A cloud infrastructure automatic design system and a cloud business management platform comprising the saem Download PDFInfo
- Publication number
- KR102761105B1 KR102761105B1 KR1020240079550A KR20240079550A KR102761105B1 KR 102761105 B1 KR102761105 B1 KR 102761105B1 KR 1020240079550 A KR1020240079550 A KR 1020240079550A KR 20240079550 A KR20240079550 A KR 20240079550A KR 102761105 B1 KR102761105 B1 KR 102761105B1
- Authority
- KR
- South Korea
- Prior art keywords
- infrastructure
- target
- probability
- project
- business
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N20/00—Machine learning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/40—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks using virtualisation of network functions or resources, e.g. SDN or NFV entities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Software Systems (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Signal Processing (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Artificial Intelligence (AREA)
- Medical Informatics (AREA)
- Evolutionary Computation (AREA)
- Computing Systems (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Mathematical Physics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
본 발명의 일 실시예에 따른 인프라 자동 설계 시스템은, 임의의 수요기관에서 공고한 제안요청서의 요구사항을 만족하는 클라우드 인프라를 설계하기 위한, 인프라 자동 설계 시스템에 있어서, 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보를 수신하는 수신모듈; 상기 대상과제정보를 기초로 대상요청서에서 요구하는 사항인 대상요구정보를 추출하는 추출모듈; 및 머신러닝으로 학습된 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라를 산출하는 구축모듈;을 포함할 수 있다. According to one embodiment of the present invention, an infrastructure automatic design system for designing a cloud infrastructure that satisfies the requirements of a request for proposal announced by an arbitrary requesting agency may include: a receiving module that receives target project information, which is information on a target request for proposal, which is a request for proposal for a desired project that a target company wishes to support; an extraction module that extracts target requirement information, which is a requirement in the target request, based on the target project information; and a construction module that calculates a target infrastructure, which is a cloud infrastructure in which the target requirement information can be realized, using an infrastructure model learned by machine learning.
Description
본 발명은 클라우드 인프라를 자동으로 결정해주는 클라우드 자동 설계 시스템 및 이를 포함하는 클라우드 사업 관리 플랫폼에 대한 것이다. The present invention relates to a cloud automatic design system that automatically determines cloud infrastructure and a cloud business management platform including the same.
정부기관, 산학 및 연구기관은 필요한 용역을 제공받기 위해서 다양하고 많은 수의 사업을 공고하고 있다. 이러한 사업에 대한 내용은 제안요청서(RFP)의 형태로 공유되고 있다. 제안요청서(RFP)는 수요기관에서 요구하는 요구사항이 적혀있는 문서를 의미할 수 있다. 공급기관은 각 기관의 제안요청서(RFP)를 살펴보고, 경쟁력 있는 사업을 공고하고 있다. 다만, 공급기관은 공고된 사업을 신청하는데 있어서, 다음과 같은 문제점들이 발생되고 있다. Government agencies, academia, and research institutes are announcing a variety of projects to obtain necessary services. The details of these projects are shared in the form of a request for proposal (RFP). A request for proposal (RFP) can mean a document that contains the requirements requested by the demand organization. The supplying organization reviews the request for proposal (RFP) of each organization and announces competitive projects. However, the supplying organization is experiencing the following problems when applying for the announced projects.
첫번째로, 공급기관은 매번 수요기관이 공고하는 사업을 검색해야 하며, 공고된 사업의 내용을 읽어보고 공고된 사업이 공급기관이 신청할 만한 사업인지 여부를 판단해야 한다. 이로 인해, 공급기관은 신청해야 할 사업을 빈번하게 놓칠 뿐만 아니라, 신청해도 되는지 여부를 판단하는데 많은 인력이 소요되고 있다. First, the supplier must search for the business announced by the demand agency every time, read the contents of the announced business, and determine whether the announced business is a business that the supplier can apply for. As a result, the supplier frequently misses the business that should be applied for, and a lot of manpower is spent on determining whether or not to apply.
두번째로, 공급기관은 클라우드 사업을 신청할 때마다, 클라우드 사업에 필요한 클라우드 인프라를 산출하고 결정하여야 한다. 이로 인해, 사업 신청 시에 클라우드 인프라를 결정하는데 많은 시간이 소요되며, 심지어 복수개의 사업을 수행할 경우 클라우드 인프라가 과중하게 설정되어, 사업 수행이 어려운 상황이 발생되기도 한다. Second, each time a supplier applies for a cloud business, it must calculate and decide on the cloud infrastructure required for the cloud business. As a result, it takes a lot of time to decide on the cloud infrastructure when applying for a business, and even when carrying out multiple businesses, the cloud infrastructure is set too heavily, making it difficult to carry out the business.
본 발명은 상술한 문제점을 해결하기 위한 것으로, 사업을 편리하게 검색하고, 클라우드 인프라를 쉽게 결정해주는 클라우드 인프라 자동 설계 시스템 및 이를 포함하는 클라우드 사업 관리 플랫폼을 제공하고자 한다. The present invention is intended to solve the above-described problems, and provides a cloud infrastructure automatic design system that conveniently searches for businesses and easily determines cloud infrastructure, and a cloud business management platform including the same.
본 발명의 일 실시예에 따른 인프라 자동 설계 시스템은, 임의의 수요기관에서 공고한 제안요청서의 요구사항을 만족하는 클라우드 인프라를 설계하기 위한, 인프라 자동 설계 시스템에 있어서, 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보를 수신하는 수신모듈; 상기 대상과제정보를 기초로 대상요청서에서 요구하는 사항인 대상요구정보를 추출하는 추출모듈; 및 머신러닝이 활용된 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라를 산출하는 구축모듈;을 포함할 수 있다. According to one embodiment of the present invention, an infrastructure automatic design system for designing a cloud infrastructure that satisfies the requirements of a request for proposal announced by an arbitrary requesting agency may include: a receiving module that receives target project information, which is information on a target request for proposal, which is a request for proposal for a desired project that a target company wishes to support; an extraction module that extracts target requirement information, which is a matter required in the target request, based on the target project information; and a construction module that calculates a target infrastructure, which is a cloud infrastructure in which the target requirement information can be realized, using an infrastructure model utilizing machine learning.
또한, 상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원을 산출하는 자원모듈;을 더 포함하고, 상기 구축모듈은, 상기 유휴자원 내에서 상기 대상 인프라를 산출할 수 있다. In addition, the system further includes a resource module that calculates idle resources, which are cloud infrastructure resources that can be utilized on the server of the target company; and the construction module can calculate the target infrastructure within the idle resources.
또한, 상기 구축모듈은, 과거 시행된 사업에 대한 제안요청서와 클라우드 인프라를 기초로 머신러닝으로 상기 인프라모델을 학습하며, 과거 시행된 사업에 대한 제안요청서와 상기 인프라모델을 이용하여 예상된 클라우드 인프라와 과거 시행된 사업에 지정된 클라우드 인프라를 서로 비교하여, 상기 인프라모델을 재 학습할 수 있다. In addition, the above-described construction module learns the infrastructure model through machine learning based on a request for proposal for a past project and a cloud infrastructure, and can re-learn the infrastructure model by comparing the expected cloud infrastructure using the request for proposal for a past project and the infrastructure model with the cloud infrastructure specified in the past project.
또한, 상기 대상기업이 상기 희망사업에 선정될 가능성인 선정확률을 산출하는 선정예측모듈; 및 미리 정해진 수정조건이 만족되는 경우, 상기 선정확률을 기초로 미리 정해진 수정방법으로 상기 대상인프라를 수정하여 수정인프라를 산출하는 결정모듈;을 더 포함하고, 상기 미리 정해진 수정조건은, 상기 희망사업에 대한 클라우드 인프라 추천 요청 시점을 기준으로, 상기 대상인프라와 상기 대상기업이 사업을 신청할 것으로 결정된 사업인 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 조건일 수 있다. In addition, the method further includes a selection prediction module that calculates a selection probability, which is a possibility that the target company will be selected for the desired project; and a decision module that calculates a modified infrastructure by modifying the target infrastructure using a predetermined modification method based on the selection probability when a predetermined modification condition is satisfied; and the predetermined modification condition may be a condition in which, based on the time of the cloud infrastructure recommendation request for the desired project, the sum of the target infrastructure and the cloud infrastructure allocated to the pending project, which is a project for which the target company is determined to apply for the project, exceeds the idle resources.
또한, 상기 미리 정해진 수정방법은, 상기 선정확률의 구간별로 클라우드 인프라를 수정하는 방법을 결정하는 방법일 수 있다. Additionally, the above-determined modification method may be a method for determining a method of modifying the cloud infrastructure for each interval of the above-described selection probability.
또한, 상기 미리 정해진 수정방법은, 제1 확률 이하 상기 제1 확률보다 낮은 확률인 제2 확률 초과인 제1 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라는 수정하지 않는 방법일 수 있다. In addition, the above-determined modification method may be a method of not modifying a cloud infrastructure corresponding to a business having the selection probability in the first section that is less than or equal to the first probability and greater than the second probability, which is a probability lower than the first probability.
또한, 상기 미리 정해진 수정방법은, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 상기 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 이하일 경우, 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 수정하지 않는 방법일 수 있다. In addition, the above-determined modification method may be a method of not modifying the cloud infrastructure corresponding to the project having the selection probability in the second section when the sum of the cloud infrastructures assigned to the desired project and the pending project having the selection probability in the first section and the second section exceeding the third probability which is lower than the second probability but less than or equal to the second probability is less than or equal to the idle resources.
또한, 상기 미리 정해진 수정 방법은, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 상기 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 이하인 동시에, 상기 제1 구간, 제2 구간 및 제3 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원을 초과할 경우, 상기 선정확률에 기초하여 상기 제3 구간의 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출하는 방법일 수 있다. In addition, the above-determined correction method may be a method of calculating a correction infrastructure by reducing the cloud infrastructure corresponding to the project having the selection probability in the third section based on the selection probability, when the sum of the cloud infrastructures assigned to the desired project and the pending project having the selection probability in the first section and the second section exceeds the third probability which is lower than or equal to the second probability and is less than or equal to the idle resources, and at the same time, the sum of the cloud infrastructures assigned to the desired project and the pending project having the selection probability in the first section, the second section, and the third section exceeds the idle resources.
또한, 상기 미리 정해진 수정방법은, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 경우, 상기 선정확률에 기초하여 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출하는 방법일 수 있다. In addition, the above-determined correction method may be a method of calculating a correction infrastructure by reducing the cloud infrastructure corresponding to the project having the above-described selection probability in the second section based on the above-described selection probability when the sum of the cloud infrastructures assigned to the above-described desired project and the pending project in the first section and the second section exceeds the above-described idle resources, which is a third probability that is lower than the above-described second probability and less than or equal to the above-described second probability.
또한, 상기 미리 정해진 수정 방법은, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과인 동시에, 상기 제3 확률 이하 상기 제3 확률보다 낮은 확률인 제4 확률 초과인 제3 구간에 상기 선정확률을 가지는 사업이 존재할 경우, 소정 기준의 이하의 수익률을 가지는 사업에 대해서 클라우드 인프라를 배정하지 않는 방법일 수 있다. In addition, the above-determined correction method may be a method of not allocating cloud infrastructure to a project having a rate of return below a predetermined standard, when the sum of cloud infrastructures allocated to the desired project and the pending project having the above-described selection probability in the first section and the second section exceeds the third probability which is lower than or equal to the second probability and has a probability exceeding the idle resources, and at the same time, a project having the above-described selection probability in the third section which is lower than or equal to the third probability and has a probability exceeding the fourth probability which is lower than the third probability exists.
본 발명의 일 실시예에 따른 인프라 자동 설계 방법은, 인프라 자동 설계 시스템에 의해 구현되며, 임의의 수요기관에서 공고한 제안요청서의 요구사항을 만족하는 클라우드 인프라를 설계하기 위한, 인프라 자동 설계 방법에 있어서, 수신모듈에 의해, 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보가 수신되는 단계; 추출모듈에 의해, 상기 대상과제정보를 기초로 대상요청서에서 요구하는 사항인 대상요구정보가 추출되는 단계; 및 구축모듈에 의해, 머신러닝이 활용된 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라가 산출되는 단계;를 포함할 수 있다. An automatic infrastructure design method according to one embodiment of the present invention is implemented by an automatic infrastructure design system, and may include a step of receiving, by a receiving module, target project information, which is information on a target request, which is a request for proposal for a desired project that a target company wishes to support; a step of extracting, by an extraction module, target requirement information, which is a requirement in a target request, based on the target project information; and a step of generating, by a construction module, a target infrastructure, which is a cloud infrastructure that can realize the target requirement information, using an infrastructure model utilizing machine learning.
본 발명의 일 실시예에 따른 사업 검색 시스템은, 온라인 네트워크 상에 공고된 제안요청서를 수집하는 수집모듈; 수집된 상기 제안요청서의 내용 중에서 추출정보를 산출하는 가공모듈; 대상기업에 대한 정보인 대상정보로부터 상기 대상기업의 특성을 나타내는 특성정보를 산출하는 기능모듈; 미리 정해진 방법으로 상기 추출정보와 상기 특성정보를 서로 처리하고 비교하여 유사한 정도를 나타내는 비교유사도를 결정하는 대응모듈; 및 상기 대상기업과 상기 제안요청서가 연관되는지 여부가 표현되도록 상기 비교유사도가 표시되는 인터페이스를 산출하는 인터페이스모듈;을 포함할 수 있다. A business search system according to one embodiment of the present invention may include a collection module that collects requests for proposals posted on an online network; a processing module that derives extracted information from the contents of the collected requests for proposals; a function module that derives characteristic information representing the characteristics of a target company from target information, which is information about the target company; a response module that processes and compares the extracted information and the characteristic information using a predetermined method to determine a degree of similarity representing the degree of similarity; and an interface module that derives an interface on which the degree of comparative similarity is displayed so as to express whether the target company and the request for proposal are related.
또한, 상기 추출정보는, 상기 제안요청서 내의 요구사항으로 이루어질 수 있다. Additionally, the extracted information may consist of requirements within the request for proposal.
또한, 상기 대상정보는, 상기 대상기업이 제공하는 서비스 또는 상기 대상기업이 생산하는 제품에 대한 정보이고, 상기 특성정보는, 상기 대상정보 중에서 기능과 관련된 정보일 수 있다. In addition, the target information may be information about a service provided by the target company or a product produced by the target company, and the characteristic information may be information related to a function among the target information.
또한, 상기 미리 정해진 방법은, 상기 추출정보와 상기 특성정보를 동일한 공간으로 임베딩한 후, 벡터화된 상기 추출정보와 벡터화된 상기 특성정보의 코사인 유사도를 산출하여 상기 비교유사도를 결정할 수 있다. In addition, the above-determined method can determine the comparative similarity by embedding the extracted information and the characteristic information into the same space and then calculating the cosine similarity of the vectorized extracted information and the vectorized characteristic information.
또한, 상기 대응모듈은, 상기 대상기업의 제품 또는 서비스별로 상기 제안요청서와 연관되었는지를 나타내기 위하여, 상기 대상기업의 제품별로 상기 비교유사도를 산출할 수 있다. In addition, the response module can calculate the comparative similarity for each product of the target company to indicate whether the product or service of the target company is related to the request for proposal.
또한, 상기 인터페이스모듈은, 상기 대상기업의 제품 또는 서비스 별로 상기 비교유사도가 바 형태로 표시되도록 인터페이스를 산출할 수 있다. In addition, the interface module can produce an interface so that the comparative similarity is displayed in the form of a bar for each product or service of the target company.
또한, 상기 대상기업이 상기 제안요청서의 기초가 되는 사업을 신청할 경우, 클라우드 인프라를 배정받을 수 있는지 여부를 시뮬레이션하는 시뮬레이션모듈;을 더 포함하고, 상기 인터페이스모듈은, 클라우드 인프라를 배정받을 수 있는지 여부에 대한 가능성을 나타내는 이미지인 가능표시와 상기 비교유사도가 동시에 표시되도록 인터페이스를 산출할 수 있다. In addition, when the target company applies for the business that is the basis of the request for proposal, the method further includes a simulation module that simulates whether or not the cloud infrastructure can be allocated; and the interface module can produce an interface so that the possibility mark, which is an image indicating the possibility of whether or not the cloud infrastructure can be allocated, and the comparative similarity are simultaneously displayed.
또한, 상기 시뮬레이션모듈은, 상기 비교유사도가 소정 기준 이상인 사업에 대해서만 시뮬레이션을 실시하고, 상기 인터페이스모듈은, 시뮬레이션이 진행된 사업에 대해서만 상기 가능표시가 표시되도록 인터페이스를 산출할 수 있다. In addition, the simulation module can perform simulation only for businesses whose comparative similarity is higher than a predetermined standard, and the interface module can produce an interface so that the possible indication is displayed only for businesses for which simulation was performed.
또한, 상기 시뮬레이션모듈은, 상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원을 기준으로 시뮬레이션의 대상인 사업의 사업 기간과 적어도 일부 기간 중복되는 사업 기간을 가지며 상기 대상기업이 사업을 신청할 것으로 예상되는 사업인 계류사업에 배정된 클라우드 자원을 고려하여 시뮬레이션을 진행할 수 있다. In addition, the above simulation module can conduct a simulation by considering cloud resources allocated to a pending business, which is a business period that overlaps at least part of the business period of the business being simulated, based on idle resources, which are cloud infrastructure resources that can be utilized on the server of the target company, and for which the target company is expected to apply for the business.
본 발명의 일 실시예에 따른 사업 검색 방법은, 사업 검색 시스템에 의해 구현되는 사업 검색 방법에 있어서, 수집모듈에 의해, 온라인 네트워크 상에 공고된 제안요청처가 수집되는 단계; 가공모듈에 의해, 상기 제안요청서의 내용 중에서 추출정보가 산출되는 단계; 기능모듈에 의해, 대상기업에 대한 정보인 대상정보로부터 상기 대상기업의 특성을 나타내는 특성정보가 산출되는 단계; 대응모듈에 의해, 미리 정해진 방법으로 상기 추출정보와 상기 특성정보가 처리되고 비교되어 유사한 정보를 나타내는 비교유사도가 결정되는 단계; 및 인터페이스모듈에 의해, 상기 대상기업과 상기 제안요청서가 연관되는지 여부가 표현되도록 상기 비교유사도가 표시되는 인터페이스가 산출되는 인터페이스모듈;을 포함할 수 있다. A business search method according to one embodiment of the present invention is a business search method implemented by a business search system, which may include a step of collecting request for proposals posted on an online network by a collection module; a step of calculating extracted information from the contents of the request for proposal by a processing module; a step of calculating characteristic information representing the characteristics of a target company from target information, which is information about the target company, by a function module; a step of processing and comparing the extracted information and the characteristic information by a predetermined method by a response module to determine a comparative similarity representing similar information; and an interface module for calculating an interface in which the comparative similarity is displayed so as to express whether the target company and the request for proposal are related by an interface module.
본 발명에 따른 클라우드 인프라 자동 설계 시스템 및 이를 포함하는 클라우드 사업 관리 플랫폼은, 업무 편의성을 증대시킬 수 있다. The cloud infrastructure automatic design system according to the present invention and the cloud business management platform including the same can increase work convenience.
또한, 사업 신청 시간을 효과적으로 최소화할 수 있다. Additionally, it can effectively minimize the time required to apply for a business.
또한, 사업 진행 효율을 극대화할 수 있다. Additionally, it can maximize business progress efficiency.
다만, 본 발명의 효과가 상술한 효과들로 제한되는 것은 아니며, 언급되지 아니한 효과들은 본 명세서 및 첨부된 도면으로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확히 이해될 수 있을 것이다.However, the effects of the present invention are not limited to the effects described above, and effects not mentioned can be clearly understood by a person having ordinary skill in the art to which the present invention pertains from this specification and the attached drawings.
도 1은 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 관계도
도 2는 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 구성도
도 3은 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 사업 검색 시스템에 의해 구현되는 사업 검색 방법의 순서도
도 4는 본 발명의 일 실시예에 따른 사업 검색 시스템의 동작 과정을 설명하기 위한 도면
도 5는 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 인프라 자동 설계 시스템에 의해 구현되는 인프라 자동 설계 방법의 순서도
도 6은 본 발명의 일 실시예에 따른 인프라 자동 설계 시스템의 동작 과정을 설명하기 위한 도면
도 7은 본 발명의 일 실시예에 따른 인프라 자동 설계 시스템이 수정인프라를 산출하는 과정을 설명하는 순서도Figure 1 is a relationship diagram of a cloud business management platform according to one embodiment of the present invention.
Figure 2 is a configuration diagram of a cloud business management platform according to one embodiment of the present invention.
FIG. 3 is a flowchart of a business search method implemented by a business search system of a cloud business management platform according to one embodiment of the present invention.
Figure 4 is a drawing for explaining the operation process of a business search system according to one embodiment of the present invention.
FIG. 5 is a flowchart of an infrastructure automatic design method implemented by an infrastructure automatic design system of a cloud business management platform according to one embodiment of the present invention.
Figure 6 is a drawing for explaining the operation process of an infrastructure automatic design system according to one embodiment of the present invention.
Figure 7 is a flowchart illustrating the process of calculating modified infrastructure by an infrastructure automatic design system according to one embodiment of the present invention.
이하에서는 도면을 참조하여 본 발명의 구체적인 실시예를 상세하게 설명한다. 다만, 본 발명의 사상은 제시되는 실시예에 제한되지 아니하고, 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서 다른 구성요소를 추가, 변경, 삭제 등을 통하여, 퇴보적인 다른 발명이나 본 발명 사상의 범위 내에 포함되는 다른 실시예를 용이하게 제안할 수 있을 것이나, 이 또한 본원 발명 사상 범위 내에 포함된다고 할 것이다.Hereinafter, specific embodiments of the present invention will be described in detail with reference to the drawings. However, the spirit of the present invention is not limited to the presented embodiments, and those skilled in the art who understand the spirit of the present invention will be able to easily propose other regressive inventions or other embodiments included within the scope of the spirit of the present invention by adding, changing, deleting, etc. other components within the scope of the same spirit, but this will also be considered to be included within the scope of the spirit of the present invention.
도 1은 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 관계도이다. Figure 1 is a relationship diagram of a cloud business management platform according to one embodiment of the present invention.
도 1을 참조하면, 클라우드 사업 관리 플랫폼(100)은 대상기업의 클라우드 서버(P10),대상기업 및/또는 외부 서버(P20)와 유/무선으로 네트워크 연결될 수 있다. Referring to FIG. 1, the cloud business management platform (100) can be connected to a cloud server (P10) of the target company, the target company, and/or an external server (P20) via a wired/wireless network.
본 발명에서 언급하는 무선 네트워크라 함은 유선 공중망, 무선 이동 통신망, 또는 휴대 인터넷 등과 통합된 코어 망일 수도 있고, TCP/IP 프로토콜 및 그 상위 계층에 존재하는 여러 서비스, 즉 HTTP(Hyper Text Transfer Protocol), HTTPS(Hyper Text Transfer Protocol Secure), Telnet, FTP(File Transfer Protocol), DNS(Domain Name System), SMTP(Simple Mail Transfer Protocol) 등을 제공하는 전 세계적인 개방형 컴퓨터 네트워크 구조를 의미할 수 있으며, 이러한 예에 한정하지 않고 다양한 형태로 데이터를 송수신할 수 있는 데이터 통신망을 포괄적으로 의미하는 것이다.The wireless network referred to in the present invention may be a core network integrated with a wired public network, a wireless mobile communication network, or a portable Internet, or may mean a worldwide open computer network structure that provides various services existing in the TCP/IP protocol and its upper layer, such as HTTP (Hyper Text Transfer Protocol), HTTPS (Hyper Text Transfer Protocol Secure), Telnet, FTP (File Transfer Protocol), DNS (Domain Name System), SMTP (Simple Mail Transfer Protocol), and the like, and is not limited to these examples, but comprehensively means a data communication network capable of transmitting and receiving data in various forms.
대상기업(P30)은 클라우드 서비스를 제공하는 기업을 의미할 수 있다. The target company (P30) may refer to a company that provides cloud services.
또한, 대상기업(P30)은 클라우드 사업 관리 플랫폼(100)의 이용자일 수 있다. Additionally, the target company (P30) may be a user of the cloud business management platform (100).
대상기업(P30)은 클라우드 사업 관리 플랫폼(100)을 이용하는 법인 및/또는 개인 모두를 포함할 수 있다. The target company (P30) may include all corporations and/or individuals using the cloud business management platform (100).
여기서, 대상기업(P30)은 대상기업이 관리, 운영, 통제하는 컴퓨팅 장치를 의미할 수 있으며, 이하에서는 '대상기업'이라는 단어는 '대상기업' 및' 대상기업이 사용하는 컴퓨팅장치'의 의미 모두 포함할 수 있다. Here, the target company (P30) may mean a computing device managed, operated, and controlled by the target company, and hereinafter, the word 'target company' may include both the meaning of 'target company' and 'computing device used by the target company.'
본 발명에서 언급하는 컴퓨팅 장치는 정보 처리 연산을 처리할 수 있는 장치를 의미할 수 있다.The computing device referred to in the present invention may mean a device capable of processing information processing operations.
일례로, 컴퓨팅 장치는 데스크탑 컴퓨터, 노트북, 스마트폰, PDA(Personal Digital Assistants), PMP(Portable Multimedia Player), 휴대용 단말기 등이 포함되는 이동 단말기 및/또는 스마트 TV 등이 포함될 수 있다.For example, computing devices may include desktop computers, laptops, smartphones, mobile terminals including Personal Digital Assistants (PDAs), Portable Multimedia Players (PMPs), handheld terminals, and/or smart TVs.
외부서버(P20)는 사업에 대한 입찰 공고와 제안요청서를 온라인 네트워크 상에 공개하는 서버를 의미할 수 있다. An external server (P20) may refer to a server that publishes a bid announcement and request for proposal for a business on an online network.
일례로, 외부서부(P20)는 공공기관, 정부기관 등의 임의의 수요기관에서 관리, 운영하는 서버를 의미할 수 있다. For example, external western (P20) can refer to a server managed and operated by any demand agency such as a public institution or government agency.
다만, 이에 한정하지 않고, 상기 외부서버는 사업 입찰 공고와 제안요청서를 취급하고 공개하는 모든 서버를 포함할 수 있다. However, without limitation thereto, the external server may include all servers that handle and disclose business bid announcements and requests for proposals.
클라우드 서버(P10)는 임의의 다수에게 가상화를 통해 클라우드 서비스를 제공하는 서버를 의미할 수 있다. A cloud server (P10) may mean a server that provides cloud services through virtualization to an arbitrary number of people.
본 발명에서 언급하는 서버는 서버의 서버 환경을 수행하기 위한 다른 구성들이 포함될 수도 있다. 서버는 임의의 형태의 장치는 모두 포함할 수 있다. The server referred to in the present invention may include other configurations for performing a server environment of the server. The server may include any type of device.
일례로, 서버는 디지털 기기로서, 랩탑 컴퓨터, 노트북 컴퓨터, 데스크톱 컴퓨터, 웹 패드, 이동 전화기와 같이 프로세서를 탑재하고 메모리를 구비한 연산 능력을 갖춘 디지털 기기일 수 있다. For example, a server may be a digital device having computing power, such as a laptop computer, a notebook computer, a desktop computer, a web pad, or a mobile phone, and having a processor and memory.
일례로, 서버는 웹 서버일 수 있다. 다만, 이에 한정하지 않고, 서버의 종류는 통상의 기술자에게 자명한 수준에서 다양하게 변경 가능하다.For example, the server may be a web server. However, the type of server is not limited to this, and can be changed in various ways at a level that is obvious to a person skilled in the art.
본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼(100)은, 온라인 네트워크 상에 공고된 제안요청서를 검색하여 기업과 사업의 연관 여부를 산출, 표시하는 사업 검색 시스템(110), 지원하기를 희망하는 희망사업에 대한 클라우드 인프라를 자동으로 설계하여 제시하는 인프라 자동 설계 시스템(120) 및 대상기업이 신청한 사업을 관리하는 관리 시스템(130)을 포함할 수 있다. A cloud business management platform (100) according to one embodiment of the present invention may include a business search system (110) that searches for a request for proposal posted on an online network and calculates and displays whether a company and a business are related, an infrastructure automatic design system (120) that automatically designs and presents a cloud infrastructure for a desired business that a target company wishes to support, and a management system (130) that manages a business applied for by a target company.
관리 시스템(130), 상기 사업 검색 시스템(110)과 상기 인프라 자동 설계 시스템(120)은 서로 정보를 교환하여 필요한 프로세스를 진행할 수 있다. The management system (130), the business search system (110) and the infrastructure automatic design system (120) can exchange information with each other to proceed with necessary processes.
사업 검색 시스템, 인프라 자동 설계 시스템 및 관리 시스템은 컴퓨팅 장치를 의미할 수 있다. Business search systems, infrastructure automation design systems and management systems may refer to computing devices.
이하, 각각의 시스템에 대해서 자세하게 서술하도록 한다. Below, each system will be described in detail.
도 2는 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 구성도이다. Figure 2 is a configuration diagram of a cloud business management platform according to one embodiment of the present invention.
도 2를 참조하면, 본 발명의 일 실시예에 따른 사업 검색 시스템(110)은, 온라인 네트워크 상에 공고된 제안요청서를 수집하는 수집모듈(111), 수집된 상기 제안요청서의 내용 중에서 추출정보를 산출하는 가공모듈(112), 대상기업에 대한 정보인 대상정보로부터 상기 대상기업의 특성을 나타내는 특성정보를 산출하는 기능모듈(113), 미리 정해진 방법으로 상기 추출정보와 상기 특성정보를 서로 처리하고 비교하여 유사한 정도를 나타내는 비교유사도를 결정하는 대응모듈(114) 및 상기 대상기업과 상기 제안요청서가 연관되는지 여부가 표현되도록 상기 비교유사도가 표시되는 인터페이스를 산출하는 인터페이스모듈(115)을 포함할 수 있다. Referring to FIG. 2, a business search system (110) according to one embodiment of the present invention may include a collection module (111) that collects requests for proposals posted on an online network, a processing module (112) that derives extracted information from the contents of the collected requests for proposals, a function module (113) that derives characteristic information representing the characteristics of a target company from target information, which is information about the target company, a response module (114) that processes and compares the extracted information and the characteristic information using a predetermined method to determine a degree of similarity representing the degree of similarity, and an interface module (115) that derives an interface on which the degree of comparative similarity is displayed so as to express whether the target company and the request for proposal are related.
또한, 상기 사업 검색 시스템(110)은, 상기 대상기업이 상기 제안요청서의 기초가 되는 사업을 신청할 경우, 클라우드 인프라를 배정받을 수 있는지 여부를 시뮬레이션하는 시뮬레이션모듈(116)을 더 포함할 수 있다. In addition, the business search system (110) may further include a simulation module (116) that simulates whether the target company can be allocated a cloud infrastructure when applying for the business that is the basis of the request for proposal.
또한, 상기 사업 검색 시스템(110)은 미리 정해진 선별방법으로 인터페이스를 통해 대상기업에게 제시되는 제안요청서를 선별하는 선별모듈(117)을 더 포함할 수 있다. In addition, the business search system (110) may further include a selection module (117) that selects a request for proposal presented to a target company through an interface using a predetermined selection method.
또한, 상기 사업 검색 시스템(110)은 대상정보, 수집한 제안요청서 등 사업 검색 방법이 구현되는데 필요한 모든 정보들이 저장되어 있는 저장모듈(118)을 더 포함할 수 있다. In addition, the business search system (110) may further include a storage module (118) in which all information necessary for implementing a business search method, such as target information and collected proposal requests, is stored.
수집모듈(111)은 온라인 네트워크 상에 공개(공고)된 제안요청서를 외부 서버로부터 수집할 수 잇다. The collection module (111) can collect a request for proposal published (announced) on an online network from an external server.
제안요청서(request for proposal)는 사업에 대한 제안을 요청하는 문서로서, 사업에 대한 지원요건, 일정, 지원방법, 혜택 등에 대한 내용을 구비할 수 있다. A request for proposal is a document requesting proposals for a business, and may contain information about the support requirements, schedule, support methods, and benefits for the business.
또한, 수집모듈(111)은 대상기업으로부터 사업 검색에 대한 요청 및 검색정보를 수신할 수 있다In addition, the collection module (111) can receive a request for business search and search information from the target company.
검색정보는 대상기업이 검색하려고 하는 사업에 대한 정보로서, 키워드일 수 있다.Search information is information about the business that the target company is trying to search for, and may be keywords.
검색정보는 대상기업의 컴퓨팅 장치에 대상기업이 입력하여 생성되는 정보로서 일종의 검색어일 수 있다. Search information is information generated by the target company entering information into the target company's computing device and may be a type of search word.
일례로, '클라우드', 'CMP', '가상화' 등일 수 있다. For example, it could be ‘cloud’, ‘CMP’, ‘virtualization’, etc.
다만, 이에 한정하지 않고, 상기 검색정보의 종류는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation thereto, the type of the above search information can be varied in various ways at a level that is obvious to a person skilled in the art.
수집모듈(111)은 대상기업에 대한 정보인 대상정보를 대상기업으로부터 전달받을 수 있다. 또한, 상기 수집모듈(111)은 상기 대상정보를 외부서버로부터 수집할 수 있다. The collection module (111) can receive target information, which is information about the target company, from the target company. In addition, the collection module (111) can collect the target information from an external server.
일례로, 상기 대상정보는 상기 대상기업이 제공하는 서비스 또는 상기 대상기업이 생산하는 제품에 대한 정보를 포함할 수 있다. For example, the target information may include information about services provided by the target company or products produced by the target company.
일례로, 상기 대상정보는 기업 자체에 대한 정보로서, 기업의 매출액, 위치, 거래처, 직원 이력/경력 등에 대한 정보를 포함할 수 있다. For example, the above target information may be information about the company itself, including information about the company's sales, location, business partners, and employee history/career.
일례로, 대상정보는 제품/서비스의 기능, 구체적인 성능, 매뉴얼 등을 포함할 수 있다. For example, target information may include product/service features, specific performance, manuals, etc.
대상 기업의 기업 정보를 대상정보라고 정의할 수 있다. The corporate information of the target company can be defined as target information.
가공모듈(112)은 상기 제안요청서의 내용 중에서 추출정보를 산출할 수 있다. The processing module (112) can extract information from the contents of the above request for proposal.
여기서, 추출정보는 상기 제안요청서 내의 요구사항에 대한 정보일 수 있다.Here, the extracted information may be information about requirements in the above request for proposal.
일례로, 요구사항은 제안요청서에서 요구하는 사업에서 수행되어야 하는 요건에 대한 정보를 의미할 수 있다. For example, requirements may mean information about what needs to be done in the business requested in the request for proposal.
일례로, 요구사항은 "사용량 변화에 탄력적 대응을 위한 Auto scaling 기능 제공", "10G 네트워크 구성을 통한 고속 Input/Output 처리", "외부 서비스용과 가상서버간 내부 네트워크 분리", "Disk는 RAID 구성으로 안정적 디스크 볼륨제공", "DB 및 콘텐츠 저장용도의 NFS(Network File System) 방식의 Shared Storage""보안 관련 H/W 및 S/W는 CC인증 제품으로 구성하여야 함"등과 같이 사업을 통해 실현되고자하는 요구 사항에 대한 정보를 의미할 수 있다. For example, requirements may mean information about requirements that are to be realized through business, such as "Provide auto scaling function for flexibly responding to changes in usage", "High-speed Input/Output processing through 10G network configuration", "Internal network separation between external services and virtual servers", "Disks provide stable disk volume with RAID configuration", "NFS (Network File System) type Shared Storage for DB and content storage", and "Security-related H/W and S/W must be configured as CC certified products."
일례로, 요구사항은 지원요건, 참여 제한 요건, 사업에서 목표하는 결과, 선정 평가 기준 등을 포함할 수 있다. For example, requirements may include support requirements, participation restrictions, desired business outcomes, selection evaluation criteria, etc.
일례로, 추출정보는 제안요청서에서 요구하는 클라우드 인프라의 요건에 대한 정보를 의미할 수 있다. For example, extracted information may mean information about the requirements for cloud infrastructure requested in the RFP.
다만, 이에 한정하지 않고, 상기 요구사항에 대한 구체적인 예시는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation thereto, specific examples of the above requirements can be varied in various ways at a level that would be obvious to a person skilled in the art.
일례로, 가공모듈(112)은 자연어 처리를 기초로 제안요청서의 내용 중에서 추출정보를 추출할 수 있다. For example, the processing module (112) can extract information from the contents of a request for proposal based on natural language processing.
일례로, 가공모듈(112)은 머신러닝을 통해 제안요청서에서 추출정보를 선별/추출하는 모델인 추출정보모델을 산출할 수 있으며, 상기 추출정보모델을 통해 제안요청서에서 추출정보를 산출할 수 있다. For example, the processing module (112) can produce an extraction information model, which is a model that selects/extracts extraction information from a request for proposal through machine learning, and can produce extraction information from a request for proposal through the extraction information model.
구체적으로 설명하자면, 시스템 관리자는 입력데이터를 제안요청서로 설정하고, 그 입력데이터의 출력데이터를 제안요청서 중에서 어느 부분이 요구사항인지가 표시(지정)된 정보로 설정할 수 있으며, 가공모듈은 관리자에 의해 라벨링된 입력데이터와 출력데이터를 사전 훈련된 언어모델에 파인튜닝하여 추출정보모델을 산출할 수 있다. To explain specifically, the system administrator can set the input data as a request for proposal, and set the output data of the input data as information indicating (designating) which part of the request for proposal is a requirement, and the processing module can fine-tune the input data and output data labeled by the administrator with a pre-trained language model to produce an extracted information model.
일례로, 사전 훈련된 언어모델은 SBERT, GPT, RoBerTa일 수 있으나, 이에 본 발명이 한정되는 것은 아니다.For example, the pre-trained language model may be SBERT, GPT, or RoBerTa, but the present invention is not limited thereto.
추출정보모델은 입력데이터와 출력데이터간의 패턴을 분석하여, 제안요청서 중에서 어느 부분이 요구사항인지 여부를 분석하고 산출하는 모델일 수 있다. An extraction information model can be a model that analyzes and calculates which part of a request for proposal is a requirement by analyzing the pattern between input data and output data.
상술한 것과 다르게, 추출정보모델은 키워드 기반으로 추출정보를 선별할 수 있다. 키워드는 관리자에 의해 미리 설정되어 있을 수 있으며, 키워드를 포함하는 문장을 추출정보로서 선별하는 일반적인 모델일 수 있다. 다만, 이에 본 발명이 한정되는 것은 아니다. Unlike the above, the extraction information model can select extraction information based on keywords. Keywords can be preset by the administrator, and can be a general model that selects sentences containing keywords as extraction information. However, the present invention is not limited thereto.
이하, 추출정보의 추출 방법의 자세한 설명은 공지된 기술 범위에서 생략될 수 있다. Below, a detailed description of the extraction method of the extracted information may be omitted within the scope of known technology.
기능모듈(113)은 대상정보로부터 특성정보를 선별할 수 있다. The function module (113) can select characteristic information from target information.
특성정보는 상기 대상정보 중에서 기능과 관련된 정보일 수 있다. The characteristic information may be information related to function among the above target information.
구체적으로, 특성정보는 대상정보 내의 서비스/제품에 대한 정보 중 기능과 관련된 정보일 수 있다. Specifically, characteristic information may be information related to functions among information about services/products within the target information.
일례로, 특성정보는 제품 및/또는 서비스의 종류, 서비스 방법, 제품/서비스 수요자의 컴퓨팅 장치 권장 사양, 제품 및/또는 서비스의 내용, 제품 및/또는 서비스의 기능에 대한 정보일 수 있다. For example, characteristic information may be information about the type of product and/or service, the service method, recommended specifications for the computing device of the product/service user, the content of the product and/or service, and the functions of the product and/or service.
다만, 이에 한정하지 않고, 특성정보에 대한 구체적인 예시는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation, specific examples of characteristic information can be modified in various ways at a level that is obvious to those skilled in the art.
일례로, 기능모듈(113)은 머신러닝을 통해 대상정보에서 특성정보를 선별/추출하는 모델인 특성정보모델을 산출할 수 있으며, 상기 특성정보모델을 통해 대상정보로부터 특성정보를 산출할 수 있다. For example, the function module (113) can produce a characteristic information model, which is a model that selects/extracts characteristic information from target information through machine learning, and can produce characteristic information from target information through the characteristic information model.
구체적으로 설명하자면, 시스템 관리자는 입력데이터를 대상정보로 설정하고, 그 입력데이터의 출력데이터를 대상정보 중에서 어느 부분이 특성정보인지가 표시(지정)된 정보로 설정할 수 있으며, 기능모듈(113)은 관리자에 의해 라벨링된 입력데이타와 출력데이터를 사전 훈련된 언어모델에 파인튜닝하여 특성정보모델을 산출할 수 있다. To explain specifically, a system administrator can set input data as target information and set output data of the input data as information indicating (designating) which part of the target information is characteristic information, and the function module (113) can fine-tune input data and output data labeled by the administrator with a pre-trained language model to produce a characteristic information model.
일례로, 사전 훈련된 언어모델은 SBERT, GPT, RoBerTa일 수 있으나, 이에 본 발명이 한정되는 것은 아니다.For example, the pre-trained language model may be SBERT, GPT, or RoBerTa, but the present invention is not limited thereto.
특성정보모델은 입력데이터와 출력데이터 간의 패턴을 분석하여, 대상정보와 그 대상정보 내의 특성정보 간의 상관 관계를 분석하는 모델일 수 있다. A feature information model can be a model that analyzes the correlation between target information and feature information within the target information by analyzing the pattern between input data and output data.
일례로, 대상정보가 "OKESTRO는 매출액이 약 500억되며, 영등포구에 위치하고 있다. OKESTRO가 출시한 제품은 'SYMPHONY A.I.', 'CONTRABASS', 'OKESTRO CMP', 'TROMEBONE'이 있다. 'SYMPHONY A.I.'는 AIOps(Artificial Intelligence for IT Operations) 솔루션으로서, 컨테이너 간의 Auto scaling을 제공하며, 외부 서비스용과 가상서버간의 분리된 네트워그 통합 관리 서비스를 제공합니다. (이하, 중략)." 이라면, 특성정보는 "'SYMPHONY A.I.'는 AIOps(Artificial Intelligence for IT Operations) 솔루션으로서, 컨테이너 간의 Auto scaling을 제공하며, 외부 서비스용과 가상서버간의 분리된 네트워그 통합 관리 서비스를 제공합니다"일 수 있다. For example, if the target information is "OKESTRO has sales of approximately 50 billion won and is located in Yeongdeungpo-gu. The products released by OKESTRO are 'SYMPHONY A.I.', 'CONTRABASS', 'OKESTRO CMP', and 'TROMEBONE'. 'SYMPHONY A.I.' is an AIOps (Artificial Intelligence for IT Operations) solution that provides auto scaling between containers and provides a separate network integrated management service for external services and virtual servers. (hereinafter, omitted).", then the characteristic information could be "'SYMPHONY A.I.' is an AIOps (Artificial Intelligence for IT Operations) solution that provides auto scaling between containers and provides a separate network integrated management service for external services and virtual servers."
일례로, 특성정보모델은 키워드 기반으로 대상정보에서 특성정보를 선별할 수 있으나, 이에 본 발명이 한정되는 것은 아니다. For example, the feature information model can select feature information from target information based on keywords, but the present invention is not limited thereto.
이하, 대상정보의 추출 방법의 자세한 설명은 공지된 기술 범위에서 생략될 수 있다. Below, a detailed description of the method for extracting target information may be omitted within the scope of known technology.
대응모듈(114)은 미리 정해진 방법으로 상기 추출정보와 상기 특성정보를 서로 처리하고 비교하여 비교유사도를 산출하여 결정할 수 있다. The response module (114) can process and compare the extracted information and the characteristic information in a predetermined manner to calculate and determine the comparative similarity.
일례로, 미리 정해진 방법은 상기 추출정보와 상기 특성정보를 동일한 공간으로 임베딩한 후, 벡터화된 상기 추출정보와 벡터화된 상기 특성정보의 코사인 유사도를 산출하여 상기 비교유사도를 결정할 수 있다. For example, a predetermined method can determine the comparative similarity by embedding the extracted information and the characteristic information into the same space and then calculating the cosine similarity of the vectorized extracted information and the vectorized characteristic information.
대응모듈(114)은 자연어 처리 모델을 이용하여 상기 추출정보와 상기 특성정보를 동일한 공간으로 임베딩할 수 있다. The response module (114) can embed the extracted information and the characteristic information into the same space using a natural language processing model.
일례로, 대응모듈(114)은 BERT 및/또는 BERT의 파인튜닝된 모델을 이용하여 상기 추출정보 및/또는 특성정보를 동일한 공간으로 임베딩할 수 있다. For example, the response module (114) can embed the extracted information and/or characteristic information into the same space using BERT and/or a fine-tuned model of BERT.
다만, 이에 한정하지 않고, 상기 대응모듈(114)이 임베딩을 위해 사용하는 모델의 종류는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation thereto, the type of model used by the corresponding module (114) for embedding can be varied in various ways at a level that is obvious to a person skilled in the art.
대응모듈(114)은 코사인 유사도가 클수록 비교유사도 값을 커질 수 있으며, 이와 달리 코사인 유사도가 작을수록 비교유사도 값은 작아질 수 있다. The corresponding module (114) may have a larger comparative similarity value as the cosine similarity increases, and conversely, a smaller comparative similarity value as the cosine similarity decreases.
대응모듈(114)은 상기 대상기업의 제품 또는 서비스별로 상기 제안요청서와 연관되었는지를 나타내기 위하여, 상기 대상기업의 제품별로 상기 비교유사도를 산출할 수 있다. The response module (114) can calculate the comparative similarity for each product of the target company to indicate whether the product or service of the target company is related to the request for proposal.
대응모듈(114)은 대상기업의 하나의 제품 및/또는 서비스에 대한 특성정보와 추출정보를 미리 정해진 방법을 이용하여 서로 비교하여 비교유사도를 산출할 수 있다. The response module (114) can compare characteristic information and extracted information about a product and/or service of a target company using a predetermined method to calculate comparative similarity.
즉, 대응모듈(114)은 대상기업의 제품 또는 서비스 별로 제안요청서와의 유사한 정도를 산출할 수 있다. That is, the response module (114) can calculate the degree of similarity with the request for proposal for each product or service of the target company.
선별모듈(117)은 미리 정해진 선별방법으로 대상기업의 제품에 대응되는 제안요청서를 선별할 수 있다. The selection module (117) can select a request for proposal corresponding to a product of a target company using a predetermined selection method.
선별모듈(117)은 대상정보를 기초로 대상기업에 대응되는 키워드를 선별할 수 있다. The selection module (117) can select keywords corresponding to the target company based on the target information.
선별모듈(117)은 머신러닝/딥러닝을 통해 과거의 기업정보와 키워드를 기초로 기업정보에 대응되는 키워드를 산출하는 키워드모델을 산출할 수 있다. The selection module (117) can produce a keyword model that produces keywords corresponding to corporate information based on past corporate information and keywords through machine learning/deep learning.
구체적으로 설명하자면, 시스템 관리자는 입력데이터를 기업정보로 설정하고, 그 입력데이터의 출력데이터를 입력데이터의 기업정보에 대한 키워드로 설정하여 라벨링할 수 있다. 상기 선별모듈은 서로 라벨링된 입력데이터와 출력데이터를 사전 훈련된 언어모델에 파인튜닝(추가 학습)함으로써 키워드모델을 생성할 수 있다. To explain specifically, the system administrator can set the input data as corporate information and label the output data of the input data by setting the keywords for the corporate information of the input data. The above selection module can create a keyword model by fine-tuning (additional learning) the input data and output data that are labeled with each other to a pre-trained language model.
일례로, 사전 훈련된 언어모델은 SBERT, GPT, RoBerTa일 수 있으나, 이에 본 발명이 한정되는 것은 아니다. For example, the pre-trained language model may be SBERT, GPT, or RoBerTa, but the present invention is not limited thereto.
키워드모델은 입력데이터와 출력데이터 간의 패턴을 분석하여, 기업정보와 그 기업정보 내의 키워드 간의 상관 관계를 분석하는 모델일 수 있다. A keyword model can be a model that analyzes the correlation between corporate information and keywords within that corporate information by analyzing patterns between input data and output data.
일례로, 기업정보가 "본 기업은 OKESRTO CMP 소프웨어를 이용하여 멀티 클라우드 서비스를 제공하고 있다. OKESRTO CMP는 플랫폼에서 서비스 형태의 인프라 관리 및 소프트웨어 기반 통합 운영하여 멀티 클라우드 통합 관리 서비스를 제공하고 있다." 라면, 키워드는 "멀티 클라우드"일 수 있다. 다만, 이는 일 예시로서, 본 발명이 한정되는 것은 아니다. For example, if the corporate information is "This company provides multi-cloud services using OKESRTO CMP software. OKESRTO CMP provides multi-cloud integrated management services by managing infrastructure in the form of services on the platform and operating software-based integration.", then the keyword may be "multi-cloud." However, this is only an example and the present invention is not limited thereto.
다만, 이에 한정하지 않고, 키워드모델은 단어 빈도수를 기초로 기업정보 중에서 키워드를 산출하는 모델일 수 있다. 키워드모델은 기업정보를 어절단위로 구분한 후에, 어절마다 벡터화하여 가장 많은 빈도를 가지는 어절을 판별할 수 있다. 여기서, 키워드모델은 기업정보 중에서 가장 높은 빈도를 가지는 10개의 어절을 키워드로 결정할 수 잇다. However, without being limited to this, the keyword model may be a model that derives keywords from corporate information based on word frequency. The keyword model can divide corporate information into phrase units, then vectorize each phrase to determine the phrase with the highest frequency. Here, the keyword model can determine the 10 phrases with the highest frequency from corporate information as keywords.
미리 정해진 선별방법은 대상기업에 대응되는 키워드를 기초로 제안요청서를 선별하는 방법일 수 있다. A pre-determined selection method may be a method of selecting requests for proposals based on keywords corresponding to the target company.
미리 정해진 선별방법은 대상정보가 입력된 키워드모델에서 산출된 키워드를 가지는 제안요청서를 선별하는 방법일 수 있다. A predetermined selection method may be a method of selecting a request for proposal having keywords derived from a keyword model in which target information is input.
인터페이스모듈(115)은 미리 정해진 표시방법으로 인터페이스를 통해 대상기업에게 제시되는 제안요청서인 표시요청서를 선별하고, 상기 표시요청서가 표시되는 인터페이스를 산출할 수 있다. The interface module (115) can select a request for proposal, which is a request for proposal presented to a target company through an interface in a predetermined display method, and produce an interface on which the request for proposal is displayed.
인터페이스모듈(115)은 미리 정해진 표시방법을 기초로 대상기업에게 표시되는 제안요청서인 표시요청서를 선별할 수 있다. The interface module (115) can select a display request form, which is a request for proposal, to be displayed to the target company based on a pre-determined display method.
가공모듈(112), 대응모듈(114)은 표시요청서에 대해서만 추출하고 비교유사도를 산출할 수 있으나, 이에 본 발명이 한정되는 것은 아니다. The processing module (112) and the response module (114) can extract only the display request form and calculate the comparative similarity, but the present invention is not limited thereto.
미리 정해진 표시방법은 대상기업이 제공하는 키워드를 포함하는 제안요청서를 표시요청서로 선별하는 방법인 제1 표시방법 및 대상기업에 대응되는 키워드를 자동으로 산출하고, 산출된 키워드를 포함하는 제안요청서를 표시요청서로 선별하는 방법인 제2 표시방법을 구비할 수 있다. The predetermined display method may include a first display method for selecting a request for proposal containing a keyword provided by a target company as a request for display, and a second display method for automatically generating a keyword corresponding to a target company and selecting a request for proposal containing the generated keyword as a request for display.
인터페이스모듈(115)이 어느 방법으로 표시요청서를 선별할지는 대상기업이 선택할 수 있다. The target company can choose how the interface module (115) selects the display request form.
대상기업이 제1 표시방법을 선택하는 경우, 인터페이스모듈(115)은 수집모듈(111)을 통해 수집된 제안요청서 중에서 검색정보의 키워드를 포함하는 제안요청서를 표시요청서로 선별할 수 있다. When the target company selects the first display method, the interface module (115) can select a request for proposal that includes a keyword of search information from among the request for proposals collected through the collection module (111) as a request for display.
대상기업이 제2 표시방법을 선택하는 경우, 인터페이스모듈(115)은 선별모듈(117)에서 선별한 제안요청서를 표시요청서로 지정할 수 있다.If the target company selects the second display method, the interface module (115) can designate the request for proposal selected by the selection module (117) as the request for display.
인터페이스모듈(115)은 표시요청서의 요약정보와 표시요청서 각각을 구별할 수 있는 이미지 및 표시요청서와 대상기업의 제품/서비스의 비교유사도가 표시될 수 있는 사용자 인터페이스를 산출하여 대상기업에게 전송할 수 있다. The interface module (115) can generate and transmit to the target company a user interface that can display summary information of the display request form, an image that can distinguish each display request form, and a comparison and similarity between the display request form and the target company's products/services.
일례로, 인터페이스모듈(115)은 상기 대상기업의 제품 또는 서비스별로 상기 비교유사도가 바 형태로 표시되도록 인터페이스를 산출할 수 있다. For example, the interface module (115) can produce an interface so that the comparative similarity is displayed in the form of a bar for each product or service of the target company.
다만, 이에 한정하지 않고, 비교유사도의 표시 방법은 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation to this, the method of indicating comparative similarity can be modified in various ways at a level that is obvious to those skilled in the art.
일례로, 인터페이스모듈(115)은 비교유사도를 제품 또는 서비스별로 0 내지 100의 숫자로 표현할 수 있다. For example, the interface module (115) can express the comparative similarity as a number from 0 to 100 for each product or service.
인터페이스모듈(115)은 시뮬레이션 결과로서 클라우드 인프라에 대한 사업에 선정될 수 있는지 여부에 대한 가능성을 나타내는 이미지인 가능표시와 상기 비교유사도가 동시에 표시되도록 사용자 인터페이스를 산출할 수 있다. The interface module (115) can produce a user interface so that a possibility mark, which is an image indicating the possibility of being selected for a cloud infrastructure business as a simulation result, and the comparative similarity are simultaneously displayed.
일례로, 인터페이스모듈(115)은 시뮬레이션이 진행된 사업에 대해서만 상기 가능표시가 표시되도록 사용자 인터페이스를 산출할 수 있다. For example, the interface module (115) can generate a user interface so that the above possible indication is displayed only for businesses for which simulation has been performed.
인터페이스모듈(115)이 제공하는 사용자 인터페이스를 통해, 대상기업은 제안요청서를 검색하고, 필요한 제안요청서의 상세한 내용을 살펴볼 수 있다. Through the user interface provided by the interface module (115), the target company can search for a request for proposal and review the details of the required request for proposal.
시뮬레이션모듈(116)은 상기 대상기업이 상기 제안요청서의 기초가 되는 사업을 신청할 경우, 대상기업이 관리하는 클라우드 인프라를 배정받을 수 있는지 여부를 시뮬레이션할 수 있다. The simulation module (116) can simulate whether the target company can be assigned a cloud infrastructure managed by the target company when the target company applies for the business that is the basis of the request for proposal.
시뮬레이션모듈(116)은 상기 비교유사도가 소정 기준 이상인 사업에 대해서만 시뮬레이션을 실시할 수 있다. The simulation module (116) can conduct simulation only for businesses whose comparative similarity is above a predetermined standard.
구체적인 일례로서, 시뮬레이션모듈(116)은 대상기업의 제품 또는 서비스 중 적어도 하나 이상과 비교유사도가 소정 기준 이상인 제안요청서/표시요청서에 대해서만 시뮬레이션을 실시할 수 있다. As a specific example, the simulation module (116) can conduct a simulation only for a request for proposal/request for indication that has a similarity level with at least one of the target company's products or services that exceeds a predetermined standard.
대상기업이 제안요청서를 검색하는 경우, 시뮬레이션모듈(116)은 표시요청서에 대해서 표시요청서에 기초하는 사업을 신청할 때 클라우드 인프라를 지원받을 수 있는지 여부를 시뮬레이션할 수 있다. When a target company searches for a request for proposal, the simulation module (116) can simulate whether cloud infrastructure can be supported when applying for a business based on the request for proposal.
시뮬레이션모듈(116)은 임의의 표시요청서에 대응되는 사업을 후술하는 희망사업으로 취급하여, 표시요청서에 대응되는 사업을 신청할 때 클라우드 인프라를 지원받을 수 있는지 여부를 시뮬레이션할 수 있다. The simulation module (116) treats a business corresponding to an arbitrary request for display as a desired business described later, and can simulate whether cloud infrastructure can be supported when applying for a business corresponding to a request for display.
일례로, 표시요청서에 대응되는 사업에 대상인프라 혹은 수정인프라를 배정받을 수 있다면, 시뮬레이션모듈(116)은 표시요청서에 대응되는 사업이 클라우드 인프라를 지원받을 수 있다고 판단할 수 있다. For example, if a target infrastructure or modified infrastructure can be assigned to a business corresponding to a request for display, the simulation module (116) can determine that the business corresponding to the request for display can be supported by cloud infrastructure.
이와 달리, 표시요청서에 대응되는 사업에 오직 대상인프라만을 배정받을 수 있는 경우에만, 시뮬레이션모듈(116)은 표시요청서에 대응되는 사업이 클라우드 인프라를 지원받을 수 있다고 판단할 수도 있다. Conversely, if only the target infrastructure can be assigned to the business corresponding to the request for display, the simulation module (116) may determine that the business corresponding to the request for display can be supported by the cloud infrastructure.
시뮬레이션모듈(116)은 시뮬레이션을 위해 인프라 자동설계 시스템으로부터 필요한 정보를 송수신할 수 있다. The simulation module (116) can transmit and receive information necessary for simulation from the infrastructure automatic design system.
일례로, 시뮬레이션모듈(116)은 상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원을 기준으로 시뮬레이션의 대상인 사업의 사업 기간과 적어도 일부 기간 중복되는 사업 기간을 가지며 상기 대상기업이 사업을 신청할 것으로 예상되는 사업인 계류사업에 배정된 클라우드 자원을 고려하여 시뮬레이션을 진행할 수 있다. For example, the simulation module (116) can conduct a simulation by considering cloud resources allocated to a pending business, which is a business period that overlaps at least part of the business period of the business being simulated, based on idle resources, which are cloud infrastructure resources that can be utilized on the server of the target company, and for which the target company is expected to apply for the business.
이를 위해, 계류사업에 대한 정보를 배정모듈(127)로부터 시뮬레이션모듈(116)은 전달받을 수 있다. For this purpose, the simulation module (116) can receive information on the pending business from the assignment module (127).
대상인프라 또는 수정인프라가 산출되는 방법의 자세한 설명은 후술할 수 있다. A detailed description of how the target infrastructure or modified infrastructure is derived can be provided later.
저장모듈(118)은 기업정보(대상정보), 수집한 제안요청서 등 사업 검색 방법이 구현되는데 필요한 모든 정보들이 저장되어 있을 수 있다. The storage module (118) may store all information necessary for implementing a business search method, such as corporate information (target information) and collected proposal requests.
일례로, 저장 모듈은 내장 메모리 및/또는 외장 메모리를 포함할 수 있다.For example, the storage module may include internal memory and/or external memory.
일례로, 내장 메모리는 휘발성 메모리(예: DRAM, SRAM, 또는 SDRAM 등), 비휘발성 메모리(예: OTPROM(one time programmable ROM), PROM, EPROM, EEPROM, mask ROM, flash ROM, 플래시 메모리, 하드 드라이브, 또는 솔리드 스테이트 드라이브 (SSD) 중 적어도 하나를 포함할 수 있다For example, the embedded memory may include at least one of volatile memory (e.g., DRAM, SRAM, or SDRAM), nonvolatile memory (e.g., one time programmable ROM (OTPROM), PROM, EPROM, EEPROM, mask ROM, flash ROM, flash memory, a hard drive, or a solid state drive (SSD).
외장 메모리는 플래시 드라이브(flash drive), 예를 들면, CF(compact flash), SD(secure digital), Micro-SD, Mini-SD, xD(extreme digital), MMC(multi-media card) 또는 메모리 스틱 등을 포함할 수 있다.External memory may include a flash drive, such as CF (compact flash), SD (secure digital), Micro-SD, Mini-SD, xD (extreme digital), MMC (multi-media card), or memory stick.
수집모듈(111), 가공모듈(112), 기능모듈(113), 대응모듈(114), 인터페이스모듈(115), 시뮬레이션모듈(116), 선별모듈(117) 및/또는 저장모듈(118)은 서로 정보통신 가능하게 연결될 수 있다. The collection module (111), processing module (112), function module (113), response module (114), interface module (115), simulation module (116), selection module (117) and/or storage module (118) can be connected to each other in a way that enables information communication.
본 발명의 일 실시예에 따른 인프라 자동 설계 시스템(120)은, 임의의 수요기관에서 공고한 제안요청서의 요구사항을 만족하는 클라우드 인프라를 설계하기 위한, 인프라 자동 설계 시스템(120)에 있어서, 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보를 수신하는 수신모듈(121), 상기 대상과제정보를 기초로 대상요청서에서 요구하는 사항인 대상요구정보를 추출하는 추출모듈(122) 및 머신러닝으로 학습된 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라를 산출하는 구축모듈(123)을 포함할 수 있다. An infrastructure automatic design system (120) according to one embodiment of the present invention may include a receiving module (121) that receives target project information, which is information on a target request, which is a request for proposal for a desired project that a target company wishes to support, in an infrastructure automatic design system (120) for designing a cloud infrastructure that satisfies the requirements of a request for proposal announced by an arbitrary requesting agency, an extraction module (122) that extracts target requirement information, which is a requirement in the target request, based on the target project information, and a construction module (123) that generates a target infrastructure, which is a cloud infrastructure in which the target requirement information can be realized, using an infrastructure model learned by machine learning.
또한, 상기 인프라 자동 설계 시스템(120)은, 상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원을 산출하는 자원모듈(124), 상기 대상기업이 상기 희망사업에 선정될 가능성인 선정확률을 산출하는 선정예측모듈(125) 및 미리 정해진 수정조건이 만족되는 경우, 상기 선정확률을 기초로 미리 정해진 수정방법으로 상기 대상인프라를 수정하여 수정인프라를 산출하는 결정모듈(126)을 더 포함할 수 있다. In addition, the above-described infrastructure automatic design system (120) may further include a resource module (124) that calculates idle resources, which are cloud infrastructure resources that can be utilized on the server of the target company, a selection prediction module (125) that calculates a selection probability, which is a possibility that the target company will be selected for the desired project, and a decision module (126) that calculates a modified infrastructure by modifying the target infrastructure using a predetermined modification method based on the selection probability when a predetermined modification condition is satisfied.
또한, 상기 인프라 자동 설계 시스템(120)은, 미리 정해진 수정조건의 만족여부를 위해 필요한 계류사업에 배정된 클라우드 인프라에 대한 정보를 저장하고 관리하는 배정모듈(127)을 더 포함할 수 있다. In addition, the above-described infrastructure automatic design system (120) may further include an assignment module (127) that stores and manages information on cloud infrastructure assigned to pending projects necessary for satisfying predetermined modification conditions.
수신모듈(121)은 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보를 수신할 수 있다. The receiving module (121) can receive information about a target request form, which is a request for proposal for a desired project that the target company wishes to support.
대상기업은 신청하기를 희망하는 희망사업에 대해서 클라우드 인프라를 추천 받기를 요청할 수 있으며, 이러한 요청신호를 수신모듈(121)이 수신할 수 있다. The target company can request a recommendation for a cloud infrastructure for the desired business it wishes to apply for, and the receiving module (121) can receive this request signal.
대상기업은 요청신호에 희망사업에 대한 대상요청서에 대한 정보를 수신모듈(121)에 송신할 수 있다. The target company can transmit information about the target request for the desired business to the receiving module (121) in the request signal.
여기서, 대상요청서에 대한 정보는 희망사업에 대한 제안요청서 또는 상기 제안요청서에 접근할 수 있는 링크 정보 등을 포함할 수 있다. Here, information about the target request may include information such as a request for proposal for the desired project or a link to access the request for proposal.
이와 달리, 수신모듈(121)이 대상기업이 요청신호를 수신하는 경우, 상기 수신모듈(121)은 요청신호에 내포된 희망사업을 특정할 수 있는 정보를 기초로 희망사업에 대한 대상과제정보를 상기 사업 검색 시스템(110)의 상기 수집모듈(111) 또는 상기 저장모듈(118)에 요청하여 수신할 수 있다. In contrast, when the receiving module (121) receives a request signal from a target company, the receiving module (121) can request and receive target task information for a desired project from the collection module (111) or the storage module (118) of the business search system (110) based on information that can specify the desired project included in the request signal.
추출모듈(122)은 대상과제정보를 기초로 대상요청서의 요구사항인 대상요구정보를 추출할 수 있다. The extraction module (122) can extract target requirement information, which is a requirement of the target request form, based on target task information.
일례로, 대상요구정보는 대상요청서에서 요구하는 클라우드 인프라의 요건에 대한 정보를 의미하는 것으로서, 대상요구사항에 대한 정보를 의미할 수 있다. For example, target requirement information refers to information about requirements for cloud infrastructure requested in the target request, and may refer to information about target requirements.
일례로, 대상요구정보는 "사용량 변화에 탄력적 대응을 위한 Auto scaling 기능 제공", "10G 네트워크 구성을 통한 고속 Input/Output 처리", "외부 서비스용과 가상서버간 내부 네트워크 분리", "Disk는 RAID 구성으로 안정적 디스크 볼륨제공", "DB 및 콘텐츠 저장용도의 NFS(Network File System) 방식의 Shared Storage""보안 관련 H/W 및 S/W는 CC인증 제품으로 구성하여야 함" 등과 같이 사업을 통해 실현되고자 하는 클라우드 인프라의 성능과 기능에 대한 정보를 의미할 수 있다. For example, target requirement information may mean information on the performance and functions of the cloud infrastructure to be realized through the business, such as "providing auto scaling function for flexibly responding to changes in usage", "high-speed input/output processing through 10G network configuration", "separation of internal networks between external services and virtual servers", "disks provide stable disk volume with RAID configuration", "NFS (Network File System) type shared storage for DB and content storage", and "security-related H/W and S/W must be configured as CC certified products".
다만, 이에 한정하지 않고, 상기 대상요구정보에 대한 구체적인 예시는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation thereto, specific examples of the above target requirement information can be modified in various ways at a level that is obvious to a person skilled in the art.
일례로, 추출모듈(122)은 자연어 처리를 기초로 대상요청서의 내용 중에서 대상요구정보를 추출할 수 있다. For example, the extraction module (122) can extract target request information from the contents of the target request form based on natural language processing.
일례로, 추출모듈(122)은 머신러닝을 통해 제안요청서에서 대상요구정보를 선별/추출하는 모델인 추출정보모델을 산출할 수 있으며, 상기 추출정보모델을 통해 제안요청서에서 대상요구정보를 산출할 수 있다. For example, the extraction module (122) can produce an extraction information model, which is a model that selects/extracts target requirement information from a request for proposal through machine learning, and can produce target requirement information from a request for proposal through the extraction information model.
구체적으로 설명하자면, 시스템 관리자는 입력데이터를 제안요청서로 설정하고, 그 입력데이터의 출력데이터를 제안요청서 중에서 어느 부분이 요구사항인지가 표시(지정)된 정보로 설정할 수 있으며, 추출모듈은 관리자에 의해 라벨링된 입력데이터와 출력데이터를 사전 훈련된 언어모델에 파인튜닝함(추가 학습)으로써 추출정보모델을 산출할 수 있다. To explain specifically, the system administrator can set the input data as a request for proposal (RFP), and set the output data of the input data as information indicating (designating) which part of the RFP is a requirement, and the extraction module can produce an extraction information model by fine-tuning (additional learning) the input data and output data labeled by the administrator on a pre-trained language model.
일례로, 사전 훈련된 언어모델은 SBERT, GPT, RoBerTa일 수 있으나, 이에 본 발명이 한정되는 것은 아니다. For example, the pre-trained language model may be SBERT, GPT, or RoBerTa, but the present invention is not limited thereto.
추출정보모델은 입력데이터와 출력데이터 간의 패턴을 분석하여, 대상요청서와 그 대상요청서 내의 요구사항과의 상관 관계를 분석하는 모델일 수 있다. The extraction information model can be a model that analyzes the correlation between the target request and the requirements within the target request by analyzing the pattern between the input data and the output data.
일례로, 추출정보모델은 키워드 기반으로 대상요구정보를 선별할 수 있으나, 이에 본 발명이 한정되는 것은 아니다. For example, the extraction information model can select target requirement information based on keywords, but the present invention is not limited thereto.
이하, 대상요구정보의 추출 방법의 자세한 설명은 공지된 기술 범위에서 생략될 수 있다. Below, a detailed description of the method for extracting target requirement information may be omitted within the scope of known technology.
추출정보모델은 가공모듈(112) 및 추출모듈(122)에서 학습되어 각 모듈에서 사용될 수 있다. The extraction information model is learned in the processing module (112) and the extraction module (122) and can be used in each module.
이와 달리, 추출정보모델은 가공모듈(112) 또는 추출모듈(122)에서 학습되어, 학습에 참여하지 않은 모듈에 전달될 수도 있다. Alternatively, the extraction information model may be learned in the processing module (112) or the extraction module (122) and transferred to a module that did not participate in the learning.
대상요청서의 요구정보를 대상요구정보라고 정의할 수 있다. The requested information in the target request form can be defined as target request information.
상술한 것과 다르게, 추출정보모델은 키워드 기반으로 추출정보를 선별할 수 있다. 키워드는 관리자에 의해 미리 설정되어 있을 수 있으며, 키워드를 포함하는 문장을 추출정보로서 선별하는 일반적인 모델일 수 있다. 다만, 이에 본 발명이 한정되는 것은 아니다. Unlike the above, the extraction information model can select extraction information based on keywords. Keywords can be preset by the administrator, and can be a general model that selects sentences containing keywords as extraction information. However, the present invention is not limited thereto.
구축모듈(123)은 머신러닝으로 학습된(머신러닝이 활용된) 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라를 산출할 수 있다. The construction module (123) can use an infrastructure model learned through machine learning (machine learning utilized) to produce a target infrastructure, which is a cloud infrastructure in which the target requirement information can be realized.
클라우드 인프라란 사업 제안 시 혹은 사업 진행 시에 대상기업이 제공해야 하는 클라우드 자원을 의미할 수 있다. Cloud infrastructure can refer to cloud resources that a target company must provide when proposing a business or conducting a business.
일례로, 클라우드 인프라는 하드웨어 장치(서버, 디스트, CPU, 램, GPU, 네트워크설비 등)의 종류, 가상화 타입(가상머신, 컨테이너), 가상화되는 램/CPU 사양, 가상 스토리지 사양 및 네트워크 리소스의 양(네트워크 속도) 등을 포함하는 클라우드 컴퓨팅에 필요한 구성요소를 모두 포함할 수 있다. For example, cloud infrastructure may include all components required for cloud computing, including the types of hardware devices (servers, disks, CPUs, RAMs, GPUs, network equipment, etc.), virtualization types (virtual machines, containers), virtualized RAM/CPU specifications, virtual storage specifications, and the amount of network resources (network speed).
구축모듈(123)은 과거 시행된 사업에 대한 제안요청서와 그 제안요청서에 기초가 된 사업을 수행할 때 사용된 클라우드 인프라에 대한 정보를 기초로 머신러닝으로 상기 인프라모델을 학습할 수 있다. The construction module (123) can learn the infrastructure model through machine learning based on information about a request for proposal for a project implemented in the past and the cloud infrastructure used when performing the project based on the request for proposal.
즉, 구축모듈(123)은 과거의 사업의 요구정보와 선정된 사업에서 활용된 클라우드 인프라를 기초로 머신러닝/딥러닝하여 인프라모델을 산출할 수 있다. That is, the construction module (123) can produce an infrastructure model by performing machine learning/deep learning based on the requirements information of past projects and the cloud infrastructure utilized in the selected project.
구체적으로 설명하자면, 시스템 관리자는 과거에 시행된 사업에 대한 제안요청서에 기재된 요구사항에 대한 정보인 요구정보를 입력데이터로 설정하고, 그 입력데이터의 출력데이터로 제안요청서의 기초가 되는 사업이 수행될 때 사용된 클라우드 인프라에 대한 정보를 출력데이터로 설정할 수 있으며, 구축모듈(123)은 관리자에 의해 라벨링된 입력데이터와 출력데이터를 사전 훈련된 언어모델에 파인튜닝(추가 학습)함으로써 인프라모델을 생성할 수 있다. To explain specifically, a system administrator can set requirement information, which is information about requirements described in a request for proposal for a project implemented in the past, as input data, and set information about cloud infrastructure used when the project that is the basis of the request for proposal is implemented as output data of the input data, and the construction module (123) can create an infrastructure model by fine-tuning (additional learning) the input data and output data labeled by the administrator on a pre-trained language model.
일례로, 사전 훈련된 언어모델은 SBERT, GPT, RoBerTa일 수 있으나, 이에 본 발명이 한정되는 것은 아니다. For example, the pre-trained language model may be SBERT, GPT, or RoBerTa, but the present invention is not limited thereto.
이를 위해, 인프라모델은 추출정보모델과 연계하여 과거에 공개된 제안요청서에서 요구정보를 추출할 수 있다. To this end, the infrastructure model can extract required information from previously published requests for proposals in conjunction with the extraction information model.
인프라모델은 입력데이터와 출력데이터 간의 패턴을 분석하여, 제안요청서의 요구사항과 그 요구사항을 실현하기 위한 클라우드 인프라와의 상관 관계를 분석하는 모델일 수 있다. An infrastructure model can be a model that analyzes the correlation between the requirements of a request for proposal and the cloud infrastructure to realize the requirements by analyzing the patterns between input and output data.
일례로, 과거에 시행된 제안요청서에 기재된 요구정보가 "Disk는 RAID 구성으로 안정적 디스크 볼륨제공", "사용량 변화에 탄력적 대응을 위한 Auto scaling 기능 제공"등이라면, 인프라모델은 클라우드 인프라에서 사용되는 디스크는 IBM의 Storwize 시리즈 또는 Dell EMC의 PowerVault 시리즈의 디스크를 대상인프라로 결정하고, Auto scaling 기능을 제공하는 소프트웨어가 설치되도록 대상인프라를 결정할 수 있다. For example, if the requirements stated in the past request for proposal were "Disk provides stable disk volume with RAID configuration" and "Auto scaling function is provided to flexibly respond to changes in usage," the infrastructure model can determine the target infrastructure to be IBM's Storwize series or Dell EMC's PowerVault series disks used in the cloud infrastructure, and determine the target infrastructure to have software that provides the Auto scaling function installed.
구축모듈(123)은 과거 시행된 사업에 대한 제안요청서와 상기 인프라모델을 이용하여 예상된 클라우드 인프라와 과거 시행된 사업에 지정된 클라우드 인프라를 서로 비교하여, 상기 인프라모델을 재 학습할 수 있다. The construction module (123) can re-learn the infrastructure model by comparing the expected cloud infrastructure with the cloud infrastructure specified in the past project using the request for proposal for the past project and the infrastructure model.
구체적으로, 구축모듈(123)은 과거 시행된 사업에 지정된 클라우드 인프라와, 과거 시행된 사업에 대한 제안요청서의 요구정보가 인프라모델에 입력되어 산출된 클라우드 인프라를 서로 비교하여, 그 차이에 대해서 상기 인프라모델을 재 학습하여, 인프라모델의 정확도를 상승시킬 수 있다. Specifically, the construction module (123) can compare the cloud infrastructure specified in a past project with the cloud infrastructure produced by inputting the request for proposal for the past project into the infrastructure model, and re-learn the infrastructure model based on the difference, thereby increasing the accuracy of the infrastructure model.
이러한, 재학습 프로세스를 통해서, 구축모듈(123)은 인프라모델을 더욱 정확하게 학습할 수 있다. Through this re-learning process, the construction module (123) can learn the infrastructure model more accurately.
구축모듈(123)은 상기 유휴자원 내에서 상기 대상 인프라를 산출할 수 있다. The construction module (123) can produce the target infrastructure within the idle resources.
구축모듈(123)은 자원모듈(124)로부터 유휴자원을 전달받을 수 있다. The construction module (123) can receive idle resources from the resource module (124).
자원모듈(124)은 상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원을 산출할 수 있다. The resource module (124) can calculate idle resources, which are cloud infrastructure resources that can be utilized on the server of the target company.
이를 위해, 자원모듈(124)은 대상기업의 클라우드 서버 혹은 대상기업으로부터 클라우드 서버의 가용 자원에 대한 정보를 전달받을 수 있다. To this end, the resource module (124) can receive information about available resources of a cloud server of the target company or a cloud server from the target company.
가용 자원은 클라우드 서버의 전체 자원에서 클라우드 서버가 클라우드 인프라의 자동 설계 시점에서 사용되고 있는 자원의 차로 산출될 수 있다. Available resources can be calculated as the difference between the total resources of the cloud server and the resources that the cloud server is using at the time of automatic design of the cloud infrastructure.
일례로, 스토리지를 기준으로 할 때, 클라우드 서버의 전체 자원이 10,000TB이고, 클라우드 인프라의 자동 설계 시점에 사용되고 있는 클라우드 서버의 자원이 5,000TB라면, 가용 자원은 5000TB일 수 있다. For example, in terms of storage, if the total resources of the cloud server are 10,000 TB and the resources of the cloud server being used at the time of automatic design of the cloud infrastructure are 5,000 TB, the available resources can be 5000 TB.
또한, 자원모듈(124)은 배정모듈(127)로부터 사업에 신청을 완료하였으나, 클라우드 서버에 반영되지 않은 사용예정 자원에 대한 정보를 전달받을 수 있다. In addition, the resource module (124) can receive information on resources scheduled for use that have been applied for business from the allocation module (127) but have not been reflected in the cloud server.
즉, 사업을 이미 신청하여 선정될 경우에는 사업 신청시에 제시한 클라우드 인프라를 대상기업이 구축하여야 하기 때문에, 이를 유휴자원에서 배제하는 것이 바람직할 수 있다. In other words, if a business has already been applied for and selected, it may be desirable to exclude it from idle resources because the target company must build the cloud infrastructure presented at the time of application.
자원모듈(124)은 가용 자원에서 사용예정 자원의 차로서 유휴자원을 산출할 수 있다. The resource module (124) can calculate idle resources as the difference between available resources and resources to be used.
선정예측모듈(125)은 상기 대상기업이 상기 희망사업에 선정될 가능성인 선정확률을 산출할 수 있다. The selection prediction module (125) can calculate the selection probability, which is the possibility that the target company will be selected for the desired project.
일례로, 선정예측모듈은 선정기준 대비 대상기업이 희망사업에서 요구하는 조건을 얼마나 만족시켜줄지 여부에 대한 값인 만족수치와 선정기준을 기초로 선정확률을 산출할 수 있다. For example, the selection prediction module can calculate the selection probability based on the selection criteria and the satisfaction level, which is a value indicating how well the target company satisfies the conditions required for the desired project compared to the selection criteria.
구체적으로 설명하자면, 선정예측모듈은 희망사업에 대한 제안요청서에 기재된 요구사항과 기업이 제공하는 제품/서비스의 기능을 서로 서로 비교하여, 상기 만족수치를 산출할 수 있다. . To explain specifically, the selection prediction module can calculate the above satisfaction level by comparing the requirements stated in the request for proposal for the desired business with the functions of the product/service provided by the company.
이를 위해서, 선정예측모듈은 추출모듈의 추출정보모델을 활용하여 제안요청서에서 요구사항을 추출할 수 있다. 또한, 선정예측모듈은 기능모듈의 특성정보모델을 활용하여 기업의 대상정보 내에서 특성정보를 추출할 수 있다. To this end, the selection prediction module can extract requirements from the request for proposal by utilizing the extraction information model of the extraction module. In addition, the selection prediction module can extract characteristic information from the target information of the company by utilizing the characteristic information model of the function module.
그리고, 선정예측모듈은 요구사항의 세부내용과 특성정보의 세부 내용이 일치하는지 여부를 판단하고, 전체 요구 사항 중에서 특성정보와 유사한 요구사항이 있는 비율로서 만족수치를 산출할 수 있다. In addition, the selection prediction module can determine whether the details of the requirements match the details of the characteristic information, and calculate a satisfaction level as the ratio of requirements similar to the characteristic information among all requirements.
선정기준은 시스템 관리자에 의해 미리 지정될 수 있다. Selection criteria can be pre-specified by the system administrator.
일례로, 선정기준은 70%일 수 있으나, 이에 본 발명이 한정되는 것은 아니고, 선정기준에 대한 구체적인 값은 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다. For example, the selection criterion may be 70%, but the present invention is not limited thereto, and the specific value of the selection criterion may be varied in various ways at a level that is obvious to a person skilled in the art.
이와 달리, 선정예측모듈은 과거의 데이터를 기초로 선정기준을 산출할 수 있다. In contrast, the selection prediction module can derive selection criteria based on past data.
구체적인 일례로, 과거의 제안요청서와 그 제안요청서에 기초가되는 사업에 선정된 기업에 대한 기업정보를 비교하여 제안요청서의 요구사항을 사업에 선정된 기업의 제품/서비스가 얼마나 만족하였는지 여부를 선정예측모듈은 산출할 수 있다. As a specific example, the selection prediction module can calculate how well the products/services of the companies selected for the project satisfy the requirements of the request for proposal by comparing the company information of the past request for proposal and the company selected for the project based on the request for proposal.
그리고, 과거의 제안요청서별로 각각 기업의 제품/서비스가 얼마나 만족하였는지 여부를 산출하여 평균냄으로써 선정기준을 산출할 수 있다. In addition, selection criteria can be derived by calculating the level of satisfaction with each company's product/service for each past RFP and taking the average.
일례로, 제안요청서에서 요구하는 조건은 1) Auto scaling 기능 제공, 2) 10G 네트워크 구성을 통한 고속 Input/Output 처리, 3) 보안 관련 H/W 및 S/W는 CC인증 제품으로 구성하야 하지만, 기업이 제공하는 서비스/제품은 Auto scaling 기능을 제공하고, 10G 네트워크 구성을 통한 고속 Input/Output 처리를 할 수 있지만, CC인증을 받지 못하였다면, 선정예측모듈은 3가지 조건 중에서 2가지만 기업이 만족시켜줄 수 있다고 판단하고, 만족수치는 66.6%로 산출될 수 있다. For example, if the conditions required in the RFP are 1) provision of auto scaling function, 2) high-speed input/output processing through 10G network configuration, and 3) security-related H/W and S/W must be configured as CC-certified products, but the service/product provided by the company provides auto scaling function and can perform high-speed input/output processing through 10G network configuration but has not received CC certification, the selection prediction module will determine that the company can satisfy only two of the three conditions, and the satisfaction level can be calculated as 66.6%.
선정예측모듈은 선정기준 이상의 만족수치일 경우, 선정기준보다 만족수치가 멀어질수록(클수록) 선정확률을 높게 평가할 수 있다. The selection prediction module can evaluate the selection probability as higher the further (larger) the satisfaction level is from the selection criteria, if the satisfaction level is higher than the selection criteria.
반대로, 선정예측모듈은 선정기준 미만의 만족수치일 경우, 선전기준보다 만족수치가 멀어질수록(작아질수록) 선정확률을 낮게 평가할 수 있다. Conversely, the selection prediction module can evaluate the selection probability as lower when the satisfaction level is lower than the selection criterion.
선정예측모듈은 0% 내지 100%의 확률로 선정확률을 산출할 수 있다. The selection prediction module can calculate the selection probability with a probability between 0% and 100%.
결정모듈(126)은 미리 정해진 수정조건이 만족되는 경우, 상기 선정확률을 기초로 미리 정해진 수정방법으로 상기 대상인프라를 수정하여 수정인프라를 산출할 수 있다. The decision module (126) can produce a modified infrastructure by modifying the target infrastructure using a predetermined modification method based on the selection probability when a predetermined modification condition is satisfied.
미리 정해진 수정조건은 상기 희망사업에 대한 클라우드 인프라 추천 요청 시점을 기준으로, 상기 대상인프라와 상기 대상기업이 사업을 신청할 것으로 결정된 사업인 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 조건일 수 있다. The predetermined modification condition may be that the sum of the target infrastructure and the cloud infrastructure allocated to the pending project for which the target company has been determined to apply for the project exceeds the idle resources at the time of the request for cloud infrastructure recommendation for the above desired project.
여기서, 계류사업은 대상기업이 클라우드 인프라를 결정하여 사업을 신청할 것으로 결정한 사업으로서, 희망사업의 사업기간과 적어도 일부 날짜가 겹치는 사업기간을 가지는 사업을 의미할 수 있다. Here, a pending business is a business for which the target company has decided to apply for a business by deciding on a cloud infrastructure, and may mean a business with a business period that overlaps at least some dates with the business period of the desired business.
이를 위해, 결정모듈(126)은 배정모듈(127)로부터 계류사업에 배정된 클라우드 인프라를 전달받을 수 있다. To this end, the decision module (126) can receive the cloud infrastructure assigned to the pending business from the assignment module (127).
미리 정해진 수정방법은 상기 희망사업에 대한 클라우드 인프라 추천 요청 시점을 기준으로 대상인프라와 계류사업에 배정된 클라우드 인프라를 모두 고려하여, 상기 선정확률의 구간별로 예측사업의 클라우드 인프라를 수정하는 방법을 결정하는 방법일 수 있다. A predetermined modification method may be a method of determining a method for modifying the cloud infrastructure of a predicted project by section of the selection probability by considering both the target infrastructure and the cloud infrastructure assigned to the pending project based on the time of the request for cloud infrastructure recommendation for the above desired project.
구체적인 일례로서, 상기 미리 정해진 수정방법은 제1 확률 이하 상기 제1 확률보다 낮은 확률인 제2 확률 초과인 제1 구간에 상기 선정확률을 가지는 사업(희망사업과 계류사업)에 대응되는 클라우드 인프라는 수정하지 않는 방법일 수 있다. As a specific example, the above-determined modification method may be a method of not modifying a cloud infrastructure corresponding to a business (a desired business and a pending business) having the above-described selection probability in a first section that is less than or equal to the first probability and greater than the second probability, which is a probability lower than the first probability.
일례로, 제1 확률은 100%일 수 있고, 제2 확률은 85%일 수 있다. For example, the first probability might be 100%, the second probability might be 85%, and so on.
다만, 이에 한정하지 않고, 제1 확률 및/또는 제2 확률의 구체적인 수치는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation thereto, the specific numerical values of the first probability and/or the second probability can be varied in various ways at a level that is obvious to a person skilled in the art.
또한, 상기 미리 정해진 수정방법은 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 이하일 경우, 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 수정하지 않는 방법일 수 있다.In addition, the above-determined modification method may be a method of not modifying the cloud infrastructure corresponding to the project having the above-described selection probability in the second section when the sum of the cloud infrastructures assigned to the desired project and the pending project having the above-described selection probability in the first section and the second section exceeding the third probability which is lower than the second probability but less than or equal to the second probability is less than or equal to the idle resources.
일례로, 제3 확률은 70%일 수 있다. For example, the third probability might be 70%.
다만, 이에 한정하지 않고, 제3 확률의 구체적인 수치는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation to this, the specific numerical value of the third probability can be varied in various ways at a level that is obvious to ordinary technicians.
또한, 미리 정해진 수정 방법은 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 이하인 동시에, 상기 제1 구간, 제2 구간 및 제3 구간에 상기 선정확률을 가지는 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원을 초과할 경우, 상기 선정확률에 기초하여 상기 제3 구간의 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출하는 방법일 수 있다. In addition, the predetermined correction method may be a method of calculating a correction infrastructure by reducing the cloud infrastructure corresponding to the project having the selection probability in the third section based on the selection probability when the sum of the cloud infrastructures assigned to the desired project and the pending project having the selection probability in the first section and the second section exceeds the third probability which is lower than or equal to the second probability and is less than or equal to the idle resources, and at the same time, the sum of the cloud infrastructures assigned to the desired project and the pending project having the selection probability in the first section, the second section, and the third section exceeds the idle resources.
또한, 미리 정해진 수정방법은, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 경우, 상기 선정확률에 기초하여 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출하는 방법일 수 있다. In addition, the predetermined correction method may be a method of calculating a correction infrastructure by reducing the cloud infrastructure corresponding to the project having the selection probability in the second section based on the selection probability when the sum of the cloud infrastructures assigned to the desired project and the pending project having the selection probability in the first section and the second section exceeds the third probability which is lower than the second probability and less than the second probability exceeds the idle resources.
또한, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과인 동시에, 상기 제3 확률 이하 상기 제3 확률보다 낮은 확률인 제4 확률 초과인 제3 구간에 상기 선정확률을 가지는 사업이 존재할 경우, 소정 기준의 이하의 수익률을 가지는 사업에 대해서 클라우드 인프라를 배정하지 않는 방법일 수 있다. In addition, in a case where the sum of cloud infrastructures allocated to the desired business and the pending business having the above selection probability in the first section and the second section exceeds the third probability which is lower than or equal to the second probability and less than or equal to the second probability, and at the same time exceeds the idle resources, and a business having the above selection probability exists in the third section which is lower than or equal to the third probability and greater than the fourth probability which is lower than the third probability, there may be a method of not allocating cloud infrastructure to a business having a rate of return below a predetermined standard.
이하, 미리 정해진 수정방법에 대해서 자세하게 서술하도록 한다. Below, we will describe in detail the predetermined modification method.
배정모듈(127)은 계류사업에 대한 클라우드 인프라 정보들을 관리하고, 필요한 모듈에 제공할 수 있다. The assignment module (127) can manage cloud infrastructure information for pending projects and provide it to necessary modules.
대상기업은 지원을 희망하는 사업에 대해서 구축모듈(123)에 의해 대상인프라 혹은 결정모듈(126)에 의해 수정인프라를 추천받을 수 있다. 대상기업은 클라우드 인프라를 추천받고, 사업을 진정으로 신청하기 전까지 내부 결제 프로세스를 진행할 수 있다. The target company can receive recommendations for target infrastructure through the construction module (123) or modified infrastructure through the decision module (126) for the business it wishes to support. The target company can receive recommendations for cloud infrastructure and proceed with an internal payment process before actually applying for the business.
배정모듈(127)은 희망사업에 대한 대상 인프라 혹은 수정인프라를 표시하는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. The allocation module (127) can produce an interface that displays the target infrastructure or modified infrastructure for the desired project and provide it to the target company.
즉, 사업에 클라우드 인프라를 배정한 상태에서, 사업 신청 전까지 사업이 계류될 수 있으며, 이러한 사업은 계류사업이라고 정의할 수 있다. In other words, when a cloud infrastructure is allocated to a business, the business may be on hold until the business application is submitted, and such a business can be defined as a pending business.
대상기업은 계류사업에 대한 정보 및 계류사업에 배정된 클라우드 인프라에 대한 정보를 배정모듈(127)에 전달할 수 있다. The target company can transmit information about the pending business and information about the cloud infrastructure assigned to the pending business to the assignment module (127).
배정모듈(127)은 계류사업에 배정된 클라우드 인프라에 변동이 있을 경우, 변동된 사항으로 정보를 변경하며, 변동된 사항을 대상기업에게 알릴 수 있다. If there is a change in the cloud infrastructure assigned to a pending business, the assignment module (127) can change the information to the changed information and notify the target company of the changed information.
배정모듈(127)은 대상인프라 또는 수정인프라에 대한 구체적인 정보들이 표시되는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. The allocation module (127) can produce an interface that displays specific information about the target infrastructure or modified infrastructure and provide it to the target company.
구체적으로, 미리 정해진 수정조건이 만족되지 않는 경우, 배정모듈(127)은 대상인프라가 표시되는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. Specifically, if a pre-determined modification condition is not satisfied, the allocation module (127) can generate an interface in which the target infrastructure is displayed and provide it to the target company.
이와 달리, 미리 정해진 수정조건이 만족되는 경우, 배정모듈(127)은 수정인프라가 표시되는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. In contrast, if a pre-determined modification condition is satisfied, the allocation module (127) can generate an interface displaying the modification infrastructure and provide it to the target company.
이를 통해, 대상기업은 희망사업에 필요한 클라우드이 인프라를 직관적으로 파악하여, 쉽게 사업계획서를 작성하여 희망사업에 신청할 수 있다. Through this, target companies can intuitively understand the cloud infrastructure required for their desired business, easily write a business plan, and apply for the desired business.
관리 시스템(130)은 대상기업이 신청하여 사업이 선정되었는지 선정되지 않았는지에 대한 정보를 관리하고, 선정 여부에 대해서 표시하는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. The management system (130) can manage information on whether a business has been selected or not by application of a target company, and can produce an interface that displays whether or not it has been selected and provide it to the target company.
또한, 관리 시스템(130)은 선정된 사업에 대한 일정을 관리하여, 일정에 대한 마감일, 일정을 표시하는 이미지를 표시하는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. In addition, the management system (130) can manage the schedule for the selected business, and can provide the target company with an interface that displays a deadline for the schedule and an image indicating the schedule.
또한, 관리 시스템(130)은 선정된 사업의 인력에 대한 정보를 저장하고, 각각의 인력이 참여한 사업 리스트들을 데이터베이스화하여 저장할 수 있다. In addition, the management system (130) can store information on personnel of the selected business and store a list of businesses in which each personnel participated in a database.
관리 시스템(130)은 대상기업의 요청에 대응하여, 임의의 인력에 대한 사업 참여 경력 리스트를 산출하여 제공할 수 있다. The management system (130) can, in response to a request from a target company, produce and provide a list of business participation careers for any personnel.
이하, 사업 검색 시스템(110)에 의해 구현되는 사업 검색 방법에 대해서 자세하게 서술하도록 한다.Below, the business search method implemented by the business search system (110) will be described in detail.
도 3은 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 사업 검색 시스템에 의해 구현되는 사업 검색 방법의 순서도이고, 도 4는 본 발명의 일 실시예에 따른 사업 검색 시스템의 동작 과정을 설명하기 위한 도면이다. FIG. 3 is a flowchart of a business search method implemented by a business search system of a cloud business management platform according to one embodiment of the present invention, and FIG. 4 is a diagram for explaining the operation process of a business search system according to one embodiment of the present invention.
도 3 및 도 4를 참조하면, 본 발명의 일 실시예에 따른 사업 검색 방법은, 사업 검색 시스템(110)에 의해 구현되는 사업 검색 방법에 있어서, 수집모듈(111)에 의해, 온라인 네트워크 상에 공고된 제안요청처가 수집되는 단계, 가공모듈(112)에 의해, 상기 제안요청서의 내용 중에서 추출정보가 산출되는 단계, 기능모듈(113)에 의해, 대상기업에 대한 정보인 대상정보로부터 상기 대상기업의 특성을 나타내는 특성정보가 산출되는 단계, 대응모듈(114)에 의해, 미리 정해진 방법으로 상기 추출정보와 상기 특성정보가 처리되고 비교되어 유사한 정보를 나타내는 비교유사도가 결정되는 단계 및 인터페이스모듈(115)에 의해, 상기 대상기업과 상기 제안요청서가 연관되는지 여부가 표현되도록 상기 비교유사도가 표시되는 인터페이스가 산출되는 인터페이스모듈(115)을 포함할 수 있다. Referring to FIGS. 3 and 4, a business search method according to an embodiment of the present invention may include, in a business search method implemented by a business search system (110), a step of collecting request for proposals posted on an online network by a collection module (111), a step of calculating extracted information from the contents of the request for proposal by a processing module (112), a step of calculating characteristic information representing the characteristics of a target company from target information, which is information about the target company, by a function module (113), a step of processing and comparing the extracted information and the characteristic information in a predetermined manner by a response module (114) to determine a comparative similarity indicating similar information, and an interface module (115) for calculating an interface in which the comparative similarity is displayed so as to express whether the target company and the request for proposal are related.
대상기업은 클라우드 사업 관리 플랫폼(100)(사업 검색 시스템(110))으로 제안요청서의 검색 요청을 할 수 있다. The target company can request a search of a request for proposal using a cloud business management platform (100) (business search system (110)).
이때, 대상기업은 표시 방법을 선택할 수 있으며, 검색정보로서 키워드를 함께 송신할 수 있다. At this time, the target company can select a display method and send keywords together as search information.
수집모듈(111)은 외부 서버를 통해 공개된 제안요청서를 수집할 수 있다. The collection module (111) can collect proposal requests made public through an external server.
가공모듈(112)은 표시요청서 또는 제안요청서의 내용 중에서 추출정보를 선별하여 산출할 수 있다. The processing module (112) can select and produce extracted information from the contents of a request for display or a request for proposal.
또한, 기능모듈(113)은 대상기업의 대상정보로부터 특성정보를 선별하여 산출할 수 있다. In addition, the function module (113) can select and produce characteristic information from the target information of the target company.
대응모듈(114)은 특성정보와 추출정보를 미리 정해진 방법으로 비교하여 비교유사도를 결정할 수 있다. The response module (114) can compare characteristic information and extracted information in a predetermined manner to determine comparative similarity.
여기서, 대응모듈(114)은 표시요청서에 대해서만 비교유사도를 산출할 수 있으나, 이에 본 발명이 한정되는 것은 아니다. Here, the response module (114) can calculate the comparative similarity only for the display request form, but the present invention is not limited thereto.
이를 위해서는, 수집모듈(111)이 수집한 제안요청서, 대상기업의 요청 및 검색정보는 저장모듈(118)을 통해 인터페이스모듈(115) 또는 인터페이스모듈(115)에 직접 전달될 수 있으며, 인터페이스모듈(115)은 제안요청서 중에서 표시요청서를 선별할 수 있다. To this end, the request for proposal, the request of the target company and the search information collected by the collection module (111) can be directly transferred to the interface module (115) or the interface module (115) through the storage module (118), and the interface module (115) can select a request for display from among the request for proposal.
그리고, 인터페이스모듈(115)이 선별한 표시요청서에 대한 리스트들이 상기 가공모듈(112) 및/또는 대응모듈(114)에 전달될 수 있다. Additionally, lists of display requests selected by the interface module (115) can be transmitted to the processing module (112) and/or the response module (114).
인터페이스모듈(115)은 미리 정해진 표시방법에 의해 선별된 표시요청서 각각을 구별할 수 있는 이미지(Q11), 비교유사도(Q12) 및/또는 가능표시(Q13)가 함께 표시되는 사용자 인터페이스(Q10)를 표시하여 상기 대상기업에게 제공할 수 있다. The interface module (115) can display a user interface (Q10) that displays an image (Q11), comparative similarity (Q12), and/or possible display (Q13) that can distinguish each display request form selected by a pre-determined display method, and provide it to the target company.
도 5는 본 발명의 일 실시예에 따른 클라우드 사업 관리 플랫폼의 인프라 자동 설계 시스템에 의해 구현되는 인프라 자동 설계 방법의 순서도이고, 도 6은 본 발명의 일 실시예에 따른 인프라 자동 설계 시스템의 동작 과정을 설명하기 위한 도면이다. FIG. 5 is a flowchart of an infrastructure automatic design method implemented by an infrastructure automatic design system of a cloud business management platform according to one embodiment of the present invention, and FIG. 6 is a drawing for explaining an operation process of an infrastructure automatic design system according to one embodiment of the present invention.
도 5 및 도 6을 참조하면, 본 발명의 일 실시예에 따른 인프라 자동 설계 시스템은, 인프라 자동 설계 시스템에 의해 구현되며, 임의의 수요기관에서 공고한 제안요청서의 요구사항을 만족하는 클라우드 인프라를 설계하기 위한, 인프라 자동 설계 방법에 있어서, 수신모듈(121)에 의해, 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보가 수신되는 단계, 추출모듈(122)에 의해, 상기 대상과제정보를 기초로 대상요청서(R11)에서 요구하는 사항인 대상요구정보(R12)가 추출되는 단계 및 구축모듈(123)에 의해, 머신러닝으로 학습된 인프라모델(M10)을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라가 산출되는 단계를 포함할 수 있다. Referring to FIGS. 5 and 6, an infrastructure automatic design system according to an embodiment of the present invention is implemented by an infrastructure automatic design system, and may include a step of receiving, by a receiving module (121), target project information, which is information on a target request form, which is a request for proposal for a desired project that a target company wishes to support, a step of extracting, by an extraction module (122), target requirement information (R12), which is a requirement in a target request form (R11), based on the target project information, and a step of generating, by a construction module (123), a target infrastructure, which is a cloud infrastructure that can realize the target requirement information, using an infrastructure model (M10) learned by machine learning.
대상기업은 클라우드 인프라를 추천받기 위해서 사업을 하나 지정하여(희망사업) 클라우드 인프라 추천을 요청할 수 있으며, 그 요청신호를 수신모듈(121)이 수신할 수 있다. The target company can request a cloud infrastructure recommendation by specifying a business (desired business) to receive a cloud infrastructure recommendation, and the request signal can be received by the receiving module (121).
수신모듈(121)은 희망사업에 대한 대상과제정보를 사업 검색 시스템(110) 혹은 외부서로부터 수신할 수 있다. The receiving module (121) can receive target task information for a desired project from the project search system (110) or an external source.
추출모듈(122)은 대상과제정보로부터 대상요구정보를 추출할 있으며,구축모델은 미리 학습한 인프라모델에 대상요구정보를 입력하여, 희망사업에 필요한 클라우드 인프라인 대상인프라를 산출할 수 있다. The extraction module (122) can extract target requirement information from target task information, and the construction model can input target requirement information into a pre-learned infrastructure model to produce target infrastructure, which is a cloud infrastructure required for a desired project.
배정모듈(127)은 대상인프라(U11)가 표시되는 인터페이스를 산출하여 대상기업에게 제공할 수 있다. The allocation module (127) can produce an interface in which the target infrastructure (U11) is displayed and provide it to the target company.
이를 통해, 대상기업은 사업 신청 시에 기재해야 하는 클라우드 인프라를 손쉽게 파악할 수 있다. Through this, target companies can easily identify the cloud infrastructure that must be included when applying for a business.
다만, 여기서, 결정모듈(126)은 미리 정해진 수정조건이 만족되는 경우, 미리 정해진 수정방법으로 상기 대상인프라를 수정하여 수정인프라를 산출할 수 있다. However, here, the decision module (126) can produce a modified infrastructure by modifying the target infrastructure using a predetermined modification method when a predetermined modification condition is satisfied.
이는, 희망사업의 선정확률이 어느 구간에 있는지에 따라 수정될지 유지될지 여부가 결정될 수 있으나, 미리 정해진 수정방법의 자세한 설명은 후술한다. This can be modified or maintained depending on the range in which the probability of selection of the desired project falls, but a detailed explanation of the predetermined modification method is provided later.
도 7은 본 발명의 일 실시예에 따른 인프라 자동 설계 시스템(120) 수정인프라를 산출하는 과정을 설명하는 순서도이다. Figure 7 is a flowchart illustrating a process of producing a modified infrastructure by an infrastructure automatic design system (120) according to one embodiment of the present invention.
도 7을 참조하면, 결정모듈(126)은 미리 정해진 수정조건이 만족되는지 여부를 판단하고, 미리 정해진 수정조건이 만족되는 경우, 미리 정해진 수정방법으로 수정인프라를 산출할 수 있다. Referring to FIG. 7, the decision module (126) determines whether a predetermined modification condition is satisfied, and if the predetermined modification condition is satisfied, the modification infrastructure can be calculated using a predetermined modification method.
미리 정해진 수정방법은 상기 선정확률의 구간별로 상기 대상인프라를 수정하는 방법을 결정하는 방법일 수 있다.The predetermined modification method may be a method for determining a method of modifying the target infrastructure for each interval of the above selection probability.
결정모듈(126)은 대상인프라와 상기 대상기업이 사업을 신청할 것으로 결정된 사업인 계류사업에 배정된 클라우드 인프라의 총합(이하, 예정인프라라고 칭함)을 기초로 미리 정해진 수정방법을 진행할 수 있다. The decision module (126) can proceed with a predetermined modification method based on the sum of the target infrastructure and the cloud infrastructure assigned to the pending project for which the target company has been determined to apply (hereinafter referred to as the planned infrastructure).
결정모듈(126)은 희망사업과 계류사업 중에서 제1 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원을 초과하는지 여부를 판단할 수 있다. The decision module (126) can determine whether the planned infrastructure of a project with a selection probability of the first section among the desired projects and pending projects exceeds idle resources.
만일, 희망사업과 계류사업 중에서 제1 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원을 초과하는 경우, 결정모듈(126)은 제1 구간의 선정확률을 가지는 사업에 대해서 선택하여 지원할 것을 대상기업에게 권유하는 인터페이스를 송신할 수 있다. 이를 통해, 대상기업은 희망사업과 계류사업 중에서 제1 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원을 초과하지 않도록, 일부 사업에 대해서 선택하고, 나머지 사업은 신청 취하할 수 있다. If the planned infrastructure of a project with a selection probability of the first section among the desired project and pending project exceeds idle resources, the decision module (126) can transmit an interface that recommends to the target company to select and support the project with a selection probability of the first section. Through this, the target company can select some projects and withdraw applications for the remaining projects so that the planned infrastructure of the project with a selection probability of the first section among the desired project and pending project does not exceed idle resources.
일례로, A 희망사업의 선정확률이 95%, B 계류사업의 선정확률이 93%, C 계류사업의 선정확률이 98%이고, A 희망사업의 클라우드 인프라의 스토리지가 100TB, B 계류사업의 클라우드 인프라의 스토리지가 150TB, C 계류사업의 클라우드 인프라의 스토리지가 200TB이고, 유휴자원의 스토리지가 400TB일 경우, 결정모듈(126)은 A, B, C 사업 중에서 일부 사업의 신청을 취소하라고 대상기업에게 권유하는 메시지가 담긴 인터페이스를 전송할 수 있다. For example, if the selection probability of hope project A is 95%, the selection probability of pending project B is 93%, the selection probability of pending project C is 98%, the storage of the cloud infrastructure of hope project A is 100 TB, the storage of the cloud infrastructure of pending project B is 150 TB, the storage of the cloud infrastructure of pending project C is 200 TB, and the storage of idle resources is 400 TB, the decision module (126) can transmit an interface containing a message recommending that the target company cancel the application for some of the projects among projects A, B, and C.
이는, 선정 확률이 높은 사업이 동시에 신청되어 선정될 경우, 대상기업의 클라우드 서버가 과부화 되는 것을 예방하기 위함일 수 있다. This may be to prevent the target company's cloud server from becoming overloaded when businesses with a high probability of being selected are applied for and selected at the same time.
만일, 희망사업과 계류사업 중에서 제1 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 이하일 경우, 결정모듈(126)은 제1 구간의 선정확률을 가지는 사업에 대한 클라우드 인프라는 수정하지 않을 수 있다. If the planned infrastructure of a project with a selection probability of the first section among the desired projects and pending projects is less than the idle resources, the decision module (126) may not modify the cloud infrastructure for the project with a selection probability of the first section.
일례로, A 희망사업의 선정확률이 95%, B 계류사업의 선정확률이 93%, C 계류사업의 선정확률이 98%이고, A 희망사업의 클라우드 인프라의 스토리지가 100TB, B 계류사업의 클라우드 인프라의 스토리지가 150TB, C 계류사업의 클라우드 인프라의 스토리지가 200TB이고, 유휴자원의 스토리지가 600TB일 경우, 결정모듈(126)은 A, B, C 사업에 배정된 클라우드 인프라를 수정하지 않을 수 있다. For example, if the selection probability of hope project A is 95%, the selection probability of pending project B is 93%, the selection probability of pending project C is 98%, the storage of the cloud infrastructure of hope project A is 100 TB, the storage of the cloud infrastructure of pending project B is 150 TB, the storage of the cloud infrastructure of pending project C is 200 TB, and the storage of idle resources is 600 TB, the decision module (126) may not modify the cloud infrastructures assigned to projects A, B, and C.
다음으로, 결정모듈(126)은 희망사업과 계류사업 중에서 제1 구간과 제2 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 이하인지 여부를 판단할 수 있다. Next, the decision module (126) can determine whether the planned infrastructure of a project with a selection probability of the first section and the second section among the desired project and the pending project is less than the idle resource.
만일, 희망사업과 계류사업 중에서 제1 구간과 제2 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 이하일 경우, 결정모듈(126)은 제1 구간 및 제2 구간의 선정확률을 가지는 사업의 클라우드 인프라를 수정하지 않을 수 있다. If the planned infrastructure of a project with a selection probability of the first and second sections among the desired and pending projects is less than the idle resources, the decision module (126) may not modify the cloud infrastructure of the project with a selection probability of the first and second sections.
일례로, A 희망사업의 선정확률이 95%, B 계류사업의 선정확률이 93%, C 계류사업의 선정확률이 80%이고, D 계류사업의 선정확률이 60%이며, A 희망사업의 클라우드 인프라의 스토리지가 100TB, B 계류사업의 클라우드 인프라의 스토리지가 150TB, C 계류사업의 클라우드 인프라의 스토리지가 200TB, D 계류사업의 클라우드 인프라의 스토리지가 300TB이고, 유휴자원의 스토리지가 500TB일 경우, 결정모듈(126)은 A, B, C 사업에 배정된 클라우드 인프라를 수정하지 않을 수 있다. For example, if the selection probability of hope project A is 95%, the selection probability of pending project B is 93%, the selection probability of pending project C is 80%, the selection probability of pending project D is 60%, and the storage of the cloud infrastructure of hope project A is 100 TB, the storage of the cloud infrastructure of pending project B is 150 TB, the storage of the cloud infrastructure of pending project C is 200 TB, the storage of the cloud infrastructure of pending project D is 300 TB, and the storage of idle resources is 500 TB, the decision module (126) may not modify the cloud infrastructures assigned to projects A, B, and C.
다음으로, 결정모듈(126)은, 희망사업과 계류사업 중에서 제1 구간, 제2 구간 및 제3 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 이하인지 여부를 판단할 수 있다.Next, the decision module (126) can determine whether the planned infrastructure of a project having a selection probability of the first section, second section, and third section among the desired project and pending project is less than or equal to idle resources.
만일, 희망사업과 계류사업 중에서 제1 구간, 제2 구간 및 제3 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 이하일 경우, 결정모듈(126)은 제1 구간 내지 제3 구간의 선정확률을 가지는 사업의 클라우드 인프라를 수정하지 않을 수 있다. If the planned infrastructure of a project with a selection probability of the first, second and third sections among the desired and pending projects is less than the idle resources, the decision module (126) may not modify the cloud infrastructure of the project with a selection probability of the first to third sections.
반면에, 희망사업과 계류사업 중에서 제1 구간, 제2 구간 및 제3 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 초과일 경우, 결정모듈(126)은 상기 선정확률에 기초하여 상기 제3 구간의 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출할 수 있다. On the other hand, if the planned infrastructure of a project having the selection probability of the first section, the second section, and the third section among the hoped-for projects and the pending projects exceeds idle resources, the decision module (126) can reduce the cloud infrastructure corresponding to the project having the selection probability of the third section based on the selection probability to produce a modified infrastructure.
구체적인 일례로, 결정확률은 선정확률이 높을수록 대상인프라를 축소하는 비율을 낮추고, 선정확률이 낮을수록 대상인프라를 축소하는 비율을 높일 수 있다. As a specific example, the decision probability can lower the rate of reduction of target infrastructure as the selection probability increases, and the rate of reduction of target infrastructure can increase as the selection probability decreases.
또한, 결정모듈(126)은 제3 구간의 선정확률을 가지는 클라우드 인프라를 축소하여 수정인프라를 산출할 수 있다. Additionally, the decision module (126) can produce a modified infrastructure by reducing the cloud infrastructure having the selection probability of the third section.
일례로, A 희망사업의 선정확률이 95%, B 계류사업의 선정확률이 93%, C 계류사업의 선정확률이 80%이고, D 계류사업의 선정확률이 60%이며, E 계류사업의 선정확률이 55%이고, A 희망사업의 클라우드 인프라의 스토리지가 100TB, B 계류사업의 클라우드 인프라의 스토리지가 150TB, C 계류사업의 클라우드 인프라의 스토리지가 200TB, D 계류사업의 클라우드 인프라의 스토리지가 300TB이고, E 계류사업의 클라우드 인프라의 스토리지가 300TB이며, 유휴자원의 스토리지가 800TB일 경우, 결정모듈(126)은 D의 계류사업에 배정된 스토리지를 180.43TB, E의 계류사업에 배정된 스토리지를 169.57TB로 축소하여 설정할 수 있다.For example, if the selection probability of hope project A is 95%, the selection probability of pending project B is 93%, the selection probability of pending project C is 80%, the selection probability of pending project D is 60%, the selection probability of pending project E is 55%, and the storage of the cloud infrastructure of hope project A is 100 TB, the storage of the cloud infrastructure of pending project B is 150 TB, the storage of the cloud infrastructure of pending project C is 200 TB, the storage of the cloud infrastructure of pending project D is 300 TB, the storage of the cloud infrastructure of pending project E is 300 TB, and the storage of idle resources is 800 TB, the decision module (126) can set the storage assigned to pending project D to be reduced to 180.43 TB and the storage assigned to pending project E to be reduced to 169.57 TB.
여기서, 결정모듈(126)은 제1 구간 내지 제3 구간의 선정확률을 가지는 클라우드 인프라의 총합이 유휴자원과 동일 혹은 이하로 가지도록 제3 구간의 선정확률을 가지는 사업의 클라우드 인프라를 축소할 수 있다. Here, the decision module (126) can reduce the cloud infrastructure of the business having the selection probability of the third section so that the sum of the cloud infrastructure having the selection probability of the first to third sections is equal to or less than the idle resources.
다음으로, 결정모듈(126)은 제4 확률보다 낮은 확률인 제5 확률 이하인 제4 구간의 선정확률을 가지는 사업에 대응되는 클라우드 인프라는 수정하지 않을 수 있다. Next, the decision module (126) may not modify the cloud infrastructure corresponding to a business having a selection probability of the fourth section that is lower than or equal to the fifth probability, which is lower than the fourth probability.
이는, 선정확률이 낮기 때문에, 처음 배정받거나 추천 받은 인프라대로 지정되어 사업을 신청하는 것이 기업 이미지 제고에 좋기 때문일 수 있다. This may be because, since the selection probability is low, it is good for the company's image to apply for a business by being designated as the first assigned or recommended infrastructure.
일례로, 제5확률은 50%일 수 있다. For example, the fifth probability might be 50%.
다만, 이에 한정하지 않고, 제5 확률의 구체적인 수치는 통상의 기술자에게 자명한 수준에서 다양하게 변형 가능하다.However, without limitation to this, the specific numerical value of the fifth probability can be varied in various ways at a level that is obvious to ordinary technicians.
상술한 바와 다르게, 희망사업과 계류사업 중에서 제1 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 이하이지만, 희망사업과 계류사업 중에서 제1 구간과 제2 구간의 선정확률을 가지는 사업의 예정인프라가 유휴 자원 초과일 경우, 제3 구간의 선정확률을 가지는 희망사업 또는 계류사업이 있는지 여부에 따라서 다음 프로세스가 변경될 수 있다. Unlike the above, if the planned infrastructure of a project with a selection probability of the first section among the hoped-for projects and pending projects is less than or equal to idle resources, but the planned infrastructure of a project with a selection probability of the first and second sections among the hoped-for projects and pending projects exceeds idle resources, the following process may be changed depending on whether there is a hoped-for project or pending project with a selection probability of the third section.
일례로, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과인 동시에 제3 구간에 상기 선정확률을 가지는 사업이 존재하지 않을 경우, 결정모듈(126)은 상기 선정확률에 기초하여 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출할 수 있다. For example, if the sum of the cloud infrastructures assigned to the desired business and the pending business having the selection probability in the first section and the second section exceeds the third probability which is lower than the second probability but less than the second probability, exceeds the idle resources and at the same time there is no business having the selection probability in the third section, the decision module (126) can reduce the cloud infrastructure corresponding to the business having the selection probability in the second section based on the selection probability to produce a modified infrastructure.
선정확률에 따라 인프라를 축소하는 방법의 자세한 설명은 상술한 내용과 중복되는 한도에서 생략될 수 있다. A detailed description of how to reduce infrastructure based on the selection probability may be omitted to the extent that it overlaps with the above-mentioned content.
이와 달리, 상기 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과인 동시에, 상기 제3 확률 이하 상기 제3 확률보다 낮은 확률인 제4 확률 초과인 제3 구간에 상기 선정확률을 가지는 사업이 존재할 경우, 결정모듈(126)은 소정 기준의 이하의 수익률을 가지는 사업에 대해서 클라우드 인프라를 배정하지 않을 수 있다. In contrast, if the sum of the cloud infrastructures assigned to the desired business and the pending business having the selection probability in the first section and the second section exceeding the third probability which is lower than or equal to the second probability and less than or equal to the second probability exceeds the idle resources, and if there is a business having the selection probability in the third section exceeding the fourth probability which is lower than or equal to the third probability and less than or equal to the third probability, the decision module (126) may not assign cloud infrastructure to the business having a rate of return below a predetermined standard.
결정모듈(126)은 희망사업과 계류사업에 대한 수익률을 산출할 수 있다. The decision module (126) can calculate the rate of return for desired projects and pending projects.
일례로, 결정모듈(126)은 희망사업에 배정된 사업비에 대상인프라를 구축하는데 발생되는 비용과 사업을 진행하기 위해서 발생되는 고정비용을 차감한 것을 배정된 사업비로 나누어 수익률을 산출할 수 있다. For example, the decision module (126) can calculate the rate of return by dividing the difference between the allocated project cost and the cost incurred in constructing the target infrastructure and the fixed cost incurred in order to proceed with the project by the allocated project cost.
일례로, 결정모듈(126)은 마이너스 수익률을 가지는 희망사업 또는 계류사업에 클라우드 인프라를 배정하지 않도록 수정인프라를 산출할 수 있다. For example, the decision module (126) can calculate a modified infrastructure so as not to allocate cloud infrastructure to a desired business or a pending business with a negative rate of return.
결정모듈(126)은 배제하는 수익률의 기준을 변경할 수 있다. The decision module (126) can change the criteria for the excluded rate of return.
일례로, 결정모듈(126)은 제1 구간 내지 제3 구간에 선정확률을 가지는 사업에 배정된 클라우드 인프라의 총합이 유휴자원 이하로 되는 수익률의 기준을 산출하고, 산출된 수익률의 기준을 만족하지 못하는 제2 구간 및 제3 구간에 선정확률을 가지는 사업에 배정된 클라우드 인프라를 철회 시킬 수 있다. For example, the decision module (126) can calculate a rate of return criterion in which the sum of cloud infrastructures assigned to businesses with a selection probability in the first to third sections is less than idle resources, and can withdraw cloud infrastructures assigned to businesses with a selection probability in the second and third sections that do not satisfy the calculated rate of return criterion.
대상기업이 희망사업을 대상인프라 혹은 수정인프라 대로 신청할 예정이라고 확정하는 경우, 대상기업은 희망사업의 신청 예정에 대한 정보를 배정모듈(127)에 송신할 수 있다. If the target company confirms that it plans to apply for the desired project as the target infrastructure or modified infrastructure, the target company can send information about the planned application for the desired project to the allocation module (127).
배정모듈(127)은 희망사업에 추천되는 대상인프라 혹은 수정인프라가 산출되는 과정에서 계류사업의 클라우드 인프라에 변동이 있었다면, 변동된 계류사업의 클라우드 인프라 정보를 대상기업에게 송신할 수 있다. If there is a change in the cloud infrastructure of a pending project during the process of calculating the target infrastructure or modified infrastructure recommended for the desired project, the allocation module (127) can transmit information on the changed cloud infrastructure of the pending project to the target company.
이를 통해, 대상기업은 희망사업을 새롭게 신청하는 것에 따라 기존의 신청 예정인 계류사업의 클라우드 인프라 자원과 저촉되는 것을 효과적으로 예방할 수 있다. Through this, target companies can effectively prevent conflicts with the cloud infrastructure resources of existing pending projects when applying for new projects.
첨부된 도면은 본 발명의 기술적 사상을 보다 명확하게 표현하기 위해, 본 발명의 기술적 사상과 관련성이 없거나 떨어지는 구성에 대해서는 간략하게 표현하거나 생략하였다.In order to more clearly express the technical idea of the present invention, the attached drawings briefly express or omit components that are not related to or have little to do with the technical idea of the present invention.
상기에서는 본 발명에 따른 실시예를 기준으로 본 발명의 구성과 특징을 설명하였으나 본 발명은 이에 한정되지 않으며, 본 발명의 사상과 범위 내에서 다양하게 변경 또는 변형할 수 있음은 본 발명이 속하는 기술분야의 당업자에게 명백한 것이며, 따라서 이와 같은 변경 또는 변형은 첨부된 특허청구범위에 속함을 밝혀둔다.Although the configuration and features of the present invention have been described above based on embodiments according to the present invention, the present invention is not limited thereto, and it will be apparent to those skilled in the art that various changes or modifications can be made within the spirit and scope of the present invention, and therefore it is made clear that such changes or modifications fall within the scope of the appended patent claims.
100 : 클라우드 사업 관리 플랫폼 110 : 사업 검색 시스템
120 : 인프라 자동 설계 시스템 130 : 관리 시스템100: Cloud Business Management Platform 110: Business Search System
120: Infrastructure automatic design system 130: Management system
Claims (11)
대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보를 수신하는 수신모듈;
상기 대상과제정보를 기초로 대상요청서에서 요구하는 사항인 대상요구정보를 추출하는 추출모듈;
상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원을 산출하는 자원모듈;
머신러닝이 활용된 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라를 상기 유휴자원 내에서 산출하는 구축모듈;
상기 대상기업이 상기 희망사업에 선정될 가능성인 선정확률을 산출하는 선정예측모듈; 및
미리 정해진 수정조건이 만족되는 경우, 상기 선정확률을 기초로 미리 정해진 수정방법으로 상기 대상인프라를 수정하여 수정인프라를 산출하는 결정모듈;을 포함하고,
상기 결정모듈은,
제1 구간 내지 제3 구간에 선정확률을 가지는 사업에 배정된 클라우드 인프라의 총합이 유휴자원 이하로 되는 상기 수정인프라를 산출하고,
상기 미리 정해진 수정조건은,
상기 희망사업에 대한 클라우드 인프라 추천 요청 시점을 기준으로, 상기 대상인프라와 상기 대상기업이 사업을 신청할 것으로 결정된 사업인 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 조건이며,
상기 미리 정해진 수정방법은,
제3 구간의 선정확률을 가지는 사업의 존재 여부에 따라서 산출하는 상기 수정인프라가 달라지며, 제1 확률 이하 상기 제1 확률보다 낮은 확률인 제2 확률 초과인 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과인 동시에, 상기 제3 확률 이하 상기 제3 확률보다 낮은 확률인 제4 확률 초과인 제3 구간에 상기 선정확률을 가지는 사업이 존재할 경우, 소정 기준의 이하의 수익률을 가지는 사업에 대해서 클라우드 인프라를 배정하지 않는 방법인,
인프라 자동 설계 시스템.
In an infrastructure automatic design system for designing a cloud infrastructure that satisfies the requirements of a request for proposal published by an arbitrary demand agency,
A receiving module that receives target project information, which is information about a target request form, which is a request for proposal for a desired project that the target company hopes to support;
An extraction module that extracts target requirement information, which is a requirement in a target request form, based on the above target task information;
A resource module that calculates idle resources, which are cloud infrastructure resources that can be utilized on the servers of the above target company;
A construction module that generates a target infrastructure, which is a cloud infrastructure that can realize the target requirement information, within the idle resources using an infrastructure model utilizing machine learning;
A selection prediction module that calculates the selection probability, which is the possibility that the above target company will be selected for the above desired project; and
Including a decision module that produces a modified infrastructure by modifying the target infrastructure using a predetermined modification method based on the selection probability when a predetermined modification condition is satisfied;
The above decision module is,
The above modified infrastructure is calculated so that the sum of cloud infrastructures assigned to businesses with a selection probability in sections 1 to 3 is less than idle resources,
The above pre-determined modification conditions are:
As of the time of requesting a cloud infrastructure recommendation for the above-mentioned desired project, the sum of the above-mentioned target infrastructure and the cloud infrastructure allocated to the pending project for which the above-mentioned target company has been determined to apply for the project is the condition of exceeding the above-mentioned idle resources.
The above predetermined modification method is,
The above modified infrastructure calculated is different depending on the existence of a business having a selection probability of the third section, and the sum of the cloud infrastructures allocated to the desired business and the pending business having the above selection probability in the first section exceeding the second probability which is lower than the first probability and lower than the first probability and in the second section exceeding the third probability which is lower than the second probability exceeds the idle resources, and in the third section exceeding the fourth probability which is lower than the third probability and lower than the third probability, a method of not allocating cloud infrastructure to a business having a rate of return below a predetermined standard, when a business having the above selection probability exists in the third section exceeding the fourth probability which is lower than the third probability and lower than the third probability.
Automated infrastructure design system.
상기 자원모듈은,
클라우드 서버의 전체 자원에서 상기 클라우드 서버가 클라우드 인프라의 자동 설계 시점에서 사용되고 있는 자원의 차로 산출되는 가용 자원 및 상기 사업에 신청을 완료하였으나 상기 클라우드 서버에 반영되지 않은 사용예정 자원의 차로서 상기 유휴자원을 산출하는,
인프라 자동 설계 시스템.
In the first paragraph,
The above resource module is,
The available resources are calculated as the difference between the resources used by the cloud server at the time of automatic design of the cloud infrastructure from the total resources of the cloud server, and the idle resources are calculated as the difference between the resources to be used for which the application for the business has been completed but not reflected in the cloud server.
Automated infrastructure design system.
상기 구축모듈은,
과거 시행된 사업에 대한 제안요청서와 클라우드 인프라를 기초로 머신러닝으로 상기 인프라모델을 학습하며,
과거 시행된 사업에 대한 제안요청서와 상기 인프라모델을 이용하여 예상된 클라우드 인프라와 과거 시행된 사업에 지정된 클라우드 인프라를 서로 비교하여, 상기 인프라모델을 재 학습하는,
인프라 자동 설계 시스템.
In the first paragraph,
The above construction module is,
The infrastructure model is learned through machine learning based on the request for proposal for the past implemented business and the cloud infrastructure.
By comparing the expected cloud infrastructure with the cloud infrastructure specified in the past project using the request for proposal for the past project and the infrastructure model, the infrastructure model is re-learned.
Automated infrastructure design system.
상기 선정예측모듈은,
과거의 제안요청서별로 기업의 제품 및 서비스가 제안요청서의 요구사항을 만족하였는지 여부를 산출하여 평균냄으로써 선정기준을 산출하고, 상기 선정기준 대비 상기 대상기업이 상기 희망사업에서 요구하는 조건을 만족하는지에 대한 값인 만족수치와 상기 선정기준을 기초로 상기 선정확률을 산출하는,
인프라 자동 설계 시스템.
In the first paragraph,
The above selection prediction module is,
By calculating whether the company's products and services satisfy the requirements of the request for proposals for each past request for proposals and averaging them, the selection criteria are derived, and the satisfaction level, which is the value indicating whether the target company satisfies the conditions required for the desired project compared to the selection criteria, and the selection probability is derived based on the selection criteria.
Automated infrastructure design system.
상기 미리 정해진 수정방법은,
상기 선정확률의 구간별로 클라우드 인프라를 수정하는 방법을 결정하는 방법인,
인프라 자동 설계 시스템.
In the first paragraph,
The above predetermined modification method is,
A method for determining how to modify cloud infrastructure for each interval of the above selection probability.
Automated infrastructure design system.
상기 미리 정해진 수정방법은,
상기 제1 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라는 수정하지 않는 방법인,
인프라 자동 설계 시스템.
In paragraph 5,
The above predetermined modification method is,
A method in which the cloud infrastructure corresponding to the business having the above selection probability in the above first section is not modified.
Automated infrastructure design system.
상기 미리 정해진 수정방법은,
상기 제1 구간과 상기 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 상기 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 이하일 경우, 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 수정하지 않는 방법인,
인프라 자동 설계 시스템.
In Article 6,
The above predetermined modification method is,
A method of not modifying the cloud infrastructure corresponding to the project having the above selection probability in the second section when the sum of the cloud infrastructure assigned to the above desired project and the above pending project having the above selection probability in the first section and the above second section is less than or equal to the idle resources.
Automated infrastructure design system.
상기 미리 정해진 수정방법은,
상기 제1 구간과 상기 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 상기 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 이하인 동시에,
상기 제1 구간, 상기 제2 구간 및 상기 제3 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원을 초과할 경우, 상기 선정확률에 기초하여 상기 제3 구간의 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출하는 방법인,
인프라 자동 설계 시스템.
In Article 7,
The above predetermined modification method is,
The sum of the cloud infrastructure allocated to the above desired project and the above pending project with the above selection probability in the above first section and the above second section is less than or equal to the above idle resources,
A method of calculating a modified infrastructure by reducing the cloud infrastructure corresponding to the project with the above selection probability in the third section based on the above selection probability, when the sum of the cloud infrastructures assigned to the above desired project and the pending project with the above selection probability in the first section, the second section and the third section exceeds the idle resources.
Infrastructure automated design system.
상기 미리 정해진 수정방법은,
상기 제3 구간에 상기 선정확률을 가지는 사업이 존재하지 않을 때, 상기 제1 구간과 상기 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 경우,
상기 선정확률에 기초하여 상기 제2 구간에 상기 선정확률을 가지는 사업에 대응되는 클라우드 인프라를 축소하여 수정인프라를 산출하는 방법인,
인프라 자동 설계 시스템.
In Article 6,
The above predetermined modification method is,
When there is no business with the above selection probability in the above 3rd section, if the sum of the cloud infrastructure allocated to the desired business and the pending business with the above selection probability in the above 1st section and the above 2nd section exceeds the idle resources,
A method of calculating a modified infrastructure by reducing the cloud infrastructure corresponding to a business having the above selection probability in the above second section based on the above selection probability.
Automated infrastructure design system.
상기 미리 정해진 수정조건이 만족되는 경우, 상기 수정인프라가 표시되는 인터페이스를 산출하여 상기 대상기업에게 제공하는 배정모듈;을 더 포함하고,
상기 배정모듈은,
상기 계류사업에 배정된 클라우드 인프라에 변동이 있을 경우, 변동된 사항으로 정보를 변경하면서 변동된 사항을 상기 대상기업에게 알리는,
인프라 자동 설계 시스템.
In the first paragraph,
If the above predetermined modification conditions are satisfied, an allocation module is further included that generates an interface in which the above modification infrastructure is displayed and provides it to the target company;
The above allocation module is,
If there is a change in the cloud infrastructure assigned to the above-mentioned pending business, the information will be changed and the changed information will be notified to the above-mentioned target company.
Automated infrastructure design system.
수신모듈에 의해, 대상기업이 지원하기를 희망하는 사업인 희망사업에 대한 제안요청서인 대상요청서에 대한 정보인 대상과제정보가 수신되는 단계;
추출모듈에 의해, 상기 대상과제정보를 기초로 대상요청서에서 요구하는 사항인 대상요구정보가 추출되는 단계;
자원모듈에 의해, 상기 대상기업의 서버에서 활용할 수 있는 클라우드 인프라 자원인 유휴자원이 산출되는 단계;
구축모듈에 의해, 머신러닝이 활용된 인프라모델을 이용하여 상기 대상요구정보가 실현될 수 있는 클라우드 인프라인 대상인프라를 상기 유휴자원 내에서 산출하는 단계;
선정예측모듈에 의해, 상기 대상기업이 상기 희망사업에 선정될 가능성인 선정확률을 산출하는 단계; 및
결정모듈에 의해, 미리 정해진 수정조건이 만족되는 경우, 상기 선정확률을 기초로 미리 정해진 수정방법으로 상기 대상인프라를 수정하여 수정인프라를 산출하는 단계;를 포함하고,
상기 수정인프라를 산출하는 단계는,
제1 구간 내지 제3 구간에 상기 선정확률을 가지는 사업에 배정된 클라우드 인프라의 총합이 유휴자원 이하로 되는 상기 수정인프라를 산출하며,
상기 미리 정해진 수정조건은,
상기 희망사업에 대한 클라우드 인프라 추천 요청 시점을 기준으로, 상기 대상인프라와 상기 대상기업이 사업을 신청할 것으로 결정된 사업인 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과일 조건이며,
상기 미리 정해진 수정방법은,
제3 구간의 선정확률을 가지는 사업의 존재 여부에 따라서 산출하는 상기 수정인프라가 달라지며, 제1 확률 이하 상기 제1 확률보다 낮은 확률인 제2 확률 초과인 제1 구간과 상기 제2 확률 이하 상기 제2 확률보다 낮은 확률인 제3 확률 초과인 제2 구간에 상기 선정확률을 가지는 상기 희망사업과 계류사업에 배정된 클라우드 인프라의 총합이 상기 유휴자원 초과인 동시에, 상기 제3 확률 이하 상기 제3 확률보다 낮은 확률인 제4 확률 초과인 제3 구간에 상기 선정확률을 가지는 사업이 존재할 경우, 소정 기준의 이하의 수익률을 가지는 사업에 대해서 클라우드 인프라를 배정하지 않는 방법인,
인프라 자동 설계 방법.An infrastructure automatic design method for designing a cloud infrastructure that satisfies the requirements of a request for proposal published by an arbitrary demand agency, implemented by an infrastructure automatic design system.
A step in which target project information, which is information on a target request form, which is a request for proposal for a desired project that the target company wishes to support, is received by the receiving module;
A step in which target requirement information, which is a matter required in a target request form, is extracted based on the target task information by an extraction module;
A step in which idle resources, which are cloud infrastructure resources that can be utilized on the server of the target company, are produced by the resource module;
A step of generating a target infrastructure, which is a cloud infrastructure in which the target requirement information can be realized, within the idle resources by using an infrastructure model utilizing machine learning through a construction module;
A step of calculating the selection probability, which is the possibility that the target company will be selected for the desired project, by the selection prediction module; and
A step of producing a modified infrastructure by modifying the target infrastructure using a predetermined modification method based on the selection probability when a predetermined modification condition is satisfied by a decision module;
The steps for calculating the above modified infrastructure are:
The above modified infrastructure is calculated so that the sum of the cloud infrastructure assigned to the business with the above selection probability in the first to third sections is less than the idle resources.
The above pre-determined modification conditions are:
As of the time of requesting a cloud infrastructure recommendation for the above-mentioned desired project, the sum of the above-mentioned target infrastructure and the cloud infrastructure allocated to the pending project for which the above-mentioned target company has been determined to apply for the project is the condition of exceeding the above-mentioned idle resources.
The above predetermined modification method is,
The above modified infrastructure calculated is different depending on the existence of a business having a selection probability of the third section, and the sum of the cloud infrastructures allocated to the desired business and the pending business having the above selection probability in the first section exceeding the second probability which is lower than the first probability and lower than the first probability and in the second section exceeding the third probability which is lower than the second probability exceeds the idle resources, and in the third section exceeding the fourth probability which is lower than the third probability and lower than the third probability, a method of not allocating cloud infrastructure to a business having a rate of return below a predetermined standard, when a business having the above selection probability exists in the third section exceeding the fourth probability which is lower than the third probability and lower than the third probability.
A method for automated infrastructure design.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020230121220 | 2023-09-12 | ||
KR20230121220 | 2023-09-12 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102761105B1 true KR102761105B1 (en) | 2025-02-03 |
Family
ID=94612147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020240079550A Active KR102761105B1 (en) | 2023-09-12 | 2024-06-19 | A cloud infrastructure automatic design system and a cloud business management platform comprising the saem |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102761105B1 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130068197A (en) * | 2011-12-14 | 2013-06-26 | 한국전자통신연구원 | Appratus and method for providing cloud infrastructure sharing |
KR20230034159A (en) * | 2021-09-02 | 2023-03-09 | 주식회사 아미크 | Method and system for effectively building cloud system by using selected target data |
-
2024
- 2024-06-19 KR KR1020240079550A patent/KR102761105B1/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130068197A (en) * | 2011-12-14 | 2013-06-26 | 한국전자통신연구원 | Appratus and method for providing cloud infrastructure sharing |
KR20230034159A (en) * | 2021-09-02 | 2023-03-09 | 주식회사 아미크 | Method and system for effectively building cloud system by using selected target data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220004718A1 (en) | Ontology-Driven Conversational Interface for Data Analysis | |
US11748621B2 (en) | Methods and apparatus for feature generation using improved term frequency-inverse document frequency (TF-IDF) with deep learning for accurate cloud asset tagging | |
EP4134900A2 (en) | Method and apparatus for recommending content, method and apparatus for training ranking model, device, and storage medium | |
US20200151651A1 (en) | Intelligent opportunity recommendation | |
US9887930B1 (en) | Aggregating resource requests | |
US20220051049A1 (en) | Using meta-learning to optimize automatic selection of machine learning pipelines | |
US20140019293A1 (en) | Automated Technique For Generating Recommendations Of Potential Supplier Candidates | |
US11288322B2 (en) | Conversational agents over domain structured knowledge | |
US9390390B1 (en) | Allocating computing resources based on service-level requests | |
US11755954B2 (en) | Scheduled federated learning for enhanced search | |
CN113706211A (en) | Advertisement click rate prediction method and system based on neural network | |
CN111598360A (en) | Service policy determination method and device and electronic equipment | |
Moon et al. | FedOps: A platform of federated learning operations with heterogeneity management | |
US11520757B2 (en) | Explanative analysis for records with missing values | |
Nagarajan et al. | Multi agent deep reinforcement learning for resource allocation in container‐based clouds environments | |
CN117651950A (en) | Interpreted natural language artifact recombination with context awareness | |
JP2023002475A (en) | Computer system, computer program and computer-implemented method (causal knowledge identification and extraction) | |
US20220300821A1 (en) | Hybrid model and architecture search for automated machine learning systems | |
WO2022129631A1 (en) | Solving mixed integer programs using neural networks | |
US20190188274A1 (en) | Recommendation prediction based on preference elicitation | |
KR102761105B1 (en) | A cloud infrastructure automatic design system and a cloud business management platform comprising the saem | |
KR102757076B1 (en) | A business search system and a cloud business management platform comprising the same | |
CN118295804A (en) | Cloud resource allocation method, device, equipment, medium and program product | |
US10817496B2 (en) | Forum inspection based on correlation rating of response poster | |
US10803519B1 (en) | Systems and methods for locating funding opportunities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20240619 |
|
PA0201 | Request for examination |
Patent event code: PA02011R01I Patent event date: 20240619 Comment text: Patent Application |
|
PA0302 | Request for accelerated examination |
Patent event date: 20240619 Patent event code: PA03022R01D Comment text: Request for Accelerated Examination Patent event date: 20240619 Patent event code: PA03021R01I Comment text: Patent Application |
|
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20240807 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20250122 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20250123 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20250123 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration |