KR102625843B1 - Installation of mooring lines for floating offshore structures - Google Patents

Installation of mooring lines for floating offshore structures Download PDF

Info

Publication number
KR102625843B1
KR102625843B1 KR1020210162260A KR20210162260A KR102625843B1 KR 102625843 B1 KR102625843 B1 KR 102625843B1 KR 1020210162260 A KR1020210162260 A KR 1020210162260A KR 20210162260 A KR20210162260 A KR 20210162260A KR 102625843 B1 KR102625843 B1 KR 102625843B1
Authority
KR
South Korea
Prior art keywords
mooring
chain
mooring chain
vessel
wire
Prior art date
Application number
KR1020210162260A
Other languages
Korean (ko)
Other versions
KR20230075761A (en
Inventor
박공만
신상성
Original Assignee
세호엔지니어링 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 세호엔지니어링 주식회사 filed Critical 세호엔지니어링 주식회사
Priority to KR1020210162260A priority Critical patent/KR102625843B1/en
Publication of KR20230075761A publication Critical patent/KR20230075761A/en
Application granted granted Critical
Publication of KR102625843B1 publication Critical patent/KR102625843B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/505Methods for installation or mooring of floating offshore platforms on site

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은, 부유상태의 해양 구조물을 계류지점에 계류시키는 부유식 해양 구조물용 계류라인 설치방법에 있어서, 일측에는 길이방향 양단에 제1와이어를 통해 한 쌍의 제1계류체인 표시부이가 연결된 제1계류체인 및, 제2와이어를 통해 앵커위치 표시부이가 연결된 앵커를 계류지점 인근의 해저면에 투입 배치하는 단계, 계류작업 선박에서 제1계류체인을 끌어올린 후, 제1계류체인의 길이방향 일단을 계류작업 선박에 배치된 계류체인 연결장치에 연결 설치하는 단계, 해양 구조물에 연결된 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결상태로 계류작업 선박에 배치하는 단계, 계류체인 연결장치에 제3와이어를 통해 연결장치 표시부이를 연결한 후, 계류체인 연결장치를 해양 구조물과 앵커 사이의 해저면에 투입 배치하는 단계, 계류작업 선박에서 제2계류체인의 장력을 조절한 후, 계류작업 선박에서 제2계류체인을 해체하는 단계를 포함하는 부유식 해양 구조물용 계류라인 설치방법을 제공한다.The present invention relates to a method of installing a mooring line for a floating marine structure for mooring a floating marine structure at a mooring point, wherein on one side, a first mooring buoy with a pair of first mooring chain indicator buoys is connected to both ends in the longitudinal direction through a first wire. A step of inserting and placing a mooring chain and an anchor connected to an anchor position indicator buoy through a second wire on the seabed near the mooring point. After pulling up the first mooring chain from the mooring operation vessel, one end of the longitudinal direction of the first mooring chain is A step of connecting and installing a mooring chain connection device placed on a mooring work vessel, a step of placing the longitudinal end of the second mooring chain connected to the marine structure on a mooring work ship while connected to a mooring chain connection device, After connecting the connecting device indicator buoy through the third wire, inserting and placing the mooring chain connecting device on the sea floor between the marine structure and the anchor, adjusting the tension of the second mooring chain on the mooring work vessel, and then moving the mooring work vessel Provides a mooring line installation method for a floating marine structure including the step of dismantling the second mooring chain.

Description

부유식 해양 구조물용 계류라인 설치방법{Installation of mooring lines for floating offshore structures}{Installation of mooring lines for floating offshore structures}

본 발명은 해상에 부유하는 각종 해양 구조물을 특정 지점에서 계류시키는 계류라인을 설치하는 부유식 해양 구조물용 계류라인 설치방법에 관한 것이다.The present invention relates to a method of installing a mooring line for a floating marine structure, which installs a mooring line to moor various marine structures floating in the sea at a specific point.

일반적으로, 해상에서 풍력이나 태양광을 이용한 발전이나 원유 채굴 작업을 진행하는 특수목적 해양 구조물은 해상을 이동하기도 하지만 필요에 따라 해상의 특정 지점에 머무른 상태로 부유하는 경우가 많다.In general, special-purpose marine structures that carry out power generation using wind or solar power or crude oil mining at sea move around the sea, but often remain floating at a specific point in the sea when necessary.

그러나 해상에서 부유하는 해양 구조물의 특성상 장시간 고정된 위치를 유지하기는 쉽지 않다. 해류의 영향이나 수시로 변하는 해상의 기상조건 등은 해양 구조물의 위치를 변동시키는 주요원인이 된다. 추진장치나 자세제어장치를 이용하더라도 해상에서 일정한 위치를 지속적으로 유지하는 데에는 한계가 있다.However, due to the nature of marine structures floating in the sea, it is not easy to maintain a fixed position for a long time. The influence of ocean currents and constantly changing sea weather conditions are the main causes of changes in the location of marine structures. Even if a propulsion device or attitude control device is used, there are limits to continuously maintaining a certain position at sea.

이로 인해, 해양 구조물과 해저면의 사이에 와이어 장비 등을 연결하여 해양 구조물을 해상에 계류시키는 기술이 사용된다. 이러한, 계류라인(Mooring line)은 해양 구조물을 계류시키기 위해 와이어 장비 등을 이용하여 형성한 일종의 고정 구조물로서 다수의 와이어 등으로 이루어진다.For this reason, a technology is used to moor an offshore structure at sea by connecting wire equipment between the marine structure and the seafloor. This mooring line is a type of fixed structure formed using wire equipment, etc. to moor marine structures and is made up of a number of wires.

그러나, 종래에는 계류라인을 설치하거나 해체하는 등의 작업이 쉽지 않고 설치시간이 지연되는 등의 여러 가지 문제가 있다. 특히, 계류와이어의 인양작업 등이 필요하고 ROV등 잠수장비가 해양 구조물과 해저면 사이를 반복적으로 이동하며 진행하는 종래의 설치방식은 작업 효율성이 낮고, 잠수장비 운용 등 추가 인력이 필요하며, 작업 안정성과 예측성이 저하되고 안전사고의 위험성도 큰 단점이 있다. 또한, 계류라인을 설치완료된 상태에서 계류라인의 장력 조절이 필요한 경우, 계류라인의 장력조절 작업도 쉽지 않은 문제점이 있다.However, in the past, there were various problems such as installation or dismantling of mooring lines not being easy and installation time being delayed. In particular, the conventional installation method, which requires lifting of mooring wires and involves repeated movement of diving equipment such as ROVs between marine structures and the seabed, has low work efficiency and requires additional manpower to operate diving equipment. The downside is that stability and predictability are reduced and the risk of safety accidents is high. In addition, when it is necessary to adjust the tension of the mooring line after the mooring line has been installed, there is a problem in that it is not easy to adjust the tension of the mooring line.

이같은, 해양 구조물의 계류라인 설치방법은, 대한민국등록특허공보 제10-0943457호(2010.02.22)에 제시된다.This method of installing mooring lines for marine structures is presented in Republic of Korea Patent Publication No. 10-0943457 (2010.02.22).

본 발명은, 계류라인의 설치작업을 안전하면서 신속하게 할 수 있게 함과 더불어 설치완료 후 계류라인의 장력 조절이 필요한 경우에도 장력 조절작업을 쉽게 수행할 수 있게 부유식 해양 구조물용 계류라인 설치방법을 제공하는데 목적이 있다.The present invention is a method of installing a mooring line for a floating marine structure that allows the installation of a mooring line to be done safely and quickly, and also allows the tension adjustment work to be easily performed even when tension adjustment of the mooring line is necessary after installation is completed. The purpose is to provide.

본 발명은, 부유상태의 해양 구조물을 계류지점에 계류시키는 부유식 해양 구조물용 계류라인 설치방법에 있어서, 일측에는 길이방향 양단에 제1와이어를 통해 한 쌍의 제1계류체인 표시부이가 연결된 제1계류체인 및, 제2와이어를 통해 앵커위치 표시부이가 연결된 앵커를 계류지점 인근의 해저면에 투입 배치하는 단계, 계류작업 선박에서 제1계류체인을 끌어올린 후, 제1계류체인의 길이방향 일단을 계류작업 선박에 배치된 계류체인 연결장치에 연결 설치하는 단계, 상기 해양 구조물에 연결된 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결상태로 계류작업 선박에 배치하는 단계, 상기 계류체인 연결장치에 제3와이어를 통해 연결장치 표시부이를 연결한 후, 계류체인 연결장치를 해양 구조물과 앵커 사이의 해저면에 투입 배치하는 단계, 상기 계류작업 선박에서 제2계류체인의 장력을 조절한 후, 계류작업 선박에서 제2계류체인을 해체하는 단계를 포함하는 부유식 해양 구조물용 계류라인 설치방법을 제공한다.The present invention relates to a method of installing a mooring line for a floating marine structure for mooring a floating marine structure at a mooring point, wherein on one side, a first mooring buoy with a pair of first mooring chain indicator buoys is connected to both ends in the longitudinal direction through a first wire. A step of inserting and placing a mooring chain and an anchor connected to an anchor position indicator buoy through a second wire on the seabed near the mooring point. After pulling up the first mooring chain from the mooring operation vessel, one end of the longitudinal direction of the first mooring chain is A step of connecting and installing a mooring chain connecting device arranged on a mooring work vessel, placing a longitudinal end of a second mooring chain connected to the marine structure on a mooring work ship while connected to a mooring chain connecting device, connecting the mooring chain. After connecting the connecting device indicator buoy to the device through a third wire, inserting and placing the mooring chain connecting device on the sea floor between the marine structure and the anchor, adjusting the tension of the second mooring chain on the mooring operation vessel, A mooring line installation method for a floating marine structure is provided, including the step of dismantling a second mooring chain from a mooring operation vessel.

또한, 상기 계류라인 연결장치는, 판 형태를 가지며, 일측면에 제1계류체인을 연결하는 계류연결고리가 형성되고, 타측면에는 제2계류체인을 관통 상태로 이동되게 가이드하는 계류가이드홈이 형성된 연결지지대를 결합 구비하는 베이스부, 상기 계류가이드홈 상측에 배치되도록 연결지지대에 회전 가능하게 힌지 결합되며, 하단면에는 계류가이드홈에 삽입 배치된 제2계류체인을 걸림상태로 이동되게 하는 걸림스토퍼가 형성된 걸림대를 포함할 수 있다.In addition, the mooring line connecting device has a plate shape, and a mooring link connecting the first mooring chain is formed on one side, and a mooring guide groove that guides the second mooring chain to move in a penetrating state is formed on the other side. A base portion coupled with the formed connection support, rotatably hinged to the connection support so as to be disposed on the upper side of the mooring guide groove, and on the lower surface, a lock that moves the second mooring chain inserted into the mooring guide groove in a locked state. It may include a stopping bar with a stopper formed thereon.

또한, 상기 계류작업 선박에서 제1계류체인을 끌어올린 후, 제1계류체인의 길이방향 일단을 계류작업 선박에 배치된 계류라인 연결장치에 연결 설치하는 단계는, 상기 제1계류체인 표시부이에 연결된 제1와이어의 길이방향 일단을 계류작업 선박으로 당김 배치시킨 후, 제1와이어의 길이방향 일단을 계류작업 선박에 구비된 권취장치를 통해 감김시키면서 제1계류체인의 길이방향 일단을 계류작업 선박에 배치시키는 단계, 상기 계류작업 선박으로 당김 배치된 제1계류체인의 길이방향 일단 끝 부분을 계류라인 연결장치에 고정 결합시키는 단계를 포함할 수 있다.In addition, after pulling up the first mooring chain from the mooring work vessel, the step of connecting and installing one end of the first mooring chain in the longitudinal direction to the mooring line connection device arranged on the mooring work vessel includes the step of connecting and installing the first mooring chain indicator buoy. After pulling and disposing the longitudinal end of the first wire to the mooring work vessel, the longitudinal end of the first mooring chain is wound to the mooring work vessel while winding the longitudinal end of the first wire through a winding device provided on the mooring work vessel. It may include the step of arranging, and fixing one end in the longitudinal direction of the first mooring chain pulled by the mooring operation vessel to the mooring line connection device.

또한, 상기 해양 구조물에 연결된 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결상태로 계류작업 선박에 배치하는 단계는, 상기 계류작업 선박을 통해 제2계류체인의 길이방향 타단을 해양 구조물에 연결한 후, 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결 배치하는 단계, 상기 제2계류체인의 길이방향 일단 끝 부분을 계류작업 선박의 권취장치에 연결 배치하는 단계를 포함할 수 있다.In addition, the step of placing the longitudinal end of the second mooring chain connected to the marine structure on the mooring operation vessel in a state of connection to the mooring chain connection device includes connecting the longitudinal other end of the second mooring chain to the marine structure through the mooring operation vessel. After connecting to the mooring chain, it may include the step of connecting and arranging the longitudinal end of the second mooring chain to the mooring chain connecting device, and the step of connecting and arranging the longitudinal end of the second mooring chain to the winding device of the mooring operation vessel. You can.

또한, 상기 계류작업 선박에서 제2계류체인의 장력을 조절한 후, 계류작업 선박에서 제2계류체인을 해체하는 단계는, 상기 계류작업 선박을 앵커위치 표시부이에 연결된 제2와이어와 연결되게 하는 단계, 상기 계류작업 선박에 구비된 권취장치를 작동시켜, 제2계류체인을 감김시키면서 장력을 조절하는 단계, 상기 제2계류체인의 길이방향 일단을 권취장치에서 해체한 후, 상기 제2계류체인의 길이방향 일단 끝 부분에 제3와이어를 통해 앵커위치 표시부이가 연결된 상태로 제2계류체인의 길이방향 일단을 해저면에 배치되게 하는 단계, 상기 제2와이어를 계류작업 선박에서 이탈되게 하는 단계를 포함할 수 있다.In addition, after adjusting the tension of the second mooring chain on the mooring work vessel, the step of dismantling the second mooring chain from the mooring work vessel includes connecting the mooring work vessel with a second wire connected to the anchor position indicator buoy. , operating a winding device provided on the mooring operation vessel to adjust tension while winding the second mooring chain, dismantling the longitudinal end of the second mooring chain from the winding device, and then dismantling the second mooring chain from the winding device. A step of placing the longitudinal end of the second mooring chain on the seabed with an anchor position indicator buoy connected to the end of the longitudinal end through a third wire, and disengaging the second wire from the mooring operation vessel. can do.

본 발명에 따른 부유식 해양 구조물용 계류라인 설치방법에 따르면, 앵커를 해저면에 투입 배치한 후, 앵커와 연결된 제1계류체인 및 해양 구조물에 연결된 제2계류체인을 계류작업 선박에 배치된 계류체인 연결장치에 연결 위치시킨 상태에서 앵커와 해양 구조물 사이 해저면에 계류체인 연결장치를 투입 설치한다. 이후, 계류작업 선박에서 제2계류체인을 권취장치에 연결시킨 상태에서 감김시켜 장력을 설정된 장력상태가 되도록 조절하고, 다시 제2계류체인을 해저면에 위치되게 하는 바, 해양 구조물의 계류 작업을 신속하면서 쉽게 할 수 있게 한다.According to the mooring line installation method for floating marine structures according to the present invention, after inserting and placing the anchor on the sea floor, the first mooring chain connected to the anchor and the second mooring chain connected to the marine structure are placed on the mooring operation vessel. While connected to the chain linkage device, the mooring chain linkage device is installed on the sea floor between the anchor and the offshore structure. Afterwards, the second mooring chain on the mooring work vessel is connected to the winding device and wound to adjust the tension to the set tension state, and then the second mooring chain is placed on the sea floor again, thereby carrying out the mooring work for the marine structure. Make it quick and easy to do.

더불어, 앵커에는 제2와이어를 통해 부유상태로 앵커위치 표시부이를 연결 구비하고, 제2계류체인에는 제4와이어를 통해 부유상태로 제2계류체인 표시부이를 연결 구비한 바, 계류 설치완료 후 해양 구조물의 계류상태 장력 조절이 필요한 경우에도 제4와이어를 통해 제2계류체인을 계류작업 선박으로 이동시킨 상태로 계류작업 선박을 제2와이어로 앵커에 연결되게 할 수 있으므로 장력 조절작업을 안정적으로 수행할 수 있게 한다.In addition, the anchor is equipped with an anchor position indicator buoy in a floating state through a second wire, and the second mooring chain is equipped with a second mooring chain indicator buoy in a floating state through a fourth wire. After the mooring installation is completed, the marine structure Even when it is necessary to adjust the mooring state tension, the second mooring chain can be moved to the mooring work vessel through the fourth wire and the mooring work vessel can be connected to the anchor with the second wire, so the tension adjustment work can be performed stably. make it possible

도 1은 본 발명의 일실시예에 따른 부유식 해양 구조물용 계류라인 설치방법을 나타낸 흐름도이다.
도 2는 도 1에 나타낸 S100단계를 나타낸 상태도이다.
도 3은 도 2에 도시된 계류체인 연결장치의 구성 단면도이다.
도 4는 도 1에 나타낸 S110단계 및 S120단계를 나타낸 상태도이다.
도 5 및 도 6은 도 1에 나타낸 S140단계를 나타낸 상태도이다.
Figure 1 is a flowchart showing a method of installing a mooring line for a floating marine structure according to an embodiment of the present invention.
Figure 2 is a state diagram showing step S100 shown in Figure 1.
Figure 3 is a cross-sectional view of the structure of the mooring chain connecting device shown in Figure 2.
Figure 4 is a state diagram showing steps S110 and S120 shown in Figure 1.
Figures 5 and 6 are state diagrams showing step S140 shown in Figure 1.

이하에서는 본 발명의 일실시예에 따른 부유식 해양 구조물용 계류라인 설치방법에 관하여 도 1 내지 도 5를 참조로 하여 상세히 설명한다.Hereinafter, a method of installing a mooring line for a floating marine structure according to an embodiment of the present invention will be described in detail with reference to FIGS. 1 to 5.

먼저, 도 2와 같이 앵커(100)를 해양 구조물(10)을 계류시키고자 하는 계류지점 인근의 해저면에 투입 배치한다(S100). 이때, 앵커(100)의 일측에는 제1계류체인(110)의 길이방향 일단을 고정되게 연결 구비한다. 그리고, 제1계류체인(110)의 길이방향 일단 및 길이방향 타단에는 앵커(100)를 해저면에 투입시, 해수면에 부유하면서 제1계류체인(110)의 길이방향 일단 및 길이방향 타단의 위치를 파악할 수 있도록 제1와이어(112)를 통해 제1계류체인(110)에 연결되는 한 쌍의 제1계류체인 표시부이(111)를 구비한다. 이러한, 제1계류체인 표시부이(111)는 제1계류체인(110)의 길이방향 양단으로부터 상측 수면 상에 부유하도록 배치되는 바, 이후 제1계류체인(110)을 계류체인 연결장치(200)에 연결 설치시, 위치 확인 및 인양을 쉽게 할 수 있게 한다.First, as shown in FIG. 2, the anchor 100 is placed on the seafloor near the mooring point where the marine structure 10 is to be moored (S100). At this time, one end of the first mooring chain 110 in the longitudinal direction is fixedly connected to one side of the anchor 100. In addition, when the anchor 100 is placed on the longitudinal end and the longitudinal other end of the first mooring chain 110 on the sea floor, the longitudinal end and the longitudinal other end of the first mooring chain 110 are positioned while floating on the sea surface. A pair of first mooring chain indicator buoys 111 connected to the first mooring chain 110 through the first wire 112 are provided so that the can be identified. This first mooring chain display buoy 111 is arranged to float on the upper water surface from both ends in the longitudinal direction of the first mooring chain 110, and then connects the first mooring chain 110 to the mooring chain connection device 200. When connecting and installing, it makes location confirmation and lifting easy.

또한, 상기 앵커(100)에는 앵커(100)를 해저면에 투입시, 해수면에 부유하면서 앵커(100)의 위치를 파악할 수 있도록 제2와이어(102)를 통해 앵커(100)에 연결되는 앵커위치 표시부이(101)를 구비한다. 이러한, 앵커위치 표시부이(101)는 앵커(100)의 상측 수면 상에 부유하도록 배치되는 바, 앵커(100) 위치 및 앵커(100)에 연결된 제2와이어(102)의 위치를 확인할 수 있게 하면서, 이후 제2계류체인(120)의 장력조절시 제2계류체인(120)과의 연결을 쉽게 할 수 있게 한다.In addition, the anchor 100 has an anchor position connected to the anchor 100 through the second wire 102 so that the position of the anchor 100 can be determined while floating on the sea surface when the anchor 100 is inserted into the seafloor. It is provided with an indicator buoy (101). This anchor position indicator buoy 101 is arranged to float on the water surface above the anchor 100, allowing the position of the anchor 100 and the position of the second wire 102 connected to the anchor 100 to be confirmed, Afterwards, when adjusting the tension of the second mooring chain 120, the connection with the second mooring chain 120 can be easily made.

이같이, 제1계류체인 표시부이(111)와 앵커위치 표시부이(101)가 연결 구비된 앵커(100)를 해저면에 투입 배치한 후에는, 제1계류체인(110)을 계류작업 선박(20)에 배치된 계류체인 연결장치(200)에 연결되게 설치한다(S110). 즉, 계류작업 선박(20)에서 제1계류체인(110)을 끌어올린 후, 제1계류체인(110)의 길이방향 일단을 계류작업 선박(20)에 배치된 계류체인 연결장치(200)에 연결 설치한다. 이에 대해 좀 더 상세하게 설명하면, 도 4와 같이, 제1계류라인 표시부이(111)에 연결된 제1와이어(112) 길이방향 일단을 계류작업 선박(20)으로 당겨 이동시킨 후, 제1와이어(112)의 길이방향 일단을 계류작업 선박(20)에 구비된 권취장치(도면미도시)를 통해 감김시키면서 제1계류체인(110)의 길이방향 일단을 계류작업 선박(20)에 배치되게 한다. 이후, 계류작업 선박(20)으로 당김 이동 배치된 제1계류체인(110)의 길이방향 일단 끝 부분을 계류라인 연결장치(200)에 고정 결합되게 한다. 이같이, 제1와이어(112) 길이방향 일단을 계류작업 선박(20)으로 당겨 이동시킨 후, 제1와이어(112)의 길이방향 일단을 계류작업 선박(20)에 구비된 권취장치(도면미도시)를 통해 감김시키면서 제1계류체인(110)의 길이방향 일단을 계류작업 선박(20)에 배치되게 하는 정도에 따라 해저면에서 앵커(100)의 위치를 이동 조절할 수도 있다.In this way, after inserting and placing the anchor 100 with the first mooring chain indicator buoy 111 and the anchor position indicator buoy 101 connected to the sea floor, the first mooring chain 110 is attached to the mooring operation vessel 20. It is installed to be connected to the arranged mooring chain connection device (200) (S110). That is, after pulling up the first mooring chain 110 from the mooring work vessel 20, one longitudinal end of the first mooring chain 110 is connected to the mooring chain connection device 200 disposed on the mooring work vessel 20. Connect and install. To explain this in more detail, as shown in Figure 4, after pulling and moving the longitudinal end of the first wire 112 connected to the first mooring line indicator buoy 111 to the mooring work vessel 20, the first wire ( While the longitudinal end of the first mooring chain 110 is wound through a winding device (not shown) provided on the mooring vessel 20, the longitudinal end of the first mooring chain 110 is placed on the mooring vessel 20. Thereafter, one end in the longitudinal direction of the first mooring chain 110, which is pulled and placed on the mooring work vessel 20, is fixedly coupled to the mooring line connection device 200. In this way, after the longitudinal end of the first wire 112 is pulled and moved to the mooring work vessel 20, the longitudinal end of the first wire 112 is connected to a winding device (not shown) provided on the mooring work vessel 20. ), the position of the anchor 100 on the sea floor can be moved and adjusted depending on the extent to which the longitudinal end of the first mooring chain 110 is placed on the mooring operation vessel 20 while being wound through.

도 3을 참조하면, 상기 계류라인 연결장치(200)는 판 형태를 가지는 베이스부(210)와, 베이스부(210)의 상측에 회전 가능하게 연결 설치되는 걸림대(220)를 포함할 수 있다. 여기서, 베이스부(210)의 상면에는 일측면에 제1계류체인(110)을 연결하는 계류연결고리(212)가 형성되고, 타측면에는 제2계류체인(120)을 관통 상태로 이동되게 가이드하는 계류가이드홈(213)이 형성된 연결지지대(211)를 결합 구비한다. 이때, 베이스부(210)는 상호 이격되게 복수의 관통공(도면미도시)이 형성되어, 계류라인 연결장치(200)를 해저면으로 투입하고자 계류작업 선박(20)에서 낙하시 해수의 통과가 안정적으로 이루어지면서 베이스부(210)의 바닥면이 해저면에 안정적으로 배치될 수 있게 한다. 여기서, 도면부호 214는 계류라인 연결장치(200)를 해저면에 투입시 와이어부재(도면미도시)를 연결하는 투입와이어연결고리이다.Referring to FIG. 3, the mooring line connection device 200 may include a base portion 210 having a plate shape, and a hanging bar 220 rotatably connected to the upper side of the base portion 210. Here, a mooring link 212 is formed on one side of the upper surface of the base portion 210 to connect the first mooring chain 110, and on the other side, a guide is formed to move the second mooring chain 120 in a penetrating state. It is provided with a connection support 211 formed with a mooring guide groove 213. At this time, the base portion 210 is formed with a plurality of through holes (not shown) spaced apart from each other, so that seawater passes through when dropped from the mooring operation vessel 20 in order to insert the mooring line connection device 200 into the seabed. This allows the bottom surface of the base portion 210 to be stably placed on the seafloor. Here, reference numeral 214 denotes an input wire connection ring that connects a wire member (not shown) when the mooring line connector 200 is input to the seafloor.

상기 걸림대(220)는 계류가이드홈(213) 상측에 배치되도록 연결지지대(211)에 회전 가능하게 힌지로 결합되는 부분이다. 이러한, 걸림대(220)의 하단면은 제2계류체인(120)의 이동을 안정적으로 이루어질 수 있도록 라운드 진 형태로 형성될 수 있으며, 더불어, 걸림대(220)의 하단면에는 계류가이드홈(213)에 삽입 배치된 제2계류체인(120)을 걸림상태로 이동되게 하는 걸림스토퍼(221)가 형성될 수 있다. 이때, 걸림스토퍼(221)도 부채꼴 단면 형태로 형성되어, 제2계류체인(120)을 계류가이드홈(213)에서 이동시, 일측 방향, 보다 상세하게는 제2계류체인(120)이 해양 구조물(10)에서 멀어지는 방향으로는 이동되게 하는 반면에, 제2계류체인(120)이 해양 구조물(10) 방향으로 이동시에는 걸림상태가 되게 하면서 이동되지 않게 고정되게 한다. 만약, 제2계류체인(120)을 해양 구조물(10) 방향으로 이동시키고자 걸림상태를 해제하고 싶을 경우에는, 걸림대(220)를 연결지지대(211) 상에서 회전시켜 걸림스토퍼(221)가 제2계류체인(120)에 걸림된 상태를 해제시키면 된다.The hanging bar 220 is a part rotatably coupled with a hinge to the connection support 211 so as to be disposed on the upper side of the mooring guide groove 213. The lower surface of the latching bar 220 may be formed in a rounded shape to ensure stable movement of the second mooring chain 120. In addition, the lower surface of the latching bar 220 has a mooring guide groove 213. A locking stopper 221 may be formed to move the second mooring chain 120 inserted into the locking state. At this time, the locking stopper 221 is also formed in a fan-shaped cross-section, so that when the second mooring chain 120 is moved in the mooring guide groove 213, the second mooring chain 120 moves in one direction, more specifically, the marine structure ( While it is moved in the direction away from 10), when the second mooring chain 120 moves in the direction of the offshore structure 10, it is locked and fixed so as not to move. If you want to release the latching state in order to move the second mooring chain 120 in the direction of the marine structure 10, rotate the latching bar 220 on the connection support 211 so that the latching stopper 221 is connected to the second mooring chain 120. All you have to do is release the state from being caught in the mooring chain 120.

이같이, 상기 계류작업 선박(20)에 배치된 계류체인 연결장치(200)의 계류연결고리(212)에 제1계류체인(110)을 연결 설치한 후에는, 해양 구조물(10)에 연결된 제2계류체인(120)의 길이방향 일단을 계류체인 연결장치(200)에 연결상태로 계류작업 선박(20)에 배치되게 한다(S120). 즉, 도 4와 같이, 제2계류체인(120)의 길이방향 타단을 계류작업 선박(20)을 통해 해양 구조물(10)에 연결한 후, 제2계류체인(120)의 길이방향 일단을 계류체인 연결장치(200)에 연결 배치한다. 보다 구체적으로는 제2계류체인(120)의 길이방향 일단은 계류체인 연결장치(200)의 계류가이드홈(213)에 삽입 배치된 상태로 걸림대(220)에 의해 걸림된 상태를 유지되게 한다. 이때, 제2계류체인(120)의 길이방향 일단 끝 부분은 제4와이어(122)를 통해 계류작업 선박(10)의 권취장치에 연결 배치되게 한다.In this way, after connecting and installing the first mooring chain 110 to the mooring link 212 of the mooring chain connecting device 200 disposed on the mooring operation vessel 20, the second mooring chain 110 connected to the marine structure 10 The longitudinal end of the mooring chain 120 is connected to the mooring chain connecting device 200 and placed on the mooring work vessel 20 (S120). That is, as shown in FIG. 4, the other longitudinal end of the second mooring chain 120 is connected to the marine structure 10 through the mooring operation vessel 20, and then the longitudinal end of the second mooring chain 120 is moored. It is connected and placed on the chain link device (200). More specifically, the longitudinal end of the second mooring chain 120 is inserted into the mooring guide groove 213 of the mooring chain connection device 200 and is maintained in a locked state by the latching bar 220. At this time, one longitudinal end of the second mooring chain 120 is connected to the winding device of the mooring vessel 10 through the fourth wire 122.

이렇게, 상기 해양 구조물(10)에 연결된 제2계류체인(120)의 단부를 계류작업 선박(20)에 배치된 계류체인 연결장치(200) 및 권취장치에 연결되게 한 후에는, 계류체인 연결장치(200)에 제3와이어(310)를 통해 연결장치 표시부이(320)를 연결한 후, 계류체인 연결장치(200)를 해양 구조물(10)과 앵커(100) 사이에 위치하도록 해저면에 투입 배치되게 한다(S130). 이러한, 연결장치 표시부이(320)는 계류체인 연결장치(200)의 상측 수면 상에 부유하도록 배치되는 바, 계류체인 연결장치(200) 위치를 확인할 수 있게 하면서, 이후 계류체인 연결장치(200)의 수리나 교체가 필요한 경우 계류체인 연결장치(200)를 다시 계류작업 선박(20)으로 쉽게 인양할 수 있게 한다.In this way, after the end of the second mooring chain 120 connected to the marine structure 10 is connected to the mooring chain connecting device 200 and the winding device disposed on the mooring operation vessel 20, the mooring chain connecting device After connecting the connection device indicator buoy 320 to (200) through the third wire 310, the mooring chain connection device 200 is placed on the sea floor so that it is located between the marine structure 10 and the anchor 100. Make it happen (S130). This connection device display buoy 320 is arranged to float on the water surface on the upper side of the mooring chain connection device 200, allowing the location of the mooring chain connection device 200 to be confirmed, and subsequently the mooring chain connection device 200. If repair or replacement is necessary, the mooring chain connection device (200) can be easily lifted back to the mooring operation vessel (20).

이같이, 상기 계류체인 연결장치(200)를 해저면에 투입 배치되게 하면, 계류작업 선박(20)에서 제2계류체인(120)의 장력을 조절한 후, 계류작업 선박(20)에서 제2계류체인(120)의 연결상태가 해제되도록 해체하는 작업을 수행한다(S140). 즉, 해양 구조물(10)이 계류지점에서 안정적으로 계류할 수 있도록 제2계류체인(120)의 장력을 조절한 후, 제2계류체인(120)을 계류작업 선박(20)에서 해체하고 제2계류체인(120)의 끝 부분 위치를 알 수 있게 한다. 도 5를 참조하면, 계류작업 선박(20)을 제5와이어(123)을 통해 앵커위치 표시부이(101)에 연결된 제2와이어(102)와 연결되게 한다. 그리고, 계류작업 선박(20)에 구비된 권취장치를 작동시켜, 계류작업 선박(20)의 권취장치에 연결된 제4와이어(122)를 감김시키면서 제2계류체인(120)이 설정된 장력상태가 되도록 조절한다. 이후, 도 6과 같이 제2계류체인(120)의 길이방향 일단을 권취장치에서 해체한 후, 제2계류체인(120)의 길이방향 일단 끝 부분에 제4와이어(122)를 통해 제2계류체인 표시부이(121)가 연결된 상태로 제2계류체인(120)의 길이방향 일단을 해저면에 배치되게 계류작업 선박(20)에서 이탈되게 한다. 여기서, 제2계류체인 표시부이(121)와 제4와이어(122)는 제2계류체인(120)과 연결된 상태로 수면 상에 부유상태로 배치되는 바, 계류체인 연결장치(200)를 해저면에 투입 배치한 상태에서 추후 제2계류체인(120)의 장력조절이 필요한 경우, 계류작업 선박(20)에서 제2계류체인(120)의 감김작업을 쉽게 수행할 수 있게 한다. 그리고, 제5와이어(123)와 제2와이어(102)의 연결을 해제시켜 제2와이어(102)가 계류작업 선박(20)에서 이탈되게 하면, 해양 구조물(10)의 계류라인 설치작업이 완료된다.In this way, when the mooring chain connection device 200 is inserted and placed on the seabed, the tension of the second mooring chain 120 is adjusted in the mooring work vessel 20, and then the second mooring chain is connected in the mooring work vessel 20. A disassembly operation is performed so that the chain 120 is disconnected (S140). That is, after adjusting the tension of the second mooring chain 120 so that the marine structure 10 can be stably moored at the mooring point, the second mooring chain 120 is dismantled from the mooring operation vessel 20 and the second mooring chain 120 is dismantled from the mooring operation vessel 20. It allows the location of the end of the mooring chain 120 to be known. Referring to FIG. 5, the mooring vessel 20 is connected to the second wire 102 connected to the anchor position indicator buoy 101 through the fifth wire 123. Then, the winding device provided on the mooring work vessel 20 is operated to wind the fourth wire 122 connected to the winding device of the mooring work vessel 20 so that the second mooring chain 120 is in the set tension state. Adjust. Thereafter, as shown in FIG. 6, after dismantling the longitudinal end of the second mooring chain 120 from the winding device, the second mooring is attached to the end of the longitudinal end of the second mooring chain 120 through the fourth wire 122. With the chain display buoy 121 connected, one end of the second mooring chain 120 in the longitudinal direction is placed on the sea floor and separated from the mooring operation vessel 20. Here, the second mooring chain indicator buoy 121 and the fourth wire 122 are connected to the second mooring chain 120 and are placed floating on the water surface, and the mooring chain connection device 200 is connected to the sea bottom. If tension adjustment of the second mooring chain 120 is required later in the deployed state, the winding operation of the second mooring chain 120 can be easily performed on the mooring work vessel 20. Then, when the connection between the fifth wire 123 and the second wire 102 is disconnected and the second wire 102 is separated from the mooring vessel 20, the mooring line installation work for the marine structure 10 is completed. do.

상기와 같은 부유식 해양 구조물용 계류라인 설치방법에 따르면, 앵커(100)를 해저면에 투입 배치한 후, 앵커(100)와 연결된 제1계류체인(110) 및 해양 구조물(10)에 연결된 제2계류체인(120)을 계류작업 선박(20)에 배치된 계류체인 연결장치(200)에 연결 위치시킨 상태에서 앵커(100)와 해양 구조물(10) 사이 해저면에 계류체인 연결장치(200)를 투입 설치한다. 이후, 계류작업 선박(20)에서 제2계류체인(120)을 권취장치에 연결시킨 상태에서 감김시켜 장력을 설정된 장력상태가 되도록 조절하고, 다시 제2계류체인(120)을 해저면에 위치되게 하는 바, 해양 구조물(10)의 계류 작업을 신속하면서 쉽게 할 수 있게 한다.According to the method of installing a mooring line for a floating marine structure as described above, after inserting and placing the anchor 100 on the sea floor, the first mooring chain 110 connected to the anchor 100 and the first mooring chain 110 connected to the marine structure 10 2With the mooring chain 120 connected to the mooring chain connection device 200 placed on the mooring operation vessel 20, the mooring chain connection device 200 is placed on the sea floor between the anchor 100 and the offshore structure 10. Inject and install. Thereafter, in the mooring work vessel 20, the second mooring chain 120 is wound while connected to the winding device to adjust the tension to the set tension state, and then the second mooring chain 120 is placed on the sea floor. This makes it possible to quickly and easily moor the marine structure 10.

더불어, 상기 앵커(100)에는 제2와이어(102)를 통해 부유상태로 앵커위치 표시부이(101)를 연결 구비하고, 제2계류체인(120)에는 제4와이어(122)를 통해 부유상태로 제2계류체인 표시부이(121)를 연결 구비한 바, 계류 설치완료 후 해양 구조물(10)의 계류상태 장력 조절이 필요한 경우에도 제4와이어(122)를 통한 제2계류체인(120)을 계류작업 선박(20)으로 이동시킨 상태로 계류작업 선박(20)을 제2와이어(102)로 앵커(100)에 연결되게 할 수 있으므로 장력 조절작업을 안정적으로 수행할 수 있게 한다In addition, the anchor position indicator buoy 101 is connected to the anchor 100 in a floating state through a second wire 102, and is connected to the second mooring chain 120 in a floating state through a fourth wire 122. The second mooring chain indicator buoy (121) is connected and equipped, so even when it is necessary to adjust the mooring state tension of the marine structure (10) after the mooring installation is completed, the second mooring chain (120) is connected to the mooring work vessel through the fourth wire (122). Since the mooring work vessel (20) can be connected to the anchor (100) with the second wire (102) while being moved to (20), tension adjustment work can be performed stably.

본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 청구범위의 기술적 사상에 의하여 정해져야 할 것이다.The present invention has been described with reference to the embodiments shown in the drawings, but these are merely exemplary, and those skilled in the art will understand that various modifications and equivalent other embodiments are possible therefrom. Therefore, the true technical protection scope of the present invention should be determined by the technical spirit of the attached claims.

100: 앵커
110: 제1계류체인
111:제1계류체인 표시부이
112: 제1와이어
120: 제2계류체인
121: 제2계류체인 표시부이
122: 제4와이어
200: 계류체인 연결장치
210: 베이스부
211: 연결지지대
212: 계류연결고리
213: 계류가이드홈
220: 걸림대
221: 걸림스토퍼
300: 연결장치 표시부이
310: 제3와이어
100: anchor
110: First mooring chain
111: 1st mooring chain indicator buoy
112: 1st wire
120: Second mooring chain
121: Second mooring chain indicator buoy
122: 4th wire
200: Mooring chain connection device
210: base part
211: Connection support
212: Mooring link
213: Mooring guide home
220: hanging bar
221: Jam stopper
300: Connector indicator buoy
310: Third wire

Claims (5)

부유상태의 해양 구조물을 계류지점에 계류시키는 부유식 해양 구조물용 계류라인 설치방법에 있어서,
일측에는 길이방향 양단에 제1와이어를 통해 한 쌍의 제1계류체인 표시부이가 연결된 제1계류체인 및, 제2와이어를 통해 앵커위치 표시부이가 연결된 앵커를 계류지점 인근의 해저면에 투입 배치하는 단계;
계류작업 선박에서 제1계류체인을 끌어올린 후, 제1계류체인의 길이방향 일단을 계류작업 선박에 배치된 계류체인 연결장치에 연결 설치하는 단계;
상기 해양 구조물에 연결된 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결상태로 계류작업 선박에 배치하는 단계;
상기 계류체인 연결장치에 제3와이어를 통해 연결장치 표시부이를 연결한 후, 계류체인 연결장치를 해양 구조물과 앵커 사이의 해저면에 투입 배치하는 단계;
상기 계류작업 선박에서 제2계류체인의 장력을 조절한 후, 계류작업 선박에서 제2계류체인을 해체하는 단계;를 포함하며,
상기 계류작업 선박에서 제2계류체인의 장력을 조절한 후, 계류작업 선박에서 제2계류체인을 해체하는 단계는,
상기 계류작업 선박을 앵커위치 표시부이에 연결된 제2와이어와 연결되게 하는 단계,
상기 계류작업 선박에 구비된 권취장치를 작동시켜, 제2계류체인을 감김시키면서 장력을 조절하는 단계,
상기 제2계류체인의 길이방향 일단을 권취장치에서 해체한 후, 상기 제2계류체인의 길이방향 일단 끝 부분에 제3와이어를 통해 앵커위치 표시부이가 연결된 상태로 제2계류체인의 길이방향 일단을 해저면에 배치되게 하는 단계,
상기 제2와이어를 계류작업 선박에서 이탈되게 하는 단계를 포함하는 부유식 해양 구조물용 계류라인 설치방법.
In the method of installing a mooring line for a floating marine structure to moor a floating marine structure at a mooring point,
A step of inserting and placing a first mooring chain with a pair of first mooring chain indicator buoys connected at both ends in the longitudinal direction through a first wire on one side, and an anchor with an anchor position indicator buoy connected through a second wire on the sea bottom near the mooring point. ;
After pulling up the first mooring chain from the mooring work vessel, connecting and installing one longitudinal end of the first mooring chain to a mooring chain connection device arranged on the mooring work vessel;
Placing one longitudinal end of the second mooring chain connected to the marine structure on a mooring operation vessel while connected to a mooring chain connection device;
Connecting the connection device indicator buoy to the mooring chain connection device through a third wire, and then inserting and placing the mooring chain connection device on the sea floor between the marine structure and the anchor;
After adjusting the tension of the second mooring chain on the mooring work vessel, dismantling the second mooring chain on the mooring work vessel,
After adjusting the tension of the second mooring chain on the mooring work vessel, the step of dismantling the second mooring chain on the mooring work vessel is:
Connecting the moored work vessel to a second wire connected to the anchor position indicator buoy,
Operating the winding device provided on the mooring operation vessel to wind the second mooring chain and adjust the tension;
After dismantling the longitudinal end of the second mooring chain from the winding device, the longitudinal end of the second mooring chain is connected with an anchor position indicator buoy connected to the end of the longitudinal end of the second mooring chain through a third wire. placing it on the seabed,
A mooring line installation method for a floating marine structure comprising the step of disengaging the second wire from the mooring operation vessel.
청구항 1에 있어서,
상기 계류라인 연결장치는,
판 형태를 가지며, 일측면에 제1계류체인을 연결하는 계류연결고리가 형성되고, 타측면에는 제2계류체인을 관통 상태로 이동되게 가이드하는 계류가이드홈이 형성된 연결지지대를 결합 구비하는 베이스부,
상기 계류가이드홈 상측에 배치되도록 연결지지대에 회전 가능하게 힌지 결합되며, 하단면에는 계류가이드홈에 삽입 배치된 제2계류체인을 걸림상태로 이동되게 하는 걸림스토퍼가 형성된 걸림대를 포함하는 부유식 해양 구조물용 계류라인 설치방법.
In claim 1,
The mooring line connection device is,
A base portion that has a plate shape and is provided with a mooring link connecting the first mooring chain on one side, and a connection support formed on the other side with a mooring guide groove that guides the second mooring chain to move in a penetrating state. ,
A floating marine device that is rotatably hinged to a connection support so as to be disposed on the upper side of the mooring guide groove, and has a locking stopper formed on the lower end to move the second mooring chain inserted into the mooring guide groove in a locked state. How to install mooring lines for structures.
청구항 1에 있어서,
상기 계류작업 선박에서 제1계류체인을 끌어올린 후, 제1계류체인의 길이방향 일단을 계류작업 선박에 배치된 계류라인 연결장치에 연결 설치하는 단계는,
상기 제1계류체인 표시부이에 연결된 제1와이어의 길이방향 일단을 계류작업 선박으로 당김 배치시킨 후, 제1와이어의 길이방향 일단을 계류작업 선박에 구비된 권취장치를 통해 감김시키면서 제1계류체인의 길이방향 일단을 계류작업 선박에 배치시키는 단계,
상기 계류작업 선박으로 당김 배치된 제1계류체인의 길이방향 일단 끝 부분을 계류라인 연결장치에 고정 결합시키는 단계를 포함하는 부유식 해양 구조물용 계류라인 설치방법.
In claim 1,
After pulling up the first mooring chain from the mooring work vessel, the step of connecting and installing one longitudinal end of the first mooring chain to the mooring line connection device arranged on the mooring work vessel includes:
After pulling and disposing the longitudinal end of the first wire connected to the first mooring chain indicator buoy to the mooring operation vessel, the longitudinal end of the first wire is wound through a winding device provided on the mooring operation vessel to secure the first mooring chain. Step of placing the longitudinal end on the mooring operation vessel,
A mooring line installation method for a floating marine structure, comprising the step of fixing and coupling one longitudinal end of the first mooring chain pulled by the mooring operation vessel to a mooring line connection device.
청구항 1에 있어서,
상기 해양 구조물에 연결된 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결상태로 계류작업 선박에 배치하는 단계는,
상기 계류작업 선박을 통해 제2계류체인의 길이방향 타단을 해양 구조물에 연결한 후, 제2계류체인의 길이방향 일단을 계류체인 연결장치에 연결 배치하는 단계,
상기 제2계류체인의 길이방향 일단 끝 부분을 계류작업 선박의 권취장치에 연결 배치하는 단계를 포함하는 부유식 해양 구조물용 계류라인 설치방법.

In claim 1,
The step of placing the longitudinal end of the second mooring chain connected to the marine structure on the mooring operation vessel while connected to the mooring chain connection device,
Connecting the other longitudinal end of the second mooring chain to the marine structure through the mooring operation vessel, and then connecting and arranging the longitudinal end of the second mooring chain to the mooring chain connecting device,
A mooring line installation method for a floating marine structure comprising the step of connecting and arranging one end of the second mooring chain in the longitudinal direction to a winding device of a mooring operation vessel.

삭제delete
KR1020210162260A 2021-11-23 2021-11-23 Installation of mooring lines for floating offshore structures KR102625843B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210162260A KR102625843B1 (en) 2021-11-23 2021-11-23 Installation of mooring lines for floating offshore structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210162260A KR102625843B1 (en) 2021-11-23 2021-11-23 Installation of mooring lines for floating offshore structures

Publications (2)

Publication Number Publication Date
KR20230075761A KR20230075761A (en) 2023-05-31
KR102625843B1 true KR102625843B1 (en) 2024-01-17

Family

ID=86543355

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210162260A KR102625843B1 (en) 2021-11-23 2021-11-23 Installation of mooring lines for floating offshore structures

Country Status (1)

Country Link
KR (1) KR102625843B1 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2597478B2 (en) * 1986-05-22 1997-04-09 大成建設株式会社 How to connect mooring lines
KR101625381B1 (en) * 2014-08-29 2016-06-02 삼성중공업 주식회사 Apparatus for moor floating platform
EP3924246A1 (en) * 2019-02-15 2021-12-22 Flintstone Technology Limited Improved mooring/tensioning apparatus

Also Published As

Publication number Publication date
KR20230075761A (en) 2023-05-31

Similar Documents

Publication Publication Date Title
EP1945940B1 (en) Deployment apparatus for submerged power plant
CA2710197C (en) Spar with detachable hull structure
US8734055B2 (en) Method for assembling an operating rig for a fluid in a body of water and associated operating rig
EP1670675B1 (en) Mooring system
BR112014031082B1 (en) method and system to provide control and shutdown capability
AU2013100495A4 (en) Buoy
EP4017792B1 (en) Method for installing a tension leg platform based floating object
US20200298944A1 (en) Method for Installing a Subsea Structure
US5065687A (en) Mooring system
AU2018273178B2 (en) Method and system for laying a submarine pipeline
EP3008328B1 (en) Power generating equipment
US8882390B2 (en) Method for installing an operating rig for a fluid in a body of water with a traction unit
AU2008240391A1 (en) Methods of and apparatus for mooring and for connecting lines to articles on the seabed
KR102625843B1 (en) Installation of mooring lines for floating offshore structures
KR20090118466A (en) Installation method of the pipelines using laying barge with sub-sea anchor block
JPH02214404A (en) Method of laying long member for floating plant in rising manner
KR102034347B1 (en) Tidal Current Power Generator Construction System Using Guide Wire
KR101281654B1 (en) Anchoring method of vessel with caisson pipe
KR101281652B1 (en) Offshore plant anchoring method using vessel with caisson pipe
KR101324118B1 (en) Ice management method using vessel with caisson pipe
KR102020108B1 (en) Tidal Current Power Generator Construction System With Easy Submarine Cable Installation
AU2013101562A4 (en) Buoy
KR102095380B1 (en) Apparatus for installing mooring line of marine structure and Method for installing mooring line of marine structure
GB2493935A (en) Buoyant structure with rapidly releasable seabed fixing arrangement
US20130277061A1 (en) Tower for exploiting fluid in an expanse of water and associated installation method

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right