KR102524135B1 - Fixing Equipment Of Over-head Distribution Line - Google Patents

Fixing Equipment Of Over-head Distribution Line Download PDF

Info

Publication number
KR102524135B1
KR102524135B1 KR1020220127726A KR20220127726A KR102524135B1 KR 102524135 B1 KR102524135 B1 KR 102524135B1 KR 1020220127726 A KR1020220127726 A KR 1020220127726A KR 20220127726 A KR20220127726 A KR 20220127726A KR 102524135 B1 KR102524135 B1 KR 102524135B1
Authority
KR
South Korea
Prior art keywords
vertical
hole
plate
horizontal plate
horizontal
Prior art date
Application number
KR1020220127726A
Other languages
Korean (ko)
Inventor
이상중
Original Assignee
(주)새롬전기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)새롬전기 filed Critical (주)새롬전기
Priority to KR1020220127726A priority Critical patent/KR102524135B1/en
Application granted granted Critical
Publication of KR102524135B1 publication Critical patent/KR102524135B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/02Devices for adjusting or maintaining mechanical tension, e.g. take-up device
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52Testing for short-circuits, leakage current or ground faults
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/185Electrical failure alarms
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure
    • H02G13/40Connection to earth
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure
    • H02G13/80Discharge by conduction or dissipation, e.g. rods, arresters, spark gaps

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Insulators (AREA)

Abstract

The present invention relates to a clamp device for fixing an overhead power distribution line with an earth leakage detection function. The clamp device for fixing an overhead power distribution line comprises: a cover (10) installed to be inserted into an upper end of an electric pole (P); a cross arm (70) of various sizes installed on the electric pole (P); a lightning protection apparatus (20) having a vertical stand (21), a horizontal stand (22), a moving rack (23), a driving apparatus (24), a pinion (25), a lightning rod (26), and a ground wire (27); a fixing bracket (30) made of a metal; a coupling member (40) having a bolt body (41) and first and second nut bodies (42, 42'); a first insulator (50) supporting the ground wire (27); a second insulator (60) supporting an overhead power distribution line (L); an earth leakage detection sensor (80) installed in the cross arm (70); an earth leakage warning lamp moving apparatus (90) having an accommodating member (91) and a moving stand (92); and an earth leakage warning lamp (100) installed on the moving stand (92) of the earth leakage warning lamp moving apparatus (90). Therefore, the present invention can rapidly cope with earth leakage occurrence.

Description

누전감지기능을 갖춘 가공배전선 고정 클램프 장치{Fixing Equipment Of Over-head Distribution Line}Overhead distribution line fixing clamp device with leakage detection function {Fixing Equipment Of Over-head Distribution Line}

본 발명은 누전감지기능을 갖춘 가공배전선 고정 클램프 장치에 관한 것이다.The present invention relates to an overhead distribution line fixing clamp device having an earth leakage detection function.

일반적으로 발전소에서 공급되는 전력은 가공배전선을 이용하여 각 가정이나 공장 등의 수요자에게 공급된다.In general, power supplied from power plants is supplied to consumers such as homes or factories using overhead distribution lines.

이때, 전주에는 완철이 설치되고, 완철에 애자가 설치되어, 애자를 통해 가공배전선이 지지된다.At this time, iron is installed on the electric pole, and an insulator is installed on the iron, and the overhead distribution line is supported through the insulator.

그러나, 종래에는 가공배전선에서 누전이 발생할 시 이를 즉각적으로 알 수 없어, 누전 발생에 대한 신속한 대처가 어려웠다.However, in the prior art, when an electric leakage occurs in an overhead distribution line, it is not immediately known, so it is difficult to promptly cope with an electric leakage.

또한, 종래에는 전주를 향해 낙뢰가 발생할 시, 낙뢰에 의해 가공배전선 및 가공배전설비가 손상되는 문제가 발생하였다.In addition, conventionally, when lightning strikes toward utility poles, overhead power distribution lines and overhead power distribution facilities are damaged by lightning.

또한, 종래에는 애자를 완철에 설치할 시, 다양한 설치환경(애자 위치, 완철 크기 등)에 맞게 애자를 편리하게 설치할 수 없었고, 애자에 충분한 완충력을 제공하는 데 어려움이 있었다.In addition, in the prior art, when installing insulators in iron rods, it was not possible to conveniently install insulators to suit various installation environments (insulator position, iron rod size, etc.), and it was difficult to provide sufficient buffering power to the insulators.

대한민국 등록특허공보 제10-1399043호Republic of Korea Patent Registration No. 10-1399043

본 발명은 상기와 같은 과제를 해결하기 위해 발명된 것으로, 누전 발생을 신속하게 알 수 있고, 낙뢰에 의한 가공배전설비의 손상을 방지하며, 다양한 설치환경(애자 위치, 완철 크기 등)에 맞게 애자를 편리하게 설치할 수 있고, 애자에 충분한 완충력을 제공하는 '가공배전선 고정 클램프 장치'를 제공하는 것을 해결하고자 하는 과제로 한다.The present invention was invented to solve the above problems, and it is possible to quickly know the occurrence of a short circuit, prevent damage to overhead power distribution equipment due to lightning strikes, and insulators suitable for various installation environments (insulator location, iron size, etc.) It is a task to be solved to provide an 'overhead distribution line fixing clamp device' that can be conveniently installed and provides sufficient buffering power to the insulator.

상기와 같은 과제를 해결하기 위한 본 발명은,The present invention for solving the above problems,

전주(P)의 상단에 삽입설치되는 커버(10)와; A cover 10 inserted and installed at the top of the electric pole (P);

전주(P)에 설치되고, 커버(10)보다 하방에 위치하는 다양한 크기의 완철(70)과;Wancheol 70 of various sizes installed on the electric pole (P) and located below the cover 10;

커버(10)에 설치되는 수직대(21); 수직대(21)의 상단에 설치되는 수평대(22); 수평대(22)에 상하방향으로 이동가능하게 삽입되는 절연재질의 이동랙(23); 수평대(22)에 설치되어 피니언(25)을 회전시키는 구동기기(24); 구동기기(24)에 설치되고, 이동랙(23)과 연동하여 이동랙(23)을 상하 이동시키는 피니언(25); 이동랙(23)의 상단에 설치되는 피뢰침(26)과, 피뢰침(26)에 연결되는 접지선(27)을 갖춘 피뢰기구(20)와;a vertical stand 21 installed on the cover 10; A horizontal stand 22 installed on top of the vertical stand 21; A movable rack 23 made of an insulating material that is movably inserted into the horizontal stand 22 in the vertical direction; a driving device 24 installed on the leveling table 22 to rotate the pinion 25; A pinion 25 installed in the driving device 24 and moving the movable rack 23 up and down in conjunction with the movable rack 23; A lightning rod 26 installed at the top of the mobile rack 23 and a lightning rod 20 having a ground wire 27 connected to the lightning rod 26;

상하방향으로 개구된 제1수직관통홀(31a)을 구비한 제1수평판(31); 상하방향으로 개구된 제1수평관통홀(32a)을 구비하고 제1수평판(31)의 전단에서 하방으로 돌출되게 형성되는 제1수직판(32); 상하방향으로 개구되어 전측이 제1수평판(31)의 제1수직관통홀(31a)과 상하방향으로 동일선상에 위치하는 제2수직관통홀(33a)을 구비하고, 제1수직판(32)의 하단에 후방으로 돌출되게 형성되되 제1수평판(32)보다 길이가 길게 형성되는 제2수평판(33); 전후방향으로 개구된 제2수평관통홀(34a)을 구비하고, 제2수평판(33)의 후단에 하방으로 돌출되게 형성되되 제1수직판(32)보다 길이가 길게 형성되는 제2수직판(34); 상하방향으로 개구되되 제2수평판(33)의 제2수직관통홀(33a)의 후측과 상하방향으로 동일선상에 위치하는 제3수직관통홀(35a)을 구비하고, 제2수직판(34)의 하단에 전방으로 돌출되게 형성되되 제2수평판(33)과 동일한 길이로 형성되는 제3수평판(35);을 갖추고서, 제1수평판(31) 및 제1수직판(32) 및 제2수평판(33)에 의해 형성되는 제1삽입공간(a1)과, 제2수평판(33) 및 제2수직판(34) 및 제3수평판(35)에 의해 형성되는 제2삽입공간(a2)의 크기가 서로 다르도록 'ㄹ'자 형상을 이루되, 제1삽입공간(a1) 또는 제2삽입공간(a2)이 완철(70)에 삽탈되는 금속재질의 고정브라켓(30)과;a first horizontal plate 31 having a first vertical through hole 31a opened in the vertical direction; a first vertical plate 32 having a first horizontal through hole 32a opened in the vertical direction and protruding downward from the front end of the first horizontal plate 31; Opened in the vertical direction, the front side has a second vertical through hole 33a located on the same line in the vertical direction with the first vertical through hole 31a of the first horizontal plate 31, and the first vertical plate 32 ) Is formed to protrude backward at the lower end of the second horizontal plate 33 formed longer than the first horizontal plate 32; A second vertical plate having a second horizontal through hole 34a opened in the front-back direction and protruding downward at the rear end of the second horizontal plate 33 and having a longer length than the first vertical plate 32 (34); A third vertical through hole (35a) opened in the vertical direction and located on the same line in the vertical direction with the rear side of the second vertical through hole (33a) of the second horizontal plate (33) is provided, and the second vertical plate (34) ) Is formed to protrude forward at the lower end of the third horizontal plate 35 formed to the same length as the second horizontal plate 33; equipped with, the first horizontal plate 31 and the first vertical plate 32 and the second insertion space a1 formed by the second horizontal plate 33, the second horizontal plate 33, the second vertical plate 34, and the third horizontal plate 35 formed by the second insertion space a1. A 'D' shape is formed so that the sizes of the insertion spaces (a2) are different from each other, and the first insertion space (a1) or the second insertion space (a2) is inserted into the complete iron (70) Fixed bracket (30) made of metal )class;

제2수평판(33)의 제2수직관통홀(33a) 및 완철(70) 및 제3수평판(35)의 제3수직관통홀(35a)을 관통하거나, 제1수평판(31)의 제1수직관통홀(31a) 및 완철(70) 및 제2수평판(33)의 제2수직관통홀(33a)을 관통하는 볼트체(41); 볼트체(41)의 양단에 각각 나사산체결되어 고정브라켓(30)이 완철(70)에 고정되도록 하는 제1,2너트체(42,42')를 갖춘 체결부재(40)와;Penetrates the second vertical through-hole 33a of the second horizontal plate 33 and the third vertical through-hole 35a of the iron 70 and the third horizontal plate 35, or of the first horizontal plate 31 The bolt body 41 penetrating the first vertical through-hole (31a) and the second vertical through-hole (33a) of the wancheol (70) and the second horizontal plate (33); A fastening member 40 having first and second nut bodies 42 and 42 'to be screwed to both ends of the bolt body 41 so that the fixing bracket 30 is fixed to the iron 70;

제1수평판(31)의 제1수직관통홀(31a) 또는 제1수직판(32)의 제1수평관통홀(32a) 또는 제2수직판(34)의 제2수평관통홀(34a) 또는 제3수평판(35)의 제3수직관통홀(35a)에 설치되어, 접지선(27)을 지지하는 제1애자(50)와;The first vertical through hole 31a of the first horizontal plate 31 or the first horizontal through hole 32a of the first vertical plate 32 or the second horizontal through hole 34a of the second vertical plate 34 or a first insulator 50 installed in the third vertical through hole 35a of the third horizontal plate 35 and supporting the ground wire 27;

제1수평판(31)의 제1수직관통홀(31a) 또는 제1수직판(32)의 제1수평관통홀(32a) 또는 제2수직판(34)의 제2수평관통홀(34a) 또는 제3수평판(35)의 제3수직관통홀(35a)에 설치되어, 가공배전선(L)을 지지하는 제2애자(60)와;The first vertical through hole 31a of the first horizontal plate 31 or the first horizontal through hole 32a of the first vertical plate 32 or the second horizontal through hole 34a of the second vertical plate 34 or a second insulator 60 installed in the third vertical through-hole 35a of the third horizontal plate 35 to support the overhead distribution line L;

완철(70)에 설치되는 누전감지센서(80)와;A leakage detection sensor 80 installed in the iron 70;

완철(70)의 상면에 설치되는 수용부재(91); 수용부재(91)에 전후방향으로 이동가능하게 설치되는 이동대(92);를 갖추며, 누전감지센서(80)로부터 누전감지신호를 수신하면 이동대(92)를 완철(70)의 전방을 향해 이동시키는 누전경고등이동기구(90)와;A receiving member 91 installed on the upper surface of the wancheol 70; A moving table 92 installed in the housing member 91 to be movable in the forward and backward directions, and when receiving an earth leakage detection signal from the earth leakage detection sensor 80, the moving table 92 is moved toward the front of the steel plate 70. an earth leakage warning light moving mechanism 90 for moving;

누전경고등이동기구(90)의 이동대(92)에 설치되고, 누전감지센서(80)로부터 누전감지신호를 수신하면 점등되는 누전경고등(100)An earth leakage warning light (100) installed on the moving base (92) of the earth leakage warning light moving mechanism (90) and turned on when an earth leakage detection signal is received from the earth leakage detection sensor (80)

을 포함하는 것을 특징으로 한다.It is characterized in that it includes.

상기와 같은 과제의 해결 수단에 따른 본 발명은, 가공배전선(L)에서 누전이 발생할 시 이를 신속하게 확인할 수 있어, 누전발생에 대한 신속한 대처가 가능한 효과가 있다.According to the present invention according to the means for solving the above problems, when an electric leakage occurs in the overhead power distribution line (L), it is possible to quickly check it, so that a quick response to the electric leakage is possible.

또한, 본 발명은, 피뢰기능을 구비하여 낙뢰로부터의 피해를 회피하되, 피뢰침(26)의 상하 위치를 조절하여, 주변 환경에 맞게 피뢰침(26)을 배치할 수 있는 효과가 있다.In addition, the present invention has an effect of avoiding damage from lightning by having a lightning protection function, but adjusting the vertical position of the lightning rod 26 to arrange the lightning rod 26 according to the surrounding environment.

또한, 본 발명은, 고정브라켓(30)을 매개로 제1애자(50) 및 제2애자(60)를 완철(70)에 편리하게 설치함은 물론, 다양한 크기의 완철(70)에 고정브라켓(30)을 설치할 수 있어, 제1애자(50) 및 제2애자(60)의 설치 편이성이 향상되는 효과가 있다.In addition, the present invention conveniently installs the first insulator 50 and the second insulator 60 to the iron 70 via the fixing bracket 30, as well as the fixing bracket to the iron 70 of various sizes. (30) can be installed, and there is an effect of improving the installation convenience of the first insulator 50 and the second insulator 60.

또한, 본 발명은, 고정브라켓(30)을 매개로 현수애자 타입 또는 라인포스트(LP) 애자 타입을 필요에 따라 쉽게 설치할 수 있어 사용 편이성이 향상되는 효과가 있다.In addition, the present invention has an effect of improving ease of use because a suspension insulator type or a line post (LP) insulator type can be easily installed as needed through the fixing bracket 30.

또한, 본 발명은, 고정브라켓(30)에 설치된 제1애자(50) 및 제2애자(60)에 외력이 작용할 시, 고정브라켓(30)에 의해 완충력이 발생하여, 제1애자(50) 및 제2애자(60)를 외력으로부터 보호할 수 있는 효과가 있다.In addition, in the present invention, when an external force acts on the first insulator 50 and the second insulator 60 installed in the fixing bracket 30, a buffering force is generated by the fixing bracket 30, and the first insulator 50 And there is an effect of protecting the second insulator 60 from external force.

또한, 본 발명은, 하나의 판을 'ㄹ'자 형상으로 굴곡시키고(프레스 가공 등 이용), 고정브라켓(30)에 필요한 홀(제1수직관통홀 등)을 펀칭하여 형성할 수 있어, 고정브라켓(30)을 쉽고 편리하게 제작할 수 있는 효과가 있다.In addition, the present invention can be formed by bending one plate in a 'L' shape (using press processing, etc.) and punching holes (first vertical through hole, etc.) required for the fixing bracket 30, fixing There is an effect that can easily and conveniently manufacture the bracket (30).

또한, 본 발명은, 고정브라켓(30)이 서로 다른 방향으로 개구된 제1삽입공간(a1) 및 제2삽입공간(a2)을 구비하기 때문에, 가공배전선(L)에 의한 장력 방향에 따라 완철(70)을 제1삽입공간(a1) 또는 제2삽입공간(a2)에 삽입하여, 가공배전선(L)에 충분한 지지력이 발생하도록 하는 효과가 있다. 이때 볼트체(41)는 제2수평판(33)으로부터 돌출되게 구비되어 고정브라켓(30)이 완철(70)에 보다 안정적으로 고정되도록 하는 효과가 있다.In addition, in the present invention, since the fixing bracket 30 has a first insertion space (a1) and a second insertion space (a2) opened in different directions, it is completely ironed according to the direction of tension by the overhead power distribution line (L). By inserting 70 into the first insertion space (a1) or the second insertion space (a2), there is an effect of generating sufficient bearing capacity in the overhead distribution line (L). At this time, the bolt body 41 is provided to protrude from the second horizontal plate 33, so that the fixing bracket 30 is more stably fixed to the wancheol 70.

도 1은 본 발명에서 가공배전선이 설치된 것을 설명하기 위한 도면이고,
도 2는 도 1의 일부를 나타낸 도면이고,
도 3은 본 발명에서 고정브라켓이 완철에 설치되고 누전경고 관련 구성이 완철에 설치된 것을 설명하기 위한 도면이고,
도 4는 본 발명에서 고정브라켓을 나타낸 사시도이고,
도 5는 본 발명에서 고정브라켓 부분을 설명하기 위한 단면도이고,
도 6은 도 3의 일부분을 나타낸 도면이고,
도 7 내지 도 10은 본 발명의 작용을 설명하기 위한 도면이다.
1 is a view for explaining that an overhead distribution line is installed in the present invention,
Figure 2 is a view showing a part of Figure 1,
3 is a view for explaining that in the present invention, the fixing bracket is installed in the iron and the leakage warning-related configuration is installed in the iron,
4 is a perspective view showing a fixing bracket in the present invention,
5 is a cross-sectional view for explaining a fixing bracket portion in the present invention;
Figure 6 is a view showing a part of Figure 3,
7 to 10 are views for explaining the operation of the present invention.

이하 통상의 기술자가 본 발명을 쉽게 실시할 수 있도록 본 발명을 설명한다.Hereinafter, the present invention will be described so that a person skilled in the art can easily practice the present invention.

도 1은 본 발명에서 가공배전선이 설치된 것을 설명하기 위한 도면이고, 도 2는 도 1의 일부를 나타낸 도면이고, 도 3은 본 발명에서 고정브라켓이 완철에 설치되고 누전경고 관련 구성이 완철에 설치된 것을 설명하기 위한 도면이고, 도 4는 본 발명에서 고정브라켓을 나타낸 사시도이고, 도 5는 본 발명에서 고정브라켓 부분을 설명하기 위한 단면도이고, 도 6은 도 3의 일부분을 나타낸 도면으로서, 도 1 내지 도 6을 참조하여 본 발명의 구성을 설명하면 다음과 같다. 한편 본 발명에서는 도 3 상에서의 X축 방향을 좌우방향으로 하고, 도 3 상에서의 Y축 방향을 전후방향으로 하며, 도 3 상에서의 Z축 방향을 상하방향으로 하여, 본 발명 구성의 방향성을 설명한다.1 is a view for explaining that an overhead power distribution line is installed in the present invention, FIG. 2 is a view showing a part of FIG. 1, and FIG. 3 is a fixed bracket installed in the complete iron and an earth leakage warning related component installed in the complete iron in the present invention. It is a view for explaining that, Figure 4 is a perspective view showing a fixing bracket in the present invention, Figure 5 is a cross-sectional view for explaining a fixing bracket portion in the present invention, Figure 6 is a view showing a portion of Figure 3, Figure 1 The configuration of the present invention is described with reference to FIG. 6 as follows. On the other hand, in the present invention, the X-axis direction in FIG. 3 is the left-right direction, the Y-axis direction in FIG. 3 is the front-back direction, and the Z-axis direction in FIG. 3 is the up-down direction. do.

본 발명에 따른 가공배전선 고정 클램프 장치는, 커버(10)와, 완철(70)과, 피뢰기구(20)와, 고정브라켓(30)과, 체결부재(40)와, 제1애자(50)와, 제2애자(60)와, 누전감지센서(80)와, 누전경고등이동기구(90)와, 누전경고등(100)을 포함한다.An overhead power distribution line fixing clamp device according to the present invention includes a cover 10, a complete iron 70, a lightning protection device 20, a fixing bracket 30, a fastening member 40, and a first insulator 50 and a second insulator 60, an earth leakage detection sensor 80, an earth leakage warning light moving mechanism 90, and an earth leakage warning light 100.

상기 커버(10)는, 도 1 및 도 2에 도시된 바와 같이, 전주(P)의 상단에 삽입설치된다. 본 발명에서 커버(10)는 일측에 외측으로 개구된 단차홈(11)이 형성된다. 본 발명에서 커버(10)는 절연재질로 이루어진다.As shown in FIGS. 1 and 2 , the cover 10 is inserted and installed at the top of the electric pole (P). In the present invention, the cover 10 is formed with a stepped groove 11 opened to the outside on one side. In the present invention, the cover 10 is made of an insulating material.

상기 완철(70)은, 도 1에 도시된 바와 같이, 전주(P)에 설치되고, 커버(10)보다 하방에 위치한다. 본 발명에서 완철(70)은 다양한 크기를 이룬다.The wancheol 70, as shown in Figure 1, is installed on the electric pole (P), located below the cover (10). Wancheol 70 in the present invention forms a variety of sizes.

상기 피뢰기구(20)는, 도 1 및 도 2에 도시된 바와 같이, 수직대(21)와, 수평대(22)와, 이동랙(23)과, 구동기기(24)와, 피니언(25)와, 피뢰침(26)과, 접지선(27)을 갖춘다.As shown in FIGS. 1 and 2, the lightning protection mechanism 20 includes a vertical stand 21, a horizontal stand 22, a movable rack 23, a driving device 24, and a pinion 25. ), a lightning rod 26, and a ground wire 27.

상기 수직대(21)는, 커버(10)에 설치된다. 본 발명에서 수직대(21)는 상하방향으로 형성된다.The upright stand 21 is installed on the cover 10 . In the present invention, the vertical stand 21 is formed in the vertical direction.

상기 수평대(22)는, 수직대(21)의 상단에 설치된다. 본 발명에서 수평대(22)는 수직대(21)의 외방으로 돌출되게 형성된다.The horizontal stand 22 is installed on top of the vertical stand 21 . In the present invention, the horizontal stand 22 is formed to protrude outward from the vertical stand 21 .

상기 이동랙(23)은, 수평대(22)에 상하방향으로 이동가능하게 삽입된다. 본 발명에서 이동랙(23)은 절연재질로 이루어진다. The movable rack 23 is inserted into the horizontal bar 22 so as to be movable in the vertical direction. In the present invention, the mobile rack 23 is made of an insulating material.

상기 구동기기(24)는, 수평대(22)에 설치되어 피니언(25)을 회전시킨다. 본 발명에서 구동기기(24)는 모터 방식이 적용될 수 있다. 한편 본 발명에서 구동기기(24)는 별도의 원격단말기(미도시)를 통해 작동제어된다.The driving device 24 is installed on the leveling table 22 and rotates the pinion 25 . In the present invention, the driving device 24 may be a motor method. Meanwhile, in the present invention, the driving device 24 is operated and controlled through a separate remote terminal (not shown).

상기 피니언(25)은, 구동기기(24)에 설치되고, 이동랙(23)과 연동하여 이동랙(23)을 상하 이동시킨다.The pinion 25 is installed in the driving device 24 and moves the movable rack 23 up and down in conjunction with the movable rack 23 .

상기 피뢰침(26)은, 이동랙(23)의 상단에 설치된다.The lightning rod 26 is installed on top of the mobile rack 23.

상기 접지선(27)은, 피뢰침(26)에 연결된다.The ground wire 27 is connected to the lightning rod 26.

한편, 본 발명에서는 랙-피니언 방식으로 피뢰침(26)을 상하 이동시키지만, 피뢰침(26)을 상하 이동시킬 수 있으면, 다양한 구동방식이 적용가능하다.On the other hand, in the present invention, although the lightning rod 26 is moved up and down by the rack-pinion method, as long as the lightning rod 26 can be moved up and down, various driving methods can be applied.

상기 고정브라켓(30)은, 도 3 내지 도 5에 도시된 바와 같이, 제1수평판(31)과, 제1수직판(32)과, 제2수평판(33)과, 제2수직판(34)과, 제3수평판(35)을 갖춘다.As shown in FIGS. 3 to 5, the fixing bracket 30 includes a first horizontal plate 31, a first vertical plate 32, a second horizontal plate 33, and a second vertical plate. (34) and a third horizontal plate (35).

상기 제1수평판(31)은, 상하방향으로 개구된 제1수직관통홀(31a)을 구비한다. The first horizontal plate 31 has a first vertical through hole 31a opened in a vertical direction.

상기 제1수직판(32)은, 상하방향으로 개구된 제1수평관통홀(32a)을 구비하고 제1수평판(31)의 전단에서 하방으로 돌출되게 형성된다.The first vertical plate 32 has a first horizontal through hole 32a opened in the vertical direction and protrudes downward from the front end of the first horizontal plate 31 .

상기 제2수평판(33)은, 상하방향으로 개구되어 전측이 제1수평판(31)의 제1수직관통홀(31a)과 상하방향으로 동일선상에 위치하는 제2수직관통홀(33a)을 구비하고, 제1수직판(32)의 하단에 후방으로 돌출되게 형성되되 제1수평판(32)보다 길이가 길게 형성된다.The second horizontal plate 33 is open in the vertical direction and has a front side of the second vertical through hole 33a located on the same line as the first vertical through hole 31a of the first horizontal plate 31 in the vertical direction. It is formed to protrude backward at the lower end of the first vertical plate 32 and is longer than the first horizontal plate 32.

상기 제2수직판(34)은, 전후방향으로 개구된 제2수평관통홀(34a)을 구비하고, 제2수평판(33)의 후단에 하방으로 돌출되게 형성되되 제1수직판(32)보다 길이가 길게 형성된다.The second vertical plate 34 has a second horizontal through hole 34a opened in the front and rear direction, and is formed to protrude downward from the rear end of the second horizontal plate 33, and the first vertical plate 32 formed longer.

상기 제3수평판(35)은, 상하방향으로 개구되되 제2수평판(33)의 제2수직관통홀(33a)의 후측과 상하방향으로 동일선상에 위치하는 제3수직관통홀(35a)을 구비하고, 제2수직판(34)의 하단에 전방으로 돌출되게 형성되되 제2수평판(33)과 동일한 길이로 형성된다.The third horizontal plate 35 has a third vertical through hole 35a that is open in the vertical direction and is located on the same line as the rear side of the second vertical through hole 33a of the second horizontal plate 33 in the vertical direction. It is formed to protrude forward at the lower end of the second vertical plate 34 and has the same length as the second horizontal plate 33.

한편, 본 발명에서 고정브라켓(30)은, 제1수평판(31) 및 제1수직판(32) 및 제2수평판(33)에 의해 형성되는 제1삽입공간(a1)과, 제2수평판(33) 및 제2수직판(34) 및 제3수평판(35)에 의해 형성되는 제2삽입공간(a2)의 크기가 서로 다르도록 'ㄹ'자 형상을 이루되, 제1삽입공간(a1) 또는 제2삽입공간(a2)이 완철(70)에 삽탈된다. 또한 본 발명에서 고정브나켓(30)은 금속재질로 이루어지만, 일정 탄성 및 강도를 가질 수 있으면 다양한 재질로 이루어질 수 있다.Meanwhile, in the present invention, the fixing bracket 30 includes the first insertion space a1 formed by the first horizontal plate 31, the first vertical plate 32, and the second horizontal plate 33, and the second The second insertion space (a2) formed by the horizontal plate 33, the second vertical plate 34, and the third horizontal plate 35 is formed in a 'd' shape so that the sizes are different from each other, and the first insertion space The space (a1) or the second insertion space (a2) is inserted into the complete iron (70). In addition, in the present invention, the fixing bracket 30 is made of a metal material, but can be made of various materials as long as it can have certain elasticity and strength.

이러한 고정브라켓(30)은 각 판 간의 연결부분은 라운드지게 형성되는 것이 바람직하다.In this fixing bracket 30, it is preferable that the connecting portion between the respective plates is formed in a round shape.

상기 체결부재(40)는, 도 3 및 도 5에 도시된 바와 같이, 볼트체(41)와, 제1,2너트체(42,42')를 갖춘다.As shown in FIGS. 3 and 5 , the fastening member 40 includes a bolt body 41 and first and second nut bodies 42 and 42'.

상기 볼트체(41)는, 제2수평판(33)의 제2수직관통홀(33a) 및 완철(70) 및 제3수평판(35)의 제3수직관통홀(35a)을 관통하거나, 제1수평판(31)의 제1수직관통홀(31a) 및 완철(70) 및 제2수평판(33)의 제2수직관통홀(33a)을 관통한다.The bolt body 41 penetrates the second vertical through hole 33a of the second horizontal plate 33 and the third vertical through hole 35a of the iron 70 and the third horizontal plate 35, It passes through the first vertical through-hole 31a of the first horizontal plate 31 and the second vertical through-hole 33a of the wancheol 70 and the second horizontal plate 33.

상기 제1,2너트체(42,42')는, 볼트체(41)의 양단에 각각 나사산체결되어 고정브라켓(30)이 완철(70)에 고정되도록 한다. 본 발명에서 제1,2너트체(42,42')는 볼트체(41)와 체결될 시 고정브라켓(30)의 표면에 밀착된다.The first and second nut bodies 42 and 42' are screwed to both ends of the bolt body 41, respectively, so that the fixing bracket 30 is fixed to the iron plate 70. In the present invention, the first and second nut bodies 42 and 42' are in close contact with the surface of the fixing bracket 30 when fastened with the bolt body 41.

한편, 본 발명에서 제1수직판(32)의 제1수평관통홀(32a)과 제2수직판(34)의 제2수평관통홀(34a)은, 고정브라켓(30)을 완철(70)에 설치할 시 고정홀로 사용될 수 있다.On the other hand, in the present invention, the first horizontal through-hole (32a) of the first vertical plate (32) and the second horizontal through-hole (34a) of the second vertical plate (34), the fixing bracket (30) wancheol (70) It can be used as a fixing hole when installed in

상기 제1애자(50)는, 제1수평판(31)의 제1수직관통홀(31a) 또는 제1수직판(32)의 제1수평관통홀(32a) 또는 제2수직판(34)의 제2수평관통홀(34a) 또는 제3수평판(35)의 제3수직관통홀(35a)에 설치되어, 접지선(27)을 지지한다. 본 발명에서는 도 3 및 도 5에 도시된 바와 같이, 제1애자(50)가 제1수평판(31)의 제1수직관통홀(31a)에 설치되는 것으로 일예를 설명한다. 이때 본 발명에서 접지선(27)은, 충분한 길이를 가지고서, 제1애자(50)를 경유한 후 전주(P)를 관통하여 전주(P) 내부로 인입된다. The first insulator 50 is formed through the first vertical through hole 31a of the first horizontal plate 31 or the first horizontal through hole 32a of the first vertical plate 32 or the second vertical plate 34 It is installed in the second horizontal through-hole (34a) or the third vertical through-hole (35a) of the third horizontal plate (35) to support the ground wire (27). In the present invention, as shown in FIGS. 3 and 5, an example in which the first insulator 50 is installed in the first vertical through hole 31a of the first horizontal plate 31 will be described. At this time, in the present invention, the ground wire 27 has a sufficient length, passes through the first insulator 50 and then penetrates the electric pole P and is led into the electric pole P.

상기 제2애자(60)는, 제1수평판(31)의 제1수직관통홀(31a) 또는 제1수직판(32)의 제1수평관통홀(32a) 또는 제2수직판(34)의 제2수평관통홀(34a) 또는 제3수평판(35)의 제3수직관통홀(35a)에 설치되어, 가공배전선(L)을 지지한다. 본 발명에서는 도 3 및 도 5에 도시된 바와 같이, 제2애자(60)가 제1수직판(32)의 제1수평관통홀(32a)에 설치되는 것으로 일예를 설명한다.The second insulator 60 is formed through the first vertical through hole 31a of the first horizontal plate 31 or the first horizontal through hole 32a of the first vertical plate 32 or the second vertical plate 34 It is installed in the second horizontal through-hole 34a of the third horizontal plate 35 or the third vertical through-hole 35a of the third horizontal plate 35 to support the overhead distribution line L. In the present invention, as shown in FIGS. 3 and 5, an example will be described in which the second insulator 60 is installed in the first horizontal through hole 32a of the first vertical plate 32.

상기 누전감지센서(80)는, 도 6에 도시된 바와 같이, 완철(70)에 설치된다. 본 발명에서 누전감지센서(80)는 완철(70)의 상면에 설치되어 완철(70)에 흐르는 전기를 감지한다.As shown in FIG. 6, the leakage detection sensor 80 is installed in the iron 70. In the present invention, the leakage detection sensor 80 is installed on the upper surface of the wancheol 70 to detect electricity flowing through the wancheol 70.

상기 누전경고등이동기구(90)는, 도 6에 도시된 바와 같이, 완철(70)의 상면에 설치되는 수용부재(91)와, 수용부재(91)에 전후방향으로 이동가능하게 설치되는 이동대(92)를 갖추며, 누전감지센서(80)로부터 누전감지신호를 수신하면 이동대(92)를 완철(70)의 전방을 향해 이동시킨다. 본 발명에서 누전경고등이동기구(90)는 실린더 방식으로 누전경고등(100)을 전후방향으로 이동시키지만, 누전경고등(100)을 전후방향으로 이동시킬 수 있으면 다양한 구동방식이 적용될 수 있다.As shown in FIG. 6, the earth leakage warning light moving mechanism 90 includes a housing member 91 installed on the upper surface of the iron plate 70 and a moving table movably installed in the housing member 91 in the forward and backward directions. 92, and upon receiving an earth leakage detection signal from the earth leakage detection sensor 80, the moving table 92 is moved toward the front of the iron box 70. In the present invention, the earth leakage warning lamp moving mechanism 90 moves the earth leakage warning lamp 100 forward and backward in a cylinder manner, but various driving methods can be applied if the earth leakage warning lamp 100 can move forward and backward.

상기 누전경고등(100)은, 도 6에 도시된 바와 같이, 누전경고등이동기구(90)의 이동대(92)에 설치되고, 누전감지센서(80)로부터 누전감지신호를 수신하면 점등된다. 본 발명에서 누전경고등(100)은 이동대(92)의 전단에 설치된다. 또한 본 발명에서 누전경고등(100)은 배터리가 내장되어 있다.As shown in FIG. 6 , the earth leakage warning light 100 is installed on the moving base 92 of the earth leakage warning light moving mechanism 90 and is turned on when an earth leakage detection signal is received from the earth leakage detection sensor 80 . In the present invention, the earth leakage warning light 100 is installed at the front end of the mobile platform 92. Also, in the present invention, the earth leakage warning light 100 has a built-in battery.

도 7은 본 발명에서 누전 알림을 설명하기 위한 도면이고, 도 8은 본 발명에서 피뢰기구의 작용을 설명하기 위한 도면이고, 도 9(a,b)는 본 발명에서 제1삽입공간 및 제2삽입공간에 서로 다른 크기의 완철이 각각 삽입되는 것을 설명하기 위한 도면이고, 도 10(a,b)은 본 발명에서 고정브라켓을 통한 가공배전선의 지지력 확보를 설명하기 위한 도면으로서, 도 7 내지 도 10을 참조하여 본 발명을 작용을 설명하면 다음과 같다.FIG. 7 is a view for explaining an earth leakage notification in the present invention, FIG. 8 is a view for explaining the operation of a lightning protection device in the present invention, and FIG. 9 (a, b) is a first insertion space and a second insertion space in the present invention. 10 (a, b) is a view for explaining the securing of the bearing capacity of the overhead distribution line through the fixing bracket in the present invention, FIG. 7 to 10 The operation of the present invention will be described with reference to.

본 발명이 설치된 상태에서, 가공배전선(L)에서 누전이 발생하여, 완철(70)로 전기가 흐르면, 누전감지센서(80)는 이를 감지한다.In the state where the present invention is installed, when an electric leakage occurs in the overhead power distribution line (L) and electricity flows to the complete iron (70), the leakage detection sensor (80) senses it.

그러면, 누전감지센서(80)는 누전감지신호를 출력하고, 누전감지신호를 수신한 누전경고이동기구(90)는 이동대(92)를 전방으로 이동시킨다.Then, the earth leakage detection sensor 80 outputs an earth leakage detection signal, and upon receiving the earth leakage detection signal, the earth leakage warning moving mechanism 90 moves the mobile platform 92 forward.

그러면, 누전경고등(100)는 완철(70)의 전방으로 돌출되어, 지상에서의 확인이 용이하게 된다.Then, the leakage warning light 100 protrudes forward of the iron 70, making it easy to check on the ground.

이때, 도 7과 같이 이동대(92)가 전방으로 이동함과 동시에 누전경고등(100)은 누전감지신호를 수신하여 점등되기 때문에, 야간에 누전 발생 여부를 보다 용이하게 식별할 수 있다.At this time, as shown in FIG. 7 , since the earth leakage warning light 100 receives the earth leakage detection signal and is turned on at the same time that the moving platform 92 moves forward, it is possible to more easily identify whether or not an earth leakage has occurred at night.

또한, 본 발명이 설치된 상태에서, 전주(P) 상단 주변으로 나뭇가지가 지나가거나, 전주(P)에 조류에 의해 새집이 지어질 경우, 피뢰침(26)이 외부로 노출되지 않을 수 있다.In addition, in the state in which the present invention is installed, when tree branches pass around the upper end of the electric pole (P) or a bird house is built by birds on the electric pole (P), the lightning rod 26 may not be exposed to the outside.

이때, 관리자는 피뢰침(26)이 육안으로 보이지 않을 경우, 별도의 원격단말기(미도시)를 통해 피뢰기구(20)의 구동기기(24)를 구동시켜, 피뢰기구(20)의 이동랙(23)을 상방으로 이동시킴으로써, 도 8과 같이 피뢰침(26)을 상방으로 이동시킨다. 이때 피뢰기구(20)의 접지선(26)은 충분히 늘어져 있어 피뢰침(26)이 상방으로 용이하게 이동할 수 있다.At this time, when the lightning rod 26 is not visible to the naked eye, the manager drives the driving device 24 of the lightning protection device 20 through a separate remote terminal (not shown) to move the mobile rack 23 of the lightning protection device 20. ) is moved upward to move the lightning rod 26 upward as shown in FIG. 8 . At this time, the ground wire 26 of the lightning arrester 20 is sufficiently stretched so that the lightning rod 26 can easily move upward.

이와 같이 피뢰침(26)이 상방으로 이동 배치되면, 낙뢰 발생 시 낙뢰로부터 가공배전설비를 용이하개 보호할 수 있다.In this way, when the lightning rod 26 is moved and disposed upward, it is possible to easily protect the overhead power distribution facility from lightning when lightning occurs.

한편, 본 발명에서 고정브라켓(30)을 활용하여, 다양한 크기의 완철(70)에 제1애자(50) 및 제2애자(60)를 다양한 방식으로 설치하는 것을 설명하면 다음과 같다.On the other hand, by utilizing the fixing bracket 30 in the present invention, when describing the installation of the first insulator 50 and the second insulator 60 in various ways to the wancheol 70 of various sizes as follows.

도 9(a)와 같이 가공배전선(L)이 완철(70)의 하방을 통과할 시, 고정브라켓(30)의 제2삽입공간(a2)를 완철(70)에 삽입하고, 볼트체(41)를 제2수평판(33)의 제1수직관통홀(33a) 및 완철(70) 및 제3수평판(35)의 제3수직관통홀(35a)에 관통삽입한 후, 제1,2너트(42,42')를 볼트체(41)에 체결하여, 고정브라켓(30)을 완철(70)에 설치한다.As shown in FIG. 9 (a), when the overhead power distribution line (L) passes through the lower part of the iron 70, the second insertion space (a2) of the fixing bracket 30 is inserted into the iron 70, and the bolt body 41 ) After penetrating the first vertical through-hole 33a of the second horizontal plate 33 and the third vertical through-hole 35a of the iron 70 and the third horizontal plate 35, the first and second By fastening the nuts 42 and 42' to the bolt body 41, the fixing bracket 30 is installed on the wancheol 70.

이때, 제2애자(60)를 제1수직판(32)의 제1수평관통홀(32a)에 설치하면, 제2애자(60)에 상기 가공배전선(L)을 설치할 수 있다. 여기서 제2애자(60)에 하방으로 외력이 작용할 시, 제1수직판(32)이 살짝 휘어지면서 탄성이 발생하여 제2애자(60)에 완충력이 제공된다.At this time, when the second insulator 60 is installed in the first horizontal through hole 32a of the first vertical plate 32, the overhead power distribution line L can be installed in the second insulator 60. Here, when an external force acts downward on the second insulator 60, the first vertical plate 32 is slightly bent while elasticity is generated to provide a buffering force to the second insulator 60.

그리고, 제1애자(50)를 제1수평판(31)의 제1수직관통홀(31a)에 설치하면, 피뢰침(26)으로부터의 접지선(27)을 제1애자(50)에 설치할 수 있다. 여기서 제1애자(50)에 측방으로 외력이 작용할 시, 제1수평판(31)이 살짝 휘어지면서 탄성이 발생하여 제1애자(50)에 완충력이 제공된다.Then, when the first insulator 50 is installed in the first vertical through hole 31a of the first horizontal plate 31, the ground wire 27 from the lightning rod 26 can be installed in the first insulator 50. . Here, when an external force acts on the first insulator 50 in a lateral direction, the first horizontal plate 31 slightly bends and elasticity is generated to provide a buffering force to the first insulator 50 .

또한, 본 발명에서는, 도 9(b)와 같이 도 9(a)에서의 완철(70)보다 크기가 작은 완철(70)에 고정브라켓(30)을 설치하고, 도 9(a)와 같은 방식으로 고정브라켓(30) 및 체결부재(40)를 매개로 제1애자(50) 및 제2애자(60)를 상기 완철(70)에 설치할 수 있다.In addition, in the present invention, as shown in FIG. 9 (b), the fixing bracket 30 is installed in the wancheol 70 smaller in size than the wancheol 70 in FIG. 9 (a), and the same method as in FIG. 9 (a) The first insulator 50 and the second insulator 60 can be installed on the iron wancheol 70 via the fixing bracket 30 and the fastening member 40 as a medium.

이뿐만 아니라, 본 발명에서는 고정브라켓(30)의 배치 위치를 다양하게 하여, 다양한 가공배전선 설치 환경에서 맞게 제1애자(50) 및 제2애자(60)를 완철(70)에 설치할 수 있다.In addition, in the present invention, the first insulator 50 and the second insulator 60 can be installed on the iron wan iron 70 according to various overhead distribution line installation environments by varying the arrangement position of the fixing bracket 30.

한편, 본 발명에서는, 도 10(a)와 같이 가공배전선(L)이 설치되는 환경일 시, 고정브라켓(30)의 제2삽입공간(a2)에 완철(70)을 삽입하면, 제2애자(60)에 걸리는 가공배전선(L)에 의해 장력이 작용(전방으로 작용)할 시, 제2수직판(34)에 의해 충분한 지지력이 확보된다. 이때 강풍이 부는 등 비상상황 발생으로 고정브라켓(30)의 후방으로 외력이 작용하게 되면, 볼트체(41)가 제2수평판(33)의 제2수직관통홀(33a)에 걸리고, 외력이 강해 제2수평판(33)의 제2수직관통홀(33a) 부분이 찢어지면서 제2수평판(33)이 후방으로 이동하면, 볼트체(41)의 상단에 제1수직판(32)이 걸려, 고정브라켓(30)이 완철(70)에서 이탈되는 것이 방지된다.On the other hand, in the present invention, when the iron 70 is inserted into the second insertion space (a2) of the fixing bracket 30 in the environment in which the overhead distribution line (L) is installed as shown in FIG. When tension is applied (acted forward) by the overhead power distribution line (L) caught on (60), sufficient supporting force is secured by the second vertical board (34). At this time, when an external force acts to the rear of the fixing bracket 30 due to an emergency situation such as strong wind blowing, the bolt body 41 is caught in the second vertical through hole 33a of the second horizontal plate 33, and the external force When the second horizontal plate 33 moves backward while the second vertical through hole 33a of the second horizontal plate 33 is torn, the first vertical plate 32 is formed at the top of the bolt body 41. Caught, the fixing bracket 30 is prevented from being separated from the wancheol 70.

또한, 본 발명에서는, 도 10(b)와 같이 가공배전선(L)이 설치되는 환경일 시, 고정브라켓(30)의 제1삽입공간(a1)에 완철(70)을 삽입하면, 제2애자(60)에 걸리는 가공배전선(L)에 의해 장력이 작용(후방으로 작용)할 시, 제1수직판(32)에 의해 충분한 지지력이 확보된다. 이때 강풍이 부는 등 비상상황 발생으로 고정브라켓(30)의 전방으로 외력이 작용하게 되면, 볼트체(41)가 제2수평판(33)의 제2수직관통홀(33a)에 걸리고, 외력이 강해 제2수평판(33)의 제2수직관통홀(33a) 부분이 찢어지면서 제2수평판(33)이 전방으로 이동하면, 볼트체(41)의 하단에 제2수직판(34)이 걸려, 고정브라켓(30)이 완철(70)에서 이탈되는 것이 방지된다.In addition, in the present invention, when the iron plate 70 is inserted into the first insertion space a1 of the fixing bracket 30 in the environment in which the overhead power distribution line L is installed as shown in FIG. 10 (b), the second insulator When tension is applied (rearward) by the overhead power distribution line (L) caught on (60), sufficient supporting force is secured by the first vertical plate (32). At this time, when an external force acts in the front of the fixing bracket 30 due to an emergency situation such as strong wind blowing, the bolt body 41 is caught in the second vertical through hole 33a of the second horizontal plate 33, and the external force When the second vertical through hole 33a of the second horizontal plate 33 is torn and the second horizontal plate 33 moves forward, the second vertical plate 34 is formed at the lower end of the bolt body 41. Caught, the fixing bracket 30 is prevented from being separated from the wancheol 70.

즉, 본 발명은 가공배전선(L)의 설치 환경에 따라, 완철(70)을 고정브라켓(30)의 제1삽입공간(a1) 또는 고정브라켓(30)의 제2삽입공간(a2)에 설치하여, 가공배전선(L) 설치 시 충분한 지지력이 확보되도록 할 수 있다.That is, the present invention installs the iron 70 in the first insertion space a1 of the fixing bracket 30 or the second insertion space a2 of the fixing bracket 30, depending on the installation environment of the overhead power distribution line L. Thus, when installing the overhead distribution line (L), it is possible to ensure sufficient bearing capacity.

상술한 바와 같은 본 발명은, 가공배전선(L)에서 누전이 발생할 시 이를 신속하게 확인할 수 있어, 누전발생에 대한 신속한 대처가 가능한 효과가 있다.As described above, the present invention can quickly check when an electric leakage occurs in the overhead power distribution line (L), and thus has an effect of quickly coping with the occurrence of electric leakage.

또한, 본 발명은, 피뢰기능을 구비하여 낙뢰로부터의 피해를 회피하되, 피뢰침(26)의 상하 위치를 조절하여, 주변 환경에 맞게 피뢰침(26)을 배치할 수 있는 효과가 있다.In addition, the present invention has an effect of avoiding damage from lightning by having a lightning protection function, but adjusting the vertical position of the lightning rod 26 to arrange the lightning rod 26 according to the surrounding environment.

또한, 본 발명은, 고정브라켓(30)을 매개로 제1애자(50) 및 제2애자(60)를 완철(70)에 편리하게 설치함은 물론, 다양한 크기의 완철(70)에 고정브라켓(30)을 설치할 수 있어, 제1애자(50) 및 제2애자(60)의 설치 편이성이 향상되는 효과가 있다.In addition, the present invention conveniently installs the first insulator 50 and the second insulator 60 to the iron 70 via the fixing bracket 30, as well as the fixing bracket to the iron 70 of various sizes. (30) can be installed, and there is an effect of improving the installation convenience of the first insulator 50 and the second insulator 60.

또한, 본 발명은, 고정브라켓(30)을 매개로 현수애자 타입 또는 라인포스트(LP) 애자 타입을 필요에 따라 쉽게 설치할 수 있어 사용 편이성이 향상되는 효과가 있다.In addition, the present invention has an effect of improving ease of use because a suspension insulator type or a line post (LP) insulator type can be easily installed as needed through the fixing bracket 30.

또한, 본 발명은, 고정브라켓(30)에 설치된 제1애자(50) 및 제2애자(60)에 외력이 작용할 시, 고정브라켓(30)에 의해 완충력이 발생하여, 제1애자(50) 및 제2애자(60)를 외력으로부터 보호할 수 있는 효과가 있다.In addition, in the present invention, when an external force acts on the first insulator 50 and the second insulator 60 installed in the fixing bracket 30, a buffering force is generated by the fixing bracket 30, and the first insulator 50 And there is an effect of protecting the second insulator 60 from external force.

또한, 본 발명은, 하나의 판을 'ㄹ'자 형상으로 굴곡시키고(프레스 가공 등 이용), 고정브라켓(30)에 필요한 홀(제1수직관통홀 등)을 펀칭하여 형성할 수 있어, 고정브라켓(30)을 쉽고 편리하게 제작할 수 있는 효과가 있다.In addition, the present invention can be formed by bending one plate in a 'L' shape (using press processing, etc.) and punching holes (first vertical through hole, etc.) required for the fixing bracket 30, fixing There is an effect that can easily and conveniently manufacture the bracket (30).

또한, 본 발명은, 고정브라켓(30)이 서로 다른 방향으로 개구된 제1삽입공간(a1) 및 제2삽입공간(a2)을 구비하기 때문에, 가공배전선(L)에 의한 장력 방향에 따라 완철(70)을 제1삽입공간(a1) 또는 제2삽입공간(a2)에 삽입하여, 가공배전선(L)에 충분한 지지력이 발생하도록 하는 효과가 있다. 이때 볼트체(41)는 제2수평판(33)으로부터 돌출되게 구비되어 고정브라켓(30)이 완철(70)에 보다 안정적으로 고정되도록 하는 효과가 있다.In addition, in the present invention, since the fixing bracket 30 has a first insertion space (a1) and a second insertion space (a2) opened in different directions, it is completely ironed according to the direction of tension by the overhead power distribution line (L). By inserting 70 into the first insertion space (a1) or the second insertion space (a2), there is an effect of generating sufficient bearing capacity in the overhead distribution line (L). At this time, the bolt body 41 is provided to protrude from the second horizontal plate 33, so that the fixing bracket 30 is more stably fixed to the wancheol 70.

한편, 본 발명은 가공배전선을 고정하는 구조에, 누전을 감지하는 구조 등 가공배전을 위한 다양한 구조를 더 포함한다는 의미에서, 본 발명의 명칭을 '누전감지기능을 갖춘 가공배전선 고정 클램프 장치'로 정의하고, 본 발명의 청구대상을 '가공배전선 고정 클램프 장치'로 정의한다.On the other hand, in the present invention, in the sense that various structures for overhead power distribution, such as a structure for detecting an electric leakage, are further included in the structure for fixing the overhead distribution line, the name of the present invention is 'an overhead distribution line fixing clamp device with an earth leakage detection function'. And the claimed subject matter of the present invention is defined as 'an overhead distribution line fixing clamp device'.

10: 커버 20: 피뢰기구
21: 수직대 22: 수평대
23: 이동랙 24: 구동기기
25: 피니언 26: 피뢰침
27: 접지선 30: 고정브라켓
31: 제1수평판 32: 제1수직판
33: 제2수평판 34: 제2수직판
35: 제3수평판 40: 체결부재
41: 볼트체 42,42': 제1,2너트체
50: 제1애자 60: 제2애자
70: 완철 80: 누전감지센서
90: 누전경고등이동기구 91: 수용부재
92: 이동대 100: 누전경고등
a1: 제1삽입공간 a2: 제2삽입공간
P: 전주 L: 가공배전선
10: cover 20: lightning arrester
21: vertical bar 22: horizontal bar
23: moving rack 24: driving device
25: pinion 26: lightning rod
27: ground wire 30: fixing bracket
31: first horizontal plate 32: first vertical plate
33: second horizontal plate 34: second vertical plate
35: third horizontal plate 40: fastening member
41: bolt body 42, 42 ': first and second nut bodies
50: first insulator 60: second insulator
70: full iron 80: leakage detection sensor
90: earth leakage warning light moving mechanism 91: receiving member
92: moving table 100: short circuit warning light
a1: first insertion space a2: second insertion space
P: utility pole L: overhead distribution line

Claims (1)

전주(P)의 상단에 삽입설치되는 커버(10)와;
전주(P)에 설치되고, 커버(10)보다 하방에 위치하는 다양한 크기의 완철(70)과;
커버(10)에 설치되는 수직대(21); 수직대(21)의 상단에 설치되는 수평대(22); 수평대(22)에 상하방향으로 이동가능하게 삽입되는 절연재질의 이동랙(23); 수평대(22)에 설치되어 피니언(25)을 회전시키는 구동기기(24); 구동기기(24)에 설치되고, 이동랙(23)과 연동하여 이동랙(23)을 상하 이동시키는 피니언(25); 이동랙(23)의 상단에 설치되는 피뢰침(26)과, 피뢰침(26)에 연결되는 접지선(27)을 갖춘 피뢰기구(20)와;
상하방향으로 개구된 제1수직관통홀(31a)을 구비한 제1수평판(31); 상하방향으로 개구된 제1수평관통홀(32a)을 구비하고 제1수평판(31)의 전단에서 하방으로 돌출되게 형성되는 제1수직판(32); 상하방향으로 개구되어 전측이 제1수평판(31)의 제1수직관통홀(31a)과 상하방향으로 동일선상에 위치하는 제2수직관통홀(33a)을 구비하고, 제1수직판(32)의 하단에 후방으로 돌출되게 형성되되 제1수평판(32)보다 길이가 길게 형성되는 제2수평판(33); 전후방향으로 개구된 제2수평관통홀(34a)을 구비하고, 제2수평판(33)의 후단에 하방으로 돌출되게 형성되되 제1수직판(32)보다 길이가 길게 형성되는 제2수직판(34); 상하방향으로 개구되되 제2수평판(33)의 제2수직관통홀(33a)의 후측과 상하방향으로 동일선상에 위치하는 제3수직관통홀(35a)을 구비하고, 제2수직판(34)의 하단에 전방으로 돌출되게 형성되되 제2수평판(33)과 동일한 길이로 형성되는 제3수평판(35);을 갖추고서, 제1수평판(31) 및 제1수직판(32) 및 제2수평판(33)에 의해 형성되는 제1삽입공간(a1)과, 제2수평판(33) 및 제2수직판(34) 및 제3수평판(35)에 의해 형성되는 제2삽입공간(a2)의 크기가 서로 다르도록 'ㄹ'자 형상을 이루되, 제1삽입공간(a1) 또는 제2삽입공간(a2)이 완철(70)에 삽탈되는 금속재질의 고정브라켓(30)과;
제2수평판(33)의 제2수직관통홀(33a) 및 완철(70) 및 제3수평판(35)의 제3수직관통홀(35a)을 관통하거나, 제1수평판(31)의 제1수직관통홀(31a) 및 완철(70) 및 제2수평판(33)의 제2수직관통홀(33a)을 관통하는 볼트체(41); 볼트체(41)의 양단에 각각 나사산체결되어 고정브라켓(30)이 완철(70)에 고정되도록 하는 제1,2너트체(42,42')를 갖춘 체결부재(40)와;
제1수평판(31)의 제1수직관통홀(31a) 또는 제1수직판(32)의 제1수평관통홀(32a) 또는 제2수직판(34)의 제2수평관통홀(34a) 또는 제3수평판(35)의 제3수직관통홀(35a)에 설치되어, 접지선(27)을 지지하는 제1애자(50)와;
제1수평판(31)의 제1수직관통홀(31a) 또는 제1수직판(32)의 제1수평관통홀(32a) 또는 제2수직판(34)의 제2수평관통홀(34a) 또는 제3수평판(35)의 제3수직관통홀(35a)에 설치되어, 가공배전선(L)을 지지하는 제2애자(60)와;
완철(70)에 설치되는 누전감지센서(80)와;
완철(70)의 상면에 설치되는 수용부재(91); 수용부재(91)에 전후방향으로 이동가능하게 설치되는 이동대(92);를 갖추며, 누전감지센서(80)로부터 누전감지신호를 수신하면 이동대(92)를 완철(70)의 전방을 향해 이동시키는 누전경고등이동기구(90)와;
누전경고등이동기구(90)의 이동대(92)에 설치되고, 누전감지센서(80)로부터 누전감지신호를 수신하면 점등되는 누전경고등(100)
을 포함하는 것을 특징으로 하는 가공배전선 고정 클램프 장치.
A cover 10 inserted and installed at the top of the electric pole (P);
Wancheol 70 of various sizes installed on the electric pole (P) and located below the cover 10;
a vertical stand 21 installed on the cover 10; A horizontal stand 22 installed on top of the vertical stand 21; A movable rack 23 made of an insulating material that is movably inserted into the horizontal stand 22 in the vertical direction; a driving device 24 installed on the leveling table 22 to rotate the pinion 25; A pinion 25 installed in the driving device 24 and moving the movable rack 23 up and down in conjunction with the movable rack 23; A lightning rod 26 installed at the top of the mobile rack 23 and a lightning rod 20 having a ground wire 27 connected to the lightning rod 26;
a first horizontal plate 31 having a first vertical through hole 31a opened in the vertical direction; a first vertical plate 32 having a first horizontal through hole 32a opened in the vertical direction and protruding downward from the front end of the first horizontal plate 31; Opened in the vertical direction, the front side has a second vertical through hole 33a located on the same line in the vertical direction with the first vertical through hole 31a of the first horizontal plate 31, and the first vertical plate 32 ) Is formed to protrude backward at the lower end of the second horizontal plate 33 formed longer than the first horizontal plate 32; A second vertical plate having a second horizontal through hole 34a opened in the front-back direction and protruding downward at the rear end of the second horizontal plate 33 and having a longer length than the first vertical plate 32 (34); A third vertical through hole (35a) opened in the vertical direction and located on the same line in the vertical direction with the rear side of the second vertical through hole (33a) of the second horizontal plate (33) is provided, and the second vertical plate (34) ) Is formed to protrude forward at the lower end of the third horizontal plate 35 formed to the same length as the second horizontal plate 33; equipped with, the first horizontal plate 31 and the first vertical plate 32 and the second insertion space a1 formed by the second horizontal plate 33, the second horizontal plate 33, the second vertical plate 34, and the third horizontal plate 35 formed by the second insertion space a1. A 'D' shape is formed so that the sizes of the insertion spaces (a2) are different from each other, and the first insertion space (a1) or the second insertion space (a2) is inserted into the complete iron (70) Fixed bracket (30) made of metal )class;
Penetrates the second vertical through-hole 33a of the second horizontal plate 33 and the third vertical through-hole 35a of the iron 70 and the third horizontal plate 35, or of the first horizontal plate 31 The bolt body 41 penetrating the first vertical through-hole (31a) and the second vertical through-hole (33a) of the wancheol (70) and the second horizontal plate (33); A fastening member 40 having first and second nut bodies 42 and 42 'to be screwed to both ends of the bolt body 41 so that the fixing bracket 30 is fixed to the iron 70;
The first vertical through hole 31a of the first horizontal plate 31 or the first horizontal through hole 32a of the first vertical plate 32 or the second horizontal through hole 34a of the second vertical plate 34 or a first insulator 50 installed in the third vertical through hole 35a of the third horizontal plate 35 and supporting the ground wire 27;
The first vertical through hole 31a of the first horizontal plate 31 or the first horizontal through hole 32a of the first vertical plate 32 or the second horizontal through hole 34a of the second vertical plate 34 or a second insulator 60 installed in the third vertical through hole 35a of the third horizontal plate 35 to support the overhead distribution line L;
A leakage detection sensor 80 installed in the iron 70;
A receiving member 91 installed on the upper surface of the wancheol 70; A moving table 92 installed in the housing member 91 to be movable in the forward and backward directions, and when receiving an earth leakage detection signal from the earth leakage detection sensor 80, the moving table 92 is moved toward the front of the steel plate 70. an earth leakage warning light moving mechanism 90 for moving;
An earth leakage warning light (100) installed on the moving base (92) of the earth leakage warning light moving mechanism (90) and turned on when an earth leakage detection signal is received from the earth leakage detection sensor (80)
An overhead distribution line fixing clamp device comprising a.
KR1020220127726A 2022-10-06 2022-10-06 Fixing Equipment Of Over-head Distribution Line KR102524135B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220127726A KR102524135B1 (en) 2022-10-06 2022-10-06 Fixing Equipment Of Over-head Distribution Line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220127726A KR102524135B1 (en) 2022-10-06 2022-10-06 Fixing Equipment Of Over-head Distribution Line

Publications (1)

Publication Number Publication Date
KR102524135B1 true KR102524135B1 (en) 2023-04-21

Family

ID=86098907

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220127726A KR102524135B1 (en) 2022-10-06 2022-10-06 Fixing Equipment Of Over-head Distribution Line

Country Status (1)

Country Link
KR (1) KR102524135B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200303201Y1 (en) * 2002-10-31 2003-02-06 한국전력공사 bracket structure for high voltage cut out switch
KR101399043B1 (en) 2014-03-12 2014-05-27 (주)도현전력기술단 Insulator type supporing bar of electric for fastening over head distribution line
KR102043700B1 (en) * 2019-04-30 2019-11-13 김경현 Underground line connecting device to safety function leakage of warning
KR102382973B1 (en) * 2021-06-11 2022-04-08 주식회사 태양전설 Distribution line fixed strap device for branchin of overhead

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200303201Y1 (en) * 2002-10-31 2003-02-06 한국전력공사 bracket structure for high voltage cut out switch
KR101399043B1 (en) 2014-03-12 2014-05-27 (주)도현전력기술단 Insulator type supporing bar of electric for fastening over head distribution line
KR102043700B1 (en) * 2019-04-30 2019-11-13 김경현 Underground line connecting device to safety function leakage of warning
KR102382973B1 (en) * 2021-06-11 2022-04-08 주식회사 태양전설 Distribution line fixed strap device for branchin of overhead

Similar Documents

Publication Publication Date Title
KR102343417B1 (en) Supporting Equipment For Over-head Distribution Lines
US20130320921A1 (en) Arrangement and process for housing electric vehicle supply equipment
KR102348867B1 (en) Supporting Equipment For Over-head Distribution Lines
KR100861795B1 (en) Connection structure of an overhead electric power line
KR102524135B1 (en) Fixing Equipment Of Over-head Distribution Line
US20230013994A1 (en) Grounding system
KR102524132B1 (en) Equipment Of Over-head Power Distribution
CN210985626U (en) Box body for realizing quick connection of bypass operation system
KR101623403B1 (en) Insulation for preventing fall electric power distribution cable
CN202535016U (en) OPGW pull-in optical cable safety grounding fixing assembly
KR102524134B1 (en) Supporting Equipment Of Over-head Distribution Lines
KR100865356B1 (en) Insulator to support the power distribution line
KR102472682B1 (en) Overhead Line Fixing Equipment
KR102524133B1 (en) Supporting Equipment Of Over-head Power Distribution Line
KR101557722B1 (en) Panel structure assembly of power facilities for substation
KR101422740B1 (en) Connector for drop wire of power transmission wire
CN111179530A (en) Live-line area isolation device for GIS equipment of transformer substation
JP5369326B2 (en) Built-in cable support
KR100843058B1 (en) High Voltage Cable Supporter
KR101150434B1 (en) Connection apparatus of light weight buffer metal for high-tension wire
KR102519172B1 (en) Supporting Equipment of Overhead Electric Power Line
ES2655986T3 (en) Procedure and device for the recognition of mechanical actions in electrical installations
CN220419511U (en) Comprehensive testing device for leakage protector
KR100834783B1 (en) A support for high-pressure cable of an electric pole
CN217984067U (en) Intelligent face snapshot recognition device

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant