KR102667471B1 - Equipment for rehabilitating superannuated pipes - Google Patents

Equipment for rehabilitating superannuated pipes Download PDF

Info

Publication number
KR102667471B1
KR102667471B1 KR1020230047228A KR20230047228A KR102667471B1 KR 102667471 B1 KR102667471 B1 KR 102667471B1 KR 1020230047228 A KR1020230047228 A KR 1020230047228A KR 20230047228 A KR20230047228 A KR 20230047228A KR 102667471 B1 KR102667471 B1 KR 102667471B1
Authority
KR
South Korea
Prior art keywords
pipe
cylinder
roller
coating film
nozzle
Prior art date
Application number
KR1020230047228A
Other languages
Korean (ko)
Inventor
이동국
Original Assignee
이동국
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이동국 filed Critical 이동국
Priority to KR1020230047228A priority Critical patent/KR102667471B1/en
Application granted granted Critical
Publication of KR102667471B1 publication Critical patent/KR102667471B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/049Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes having self-contained propelling means for moving the cleaning devices along the pipes, i.e. self-propelled
    • B08B9/0495Nozzles propelled by fluid jets
    • B08B9/0497Nozzles propelled by fluid jets provided with additional mechanical cleaning tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/16Rigid blades, e.g. scrapers; Flexible blades, e.g. wipers
    • B08B1/165Scrapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/049Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes having self-contained propelling means for moving the cleaning devices along the pipes, i.e. self-propelled
    • B08B9/051Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes having self-contained propelling means for moving the cleaning devices along the pipes, i.e. self-propelled the cleaning devices having internal motors, e.g. turbines for powering cleaning tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B2209/00Details of machines or methods for cleaning hollow articles
    • B08B2209/02Details of apparatuses or methods for cleaning pipes or tubes
    • B08B2209/027Details of apparatuses or methods for cleaning pipes or tubes for cleaning the internal surfaces
    • B08B2209/04Details of apparatuses or methods for cleaning pipes or tubes for cleaning the internal surfaces using cleaning devices introduced into and moved along the pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Coating Apparatus (AREA)

Abstract

본 발명은 스크래핑 능력이 향상된 관로갱생용 도막제거 장비에 관한 것으로서, 관로(P)의 내부 일측에 밀착되어 구름 운동하는 제1롤러(110)를 가지는 제1바디(100); 상기 제1바디(100)에 탑재되어 상기 제1롤러(110)를 회전 구동시키는 제1롤러구동부(200); 상기 관로(P)의 내부 타측에 밀착되어 구름 운동하는 제2롤러(310)를 가지는 제2바디(300); 상기 제2바디(300)에 탑재되어 상기 제2롤러(310)를 회전 구동시키는 제2롤러구동부(400); 상기 제1바디(100)와 제2바디(300) 사이를 이격시키면서 연결하는 것으로서, 상기 리니어연결부(500)는, 상기 제1바디(100)에 고정되는 제1댐핑실린더(510)와, 상기 제2바디(300)에 고정되는 제2댐핑실린더(520)와, 상기 제1댐핑실린더(510)와 제2댐핑실린더(520)를 연결하면서 상기 제1,2댐핑실린더(510)(520) 내측으로 출몰되는 매개로드(530)를 포함하는 리니어연결부(500); 및 제1바디(100)에 설치된 것으로서 관로(P) 내주면의 노후 도막(F)을 긁어 박리시키기 위한 스크래퍼(630)를 가지는 도막박리부(600);를 포함하는 것을 특징으로 한다. The present invention relates to a coating film removal equipment for pipe rehabilitation with improved scraping ability, comprising: a first body (100) having a first roller (110) that is in close contact with one inner side of the pipe (P) and moves in a rolling motion; A first roller driving unit 200 mounted on the first body 100 to rotate the first roller 110; A second body 300 having a second roller 310 that is in close contact with the other inner side of the pipe P and moves in a rolling motion; a second roller driving unit 400 mounted on the second body 300 to rotate the second roller 310; Connecting the first body 100 and the second body 300 while spaced apart, the linear connection part 500 includes a first damping cylinder 510 fixed to the first body 100, and The second damping cylinder 520 is fixed to the second body 300, and the first and second damping cylinders 510 and 520 are connected by connecting the first damping cylinder 510 and the second damping cylinder 520. A linear connection portion 500 including an intermediate rod 530 protruding inward; And a coating film peeling unit 600 installed on the first body 100 and having a scraper 630 for scraping and peeling off the aged coating film (F) on the inner peripheral surface of the pipe (P).

Description

스크래핑 능력이 향상된 관로갱생용 도막제거 장비{Equipment for rehabilitating superannuated pipes}Film removal equipment for pipe rehabilitation with improved scraping ability {Equipment for rehabilitating superannuated pipes}

본 발명은 관로갱생용 도막제거장비에 관한 것으로서, 더욱 상세하게는 노후 관로 갱생을 위한 도장공정을 하기 전에, 관로내 도막을 효과적으로 제거할 수 있는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비에 관한 것이다. The present invention relates to film removal equipment for pipe rehabilitation, and more specifically, to film removal equipment for pipe rehabilitation with improved scraping ability, which can effectively remove the film within the pipe before the painting process for rehabilitation of old pipes. will be.

일반적으로 상수도관과 같은 대형 관로는 주철관이나 강관으로 이루어지는데, 관로의 내주면에는 도막이 형성되어 유동하는 유체에 의하여 부식되는 것이 방지된다. 이러한 관로는 매립된 이후 온도 및 압력의 변화에 의하여 내부 도막의 박리가 진행되고, 박리가 일단 진행되면 유체의 흐름에 따른 저항에 의하여 박리가 더욱 촉진되고, 이후 산화로 인한 부식이 일어나게 된다. 뿐만 아니라 오랜 시간이 경과하면 도막에 물때층이 형성되게 되어 수질의 악화로 귀결된다. In general, large pipes such as water pipes are made of cast iron pipes or steel pipes, and a coating film is formed on the inner circumferential surface of the pipe to prevent corrosion by flowing fluid. After these pipes are buried, peeling of the internal coating film progresses due to changes in temperature and pressure, and once peeling progresses, peeling is further accelerated by resistance due to the flow of fluid, and corrosion due to oxidation occurs thereafter. In addition, over a long period of time, a scale layer is formed on the paint film, resulting in deterioration of water quality.

이러한 문제점을 해결하기 위하여, 먼저 관로 내주면에서 노후 도막 및 부식면을 제거하고 이후 새로운 도막을 형성하여야 한다. To solve this problem, the old coating film and corroded surface must first be removed from the inner peripheral surface of the pipe, and then a new coating film must be formed.

이를 위하여, 먼저 관로 내부로 블라스팅 장비를 투입하여 관로를 타고 이동하면서 관로 내주면으로 미세한 다수의 쇼트볼을 분사함으로서 노후 도막 및 부식면을 제거하고, 이후 관로를 진행하면서 바닥에 낙하된 쇼트볼을 다시 회수하여 도막 및 부식면 제거에 재사용하였다. For this purpose, blasting equipment is first introduced into the pipe, and while moving through the pipe, a large number of fine shot balls are sprayed on the inner circumference of the pipe to remove old coatings and corroded surfaces. Then, while moving through the pipe, the shot balls that have fallen to the floor are blasted again. It was recovered and reused to remove the coating film and corrosion surfaces.

그런데 쇼트볼은 압축공기에 의하여 발사되므로, 도막 및 부식면이 제거되는 과정에서 다량의 분진이 발생되고, 바닥에 낙하된 쇼트볼은 분진과 혼합된 상태이기 때문에 쇼트볼의 재활용을 위하여 분진과 쇼트볼은 분리하는 별도의 과정등이 필요하여 블라스팅 공정을 수행하는데 많은 시간 및 노력이 소요되었다. However, since the shot ball is fired by compressed air, a large amount of dust is generated during the process of removing the coating film and corroded surface, and the shot ball that falls on the floor is mixed with dust, so the dust and shot must be removed for recycling of the shot ball. A separate process was required to separate the balls, so it took a lot of time and effort to perform the blasting process.

또한 블라스팅 과정에서 많은 분진이 발생되어 작업자에게 매우 해로우므로, 분진을 포집하기 위한 별도의 집진장비를 과도하게 운영하여야 하였다라는 문제점이 있었다. In addition, a lot of dust is generated during the blasting process, which is very harmful to workers, so there was a problem that separate dust collection equipment had to be excessively operated to collect dust.

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로서, 노후 도막을 빠르게 제거할 수 있어 도막제거 효율을 극대화시킬 수 있는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비를 제공하는 것을 목적으로 한다.The present invention was created to solve the above problems, and its purpose is to provide paint film removal equipment for pipe rehabilitation with improved scraping ability, which can quickly remove old paint films and maximize paint film removal efficiency.

본 발명의 다른 목적은, 내경이 일정치 않은 관로에서도 노후 도막을 효과적으로 제거할 수 있는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비를 제공하는 것이다. Another object of the present invention is to provide paint film removal equipment for pipe rehabilitation with improved scraping ability, which can effectively remove old paint films even from pipes with uneven inner diameters.

본 발명의 다른 목적은, 노후 도막 제거과정에서 분진 발생을 최소화함으로써 집진장치의 운영을 최소화할 수 있는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비를 제공하는 것을 목적으로 한다. Another object of the present invention is to provide film removal equipment for pipe rehabilitation with improved scraping ability, which can minimize the operation of the dust collection device by minimizing the generation of dust during the removal process of the old film.

상기와 같은 목적을 달성하기 위하여, 본 발명에 따른 스크래핑 능력이 향상된 관로갱생용 도막제거 장비는, 관로(P)의 내부 일측에 밀착되어 구름 운동하는 제1롤러(110)를 가지는 제1바디(100); 상기 제1바디(100)에 탑재되어 상기 제1롤러(110)를 회전 구동시키는 제1롤러구동부(200); 상기 관로(P)의 내부 타측에 밀착되어 구름 운동하는 제2롤러(310)를 가지는 제2바디(300); 상기 제2바디(300)에 탑재되어 상기 제2롤러(310)를 회전 구동시키는 제2롤러구동부(400); 상기 제1바디(100)와 제2바디(300) 사이를 이격시키면서 연결하는 것으로서, 상기 리니어연결부(500)는, 상기 제1바디(100)에 고정되는 제1댐핑실린더(510)와, 상기 제2바디(300)에 고정되는 제2댐핑실린더(520)와, 상기 제1댐핑실린더(510)와 제2댐핑실린더(520)를 연결하면서 상기 제1,2댐핑실린더(510)(520) 내측으로 출몰되는 매개로드(530)를 포함하는 리니어연결부(500); 및 제1바디(100)에 설치된 것으로서 관로(P) 내주면의 노후 도막(F)을 긁어 박리시키기 위한 스크래퍼(630)를 가지는 도막박리부(600);를 포함하는 것을 특징으로 한다. In order to achieve the above object, the film removal equipment for pipe rehabilitation with improved scraping ability according to the present invention includes a first body (110) having a first roller 110 that is in close contact with one inner side of the pipe (P) and rolls 100); A first roller driving unit 200 mounted on the first body 100 to rotate the first roller 110; A second body 300 having a second roller 310 that is in close contact with the other inner side of the pipe P and moves in a rolling motion; a second roller driving unit 400 mounted on the second body 300 to rotate the second roller 310; Connecting the first body 100 and the second body 300 while spaced apart, the linear connection part 500 includes a first damping cylinder 510 fixed to the first body 100, and The second damping cylinder 520 is fixed to the second body 300, and the first and second damping cylinders 510 and 520 are connected by connecting the first damping cylinder 510 and the second damping cylinder 520. A linear connection portion 500 including an intermediate rod 530 protruding inward; And a coating film peeling unit 600 installed on the first body 100 and having a scraper 630 for scraping and peeling off the aged coating film (F) on the inner peripheral surface of the pipe (P).

본 발명에 있어서, 상기 도막박리부(600)는, 상기 제1바디(100)의 제1테이블(140)에 설치되는 한쌍의 전방지지날개(610)와, 상기 전방지지날개(610)에 회전 가능하게 축 결합된 회동축(620)과. 상기 회동축(620)에 연장되게 고정되어 관로(P) 내주면에 밀착된 것으로서 노후 도막(F)을 긁어 박리하기 위한 상기 다수의 스크래퍼(630)를 포함한다.In the present invention, the coating film peeling unit 600 rotates on a pair of front support wings 610 installed on the first table 140 of the first body 100 and the front support wings 610. A rotation axis 620 possibly coupled to the axis. It is fixed to extend on the rotation axis 620 and is in close contact with the inner peripheral surface of the pipe (P), and includes the plurality of scrapers 630 for scraping and peeling off the aged coating film (F).

본 발명에 있어서, 상기 도막박리부(600)는, 상기 전방지지날개(610)의 후방측에 설치되는 후방지지날개(640)와, 상기 후방지지날개(640)에 지지되어 상기 관로(P) 내주면에 밀착되는 스크래퍼(630)의 텐션을 가변하기 위하여 회동축(620)을 시계 또는 반시계 방향으로 회동시키는 제1텐션인가부(650)를 더 포함한다. In the present invention, the coating film peeling unit 600 is supported on the rear support wing 640, which is installed on the rear side of the front support wing 610, and the rear support wing 640, and is connected to the pipe (P). It further includes a first tension application unit 650 that rotates the rotation shaft 620 clockwise or counterclockwise in order to vary the tension of the scraper 630 in close contact with the inner peripheral surface.

본 발명에 있어서, 상기 제1텐션인가부(650)는, 상기 회동축(620)로부터 돌출되는 레버(651)와, 상기 레버(651)의 단부에 회전 가능하게 지지되는 것으로서 내부가 관통된 전방회전볼(652)과, 상기 후방지지날개(640)에 회전 가능하게 결합되는 것으로서 내부에 나사홀이 형성된 후방회전볼(653)과, 상기 전방회전볼(652)에 헛돌게 결합된 상태에서 상기 후방회전볼(653)의 나사홀에 나사결합되는 볼트샤프트(654)를 포함한다. In the present invention, the first tension application part 650 includes a lever 651 protruding from the rotation axis 620, and a front rotatable support portion that is rotatably supported at an end of the lever 651 and penetrates the inside. In a state in which the rotation ball 652, the rear rotation ball 653, which is rotatably coupled to the rear support wing 640 and has a screw hole formed therein, and the front rotation ball 652 are loosely coupled to the It includes a bolt shaft 654 that is screwed into the screw hole of the rear rotating ball 653.

본 발명에 있어서, 상기 제1댐핑실린더(510)는, 일측면 및 타측면에 오일이 유출입되는 제1전방노즐(511a) 및 제1후방노즐(511b)이 형성되고 입구가 형성된 제1실린더관(511)과, 상기 제1실린더관(511)의 입구에 결합되는 제1실린더헤더(512)와, 상기 제1전방노즐(511a)과 제1후방노즐(511b) 사이의 제1실린더관(511)에 내장되는 것으로서 인가되는 압력에 의하여 신축되는 제1가스스프링(513)과, 상기 제1가스스프링(513)과 제1전방노즐(511a) 사이의 제1실린더관(511)에 내장되는 제1전방피스톤(514)과, 상기 제1가스스프링(513)과 제1후방노즐(511b) 사이의 제1실린더관(511)에 내장되는 제1후방피스톤(515)을 포함하고, 상기 제2댐핑실린더(520)는, 일측면 및 타측면에 오일이 유출입되는 제2전방노즐(521a) 및 제2후방노즐(521b)이 형성되고 입구가 형성된 제2실린더관(521)과, 상기 제2실린더관(521)의 입구에 결합되는 제2실린더헤더(522)와, 상기 제2전방노즐(521a)과 제2후방노즐(521b) 사이의 제2실린더관(521)에 내장되는 것으로서 인가되는 압력에 의하여 신축되는 제2가스스프링(523)과, 상기 제2전방노즐(521a)과 제2가스스프링(523) 사이의 제2실린더관(521)에 내장되는 제2전방피스톤(524)과, 상기 제2가스스프링(523)과 제2후방노즐(521b) 사이의 제2실린더관(521)에 내장되는 제2후방피스톤(525)을 포함한다. In the present invention, the first damping cylinder 510 is a first cylinder tube having an inlet and a first front nozzle 511a and a first rear nozzle 511b through which oil flows in and out on one side and the other side. (511), the first cylinder header 512 coupled to the inlet of the first cylinder pipe 511, and the first cylinder pipe between the first front nozzle 511a and the first rear nozzle 511b ( 511) and a first gas spring 513 that expands and contracts by the applied pressure, and a first cylinder tube 511 between the first gas spring 513 and the first front nozzle 511a. It includes a first front piston 514 and a first rear piston 515 built into the first cylinder tube 511 between the first gas spring 513 and the first rear nozzle 511b, 2 Damping cylinder 520 includes a second cylinder tube 521 having a second front nozzle (521a) and a second rear nozzle (521b) through which oil flows in and out on one side and the other side and an inlet, and the second cylinder pipe (521) having an inlet. It is approved as being built into the second cylinder header 522 coupled to the inlet of the second cylinder tube 521 and the second cylinder tube 521 between the second front nozzle 521a and the second rear nozzle 521b. A second gas spring 523 that expands and contracts due to pressure, and a second front piston 524 built into the second cylinder tube 521 between the second front nozzle 521a and the second gas spring 523. and a second rear piston 525 built into the second cylinder pipe 521 between the second gas spring 523 and the second rear nozzle 521b.

본 발명에 있어서, 상기 매개로드(530)는, 상기 제1실린더헤더(512)를 관통하여 상기 제1전방피스톤(514)과 연결되고 상기 제2실린더헤더(522)를 관통하여 제2전방피스톤(524)에 결합되는 로드몸체(531)와, 상기 로드몸체(531)의 일측 내부에서 상기 제1전방피스톤(514)을 관통하여 상기 제1가스스프링(513) 측 공간과 외기를 연통시키는 제1에어홀(532)과, 상기 로드몸체(531)의 타측 내부에서 상기 제2전방피스톤(524)을 관통하여 상기 제2가스스프링(523) 측 공간과 외기를 연통시키는 제2에어홀(533)을 포함한다.In the present invention, the intermediate rod 530 penetrates the first cylinder header 512 and is connected to the first front piston 514, and penetrates the second cylinder header 522 to form the second front piston. A rod body 531 coupled to (524), and a rod body 531 that penetrates the first front piston 514 from inside one side of the rod body 531 and communicates with the space on the side of the first gas spring 513 and external air. 1 air hole 532, and a second air hole 533 that penetrates the second front piston 524 inside the other side of the rod body 531 and communicates the space on the side of the second gas spring 523 with external air. ) includes.

본 발명에 따르면, 제1,2롤러(110)(310)가 설치된 제1,2바디(100)(300)가 제1,2댐핑실린더(510)(520) 및 매개로드(530)에 의하여 신축이 가능하므로, 제1,2바디(100)(300) 사이 간격이 좁혀진 상태에서 대차에 탑재하여 좁은 관로(P) 내를 따라 이동이 가능하다. 더 나아가, 리니어 형태이므로 사람이 통과할 수 있는 공간을 형성하고, 이에 따라 작업성이 용이해진다. According to the present invention, the first and second bodies 100 and 300 on which the first and second rollers 110 and 310 are installed are moved by the first and second damping cylinders 510 and 520 and the intermediate rod 530. Since it is expandable, it can be mounted on a bogie and moved along a narrow pipe (P) while the gap between the first and second bodies (100) and (300) is narrowed. Furthermore, because it is linear, it creates a space through which people can pass, thereby making workability easier.

제1,2댐핑실린더(510)(520)에 제1,2가스스프링(513)(523)이 내장됨으로서, 관 변형이 발생되더라도 본 발명의 도막제거 장비는 관로(P)에서 원활히 회전할 수 있으며, 이에 따라 노후 도막(F)을 완벽하게 박리 및 제거할 수 있다.Since the first and second gas springs (513) (523) are built into the first and second damping cylinders (510) (520), the film removal equipment of the present invention can rotate smoothly in the pipe (P) even if pipe deformation occurs. Accordingly, the aged coating film (F) can be completely peeled off and removed.

또한 제1,2롤러(110)(310)가 제1,2베이스(120)(320)에 대하여 소정 각도로 틸팅됨으로써, 제1,2롤러(110)(310)의 회전방향에 따라 본 발명의 도막제거 장비는 관로(P) 내에서 전진 또는 후진할 수 있다. In addition, the first and second rollers 110 and 310 are tilted at a predetermined angle with respect to the first and second bases 120 and 320, so that according to the rotation direction of the first and second rollers 110 and 310, the present invention The film removal equipment can move forward or backward within the pipe (P).

또한 종래의 쇼트볼을 사용하지 않음으로써 노후 도막 제거과정에서 분진 발생을 최소화함으로써 집진장치의 운영을 최소화할 수 있다. In addition, by not using conventional short balls, the operation of the dust collection device can be minimized by minimizing the generation of dust during the process of removing the old paint film.

또한 도막박리부(600)가, 제1테이블(140)에 설치되는 한쌍의 전방지지날개(610)와, 전방지지날개(610)에 회전 가능하게 축 결합된 회동축(620)과. 회동축(620)에 연장되게 고정되어 관로(P) 내주면에 밀착된 것으로서 노후 도막(F)을 긁어 박리하기 위한 다수의 스크래퍼(630)와, 전방지지날개(610)의 후방측에 설치되는 후방지지날개(640)와, 후방지지날개(640)에 지지되어 회동축(620)을 시계 또는 반시계 방향으로 회동시키는 제1텐션인가부(650)를 포함함으로서, 관로(P) 내주면에 밀착되는 스크래퍼(630)의 텐션을 가변하여 도막(P)을 효과적으로 긁어 제거할 수 있음과 동시에, 필요에 따라 스크래퍼(630)를 교체함으로써 스크래핑 능력을 최대한 향상시킬 수 있다. In addition, the coating film peeling unit 600 includes a pair of front support wings 610 installed on the first table 140, and a pivot shaft 620 rotatably coupled to the front support wings 610. A plurality of scrapers 630 that are extended and fixed to the rotation axis 620 and are in close contact with the inner peripheral surface of the pipe (P) for scraping and peeling off the aged coating film (F), and a rear scraper installed on the rear side of the front support wing 610. It includes a support wing 640 and a first tension application part 650 that is supported on the rear support wing 640 and rotates the rotation axis 620 clockwise or counterclockwise, and is in close contact with the inner peripheral surface of the pipe (P). By varying the tension of the scraper 630, the coating film P can be effectively scraped and removed, and at the same time, the scraping ability can be maximized by replacing the scraper 630 as needed.

그리고 도막커팅부(700)가 제2바디(300)의 제2테이블(340)에 배치되는 것으로서 전방측으로 개구된 U 형태의 커터브라켓(710)과, 커터브라켓(710)에 회전 가능하게 설치되는 것으로서 관로(P) 내주면의 노후 도막(F)을 원주 방향으로 커팅하는 다수의 커팅휠(720)과, 커팅휠(720)이 상기 도막(F)에 밀착되도록 커터브라켓(710)에 텐션을 인가하는 제2텐션인가부(730)를 포함함으로써, 도막(F)을 작은 폭을 이루면서 원주 방향으로 커팅할 수 있으며, 이에 따라 도막박리부(600)의 스크래퍼(630)는 작은 폭으로 커팅된 도막(F)을 용이하면서 완벽하게 긁어 제거할 수 있다. In addition, the coating cutting unit 700 is disposed on the second table 340 of the second body 300, has a U-shaped cutter bracket 710 opened toward the front, and is rotatably installed on the cutter bracket 710. As a result, tension is applied to a plurality of cutting wheels 720 that cut the aged coating film (F) on the inner peripheral surface of the pipe (P) in the circumferential direction, and to the cutter bracket 710 so that the cutting wheels 720 are in close contact with the coating film (F). By including the second tension application portion 730, the coating film F can be cut in the circumferential direction while forming a small width, and accordingly, the scraper 630 of the coating film peeling unit 600 cuts the coating film F into a small width. (F) can be easily and completely removed by scraping.

도 1은 본 발명에 따른 스크래핑 능력이 향상된 관로갱생용 도막제거 장비가 관로에 설치된 것을 설명하기 위한 도면,
도 2는 도 1의 관로갱생용 도막제거 장비를 반대측에서 본 도면,
도 3은 도 1의 제1,2바디 및 제1,2롤러구동부를 발췌하여 구성을 설명하기 위한 도면,
도 4는 도 3의 제1,2바디 및 제1,2롤러구동부의 평면도,
도 5는 도 3의 제1,2바디 및 제1,2롤러구동부의 배면도,
도 6은 도 3의 제1,2롤러의 틸팅 각도를 가변하기 위한 제1,2틸팅가변부의 구성을 설명하기 위한 도면,
도 7은 도 6의 제1,2스테이지를 회전시켜 제1,2롤러의 틸탕 각도를 가변하는 것을 설명하기 위한 도면,
도 8은 도 1의 리니어연결부를 발췌하여 도시한 도면,
도 9는 도 8의 IX-IX 선을 따른 단면도,
도 10은 도 9의 제1,2댐핑실린더 및 매개로드를 분해하여 구성을 설명하기 위한 도면,
도 11은 도 9의 제1,2댐핑실린더 사이가 매개로드를 기준으로 좁아지는 것을 설명하기 위한 도면,
도 12는 도 11에 있어서 가스실린더의 동작을 설명하기 위한 도면,
도 13은 도 1의 도막박리부를 발췌하여 도시한 도면,
도 14는 도 13의 도막박리부를 설명하기 위한 평면도,
도 15는 도 13의 도막박리부의 내부 구성을 설명하기 위한 단면도,
도 16은 도 1의 도막커팅부를 발췌하여 도시한 도면,
도 17은 도 16의 도막적단부를 설명하기 위한 평면도,
도 18은 도 16의 도막커팅부의 내부 구성을 설명하기 위한 단면도,
도 19는 도 18의 도막커팅부의 동작을 설명하기 위한 단면도,
도 20은 도 1의 도막제거 장비가 관로내에서 회전되는 것을 설명하기 위한 도면.
Figure 1 is a view for explaining that the film removal equipment for pipe rehabilitation with improved scraping ability according to the present invention is installed in the pipe;
Figure 2 is a view of the film removal equipment for pipe rehabilitation of Figure 1 seen from the opposite side;
Figure 3 is a diagram illustrating the configuration of the first and second bodies and the first and second roller drives of Figure 1;
Figure 4 is a plan view of the first and second bodies and the first and second roller drives of Figure 3;
Figure 5 is a rear view of the first and second bodies and the first and second roller drives of Figure 3;
Figure 6 is a diagram for explaining the configuration of the first and second tilting variable parts for varying the tilting angles of the first and second rollers of Figure 3;
Figure 7 is a diagram for explaining changing the tilt angles of the first and second rollers by rotating the first and second stages of Figure 6;
Figure 8 is a diagram showing an excerpt of the linear connection of Figure 1;
Figure 9 is a cross-sectional view taken along line IX-IX of Figure 8;
Figure 10 is a view for explaining the disassembled configuration of the first and second damping cylinders and intermediate rods of Figure 9;
Figure 11 is a diagram for explaining that the distance between the first and second damping cylinders of Figure 9 is narrowed based on the intermediate load;
Figure 12 is a diagram for explaining the operation of the gas cylinder in Figure 11;
Figure 13 is a view showing an excerpt of the coating film peeling part of Figure 1;
Figure 14 is a plan view for explaining the film peeling portion of Figure 13;
Figure 15 is a cross-sectional view for explaining the internal configuration of the coating film peeling part of Figure 13;
Figure 16 is a view showing an excerpt of the film cutting part of Figure 1;
Figure 17 is a plan view for explaining the coating layer end portion of Figure 16;
Figure 18 is a cross-sectional view for explaining the internal configuration of the film cutting part of Figure 16;
Figure 19 is a cross-sectional view for explaining the operation of the film cutting unit of Figure 18;
Figure 20 is a view for explaining that the film removal equipment of Figure 1 is rotated within the pipe.

이하, 본 발명에 따른 관로갱생용 도막제거 장비를 첨부된 도면들을 참조하여 상세히 설명한다. Hereinafter, the film removal equipment for pipe rehabilitation according to the present invention will be described in detail with reference to the attached drawings.

이하의 실시예에서, 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 이하의 실시예에서, 포함하다 또는 가지다 등의 용어는 명세서상에 기재된 특징, 또는 구성요소가 존재함을 의미하는 것이고, 하나 이상의 다른 특징들 또는 구성요소가 부가될 가능성을 미리 배제하는 것은 아니다. 이하의 실시예에서, 막, 영역, 구성 요소 등의 부분이 다른 부분 위에 또는 상에 있다고 할 때, 다른 부분의 바로 위에 있는 경우뿐만 아니라, 그 중간에 다른 막, 영역, 구성 요소 등이 개재되어 있는 경우도 포함한다. 도면에서는 설명의 편의를 위하여 구성 요소들이 그 크기가 과장 또는 축소될 수 있다. 예컨대, 도면에서 나타난 각 구성의 크기 및 두께는 설명의 편의를 위해 임의로 나타내었으므로, 본 발명이 반드시 도시된 바에 한정되지 않는다. 어떤 실시예가 달리 구현 가능한 경우에 특정한 공정 순서는 설명되는 순서와 다르게 수행될 수도 있다. 예를 들어, 연속하여 설명되는 두 공정이 실질적으로 동시에 수행될 수도 있고, 설명되는 순서와 반대의 순서로 진행될 수 있다.In the following examples, singular terms include plural terms unless the context clearly dictates otherwise. In the following embodiments, terms such as include or have mean the presence of features or components described in the specification, and do not exclude in advance the possibility of adding one or more other features or components. In the following embodiments, when a part of a film, region, component, etc. is said to be on or on another part, it is not only the case where it is directly on top of the other part, but also when another film, region, component, etc. is interposed between them. Also includes cases where there are. In the drawings, the sizes of components may be exaggerated or reduced for convenience of explanation. For example, the size and thickness of each component shown in the drawings are shown arbitrarily for convenience of explanation, so the present invention is not necessarily limited to what is shown. In cases where an embodiment can be implemented differently, a specific process sequence may be performed differently from the described sequence. For example, two processes described in succession may be performed substantially at the same time, or may be performed in an order opposite to that in which they are described.

도 1은 본 발명에 따른 스크래핑 능력이 향상된 관로갱생용 도막제거 장비가 관로에 설치된 것을 설명하기 위한 도면이고, 도 2는 도 1의 관로갱생용 도막제거 장비를 반대측에서 본 도면이고, 도 20은 도 1의 도막제거 장비가 관로내에서 회전되는 것을 설명하기 위한 도면이다. Figure 1 is a view to explain that the film removal equipment for pipe rehabilitation with improved scraping ability according to the present invention is installed in the pipeline, Figure 2 is a view of the film removal equipment for pipe rehabilitation of Figure 1 seen from the opposite side, and Figure 20 is This is a diagram to explain that the film removal equipment in Figure 1 is rotated within the pipe.

도시된 바와 같이, 관로갱생용 도막제거 장비는, 관로(P)의 내부 일측에 밀착되어 구름 운동하는 제1롤러(110)를 가지는 제1바디(100)와; 제1바디(100)에 탑재되어 제1롤러(110)를 회전 구동시키는 제1롤러구동부(200)와; 관로(P)의 내부 타측에 밀착되어 구름 운동하는 제2롤러(310)를 가지는 제2바디(300)와; 제2바디(300)에 탑재되어 제2롤러(310)를 회전 구동시키는 제2롤러구동부(400)와; 제1바디(100)와 제2바디(300) 사이를 이격시키면서 연결하는 리니어연결부(500)와; 제1바디(100)에 설치된 것으로서 관로(P) 내주면의 노후 도막(F)을 긁어 박리시키기 위한 스크래퍼(630)를 가지는 도막박리부(600)와; As shown, the film removal equipment for pipe rehabilitation includes a first body 100 having a first roller 110 that is in close contact with one inner side of the pipe P and moves in a rolling motion; a first roller driving unit 200 mounted on the first body 100 to rotate the first roller 110; a second body 300 having a second roller 310 that is in close contact with the other inner side of the pipe P and moves in a rolling motion; a second roller driving unit 400 mounted on the second body 300 to rotate the second roller 310; A linear connection part 500 connecting the first body 100 and the second body 300 while spaced apart from each other; A coating film peeling unit 600 installed on the first body 100 and having a scraper 630 for scraping and peeling off the aged coating film (F) on the inner peripheral surface of the pipe (P);

제2바디(300)에 설치되어 관로(P) 내주면의 노후 도막(F)을 원주 방향으로 커팅하는 커팅휠(720)을 가지는 도막커팅부(700)와; 제1,2바디(100)(300) 중 어느 하나에 회전 가능하게 지지되는 것으로서, 제1,2바디(100)(300)가 관로(P) 내측에서 회전될 때 반대로 회전되면서 제1,2롤러구동부(200)(400)로 전원을 공급하는 스위블(800)을 포함한다. A coating film cutting unit 700 installed in the second body 300 and having a cutting wheel 720 for cutting the aged coating film (F) on the inner peripheral surface of the pipe (P) in the circumferential direction; It is rotatably supported on one of the first and second bodies 100 and 300, and when the first and second bodies 100 and 300 are rotated inside the pipe P, they are rotated in the opposite direction and the first and second bodies 100 and 300 are rotatably supported. It includes a swivel 800 that supplies power to the roller drive units 200 and 400.

제1바디(100)와 제2바디(300)는 리니어연결부(500)에 의하여 리니어 형태로 연결되고, 제1롤러(110)가 관로(P) 내주면 일측에 밀착되어 구름 운동하고, 제2롤러(310)가 관로(P)의 내주면 타측에 밀착되어 구름 운동함으로서, 도 20에 도시된 바와 같이, 본 발명의 도막제거장비를 관로(P)의 내부에서 회전시킬 수 있다. The first body 100 and the second body 300 are connected in a linear form by a linear connection part 500, the first roller 110 is in close contact with one side of the inner circumference of the pipe (P) and makes a rolling movement, and the second roller As (310) is in close contact with the other side of the inner peripheral surface of the pipe (P) and rolls, the film removal equipment of the present invention can be rotated inside the pipe (P), as shown in Figure 20.

스위블(800)은 제1,2바디(100)(300) 중 어느 하나, 본 실시예에서는 제2바디(300)에서 연장된 사이드프레임(810)에 축 결합되어 관로(P)의 중앙에 위치된 것으로서, 중력 방향을 향하는 추(미도시)가 내장되어 본 발명의 도막제거 장비가 관로(P) 내에서 회전되는 동안에 반대 방향으로 회전됨으로써 항상 초기 각도를 유지한다, 스위블(800)의 전방측에는 외부에서 인가되는 전원선(미도시)이 연결되고, 후방측에는 제1,2롤러구동부(200)(400)로 전원을 공급하는 전원선이 연결된다. 스위블(800)은 도막제거 장비가 관로(P) 내에서 회전되는 동안에도 초기 위치를 유지함으로써 전원선이 꼬이는 것을 방지하고, 제1,2롤러구동부(200)(400)로 전원을 안정적으로 공급되게 한다. 이러한 스위블(800)은 산업현장에서 일반적으로 사용되는 기술이기 때문에 더 이상의 상세한 설명은 생략한다. The swivel 800 is axially coupled to one of the first and second bodies 100 and 300, and in this embodiment, to the side frame 810 extending from the second body 300 and is located in the center of the pipe (P). As a result, a weight (not shown) facing the direction of gravity is built in to always maintain the initial angle by rotating in the opposite direction while the film removal equipment of the present invention is rotated within the pipe (P). On the front side of the swivel (800) An external power line (not shown) is connected, and a power line that supplies power to the first and second roller driving units 200 and 400 is connected to the rear side. The swivel 800 maintains the initial position even while the film removal equipment is rotated within the pipe (P), thereby preventing the power line from being twisted and stably supplying power to the first and second roller drives (200) and (400). Let it happen. Since this swivel 800 is a technology commonly used in industrial fields, further detailed description is omitted.

도 3은 도 1의 제1,2바디 및 제1,2롤러구동부를 발췌하여 구성을 설명하기 위한 도면이고, 도 4는 도 3의 제1,2바디 및 제1,2롤러구동부의 평면도이고, 도 5는 도 3의 제1,2바디 및 제1,2롤러구동부의 배면도이다. Figure 3 is a drawing for explaining the configuration of the first and second bodies and the first and second roller driving parts of Figure 1, and Figure 4 is a plan view of the first and second bodies and the first and second roller driving parts of Figure 3. , Figure 5 is a rear view of the first and second bodies and the first and second roller drives of Figure 3.

제1바디(100)는, 도 3에 도시된 바와 같이, 리니어연결부(500)의 일측을 지지하는 제1베이스(120)와, 제1롤러(110)를 제1베이스(120)에 구름 운동 가능하게 지지하는 제1롤러지지부(130)와, 제1롤러지지부(130) 반대측의 제1베이스(120)에 설치되어 도막박리부(600)를 지지하는 제1테이블(140)을 포함한다. As shown in FIG. 3, the first body 100 includes a first base 120 supporting one side of the linear connection 500, and a first roller 110 in a rolling motion on the first base 120. It includes a first roller support part 130 that supports the first roller support part 130, and a first table 140 that is installed on the first base 120 on the opposite side of the first roller support part 130 and supports the coating film peeling part 600.

제1롤러(110)는 관로(P)의 내주면에 밀착되어 구름 운동하는 것으로서, 외주면에는 구름 운동 과정에서 노후 도막(F)을 통하여 인가되는 불규칙한 충격을 흡수할 수 있도록 제1탄성층(111)이 형성되어 있다. The first roller 110 is in close contact with the inner circumferential surface of the pipe (P) and rolls, and the outer circumferential surface has a first elastic layer 111 to absorb irregular shocks applied through the aged coating film (F) during the rolling motion. This is formed.

제1롤러지지부(130)는, 도 4에 도시된 바와 같이, 제1베이스(120)의 상부면에 설치되는 제1스테이지(131)와, 제1스테이지(131)의 전방에 설치되어 제1롤러(110)의 제1회전축(112)을 회전 가능하게 지지하는 제1베어링브라켓(132)을 포함한다. As shown in FIG. 4, the first roller support portion 130 includes a first stage 131 installed on the upper surface of the first base 120, and a first stage 131 installed in front of the first stage 131. It includes a first bearing bracket 132 that rotatably supports the first rotation shaft 112 of the roller 110.

제1스테이지(131)에는 제1롤러구동부(200)를 구성하는 제1기어드모터(210) 및 제1아이들러(250)가 설치된다. A first geared motor 210 and a first idler 250 constituting the first roller drive unit 200 are installed in the first stage 131.

제1롤러(110)의 제1회전축(112)에 있어, 제1회전축(112)의 측면에서 직각 방향으로 형성된 법선(V)은 제1바디(100)의 수평선(H)을 기준으로 제1각도(θ1), 본 실시예에서는 2~3°로 틸팅된다. 이에 따라 제1회전축(112)의 결합된 제1롤러(110)는 제1바디(100)를 기준으로 틸팅된 상태로 회전된다. In the first rotation axis 112 of the first roller 110, the normal line (V) formed in a right angle direction from the side of the first rotation axis 112 is the first line (V) based on the horizontal line (H) of the first body 100. The angle θ1 is tilted at 2 to 3 degrees in this embodiment. Accordingly, the first roller 110 coupled to the first rotation axis 112 is rotated in a tilted state with respect to the first body 100.

제1테이블(140)은 제1베이스(120)의 배면에 설치되어 후술할 도막박리부(600)를 지지한다. The first table 140 is installed on the back of the first base 120 and supports the film peeling portion 600, which will be described later.

제1롤러구동부(200)는, 도 3에 도시된 바와 같이, 제1스테이지(131)에 지지되어 회전 구동력을 제공하는 제1기어드모터(210)와, 제1기어드모터(210)의 회전축에 결합되는 제1모터스프로킷(220)과 제1롤러(110)의 제1회전축(112)에 결합되는 제1롤러스프로킷(230)과, 제1모터스트로킷(220)과 제1롤러스프로킷(230)을 연결하는 제1체인(240)과, 제1스테이지(131)에 지지되어 제1체인(240)의 측부를 가압하여 적정 텐션을 유지하도록 제1아이들러(250)를 포함한다.As shown in FIG. 3, the first roller drive unit 200 is connected to a first geared motor 210 that is supported on the first stage 131 and provides rotational driving force, and a rotation axis of the first geared motor 210. The first motor sprocket 220 is coupled to the first roller sprocket 230 coupled to the first rotation axis 112 of the first roller 110, and the first motor sprocket 220 and the first roller sprocket 230 are coupled to each other. ) and a first idler 250 that is supported on the first stage 131 and presses the side of the first chain 240 to maintain appropriate tension.

제1아이들러(250)는, 제1체인(240)이 어느 위치에 있던지간에 항상 팽팽한 상태를 유지할 수 있도록 텐션을 인가한다. The first idler 250 applies tension so that the first chain 240 can always remain taut regardless of its position.

본 발명의 도막제거 장비는 관로(P) 내에서 회전되면서 수평 방향으로 위치될 경우, 제1모터스프로킷(220)과 제1롤러스프로킷(230) 사이에서 제1체인(240)은 자중에 의하여 늘어지면서 제1모터스프로킷(220)과 제1롤러스프로킷(230)에 견고하게 치합된 상태를 유지할 수 있으며, 이에 따라 제1기어드모터(210)의 회전 구동력이 완벽하게 전달될 수 있다. When the film removal equipment of the present invention is positioned in the horizontal direction while rotating within the pipe (P), the first chain 240 is stretched between the first motor sprocket 220 and the first roller sprocket 230 by its own weight. As it moves, it can maintain a state of being firmly engaged with the first motor sprocket 220 and the first roller sprocket 230, and thus the rotational driving force of the first geared motor 210 can be perfectly transmitted.

그러나 도막제거 장비가 수직 방향으로 위치될 경우, 제1모터스프로킷(220)과 제1롤러스프로킷(230)이 상하부측으로 위치되므로, 예를 들면 제1모터스프로킷(220)이 상부측에 위치될 때 제1체인(240)의 하부측이 늘어지면서 제1롤러스프로킷(230)에 견고하게 치합되지 않게 되고, 이 경우 제1기어드모터(210)의 회전 구동력이 완벽하게 전달되지 않음은 물로, 심할 경우 제1롤러스로로킷(230)으로부터 벗어날 수 있다. However, when the film removal equipment is positioned in the vertical direction, the first motor sprocket 220 and the first roller sprocket 230 are positioned at the top and bottom, for example, when the first motor sprocket 220 is positioned at the top. As the lower side of the first chain 240 is stretched, it is not firmly engaged with the first roller rocket 230, and in this case, the rotational driving force of the first geared motor 210 is not perfectly transmitted. It is possible to escape from the first roller roller kit 230.

본 발명에서는 제1아이들러(250)를 채용하여 제1체인(240)을 가압함으로써 항상 텐션을 유지하도록 하고, 이에 따라 도막제거 장비의 회전 위치에 관계없이 제1모터스프로킷(220)과 제1롤러스프로킷(230) 사이에서 회전 구동력이 완벽하게 전달될 수 있도록 할 수 있다. In the present invention, the first idler 250 is employed to pressurize the first chain 240 to always maintain tension, and thus the first motor sprocket 220 and the first roller are maintained regardless of the rotational position of the film removal equipment. The rotational driving force can be perfectly transmitted between the sprockets 230.

제2바디(300)는, 도 3에 도시된 바와 같이, 리니어연결부(500)의 타측을 지지하는 제2베이스(320)와, 제2롤러(310)를 제2베이스(320)에 구름 운동 가능하게 지지하는 제2롤러지지부(330)와, 제2롤러지지부(330) 반대측의 제2베이스(320)에 설치되어 도막커팅부(700)를 지지하는 제2테이블(340)을 포함한다. As shown in FIG. 3, the second body 300 includes a second base 320 that supports the other side of the linear connector 500, and a second roller 310 in a rolling motion on the second base 320. It includes a second roller support part 330 that supports the second roller support part 330, and a second table 340 that is installed on the second base 320 on the opposite side of the second roller support part 330 and supports the coating cutting part 700.

제2롤러(310)는 관로(P)의 내주면에 밀착되어 구름 운동하는 것으로서, 외주면에는 구름 운동 과정에서 노후 도막(F)을 통하여 인가되는 불규칙한 충격을 흡수할 수 있도록 제2탄성층(311)이 형성되어 있다. The second roller 310 is in close contact with the inner circumferential surface of the pipe (P) and rolls, and the outer circumferential surface has a second elastic layer 311 to absorb irregular shocks applied through the aged coating film (F) during the rolling motion. This is formed.

제2롤러지지부(330)는, 도 4에 도시된 바와 같이, 제2베이스(320)의 상부면에 설치되는 제2스테이지(331)와, 제2스테이지(331)의 전방에 설치되어 제2롤러(310)의 제2회전축(312)을 회전 가능하게 지지하는 제2베어링브라켓(332)을 포함한다.As shown in FIG. 4, the second roller support portion 330 is installed on the second stage 331 installed on the upper surface of the second base 320 and in front of the second stage 331 to support the second stage 331. It includes a second bearing bracket 332 that rotatably supports the second rotation shaft 312 of the roller 310.

제2스테이지(331)에는 제2롤러구동부(400)를 구성하는 제2기어드모터(410) 및 제2아이들러(450)가 설치된다. A second geared motor 410 and a second idler 450 constituting the second roller drive unit 400 are installed in the second stage 331.

제2롤러(310)의 제2회전축(312)에 있어, 제2회전축(312)의 측면에서 직각 방향으로 형성된 법선(V)은 제2바디(300)의 수평선(H)을 기준으로 제2각도(θ2), 본 실시예에서는 2~3° 로 틸팅되고, 이에 따라 제2회전축(312)의 결합된 제2롤러(310)는 제2바디(300)를 기준으로 틸팅된 상태로 회전된다.In the second rotation axis 312 of the second roller 310, the normal line V formed in a right angle direction from the side of the second rotation axis 312 is the second axis with respect to the horizontal line H of the second body 300. The angle θ2, in this embodiment, is tilted at 2 to 3°, and accordingly, the second roller 310 coupled to the second rotation axis 312 is rotated in a tilted state with respect to the second body 300. .

본 실시에에서는 용이한 설명을 위하여, 제1롤러(110)의 제1회전축(112)이 제1각도(θ1) 및 제2각도(θ2)로 틸팅된 것으로 예시하였으나, 제1각도(θ1) 및 제2각도(θ2)는 동일할 수도 있음은 물론이다. In this embodiment, for ease of explanation, the first rotation axis 112 of the first roller 110 is illustrated as tilted at the first angle θ1 and the second angle θ2, but the first angle θ1 And the second angle θ2 may of course be the same.

제2테이블(340)은 제2베이스(320)의 배면에 설치되어 후술할 도막커팅부(700) 각각을 지지한다 The second table 340 is installed on the back of the second base 320 and supports each of the film cutting parts 700, which will be described later.

제2롤러구동부(400)는, 도 3에 도시된 바와 같이, 제2스테이지(331)에 지지되어 회전 구동력을 제공하는 제2기어드모터(410)와, 제2기어드모터(410)의 회전축에 결합되는 제2모터스프로킷(420)과 제2롤러(310)의 제2회전축(312)에 결합되는 제2롤러스프로킷(430)과, 제2모터스트로킷(420)과 제2롤러스프로킷(430)을 연결하는 제2체인(440)과, 제2스테이지(331)에 지지되어 제2체인(440)의 측부를 가압하여 적정 텐션을 유지하도록 제2아이들러(450)를 포함한다. As shown in FIG. 3, the second roller drive unit 400 is supported on the second stage 331 and is connected to the second geared motor 410, which provides rotational driving force, and the rotation axis of the second geared motor 410. The second motor sprocket 420 is coupled to the second roller sprocket 430 coupled to the second rotation axis 312 of the second roller 310, and the second motor sprocket 420 and the second roller sprocket 430 are coupled to each other. ) and a second idler 450 that is supported on the second stage 331 and presses the side of the second chain 440 to maintain appropriate tension.

제2아이들러(450)는, 제2체인(440)이 어느 위치에 있던지간에 항상 팽팽한 상태를 유지할 수 있도록 텐션을 인가하는 것이다. 이러한 제2아이들러(450)는 제1아이들러(250)에서 설정된 동작과 실질적으로 유사하기 때문에 더 이상의 상세한 설명은 생략한다. The second idler 450 applies tension so that the second chain 440 can always remain taut regardless of its position. Since this second idler 450 is substantially similar to the operation set in the first idler 250, further detailed description will be omitted.

도 6은 도 3의 제1,2롤러의 틸팅 각도를 가변하기 위한 제1,2틸팅가변부의 구성을 설명하기 위한 도면이고, 도 7은 도 6의 제1,2스테이지를 회전시켜 제1,2롤러의 틸팅 각도를 가변하는 것을 설명하기 위한 도면이다. Figure 6 is a diagram for explaining the configuration of the first and second tilting variable parts for varying the tilting angles of the first and second rollers in Figure 3, and Figure 7 shows the first and second stages by rotating the first and second stages in Figure 6. This is a diagram to explain changing the tilting angle of the two rollers.

제1바디(100)는, 제1베이스(120)를 기준으로 제1롤러지지부(130)의 틸팅 각도를 가변시키는 제1틸팅가변부(150)를 더 포함한다. 이러한 제1틸팅가변부(150)는, 제1스테이지(131) 일측을 제1베이스(120)에 축결합하는 제1축결합부(151)와, 제1축결합부(151)에 대향되는 제1스테이지(131)에 돌출되게 형성되는 제1돌부(152)와, 제1베이스(120)에 설치되어 제1돌부(152)를 제1축결합부(151)를 기준으로 좌우 방향으로 회동시키는 제1돌부회동부(153)와, 제1돌부회동부(153)를 자동으로 조작하는 제1자동조작부(154)와, 제1스테이지(131)에 형성된 것으로서 상기 제1축결합부(151)를 기준으로 동일 반경을 이루며 형성되는 제1원주홈(155)과, 제1원주홈(155)을 관통하여 제1베이스(120)에 나사결합됨으로써 제1스테이지(131)가 틸팅되는 동안에도 제1베이스(120)에 견고하게 밀착된 상태를 유지하게 하는 제1와셔볼트(156)를 포함한다. The first body 100 further includes a first tilting variable part 150 that changes the tilting angle of the first roller support part 130 with respect to the first base 120. This first tilting variable portion 150 includes a first shaft coupling portion 151 that axially couples one side of the first stage 131 to the first base 120, and a first shaft coupling portion 151 opposite the first shaft coupling portion 151. The first protrusion 152 is formed to protrude from the first stage 131, and the first protrusion 152 is installed on the first base 120 and rotates in the left and right directions based on the first shaft coupling portion 151. The first protrusion rotating part 153 is formed on the first protrusion rotating part 153, the first automatic operating part 154 automatically operates the first protruding rotating part 153, and the first stage 131, and the first shaft coupling part 151 is formed on the first stage 131. Even while the first stage 131 is tilted by being screwed to the first base 120 through the first circumferential groove 155, which is formed with the same radius based on ), and the first circumferential groove 155, It includes a first washer bolt 156 that maintains firm contact with the first base 120.

제1돌부회동부(153)는, 제1축결합부(151) 반대측 제1베이스(120)에 설치되는 한쌍의 제1지지축(153a)과, 한쌍의 제1지지축(153a)에 헛돌게 결합되는 제1볼스크류(153b)와, 제1돌부(152)에 형성되는 제1장공(153c)과, 제1볼스크류(153b)에 나사결합되어 상기 제1장공(153c)에 그 제1장공(153c)을 따라 이동 가능하게 결합되는 제1볼(153d)을 포함한다. The first protrusion rotating portion 153 is connected to a pair of first support shafts 153a installed on the first base 120 on the opposite side of the first shaft coupling portion 151 and a pair of first support shafts 153a. The first ball screw (153b) is pivotably coupled, the first long hole (153c) formed in the first protrusion 152, and is screwed to the first ball screw (153b) to form the first long hole (153c). It includes a first ball (153d) that is movably coupled along one long hole (153c).

제1자동조작부(154)는, 제1스테이지(131)에서 연장된 제1서브스테이지(131a)에 설치되는 제1기어드모터(154a)와, 제1기어드모터(154a)의 회전축과 제1볼스크류(153b)를 연결하는 제1컨넥터(154b)를 포함한다.The first automatic operation unit 154 includes a first geared motor 154a installed on the first substage 131a extending from the first stage 131, a rotation axis of the first geared motor 154a, and a first ball. It includes a first connector (154b) connecting the screw (153b).

제2바디(300)는, 제2베이스(320)를 기준으로 제2롤러지지부(330)의 틸팅 각도를 가변시키는 제2틸팅가변부(350)를 더 포함한다. 이러한 제2틸팅가변부(350)는, 제2스테이지(331) 일측을 제2베이스(320)에 축결합하는 제2축결합부(351)와, 제2축결합부(351)에 대향되는 제2스테이지(331)에 돌출되게 형성되는 제2돌부(352)와, 제2베이스(320)에 설치되어 제2돌부(352)를 제2축결합부(351)를 기준으로 좌우 방향으로 회동시키는 제2돌부회동부(353)와, 제2돌부회동부(353)를 자동으로 조작하는 제2자동조작부(354)와, 제2스테이지(331)에 형성된 것으로서 상기 제2축결합부(351)를 기준으로 동일 반경을 이루며 형성되는 제2원주홈(355)과, 제2원주홈(355)을 관통하여 제2베이스(320)에 나사결합됨으로써 제2스테이지(331)가 틸팅되는 동안에도 제2베이스(320)에 견고하게 밀착된 상태를 유지하게 하는 제2와셔볼트(356)를 포함한다. The second body 300 further includes a second tilting variable part 350 that changes the tilting angle of the second roller support part 330 with respect to the second base 320. This second tilting variable portion 350 includes a second shaft coupling portion 351 that axially couples one side of the second stage 331 to the second base 320, and a second shaft coupling portion 351 opposite the second shaft coupling portion 351. The second protrusion 352 is formed to protrude from the second stage 331, and the second protrusion 352 is installed on the second base 320 and rotates in the left and right directions based on the second shaft coupling portion 351. The second protrusion rotating portion 353 is formed on the second protruding portion 353, the second automatic operating portion 354 automatically operates the second protruding rotating portion 353, and the second stage 331, and the second shaft engaging portion 351 Even while the second stage 331 is tilted by being screwed to the second base 320 through the second circumferential groove 355, which is formed with the same radius based on ), and the second circumferential groove 355, It includes a second washer bolt 356 that maintains firm contact with the second base 320.

제2돌부회동부(353)는, 제2축결합부(351) 반대측 제2베이스(320)에 설치되는 한쌍의 제2지지축(353a)과, 한쌍의 제2지지축(353a)에 헛돌게 결합되는 제2볼스크류(353b)와, 제2돌부(352)에 형성되는 제2장공(353c)과, 제2볼스크류(353b)에 나사결합되어 상기 제2장공(353c)에 그 제2장공(353c)을 따라 이동 가능하게 결합되는 제2볼(353d)을 포함한다. The second protruding rotating portion 353 is connected to a pair of second support shafts 353a installed on the second base 320 on the opposite side of the second shaft coupling portion 351 and a pair of second support shafts 353a. The second ball screw (353b) is pivotably coupled, the second long hole (353c) formed in the second protrusion 352, and is screwed to the second ball screw (353b) to form the second long hole (353c). It includes a second ball (353d) that is movably coupled along the two long holes (353c).

제2자동조작부(354)는, 제2스테이지(331)에서 연장된 제2서브스테이지(331a)에 설치되는 제1기어드모터(154a)와, 제1기어드모터(154a)의 회전축과 제2볼스크류(353b)를 연결하는 제1컨넥터(154b)를 포함한다.The second automatic operation unit 354 includes a first geared motor 154a installed on the second substage 331a extending from the second stage 331, a rotation axis of the first geared motor 154a, and a second ball. It includes a first connector (154b) connecting the screw (353b).

이러한 제1틸팅가변부(150)와 제2틸팅가변부(350)는 실질적으로 동일 구성을 가진다. The first tilt variable portion 150 and the second tilt variable portion 350 have substantially the same configuration.

도 8은 도 1의 리니어연결부를 발췌하여 도시한 도면이고, 도 9는 도 8의 IX-IX 선을 따른 단면도이고, 도 10은 도 9의 제1,2댐핑실린더 및 매개로드를 분해하여 구성을 설명하기 위한 도면이고, 도 11은 도 9의 제1,2댐핑실린더 사이가 매개로드를 기준으로 좁아지는 것을 설명하기 위한 도면이고, 도 12는 도 11에 있어서 가스실린더의 동작을 설명하기 위한 도면이다.FIG. 8 is a drawing showing an excerpt of the linear connection part of FIG. 1, FIG. 9 is a cross-sectional view taken along line IX-IX of FIG. 8, and FIG. 10 is an exploded configuration of the first and second damping cylinders and intermediate rods of FIG. 9. is a drawing for explaining, and FIG. 11 is a drawing for explaining that the space between the first and second damping cylinders in FIG. 9 is narrowed based on the intermediate load, and FIG. 12 is a drawing for explaining the operation of the gas cylinder in FIG. 11. It is a drawing.

리니어연결부(500)는, 제1바디(100)에 고정되는 제1댐핑실린더(510)와, 제2바디(300)에 고정되는 제2댐핑실린더(520)와, 제1댐핑실린더(510)와 제2댐핑실린더(520)를 연결하면서 제1,2댐핑실린더(510)(520) 내측으로 출몰되는 매개로드(530)를 포함한다. The linear connection portion 500 includes a first damping cylinder 510 fixed to the first body 100, a second damping cylinder 520 fixed to the second body 300, and a first damping cylinder 510. It includes an intermediate rod 530 that protrudes inside the first and second damping cylinders 510 and 520 while connecting the second damping cylinder 520.

제1댐핑실린더(510)는, 도 9에 도시된 바와 같이, 일측면 및 타측면에 오일이 유출입되는 제1전방노즐(511a) 및 제1후방노즐(511b)이 형성되고 입구가 형성된 제1실린더관(511)과, 제1실린더관(511)의 입구에 결합되는 제1실린더헤더(512)와, 제1전방노즐(511a)과 제1후방노즐(511b) 사이의 제1실린더관(511)에 내장되는 것으로서 인가되는 압력에 의하여 신축되는 제1가스스프링(513)과, 제1가스스프링(513)과 제1전방노즐(511a) 사이의 제1실린더관(511)에 내장되는 제1전방피스톤(514)과, 제1가스스프링(513)과 제1후방노즐(511b) 사이의 제1실린더관(511)에 내장되는 제1후방피스톤(515)을 포함한다. As shown in FIG. 9, the first damping cylinder 510 has a first front nozzle 511a and a first rear nozzle 511b through which oil flows in and out on one side and the other side, and an inlet. The first cylinder header 512 coupled to the inlet of the cylinder tube 511 and the first cylinder tube 511, and the first cylinder tube between the first front nozzle 511a and the first rear nozzle 511b ( 511) and a first gas spring 513 that expands and contracts by the applied pressure, and a first cylinder tube 511 between the first gas spring 513 and the first front nozzle 511a. It includes a front piston 514 and a first rear piston 515 built into the first cylinder tube 511 between the first gas spring 513 and the first rear nozzle 511b.

제1실린더관(511)이 제1베이스(120)의 고정됨으로 제1댐핑실린더(510)는 제1바디(100)에 고정된다. As the first cylinder tube 511 is fixed to the first base 120, the first damping cylinder 510 is fixed to the first body 100.

제1가스스프링(513)은 제1전방피스톤(541)과 제1후방피스톤(515) 사이에 배치된다. 이러한 제1가스스프링(513)은, 압축가스가 내장된 원통형태의 제1스프링몸체(513a)와, 제1스프링몸체(513a)에서 출몰되는 제1스프링로드(513b)를 포함하며, 제1스프링로드(513b) 측으로 압력이 인가될 때 제1스프링로드(513b)는 제1스프링몸체(513a)로 몰입되고, 인가되는 압력이 해제되면 제1스프링로드(513b)는 제1스프링몸체(513a)로부터 돌출된다. The first gas spring 513 is disposed between the first front piston 541 and the first rear piston 515. This first gas spring 513 includes a cylindrical first spring body 513a with compressed gas built in, a first spring rod 513b protruding from the first spring body 513a, and a first spring rod 513b. When pressure is applied to the spring rod (513b), the first spring rod (513b) is immersed in the first spring body (513a), and when the applied pressure is released, the first spring rod (513b) is immersed in the first spring body (513a). ) protrudes from.

제1전방피스톤(514) 및 제1후방피스톤(515)은, 제1전방노즐(511a) 및 제1후방노즐(511b) 사이에 위치된다. 이에 따라, 제1전방노즐(511a) 및 제1후방노즐(511b)로 오일이 유출입될 때, 제1전방피스톤(514), 제1후방노즐(515) 및 제1전,후방 피스톤(514)(515) 사이의 제1가스스프링(513)은 한번이 전진 또는 후진된다. The first front piston 514 and the first rear piston 515 are located between the first front nozzle 511a and the first rear nozzle 511b. Accordingly, when oil flows in and out of the first front nozzle 511a and the first rear nozzle 511b, the first front piston 514, the first rear nozzle 515, and the first front and rear pistons 514 The first gas spring 513 between 515 moves forward or backward once.

제1전방피스톤(514) 및 제1후방피스톤(515)의 외주면에는 오링이 설치되어, 제1전방노즐(511a) 및 제1후방노즐(511b)로 유입되는 오일을 완전히 실링한다. O-rings are installed on the outer peripheral surfaces of the first front piston 514 and the first rear piston 515 to completely seal the oil flowing into the first front nozzle 511a and the first rear nozzle 511b.

제2댐핑실린더(520)는, 도 9에 도시된 바와 같이, 일측면 및 타측면에 오일이 유출입되는 제2전방노즐(521a) 및 제2후방노즐(521b)이 형성되고 입구가 형성된 제2실린더관(521)과, 제2실린더관(521)의 입구에 결합되는 제2실린더헤더(522)와, 제2전방노즐(521a)과 제2후방노즐(521b) 사이의 제2실린더관(521)에 내장되는 것으로서 인가되는 압력에 의하여 신축되는 제2가스스프링(523)과, 제2전방노즐(521a)과 제2가스스프링(523) 사이의 제2실린더관(521)에 내장되는 제2전방피스톤(524)과, 제2가스스프링(523)과 제2후방노즐(521b) 사이의 제2실린더관(521)에 내장되는 제2후방피스톤(525)을 포함한다. As shown in FIG. 9, the second damping cylinder 520 is a second front nozzle 521a and a second rear nozzle 521b through which oil flows in and out on one side and the other side, and a second inlet. A second cylinder header 522 coupled to the cylinder tube 521 and the inlet of the second cylinder tube 521, and a second cylinder tube between the second front nozzle 521a and the second rear nozzle 521b ( 521) and a second gas spring 523 that expands and contracts by the applied pressure, and a second cylinder tube 521 between the second front nozzle 521a and the second gas spring 523. It includes a second front piston 524 and a second rear piston 525 built into the second cylinder tube 521 between the second gas spring 523 and the second rear nozzle 521b.

제2실린더관(521)이 제2베이스(320)의 고정됨으로 제2댐핑실린더(520)는 제2바디(300)에 고정된다. As the second cylinder tube 521 is fixed to the second base 320, the second damping cylinder 520 is fixed to the second body 300.

제2가스스프링(523)은 제2전방피스톤(524)과 제2후방피스톤(525) 사이에 배치된다. 이러한 제2가스스프링(523)은, 압축가스가 내장된 원통형태의 제2스프링몸체(523a)와, 제2스프링몸체(523a)에서 출몰되는 제2스프링로드(523b)를 포함하며, 제2스프링로드(523b) 측으로 압력이 인가될 때 제2스프링로드(523b)는 제2스프링몸체(523a)로 몰입되고, 인가되는 압력이 해제되면 제2스프링로드(523b)는 제2스프링몸체(523a)로부터 돌출된다. The second gas spring 523 is disposed between the second front piston 524 and the second rear piston 525. This second gas spring 523 includes a cylindrical second spring body 523a with compressed gas built in, a second spring rod 523b protruding from the second spring body 523a, and a second spring rod 523b. When pressure is applied to the spring rod (523b), the second spring rod (523b) is immersed in the second spring body (523a), and when the applied pressure is released, the second spring rod (523b) is immersed in the second spring body (523a). ) protrudes from.

제2전방피스톤(524) 및 제2후방피스톤(525)은, 제2전방노즐(521a) 및 제2후방노즐(521b) 사이에 위치된다. 이에 따라, 제2전방노즐(521a) 및 제2후방노즐(521b)로 오일이 유출입될 때, 제2전방피스톤(524), 제2후방노즐(525) 및 제2전,후방 피스톤(524)(525) 사이의 제2가스스프링(523)은 한번이 전진 또는 후진된다. The second front piston 524 and the second rear piston 525 are located between the second front nozzle 521a and the second rear nozzle 521b. Accordingly, when oil flows in and out of the second front nozzle 521a and the second rear nozzle 521b, the second front piston 524, the second rear nozzle 525, and the second front and rear pistons 524 The second gas spring 523 between 525 moves forward or backward once.

제2전방피스톤(524) 및 제2후방피스톤(525)의 외주면에는 오링이 설치되어, 제2전방노즐(521a) 및 제2후방노즐(521b)로 유입되는 오일을 완전히 실링한다. O-rings are installed on the outer peripheral surfaces of the second front piston 524 and the second rear piston 525 to completely seal the oil flowing into the second front nozzle 521a and the second rear nozzle 521b.

제1,2가스스프링(513)(523)에는 질소가스가 충진되어 있으며, 제1,2스프링로드(513b)(523b)는 8cm 스트로크를 가지게 제1,2스프링몸체(513a)(523a) 내에서 출몰이 가능하다. The first and second gas springs (513) (523) are filled with nitrogen gas, and the first and second spring rods (513b) (523b) have a stroke of 8 cm and are located within the first and second spring bodies (513a) (523a). It is possible to appear in

매개로드(530)는, 제1실린더헤더(512)를 관통하여 제1전방피스톤(514)과 연결되고 제2실린더헤더(522)를 관통하여 제2전방피스톤(524)에 결합되는 로드몸체(531)와, 로드몸체(531)의 일측 내부에서 제1전방피스톤(514)을 관통하여 제1가스스프링(513) 측 공간과 외기를 연통시키는 제1에어홀(532)과, 로드몸체(531)의 타측 내부에서 제2전방피스톤(524)을 관통하여 제2가스스프링(523) 측 공간과 외기를 연통시키는 제2에어홀(533)을 포함한다. The intermediate rod 530 is connected to the first front piston 514 through the first cylinder header 512, and is a rod body ( 531), and a first air hole 532 that penetrates the first front piston 514 inside one side of the rod body 531 and communicates with the space on the side of the first gas spring 513 and the outside air, and the rod body 531 ) includes a second air hole 533 that penetrates the second front piston 524 inside the other side and communicates the space on the side of the second gas spring 523 with the outside air.

제1에어홀(532)의 입구(532a)는 제1전방피스톤(514)에 형성되고 출구(532b)는 로드몸체(531)의 중앙측에 형성된다.The inlet 532a of the first air hole 532 is formed in the first front piston 514, and the outlet 532b is formed in the center of the rod body 531.

제2에어홀(533)의 입구(533a)는 제2전방피스톤(524)에 형성되고 출구(532b)는 로드몸체(531)의 중앙측에 형성된다. The inlet 533a of the second air hole 533 is formed in the second front piston 524, and the outlet 532b is formed in the center of the rod body 531.

본 실시예에서 용이한 설명을 위하여 제1에어홀(532) 및 제2에어홀(533)로 분리하여 설명하였으나 하나의 구성으로 구현될 수 있음은 물론이며, 이 경우 출구(532b)(533b)는 하나의 구성으로 이루어진다.In this embodiment, for ease of explanation, the first air hole 532 and the second air hole 533 are described separately, but of course they can be implemented as a single configuration. In this case, the outlets 532b and 533b consists of one composition.

이러한 리니어 연결부(500)에 의하여, 제1전방노즐(511a) 또는 제1후방노즐(511b)로 오일을 주입함으로서 제1전방피스톤(514) 및 제1후방피스톤(514)를 제1실린더(511) 내에서 동시에 전후진시킬 수 있고, 제2전방노즐(521a) 또는 제2후방노즐(521b)로 오일을 주입함으로서 제2전방피스톤(524) 및 제2후방피스톤(524)를 제2실린더(521) 내에서 동시에 전후진시킬 수 있고, 이에 따라 매개로드(530)는 제1댐핑실린더(510) 및 제2댐핑실린더(520) 내측으로 출몰됨으로서 제1,2바디(100)(300) 사이의 간격이 좁아지거나 멀어진다. By this linear connection 500, oil is injected into the first front nozzle 511a or the first rear nozzle 511b, thereby connecting the first front piston 514 and the first rear piston 514 to the first cylinder 511. ) can be moved forward and backward at the same time, and by injecting oil into the second front nozzle (521a) or the second rear nozzle (521b), the second front piston (524) and the second rear piston (524) are connected to the second cylinder ( 521) can be moved forward and backward at the same time, and accordingly, the intermediate rod 530 appears inside the first damping cylinder 510 and the second damping cylinder 520 between the first and second bodies 100 and 300. The gap becomes narrower or farther away.

이때, 제1,2전방노즐(511a)(521a) 및 제1,2후방노즐(511b)(521b)로 유출입되는 오일양에 의하여, 매개로드(530)를 기준으로 제1,2바디(100)(300) 사이의 길이를 가변할 수 있으며, 이에 따라 관로(P)의 직격이 크거나 작을 때에도 본 발명의 도막제거 장비를 투입하여 사용할 수 있다. At this time, depending on the amount of oil flowing in and out of the first and second front nozzles (511a) (521a) and the first and second rear nozzles (511b) (521b), the first and second bodies (100) are connected to each other based on the intermediate rod (530). The length between (300) can be varied, and accordingly, the film removal equipment of the present invention can be used even when the direct hit of the pipe (P) is large or small.

이와 같이, 도 11에 도시된 바와 같이, 제1,2댐핑실린더(510)(520) 및 매개로드(530)에 의하여 제1,2바디(100)(300)의 간격이 좁아질 때, 본 발명의 도막제거 장비를 관로(P) 내로 유입되는 카트(미도시)에 실어 관로(P)를 따라 용이하게 이동시킬 수 있다. 그리고 제1,2바디(100)(300) 사이의 간격이 멀어질 때 제1,2롤러(110)(310)는 관로(P) 내주면에 밀착된다. In this way, as shown in FIG. 11, when the gap between the first and second bodies 100 and 300 is narrowed by the first and second damping cylinders 510 and 520 and the intermediate rod 530, the main The film removal equipment of the invention can be easily moved along the pipe (P) by placing it on a cart (not shown) that flows into the pipe (P). And when the gap between the first and second bodies 100 and 300 increases, the first and second rollers 110 and 310 come into close contact with the inner peripheral surface of the pipe (P).

한편, 관로(P)의 직경이 부분적으로 납작하게 찌그러지거나 또는 내주면이 부분적으로 돌출될 경우, 본 발명의 도막제거 장비가 회전될 때, 도 13에 도시된 바와 같이, 제1,2전방피스톤(514)(524)이 제1,2실린더관(511)(521)에서 몰입되면서 제1,2후방피스톤(515)(525)에 지지되는 제1,2가스스프링(513)(523)을 가압하고, 이에 따라 제1,2스프링로드(513b)(523b)가 제1,2스프링몸체(513a)(523a)로 몰입되면서 도막제거 장비가 회전될 수 있도록 한다. 이때, 제1,2가스피스톤(513)(523) 측 공간에 존재하는 에어는, 제1,2에어홀(532)(533)으로 배출되거나 유입되며, 이에 따라 제1,2가스스프링(513)(513)의 압축 동작이 반복적으로 진행될 수 있다. On the other hand, when the diameter of the pipe (P) is partially flattened or the inner peripheral surface is partially protruded, when the film removal equipment of the present invention is rotated, as shown in FIG. 13, the first and second front pistons ( 514) (524) is immersed in the first and second cylinder pipes (511) (521) and pressurizes the first and second gas springs (513) (523) supported by the first and second rear pistons (515) (525). And, accordingly, the first and second spring rods (513b) (523b) are immersed into the first and second spring bodies (513a) (523a) so that the film removal equipment can be rotated. At this time, the air existing in the space on the side of the first and second gas pistons (513) (523) is discharged or introduced into the first and second air holes (532) (533), and thus the first and second gas springs (513) ) The compression operation of 513 may proceed repeatedly.

도 13은 도 1의 도막박리부를 발췌하여 도시한 도면이고, 도 14는 도 13의 도막박리부를 설명하기 위한 평면도이고, 도 15는 도 13의 도막박리부의 내부 구성을 설명하기 위한 단면도이다. FIG. 13 is a drawing showing an excerpt of the coating film peeling part of FIG. 1, FIG. 14 is a plan view for explaining the coating film peeling part of FIG. 13, and FIG. 15 is a cross-sectional view for explaining the internal configuration of the coating film peeling part of FIG. 13.

도막박리부(600)는, 제1바디(100)의 제1테이블(140)에 설치되는 한쌍의 전방지지날개(610)와, 전방지지날개(610)에 회전 가능하게 축 결합된 회동축(620)과. 회동축(620)에 연장되게 고정되어 관로(P) 내주면에 밀착된 것으로서 노후 도막(F)을 긁어 박리하기 위한 상기 다수의 스크래퍼(630)와, 전방지지날개(610)의 후방측에 설치되는 후방지지날개(640)와, 후방지지날개(640)에 지지되어 관로(P) 내주면에 밀착되는 스크래퍼(630)의 텐션을 가변하기 위하여 회동축(620)을 시계 또는 반시계 방향으로 회동시키는 제1텐션인가부(650)를 포함한다. The coating film peeling unit 600 includes a pair of front support wings 610 installed on the first table 140 of the first body 100, and a rotation axis rotatably coupled to the front support wings 610. 620) and. It is fixed to extend on the rotation axis 620 and is in close contact with the inner peripheral surface of the pipe (P), and is installed on the rear side of the plurality of scrapers 630 for scraping and peeling off the aged coating film (F) and the front support wing 610. A device that rotates the rotating shaft 620 clockwise or counterclockwise to change the tension of the rear support wing 640 and the scraper 630 supported by the rear support wing 640 and in close contact with the inner peripheral surface of the pipe (P). 1Includes a tension application unit 650.

회동축(620)은 전방지지날개(610)에 회동 가능하게 지지됨과 동시에, 스크래퍼(630)가 돌출되게 지지한다. 이때 스크래퍼(630)는 회동축(620)에 볼트 및 너트에 의하여 착탈 가능하며, 이에 따라 스크래퍼(630)가 마모되면 다른 스크래퍼로 교체가 가능하다. The rotation axis 620 is rotatably supported on the front support wing 610 and supports the scraper 630 to protrude. At this time, the scraper 630 is detachable from the rotating shaft 620 using bolts and nuts, and accordingly, when the scraper 630 is worn, it can be replaced with another scraper.

스크래퍼(630)는, 도 14에 도시된 바와 같이, 회동축(620)에 다수개, 본 실시예에서는 3 개가 설치된다. 스크래퍼(630)는, 탄성이 큰 스프링철판을 스크랩 형태로 절단한 후 절곡됨으로서 구현되고, 회동축(620)에 고정되는 고정판(631)과, 고정판(631)에서 절곡되어 관로(P) 내주면에 밀착되는 나이프판(622)로 구성된다. 이러한 고정판(631)은 나이프판(622)을 탄성적으로 지지하고, 하단은 회동축(620)에 볼트 및 너트에 의하여 착탈 가능하게 고정된다. As shown in FIG. 14, a plurality of scrapers 630 are installed on the rotation axis 620, and in this embodiment, three scrapers are installed. The scraper 630 is implemented by cutting a spring steel plate with high elasticity into a scrap shape and then bending it, and includes a fixed plate 631 fixed to the rotating shaft 620 and bent from the fixed plate 631 to the inner peripheral surface of the pipeline (P). It consists of a knife plate 622 that is in close contact. This fixing plate 631 elastically supports the knife plate 622, and the lower end is detachably fixed to the rotation axis 620 with bolts and nuts.

제1텐션인가부(650)는, 회동축(620)로부터 돌출되는 레버(651)와, 레버(651)의 단부에 회전 가능하게 지지되는 것으로서 내부가 관통된 전방회전볼(652)과, 후방지지날개(640)에 회전 가능하게 결합되는 것으로서 내부에 나사홀이 형성된 후방회전볼(653)과, 전방회전볼(652)에 헛돌게 결합된 상태에서 후방회전볼(653)의 나사홀에 나사결합되는 볼트샤프트(654)와, 볼트샤프트(654)의 단부에 형성되어 볼트샤프트(654)를 정역회전 시키기 위한 손잡이(655)를 포함한다. The first tension application unit 650 includes a lever 651 protruding from the rotation axis 620, a front rotating ball 652 rotatably supported at the end of the lever 651 and penetrating the inside, and a rear rotating ball 652. The rear rotating ball 653, which is rotatably coupled to the support wing 640 and has a screw hole formed therein, is screwed into the screw hole of the rear rotating ball 653 while being loosely coupled to the front rotating ball 652. It includes a coupled bolt shaft 654 and a handle 655 formed at the end of the bolt shaft 654 to rotate the bolt shaft 654 forward and backward.

볼트샤프트(654)는, 전방회전볼(652)에 헛돌게 고정되고, 후방회전볼(653)에 나사결합되며, 이에 따라 볼트샤프트(654)가 회전될 때 후방회전볼(653)을 기준으로 하여 전방회전볼(652)은 전후진된다. The bolt shaft 654 is fixed to the front rotating ball 652 and screwed to the rear rotating ball 653, and accordingly, when the bolt shaft 654 is rotated, it rotates based on the rear rotating ball 653. Accordingly, the front rotating ball 652 moves forward and backward.

이러한 제1텐션인가부(650)에 의하여, 도 15에 도시된 바와 같이, 손잡이(655)를 회전시키면 볼트샤프트(654)에 의하여 전방회전볼(652)이 후방회전볼(653)을 기준으로 전진 또는 후진되고, 전방회전볼(652)이 전진하면 스크래퍼(630)는 관로(P) 내주면에 강한 텐션으로 밀착된다. 이에 따라, 제거하고자 하는 관로 도막(F)이 두껍거나 강도가 강할 때, 스크래퍼(630)의 텐션을 강하게 가변함으로써 효과적인 제거가 가능하다. By this first tension application unit 650, as shown in FIG. 15, when the handle 655 is rotated, the front rotating ball 652 is rotated based on the rear rotating ball 653 by the bolt shaft 654. It moves forward or backward, and when the front rotating ball 652 moves forward, the scraper 630 is in close contact with the inner peripheral surface of the pipe (P) with strong tension. Accordingly, when the pipe film F to be removed is thick or strong, effective removal is possible by strongly varying the tension of the scraper 630.

도 16은 도 1의 도막커팅부를 발췌하여 도시한 도면이고, 도 17은 도 16의 도막적단부를 설명하기 위한 평면도이고, 도 18은 도 16의 도막커팅부의 내부 구성을 설명하기 위한 단면도이고, 도 19는 도 18의 도막커팅부의 동작을 설명하기 위한 단면도이다. Figure 16 is a drawing showing an excerpt of the film cutting part of Figure 1, Figure 17 is a plan view for explaining the film cutting part of Figure 16, and Figure 18 is a cross-sectional view for explaining the internal configuration of the film cutting part of Figure 16, Figure 19 is a cross-sectional view for explaining the operation of the film cutting unit of Figure 18.

도막커팅부(700)는, 제2바디(300)에 설치되어 관로(P)의 내주면에 형성된 노후 도막(F)을 도막박리부(600)가 용이하게 박리할 수 있도록 작은 폭으로 커팅한다. 이러한 도막커팅부(700)는, 제2바디(300)의 제2테이블(340)에 배치되는 것으로서 전방측으로 개구된 U 형태의 커터브라켓(710)과, 커터브라켓(710)에 회전 가능하게 설치되는 것으로서 관로(P) 내주면의 노후 도막(F)을 원주 방향으로 커팅하는 다수의 커팅휠(720)과, 커팅휠(720)이 도막(F)에 밀착되도록 커터브라켓(710)에 텐션을 인가하는 제2텐션인가부(730)를 포함한다. The coating cutting unit 700 is installed on the second body 300 and cuts the aged coating film (F) formed on the inner peripheral surface of the pipe (P) to a small width so that the coating film peeling unit 600 can easily peel it off. This coating cutting unit 700 is disposed on the second table 340 of the second body 300 and is rotatably installed on the U-shaped cutter bracket 710 opened toward the front and the cutter bracket 710. As a result, tension is applied to a plurality of cutting wheels 720 that cut the aged coating film (F) on the inner peripheral surface of the pipe (P) in the circumferential direction, and to the cutter bracket (710) so that the cutting wheels (720) are in close contact with the coating film (F). It includes a second tension application unit 730 that does.

커터브라켓(710)은 다수의 커팅휠(720)을 이격된 상태로 회전 가능하게 지지한다. The cutter bracket 710 rotatably supports a plurality of cutting wheels 720 in a spaced apart state.

커팅휠(720)은 직경이 대략 10~20cm 이며, 도 17에 도시된 바와 같이, 커터브라켓(710)에 다수, 본 실시예에서는 6 개가 설치되며, 이에 따라 커팅휠(720)은 도막을 작은 폭의 스트랩 형태로 커팅한다. The cutting wheel 720 has a diameter of approximately 10 to 20 cm, and as shown in FIG. 17, a plurality of cutting wheels (6 in this embodiment) are installed on the cutter bracket 710. Accordingly, the cutting wheels 720 cut the coating film into small pieces. Cut into wide strap shapes.

제2텐션인가부(730)는, 커팅휠(720)이 도막(F)을 완벽하게 절단할 수 있도록 커팅휠(720)을 관로(P) 내주면에 탄성적으로 가압한다. 이러한 제2텐션인가부(730)는, 제2테이블(340)에 고정되는 것으로서 전방측으로 개구된 박스지그(731)와, 커터브라켓(710)의 배면에 돌출되게 결합되어 박스지그(731)에 슬라이드 가능하게 끼어지는 브라켓슬라이더(732)와, 브라켓슬라이더(732)와 박스지그(731)의 내측면(731a) 사이에 설치되는 스프링(733)과, 스프링(733)과 박스베이스 내측면(731a) 사이에 설치되는 가압단(734)과, 박스지그(731)의 배면에 관통되게 형성된 나사홀(731b)에 나사결합되어 가압단(734)을 선택적으로 가압하는 가압볼트(735)와, 가압볼트(735)의 단부에 형성되어 상기 가압볼트(735)를 정역회전 시키기 위한 손잡이(736)를 포함한다. The second tension application unit 730 elastically presses the cutting wheel 720 to the inner peripheral surface of the pipe (P) so that the cutting wheel 720 can perfectly cut the coating film (F). This second tension application part 730 is fixed to the second table 340 and is protrudingly coupled to the box jig 731 opened toward the front and the back of the cutter bracket 710 to the box jig 731. A bracket slider 732 that is slidably inserted, a spring 733 installed between the bracket slider 732 and the inner surface 731a of the box jig 731, and the spring 733 and the inner surface 731a of the box base. ) and a pressurizing bolt 735 that is screwed into the screw hole 731b formed through the back of the box jig 731 and selectively pressurizes the pressurizing end 734, which is installed between the pressurizing end 734 and the pressurizing end 734. It is formed at the end of the bolt 735 and includes a handle 736 for rotating the pressurizing bolt 735 forward and backward.

브라켓슬라이더(732)는 커터브라켓(710)의 배면을 지지하며, 박스지그(731) 내측으로 출몰되면서 커팅휠(720)을 전후방측으로 이동시킨다. The bracket slider 732 supports the back of the cutter bracket 710, and moves the cutting wheel 720 forward and backward as it protrudes inside the box jig 731.

이러한 제2텐션인가부(730)에 의하여, 커팅휠(720)이 관로(P)의 도막(F)의 표면에 밀착된 상태에서는, 도 18에 도시된 바와 같이, 스프링(733)은 벌어진 상태를 유지하고, 이에 따라 스프링(733)에 의하여 브라켓슬라이더(732)로 인가되는 탄성력은 작으므로, 커팅휠(720)은 관로 도막(F)에 작은 텐션으로 밀착된다. 이 경우, 커팅휠(720)은 상대적으로 얇은 도막(F)을 커팅할 수 있다. By this second tension application unit 730, when the cutting wheel 720 is in close contact with the surface of the coating film F of the pipe P, as shown in FIG. 18, the spring 733 is in an open state. is maintained, and accordingly, the elastic force applied to the bracket slider 732 by the spring 733 is small, so the cutting wheel 720 is in close contact with the pipe coating film (F) with a small tension. In this case, the cutting wheel 720 can cut a relatively thin coating film (F).

한편, 관로 도막(F)이 두꺼울 경우, 도 19에 도시된 바와 같이, 손잡이(736)를 회전시켜 가압볼트(735)를 스프링(733) 측으로 이동시킨다. 그러면 가압단(734)은 스프링(733)을 가압시켜 브라켓슬라이더(732)로 인가되는 탄성력은 크게 증가시키고. 이 경우 커터휠(720)은 관로 도막(F)에 큰 텐션으로 밀착되며, 이에 따라 커팅휠(720)은 상대적으로 두꺼운 도막(F)을 커팅할 수 있다. On the other hand, when the pipe coating film (F) is thick, as shown in FIG. 19, the handle 736 is rotated to move the pressure bolt 735 toward the spring 733. Then, the pressing end 734 presses the spring 733 and greatly increases the elastic force applied to the bracket slider 732. In this case, the cutter wheel 720 is in close contact with the pipeline coating film (F) with a large tension, and accordingly, the cutting wheel 720 can cut the relatively thick coating film (F).

즉, 제2텐션인가(730)에 의하여. 관로 도막(F)이 얇거나 두꺼울 경우, 또는 관로 도막(F)의 강도가 강하거나 작을 때, 커팅휠(720)로 적절한 텐션을 주어 관로(P)의 표면을 손상시키지 않고 도막(F)을 효과적으로 커팅할 수 있는 것이다. That is, by applying the second tension (730). When the pipe film (F) is thin or thick, or when the strength of the pipe film (F) is strong or small, appropriate tension can be applied with the cutting wheel (720) to cut the paint film (F) without damaging the surface of the pipe (P). It can cut effectively.

상기 도막커팅부(700)에 의하여, 다수의 커팅휠(720)은 관로(P) 내주면을 따라 도막(F)을 작은 폭의 스크랩 형태로 커팅할 수 있으며, 이에 따라 도막박리부(600)의 스크래퍼(630)는 스크랩 형태로 커팅된 도막(F)을 용이하면서 완벽하게 긁어 제거할 수 있다. By the coating cutting unit 700, the plurality of cutting wheels 720 can cut the coating film (F) into scraps of a small width along the inner peripheral surface of the pipe (P), and thus the coating film peeling unit 600 The scraper 630 can easily and completely scrape and remove the coating film (F) cut in the form of scrap.

이와 같이, 본 발명에 따르면, 제1,2롤러(110)(310)가 설치된 제1,2바디(100)(300)가 제1,2댐핑실린더(510)(520) 및 매개로드(530)에 의하여 신축이 가능하므로, 제1,2바디(100)(300) 사이 간격이 좁혀진 상태에서 대차에 탑재하여 좁은 관로(P) 내를 따라 이동이 가능하다. 더 나아가, 리니어 형태이므로 사람이 통과할 수 있는 공간을 형성하고, 이에 따라 작업성이 용이해진다. As such, according to the present invention, the first and second bodies 100 and 300 on which the first and second rollers 110 and 310 are installed are connected to the first and second damping cylinders 510 and 520 and the intermediate rod 530. ), so it is possible to move along the narrow pipe (P) by mounting it on a bogie with the gap between the first and second bodies (100) (300) narrowed. Furthermore, because it is linear, it creates a space through which people can pass, thereby making workability easier.

제1,2댐핑실린더(510)(520)에 제1,2가스스프링(513)(523)이 내장됨으로서, 관 변형이 발생되더라도 본 발명의 도막제거 장비는 관로(P)에서 원활히 회전할 수 있으며, 이에 따라 노후 도막(F)을 완벽하게 박리 및 제거할 수 있다.Since the first and second gas springs (513) (523) are built into the first and second damping cylinders (510) (520), the film removal equipment of the present invention can rotate smoothly in the pipe (P) even if pipe deformation occurs. Accordingly, the aged coating film (F) can be completely peeled off and removed.

또한 제1,2롤러(110)(310)가 제1,2베이스(120)(320)에 대하여 소정 각도로 틸팅됨으로써, 제1,2롤러(110)(310)의 회전방향에 따라 본 발명의 도막제거 장비는 관로(P) 내에서 전진 또는 후진할 수 있다. In addition, the first and second rollers 110 and 310 are tilted at a predetermined angle with respect to the first and second bases 120 and 320, so that according to the rotation direction of the first and second rollers 110 and 310, the present invention The film removal equipment can move forward or backward within the pipe (P).

또한 종래의 쇼트볼을 사용하지 않음으로써 노후 도막 제거과정에서 분진 발생을 최소화함으로써 집진장치의 운영을 최소화할 수 있다. In addition, by not using conventional short balls, the operation of the dust collection device can be minimized by minimizing the generation of dust during the process of removing the old paint film.

또한 도막박리부(600)가, 제1테이블(140)에 설치되는 한쌍의 전방지지날개(610)와, 전방지지날개(610)에 회전 가능하게 축 결합된 회동축(620)과. 회동축(620)에 연장되게 고정되어 관로(P) 내주면에 밀착된 것으로서 노후 도막(F)을 긁어 박리하기 위한 다수의 스크래퍼(630)와, 전방지지날개(610)의 후방측에 설치되는 후방지지날개(640)와, 후방지지날개(640)에 지지되어 회동축(620)을 시계 또는 반시계 방향으로 회동시키는 제1텐션인가부(650)를 포함함으로서, 관로(P) 내주면에 밀착되는 스크래퍼(630)의 텐션을 가변하여 도막(P)을 효과적으로 긁어 제거할 수 있음과 동시에, 필요에 따라 스크래퍼(630)를 교체함으로써 스크래핑 능력을 최대한 향상시킬 수 있다. In addition, the coating film peeling unit 600 includes a pair of front support wings 610 installed on the first table 140, and a pivot shaft 620 rotatably coupled to the front support wings 610. A plurality of scrapers 630 that are extended and fixed to the rotation axis 620 and are in close contact with the inner peripheral surface of the pipe (P) for scraping and peeling off the aged coating film (F), and a rear scraper installed on the rear side of the front support wing 610. It includes a support wing 640 and a first tension application part 650 that is supported on the rear support wing 640 and rotates the rotation axis 620 clockwise or counterclockwise, and is in close contact with the inner peripheral surface of the pipe (P). By varying the tension of the scraper 630, the coating film P can be effectively scraped and removed, and at the same time, the scraping ability can be maximized by replacing the scraper 630 as needed.

그리고 도막커팅부(700)가 제2바디(300)의 제2테이블(340)에 배치되는 것으로서 전방측으로 개구된 U 형태의 커터브라켓(710)과, 커터브라켓(710)에 회전 가능하게 설치되는 것으로서 관로(P) 내주면의 노후 도막(F)을 원주 방향으로 커팅하는 다수의 커팅휠(720)과, 커팅휠(720)이 상기 도막(F)에 밀착되도록 커터브라켓(710)에 텐션을 인가하는 제2텐션인가부(730)를 포함함으로써, 도막(F)을 작은 폭을 이루면서 원주 방향으로 커팅할 수 있으며, 이에 따라 도막박리부(600)의 스크래퍼(630)는 작은 폭으로 커팅된 도막(F)을 용이하면서 완벽하게 긁어 제거할 수 있다. In addition, the coating cutting unit 700 is disposed on the second table 340 of the second body 300, has a U-shaped cutter bracket 710 opened toward the front, and is rotatably installed on the cutter bracket 710. As a result, tension is applied to a plurality of cutting wheels 720 that cut the aged coating film (F) on the inner peripheral surface of the pipe (P) in the circumferential direction, and to the cutter bracket 710 so that the cutting wheels 720 are in close contact with the coating film (F). By including the second tension application portion 730, the coating film F can be cut in the circumferential direction while forming a small width, and accordingly, the scraper 630 of the coating film peeling unit 600 cuts the coating film F into a small width. (F) can be easily and completely removed by scraping.

본 발명은 도면에 도시된 일 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. The present invention has been described with reference to an embodiment shown in the drawings, but this is merely illustrative, and those skilled in the art will understand that various modifications and other equivalent embodiments are possible therefrom.

100 ... 제1바디 110 ... 제1롤러
111 ... 제1탄성층 112 ... 제1회전축
120 ... 제1베이스 130 ... 제1롤러지지부
131 ... 제1스테이지 132 ... 제1베어링브라켓
140 ... 제1테이블 150 ... 제1틸팅가변부
151 ... 제1축결합부 152 ... 제1돌부
153 ... 제1돌부회동부 153a ... 제1지지축
153b ... 제1볼스크류 153c ... 제1장공
153d ... 제1볼 154 ... 제1자동조작부
154a ... 제1기어드모터 154b ... 제1컨넥터
155 ... 제1원주홈 156 ... 제1와셔볼트
200 ... 제1롤러구동부 210 ... 제1기어드모터
220 ... 제1모터스프로킷 230 ... 제1롤러스프로킷
240 ... 제1체인 250 ... 제1아이들러
300 ... 제2바디 310 ... 제2롤러
311 ... 제2탄성층 312 ... 제2회전축
320 ... 제2베이스 330 ... 제2롤러지지부
331 ... 제2스테이지 332 ... 제2베어링브라켓
340 ... 제2테이블 350 ... 제2틸팅가변부
351 ... 제2축결합부 352 ... 제2돌부
353 ... 제2돌부회동부 353a ... 제2지지축
353b ... 제2볼스크류 353c ... 제2장공
353d ... 제2볼 354 ... 제2자동조작부
354a ... 제2기어드모터 354b ... 제2컨넥터
355 ... 제2원주홈 356 ... 제2와셔볼트
400 ... 제2롤러구동부 410 ... 제2기어드모터
420 ... 제2모터스프로킷 430 ... 제2롤러스프로킷
440 ... 제2체인 450 ... 제2아이들러
500 ... 리니어연결부 510 ... 제1댐핑실린더
511 ... 제1실린더관 511a ... 제1전방노즐
511b ... 제1후방노즐 512 ... 제1실린더헤더
513 ... 제1가스스프링 513a ... 제1스프링몸체
513b ... 제1스프링로드 514 ... 제1전방피스톤
515 ... 제1후방피스톤 520 ... 제2댐핑실린더
521 ... 제2실린더관 521a ... 제2전방노즐
521b ... 제2후방노즐 522 ... 제2실린더헤더
523 ... 제2가스스프링 523a ... 제2스프링몸체
523b ... 제2스프링로드 524 ... 제2전방피스톤
525 ... 제2후방피스톤 530 ... 매개로드
531 ... 로드몸체 532 ... 제1에어홀
533 ... 제2에어홀 600 ... 도막박리부
610 ... 전방지지날개 620 ... 회동축
630 ... 스크래퍼 631 ... 고정판
632 ... 나이프판 640 ... 후방지지날개
650 ... 제1텐션인가부 651 ... 레버
652 ... 전방회전볼 653 ... 후방회전볼
654 ... 볼트샤프트 655 ... 손잡이
700 ... 도막커팅부 710 ... 커터브라켓
720 ... 커팅휠 730 ... 제2텐션인가부
731 ... 박스지그 731a ... 내측면
731b ... 나사홀 732 ... 브라켓슬라이더
733 ... 스프링 734 ... 가압단
735 ... 가압볼트 736 ... 손잡이
800 ... 스위블
100 ... first body 110 ... first roller
111 ... first elastic layer 112 ... first rotation axis
120 ... first base 130 ... first roller support
131 ... 1st stage 132 ... 1st bearing bracket
140 ... 1st table 150 ... 1st tilting variable part
151 ... first shaft coupling portion 152 ... first protrusion
153 ... first protruding part 153a ... first support axis
153b ... 1st ball screw 153c ... 1st long hole
153d ... 1st ball 154 ... 1st automatic operation unit
154a ... first geared motor 154b ... first connector
155 ... 1st circumferential groove 156 ... 1st washer bolt
200 ... first roller driving part 210 ... first geared motor
220 ... 1st motor sprocket 230 ... 1st roller sprocket
240 ... 1st chain 250 ... 1st idler
300 ... 2nd body 310 ... 2nd roller
311 ... second elastic layer 312 ... second rotation axis
320 ... second base 330 ... second roller support
331 ... 2nd stage 332 ... 2nd bearing bracket
340 ... 2nd table 350 ... 2nd tilting variable part
351 ... second shaft coupling portion 352 ... second protrusion
353 ... second protruding part 353a ... second support axis
353b ... 2nd ball screw 353c ... 2nd long hole
353d ... 2nd ball 354 ... 2nd automatic operation unit
354a ... 2nd geared motor 354b ... 2nd connector
355 ... 2nd circumferential groove 356 ... 2nd washer bolt
400 ... 2nd roller driving part 410 ... 2nd geared motor
420 ... 2nd motor sprocket 430 ... 2nd roller sprocket
440 ... 2nd chain 450 ... 2nd idler
500 ... Linear connection 510 ... 1st damping cylinder
511 ... first cylinder tube 511a ... first front nozzle
511b ... first rear nozzle 512 ... first cylinder header
513 ... first gas spring 513a ... first spring body
513b ... 1st spring rod 514 ... 1st front piston
515 ... 1st rear piston 520 ... 2nd damping cylinder
521 ... 2nd cylinder tube 521a ... 2nd front nozzle
521b ... 2nd rear nozzle 522 ... 2nd cylinder header
523 ... second gas spring 523a ... second spring body
523b ... 2nd spring rod 524 ... 2nd front piston
525 ... 2nd rear piston 530 ... intermediate rod
531 ... rod body 532 ... first air hole
533 ... second air hole 600 ... film peeling part
610 ... front support wing 620 ... rotation axis
630 ... scraper 631 ... fixing plate
632 ... Knife plate 640 ... Rear support wing
650 ... 1st tension application 651 ... lever
652 ... front rotating ball 653 ... rear rotating ball
654 ... bolt shaft 655 ... handle
700 ... Paint cutting part 710 ... Cutter bracket
720 ... cutting wheel 730 ... second tension application
731 ... box jig 731a ... inner side
731b ... screw hole 732 ... bracket slider
733 ... Spring 734 ... Pressure end
735 ... pressurizing bolt 736 ... handle
800 ... swivel

Claims (6)

관로(P)의 내부 일측에 밀착되어 구름 운동하는 제1롤러(110)를 가지는 제1바디(100);
상기 제1바디(100)에 탑재되어 상기 제1롤러(110)를 회전 구동시키는 제1롤러구동부(200);
상기 관로(P)의 내부 타측에 밀착되어 구름 운동하는 제2롤러(310)를 가지는 제2바디(300);
상기 제2바디(300)에 탑재되어 상기 제2롤러(310)를 회전 구동시키는 제2롤러구동부(400);
상기 제1바디(100)와 제2바디(300) 사이를 이격시키면서 연결하는 것으로서, 상기 제1바디(100)에 고정되는 제1댐핑실린더(510)와, 상기 제2바디(300)에 고정되는 제2댐핑실린더(520)와, 상기 제1댐핑실린더(510)와 제2댐핑실린더(520)를 연결하면서 상기 제1,2댐핑실린더(510)(520) 내측으로 출몰되는 매개로드(530)를 포함하는 리니어연결부(500); 및
상기 제1바디(100)에 설치된 것으로서 관로(P) 내주면의 노후 도막(F)을 긁어 박리시키기 위한 스크래퍼(630)를 가지는 도막박리부(600);를 포함하고,
상기 제1댐핑실린더(510)는, 일측면 및 타측면에 오일이 유출입되는 제1전방노즐(511a) 및 제1후방노즐(511b)이 형성되고 입구가 형성된 제1실린더관(511)과, 상기 제1실린더관(511)의 입구에 결합되는 제1실린더헤더(512)와, 상기 제1전방노즐(511a)과 제1후방노즐(511b) 사이의 제1실린더관(511)에 내장되는 것으로서 인가되는 압력에 의하여 신축되는 제1가스스프링(513)과, 상기 제1가스스프링(513)과 제1전방노즐(511a) 사이의 제1실린더관(511)에 내장되는 제1전방피스톤(514)과, 상기 제1가스스프링(513)과 제1후방노즐(511b) 사이의 제1실린더관(511)에 내장되는 제1후방피스톤(515)을 포함하고,
상기 제2댐핑실린더(520)는, 일측면 및 타측면에 오일이 유출입되는 제2전방노즐(521a) 및 제2후방노즐(521b)이 형성되고 입구가 형성된 제2실린더관(521)과, 상기 제2실린더관(521)의 입구에 결합되는 제2실린더헤더(522)와, 상기 제2전방노즐(521a)과 제2후방노즐(521b) 사이의 제2실린더관(521)에 내장되는 것으로서 인가되는 압력에 의하여 신축되는 제2가스스프링(523)과, 상기 제2전방노즐(521a)과 제2가스스프링(523) 사이의 제2실린더관(521)에 내장되는 제2전방피스톤(524)과, 상기 제2가스스프링(523)과 제2후방노즐(521b) 사이의 제2실린더관(521)에 내장되는 제2후방피스톤(525)을 포함하는 것을 특징으로 하는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비.
A first body 100 having a first roller 110 that is in close contact with one inner side of the pipe P and moves in a rolling motion;
A first roller driving unit 200 mounted on the first body 100 to rotate the first roller 110;
A second body 300 having a second roller 310 that is in close contact with the other inner side of the pipe P and moves in a rolling motion;
a second roller driving unit 400 mounted on the second body 300 to rotate the second roller 310;
It connects the first body 100 and the second body 300 while spaced apart, and includes a first damping cylinder 510 fixed to the first body 100 and a first damping cylinder 510 fixed to the second body 300. An intermediate rod 530 that appears inside the first and second damping cylinders 510 and 520 while connecting the second damping cylinder 520 and the first damping cylinder 510 and the second damping cylinder 520. ) Linear connection unit 500 including; and
It includes a coating film peeling unit 600 installed on the first body 100 and having a scraper 630 for scraping and peeling off the aged coating film (F) on the inner peripheral surface of the pipe (P),
The first damping cylinder 510 includes a first cylinder tube 511 having an inlet and a first front nozzle 511a and a first rear nozzle 511b through which oil flows in and out on one side and the other side, and Built into the first cylinder header 512 coupled to the inlet of the first cylinder tube 511, and the first cylinder tube 511 between the first front nozzle 511a and the first rear nozzle 511b. A first gas spring 513 that expands and contracts by the applied pressure, and a first front piston ( 514) and a first rear piston 515 built into the first cylinder tube 511 between the first gas spring 513 and the first rear nozzle 511b,
The second damping cylinder 520 includes a second cylinder tube 521 having a second front nozzle 521a and a second rear nozzle 521b through which oil flows in and out on one side and the other side, and an inlet, and A second cylinder header 522 coupled to the inlet of the second cylinder pipe 521, and built into the second cylinder pipe 521 between the second front nozzle 521a and the second rear nozzle 521b. A second gas spring 523 that expands and contracts by the applied pressure, and a second front piston ( 524) and a second rear piston 525 built into the second cylinder pipe 521 between the second gas spring 523 and the second rear nozzle 521b. Improved film removal equipment for pipe rehabilitation.
제1항에 있어서, 상기 도막박리부(600)는,
상기 제1바디(100)의 제1테이블(140)에 설치되는 한쌍의 전방지지날개(610)와,
상기 전방지지날개(610)에 회전 가능하게 축 결합된 회동축(620)과,
상기 회동축(620)에 연장되게 고정되어 관로(P) 내주면에 밀착된 것으로서 노후 도막(F)을 긁어 박리하기 위한 상기 다수의 스크래퍼(630)를 포함하는 것을 특징으로 하는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비.
The method of claim 1, wherein the coating film peeling unit 600 is,
A pair of front support wings 610 installed on the first table 140 of the first body 100,
A pivot shaft 620 rotatably coupled to the front support wing 610,
A pipe with improved scraping ability, characterized in that it includes a plurality of scrapers (630) that are extended and fixed to the rotating shaft (620) and in close contact with the inner peripheral surface of the pipe (P) for scraping and peeling off the aged coating film (F). Paint removal equipment for rehabilitation.
제2항에 있어서, 상기 도막박리부(600)는,
상기 전방지지날개(610)의 후방측에 설치되는 후방지지날개(640)와,
상기 후방지지날개(640)에 지지되어 상기 관로(P) 내주면에 밀착되는 스크래퍼(630)의 텐션을 가변하기 위하여 회동축(620)을 시계 또는 반시계 방향으로 회동시키는 제1텐션인가부(650)를 포함하는 것을 특징으로 하는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비.
The method of claim 2, wherein the coating film peeling unit 600 is,
A rear support wing 640 installed on the rear side of the front support wing 610,
A first tension application unit 650 that rotates the rotation axis 620 clockwise or counterclockwise to vary the tension of the scraper 630 supported by the rear support wing 640 and in close contact with the inner peripheral surface of the pipe (P). ), a film removal equipment for pipe rehabilitation with improved scraping ability, characterized in that it includes.
제3항에 있어서, 상기 제1텐션인가부(650)는,
상기 회동축(620)로부터 돌출되는 레버(651)와,
상기 레버(651)의 단부에 회전 가능하게 지지되는 것으로서 내부가 관통된 전방회전볼(652)과,
상기 후방지지날개(640)에 회전 가능하게 결합되는 것으로서 내부에 나사홀이 형성된 후방회전볼(653)과,
상기 전방회전볼(652)에 헛돌게 결합된 상태에서 상기 후방회전볼(653)의 나사홀에 나사결합되는 볼트샤프트(654)를 포함하는 것을 특징으로 하는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비.
The method of claim 3, wherein the first tension application unit 650,
A lever 651 protruding from the rotation axis 620,
A front rotating ball 652 rotatably supported at the end of the lever 651 and having a penetrating interior,
A rear rotating ball 653 rotatably coupled to the rear support wing 640 and having a screw hole formed therein,
Film removal for pipe rehabilitation with improved scraping ability, characterized in that it includes a bolt shaft 654 screwed to the screw hole of the rear rotating ball 653 in a state of being loosely coupled to the front rotating ball 652. equipment.
삭제delete 제1항에 있어서, 상기 매개로드(530)는,
상기 제1실린더헤더(512)를 관통하여 상기 제1전방피스톤(514)과 연결되고 상기 제2실린더헤더(522)를 관통하여 제2전방피스톤(524)에 결합되는 로드몸체(531)와,
상기 로드몸체(531)의 일측 내부에서 상기 제1전방피스톤(514)을 관통하여 상기 제1가스스프링(513) 측 공간과 외기를 연통시키는 제1에어홀(532)과,
상기 로드몸체(531)의 타측 내부에서 상기 제2전방피스톤(524)을 관통하여 상기 제2가스스프링(523) 측 공간과 외기를 연통시키는 제2에어홀(533)을 포함하는 것을 특징으로 하는, 스크래핑 능력이 향상된 관로갱생용 도막제거 장비.
The method of claim 1, wherein the intermediate rod 530 is:
A rod body 531 connected to the first front piston 514 through the first cylinder header 512 and coupled to the second front piston 524 through the second cylinder header 522,
A first air hole 532 passing through the first front piston 514 inside one side of the rod body 531 and communicating with the space on the side of the first gas spring 513 and external air,
Characterized in that it includes a second air hole 533 that penetrates the second front piston 524 inside the other side of the rod body 531 and communicates with the space on the side of the second gas spring 523 and external air. , Film removal equipment for pipe rehabilitation with improved scraping ability.
KR1020230047228A 2023-04-11 2023-04-11 Equipment for rehabilitating superannuated pipes KR102667471B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020230047228A KR102667471B1 (en) 2023-04-11 2023-04-11 Equipment for rehabilitating superannuated pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020230047228A KR102667471B1 (en) 2023-04-11 2023-04-11 Equipment for rehabilitating superannuated pipes

Publications (1)

Publication Number Publication Date
KR102667471B1 true KR102667471B1 (en) 2024-05-20

Family

ID=91282595

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020230047228A KR102667471B1 (en) 2023-04-11 2023-04-11 Equipment for rehabilitating superannuated pipes

Country Status (1)

Country Link
KR (1) KR102667471B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090025881A (en) * 2007-09-07 2009-03-11 덕원산업개발주식회사 An apparatus for removing coal tar on the inner surface of the superannuated pipe
KR20130122313A (en) * 2012-04-30 2013-11-07 주식회사 포스코 Robot device for pipe line
KR101338970B1 (en) * 2013-06-19 2013-12-10 수자원기술 주식회사 Rust and coating removing system by using vehicle and induction coil of inside of large size pipe
KR101517199B1 (en) * 2014-07-18 2015-05-04 홍익산업개발 주식회사 Coating-layer removal device for regenerating superannuated pipes and its manufacturing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090025881A (en) * 2007-09-07 2009-03-11 덕원산업개발주식회사 An apparatus for removing coal tar on the inner surface of the superannuated pipe
KR20130122313A (en) * 2012-04-30 2013-11-07 주식회사 포스코 Robot device for pipe line
KR101338970B1 (en) * 2013-06-19 2013-12-10 수자원기술 주식회사 Rust and coating removing system by using vehicle and induction coil of inside of large size pipe
KR101517199B1 (en) * 2014-07-18 2015-05-04 홍익산업개발 주식회사 Coating-layer removal device for regenerating superannuated pipes and its manufacturing method

Similar Documents

Publication Publication Date Title
US5458683A (en) Device for surface cleaning, surface preparation and coating applications
US5263504A (en) Apparatus and method for cleaning with a focused fluid stream
CN111962003A (en) Tungsten carbide spraying equipment with grinding and surface defect repairing functions
JPH08206619A (en) Pipe line treating device
JPH072235B2 (en) Piping system processing equipment
CN111644309A (en) Rotary spraying equipment for steel pipe production and processing and spraying method thereof
KR102667471B1 (en) Equipment for rehabilitating superannuated pipes
KR102667473B1 (en) Equipment for rehabilitating superannuated pipes
KR102667470B1 (en) Equipment for rehabilitating superannuated pipes
CN116603672B (en) Corrosion-resistant treatment device and corrosion-resistant method for electric power iron tower
CN110681653A (en) Elastic cleaning device for attachments on inner wall of pipeline
CN117085885B (en) Stainless steel spraying device for detection
CN110883657A (en) Polishing device for nodular cast iron jacking pipe and using method thereof
KR101369680B1 (en) A painting device
CN216143383U (en) Flexible shaft suitable for robot for pipeline inner wall anticorrosion operation
JPH03229663A (en) Method and apparatus for applying oil to inner surface of steel pipe
CN115138508A (en) Paint spraying apparatus is used in intelligent machine-building processing
KR102251235B1 (en) Gun type underwater coating equipment using a piston
KR101937089B1 (en) Method for rehabilitating superannuated pipes using shot blasting equipment
CN212681478U (en) Copper paint spraying apparatus
CN221088666U (en) Shot blasting machine for continuous shot blasting processing
CN219909811U (en) Wall paint spraying equipment
CN113738995B (en) Robot for pipeline inner wall corrosion prevention operation
KR100199070B1 (en) Paint removing apparatus
CN221063176U (en) Paint spraying device for machining automobile parts

Legal Events

Date Code Title Description
GRNT Written decision to grant