structure.

본발명의 목적은 상하수처리시설조 내에 간벽을 설치함에 있어서, 내구성있는 강재로서 간벽틀을 형성하고, 상기 간벽틀 내부에는 내부식성과 내구성을 가지는 중공부패널들을 삽입하여서 조립 설치하거나, 스테인레스 철판을 요철형으로 절곡시켜서 제작되는 강판들을 삽입하여서 간단하게 간벽을 조립할 수 있도록 함으로써, 콘크리트 구조물 벽면에는 앵커볼트 구멍만을 뚫어서 고정할 수 있도록 하여 콘크리트 자체에는 손상을 거의 주지 않으면서도 간단하게 시공할 수 있는 하수처리장의 중공부패널을 이용한 조립식 간벽을 제공하는 데 있다.The purpose of the present invention is to install an interwall in a water and sewage treatment tank, to form an interwall as a durable steel, and to install by inserting a hollow panel having a corrosion resistance and durability inside the interwall, or a stainless steel plate By inserting the steel plates produced by bending into the uneven shape, it is possible to easily assemble the wall, so that only the anchor bolt hole can be fixed to the wall of the concrete structure so that the concrete can be easily installed without damaging the concrete itself. It is to provide a prefabricated partition wall using the hollow panel of the treatment plant.

도 1a는 콘크리트구조물에 콘크리트 간벽이 일체로 타설되는 것을 도시한 일부절결사시도.Figure 1a is a partial cutaway perspective view showing that the concrete partition wall is integrally cast on the concrete structure.

도 1b는 콘크리트구조물 벽면을 일부 파취하여 콘크리트 간벽을 설치한 것을 도시한 일부 발췌 사시도.Figure 1b is a partial perspective view showing a part of the concrete structure wall excavation to install a concrete partition wall.

도 2는 콘크리트구조물에 본발명의 하수처리장의 중공부패널을 이용한 조립식 간벽을 설치한 것을 도시한 일부절결 사시도.Figure 2 is a partially cutaway perspective view showing the installation of a prefabricated partition wall using the hollow panel of the sewage treatment plant of the present invention in a concrete structure.

도 3a는 도2의 본발명인 하수처리장의 중공부패널을 이용한 조립식 간벽들 중 하나를 도시한 정면도.Figure 3a is a front view showing one of the prefabricated partition walls using the hollow panel of the sewage treatment plant of the present invention of FIG.

도 3b는 도3a의 측단면도.3B is a side cross-sectional view of FIG. 3A.

도 3c은 도3a의 평단면도.3C is a cross sectional view of FIG. 3A;

도 4는 본발명의 실시예인 중공부패널를 예시한 사시도.Figure 4 is a perspective view illustrating a hollow panel which is an embodiment of the present invention.

도 5는 본발명의 다른실시예 중 스테인레스패널을 도시한 사시도.5 is a perspective view showing a stainless panel of another embodiment of the present invention.

도 6a는 도3b의 상부 연결부를 도시한 일부 확대 측단면도.6A is an enlarged side cross-sectional view of the upper connection of FIG. 3B.

도 6b는 도3b의 하부 연결부를 도시한 일부 확대 측단면도.6B is an enlarged side cross-sectional view of the bottom connection of FIG. 3B;

도 6c는 도3c의 중앙 연결부를 도시한 일부 확대 평단면도.FIG. 6C is an enlarged partial cross-sectional view of the center connection of FIG. 3C; FIG.

도 7a는 본발명에 사각보강판을 설치한 실시예를 도시한 일부 절결 확대 정면도.Figure 7a is a partially cut-out enlarged front view showing an embodiment in which the rectangular reinforcing plate is installed in the present invention.

도 7b는 본발명의 사각보강판을 설치한 다른 실시예를 도시한 일부 절결 확대 정면도.Figure 7b is a partially cut-out enlarged front view showing another embodiment of installing the square reinforcing plate of the present invention.

도 8은 본발명의 하수처리장의 중공부패널을 이용한 조립식패널들을 적용한실시예를 도시한 평면배치도.8 is a planar view showing an embodiment applying the prefabricated panels using the hollow panel of the sewage treatment plant of the present invention.

도 9는 본발명들의 하수처리장의 중공부패널을 이용한 조립식패널들을 적용한 다른 실시예를 도시한 평면배치도.Figure 9 is a planar view showing another embodiment applying the prefabricated panels using the hollow panel of the sewage treatment plant of the present invention.

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of the drawings

100 : 콘크리트 구조물 110 : 철 근 120 : 콘크리트간벽100: concrete structure 110: steel reinforcement 120: concrete interwall

200 : 본발명의 간벽 200a, 200b : 개구부 210 : 중공부패널200: partition wall 200a, 200b of the present invention: opening 210: hollow panel

220 : 간벽틀 222 : ㄷ형강재 224 : H형강재220: inter-wall frame 222: C-shaped steel 224: H-shaped steel

230 : 기초틀 232 : ㄱ형강재 240 : 체결볼트230: foundation frame 232: a-shape steel 240: fastening bolt

250 : 앵커볼트 260 : 사각보강판 270 : 스테인레스패널250: anchor bolt 260: square reinforcement plate 270: stainless panel

이하, 본발명의 기술구성을 실시예를 들어 상세히 설명하면 다음과 같다.Hereinafter, a description will be given of the technical configuration of the present invention in detail as follows.

콘크리트 구조물(100) 내에 간벽(200)을 형성함에 있어서,In forming the partition wall 200 in the concrete structure 100,

본발명의 하수처리장의 중공부패널을 이용한 조립식 간벽(200)은 도2 및 도3a 내지 도3c에 도시되는 바와 같이, 상기 간벽(200)은 고밀도 폴리에틸렌의 재질을 사용하여 평활하게 형성되는 한 쌍의 평판(210a) 사이에 폭방향으로 파형단면들이 반복형성 되어지는 파형단판(210b)을 융착시켜 제조하여서 휨 강도가 크며, 내구성 및 내부식성을 가지며, 소정의 크기들로 제작되어지는 중공부패널(210)들과, 내구성 있는 강판으로 그 단면이 ㄷ자로 절곡되는 ㄷ형강재(222)들이 수평방향과 수직방향으로 형성되는 간벽틀(220)과, 내구성 있는 강판으로 그 단면이 ㄱ자로 절곡되는 ㄱ형강재(224)들이 상기 간벽틀(220)의 외곽에 설치되어서 콘크리트 구조물 내부면을 따라서 설치되는 기초틀(230)로 구성되어서, 상기 중공부패널 (210)들을 상기 간벽틀(220) 및 기초틀(230)에 체결볼트(240)으로서 체결하고, 상기 기초틀(230)을 콘크리트 구조물의 내부면에 앵커볼트(250)로 고정하여서 콘크리트 구조물 내부에 간벽을 간단하게 조립함을 특징으로 한다.Prefabricated partition wall 200 using the hollow panel of the sewage treatment plant of the present invention is shown in Figures 2 and 3a to 3c, the partition wall 200 is a pair formed smoothly using a high-density polyethylene material The hollow panel is manufactured by welding the corrugated end plate 210b in which the corrugated cross sections are repeatedly formed in the width direction between the flat plates 210a of the plate 210a, and having a high bending strength, durability and corrosion resistance, and being manufactured to predetermined sizes. (210), the c-shaped steel 222, the cross section of which is bent into a c-shaped with a durable steel plate, the partition wall frame 220 is formed in a horizontal direction and a vertical direction, and the a-shape that the cross-section is bent into a c with a durable steel plate Steel 224 is installed on the outer wall of the inter-wall frame 220 is composed of a base frame 230 is installed along the inner surface of the concrete structure, so that the hollow panel panels 210 to the inter-wall frame 220 and the base frame Sieve 230 As fastening bolt 240, characterized in that the base frame 230 is fixed to the inner surface of the concrete structure by anchor bolts 250 to simply assemble the interior wall inside the concrete structure.

이와 같이 구성되는 본발명은 도4에 도시되는 바와 같이, 상기 중공부패널 (210)은 합성수지 재질의 시트를 특수가공법으로 제작하여 이중 프레임구조를 갖게 형성한 것을 사용하는 것이 내부식성, 내구성, 내화학성 및 압축강도와 휨 강도에 강하게 함으로서 구조물 제작에 용이하면서도 안전성을 높인 것이다.As shown in FIG. 4, the hollow panel panel 210 is formed of a synthetic resin sheet by using a special processing method, and has a double frame structure. By strengthening the chemical and compressive strength and the bending strength, it is easy to manufacture the structure and increases safety.

특히, 본발명에서는 상기 합성수지의 원료는 석유화학 제품으로 밀도는 0.93∼0.965g/cm3이내인 고밀도 폴리에틸렌(HDPE; HIGH DENSITY POLYETHYLENE)을 사용하는 것이 좋다.In particular, in the present invention, the raw material of the synthetic resin is a petrochemical product, and it is preferable to use high density polyethylene (HDPE; HIGH DENSITY POLYETHYLENE) having a density within 0.93 to 0.965 g / cm 3 .

상기 간벽틀(220)은 상기 중공부패널(210)들이 간벽(200)의 형상을 유지하고 측압에 견디기 위한 보강구조를 형성하는데 필요한 ㄷ형강재(222)들로서 구성된다.The trunk wall frame 220 is configured as c-shaped steels 222 required to form a reinforcing structure for the hollow panel 210 to maintain the shape of the trunk wall 200 and withstand side pressure.

상기 ㄷ형강재(222) 2개를 한 쌍으로 하여 그 형상이 H형상이 되도록 붙여서 맞닿는 부분을 용접하여 H형강재(224)를 제작한다.The two c-shaped steels 222 are paired to form a H-shape, and the abutting portions are welded to produce the H-shaped steel 224.

상기 기초틀(230)은 도3a 내지 도3c 및 도6b에 도시되는 바와 같이, 상기 간벽틀(220)과 상기 중공부패널(210)들로 세워지는 벽체를 콘크리트 구조물 내에 고정시켜주기 위한 보강구조를 형성하는데 필요한 ㄱ형강재(232)들로서 구성된다.As shown in FIGS. 3A to 3C and 6B, the base frame 230 is a reinforcing structure for fixing the wall formed by the interwall 220 and the hollow panel 210 in a concrete structure. It is configured as the a-shaped steels 232 necessary to form a.

상기 강재들은 ㄱ형 및 ㄷ형의 형상을 갖도록 스테인레스 계열중에서 SUS304재질의 평판을 절곡가공하며, 절곡된 측면들에는 일정 간격으로 앵커볼트 또는 볼트 체결용 구멍들을 뚫어서 각각 ㄱ형강재(232) 및 ㄷ형강재(222)들로 제작한다.The steels are bent in the stainless steel series to have the shape of the a-type and c-type, SUS304 plate, and bent sides of the anchor bolt or bolt fastening holes at regular intervals to form a-shaped steel 232 and c-shaped steel (222) Produce with).

그리고, 상기 중공부패널(210)들을 상기 강재들에 삽입하여 고정시키는 체결볼트(240)로는 SUS304 계열의 볼트를 사용하는 것이 좋다.In addition, it is preferable to use a SUS304 series bolt as the fastening bolt 240 for fixing the hollow panel 210 to the steel materials.

상기 간벽틀(220)을 콘크리트구조물(100)에 고정시키는 고정수단으로 SUS304 계열의 앵커볼트(250)를 사용하는 것이 ㄱ형강재(232)를 콘크리트에 고정하는데 필요한 공법안정성 및 표면 고착성을 감안하여 볼 때 좋다.Using the anchor bolt 250 of the SUS304 series as a fixing means for fixing the inter-wall frame 220 to the concrete structure 100 in consideration of the process stability and surface adhesion required to fix the a-shaped steel 232 to concrete When good.

여기서, 상기 H형강재(224)는 도3a 내지 도3c 및 도6c에 도시되는 바와 같이, 상기 간벽틀(220)의 내부에 가로부재 및 세로부재로 설치되며, 가로부재 및 세로부재로 짜여진 틀체 내부에는 상기 중공부패널(210)을 삽입하여 볼트(240)로 조립한다.Here, the H-shaped steel 224 is installed as a horizontal member and a vertical member in the interior of the interior wall frame 220, as shown in Figures 3a to 3c and 6c, the frame woven into the horizontal member and vertical member The hollow panel 210 is inserted into the bolt 240.

상기 기초틀(230)은 상기 간벽틀(220)의 외부에 형성되는 가로부재 및 세로부재로서 상기 ㄱ형강재(232) 2개를 한 쌍으로 해서 그 일측은 상기 중공부패널 (210)의 외측 테두리면의 양측면에 접해서 고정볼트로서 상기 중공부패널(210)들을 고정하게 되며, 그 타측은 콘크리트 구조물면에 접해서 앵커볼트로서 콘크리트 구조물에 상기 간벽틀(220)을 고정시켜주는 역할을 하게 되는 것이다.The base frame 230 is a horizontal member and a vertical member formed on the outside of the inter-wall frame 220 as a pair of two a-shape steel 232, one side of which is an outer edge of the hollow panel 210. The hollow panel 210 is fixed as a fixing bolt in contact with both sides of the surface, the other side is in contact with the surface of the concrete structure serves to fix the inter-wall frame 220 to the concrete structure as an anchor bolt. will be.

그리고, 도6a에 도시되는 바와 같이, 상기 간벽틀(220)의 외측 테두리부분들 중 콘크리트 구조물과 접하지 않는 부분들인 중공부패널(210)들의 테두리 부분들에는 ㄷ형강재(222)들을 삽입하여서 고정시켜 준다.And, as shown in Figure 6a, the outer portion of the outer wall portion 220 of the hollow wall panel 210, which is not part of the contact with the concrete structure by inserting the c-shaped steel 222 is fixed by inserting Let it be.

그리고, 본발명의 다른 실시예로 도7a 내지 도7c에 도시되는 바와 같이, 상기 간벽틀(220)과 기초틀(230)의 강재들이 서로 만나는 연결 부분들의 여건에 따라서 그 크기를 달리하여 동일 재질의 강판으로 제작하고 용접이나 볼트로서 접합하여 보강해주는 사각보강판(260)들의 구성을 예로 들 수 있다.As another embodiment of the present invention, as shown in FIGS. 7A to 7C, the same material may be different in size depending on the conditions of connection parts where the steel materials of the interior wall frame 220 and the base frame 230 meet each other. For example, the configuration of the square reinforcing plate 260 is made of a steel sheet and bonded or reinforced by welding or bolts.

그리고, 본발명의 또 다른 실시예로 도5에 도시되는 바와 같이, 상기 중공부패널(210) 대신에 스테인레스 강판을 요철(凹凸)형으로 절곡하여서 제작되어지는 스테인레스패널(270)을 사용할 수 도 있음을 밝혀두는 바이다.As another embodiment of the present invention, as shown in FIG. 5, instead of the hollow panel 210, a stainless panel 270 that is manufactured by bending a stainless steel sheet into an uneven shape may be used. It is to be noted.

위와 같이 구성되는 본발명의 시공예를 들면 다음과 같다.Examples of the construction of the present invention configured as described above are as follows.

콘크리트 구조물(100)의 벽면에 앵커홀을 간벽이 설치되는 위치의 전·후면부를 따라서 소정의 간격마다 뚫어서 되는 앵커홀의 형성 단계와;An anchor hole formed on the wall surface of the concrete structure 100 along the front and rear portions of the position where the interwall is installed;

ㄱ형강재(232)를 상기 콘크리트 구조물(100)에 앵커볼트(250)로 후면 1열의 앵커홀에 고정하는 ㄱ형강재의 고정 단계와;A step of fixing the a-shape steel 232 to the anchor hole in the first row of the rear side with an anchor bolt 250 to the concrete structure 100;

일측 구석에서부터 중공부패널(210)들을 다수개의 층으로 수직하게 1열로 세우고, 상기 중공부패널(210)들의 상하층 사이에는 각각 H형강재(224)를 설치하고, 상기 중공부패널(210)들의 수직방향으로는 전체길이를 따라서 H형강재(224)를 설치 및 조립하는 단위벽체의 설치 단계와;Hollow part panels 210 are vertically arranged in a row from one corner in a plurality of layers, and H-shaped steels 224 are installed between upper and lower layers of the hollow part panels 210, respectively, and the hollow part panel 210 is disposed. An installation step of the unit wall for installing and assembling the H-shaped steel 224 along the entire length in the vertical direction thereof;

상기 단위벽체의 설치 단계를 연속적으로 반복하여 최종적으로 상기 단위벽체가 2열이 남을 때까지 반복설치하는 단위벽체의 반복 설치 단계와;Repeatedly installing the unit walls by repeatedly repeating the installation of the unit walls and finally installing the unit walls until two rows remain;

남는 2열의 단위벽체를 별도의 작업공간에서 각각 ㄷ형 강재에 일측 수직 테두리부에 중공부패널(210) 1열을 각각 삽입하여 조립하고, 그 상하단 사이에는 H형강재(224)를 삽입하여 조립하는 별도의 단위벽체 조립 단계와;The remaining two rows of unit walls are assembled in a separate working space by inserting one row of the hollow panel 210 into one vertical edge portion of the c-shaped steel, respectively, and inserting the H-shaped steel 224 between the upper and lower ends thereof. A separate unit wall assembly step;

상기 별도의 단위벽체 조립 단계에서 제작된 단위벽체를 각각 일으켜서 최종적으로 작업한 상기 단위벽체의 최종 H형강재(224)에 연속적으로 상기 별도의 단위벽체들을 설치하고, 상기 별도의 단위벽체들이 맞닫는 부분의 ㄷ형강재(222) 사이를 용접하는 별도의 단위벽체의 설치 단계와;The separate unit walls are continuously installed in the final H-shaped steel material 224 of the unit wall which is finally worked by raising the unit walls manufactured in the separate unit wall assembly step, and the separate unit walls close to each other. An installation step of a separate unit wall for welding between the c-shaped steels 222;

이상과 같은 방법으로 가조립된 간벽(200) 테두리부의 타측면부에 다른 ㄱ형강재(232)을 고정 설치후 전체를 완전 고정시켜서 되는 L형강재의 고정 및 마무리 단계 로 설치 및 조립되는 것이다.It is to be installed and assembled in the fixing and finishing step of the L-shaped steel which is completely fixed after the installation of the other a-shaped steel 232 to the other side portion of the rim part 200 is temporarily assembled in the above manner.

또한, 위와는 별도로 간벽을 별도의 작업공간에서 조립한 후 일으켜서 세우고 콘크리트 구조물에 앵커볼트로서 고정시키는 다른 시공예를 들 수도 있다.In addition, apart from the above, another construction example of assembling the walls in a separate working space, then raising and standing as anchor bolts to the concrete structure may be mentioned.

이외에도, 본발명의 중공부패널(210)의 형상과 강재(222, 224, 232)들을 가지고서 다양한 설치 및 조립방법에 의해서 간벽을 설치할 수 있음을 밝혀두는 바이다.In addition, with the shape of the hollow panel 210 and the steel materials (222, 224, 232) of the present invention will be found that the partition wall can be installed by a variety of installation and assembly methods.

이상과 같이 구성되는 본발명을 설치한 실시예로 간단하게는 도8의 도시와 같이 3면이 콘크리트 구조물로 둘러싸여서 형성되어지게 할 수 있는 것이다.In an embodiment in which the present invention is configured as described above, it is possible to simply form three surfaces surrounded by a concrete structure as shown in FIG.

그리고, 다른 실시예로 도9의 도시와 같이, 콘크리트 구조물 내에 도8의 구성과 같은 간벽들을 설치하고, 상기 간벽들 사이에 또다시 다른 간벽들을 설치한 것을 나타내고 있다.In another embodiment, as shown in FIG. 9, partition walls as shown in FIG. 8 are installed in a concrete structure, and another partition walls are installed between the partition walls.

이때, 상기 간벽들이 콘크리트 구조물에만 고정 설치되는 것이 아니고 다른 간벽들 사이에서도 설치될 수 있음을 알 수 있다.In this case, it can be seen that the partition walls are not fixedly installed only in the concrete structure but may be installed between other partition walls.

상기 간벽을 콘크리트 구조물이 아닌 다른 간벽에 고정시키는 예를 들면 용접이나 체결볼트로서 고정하는 방법이 있다.For example, there is a method of fixing the barrier wall to another barrier wall other than a concrete structure by welding or fastening bolts.

상기와 같이 구성되어 제작되어지는 본발명은 구조적 강도가 강하고 종공부를 형성한 중공부패널과 간벽틀, 기초틀로 이루어지는 조립식 간벽으로서,The present invention constructed and manufactured as described above is a prefabricated partition wall composed of a hollow panel, a partition wall frame and a foundation frame having a strong structural strength and forming a longitudinal hole,

첫째, 기존의 콘크리트 구조물의 벽면에는 앵커볼트로서 고정되므로서, 노후화된 콘크리트 구조물에 손상을 거의 주지 않으며;First, it is fixed as an anchor bolt on the wall surface of the existing concrete structure, thereby hardly damaging the aging concrete structure;

둘째, 간벽을 설치하기 위한 작업공간은 인부들이 들어가서 활동할 수 있으면 어디서든지 간단하게 설치하여 완료할 수 있으며,Second, the work space for installing the partition wall can be simply installed and completed wherever workers can enter and be active.

셋째, 조립식으로 설치하므로서 기존의 일체로 타설되는 콘크리트구조 보다 시공기간이 많이 단축되어서, 가동중인 기존시설의 처리효과의 감소를 없애주면서도 경제적으로 시공할 수 있으며,Third, the installation time is shorter than the existing one-cast concrete structure, so it can be installed economically while eliminating the reduction of the treatment effect of the existing existing facilities.

넷째,고밀도 폴리에틸렌 수지를 사용하는 조립식 간벽으로서 유해한 물질을 발생시키지 않으므로 환경친화적이고,Fourth, as a prefabricated partition wall using high density polyethylene resin does not generate harmful substances, it is environmentally friendly,

다섯째, 간벽의 두께가 기존 콘크리트 벽체는 200mm이상이 되는 데 반하여 본발명의 벽체의 두께는 60-70mm로 줄일 수 있어서 벽체의 수량이 많아질수록 상·하수 처리장의 용량이 콘크리트구조보다 증가되어 기존 상하수 처리시설의 성능을 높여주는 효과가 있다.Fifth, the thickness of the wall is more than 200mm of the existing concrete wall, while the thickness of the wall of the present invention can be reduced to 60-70mm. As the number of walls increases, the capacity of the water and sewage treatment plant increases compared to the concrete structure. It has the effect of improving the performance of water and sewage treatment facilities.

이상에서 살펴본 바와 같이, 본발명은 환경친화적이며, 간단한 조립방법으로 시공성을 높여주면서도 저렴한 비용으로 공사를 완료할수 있어서 공사 단가를 줄여주며, 조립식이어서 설치 및 해체가 용이하여 시공관리하기가 좋은 매우 유용한 것이다.As described above, the present invention is environmentally friendly, it is easy to install and dismantle because it is easy to install and dismantle as it is easy to install and dismantle because the construction can be completed at a low cost while improving the constructability by a simple assembly method. will be.

Claims (5)

콘크리트 구조물내에 간벽(200)을 형성함에 있어서,In forming the partition wall 200 in the concrete structure, 상기 간벽(200)은 고밀도 폴리에틸렌의 재질을 사용하여 평활하게 형성되는 한쌍의 평판(210a) 사이에 폭방향으로 파형단면들이 반복형성 되어지는 파형단판 (210b)을 융착시켜 제조하여서 강도가 강하고, 내구성 및 내부식성을 가지며, 소정의 크기들로 제작되어지는 중공부패널(210)들과, 내구성 있는 강판으로 그 단면이 ㄷ자로 절곡되는 ㄷ형강재(222)들이 수평방향과 수직방향으로 형성되는 간벽틀 (220)과, 내구성 있는 강판으로 그 단면이 ㄱ자로 절곡되는 ㄱ형강재(232)들이 상기 간벽틀(220)의 외곽에 설치되어서 콘크리트 구조물 내부면을 따라서 설치되는 기초틀(230)로 구성되어서, 상기 중공부패널(210)들을 상기 간벽틀(220) 및 기초틀 (230)에 체결볼트(240)으로서 체결하고, 상기 기초틀(230)을 콘크리트 구조물의 내부면에 앵커볼트(250)로 고정하여서 콘크리트 구조물내부에 간벽을 간단하게 조립함을 특징으로 하는 하수처리장의 중공부패널을 이용한 조립식 간벽The partition wall 200 is manufactured by fusing the corrugated end plate 210b, in which the corrugated cross sections are repeatedly formed in the width direction, between a pair of flat plates 210a smoothly formed by using a material of high density polyethylene, thereby making the strength strong and durable. And a hollow wall panel 210 having corrosion resistance and made of predetermined sizes, and c-shaped steels 222 whose cross sections are bent in a letter C with a durable steel plate are formed in a horizontal direction and a vertical direction. (220) and the a-shaped steels 232 whose cross sections are bent into a letter A with durable steel sheets are installed on the outer wall of the inter-wall frame 220, and are composed of a base frame 230 installed along an inner surface of the concrete structure, The hollow panel panels 210 are fastened to the inter-wall frame 220 and the base frame 230 as fastening bolts 240, and the base frame 230 is fixed to the inner surface of the concrete structure with anchor bolts 250. Conk Prefabricated partition wall using hollow panel of sewage treatment plant, characterized in that the partition wall is simply assembled inside the lit structure 제1항에 있어서, 상기 상기 간벽틀(220)과 기초틀(230)이 교차하여 조립되는 부분에 소정의 크기의 사각보강판(260)을 덧붙여서 용접하여 보강함을 특징으로 하는 하수처리장의 중공부패널을 이용한 조립식 간벽According to claim 1, wherein the hollow wall of the sewage treatment plant characterized in that the reinforcement by adding a rectangular reinforcing plate 260 of a predetermined size to the portion where the inter-wall frame 220 and the base frame 230 cross and assemble. Prefabricated Wall Using Subpanel 제1항 또는 제2항에 있어서, 상기 중공부패널(210)을 스테인레스 재질이며 그 단면이 요철(凹凸)형으로 절곡하여 제작되는 스테인레스패널(270)로 함을 특징으로 하는 하수처리장의 중공부패널을 이용한 조립식 간벽The hollow part of the sewage treatment plant according to claim 1 or 2, wherein the hollow part panel 210 is made of stainless material, and a stainless panel 270 is formed by bending the cross section into an uneven shape. Prefabricated Walls with Panels 콘크리트 구조물의 벽면에 앵커홀을 간벽이 설치되는 위치의 전·후면부를 따라서 소정의 간격마다 뚫어서 되는 앵커홀의 형성 단계와;Forming an anchor hole in the wall surface of the concrete structure, the anchor hole being drilled at predetermined intervals along the front and rear portions of the position where the interwall is installed; ㄱ형강재(232)를 상기 콘크리트 구조물에 앵커볼트로 후면 1열의 앵커홀에 고정하는 ㄱ형강재의 고정 단계와;A step of fixing the a-shape steel 232 to the anchor hole in the first row of the rear with anchor bolts to the concrete structure; 일측 구석에서부터 중공부패널(210)들을 다수개의 층으로 수직하게 1열로 세우고, 상기 중공부패널(210)들의 상하층 사이에는 각각 H형 강재(224)를 설치하고, 상기 중공부패널(210)들의 수직방향으로는 전체길이를 따라서 H형강재(224)를 설치 및 조립하는 단위 벽체의 설치 단계와;Hollow panel panels 210 are arranged in one row vertically from one corner in a plurality of layers, and H-shaped steels 224 are installed between upper and lower layers of the hollow panel panels 210 and the hollow panel 210 An installation step of the unit wall for installing and assembling the H-shaped steel 224 along its entire length in the vertical direction thereof; 상기 단위벽체의 설치 단계를 연속적으로 반복하여 최종적으로 상기 단위벽체가 2열이 남을 때까지 반복설치하는 단위벽체의 반복 설치 단계와;Repeatedly installing the unit walls by repeatedly repeating the installation of the unit walls and finally installing the unit walls until two rows remain; 남는 2열의 단위벽체(224)를 별도의 작업공간에서 각각 ㄷ형 강재에 일측 수직 테두리부에 중공부패널(210) 1열을 각각 삽입하여 조립하고, 그 상하단 사이에는 H형 강재(224)를 삽입하여 조립하는 별도의 단위벽체 조립 단계와;The remaining two rows of unit walls 224 are assembled in a separate working space by inserting one row of the hollow panel 210 into the vertical edge on each side of the c-shaped steel, and inserting the H-shaped steel 224 between the upper and lower ends thereof. Assembling a separate unit wall assembly step; 상기 별도의 단위벽체 조립 단계에서 제작된 단위벽체를 각각 일으켜서 최종적으로 작업한 상기 단위벽체의 최종 H형강재(224)에 연속적으로 상기 별도의 단위벽체들을 설치하고, 상기 별도의 단위벽체들이 맞닿는 부분의 ㄷ형강재(222) 사이를 용접하는 별도의 단위벽체의 설치 단계와;A portion in which the separate unit walls are continuously installed in the final H-shaped steel 224 of the unit wall which is finally worked by raising the unit walls manufactured in the separate unit wall assembly step, and the separate unit walls are in contact with each other. And the installation step of the separate unit wall for welding between the c-shaped steel 222; 이상과 같은 방법으로 가조립된 간벽(200) 테두리부의 타측면부에 다른 ㄱ형강재(232)을 고정 설치후 전체를 완전 고정시켜서 되는 ㄱ형 강재의 고정 및 마무리 단계로 구성되어 조립됨을 특징으로 하는 하수처리장의 중공부패널을 이용한 조립식 간벽The sewage treatment plant of the sewage treatment plant characterized in that the assembly is composed of the fixing and finishing stages of the a-shaped steel which is completely fixed after the other a-shaped steel 232 is fixedly installed on the other side portion of the edge portion of the partition wall 200 which is temporarily assembled. Prefabricated Wall Using Hollow Panel 제 4항에 있어서, 상기 별도의 단위벽체의 설치 단계를 거친후 상기 간벽의 외측 테두리중 콘크리트면에 접촉하지 않는 테두리부분들은 ㄷ형강재(222)로서 삽입하여 고정하는 외측 테두리부의 ㄷ형강재(222)의 설치 단계를 추가함을 특징으로 하는 하수처리장의 중공부패널을 이용한 조립식 간벽The c-shaped steel 222 of the outer edge portion of the outer edge portion of the outer edge portion of the outer edge of the outer wall of the outer wall of the outer wall of the interwall that does not contact the concrete surface is inserted and fixed as the c-shaped steel 222 after the installation of the separate unit wall. Prefabricated partition wall using hollow panel of sewage treatment plant
KR1019990013071A 1999-04-13 1999-04-13 Enclosure wall body of water source and sewage disposal plant and construction method thereof KR100406084B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990013071A KR100406084B1 (en) 1999-04-13 1999-04-13 Enclosure wall body of water source and sewage disposal plant and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990013071A KR100406084B1 (en) 1999-04-13 1999-04-13 Enclosure wall body of water source and sewage disposal plant and construction method thereof

Publications (2)

Publication Number Publication Date
KR19990064576A true KR19990064576A (en) 1999-08-05
KR100406084B1 KR100406084B1 (en) 2003-11-17

Family

ID=37422689

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990013071A KR100406084B1 (en) 1999-04-13 1999-04-13 Enclosure wall body of water source and sewage disposal plant and construction method thereof

Country Status (1)

Country Link
KR (1) KR100406084B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100371647B1 (en) * 1999-10-02 2003-02-11 주식회사 젠트로 A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site
KR100427772B1 (en) * 2001-05-18 2004-04-28 변무원 Partition Wall for Water Treatment Tank
KR100690628B1 (en) 2006-05-16 2007-03-12 주식회사 젠트로 Structure of partition wall for water disposal plant and construction method thereof
KR100788999B1 (en) * 2006-12-01 2007-12-28 주식회사 젠트로 Partition wall for water disposal plant and method for constructing the wall
KR100910738B1 (en) * 2007-09-13 2009-08-05 조창균 Partition wall structure of a water treatment site
KR101404810B1 (en) * 2013-12-05 2014-07-02 주식회사 한국종합기술 Open and close type training wall
KR102428758B1 (en) * 2022-04-05 2022-08-05 주식회사 피엘테크코리아 Baffle panel with enhanced ozone resistance and baffle panel for preventing sludge from remaining in a water treatment plant using the baffle panel
KR102610318B1 (en) * 2023-06-13 2023-12-07 (주)젠트로그룹 Prefabricated antibacterial baffle wall using PE material

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100993334B1 (en) * 2009-12-09 2010-11-09 (주) 선암기술연구소 Structure for separation rain or dirty water and methode there of
KR101158034B1 (en) * 2010-06-30 2012-06-22 (주) 선암기술연구소 Structure for separation rain or dirty water and methode there of
KR101017676B1 (en) 2010-07-06 2011-02-25 수엔비텍 주식회사 Partition wall for water disposal plant
KR101274603B1 (en) * 2010-07-23 2013-06-14 주식회사 창우엔바이로 Stop and flow wall of cleaning bed
KR101286255B1 (en) 2013-03-14 2013-07-15 주식회사 성지기공 Water treatment plant of the guide wall assembly structure and construction method thereof
KR101374423B1 (en) * 2013-10-31 2014-03-13 주식회사 한국종합기술 Open and close type training wall
KR101858838B1 (en) * 2016-10-25 2018-05-17 김현숙 A Reinforcing Device For Separation Wall

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100371647B1 (en) * 1999-10-02 2003-02-11 주식회사 젠트로 A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site
KR100427772B1 (en) * 2001-05-18 2004-04-28 변무원 Partition Wall for Water Treatment Tank
KR100690628B1 (en) 2006-05-16 2007-03-12 주식회사 젠트로 Structure of partition wall for water disposal plant and construction method thereof
KR100788999B1 (en) * 2006-12-01 2007-12-28 주식회사 젠트로 Partition wall for water disposal plant and method for constructing the wall
KR100910738B1 (en) * 2007-09-13 2009-08-05 조창균 Partition wall structure of a water treatment site
KR101404810B1 (en) * 2013-12-05 2014-07-02 주식회사 한국종합기술 Open and close type training wall
KR102428758B1 (en) * 2022-04-05 2022-08-05 주식회사 피엘테크코리아 Baffle panel with enhanced ozone resistance and baffle panel for preventing sludge from remaining in a water treatment plant using the baffle panel
KR102610318B1 (en) * 2023-06-13 2023-12-07 (주)젠트로그룹 Prefabricated antibacterial baffle wall using PE material

Also Published As

Publication number Publication date
KR100406084B1 (en) 2003-11-17

Similar Documents

Publication Publication Date Title
KR19990064576A (en) Prefabricated Wall Using Hollow Panel of Sewage Treatment Plant
KR100807826B1 (en) Ceiling type pipe line supporting device
KR100694888B1 (en) Structure of partition wall for water disposal plant
KR102186348B1 (en) Post structure of soundproofing walls for c-type steel of high rigidity structure
KR101286255B1 (en) Water treatment plant of the guide wall assembly structure and construction method thereof
KR102177024B1 (en) prefabricated PDF panel water tank for seismic purposes
KR20120089062A (en) Water Tank having a Reinforcement Frame Assembly
KR200381758Y1 (en) Reinforcement Structure for Partition of Fabricated Water Tank
KR101132415B1 (en) Soundproof wall including support of multi strength
KR100690628B1 (en) Structure of partition wall for water disposal plant and construction method thereof
KR100371647B1 (en) A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site
KR101074469B1 (en) A water tank having multi-bulkheads and concrete structure with vertical panel as one body and method for constructing the same
KR101946500B1 (en) Hinged connected CFT column
KR200289680Y1 (en) The construction structure of steel house frame
KR200431700Y1 (en) The base frame of pre-engineered water tank
KR100427772B1 (en) Partition Wall for Water Treatment Tank
KR101990350B1 (en) Flow guide wall structure using PDF panel to prevent dead water in water storage facilities
KR100726396B1 (en) A structure for supporting fabricated tank and a bottom panel for fabricated tank
CN216341303U (en) Steel structure pond internal partition wall and steel structure pond
KR100352387B1 (en) Plastic Water Tank
KR100654169B1 (en) Obstacle through type fabricated water tank
KR102440815B1 (en) Anti-vibration Water Tank using Wave Type Assembly Block and Manufacturing Method Thereof
JP2613987B2 (en) Construction method of steel lining tank
KR101172875B1 (en) Wall structure of installation to waterway
KR200325599Y1 (en) Prefabricated building using container box

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20091125

Effective date: 20110906

J2X1 Appeal (before the patent court)

Free format text: INVALIDATION

J202 Request for trial for correction [limitation]
J2X2 Appeal (before the supreme court)

Free format text: APPEAL BEFORE THE SUPREME COURT FOR INVALIDATION

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20111004

Effective date: 20120406

J301 Trial decision

Free format text: TRIAL DECISION FOR CORRECTION REQUESTED 20120221

Effective date: 20121102

J221 Remand (intellectual property tribunal)

Free format text: REMAND (INTELLECTUAL PROPERTY TRIBUNAL) FOR INVALIDATION

J303 Written judgement (supreme court)

Free format text: JUDGMENT (SUPREME COURT) FOR INVALIDATION REQUESTED 20120406

Effective date: 20121011

J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20121122

Effective date: 20130108

EXTG Extinguishment