KR102654499B1 - Construction method of communication structure with - Google Patents
Construction method of communication structure with Download PDFInfo
- Publication number
- KR102654499B1 KR102654499B1 KR1020210136168A KR20210136168A KR102654499B1 KR 102654499 B1 KR102654499 B1 KR 102654499B1 KR 1020210136168 A KR1020210136168 A KR 1020210136168A KR 20210136168 A KR20210136168 A KR 20210136168A KR 102654499 B1 KR102654499 B1 KR 102654499B1
- Authority
- KR
- South Korea
- Prior art keywords
- communication
- pole
- flange
- steel pipe
- pipe
- Prior art date
Links
- 238000004891 communication Methods 0.000 title claims abstract description 88
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 34
- 239000010959 steel Substances 0.000 claims abstract description 34
- 238000009434 installation Methods 0.000 claims abstract description 20
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 238000003780 insertion Methods 0.000 claims description 10
- 230000037431 insertion Effects 0.000 claims description 10
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 4
- 239000007787 solid Substances 0.000 abstract description 2
- 230000008901 benefit Effects 0.000 description 5
- 239000002184 metal Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 206010033799 Paralysis Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Support Of Aerials (AREA)
Abstract
본 발명은 통신케이블의 가설을 위해 설치되는 통신주의 강도를 보강하고 견고한 설치로서 강한 바람이나 케이블의 긴장력에 의해 휘어지거나 변형되는 것을 방지한 보강구조를 갖는 통신주의 시공방법에 관한 것으로, 단관체로 된 강관 통신주 본체의 외면에 한 쌍으로 이루어져 통신주 본체의 외면을 감싸는 상태로 결합되는 반경관이 중첩되게 설치되고, 상기 한 쌍의 반경관에는 양단에 플랜지가 ㄱ 자 형상으로 대응되게 돌출 형성되어 서로 합체된 상태에서 일정 간격으로 체결되는 볼트에 의해 통신주 본체의 외면에 이중으로 중첩 설치되어 보강구조를 갖는 통신주의 시공방법을 특징으로 한다. The present invention relates to a method of constructing a communication pole having a reinforcing structure that reinforces the strength of a communication pole installed for laying a communication cable and prevents it from being bent or deformed by strong wind or tension of the cable through solid installation. It is made of a single pipe. A pair of radial pipes are installed on the outer surface of the steel pipe communication pole main body to overlap and surround the outer surface of the communication pole main body, and flanges at both ends of the pair of radial pipes are formed to protrude correspondingly in an L shape and are combined with each other. It is characterized by a construction method of a telecommunication pole that has a reinforcing structure by being double-overlapped and installed on the outer surface of the main body of the telecommunication pole by bolts fastened at regular intervals in the installed state.
Description
본 발명은 보강구조를 갖는 통신주의 시공방법에 관한 것으로, 더욱 상세하게는 통신케이블의 가설을 위해 설치되는 통신주의 강도를 보강하고 견고한 설치로서 강한 바람이나 케이블의 긴장력에 의해 휘어지거나 변형되는 것을 방지한 보강구조를 갖는 통신주의 시공방법에 관한 것이다. The present invention relates to a method of constructing a communication pole having a reinforcing structure, and more specifically, to reinforce the strength of a communication pole installed for laying a communication cable and prevent it from being bent or deformed by strong wind or tension of the cable through solid installation. This relates to the construction method of a communication pole with a reinforced structure.
근래에는 IT기술이 발달하고 이동통신 기술이 발달하면서 통신선로의 건설은 더욱 확대되고 있으며, 이러한 통신선로는 IP강관주로 불리는 통신주에 설치되는 데 통신케이블이 가설되는 통신주는 철재강관으로 제작되어 통신케이블이 연결되는 지역의 지고(地高)에 따라 통신케이블을 비교적 수평으로 배선하기 위하여 통상 2단 이상의 적정 높이로 조립하여 설치하게 되고 상단에 통신케이블을 지지 연결하기 위한 케이블 클램프와 안테나, 단자함 등 여러가지의 통신관련시설물 들을 클램프에 의해 고정 설치하고 상기 통신주를 경유하여 통신케이블을 인접한 통신주로 연결하거나 수용가 쪽으로 연결 설치하게 된다. In recent years, with the development of IT technology and mobile communication technology, the construction of communication lines is expanding further. These communication lines are installed on communication poles called IP steel pipe poles, and the poles on which communication cables are installed are made of steel pipes and are used as communication cables. In order to route communication cables relatively horizontally depending on the altitude of the connected area, they are usually assembled and installed at an appropriate height of two or more stages, and various cable clamps, antennas, terminal boxes, etc. are installed at the top to support and connect the communication cables. Communication-related facilities are fixed and installed with clamps, and communication cables are connected to adjacent communication poles or installed toward customers via the telecommunication pole.
이와 같은 통신주는 운반과 설치의 어려움 등으로 인해 비교적 짧은 길이로서 제작하여 2단 이상으로 끼워 결합하는 조립식으로 설치하는 것이 일반적이고 풍속등에 대응하기 위해 일정한 두께의 단면으로 구성하게 되는 데 그 두께는 전체 중량을 줄이고 크레인 등에 의한 공중 조립 작업상의 어려움을 해소하기 위해 비교적 얇은 두께로서 구성하게 된다. Due to difficulties in transportation and installation, such communication poles are generally manufactured in relatively short lengths and installed in a prefabricated manner by fitting and joining in two or more stages. In order to respond to wind speed, etc., they are constructed with a cross-section of a certain thickness, and the thickness is the overall thickness. In order to reduce weight and eliminate difficulties in aerial assembly work using cranes, etc., it is constructed with a relatively thin thickness.
따라서, 통신주가 2단 이상 긴 길이로 조립 설치한 경우 강한 풍속뿐 아니라 강한 태풍이 불 때 반복적으로 흔들리면서 휘어지는 변형이 쉽게 발생하게 되고 또 연결된 통신케이블의 긴장력을 지속적으로 받는 과정에서 쉽게 변형되는 단점과 이 과정에서 안전사고의 위험과 통신마비 현상을 발생시키게 되는 문제점이 있었을 뿐 아니라 통신주에 단자함과 안테나 등을 단순히 고정밴드로서 결속하여 설치하게 되므로 결속력이 약하여 바람 등에 의해 지속적으로 흔들리면서 단자함과 안테나 등이 밑으로 처지게 되는 문제점이 있었다. Therefore, if the telecommunication poles are assembled and installed in a long length of two or more stages, they are easily deformed by being shaken repeatedly during strong wind speeds as well as strong typhoons, and are easily deformed in the process of continuously receiving tension from the connected communication cables. In this process, not only was there a risk of safety accidents and problems causing communication paralysis, but because the terminal box and antenna were installed simply by binding them to the telecommunication pole with a fixed band, the binding force was weak and the terminal box and antenna were constantly shaken by the wind. There was a problem with it sagging downwards.
본 발명의 목적은 상기한 문제점을 해소하기 위한 것으로 다단으로 조립설치되는 통신주의 외면에 통신주를 감싸는 한 쌍의 반경관을 중첩되게 결합 체결하여 통신주의 강도를 보강하고, 반경관을 체결하는 플랜지에 부분적으로 단자함 등 통신관련 시설물을 긴밀하게 설치할 수 있도록 체결밴드가 안착되는 결여부를 형성하여 시설물의 설치를 용이하게 하고 보강된 통신주를 보다 견고하게 고정하는 보강구조를 갖는 통신주의 시공방법을 제공하는 데 있다. The purpose of the present invention is to solve the above-mentioned problems, and to strengthen the strength of the communication pole by overlapping and fastening a pair of radial pipes surrounding the communication pole to the outer surface of the communication pole that is assembled and installed in multiple stages, and to the flange for fastening the radius pipe. In order to partially install communication-related facilities such as terminal boxes, a missing part where a fastening band is seated is formed to facilitate installation of the facility, and to provide a construction method for a communication pole with a reinforcing structure to more firmly fix the reinforced communication pole. there is.
삭제delete
본 발명은 이러한 목적을 달성하기 위한 수단으로, 상부상관과 하부강관을 조립 연결하여 소정의 길이를 가진 통신주 본체를 형성하는 단계;The present invention is a means for achieving this purpose, comprising the steps of assembling and connecting the upper pipe and the lower steel pipe to form a communication pole main body with a predetermined length;
삭제delete
삭제delete
상기, 통신주 본체의 상부강관의 외면에 ㄱ자 형상으로 대응되게 돌출시킨 플랜지에 결여부가 한 개 이상 소정 간격을 두고 형성된 한 쌍의 반경관을 감싸는 상태로 중첩시켜 플랜지를 볼트로서 견고하게 체결 고정하는 단계;Above, the step of attaching one or more missing portions to a flange correspondingly protruding in an L-shape from the outer surface of the upper steel pipe of the communication main body in a state surrounding a pair of radial pipes formed at a predetermined interval and firmly fastening the flange with a bolt. ;
통신주 본체의 하부강관의 외면에 ㄱ자 형상으로 대응되게 돌출시킨 플랜지의 결여부가 한 개 이상 형성된 한 쌍의 반경관을 감싸는 상태로 중첩시켜 플랜지를 볼트로서 견고하게 체결 고정하는 단계;A step of overlapping a pair of radial pipes in which at least one missing part of the flange correspondingly protruding in an L shape is formed on the outer surface of the lower steel pipe of the communication pole main body in a state of surrounding it and firmly fastening the flange with a bolt;
상기, 상부강관의 반경관에 형성된 플랜지의 결여부에 한 쌍의 이격된 반원판의 간격부로 플랜지가 통과되도록 볼트로서 체결한 안테나 브라켓을 한 개 이상 교차되게 설치하는 단계;Installing one or more antenna brackets fastened with bolts to cross the missing portion of the flange formed in the radius pipe of the upper steel pipe so that the flange passes through the gap between the pair of spaced semi-circular plates;
상기, 안테나 브라켓을 설치한 후 통신주의 중간 위치에 단자함을 플랜지의 결여부에 권회시킨 체결밴드로서 결속하여 체결하는 단계;After installing the antenna bracket, fastening the terminal box to the middle position of the communication pole by binding it with a fastening band wound around the missing part of the flange;
안테나 브라켓, 단자함 등 각종 통신시설물을 설치한 통신주의 지중에 매설되는 하부강관에 반원체와 상기 반원체를 분할한 2개의 분할체의 총 3조각으로 분할하여 조립하되 반원체와 분할체는 플랜지가 통과하는 간격을 두고 볼트로서 조립되고 분할체는 입상관이 통과될 수 있는 크기의 보다 넓은 간격을 두고 조립된 앙카고정용 플레이트를 고정 설치하여 지중에 매설하고 콘크리트를 타설하여 콘크리트 구조물과 일체로 고정하는 단계The lower steel pipe buried in the ground of a telecommunication pole where various communication facilities such as antenna brackets and terminal boxes are installed is divided into a total of 3 pieces, including a semicircular body and two divisions of the semicircular body, and assembled. The semicircular body and the division body have flanges. It is assembled with bolts at passing intervals, and the split body is fixed and installed with anchor fixing plates assembled at wider intervals that allow the granular pipe to pass through, buried in the ground, and poured into concrete to be fixed integrally with the concrete structure. steps to do
앙카고정용 플레이트의 설치가 끝난 후 앙카고정용 플레이트의 상부에 입상관 삽입공을 관통한 베이스 커버를 설치하는 단계;After completing the installation of the anchor fixing plate, installing a base cover penetrating the granular pipe insertion hole on the upper part of the anchor fixing plate;
상기, 베이스 커버의 입상관 삽입공에 삽입시켜 통신주의 하부강관에 밀착 고정시킨 입상관의 내부를 통해 지중으로부터 통신케이블을 입상하는 단계;로 시공됨을 특징으로 하는 보강구조를 갖는 통신주의 시공방법을 제공한다. The construction method of a communication pole having a reinforcing structure, characterized in that it is constructed by the step of raising the communication cable from the ground through the inside of the granular pipe that is inserted into the granular pipe insertion hole of the base cover and fixed in close contact with the lower steel pipe of the communication column. to provide.
이와 같이 본 발명의 보강구조를 갖는 통신주의 시공방법에 따르면 비교적 얇은 두께의 단면을 가지는 통신주의 외면을 한 쌍의 반경관으로 감싸 중첩시켜 두께를 보강함으로써 통신주를 강한 풍속이나 통신케이블의 긴장력 등으로부터 보호할 수 있고 또한, 한 쌍의 반경관은 통신주의 설치 현장에서 조립되는 통신주에 설치되어 운반상 어려움이 없이 간단하게 통신주를 보강할 수 있는 장점이 있으며, 또한, 단자함 등 통신관련시설물이 설치되는 구간에는 반경관의 플랜지에 결여부가 부분적으로 형성되어 있으므로 체결밴드를 결여부에 안착시켜 시설물의 설치를 통신주에 밀착되게 설치할 수 있는 효과가 있다. According to the construction method of a communication pole with a reinforcing structure of the present invention, the outer surface of a communication pole with a relatively thin cross-section is wrapped and overlapped with a pair of radial pipes to reinforce the thickness, thereby protecting the pole from strong wind speed or tension of the communication cable. In addition, a pair of radial pipes is installed on a telecommunication pole assembled at the pole installation site, which has the advantage of simply reinforcing the pole without difficulty in transportation. Additionally, it has the advantage of being able to easily reinforce the pole without difficulty in transportation. Additionally, a pair of radial pipes can be installed on a pole that is assembled at the pole installation site. In addition, a pair of radial pipes have the advantage of being able to simply reinforce the pole without difficulty in transportation. Additionally, a pair of radial pipes can be installed on a pole that is assembled at the pole installation site, and have the advantage of being able to simply reinforce the pole without difficulty in transportation. In addition, a pair of radial pipes can be installed on a pole that is assembled at the pole installation site, and have the advantage of being able to simply reinforce the pole without difficulty in transportation. In the section, since the missing part is partially formed on the flange of the radius pipe, there is an effect that the installation of the facility can be installed in close contact with the communication pole by seating the fastening band on the missing part.
도 1은 종래 통신주의 조립상태 예시도
도 2는 본 발명의 실시예에 따른 통신주의 전체 조립상태 예시도
도 3은 본 발명의 실시예에 따른 통신주의 반경관을 분해한 상태의 예시도
도 4의 (a)(b)(c)(d)(e)(f)(g)(h)는 본 발명의 실시예에 따른 시공방법을 순서적으로 도시한 설명도
도 5는 도 1의 "A"부 단면도
도 6은 도 4(a)의 "가-가" 선 단면도
도 7은 도 4(b)의 "나-나" 선 단면도
도 8은 도 4(d)의 "다-다" 선 단면도
도 9는 도 4(f)의 "라-라" 선 단면도
도 10은 도 4(h)의 "마-마" 선 단면도
도 11은 지중에 매설된 통신주의 입상관을 통해 통신케이블이 설치된 매설상태 단면도
도 12는 본 발명의 시공방법에 대한 단계별 흐름도 Figure 1 is an example of the assembly state of a conventional communication pole
Figure 2 is an illustration of the overall assembly state of the communication pole according to an embodiment of the present invention
Figure 3 is an illustration of an exploded state of the radius pipe of a communication pole according to an embodiment of the present invention.
4 (a) (b) (c) (d) (e) (f) (g) (h) is an explanatory diagram sequentially showing the construction method according to an embodiment of the present invention.
Figure 5 is a cross-sectional view of portion "A" in Figure 1
Figure 6 is a cross-sectional view taken along the line "A-A" of Figure 4(a)
Figure 7 is a cross-sectional view taken along line "B-B" of Figure 4(b).
Figure 8 is a cross-sectional view taken along the "da-da" line of Figure 4(d)
Figure 9 is a cross-sectional view taken along the "la-la" line of Figure 4(f)
Figure 10 is a cross-sectional view along the line "Ma-Ma" in Figure 4(h)
Figure 11 is a cross-sectional view of a buried state in which a communication cable is installed through a standing pipe of a communication pole buried in the ground.
Figure 12 is a step-by-step flow chart of the construction method of the present invention
이하, 본 발명의 실시 예를 첨부된 도면을 참조하여 본 발명에 따른 동작 및 작용을 이해하는 데 필요한 부분을 중심으로 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the attached drawings, focusing on the parts necessary to understand the operation and action according to the present invention.
본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 변형 예들이 있을 수 있음을 이해하여야 한다.The embodiments described in this specification and the configurations shown in the drawings are only one of the most preferred embodiments of the present invention and do not represent the entire technical idea of the present invention, so various modifications that can replace them at the time of filing the present application You must understand that there may be.
본 발명의 실시 예를 설명하면서, 본 발명이 속하는 기술 분야에 익히 알려졌고 본 발명과 직접적으로 관련이 없는 불필요한 기술 내용에 대해서는 본 발명의 요지를 흐리지 않고 더욱 명확한 전달을 위해 설명을 생략한다.While describing embodiments of the present invention, unnecessary technical content that is well known in the technical field to which the present invention pertains and is not directly related to the present invention will be omitted in order to convey it more clearly without obscuring the gist of the present invention.
도 1은 상부강관(1)의 하단(1')과 하부강관(2)의 상부 축관부(2')를 결합하여 조립한 통신주(100)에 대한 예시도로서, 이의 외면에 단자함(3), 안테나 브라켓(4)등 통신관련시설물이 별도의 결속밴드(5)로서 체결된다. Figure 1 is an exemplary view of a communication pole 100 assembled by combining the lower end (1') of the upper steel pipe (1) and the upper shaft pipe portion (2') of the lower steel pipe (2), and a terminal box (3) on its outer surface. , communication-related facilities such as antenna brackets (4) are fastened as separate binding bands (5).
도 2는 본 발명의 통신주(100)에 단자함(3)과 안테나 취부 브라켓(4) 등을 설치하고 하단(1')을 지중에 매설한 상태의 조립상태 예시도로서, 이를 참조하면, 단관체로 된 강관 통신주(100)의 외면에 도 3에 도시된 바와 같이 한 쌍으로 이루어져 통신주(100)의 외면을 감싸는 상태로 중첩되게 결합되는 금속재 반경관(10)(20)이 설치된다. Figure 2 is an example of an assembled state in which the terminal box (3) and the antenna mounting bracket (4), etc. are installed on the communication pole (100) of the present invention and the lower end (1') is buried in the ground. Referring to this, it is a single pipe body. As shown in FIG. 3, metal radial pipes 10 and 20 are installed on the outer surface of the steel pipe communication column 100 and are combined in a pair to overlap each other to surround the outer surface of the communication column 100.
상기 한 쌍의 금속재 반경관(10)(20)에는 양단에 플랜지(30)가 ㄱ 자 형상으로 대응되게 돌출 형성되고 서로 합체된 상태에서 일정 간격(6)으로 체결되는 볼트(31)에 의해 통신주(100)의 외면에 일체로 중첩 설치되어 통신주(100)를 보강하게 된다.The pair of metal radius pipes (10) and (20) have flanges (30) protruding from both ends in a corresponding L-shape, and are connected to each other by bolts (31) fastened at regular intervals (6) in a combined state. It is integrally installed on the outer surface of (100) to reinforce the communication pole (100).
상기 반경관(10)(20)은 통신주(100)를 구성하는 상부강관(1)과 하부강관(2)에 대응되는 길이로 각각 설치되고 하부강관(2)과 같이 길이가 긴 경우 한 개 이상으로 구성되어 조립 설치된다. The radius pipes (10) (20) are each installed in a length corresponding to the upper steel pipe (1) and lower steel pipe (2) constituting the communication column (100), and when the length is long like the lower steel pipe (2), there is one or more It is composed, assembled and installed.
또한, 상기 한 쌍의 반경관(10)(20)의 플랜지(30)에는 소정의 간격(6)을 두고 한 개 이상의 결여부(40)가 부분적으로 형성되어 이에 단자함(3), 안테나 브라켓(4) 등의 통신시설물을 고정하는 결속밴드(5)가 설치된다. In addition, one or more missing portions 40 are partially formed on the flange 30 of the pair of radial pipes 10 and 20 at a predetermined interval 6, thereby forming a terminal box 3 and an antenna bracket ( 4) A binding band (5) is installed to secure communication facilities such as.
이와 같이 본 발명의 통신주(100)는 통신주(100) 본체의 외면을 감싸는 상태로 중첩 설치되는 한 쌍의 금속재로 된 반경관(10)(20)에 의해 통신주(100) 본체의 두께가 두꺼워지므로 강도를 충분하게 보강하게 되고 이러한 반경관(10)(20)은 통신주(100) 본체의 설치 현장에서 조립되므로 운반이 용이하다. In this way, in the communication pole 100 of the present invention, the thickness of the main body of the communication pole 100 is increased by a pair of radial pipes 10 and 20 made of metal that are installed overlapping while surrounding the outer surface of the main body of the communications pole 100. The strength is sufficiently reinforced, and these radius pipes (10) (20) are assembled at the installation site of the main body of the communication pole (100), so they are easy to transport.
그리고 통신주(100)의 상부에 설치되는 안테나 브라켓(4)은 도 8과 같이 한 쌍의 반원판(4')이 반경관(10)(20)의 플랜지(30)가 통과될 수 있는 간격(6)을 두고 볼트(31)로서 수평으로 결합되어 설치된다. And the antenna bracket 4 installed on the upper part of the communication column 100 has a pair of semi-circular plates 4' as shown in FIG. 8 at a gap through which the flange 30 of the radius pipe 10 and 20 can pass ( 6) and is installed horizontally as a bolt (31).
여기서 안테나 브라켓(4)은 공지구조이므로 구체적인 설명은 생략한다. Here, since the antenna bracket 4 is a known structure, detailed description will be omitted.
또한, 본 발명의 통신주(100)를 지면에 매설하여 콘크리트 구조물(50)에 견고하게 고정하기 위해 설치하는 앙카고정용 플레이트(60)는 도 9와 같이 반원체(61)와 상기 반원체(61)를 분할한 2개의 분할체(62)(62')의 총 3조각으로 분할되어 조립되되 반원체(61)와 분할체(62)(62')는 플랜지(30)가 통과하는 간격(6)을 두고 볼트(31)로서 조립되고 분할체(62)(62')는 입상관(70)이 통과될 수 있는 크기의 보다 넓은 간격(6)을 두고 조립된다. In addition, the anchor fixing plate 60, which is installed to firmly fix the communication column 100 of the present invention to the concrete structure 50 by embedding it in the ground, has a semicircular body 61 and the semicircular body 61 as shown in FIG. 9. ) is divided and assembled into a total of 3 pieces of two divided parts (62) (62'), and the semicircular body (61) and the divided parts (62) (62') have a gap (6) through which the flange (30) passes. ) are assembled as bolts 31, and the partitions 62 and 62' are assembled with a wider gap 6 of a size through which the granular pipe 70 can pass.
상기 앙카고정용 플레이트(60)의 상부에는 입상관(70) 삽입공(63)이 관통된 베이스 커버(80)가 설치되고 상기 입상관(70) 삽입공(63)으로 입상관(70)이 통신주(100)와 밀착되도록 입설되어 지중으로부터 입상하는 통신케이블(90)이 설치된다. A base cover 80 is installed on the upper part of the anchor fixing plate 60 through which the insertion hole 63 of the riser pipe 70 passes, and the riser pipe 70 is inserted through the insertion hole 63 of the riser pipe 70. A communication cable 90 is installed so as to be in close contact with the communication pole 100 and rises from the ground.
이와 같이 된 본 발명의 반경관(10)(20)은 양단에 플랜지(30)가 돌출 형성되어 결합됨으로써 통신주(100) 본체의 두께를 보강하여 바람에 흔들리지 않는 견고한 통신주(100)를 구성하게 되고, 반경관(10)(20)의 플랜지(30)에는 소정의 간격(6)을 두고 결여부(40)가 부분적으로 형성되어 있으므로 단자함(3)과 안테나 등을 결속밴드(5)로서 긴밀하게 안정된 상태로 체결할 수 있게 되는 데, 특히, 플랜지(30)에 일정 간격(6)을 두고 통신시설물을 결속밴드(5)로서 고정시 결속밴드(5)가 느슨해지는 경우에도 플랜지(30)가 받치고 있으므로 더이상 밑으로 하강하지 않고 체결상태를 유지하게 되는 특징이 있다. The radius pipes (10) (20) of the present invention as described above are joined with flanges (30) protruding at both ends, thereby reinforcing the thickness of the main body of the communication column (100) to form a sturdy communication column (100) that is not shaken by the wind. Since the missing part 40 is partially formed on the flange 30 of the radius pipe 10 and 20 at a predetermined interval 6, the terminal box 3 and the antenna, etc. are tightly connected as a binding band 5. It can be fastened in a stable state. In particular, when fixing a communication facility with a binding band (5) at a certain distance (6) to the flange (30), even if the binding band (5) becomes loose, the flange (30) Since it is supported, it has the characteristic of maintaining the fastened state without falling any further.
이하, 본 발명의 보강구조를 갖는 통신주의 시공방법을 도 12를 참조하여 설명하면 다음과 같다. Hereinafter, the construction method of the communication pole having the reinforcing structure of the present invention will be described with reference to FIG. 12.
도 4의 (a)(b)(c)(d)(e)(f)(g)(h)는 본 발명의 실시예에 따른 통신주(100)의 시공방법을 순서적으로 나타낸 예시도이다. Figure 4 (a) (b) (c) (d) (e) (f) (g) (h) is an example diagram sequentially showing the construction method of the communication pole 100 according to an embodiment of the present invention. .
상부강관(1)과 하부강관(2)을 조립 연결하여 소정의 길이를 가진 통신주(100) 본체를 형성하는 단계(도 4의 (a));Forming a main body of a communication pole 100 having a predetermined length by assembling and connecting the upper steel pipe 1 and the lower steel pipe 2 ((a) of FIG. 4);
여기서 상부강관(1)과 하부강관(2)에는 대응되는 축관부와 확관부가 형성되어 삽입 방식으로 고정 조립하게 되는 데 필요에 따라 2 개 이상 연결 사용한다. Here, the upper steel pipe (1) and the lower steel pipe (2) are formed with corresponding shaft pipe portions and expansion pipe portions, and are fixedly assembled by insertion. Two or more pipes are connected and used as necessary.
이와 같이 조립된 통신주(100) 본체의 상부강관(1)의 외면에 ㄱ자 형상으로 대응되게 돌출시킨 플랜지(30)에 결여부(40)가 한 개 이상 소정 간격(6)을 두고 형성된 한 쌍의 반경관(10)(20)을 감싸는 상태로 중첩시켜 플랜지(30)를 볼트(31)로서 견고하게 체결 고정하는 단계(도 4의 (b));A pair of missing portions (40) formed at a predetermined interval (6) on the flange (30) protruding correspondingly in an L shape on the outer surface of the upper steel pipe (1) of the main body of the communication pole (100) assembled in this way. A step of overlapping the radius pipes (10) and (20) and firmly fastening the flange (30) using a bolt (31) (Figure 4 (b));
상기 플랜지(30)는 반경관(10)(20)의 양단에 ㄱ 자 형상으로 서로 대응되게 돌출되는 것으로 한쪽은 크고 다른 한쪽은 작은 크기로서 서로 포개질 수 있는 구조로 형성되어 볼트(31)로서 고정된다. The flanges 30 protrude in correspondence with each other in an L-shape at both ends of the radius tubes 10 and 20. One side is large and the other side is small, and are formed in a structure that can be overlapped with each other as a bolt 31. It is fixed.
이어서 통신주(100) 본체의 하부강관(2)의 외면에 ㄱ자 형상으로 대응되게 돌출시킨 플랜지(30)의 결여부(40)가 한 개 이상 부분적으로 형성된 한 쌍의 반경관(10)(20)을 감싸는 상태로 중첩시켜 플랜지(30)를 볼트(31)로서 견고하게 체결 고정하는 단계(도 4의 (c));Subsequently, a pair of radial pipes (10) (20) in which one or more missing portions (40) of the flange (30) protruding correspondingly in an L shape are partially formed on the outer surface of the lower steel pipe (2) of the main body of the communication pole (100). A step of firmly fastening and fastening the flange 30 as a bolt 31 by overlapping in a surrounding state (FIG. 4(c));
여기서, 하부강관(2)의 외면을 감싸는 한 쌍의 반경관(10)(20)은 길이가 긴 경우 한 개 이상으로 분할하여 체결할 수 있다. Here, if the pair of radius pipes 10 and 20 surrounding the outer surface of the lower steel pipe 2 are long, they can be divided into one or more pieces and fastened together.
상기 단계 후 상부강관(1)의 반경관(10)(20)에 형성된 플랜지(30)의 결여부(40)에 한 쌍의 이격된 반원판(4')의 간격부로 플랜지(30)가 통과되도록 볼트(31)로서 체결한 안테나 브라켓(4)을 한 개 이상 교차되게 설치하는 단계(도 4의 (d));After the above step, the flange 30 passes through the gap between the pair of spaced semi-circular plates 4' in the missing portion 40 of the flange 30 formed in the radius pipes 10 and 20 of the upper steel pipe 1. Installing one or more antenna brackets (4), preferably fastened with bolts (31), crossing each other (Figure 4 (d));
상기 안테나 브라켓(4)은 한 쌍의 반원판(4') 사이에 플랜지(30)가 통과되도록 결합하여 볼트(31)로서 체결하게 되면 상부강관(1)에 고정되어 안테나를 견고하게 설치하게 되고 체결력의 이완으로 느슨해진 안테나 브라켓(4)이 하부로 하강되는 경우에도 플랜지(30)가 받쳐주게 되므로 안테나 브라켓(4)은 임의로 분해되지 않게 된다. The antenna bracket (4) is coupled to allow the flange (30) to pass between a pair of semi-circular plates (4') and fastened with a bolt (31) to be fixed to the upper steel pipe (1) to firmly install the antenna. Even when the antenna bracket 4, which has become loose due to relaxation of the fastening force, is lowered, the flange 30 supports it, so the antenna bracket 4 is not arbitrarily disassembled.
상기 안테나 브라켓(4)을 설치한 후 통신주(100)의 중간 위치에 단자함(3)을 플랜지(30)의 결여부(40)에 권회시킨 체결밴드로서 결속하여 체결하는 단계(도 4의 (e));After installing the antenna bracket (4), fastening the terminal box (3) to the middle position of the communication pole (100) with a fastening band wound around the missing portion (40) of the flange (30) (Fig. 4 (e) ));
여기서 단자함(3)은 반드시 중간위치에 한정되는 것은 아니며 설치환경에 따라 설치위치가 변동될 수 있다. Here, the terminal box 3 is not necessarily limited to the middle position, and the installation location may change depending on the installation environment.
이같이 반경관(10)(20)의 설치로서 보다 견고해진 통신주(100)에 안테나 브라켓(4), 단자함(3) 등 각종 통신시설물을 설치한 상태에서 지중에 매설되는 하부강관(2)에 반원체(61)와 상기 반원체(61)를 분할한 2개의 분할체(62)(62')의 총 3조각으로 분할하여 조립하되 반원체(61)와 분할체(62)(62')는 플랜지(30)가 통과하는 간격(6)을 두고 볼트(31)로서 조립되고 분할체(62)(62')는 입상관(70)이 통과될 수 있는 크기의 보다 넓은 간격(6)을 두고 조립된 앙카고정용 플레이트(60)를 고정 설치하여 지중에 매설하고 콘크리트를 타설하여 콘크리트 구조물(50)과 일체로 고정하는 단계(도 4의 (f));In this way, various communication facilities such as antenna brackets (4) and terminal boxes (3) are installed on the communication pole (100), which has become more robust due to the installation of the radius pipes (10) and (20), and are placed against the lower steel pipe (2) buried in the ground. The circular body 61 and the semi-circular body 61 are divided into three pieces, two divided bodies (62) (62'), and assembled. The semi-circular body (61) and the divided bodies (62) (62') are divided into three pieces. The flange 30 is assembled as a bolt 31 with a gap 6 through which it passes, and the partitions 62 and 62' have a wider gap 6 through which the granular pipe 70 can pass. Step of fixing and installing the assembled anchor fixing plate 60, burying it in the ground, pouring concrete, and integrally fixing it with the concrete structure 50 ((f) in FIG. 4);
상기 단계는 통신주(100)를 콘크리트 구조물(50)에 앙카로서 고정하여 보다 견고한 설치를 위한 것으로 통신주(100)는 상기 앙카고정용 플레이트(60)와 콘크리트 구조물(50)에 의해 견고한 설치가 이루어져 강한 바람 등에 흔들리지 않고 고정 설치된다. The above step is for a more robust installation by fixing the communication pole 100 to the concrete structure 50 as an anchor. The communication pole 100 is firmly installed by the anchor fixing plate 60 and the concrete structure 50, making it strong. It is installed fixedly without being shaken by the wind.
상기와 같이 앙카고정용 플레이트(60)의 설치가 끝나면 앙카고정용 플레이트(60)의 상부에 입상관(70) 삽입공(63)을 관통한 베이스 커버(80)를 설치하여 앙카고정용 플레이트(60)를 은폐하고 미관을 장식하는 단계(도 4의 (g)); After the installation of the anchor fixing plate 60 is completed as described above, the base cover 80 passing through the insertion hole 63 of the granular pipe 70 is installed on the upper part of the anchor fixing plate 60 to install the anchor fixing plate ( Step 60) of concealing and decorating aesthetics ((g) of FIG. 4);
통신주(100)의 하부강관(2)에 하단(1')이 베이스 커버(80)의 입상관(70) 삽입공(63)에 삽입되도록 입상관(70)을 밀착 고정시키고, 이의 내부를 통해 지중으로부터 통신케이블(90)을 입상하는 단계(도 4의 (h))로 시공됨을 특징으로 한다. The granular pipe (70) is tightly fixed to the lower steel pipe (2) of the communication pole (100) so that the lower end (1') is inserted into the insertion hole (63) of the granular pipe (70) of the base cover (80), and through the inside thereof. It is characterized in that the construction is carried out in the step of raising the communication cable 90 from the ground ((h) in FIG. 4).
이상과 같은 시공방법은 하나의 실시예를 예시한 것으로서 이에 한정되지 않고 본 발명이 권리범위내에서 설치 순서는 서로 바뀔 수 있고 안테나와 단자함(3) 등 통신시설물의 설치 위치도 통신주(100)의 설치 환경에 따라 가변될 수 있음은 물론이다. The above construction method is illustrative of one embodiment and is not limited thereto. The installation order may be changed within the scope of the present invention, and the installation location of communication facilities such as the antenna and terminal box (3) may also be determined by the communication owner (100). Of course, it may vary depending on the installation environment.
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
삭제delete
1 : 상부강관 1' : 하단 2 : 하부강관 2' : 상부 축관부 3 : 단자함 4 : 브라켓 4' : 반원판 5 : 결속밴드 6 : 간격 10,20 : 반경관 30 : 플랜지 31 : 볼트 40 : 결여부 50 : 구조물 60 : 플레이트 61 : 반원체 62,62' : 분할체 63 : 삽입공 70 : 입상관 80 : 커버 90 : 통신케이블 100 : 통신주1: Upper steel pipe 1': Bottom 2: Lower steel pipe 2': Upper shaft pipe 3: Terminal box 4: Bracket 4': Semicircular plate 5: Binding band 6: Spacing 10,20: Radius pipe 30: Flange 31: Bolt 40: Absent part 50: Structure 60: Plate 61: Semicircular body 62,62': Split body 63: Insertion hole 70: Granular pipe 80: Cover 90: Communication cable 100: Communication pole
Claims (3)
상기, 통신주(100) 본체의 상부강관(1)의 외면에 ㄱ자 형상으로 대응되게 돌출시킨 플랜지(30)에 결여부(40)가 한 개 이상 소정 간격(6)을 두고 형성된 한 쌍의 반경관(10)(20)을 감싸는 상태로 중첩시켜 플랜지(30)를 볼트(31)로서 견고하게 체결 고정하는 단계;
통신주(100) 본체의 하부강관(2)의 외면에 ㄱ자 형상으로 대응되게 돌출시킨 플랜지(30)의 결여부(40)가 한 개 이상 형성된 한 쌍의 반경관(10)(20)을 감싸는 상태로 중첩시켜 플랜지(30)를 볼트(31)로서 견고하게 체결 고정하는 단계;
상기, 상부강관(1)의 반경관(10)(20)에 형성된 플랜지(30)의 결여부(40)에 한 쌍의 이격된 반원판(4')의 간격부로 플랜지(30)가 통과되도록 볼트(31)로서 체결한 안테나 브라켓(4)을 한 개 이상 교차되게 설치하는 단계;
상기, 안테나 브라켓(4)을 설치한 후 통신주(100)의 중간 위치에 단자함(3)을 플랜지(30)의 결여부(40)에 권회시킨 체결밴드로서 결속하여 체결하는 단계;
안테나 브라켓(4), 단자함(3) 등 각종 통신시설물을 설치한 통신주(100)의 지중에 매설되는 하부강관(2)에 반원체(61)와 상기 반원체(61)를 분할한 2개의 분할체(62)(62')의 총 3조각으로 분할하여 조립하되 반원체(61)와 분할체(62)(62')는 플랜지(30)가 통과하는 간격(6)을 두고 볼트(31)로서 조립되고 분할체(62)(62')는 입상관(70)이 통과될 수 있는 크기의 보다 넓은 간격(6)을 두고 조립된 앙카고정용 플레이트(60)를 고정 설치하여 지중에 매설하고 콘크리트를 타설하여 콘크리트 구조물(50)과 일체로 고정하는 단계
앙카고정용 플레이트(60)의 설치가 끝난 후 앙카고정용 플레이트(60)의 상부에 입상관(70) 삽입공(63)을 관통한 베이스 커버(80)를 설치하는 단계;
통신주(100)의 하부강관(2)에 하단(1')이 베이스 커버(80)의 입상관(70) 삽입공(63)에 삽입되도록 입상관을 밀착 고정시키고, 이의 내부를 통해 지중으로부터 통신케이블(90)을 입상하는 단계로 시공됨을 특징으로 하는 보강구조를 갖는 통신주의 시공방법. Forming a main body of a communication pole (100) having a predetermined length by assembling and connecting the upper pipe and the lower steel pipe (2);
Above, a pair of radial pipes in which one or more missing portions 40 are formed at a predetermined interval 6 on the flange 30 protruding in a corresponding L-shape on the outer surface of the upper steel pipe 1 of the main body of the communication column 100. (10) Overlapping (20) in a surrounding state and firmly fastening the flange (30) using a bolt (31);
A state in which at least one missing portion 40 of the flange 30 protrudes in an L-shape on the outer surface of the lower steel pipe 2 of the main body of the communication pole 100 surrounds a pair of radius pipes 10 and 20 formed. Overlapping and firmly fastening the flange 30 with a bolt 31;
The flange 30 is passed through the gap between the pair of spaced semi-circular plates 4' in the missing portion 40 of the flange 30 formed in the radius pipes 10 and 20 of the upper steel pipe 1. Installing one or more antenna brackets (4) fastened with bolts (31) so that they are crossed;
After installing the antenna bracket (4), fastening the terminal box (3) to the middle position of the communication pole (100) by binding it with a fastening band wound around the missing portion (40) of the flange (30);
A semicircular body (61) and two divisions of the semicircular body (61) in the lower steel pipe (2) buried in the ground of the telecommunication pole (100) on which various communication facilities such as antenna brackets (4) and terminal boxes (3) are installed. The sieves (62) (62') are divided into three pieces and assembled, but the semicircular body (61) and the divided bodies (62) (62') are separated by bolts (31) at a gap (6) through which the flange (30) passes. It is assembled as a separate body (62) (62') and is buried in the ground by fixing and installing anchor fixing plates (60) assembled at a wider gap (6) of a size through which the granular pipe (70) can pass. Step of pouring concrete and fixing it integrally with the concrete structure (50)
After completing the installation of the anchor fixing plate 60, installing the base cover 80 penetrating the insertion hole 63 of the granular pipe 70 on the upper part of the anchor fixing plate 60;
The granular pipe is tightly fixed to the lower steel pipe (2) of the communication column (100) so that the lower end (1') is inserted into the insertion hole (63) of the granular pipe (70) of the base cover (80), and communication is communicated from the ground through the inside of this. A construction method for a telecommunication pole having a reinforcing structure, characterized in that it is constructed in the step of raising the cable (90).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020210136168A KR102654499B1 (en) | 2021-10-13 | 2021-10-13 | Construction method of communication structure with |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020210136168A KR102654499B1 (en) | 2021-10-13 | 2021-10-13 | Construction method of communication structure with |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20230052766A KR20230052766A (en) | 2023-04-20 |
KR102654499B1 true KR102654499B1 (en) | 2024-04-04 |
Family
ID=86143599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020210136168A KR102654499B1 (en) | 2021-10-13 | 2021-10-13 | Construction method of communication structure with |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102654499B1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100856660B1 (en) | 2007-05-09 | 2008-09-04 | 주식회사 케이티 | Electrical pole of steel pipe and installing structure for stand pipe road |
KR101238283B1 (en) * | 2011-09-01 | 2013-02-28 | (주)지티씨코퍼레이션 | A reinforcing cover plate for a telephone pole and it's reinforcing method |
KR101451555B1 (en) | 2014-05-12 | 2014-10-16 | 신희수 | Anti-rotation guard rail post |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090004281U (en) * | 2007-11-02 | 2009-05-08 | 월드탑텍(주) | Solar street light for having hid lamp |
-
2021
- 2021-10-13 KR KR1020210136168A patent/KR102654499B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100856660B1 (en) | 2007-05-09 | 2008-09-04 | 주식회사 케이티 | Electrical pole of steel pipe and installing structure for stand pipe road |
KR101238283B1 (en) * | 2011-09-01 | 2013-02-28 | (주)지티씨코퍼레이션 | A reinforcing cover plate for a telephone pole and it's reinforcing method |
KR101451555B1 (en) | 2014-05-12 | 2014-10-16 | 신희수 | Anti-rotation guard rail post |
Also Published As
Publication number | Publication date |
---|---|
KR20230052766A (en) | 2023-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5649402A (en) | Antenna support for power transmission tower | |
US7591119B2 (en) | Method and apparatus for increasing the capacity and stability of a single-pole tower | |
US4543764A (en) | Standing poles and method of repair thereof | |
US10781601B2 (en) | Link-plate connection for monopole reinforcing bars | |
KR101920371B1 (en) | Steel pole | |
US8156712B2 (en) | Tower reinforcement apparatus and method | |
KR101431243B1 (en) | Fence for Antenna of base station | |
US6668498B2 (en) | System and method for supporting guyed towers having increased load capacity and stability | |
US6948290B2 (en) | System and method for increasing the load capacity and stability of guyed towers | |
KR102654499B1 (en) | Construction method of communication structure with | |
US20040139665A1 (en) | Method and arrangement for utility pole reinforcement | |
KR101314058B1 (en) | Steel pole for traffic facility with excellent structural stability | |
KR200359420Y1 (en) | electric pole branch line fixing equipment | |
KR101234357B1 (en) | Assembling type an electric pole using pipes | |
JP2003193564A (en) | Column-beam structural body, its construction method, and connection metal fitting | |
GB2339436A (en) | Lattice tower structure | |
KR102633535B1 (en) | An utility pole reinforcement assembly | |
JPH0473381A (en) | Independent electric pole and its pole erecting construction | |
JPH1018234A (en) | Enhanced post wood imitation method for protective fence | |
CN117127839A (en) | Iron tower body reinforcing structure and iron tower | |
JP2008240302A (en) | Composite pole of steel pipe and concrete | |
JPH11168311A (en) | Antenna support and tower | |
JPH11168310A (en) | Antenna support | |
JPH11193532A (en) | Execution method of greening grating crib |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |