KR102669893B1 - Automatic calculation system for profit and loss by IT project using smart work log - Google Patents
Automatic calculation system for profit and loss by IT project using smart work log Download PDFInfo
- Publication number
- KR102669893B1 KR102669893B1 KR1020240023852A KR20240023852A KR102669893B1 KR 102669893 B1 KR102669893 B1 KR 102669893B1 KR 1020240023852 A KR1020240023852 A KR 1020240023852A KR 20240023852 A KR20240023852 A KR 20240023852A KR 102669893 B1 KR102669893 B1 KR 102669893B1
- Authority
- KR
- South Korea
- Prior art keywords
- project
- information
- profit
- amount
- expected
- Prior art date
Links
- 238000004364 calculation method Methods 0.000 title claims description 40
- 238000013480 data collection Methods 0.000 claims description 9
- 238000012946 outsourcing Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 10
- 238000011156 evaluation Methods 0.000 description 10
- 238000013473 artificial intelligence Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- NYPJDWWKZLNGGM-RPWUZVMVSA-N esfenvalerate Chemical compound C=1C([C@@H](C#N)OC(=O)[C@@H](C(C)C)C=2C=CC(Cl)=CC=2)=CC=CC=1OC1=CC=CC=C1 NYPJDWWKZLNGGM-RPWUZVMVSA-N 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06314—Calendaring for a resource
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1091—Recording time for administrative or management purposes
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
본 발명은 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템에 관한 것으로 프로젝트별 업무시간이 자동으로 체크되는 스마트 업무일지와 이를 통해 프로젝트별 투입금액이 자동으로 산정되도록 하는 시스템을 제공하기 위한 것이다.
본 발명은 프로젝트 참여자의 업무시간을 자동으로 체크하고 프로젝트의 손익 금액을 실시간으로 트래킹함으로써 문제가 발생하고있는 있는 프로젝트를 바로 트래킹할 수 있고, 이후 새로운 프로젝트 수주 시 적절한 견적과 리소스 투입을 전략적으로 시행할 수 있도록 함으로서 외주사의 순매출 증가 전략에 크게 기여할 수 있는 시스템을 제공하는 효과가 있다.The present invention relates to a system for automatically calculating the profit and loss amount for each IT project using a smart work log. The present invention is to provide a smart work log that automatically checks work hours for each project and a system that automatically calculates the input amount for each project through this. will be.
The present invention automatically checks the work hours of project participants and tracks the profit and loss amount of the project in real time, allowing immediate tracking of projects that are experiencing problems, and then strategically implementing appropriate estimates and resource input when receiving new project orders. By enabling this, it has the effect of providing a system that can greatly contribute to the outsourcing company's net sales increase strategy.
Description
본 발명은 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템에 관한 것으로 프로젝트별 업무시간이 자동으로 체크되는 스마트 업무일지와 이를 통해 프로젝트별 투입금액이 자동으로 산정되도록 하는 시스템을 제공하기 위한 것이다. The present invention relates to a system for automatically calculating the profit and loss amount for each IT project using a smart work log. The present invention is to provide a smart work log that automatically checks work hours for each project and a system that automatically calculates the input amount for each project through this. will be.
기존 IT 프로젝트는 일일이 테스크와 시간을 입력하는 방식으로 프로젝트를 관리한다. 도구로는 Jira, Asana, Notion 등 테스크 관리 솔루션을 통해 프로젝트를 관리하지만, 실제 투입된 시간을 측정해 금액으로 환산되는 기능을 제공하고 있지 않다. 즉 실제 투입시간을 기록하려면 일일이 입력해야해서, 관리를 위한 관리가 추가되어야 하며, 엑셀로 복잡하게 수식을 정의해 산출해내더라도, 일일이 입력하지 않고서는 자동으로 실제 업무기간을 측정해내기 어려움이 있다.Existing IT projects are managed by manually entering tasks and times. As a tool, projects are managed through task management solutions such as Jira, Asana, and Notion, but they do not provide a function to measure the actual time invested and convert it into money. In other words, to record the actual time invested, it must be entered one by one, so management must be added, and even if a complex formula is defined and calculated in Excel, it is difficult to automatically measure the actual work period without entering it one by one. .
특히 규모가 작은 회사이거나, 테스크조차 관리할 시간이 없는 회사에서는 업무 트래킹이 제대로 되고있지 않으며 또한 프로젝트를 진행하는 외주회사는 인건비가 곧 제작 비용인 경우가 많기 때문에 프로젝트 별로 어떤 실무자가 정확히 얼마만큼의 리소스로 투입되었는지 일일이 기록하지 않고서는 판단하기 어려운 문제가 있다. 실무자의 정확한 리소스 투입 정도를 파악할 수 없다면, 외주회사의 프로젝트 제작비용을 정확히 측정하는 것이 불가능하다. 제대로된 프로젝트 별 손익 계산이 되지않아, 이후 새로운 프로젝트에서의 견적도 정확히 산정할 수 없고, 매출 전략도 개선할 수 없는 악순환이 반복되고있는 실정이다.In particular, in small companies or companies that do not have time to even manage tasks, work tracking is not done properly, and in the case of outsourcing companies carrying out projects, labor costs are often the production cost, so it is difficult to know exactly how much a worker will spend on each project. There is a problem in determining whether resources have been invested without recording them one by one. If the exact level of resource commitment by practitioners cannot be determined, it is impossible to accurately measure the outsourcing company's project production costs. Due to the lack of proper profit and loss calculation for each project, estimates for new projects cannot be accurately calculated and sales strategies cannot be improved, a vicious cycle is being repeated.
본 발명의 목적은 프로젝트 참여자의 업무시간을 자동으로 체크하고 프로젝트의 손익 금액을 실시간으로 트래킹함으로써 문제가 발생하고있는 있는 프로젝트를 바로 트래킹할 수 있고, 이후 새로운 프로젝트 수주 시 적절한 견적과 리소스 투입을 전략적으로 시행할 수 있도록 하기 위한 것이다.The purpose of the present invention is to automatically check the work hours of project participants and track the profit and loss amount of the project in real time, so that projects that are experiencing problems can be immediately tracked, and when receiving a new project order, appropriate estimates and resource input can be strategically provided. This is to ensure that it can be implemented.
상기와 같은 문제를 해결하기 위해 본 발명은 회사 내 네트워크에 다수개의 프로젝트정보를 등록하기 위한 프로젝트입력부(110)와, 회사 내 네트워크에 접속한 접속자의 접속시간데이터를 수집하기 위한 활성데이터수집부(120)와, 상기 활성데이터수집부(120)를 통해 수집된 접속자의 접속시간데이터를 프로젝트입력부(110)를 통해 등록된 프로젝트정보와 대조하여 각 프로젝트별로 접속자의 접속시간데이터를 분류하기 위한 활성시간산출부(130)와, 프로젝트입력부(110)로 입력된 프로젝트정보를 토대로 각 프로젝트별 예상투입금액과 예상이익금액을 산출하기 위한 예상투입및이익금액산출부(140)와, 활성시간산출부(130)를 통해 각 프로젝트별 실무자의 접속시간을 제공받고, 예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받고, 프로젝트별투입금액상정부(170)를 통해 실제투입금액, 실제이익금액을 제공받고, 프로젝트별손익판단부(170)를 통해 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출한 정보를 스마트업무일지로 제공받기 위한 스마트업무일지제공부(150)와, 활성시간산출부(130)를 통해 각 프로젝트별 실무자의 접속시간을 제공받고, 프로젝트입력부(110)를 통해 프로젝트정보 중 실무자별연봉정보를 제공받고 제공된 실무자의 접속시간과 실무자별연봉정보를 토대로 각 프로젝트별 실제 발생된 인건비를 포함하는 실제프로젝트별투입금액을 산정하기 위한 프로젝트별투입금액산정부(160)와, 예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받고 프로젝트별투입금액산정부(160)를 통해 실제프로젝트별투입금액을 제공받아 예상투입금액, 예상이익금액, 실제프로젝트별투입금액을 토대로 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출하기 위한 프로젝트별손익판단부(170)를 포함하는 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템을 제공한다.In order to solve the above problems, the present invention includes a project input unit 110 for registering a plurality of project information in the company's network, and an active data collection unit ( 120) and an active time for classifying the access time data of the accessor for each project by comparing the access time data of the accessor collected through the active data collection unit 120 with the project information registered through the project input unit 110. An expected input and profit amount calculation unit 140 for calculating the expected investment amount and expected profit amount for each project based on the project information entered into the calculation unit 130 and the project input unit 110, and an active time calculation unit ( The access time of the working-level staff for each project is provided through 130), the expected investment amount and expected profit amount are provided through the expected investment and profit amount calculation department (140), and the actual investment amount is provided through the project-specific investment amount calculation department (170). A smart work log system to receive the input amount and actual profit amount, and to receive information on whether profit or loss is judged, whether profit or loss is judged compared to expected, and the amount of profit compared to expected is calculated through the profit and loss judgment department for each project (170) in a smart work log. The access time of the worker for each project is provided through the study unit 150 and the active time calculation unit 130, and the salary information for each worker among the project information is provided through the project input unit 110. The access time of the provided worker and the worker are provided. Based on the annual salary information, the estimated input amount is calculated through the project-specific input amount calculation unit 160 and the expected input and profit amount calculation unit 140 to calculate the actual investment amount for each project, including the actual labor costs incurred for each project. , the expected profit amount is provided, and the actual investment amount for each project is provided through the project-specific investment amount calculation unit 160. Whether to judge profit or loss based on the expected investment amount, expected profit amount, and actual investment amount for each project, and whether to judge profit or loss compared to the expectation. , Provides an automatic profit and loss amount calculation system for each IT project using a smart work log that includes a profit and loss judgment unit 170 for each project to calculate the profit amount compared to expected.
본 발명은 프로젝트 참여자의 업무시간을 자동으로 체크하고 프로젝트의 손익 금액을 실시간으로 트래킹함으로써 문제가 발생하고있는 있는 프로젝트를 바로 트래킹할 수 있고, 이후 새로운 프로젝트 수주 시 적절한 견적과 리소스 투입을 전략적으로 시행할 수 있도록 함으로서 외주사의 순매출 증가 전략에 크게 기여할 수 있는 시스템을 제공하는 효과가 있다.The present invention automatically checks the work hours of project participants and tracks the profit and loss amount of the project in real time, allowing immediate tracking of projects that are experiencing problems, and then strategically implementing appropriate estimates and resource input when receiving new project orders. By enabling this, it has the effect of providing a system that can greatly contribute to the outsourcing company's net sales increase strategy.
도 1은 본 발명의 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템의 전체 구성을 나타낸 도면이다.
도 2는 본 발명의 프로젝트별 리소스정보를 입력하기 위한 화면을 나타낸 예시도면이다.
도 3은 본 발명의 프로젝트정보에 대한 예시도면이다.
도 4는 본 발명의 스마트업무일지를 통해 업무시간이 자동으로 체크되는 것을 나타낸 예시도면이다.
도 5는 본 발명의 프로젝트별 손익판단에 대한 예시도면이다.
도 6은 본 발명의 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템의 시행과정을 나타낸 예시도면이다.Figure 1 is a diagram showing the overall configuration of an automatic calculation system for profit and loss amounts for each IT project using the smart work log of the present invention.
Figure 2 is an example diagram showing a screen for inputting resource information for each project of the present invention.
Figure 3 is an example diagram of project information of the present invention.
Figure 4 is an example diagram showing that work hours are automatically checked through the smart work log of the present invention.
Figure 5 is an example diagram of profit and loss judgment for each project of the present invention.
Figure 6 is an example diagram showing the implementation process of the automatic calculation system for profit and loss amount for each IT project using the smart work log of the present invention.
본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Terms or words used in this specification and claims should not be construed as limited to their usual or dictionary meanings, and the inventor may appropriately define the concept of terms to explain his or her invention in the best way. It must be interpreted as meaning and concept consistent with the technical idea of the present invention based on principles.
이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the attached drawings.
본 발명은 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템에 관한 것으로 프로젝트별 업무시간이 자동으로 체크되는 스마트 업무일지와 이를 통해 프로젝트별 투입금액이 자동으로 산정되도록 하는 시스템을 제공하기 위한 것이다.The present invention relates to a system for automatically calculating the profit and loss amount for each IT project using a smart work log. The present invention is to provide a smart work log that automatically checks work hours for each project and a system that automatically calculates the input amount for each project through this. will be.
도 1은 본 발명의 전체 구성을 나타낸 도면으로 본 발명의 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템은 프로젝트입력부(110), 활성데이터수집부(120), 활성시간산출부(130), 예상투입및이익금액산출부(140), 스마트업무일지연동부(150), 프로젝트별투입금액산정부(160), 프로젝트별손익판단부(170)를 포함하여 구성된다.Figure 1 is a diagram showing the overall configuration of the present invention. The system for automatically calculating the profit and loss amount for each IT project using the smart work log of the present invention includes a project input unit 110, an active data collection unit 120, and an active time calculation unit 130. ), the expected input and profit amount calculation department (140), the smart work schedule department (150), the investment amount calculation department by project (160), and the profit and loss judgment department by project (170).
각 구성요소를 구체적으로 설명하면 다음과 같다.Each component is described in detail as follows.
프로젝트입력부(110)는 회사 내 네트워크에 다수개의 프로젝트정보를 등록하기 위한 것이다.The project input unit 110 is used to register multiple project information in the company's network.
상기 프로젝트정보는 프로젝트 계약금액, 프로젝트 참여 실무자이름, 실무자별 프로젝트 투입 일정, 실무자별 투입율, 실무자별 연봉정보, 각 프로젝트별로 실무자 각각에 대한 리소스정보를 포함한다.The project information includes the project contract amount, the name of the practitioners participating in the project, the project input schedule for each practitioner, the input rate for each practitioner, salary information for each practitioner, and resource information for each practitioner for each project.
리소스 정보는 수행 주체가 과거 수행한 프로젝트에 대한 결과물, 프로젝트로부터 획득된 저작물과 관련된 정보일 수 있다. 이 경우, 리소스 정보는 수행 주체의 전문성을 평가할 수 있는 모든 종류의 정보를 포함할 수 있으며, 수행 주체의 전문성을 평가할 수 있는 정보라 함은, 수행 주체의 특정 분야의 전문성과 소정 의 기준값 이상의 연관성을 갖는 정보를 의미할 수 있다.Resource information may be information related to the results of projects carried out in the past by the executing entity or works acquired from the project. In this case, the resource information may include all types of information that can evaluate the expertise of the performing entity, and information that can evaluate the expertise of the performing entity refers to a correlation between the performing entity's expertise in a specific field and a predetermined standard value or more. It can mean information having .
도 2는 본 발명의 프로젝트별 리소스정보를 입력하기 위한 화면을 나타낸 예시도면이며, 도 3은 본 발명의 프로젝트정보가 입력된 스마트업무일지의 화면에 대한 예시도면이다.Figure 2 is an example diagram showing a screen for inputting resource information for each project of the present invention, and Figure 3 is an example diagram of a screen of a smart work log into which project information of the present invention is input.
또한 프로젝트입력부(110)는 프로젝트인력추천부(111)를 더 포함할 수 있으며, 상기 프로젝트인력추천부(111)는 진행된 프로젝트별 실무자에 대한 리소스정보를 학습하고 학습된 리소스정보를 토대로 새롭게 등록되는 프로젝트정보에 대응되는 실무자를 선별하여 추천하기 위한 것으로, 상기 프로젝트정보로 등록되는 정보 중 실무자지정연봉, 요구직무정보와, 직무일치도에 대한 값과 실무자의 리소스정보를 토대로 [수학식1]을 통해 실무자선별지수를 산출하여 산출된 실무자선별지수를 토대로 실무자를 추천하기 위한 것이다.In addition, the project input unit 110 may further include a project personnel recommendation unit 111, wherein the project personnel recommendation unit 111 learns resource information about practitioners for each project and newly registered information based on the learned resource information. This is to select and recommend practitioners who correspond to the project information. Among the information registered as the project information, the practitioner-designated annual salary, required job information, values for job congruence, and worker's resource information are used through [Equation 1]. It is intended to recommend practitioners based on the practitioner selection index calculated by calculating the practitioner selection index.
상기 실무자의 리소스정보는 수행 주체가 과거 수행한 프로젝트에 대한 결과물, 프로젝트로부터 획득된 저작물과 관련된 정보, 실무자의 연봉정보, 실무자의 경력정보 등을 포함하는 정보이다.The worker's resource information is information that includes the results of projects carried out in the past by the performing entity, information related to works acquired from the project, the worker's salary information, and the worker's career information.
(여기서, K는 실무자선별지수이고, J1은 프로젝트정보에 등록된 실무자지정연봉, J2는 실무자의 리소스정보에 포함된 연봉, P1는 (J1-J2)에 대한 가중치, Rn은 n번째 리소스정보에 대한 변수에 대응하는 값이며, P2는 리소스정보의 변수에 대응하는 가중치이고, W는 프로젝트에 대응되는 실무자의 직무일치값이며, P3은 프로젝트의 직무에 대한 가중치를 의미한다.)(Here, K is the practitioner selection index, J1 is the practitioner-designated annual salary registered in the project information, J2 is the annual salary included in the practitioner's resource information, P1 is the weight for (J1-J2), and Rn is the nth resource information. P2 is the weight corresponding to the variable of resource information, W is the job matching value of the worker corresponding to the project, and P3 means the weight of the job of the project.)
리소스정보의 변수값의 경우 리소스정보로 제공되는 값 중 해당 프로젝트에서 요구되는 경력사항 등 자격이 포함되는 경우 +5의 값이 되고, 포함되지 않는 경우 +1의 값이 되도록 설정할 수 있으며, 이에 대한 값은 관리자에 의해 임의로 조정될 수 있다.In the case of the variable value of resource information, if qualifications such as experience required for the project are included among the values provided as resource information, it will be a value of +5, and if not, it can be set to a value of +1. The value can be arbitrarily adjusted by the administrator.
(J1-J2)에 대한 가중치인 P1의 경우 실무자의 리소스정보에 포함된 연봉(J2)이 프로젝트정보에 등록된 실무자지정연봉(J1)보다 낮은 경우 더 높은 값을 가지도록 설정될 수 있으며, 가중치를 부여하는 기준은 관리자에 의해 임의로 설정될 수 있으며 0-1 사이 값이 바람직하다. In the case of P1, which is the weight for (J1-J2), if the annual salary (J2) included in the worker's resource information is lower than the worker's designated annual salary (J1) registered in the project information, the weight can be set to have a higher value. The criteria for assigning can be arbitrarily set by the administrator, and a value between 0-1 is preferable.
또한 상기 연봉에 대한 값은 계산의 편의를 위해 만원 단위 이하의 값을 생략할 수 있으며 예를 들어 연봉이 5000만원인 경우, 5000으로만 표시되도록 하는 것이 바람직하다.In addition, for the convenience of calculation, values less than 10,000 Won can be omitted from the value for the annual salary. For example, if the annual salary is 50 million Won, it is desirable to display only 5,000.
프로젝트에 대응되는 실무자의 직무일치값은 프로젝트정보와 실무자의 리소스정보를 대응하여 유사정도를 판단하여 1-10 사이 값을 가지도록 하되, 유사도가 높을수록 더 큰 값을 가지며, 관리자에 의해 임의로 설정될 수 있는 값이다.The job match value of the worker corresponding to the project is determined by the degree of similarity between the project information and the worker's resource information, and has a value between 1 and 10. The higher the similarity, the larger the value is, and is arbitrarily set by the manager. This is a possible value.
프로젝트직무에 대한 가중치는 프로젝트정보를 등록 시 함께 입력되는 값으로 프로젝트 직무에 대한 중요도가 높을수록 더 큰 값을 가지며 이는 관리자에 의해 조정될 수 있는 값으로 1-10 사이 값이 바람직하다.The weight for the project job is a value entered together when registering project information. The higher the importance of the project job, the larger the value. This is a value that can be adjusted by the manager, and a value between 1 and 10 is desirable.
예를 들면 프로젝트정보에 등록된 실무자지정연봉이 5000이고, 실무자의 리소스정보에 포함된 연봉이 4500이고, (J1-J2)에 대한 가중치 P1가 0.2, 첫번째 리소스정보에 대한 변수에 대응하는 값은 5이며 해당되는 가중치는 3, 두번째 리소스정보에 대한 변수에 대응하는 값은 7이고 해당되는 가중치는 4이다. 프로젝트에 대응되는 실무자의 직무일치값은 8이고,프로젝트의 직무에 대한 가중치는 2인 경우For example, the designated annual salary of a worker registered in the project information is 5000, the annual salary included in the worker's resource information is 4500, the weight P1 for (J1-J2) is 0.2, and the value corresponding to the variable for the first resource information is It is 5 and the corresponding weight is 3. The value corresponding to the variable for the second resource information is 7 and the corresponding weight is 4. When the job matching value of the worker corresponding to the project is 8 and the weight for the project job is 2
상기 계산된 실무자선별지수에 대한 값은 기존에 진행되었던 프로젝트에 참여한 실무자에 대한 실무자선별지수와 비교하여 계산된 실무자선별지수가 사전에 설정된 오차범위 내인지 여부를 판단하고 오차범위 내라면 적합한 실무자로 판단할 수 있도록 한다.The value of the calculated practitioner selection index is compared with the practitioner selection index for practitioners who participated in existing projects to determine whether the calculated practitioner selection index is within the preset error range, and if it is within the error range, a suitable practitioner is selected. Allows you to judge.
활성데이터수집부(120)는 제공되는 회사 내 네트워크에 접속한 접속자의 접속시간데이터를 수집하기 위한 것이다. The active data collection unit 120 is used to collect access time data of users connected to the provided company network.
상기 접속자는 접속자단말기를 통하여 회사 내 네트워크에 접속하는 것으로 접속자단말기는 PC,모바일단말기, 태블릿 등이 될 수 있다. The accessor connects to the network within the company through the accessor terminal, and the accessor terminal can be a PC, mobile terminal, tablet, etc.
또한 회사 내 네트워크는 회사에서 제공하는 네트워크로서 접속가능한 서버, 프로그램 등으로 제공될 수 있다. Additionally, the company's network is a network provided by the company and can be provided by accessible servers, programs, etc.
활성시간산출부(130)는 상기 활성데이터수집부(120)를 통해 수집된 접속자의 접속시간데이터를 프로젝트입력부(110)를 통해 등록된 프로젝트정보와 대조하여 각 프로젝트별로 접속자의 접속시간데이터를 분류하고 스마트업무일지제공부(150)로 전송하기 위한 것이다.The active time calculation unit 130 compares the user's access time data collected through the active data collection unit 120 with the project information registered through the project input unit 110 and classifies the user's access time data for each project. This is to transmit it to the smart work log provision unit (150).
도 4는 본 발명의 스마트업무일지제공부(150)를 통해 제공되는 스마트업무일지로서 스마트업무일지에 각 프로젝트별 실무자의 접속시간이 제공된 모습을 나타낸 예시도면이다.Figure 4 is a smart work log provided through the smart work log providing unit 150 of the present invention, and is an example diagram showing the access time of the worker for each project provided in the smart work log.
예상투입및이익금액산출부(140)는 프로젝트입력부(110)로 입력된 프로젝트정보를 토대로 각 프로젝트별 예상투입금액과 예상이익금액을 산출하기 위한 것이다.The expected input and profit amount calculation unit 140 is used to calculate the expected investment amount and expected profit amount for each project based on the project information entered into the project input unit 110.
즉 프로젝트정보의 프로젝트 계약금액, 프로젝트 참여 실무자이름, 실무자별 프로젝트 투입 일정, 실무자별 투입율, 실무자별 연봉정보, 각 프로젝트별로 실무자 각각에 대한 리소스정보를 토대로 각 프로젝트별 예상투입금액과 예상이익금액을 산출할 수 있다.That is, the expected investment amount and expected profit amount for each project based on the project contract amount in the project information, the name of the project participant, project input schedule for each worker, input rate for each worker, salary information for each worker, and resource information for each worker for each project. can be calculated.
상기 예상투입및이익금액산출부(140)는 인공지능 기발 모델을 이용하여 각 프로젝트별 예상투입금액과 예상이익금액을 산출할 수도 있다.The expected input and profit amount calculation unit 140 may calculate the expected investment amount and expected profit amount for each project using an artificial intelligence original model.
즉 프로젝트를 완료할때 마다 각 프로젝트정보, 각 프로젝트별 실무자의 접속시간, 예상투입금액, 예상이익금, 실제투입금액, 실제이익금액, 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액 등 프로젝트에 관련된 정보를 인공지능 기반 모델로 학습하고 학습된 모델을 통해 예상투입금액과 예상이익금액을 산출하는 것이다.In other words, whenever a project is completed, each project information, access time of each project worker, expected investment amount, expected profit, actual investment amount, actual profit amount, whether profit or loss is judged, whether profit or loss is judged compared to expected, profit amount compared to expected, etc. Information related to this is learned using an artificial intelligence-based model, and the expected investment amount and expected profit amount are calculated through the learned model.
스마트업무일지제공부(150)는 활성시간산출부(130)를 통해 각 프로젝트별 실무자의 접속시간을 제공받고, 예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받고, 프로젝트별투입금액상정부(170)를 통해 실제투입금액, 실제이익금액을 제공받고, 프로젝트별손익판단부(170)를 통해 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출한 정보를 스마트업무일지로 제공받기 위한 것이다. The smart work log providing unit 150 receives the access time of workers for each project through the active time calculation unit 130, and provides the expected investment amount and expected profit amount through the expected investment and profit amount calculation unit 140. The actual investment amount and actual profit amount are provided through the project-specific investment amount estimation department (170), and the profit and loss judgment by project (170) calculates whether profit or loss is judged, whether profit or loss is judged compared to expected, and the profit amount compared to expected. This is to receive information as a smart work log.
상기 스마트업무일지제공부(150)는 프로젝트에 참여한 실무자에 대한 정보를 수집하여 데이터베이스화하고 프로젝트에 참여한 빈도수를 토대로 [수학식 2]를 통하여 직원성실도평가지수를 제공할 수 있으며, 제공된 직원성실도평가지수는 직원별로 상대평가하여 성실도평가지수가 높은 직원에게 포상을 주거나 혜택을 주는 등의 자료로 활용할 수 있도록 한다.The smart work log providing unit 150 can collect information on practitioners who participated in the project, create a database, and provide an employee sincerity evaluation index through [Equation 2] based on the frequency of participation in the project. The provided employee sincerity The provincial evaluation index is evaluated relative to each employee and can be used as data to reward or provide benefits to employees with a high integrity evaluation index.
(여기서 V는 직원성실도평가지수이고, G는 참여프로젝트 중 메인으로 참여한(프로젝트 기여도가 높은) 프로젝트의 갯수, L는 참여프로젝트 중 보조로 참여한 프로젝트 갯수, H는 참여프로젝트 중 기여도가 설정된 값 이하인 프로젝트의 갯수를 의미함) (Here, V is the employee sincerity evaluation index, G is the number of projects that participated as the main project (high contribution to the project) among participating projects, L is the number of projects that participated as an auxiliary project among participating projects, and H is the number of projects that participated as an auxiliary project among participating projects whose contribution is less than the set value. refers to the number of projects)
여기서 기여도가 설정된 값 이하인 프로젝트 갯수가 2개 이하인 경우 H-1은 1로 대입한다.Here, if the number of projects whose contribution is less than the set value is 2 or less, H-1 is substituted as 1.
즉 직원성실도평가지수는 설정된 기간 내에서 각 직원별로 참여한 프로젝트의 기여도에 따라 메인참여 프로젝트, 보조참여 프로젝트, 참여는 했으나 기여도가 설정된 값 이하(기여도가 낮음으로 판단)인 프로젝트로 프로젝트를 분류하고, 분류한 프로젝트를 통해 직원성실도평가지수를 산출할 수 있으며, 산출된 값이 클수록 성실하게 업무를 수행했다고 판단할 수 있다. 관리자에 의해 직원이 참여한 프로젝트별로 메인 참여 프로젝트인지 보조 참여 프로젝트인지 기여도가 낮은 프로젝트인지를 입력받을 수도 있으며, 사전에 설정된 기준에 따라 스마트업무일지에 제공된 정보를 토대로 자동으로 분류될 수도 있다. In other words, the employee integrity evaluation index classifies projects into main participating projects, auxiliary participating projects, and projects in which each employee participated but whose contribution is below the set value (deemed to be low contribution) according to the contribution level of the project in which each employee participated within the set period. , the employee sincerity evaluation index can be calculated through the classified projects, and the larger the calculated value, the more faithfully the work can be judged to have been performed. The manager can input whether each project an employee participates in is a main project, an auxiliary project, or a low-contribution project, and can be automatically classified based on information provided in the smart work log according to preset standards.
기본적으로 프로젝트의 전반적인 참여빈도가 많을 수록 높은 직원성실도 평가지수가 산출될 수 있다. 또한 수학식 1의 하이퍼볼릭탄젠트는 변수가 0-1 사이 값을 가지며 변수가 커질수록 1에 가까운 값을 가지도록 함으로서 변수의 값이 증가하더라도 일정 값 이상을 넘어가면 증가폭이 작아지도록 함으로서 무의미하게 결과값이 증가되는 것을 방지할 수 있다.Basically, the higher the overall participation frequency in a project, the higher the employee integrity evaluation index can be calculated. In addition, the hyperbolic tangent of Equation 1 means that the variable has a value between 0 and 1, and as the variable increases, it has a value closer to 1. Even if the value of the variable increases, the amount of increase becomes smaller when it exceeds a certain value, resulting in a meaningless result. You can prevent the value from increasing.
예를 들면 Q 직원의 참여프로젝트 중 메인으로 참여한 프로젝트가 5개, 보조로 참여한 프로젝트가 4개, 기여도가 낮은(설정된 값 이하인) 프로젝트가 2개인 경우For example, among the projects in which employee Q participated, there were 5 projects in which he participated as the main project, 4 projects in which he participated as an auxiliary project, and 2 projects with low contribution (lower than the set value).
으로 약 24로 산출된다. It is calculated to be approximately 24.
업무에 참여한 전체 직원의 직원성실도평가지수를 산출하고 산출된 값을 토대로 직원성실도평가지수가 높은 직원 순으로 보상을 제공하는 등 인사평가에 반영하여 혜택을 줄 수 있는 지표로 활용할 수 있다. It can be used as an indicator that can be reflected in personnel evaluations to provide benefits, such as calculating the employee integrity evaluation index of all employees who participated in work and providing rewards in order of employees with the highest employee integrity evaluation index based on the calculated value.
프로젝트별투입금액산정부(160)는 활성시간산출부(130)를 통해 각 프로젝트별 실무자의 접속시간을 제공받고, 프로젝트입력부(110)를 통해 프로젝트정보 중 실무자별연봉정보를 제공받고 제공된 실무자의 접속시간과 실무자별연봉정보를 토대로 각 프로젝트별 실제 발생된 인건비를 포함하는 실제프로젝트별투입금액을 산정하기 위한 것이다.The project-specific input amount calculation unit 160 receives the access time of the worker for each project through the active time calculation unit 130, and receives salary information for each worker among the project information through the project input unit 110. This is to calculate the actual investment amount for each project, including the actual labor costs incurred for each project, based on access time and salary information for each worker.
프로젝트별손익판단부(170)은 예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받고 프로젝트별투입금액산정부(160)를 통해 실제프로젝트별투입금액을 제공받아 예상투입금액, 예상이익금액, 실제프로젝트별투입금액을 토대로 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출하기 위한 것이다. The profit and loss judgment unit 170 for each project receives the expected input amount and expected profit amount through the expected input and profit amount calculation unit 140, and receives the actual input amount for each project through the project input amount calculation unit 160. This is to calculate the profit or loss judgment, whether to judge profit or loss compared to expected value, and the amount of profit compared to expected value based on the expected investment amount, expected profit amount, and actual investment amount for each project.
도 6을 참고하면 본 발명의 시스템을 실행하기 위한 플로우는 다음과 같다.Referring to Figure 6, the flow for executing the system of the present invention is as follows.
먼저 A프로젝트 참여자가 회사 내 네트워크에 접속하여 A프로젝트와 관련된 프로그램을 실행하면(S1), 활성(또는 활성창)데이터가 활성데이터수집부(120)로 수집된다(S2). 수집된 활성데이터는 회사 네트워크 내에서 제공되는 서버에 저장되고(S3), 수집된 활성데이터는 활성시간산출부(130)를 통해 프로젝트별로 활성시간이 분류되며, A프로젝트 참여자이기 때문에 A 프로젝트로 참여자의 활성시간의 로그가 분류되며, 분류방법은 사전에 학습된 인공지능 모델에 의해 분류될 수도 있다(S4,S5). 분류된 정보는스마트업무일지에 연동되도록 스마트업무일지제공부(150)로 전달된다(S7). 또한 회사 내 네트워크 관리자에 의해 리소스정보를 포함하는 프로젝트정보가 입력되고(S6) 입력된 정보는 스마트업무일지제공부(150)로 전달되어 스마트업무일지에 연동된다(S7). 스마트업무일지에 연동된 정보는 객체검증이 끝난 후 예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받는다(S8).First, when a project A participant connects to the company's network and executes a program related to project A (S1), active (or active window) data is collected by the active data collection unit 120 (S2). The collected active data is stored on a server provided within the company network (S3), and the collected active data is classified into active time by project through the active time calculation unit 130, and since the participant is a participant in Project A, he or she participates as Project A. The log of the active time is classified, and the classification method may be classified by a pre-trained artificial intelligence model (S4, S5). The classified information is delivered to the smart work log provision unit 150 to be linked to the smart work log (S7). In addition, project information including resource information is input by the network manager within the company (S6), and the input information is transmitted to the smart work log providing unit 150 and linked to the smart work log (S7). The information linked to the smart work journal receives the expected investment amount and expected profit amount through the expected investment and profit amount calculation unit (140) after object verification is completed (S8).
이후 프로젝트별투입금액상정부(170)를 통해 실제투입금액, 실제이익금액을 제공받고, 프로젝트별손익판단부(170)를 통해 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출한 정보를 제공받음으로서 프로젝트별 손익을 판단할 수 있다(S9).Afterwards, the actual input amount and actual profit amount are provided through the project-specific input amount estimation department (170), and the profit and loss judgment by project (170) is used to calculate profit or loss, whether profit or loss is judged compared to expected, and the profit amount compared to expected. By receiving information, the profit and loss for each project can be judged (S9).
이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.The embodiments described in the present specification and the configurations shown in the drawings are only one of the most preferred embodiments of the present invention and do not represent the entire technical idea of the present invention, so various equivalents and modifications can be substituted for them. It should be understood that there may be examples.
110 프로젝트입력부
120 활성데이터수집부
130 활성시간산출부
140 예상투입및이익금액산출부
150 스마트업무일지제공부
160 프로젝트별투입금액산정부
170 프로젝트별손익판단부110 Project input unit
120 Active data collection department
130 Active time calculator
140 Expected input and profit amount calculation book
150 Smart work log provision department
160 Calculation of investment amount by project
170 Project-specific profit and loss judgment department
Claims (3)
회사 내 네트워크에 접속한 접속자의 접속시간데이터를 수집하기 위한 활성데이터수집부(120)와,
상기 활성데이터수집부(120)를 통해 수집된 접속자의 접속시간데이터를 프로젝트입력부(110)를 통해 등록된 프로젝트정보와 대조하여 각 프로젝트별로 접속자의 접속시간데이터를 분류하기 위한 활성시간산출부(130)와,
프로젝트입력부(110)로 입력된 프로젝트정보를 토대로 각 프로젝트별 예상투입금액과 예상이익금액을 산출하기 위한 예상투입및이익금액산출부(140)와,
활성시간산출부(130)를 통해 각 프로젝트별 실무자의 접속시간을 제공받고, 예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받고, 프로젝트별투입금액상정부(170)를 통해 실제투입금액, 실제이익금액을 제공받고, 프로젝트별손익판단부(170)를 통해 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출한 정보를 스마트업무일지로 제공받기 위한 스마트업무일지제공부(150)와,
활성시간산출부(130)를 통해 각 프로젝트별 실무자의 접속시간을 제공받고, 프로젝트입력부(110)를 통해 프로젝트정보 중 실무자별연봉정보를 제공받고 제공된 실무자의 접속시간과 실무자별연봉정보를 토대로 각 프로젝트별 실제 발생된 인건비를 포함하는 실제프로젝트별투입금액을 산정하기 위한 프로젝트별투입금액산정부(160)와,
예상투입및이익금액산출부(140)를 통해 예상투입금액, 예상이익금액을 제공받고 프로젝트별투입금액산정부(160)를 통해 실제프로젝트별투입금액을 제공받아 예상투입금액, 예상이익금액, 실제프로젝트별투입금액을 토대로 손익판단여부, 예상 대비 손익판단여부, 예상대비 이익금액을 산출하기 위한 프로젝트별손익판단부(170)를 포함하고,
상기 프로젝트입력부(110)의 프로젝트정보는 프로젝트 계약금액, 프로젝트 참여 실무자이름, 실무자별 프로젝트 투입 일정, 실무자별 투입율, 실무자별 연봉정보, 각 프로젝트별로 실무자 각각에 대한 리소스정보를 포함하고,
상기 프로젝트입력부(110)는
진행된 프로젝트별 실무자에 대한 리소스정보를 학습하고 학습된 리소스정보를 토대로 새롭게 등록되는 프로젝트정보에 대응되는 실무자를 선별하여 추천하기 위한 위한 프로젝트인력추천부(111)를 더 포함하고,
상기 프로젝트인력추천부(111)는
프로젝트정보로 등록되는 정보 중 실무자지정연봉, 요구직무정보와, 직무일치도에 대한 값과 실무자의 리소스정보를 토대로 [수학식1]을 통해 실무자선별지수를 산출하여 산출된 실무자선별지수를 토대로 실무자를 추천하되,
상기 실무자의 리소스정보는 수행 주체가 과거 수행한 프로젝트에 대한 결과물, 프로젝트로부터 획득된 저작물과 관련된 정보, 실무자의 연봉정보, 실무자의 경력정보을 포함하는 정보이며,
[수학식 1]은
(여기서, K는 실무자선별지수이고, J1은 프로젝트정보에 등록된 실무자지정연봉, J2는 실무자의 리소스정보에 포함된 연봉, P1는 (J1-J2)에 대한 가중치, Rn은 n번째 리소스정보에 대한 변수에 대응하는 값이며, P2는 리소스정보의 변수에 대응하는 가중치이고, W는 프로젝트에 대응되는 실무자의 직무일치값이며, P3은 프로젝트의 직무에 대한 가중치를 의미한다.)인 것을 특징으로 하는 스마트 업무일지를 활용한 IT프로젝트별 손익 금액 자동 계산 시스템.A project input unit 110 for registering multiple project information in the company's network,
An active data collection unit 120 for collecting access time data of users connected to the company's network,
An active time calculation unit (130) for classifying the access time data of the user for each project by comparing the access time data of the user collected through the active data collection unit 120 with the project information registered through the project input unit 110. )and,
An expected input and profit amount calculation unit 140 for calculating the expected investment amount and expected profit amount for each project based on the project information entered into the project input unit 110;
The access time of the worker for each project is provided through the active time calculation unit 130, the expected investment amount and expected profit amount are provided through the expected input and profit amount calculation unit 140, and the investment amount amount for each project is provided ( Receive the actual investment amount and actual profit amount through 170), and receive information on whether profit or loss is judged, whether profit or loss is judged compared to expected, and the amount of profit compared to expected is calculated through the profit and loss judgment department for each project (170) in a smart work log. A smart work log provision unit (150) for
The access time of the worker for each project is provided through the active time calculation unit 130, and the salary information for each worker is provided among the project information through the project input unit 110. Based on the provided access time and salary information for each worker, each A project-specific input amount calculation unit 160 for calculating the actual project-specific input amount including labor costs actually incurred for each project,
The expected investment amount and expected profit amount are provided through the expected input and profit amount calculation unit 140, and the actual investment amount for each project is provided through the project-specific investment amount calculation unit 160, and the expected investment amount, expected profit amount, and actual amount are provided. It includes a profit and loss judgment unit 170 for each project to determine whether to determine profit or loss based on the investment amount for each project, whether to judge profit or loss compared to expectations, and calculate the amount of profit compared to expected,
The project information of the project input unit 110 includes the project contract amount, the name of the project participant, the project input schedule for each worker, the input rate for each worker, salary information for each worker, and resource information for each worker for each project,
The project input unit 110 is
It further includes a project human resource recommendation unit 111 for learning resource information about practitioners for each carried out project and selecting and recommending practitioners corresponding to newly registered project information based on the learned resource information,
The project personnel recommendation department (111) is
Among the information registered as project information, the practitioner selection index is calculated by calculating the practitioner selection index through [Equation 1] based on the practitioner-designated annual salary, required job information, job congruence value, and practitioner resource information, and the practitioner selection index is selected. Recommended,
The worker's resource information is information that includes the results of projects carried out in the past by the performing entity, information related to works acquired from the project, the worker's salary information, and the worker's career information,
[Equation 1] is
(Here, K is the practitioner selection index, J1 is the practitioner-designated annual salary registered in the project information, J2 is the annual salary included in the practitioner's resource information, P1 is the weight for (J1-J2), and Rn is the nth resource information. is a value corresponding to a variable, P2 is a weight corresponding to a variable of resource information, W is a job match value of a practitioner corresponding to the project, and P3 is a weight for the job of the project.) An automatic calculation system for profit and loss amounts for each IT project using a smart work log.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020240023852A KR102669893B1 (en) | 2024-02-19 | 2024-02-19 | Automatic calculation system for profit and loss by IT project using smart work log |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020240023852A KR102669893B1 (en) | 2024-02-19 | 2024-02-19 | Automatic calculation system for profit and loss by IT project using smart work log |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102669893B1 true KR102669893B1 (en) | 2024-05-28 |
Family
ID=91277104
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020240023852A KR102669893B1 (en) | 2024-02-19 | 2024-02-19 | Automatic calculation system for profit and loss by IT project using smart work log |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102669893B1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101847946B1 (en) | 2016-10-18 | 2018-04-11 | ㈜하이테크엔지니어링 | Human resources management system and method specific project |
KR20210103845A (en) * | 2020-02-14 | 2021-08-24 | 이도훈 | Team project data storage and analysis system |
KR102312308B1 (en) * | 2020-04-06 | 2021-10-14 | (주)앱닥터 | Project mediation system, server and method thereof |
KR102376755B1 (en) | 2014-03-25 | 2022-03-21 | 이노타스 | A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints |
KR20220067885A (en) * | 2020-11-18 | 2022-05-25 | 주식회사 신시웨이 | Service providing system for calculating performance indicators according to business performance |
-
2024
- 2024-02-19 KR KR1020240023852A patent/KR102669893B1/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102376755B1 (en) | 2014-03-25 | 2022-03-21 | 이노타스 | A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints |
KR101847946B1 (en) | 2016-10-18 | 2018-04-11 | ㈜하이테크엔지니어링 | Human resources management system and method specific project |
KR20210103845A (en) * | 2020-02-14 | 2021-08-24 | 이도훈 | Team project data storage and analysis system |
KR102312308B1 (en) * | 2020-04-06 | 2021-10-14 | (주)앱닥터 | Project mediation system, server and method thereof |
KR20220067885A (en) * | 2020-11-18 | 2022-05-25 | 주식회사 신시웨이 | Service providing system for calculating performance indicators according to business performance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Abran | Software project estimation: the fundamentals for providing high quality information to decision makers | |
Mortaji et al. | Fuzzy time-driven activity-based costing | |
US20060100957A1 (en) | Electronic data processing system and method of using an electronic data processing system for automatically determining a risk indicator value | |
CN109360084A (en) | Appraisal procedure and device, storage medium, the computer equipment of reference default risk | |
Hujainah et al. | StakeQP: A semi-automated stakeholder quantification and prioritisation technique for requirement selection in software system projects | |
Hornuf et al. | Hourly wages in crowdworking: A meta-analysis | |
Cheng et al. | A CMMI appraisal support system based on a fuzzy quantitative benchmarks model | |
Rocci et al. | Total process error: An approach for assessing and monitoring the quality of multisource processes | |
Thaheem et al. | A survey on usage and diffusion of project risk management techniques and software tools in the construction industry | |
Machuca-Villegas et al. | Measures related to social and human factors that influence productivity in software development teams | |
Alamsyah et al. | Mapping Organization Knowledge Network and Social Media Based Reputation Management | |
Pernici et al. | Improving the analysis of the judiciary performance-the use of data mining techniques to assess the timeliness of civil trials | |
Janicijevic et al. | Software quality improvement: a model based on managing factors impacting software quality | |
CN117035550A (en) | Personnel evaluation system control method and related equipment | |
Ludewig et al. | Measuring organizational capital | |
KR102669893B1 (en) | Automatic calculation system for profit and loss by IT project using smart work log | |
Alhamed et al. | Estimating software task effort in crowds | |
Hatefi | A model for measuring success of an organisational management system | |
Vähämäki et al. | The Road to Productivity With Automatization: Dialogue Between the Experienced and Measured | |
Mstoi | Data analytics and its implications on auditing | |
CN113627883B (en) | Cloud customization recruitment method and system | |
Alrabei et al. | The Role of Accounting Information Quality in Enhancing Cost Accounting Objectives in Jordanian Industries Companies | |
Top et al. | Making functional similarity count for more reliable effort prediction models | |
Duch-Brown et al. | Assessing the assignation of public subsidies: do the experts choose the most efficient R&D projects? | |
Lubis et al. | ANALYSIS OF THE RELATIONSHIP OF TOTAL QUALITY MANAGEMENT IMPLEMENTATION WITH MANAGERIAL PERFORMANCE AT BANK MUAMALAT MEDAN |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |