KR19990038467A - Remote monitoring and control system of load switch - Google Patents

Remote monitoring and control system of load switch Download PDF

Info

Publication number
KR19990038467A
KR19990038467A KR1019970058209A KR19970058209A KR19990038467A KR 19990038467 A KR19990038467 A KR 19990038467A KR 1019970058209 A KR1019970058209 A KR 1019970058209A KR 19970058209 A KR19970058209 A KR 19970058209A KR 19990038467 A KR19990038467 A KR 19990038467A
Authority
KR
South Korea
Prior art keywords
controller
monitoring
switch
line
control
Prior art date
Application number
KR1019970058209A
Other languages
Korean (ko)
Other versions
KR100249894B1 (en
Inventor
임태현
선상진
Original Assignee
임태현
아주콘트롤시스템 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임태현, 아주콘트롤시스템 주식회사 filed Critical 임태현
Priority to KR1019970058209A priority Critical patent/KR100249894B1/en
Publication of KR19990038467A publication Critical patent/KR19990038467A/en
Application granted granted Critical
Publication of KR100249894B1 publication Critical patent/KR100249894B1/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B15/00Supervisory desks or panels for centralised control or display
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

본 발명은 부하 개폐기의 원방감시 및 제어시스템에 관한 것으로, 선로 개폐기의 개방이나 투입을 제어하는 제어장치의 콘트롤러에서 정보를 인터페이스를 통해 무선 데이타 통신망의 네트워크 콘트롤러에 전달하고, 상기의 네트워크 콘트롤러를 통해 정보를 전달받은 배선자동화 시스템의 중앙제어장치는 감시에 따른 결과를 판단한 후 모니터를 통해 배선계통도와 선로 개폐기의 개폐상태를 표시하는 동시에 제어명령을 제어장치의 콘트롤러로 전달하여 선로 개폐기의 개폐 및 선택에 따른 동작을 수행하도록 함으로써 개폐기 제어장치와 배선자동화 시스템의 중앙제어장치가 무선으로 통신을 수행하면서 중앙제어장치의 통신부담을 줄이고 고장처리의 신속성 및 신뢰성이 향상되며 긴급을 요하지 않는 데이터관리 및 부하관리를 효율적으로 운용할 수 있도록 한 것이다.The present invention relates to a remote monitoring and control system of a load switchgear, the controller of the control device for controlling the opening or closing of the switchgear transfers the information to the network controller of the wireless data communication network through the interface, and through the network controller The central control unit of the wiring automation system that receives the information judges the result of monitoring and displays the wiring system and the open / closed state of the line switch through the monitor, and transmits the control command to the controller of the control device to open and close the line switch. The switch control unit and the central control unit of the wiring automation system wirelessly communicate with each other to reduce the communication burden of the central control unit, improve the speed and reliability of troubleshooting, and improve the need for emergency data management and load. Manage efficiently It is to be done.

Description

부하 개폐기의 원방감시 및 제어시스템Remote monitoring and control system of load switch

본 발명은 3상 Y가공 배전선로에 설치하여 사용하는 부하계폐기의 원방감시 및 제어시스템에 관한 것으로, 특히 개폐기 제어장치와 배선자동화 시스템의 중앙제어장치가 무선으로 통신을 수행하도록 하여 중앙제어장치의 통신의 부담을 줄이면서 고장처리의 신속성 및 신뢰성이 향상되도록 하는 동시에 긴급을 요하지 않는 데이터관리 및 부하관리를 효율적으로 운용할 수 있도록 한 부하 개폐기의 원방감시 및 제어시스템에 관한 것이다.The present invention relates to a remote monitoring and control system of a load interrupter installed and used in a three-phase Y-processed distribution line, and in particular, a central control device by wirelessly communicating a switch control device and a central control device of a wiring automation system. The present invention relates to a remote monitoring and control system of a load switchgear that reduces the burden of communication and improves the speed and reliability of troubleshooting, while efficiently operating data management and load management that do not require emergency.

일반적으로 22.9KV 3상 배전 계통에 설치되는 개폐기 제어장치는 변전소 차단기인 회로차단기(Circuit Breaker; CB), 가공용 자동 개폐기 및 지상형 다회로 개폐기를 멀리 떨어진 위치인 배선자동화 시스템의 중앙제어장치의 감시 및 제어에 따른 신호를 펄스 코드 방식의 배전제어 단말장치(Feeder Remote Unit)를 통하여 전달받으면서 개방이나 투입의 동작을 수동적으로 수행하는 제어장치로 구성되어 있음은 이미 잘 알려진 사실이다.In general, the switch control device installed in the 22.9KV three-phase power distribution system is a circuit breaker (CB) that is a substation breaker, a process automatic switchgear, and a grounded multi-circuit switch remote monitoring of the central control device of the wiring automation system And it is already well known that the control device is configured to manually perform the operation of opening or closing while receiving a signal according to the control via a pulse code type power distribution control terminal (Feeder Remote Unit).

그리고 배전선로는 변전소 차단기의 회로차단기(Circuit Break; CB) 및 선로개폐기와 협조하여 과도 고장과 영구 고장을 제거하기 위한 리크로저(Recloser : REC)와, 이 리크로저(REC), 회로차단기(CB) 등의 후비보호장치와 협조하여 고장구간을 분리하기 위한 선로 구간용 개폐기(Switch : SW), 로서 자동구간 개폐기(Sectionalizer; SEC) 또는 거의 동일한 목적으로 재투입이 가능한 구간용 개폐기(Reclosing Sectionalizer: RS)와 결합하여 운영되어 진다.In addition, the distribution line cooperates with the circuit breaker (CB) and the line breaker of the substation breaker, and a recloser (REC) for eliminating transient and permanent faults, and the recloser (REC) and circuit breaker (CB). Line section switchgear (Switch: SW) to separate fault sections in cooperation with back protection devices, etc.), Automatic section switch (SEC) or Reclosing Sectionalizer which can be re-inserted for almost the same purpose: It is operated in conjunction with RS).

또한 루프(Loop) 선로운영을 위하여 타변전소 및 뱅크(Bank)에서 구성된 선로와 결합된 위치에서 상시 개방상태로 운영되고 있는 결하용 개폐기(Tie Switch : TS)를 사용하여 복합적으로 결합운영하기도 한다.In addition, a combined operation is performed by using a tie switch (TS), which is operated in an open state at a position combined with a line composed of other substations and a bank for loop line operation.

그러므로 1993년 특허출원 제 17730호와 1994년 특허출원 제 40373호에서와 같이 상별 위상검출기능과 결상검출기능을 부가하면서 고장전류의 통전유무를 수동과 자동으로 구분하여 고저항 지락사고의 감지 및 과도고장의 상태를 확인할 수 있으며, 위상불일치시 개폐기의 투입을 억제할 수 있도록 하면서 배전선로를 개폐시키도록 하였다.Therefore, as shown in 1993 Patent Application No. 17730 and 1994 Patent Application No. 40373, phase detection and phase detection function are added to each phase, and the presence or absence of fault current is applied automatically to detect and transient high resistance ground fault. It is possible to check the status of the failure and to open and close the distribution line while suppressing the input of the switchgear in case of phase mismatch.

그리고 1997년 특허출원 제 22138호에서와 같이 배선자동화 시스템의 중앙 제어장치와 통신을 위한 통신장치를 일체화하여 현장 및 원격의 제어가 가능하며, 상태정보와 단상/결상정보와 3상전압 및 측정치들을 제공하는 동시에 돌입전류의 정정과 최소 동작전류의 정정 및 상불일치의 정정 등의 기능에 따른 수정을 원방에서 가능하도록 하여 선로의 상태에 따라 고장검출(각 상별 발생시간, 각 상별 발생 회숫), 개폐기 동작(동작시간, 동작상태), 최대 부하전류(시간 및 전류치) 등에 대한 정보를 비휘발성으로 저장하여 현장이나 원방에서 확인할 수 있도록 함으로써 시스템을 원활하게 유용하도록 하였다.In addition, as in 1997 Patent Application No. 22138, it is possible to control the field and remote by integrating the communication device for communication with the central control device of the wiring automation system, and the status information, single phase / phase information, three phase voltage and measured values At the same time, correction of inrush current, correction of minimum operating current and correction of phase mismatch are possible from far away, and fault detection according to the line status (occurrence time for each phase, occurrence number for each phase), switchgear The information on the operation (operation time, operation state), maximum load current (time and current value), etc. are stored non-volatile so that the system can be used in the field or remotely.

그러나 상기와 같은 종래의 개폐기 제어장치에 의하여서는 전자인 1993년 특허출원 제 17730호와 1994년 특허출원 제 40373호의 경우에는 배선자동화 시스템의 중앙제어장치와 통신을 수행하기 위한 통신 유니트가 별도로 형성되어 있어 원활한 통신이 수행되지 않는 동시에 배전선로에 설치할 때 현장의 작업이 복잡해지는 등의 단점이 있었다.However, according to the conventional switchgear control device as described above, in the case of the patent application No. 17730 of 1993 and the patent application No. 40373 of 1994, a communication unit for communicating with the central control unit of the wiring automation system is separately formed. There was a disadvantage such that the work of the field was complicated when installed on the distribution line while the communication was not performed smoothly.

그리고 후자인 1997년 특허출원 제 22138호의 경우에는 통신유니트가 배선자동화 시스템의 중앙제어장치와 유선으로 통신을 수행하였으므로 고장구간을 자동 분리시키거나, 역송투입하여 건전선로를 회복시키면서 정전구간을 축소시키는 잇점이 있는 반면에, 개폐기의 양 전원이 가압된 상태에서 전기적인 수동투입을 시도할 때 선로의 고장상태 여부와 고저항 지락사고에 의한 결상감지 기능이 있으며, 개방 상태에서 개폐기 양 전원의 위상이 불일치한 경우가 있더라도 투입이 가능하게 되는 등의 단점이 있었다.In the latter patent application No. 22138, the communication unit communicated with the central control unit of the wiring automation system in a wired manner to automatically disconnect the fault section or to reduce the power failure section while recovering the healthy line by back-feeding. On the other hand, when attempting to turn on electric power manually when both switches are pressurized, there is a fault detection function due to line failure and high resistance ground fault. Even if there was a discrepancy, there were disadvantages such as input being possible.

이에 따라 본 발명은 개폐기 제어장치와 배선자동화 시스템의 중앙제어장치가 무선으로 통신을 수행하면서 중앙제어장치의 통신의 부담을 줄이고 고장처리의 신속성 및 신뢰성이 향상되며 긴급을 요하지 않는 데이터관리 및 부하관리를 효율적으로 운용할 수 있도록 한 부하 개폐기의 원방감시 및 제어시스템을 제공하는 것을 그 목적으로 한다.Accordingly, the present invention reduces the burden of communication of the central control unit, improves the speed and reliability of troubleshooting, and does not require urgent data management and load management while the switch controller and the central control unit of the wiring automation system perform wireless communication. It is an object of the present invention to provide a remote monitoring and control system for a load switchgear that can be operated efficiently.

이와 같은 목적을 달성하기 위한 본 발명의 부하 개폐기의 원방감시 및 제어시스템은 선로 개폐기의 개방이나 투입을 제어하는 제어장치의 콘트롤러에서 인터페이스와 무선모뎀을 통하여 정보를 무선 데이타 통신망의 기지국을 거쳐 네트워크 콘트롤러에 무선으로 전달하고, 상기의 네트워크 콘트롤러에서 유선모뎀을 통해 정보를 전달받아 배선자동화 시스템의 중앙제어장치에서는 메모리에 저장된 감시제어 프로그램에 따라 감시에 따른 결과를 판단한 후 모니터를 통해 감시에 따른 배선계통도와 선로 개폐기의 개폐상태를 표시하는 동시에, 판단 결과에 따른 제어명령을 다시 제어장치의 콘트롤러로 전달되어 선로 개폐기의 개페 및 선택에 따른 동작을 수행하도록 함으로써 개폐기 제어장치와 배선자동화 시스템의 중앙제어장치가 무선으로 통신을 수행하면서 중앙제어장치의 통신의 부담을 줄이고 고장처리의 신속성 및 신뢰성이 향상되며 긴급을 요하지 않는 데이터관리 및 부하관리를 효율적으로 운용할 수 있도록 한 것이다.The remote monitoring and control system of the load switchgear of the present invention for achieving the above object is a controller of a control device that controls the opening or closing of a line switchgear through a base station of a wireless data communication network via an interface and a wireless modem. Wireless network, and the network controller receives the information through the wired modem, and the central control unit of the wiring automation system determines the result of the monitoring according to the monitoring control program stored in the memory and then monitors the wiring system according to the monitoring. And the control unit according to the determination result is transmitted to the controller of the control device to perform the operation according to the opening and selection of the line switch and the central control device of the wiring automation system. Going wirelessly While performing one would reduce the burden on the communication of the central control device improves the speed and reliability of the fault process is to operate the data management and load management that does not require an urgent efficiently.

도 1은 본 발명의 개략적인 구성을 나타낸 블럭 다이어그램.1 is a block diagram showing a schematic configuration of the present invention.

도 2는 본 발명의 제어장치의 구성을 도시한 블럭 다이아 그램.2 is a block diagram showing the configuration of the control device of the present invention;

도 3은 본 발명의 동작 과정을 나타낸 플로우 차트.3 is a flow chart illustrating an operation process of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>

1 : 선로 개폐기 2 : 제어장치1: line switch 2: control device

3 : 콘트롤러 5 : 무선모뎀3: controller 5: wireless modem

6 : 무선 데이타 통신망 8 : 네트워크 콘트롤러6: wireless data communication network 8: network controller

11 : 배선자동화 시스템 13 : 중앙제어장치11: wiring automation system 13: central control unit

14 : 메모리 15 : 모니터14 memory 15 monitor

이하 본 발명을 첨부도면에 의거 상세히 기술하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 전체적인 구성을 개략적으로 도시한 것으로서, 선로 개폐기(1)의 개방이나 투입을 제어하는 제어장치(2)의 콘트롤러(3)에서 인터페이스(4)와 무선모뎀(5)을 통하여 개폐기의 제어상태와 같은 정보를 무선 데이타 통신망(6)의 기지국(7)을 거쳐 네트워크 콘트롤러(8)에 무선으로 전달하고, 상기의 네트워크 콘트롤러(8)의 유선모뎀(9)과 전용선(10)을 통하여 연결된 유선모뎀(12)을 통해 정보를 전달받은 배선자동화 시스템(11)의 중앙제어장치(13)에서는 메모리(14)에 저장된 감시제어 프로그램에 따른 감시에 다른 결과를 판단하도록 하고, 모니터(15)를 통해 감시에 따른 배선계통도와 선로 개폐기의 개폐상태를 표시하는 상기 중앙제어장치(13)에서의 판단 결과에 따른 제어명령(개방, 투입, 후비보호 장치선택, 수지상 루프 선로선택, 로크아웃 해제, 구간기능 해제 등)은 유선 모뎀(12)(9)을 거치고 네트워크 콘트롤러(8)를 경유하여 제어장치(2)의 콘트롤러(3)로 전달되어 선로 개폐기(1)의 개폐 및 선택에 따른 동작을 수행하도록 한다.FIG. 1 schematically shows the overall configuration, in which the controller 3 of the controller 2 controlling the opening or closing of the line switch 1 is controlled through the interface 4 and the wireless modem 5. Information such as status is wirelessly transmitted to the network controller 8 via the base station 7 of the wireless data communication network 6, and is connected to the wired modem 9 of the network controller 8 through a dedicated line 10. The central control unit 13 of the wire automation system 11 that has received the information through the wired modem 12 allows the monitor 15 to determine a different result from the monitoring according to the monitoring control program stored in the memory 14. Control command (opening, closing, pick-up protection device selection, dendritic loop line selection, lockout release, section) according to the determination result in the central control unit 13 which displays the wiring system and the open / closed state of the line switch according to monitoring group Turn off, etc.) is passed to the controller 3 of the control device 2 via the wired modem 12 (9) and the network controller (8) to perform the operation according to the opening and closing of the line switch (1) Do it.

도 2는 개폐기 제어장치의 상세한 구성을 도시한 것으로서, 3상의 선로를 통해 각각 흐르는 3상의 전류를 변류기(21)를 통해 적절한 비율로 변류되어 전류입력부(22)로 입력되도록 하여 감압되고 전파 정류된 전류신호가 출력되도록 하고, 선로 개폐기(1)의 전단에서 전압 및 위상 검출부(23)에 의해 검출된 전압치와, 선로 개폐기(1)의 후단에서 전압 및 위상 검출부(24)에 의해 검출된 전압치는 멀티플렉서(25)에서 혼합되도록 하고, 상기의 전류 입력부(22)와 멀티플렉서(25)에서 혼합된 각 상(R. S. T)의 전압 신호와 위상신호 및 각 상과 지락의 전류신호가 콘트롤러(3)의 내부에 설치된 아날로그/디지틀 변환기를 통하여 디지틀신호로 변환입력되면 내부의 프로그램 메모리(26)에 입력된 방법과 순서에 의해 제어하면서 이들 신호에 의해 전류값, 전압값, 단선/결상의 여부 및 상 불일치 상태 등을 감지하여 메모리(27)에 정보를 일시 저장하도록 하고, 상기 콘트롤러(3)에는 EEPROM(28)을 연결하여 고장의 검출에 따른 발생 시간과 발생 횟수, 개폐기의 동작 및 최대 부하 전류에 따른 시간과 전류치에 해당하는 정보를 비휘발성으로 저장하도록 하고, 닫힘/열림의 동작스위치(S1), 현장/원방의 조작선택스위치(S2), 잠금/해제의 제어조작 로크스위치(S3), 리세트스위치(S4), 충전장치 및 축전지 시험스위치(S5), 램프 시험스위치(S6), 전압계/전류계/상 선택스위치(S7), 위상정정용 딥스위치(S8) (S9) (S10) 및 선택 정정스위치(S11)들을 통한 사용자의 선택사양은 키이스캔부(29)를 경유하여 상기의 콘트롤러(3)에 입력되도록 하고, 상기 콘트롤러(3)에서 표시부(30)를 통하여 주접점의 닫힘 상태표시, 주접점의 열린 상태표시, R상 고장표시, S상 고장표시, T상 고장표시, 지락 고장표시, 전원측 단상표시, 전원측 결상표시, 부하측 단상표시, 부하측 결상표시, R상 위상 불일치표시, S상 위상 불일치표시, T상 불일치표시, 가스 압력저하 잠금표시, 개폐 조작 잠금표시, 선택 정정표시들을 외부에 알려주도록 하고, 상기 콘트롤러(3)의 개방 신호가 입출력부(31)를 통해 개방구동부(32)로 전달되면 트립코일(TC)(33)을 구동시켜 선로 개폐기(1)를 개방시키며 투입신호가 입출력부(31)를 통해 투입구동부(34)로 전달되면 투입코일(CC)(35)을 구동시켜 선로 개폐기(1)를 투입시키고, 상기 선로 개폐기(1)의 개방이나 투입에 따른 상태는 접점부(36)에 의해 입출력부(31)를 통하여 콘트롤러(3)에 전달되도록 하고, 상기 콘트롤러(3)로부터 데이타신호를 전달받는 인터페이스(4)의 통신 IC(37)에서는 무선모뎀(5)을 통하여 외부의 배선자동화 시스템(11)의 중앙제어장치(13)에 의한 원격의 제어가 가능하도록 하는 동시에 상태정보, 고장표시 정보, 단선/결상 정보, 상 불일치 정보, 3상 전압 및 전류 측정치들을 제공할 수 있도록 한 것이다.Figure 2 shows a detailed configuration of the switch control device, the three-phase current flowing through each of the three-phase line is flowed through the current transformer 21 at an appropriate ratio to be input to the current input unit 22 to decompress and full-wave rectified The current signal is output, the voltage value detected by the voltage and phase detection unit 23 at the front end of the line switch 1, and the voltage detected by the voltage and phase detection unit 24 at the rear end of the line switch 1. Value is mixed in the multiplexer 25, the voltage signal and phase signal of each phase (RS T) mixed in the current input unit 22 and the multiplexer 25 and the current signal of each phase and ground fault When converted into digital signals through an analog / digital converter installed inside the controller, the current values, voltage values, and disconnection / connection are controlled by these signals while being controlled by the method and order input to the internal program memory 26. Information is stored temporarily in the memory 27 by detecting whether or not the phase mismatch state and the like, and an EEPROM 28 is connected to the controller 3 so that the occurrence time and the number of occurrences according to the detection of a failure, operation of the switch and The information corresponding to the time and the current value according to the maximum load current is stored non-volatile, and the operation switch (S1) for closing / opening, the operation selection switch (S2) for field / distance, and the control operation lock switch for locking / unlocking ( S3), reset switch (S4), charging device and battery test switch (S5), lamp test switch (S6), voltmeter / ammeter / phase selection switch (S7), dip switch for phase correction (S8) (S9) (S10) And the user's option through the selection correction switches S11 are input to the controller 3 via the key scan unit 29, and the main contact is closed through the display unit 30 in the controller 3. Status display, open status display of main contact point, R phase fault display , S phase fault indication, T phase fault indication, ground fault indication, power supply single phase indication, power supply phase loss indication, load side single phase indication, load side phase indication, R phase phase mismatch indication, S phase phase mismatch indication, T phase mismatch indication, gas pressure Degradation lock indication, opening and closing operation lock indication, selection correction indication to inform the outside, the trip coil (TC) (33) when the open signal of the controller 3 is transmitted to the open drive unit 32 through the input and output unit 31 Drive the opening and closing line (1) and the input signal is transmitted to the input driving unit 34 through the input and output unit 31 to drive the input coil (CC) (35) to insert the line switch (1), An interface according to the opening or closing of the line switch 1 is transmitted to the controller 3 through the input / output unit 31 by the contact unit 36, and receives an interface signal from the controller 3. In the communication IC 37 of 4), the wireless modem 5 is used. It enables remote control by the central control unit 13 of the external wiring automation system 11 and provides status information, fault indication information, disconnection / phase information, phase mismatch information, three-phase voltage and current measurements. I would have to.

이와 같이 구성한 본 발명의 부하 개폐기의 원방감시 및 제어시스템은 선로 개폐기(1)의 개방이나 투입에 따른 상태를 접점부(36)에 의해 입출력부(31)를 통하여 제어장치(2)의 콘트롤러(3)에서 인식하면(단계 41), 이에 따른 데이타신호를 인터페이스(4)의 통신 IC(37)로 출력한다(단계 42).In the remote monitoring and control system of the load switchgear of the present invention configured as described above, the controller of the controller 2 of the control device 2 via the input / output part 31 by the contact part 36 is in contact with the opening or closing of the line switch 1. In step 3) (step 41), the corresponding data signal is outputted to the communication IC 37 of the interface 4 (step 42).

상기 콘트롤러(3)로부터 데이타신호를 전달받는 통신 IC(37)에서는 데이타 신호를 무선 데이타로 변환시킨 후(단계 43), 무선모뎀(5)을 통하여 무선으로 송출한다(단계 44).The communication IC 37 receiving the data signal from the controller 3 converts the data signal into wireless data (step 43) and then wirelessly transmits it via the wireless modem 5 (step 44).

상기의 무선모뎀(5)을 통하여 무선으로 전달되는 무선 데이타는 무선 데이타 통신망(6)의 기지국(7)으로 수신되어 네트워크 콘트롤러(8)에 전달된다(단계 45).The wireless data transmitted wirelessly through the wireless modem 5 is received by the base station 7 of the wireless data communication network 6 and transmitted to the network controller 8 (step 45).

상기의 무선 데이타를 수신한 네트워크 콘트롤러(8)에서는 무선 데이타를 변환시킨 후(단계 46), 변환된 정보를 유선모뎀(9)으로 출력하여 전용선(10)을 통해 이동하도록 한다(단계 47).After receiving the wireless data, the network controller 8 converts the wireless data (step 46), and outputs the converted information to the wired modem 9 to move through the dedicated line 10 (step 47).

상기의 전용선(9)을 통하여 전달되는 무선 데이타의 정보가 유선모뎀(12)을 통해 배선자동화 시스템(11)의 중앙제어장치(13)로 전달되면(단계 48), 중앙제어장치(13)에서 자신에 해당하는 어드레스인 가를 확인하고(단계 49), 자신의 어드레스이면 내부의 메모리(14)에 저장된 감시제어 프로그램에 따라 감시에 따른 결과를 판단한다(단계 50).When the information of the wireless data transmitted through the dedicated line 9 is transmitted to the central control unit 13 of the wire automation system 11 through the wired modem 12 (step 48), the central control unit 13 It is checked whether or not it is an address corresponding to itself (step 49), and if it is its own address, the result according to monitoring is determined according to the monitoring control program stored in the internal memory 14 (step 50).

그리고 상기 중앙제어장치(13)에서 감시의 결과에 대한 판단이 완료되면 이에 따른 데이타를 모니터(15)로 출력하여 배선계통도와 선로 개폐기의 개폐상태를 표시하는 동시에(단계 51), 상기의 판단 결과에 따라 개방, 투입, 후비보호 장치선택, 수지상 루프 선로선택, 로크아웃 해제, 구간기능 해제 등의 제어명령을 유선 모뎀(12)을 거쳐 출력한다(단계 52).When the determination of the monitoring result is completed in the central control unit 13, the data is output to the monitor 15 to display the wiring system and the open / closed state of the line switch (step 51). Control commands such as opening, closing, dobby protection device selection, dendritic loop line selection, lockout release, and section function release are output via the wired modem 12 (step 52).

상기의 제어명령을 전용선(10)을 통하여 전달받은 네트워크 콘트롤러(8)에서는 제어명령을 데이타 변환시킨 후(단계 53), 이에 따른 무선 데이타의 제어명령을 기지국(7)을 경유하여 무선으로 송출한다(단계 54).The network controller 8, which has received the control command through the leased line 10, converts the control command into data (step 53), and then wirelessly transmits the control command of the wireless data via the base station 7. (Step 54).

상기 무선 데이타의 제어명령은 무선모뎀(5)에 수신되어 인터페이스(4)의 통신 IC(37)로 전달되면(단계 55), 무선 데이타를 데이타 변환시켜 제어장치(2)의 콘트롤러(3)에 입력시키고(단계 56), 이에 따라 코트롤러(3)에서는 입출력부(31)를 통해 개방구동부(32)나 투입구동부(34)로 제어신호를 출력하면서 트립코일(33) 또는 투입코일(35)를 선택적으로 동작시켜 선로 개폐기(1)의 개폐 및 선택에 따른 동작을 수행하도록 한다(단계 57).When the control command of the radio data is received by the radio modem 5 and transmitted to the communication IC 37 of the interface 4 (step 55), the radio data is converted into data to the controller 3 of the control device 2. Inputting (step 56), and thus, the coat roller 3 outputs a control signal to the open drive part 32 or the input drive part 34 through the input / output part 31, and thus the trip coil 33 or the input coil 35. By selectively operating to perform the operation according to the opening and closing and selection of the line switch 1 (step 57).

이와 같은 본 발명의 부하 개폐기의 원방감시 및 제어시스템에 의하여서는 개폐기 제어장치와 배선자동화 시스템의 중앙제어장치가 무선으로 통신을 수행하면서 중앙제어장치의 통신의 부담을 줄이고 고장처리의 신속성 및 신뢰성이 향상되며 긴급을 요하지 않는 데이터관리 및 부하관리를 효율적으로 운용할 수 있도록 한 것이다.According to such a remote monitoring and control system of the load switchgear of the present invention, while the switchgear control device and the central control device of the wiring automation system communicate wirelessly, the burden of communication of the central control device is reduced, and the speed and reliability of the troubleshooting is improved. Improved and efficient management of data management and load management that do not require emergency.

Claims (2)

선로 개폐기(1)의 개방이나 투입을 제어하는 제어장치(2)의 콘트롤러(3)에서 인터페이스(4)와 무선모뎀(5)을 통하여 개폐기의 제어상태와 같은 정보를 무선 데이타 통신망(6)의 기지국(7)을 거쳐 네트워크 콘트롤러(8)에 무선으로 전달하고,In the controller 3 of the control device 2 which controls the opening or closing of the line switch 1, information such as the control state of the switch is transmitted through the interface 4 and the wireless modem 5 of the wireless data communication network 6; Wirelessly via the base station 7 to the network controller 8, 상기의 네트워크 콘트롤러(8)의 전용선(9)에 연결된 유선모뎀(11)을 통해 정보를 전달받은 배선자동화 시스템(10)의 중앙제어장치(12)에서는 메모리(13)에 저장된 감시제어 프로그램에 따라 감시에 따른 결과를 판단하고,In the central control unit 12 of the wiring automation system 10, which has received information through the wired modem 11 connected to the dedicated line 9 of the network controller 8, according to the monitoring control program stored in the memory 13, Judge the results of the monitoring, 모니터(14)를 통해 감시에 따른 배선계통도와 선로 개폐기의 개폐상태를 표시하는 상기 중앙제어장치(12)에서 판단 결과에 따른 제어명령을 유선모뎀(11)과 네트워크 콘트롤러(8)을 경유하여 제어장치(2)의 콘트롤러(3)로 전달하도록 구성됨을 특징으로 하는 부하 개폐기의 원방감시 및 제어시스템.The control command according to the determination result is controlled by the central modem 12 displaying the wiring system and the line open / closed state according to the monitoring through the monitor 14 via the wired modem 11 and the network controller 8. A remote monitoring and control system of a load switch, characterized in that it is configured to transmit to the controller (3) of the device (2). 선로 개폐기(1)의 개방이나 투입에 따른 상태를 접점부(36)에 의해 입출력부(31)를 통하여 제어장치(2)의 콘트롤러(3)에서 인식하면 이에 따른 데이타신호를 인터페이스(4)의 통신 IC(37)로 출력하는 단계와,When the controller 3 of the control device 2 recognizes the state according to the opening or closing of the line switch 1 through the input / output unit 31 by the contact unit 36, the corresponding data signal of the interface 4 Outputting to the communication IC 37, 상기 콘트롤러(3)로부터 데이타신호를 전달받는 통신 IC(37)에서는 데이타 신호를 무선 데이타로 변환시킨 후, 무선모뎀(5)을 통하여 무선으로 송출하는 단계와,The communication IC 37 receiving the data signal from the controller 3 converts the data signal into wireless data, and then wirelessly transmits the data signal through the wireless modem 5; 상기의 무선 데이타를 무선 데이타 통신망(6)의 기지국(7)을 통해 전달받은 네트워크 콘트롤러(8)에서 무선 데이타를 변환시킨 후, 유선모뎀(9)과 전용선(10)을 통해 출력하는 단계와,Converting the wireless data from the network controller 8 received through the base station 7 of the wireless data communication network 6 and outputting the wireless data through the wired modem 9 and the dedicated line 10; 상기의 전용선(10)을 통하여 전달되는 정보가 유선모뎀(12)을 통해 배선자동화 시스템(11)의 중앙제어장치(13)로 전달되면 자신에 해당하는 어드레스인 가를 확인하는 단계와,When the information transmitted through the dedicated line 10 is transmitted to the central control unit 13 of the wire automation system 11 through the wired modem 12, and confirming whether the address corresponding to itself; 자신의 어드레스이면내부의 메모리(14)에 저장된 감시제어 프로그램에 따라 감시에 따른 결과를 판단하는 단계와,Determining a result according to the monitoring according to the monitoring control program stored in the internal memory 14 if the address is its own address; 감시의 결과에 따른 데이타를 모니터(14)로 출력하여 배선계통도와 선로 개폐기의 개폐상태를 표시하는 동시에, 제어명령을 상기 전송의 역순으로 출력하는 단계와,Outputting data according to the monitoring result to the monitor 14 to display the wiring system and the open / closed state of the line switch, and to output the control command in the reverse order of the transmission; 상기의 제어명령을 전달받은 제어장치(2)의 콘트롤러(3)에서 선로 개폐기(1)의 개폐 및 선택에 따른 동작을 수행하는 단계들에 의해 수행됨을 특징으로 하는 부하 개폐기의 원방감시 및 제어시스템.Remote monitoring and control system of a load switch, characterized in that performed by the step of performing the operation according to the opening and closing of the line switch 1 in the controller (3) of the control device (2) received the control command .
KR1019970058209A 1997-11-05 1997-11-05 Remote area pilot and control system of load switch KR100249894B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019970058209A KR100249894B1 (en) 1997-11-05 1997-11-05 Remote area pilot and control system of load switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019970058209A KR100249894B1 (en) 1997-11-05 1997-11-05 Remote area pilot and control system of load switch

Publications (2)

Publication Number Publication Date
KR19990038467A true KR19990038467A (en) 1999-06-05
KR100249894B1 KR100249894B1 (en) 2000-03-15

Family

ID=19524186

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970058209A KR100249894B1 (en) 1997-11-05 1997-11-05 Remote area pilot and control system of load switch

Country Status (1)

Country Link
KR (1) KR100249894B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040019748A (en) * 2002-08-29 2004-03-06 아주콘트롤시스템 주식회사 Control device of automatic switch and control method
KR100537217B1 (en) * 2005-09-23 2005-12-16 주식회사 세니온 Distribution control system of separating failure of sections from distribution line and method for operating the system
KR100786238B1 (en) * 2006-07-04 2007-12-17 에이스콘트롤(주) Remote terminal unit for rapid-transit railway unusualness disconnector

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040019748A (en) * 2002-08-29 2004-03-06 아주콘트롤시스템 주식회사 Control device of automatic switch and control method
KR100537217B1 (en) * 2005-09-23 2005-12-16 주식회사 세니온 Distribution control system of separating failure of sections from distribution line and method for operating the system
KR100786238B1 (en) * 2006-07-04 2007-12-17 에이스콘트롤(주) Remote terminal unit for rapid-transit railway unusualness disconnector

Also Published As

Publication number Publication date
KR100249894B1 (en) 2000-03-15

Similar Documents

Publication Publication Date Title
US5701226A (en) Apparatus and method for distributing electrical power
US6442493B1 (en) Method of detecting a fault in a monitored section of an electric transmission line using distance protection techniques
US6127742A (en) Draw-out electrical switchgear apparatus
CN108565974B (en) Self-powered remote failure protection method and system based on protection device
CN202004540U (en) Digitized intelligent circuit breaker analog device
CN105405693A (en) GIS breaker contact opening and closing condition monitoring system
US6327130B1 (en) Control device of a circuit breaker opening or closing electromagnet with local and remote control
KR100775025B1 (en) A automatic separating method and system of fault locating for distribution line
CN201789274U (en) Intelligent monitor protective device of motor
KR100777209B1 (en) A automatic separating method and system of fault locating and gathering data for distribution line
KR100249894B1 (en) Remote area pilot and control system of load switch
US5373412A (en) Electronic trip device comprising communication means
US6034447A (en) Connector for consumer networks
CN113595250B (en) Automatic analysis method and system for abnormal opening and closing positions of GIS busbar disconnecting link
KR20040019748A (en) Control device of automatic switch and control method
CN104868454A (en) Backup power supply switchover protective system
KR101126292B1 (en) System and method of opening/closing a gas valve for gas insulated switchgear
CN110401264B (en) Intelligent isolation circuit breaker
CN112332402A (en) Dual-power measurement and control device
CN203039358U (en) An AC brake opening and closing self-holding circuit
KR0124040B1 (en) Distribution line on/off system &amp; line switch control apparatus
CN110426595A (en) One secondary circuit failure detection device of ring-main unit
CN110148905A (en) Ring network cabinet prevents closing protective device with ground
CN216696527U (en) Feeder terminal with fault location and isolation functions
CN212323734U (en) Manual and automatic integrated switching device and voltage switching control mode switching circuit for railway traction substation

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20021226

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee