KR102496880B1 - Installation method of forest flow measuring device of water gate type - Google Patents

Installation method of forest flow measuring device of water gate type Download PDF

Info

Publication number
KR102496880B1
KR102496880B1 KR1020200154094A KR20200154094A KR102496880B1 KR 102496880 B1 KR102496880 B1 KR 102496880B1 KR 1020200154094 A KR1020200154094 A KR 1020200154094A KR 20200154094 A KR20200154094 A KR 20200154094A KR 102496880 B1 KR102496880 B1 KR 102496880B1
Authority
KR
South Korea
Prior art keywords
mooring
forest
flow
notch
flow path
Prior art date
Application number
KR1020200154094A
Other languages
Korean (ko)
Other versions
KR20220067421A (en
Inventor
최형태
임홍근
양현제
Original Assignee
대한민국
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대한민국 filed Critical 대한민국
Priority to KR1020200154094A priority Critical patent/KR102496880B1/en
Publication of KR20220067421A publication Critical patent/KR20220067421A/en
Application granted granted Critical
Publication of KR102496880B1 publication Critical patent/KR102496880B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/002Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow wherein the flow is in an open channel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B13/00Irrigation ditches, i.e. gravity flow, open channel water distribution systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F11/00Apparatus requiring external operation adapted at each repeated and identical operation to measure and separate a predetermined volume of fluid or fluent solid material from a supply or container, without regard to weight, and to deliver it
    • G01F11/28Apparatus requiring external operation adapted at each repeated and identical operation to measure and separate a predetermined volume of fluid or fluent solid material from a supply or container, without regard to weight, and to deliver it with stationary measuring chambers having constant volume during measurement

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)

Abstract

본 발명은 수문방식의 산림 유량측정장치의 설치방법에 관한 것으로, 더욱 상세하게는 산림 계류가 통과되도록 유로가 형성되는 몸체부, 상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽, 상기 몸체부에 돌출되도록 구비되어 일정 수위 이상일 경우, 계류가 넘어서 이동되는 노치부, 및 상기 몸체부에 구비되어 계류의 유량을 측정하기 위한 유량측정부,를 포함한다.
상기와 같은 본 발명에 의하면, 산림에 비 올때는 물론, 비 오지 않을때에도 계류의 수량을 정밀하게 측정할 수 있어 신뢰성을 향상시킬 수 있다.
The present invention relates to a method for installing a forest flow rate measuring device of a sluice gate method, and more particularly, to a body portion in which a flow path is formed to allow a forest mountain stream to pass through, and a blocking wall for inducing mooring into a flow path of the body portion by blocking the mooring stream. , a notch portion provided to protrude from the body portion and moved beyond a mooring stream when the water level is higher than a certain level, and a flow measurement portion provided to the body portion and configured to measure the flow rate of the mooring stream.
According to the present invention as described above, it is possible to precisely measure the quantity of streams even when it is not raining as well as when it is raining in the forest, so that reliability can be improved.

Description

수문방식의 산림 유량측정장치의 설치방법{Installation method of forest flow measuring device of water gate type}Installation method of forest flow measuring device of water gate type {Installation method of forest flow measuring device of water gate type}

본 발명은 유량측정장치의 설치방법에 관한 것으로, 더욱 상세하게는 산림 계류를 저장시키되, 일정 수위이상일 경우, 하류로 이동됨에 따라, 일정 수량을 유지시킴은 물론, 월류되는 량을 측정할 수 있어 정밀한 측정에 의한 신뢰성을 향상시킬 수 있는 수문방식의 산림 유량측정장치의 설치방법에 관한 것이다.The present invention relates to a method for installing a flow measurement device, and more particularly, to store a forest mountain stream, but when it is above a certain water level, as it moves downstream, it maintains a certain amount of water and can measure the amount of overflow It relates to a method for installing a floodgate-type forest flow measurement device that can improve reliability by precise measurement.

일반적으로, 수자원의 효율적인 관리를 위해 소하천의 유량측정 중요성이 대두되고 있으며, 더 나아가 산림 수자원의 유량 관리의 필요성이 대두되고 있다.In general, for efficient management of water resources, the importance of measuring the flow rate of small rivers has emerged, and furthermore, the need for flow management of forest water resources has emerged.

여기서, 산림의 수자원 함량을 증가시키기 위한 방법 중 현재 전국의 산촌에서 진행되고 있는 숲 가꾸기 등 수원 함양 사업 추진 정책을 통해 효율적인 수원함양림의 조성 및 관리지침을 제공하기 위하여 산림수자원 특성 구명 및 데이터 베이스(DB) 구축이 이루어지고 있다.Here, among the methods for increasing the water resource content of forests, the characteristics of forest water resources are identified and a database is provided to provide guidelines for the creation and management of efficient water source enrichment forests through the policy for promoting water source cultivation projects such as forest cultivation, which is currently being carried out in mountain villages across the country. (DB) construction is in progress.

때문에 산림수자원 특성 구명 및 데이터 베이스 구축을 위하여 산림유량 관측 시설을 설치하여 수자원 모니터링이 이루어지고 있으며, 유역 특성에 따른 유출량을 산출하고 있다.Therefore, in order to investigate the characteristics of forest water resources and establish a database, forest flow observation facilities are installed to monitor water resources, and runoff according to basin characteristics is calculated.

종래 간이 유량측정 장치는 공개특허공보 제10-2012-0109034호에 개진된 바와 같이, 유수로패널과 위어판을 설치하여 월류되는 순간의 수위를 측정하여 용이한 관리를 유도하고 있다.As disclosed in Patent Publication No. 10-2012-0109034, a conventional simple flow measurement device measures the water level at the moment of overflow by installing a waterway panel and a weir board to induce easy management.

그러나 종래 간이 유량측정 장치는 노치가 형성된 보가 설치된 곳에서만 사용가능한 것으로, 해당 지역의 조건에 따라 선택적으로 사용할 수 있어 호환성이 떨이지는 문제점이 있다.However, the conventional simple flow rate measurement device is usable only where a notched beam is installed, and can be used selectively according to the conditions of the region, so there is a problem of poor compatibility.

그리고 종래 간이 유량측정 장치는 장기간 설치되되, 보에 일체로 설치되는 것이 아님에 따라, 증가한 유량에 의해 위치가 변동되거나 유실되는 등의 문제점이 발생되어 수위를 측정하지 못하는 문제점이 발생된다.In addition, the conventional simple flow rate measuring device is installed for a long time, but as it is not integrally installed in the beam, problems such as change in position or loss due to increased flow rate occur, resulting in a problem that the water level cannot be measured.

특히, 산림의 경우, 계류의 경사가 급해 비가와도 급속히 하류로 이동됨에 따라, 설치된 유량측정 장치의 유실 가능성이 더욱 높으며, 계류의 주변 및 지중으로 흐르는 물이 많아 간이 유량측정 장치를 견고하게 설치하더라도 정확한 측정을 할 수 없는 문제점이 있다.In particular, in the case of forests, as the slope of the mountain stream is steep and it moves downstream rapidly even when it rains, the possibility of loss of the installed flow measurement device is higher, and there is a lot of water flowing around the mooring and underground, so the simple flow measurement device is firmly installed However, there are problems with accurate measurement.

이에 따라, 풍수기는 물론, 갈수기에도 산림의 계류에 대한 수량을 정밀하게 측정할 수 있는 기술에 대한 개발이 절실히 요구되고 있는 실정이다.Accordingly, there is an urgent need to develop a technology capable of precisely measuring the quantity of water in a mountain stream in a forest even during a dry season as well as a feng shui season.

이에 본 발명은 상기와 같은 문제점들을 해소하기 위해 안출된 것으로써, 산림 계류가 통과되도록 유로가 형성되는 몸체부, 상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽, 상기 몸체부에 돌출되도록 구비되어 일정 수위 이상일 경우, 계류가 넘어서 이동되는 노치부, 및 상기 몸체부에 구비되어 계류의 유량을 측정하기 위한 유량측정부,를 포함하여 산림에 비 올때는 물론, 비 오지 않을때에도 계류의 수량을 정밀하게 측정할 수 있어 신뢰성을 향상시킬 수 있는 수문방식의 산림 유량측정장치의 설치방법을 제공하는 것이 목적이다.Therefore, the present invention has been made to solve the above problems, a body portion in which a flow path is formed so that a forest mountain stream passes, a blocking wall for inducing mooring to a flow path of the body portion by blocking the mooring, and the body portion It is provided to protrude from the mooring, including a notch that moves beyond a certain water level, and a flow measurement unit provided in the body to measure the flow rate of the mooring, including when it rains in the forest as well as when it does not rain. The purpose of the present invention is to provide a method for installing a floodgate-type forest flow measurement device that can precisely measure the quantity of water and improve reliability.

상기 목적을 이루기 위한 본 발명은, 유량측정장치를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정하는 위치설정단계, 상기 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착하는 굴착단계, 산림 계류가를 따라 설치되는 측벽을 형성하는 측벽설치단계, 노출된 상기 신선암반에 상기 유량측정장치를 타설하기 위한 타설단계, 및 상기 타설된 유량측정장치의 상단부가 노출되도록 덮어 상기 산림 계류를 복원시키는 복토단계,를 포함한다.The present invention for achieving the above object is a position setting step of setting an installation location by examining the surroundings of a forest mooring for installing a flow measuring device, excavating the bottom surface of the forest mooring at the installation location, excavating so that fresh rock mass is exposed Excavation step of doing, side wall installation step of forming a side wall installed along the forest stream, pouring step of placing the flow measurement device on the exposed fresh bedrock, and covering the upper end of the poured flow measurement device to be exposed It includes a soil cover step of restoring a forest mooring.

바람직하게, 상기 유량측정장치는, 산림 계류가 통과되도록 유로가 형성되는 몸체부, 상기 산림 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽, 상기 몸체부의 유로 저면에 돌출되도록 구비되어 일정 수위 이상일 경우, 계류가 넘어서 이동되는 노치부, 및 상기 몸체부에 구비되어 계류의 유량을 측정하기 위한 유량측정부,를 포함한다.Preferably, the flow rate measuring device is provided so as to protrude from the lower surface of the flow path of the body part, a body part in which a flow path is formed so that the forest mooring passes, a blocking wall for inducing the mooring to the flow path of the body part by blocking the forest mooring When the water level is above a certain level, it includes a notch part that moves beyond the mooring, and a flow rate measurement unit provided in the body to measure the flow rate of the mooring.

그리고 상기 몸체부는, 하류방향으로 일정 길이를 갖고, 계류가 하류쪽으로 이동되도록 중앙부와 일측부에 형성되는 제1유로와 구획벽에 의해 상기 제1유로와 구획되어 타측부에 형성되는 제2유로를 갖는 유로, 상기 제1유로와 제2유로를 통해 계류를 하류쪽으로 배출시키기 위한 배출구, 및 상기 배출구를 통해 배출되는 계류에 의해 계류바닥에 소가 형성되는 것을 방지하기 위한 물방석,을 포함한다.And the body part has a certain length in the downstream direction, and a first flow path formed at the center and one side so that the mooring stream moves downstream and a second flow path formed on the other side separated from the first flow path by a partition wall It includes a flow path, an outlet for discharging the mooring downstream through the first and second flow channels, and a water cushion for preventing cows from being formed at the bottom of the mooring by the mooring discharged through the outlet.

또한, 상기 몸체부의 하단부는, 상기 산림 계류 지중의 신선암반에 타설된다.In addition, the lower end of the body part is cast in the fresh bedrock of the forest mooring ground.

그리고 상기 제2유로의 폭은 상기 제1유로의 폭보다 작게 형성되고, 상기 제2유로의 저면은 상기 제1유로의 저면보다 낮게 형성되어 산림 계류가 상기 제2유로를 통해 하류로 이동되되, 수위가 올라갈 경우, 제1유로와 함께 하류로 이동된다.And the width of the second flow path is formed smaller than the width of the first flow path, and the bottom of the second flow path is formed lower than the bottom surface of the first flow path so that the forest mountain stream moves downstream through the second flow path, When the water level rises, it moves downstream together with the first flow path.

또한, 상기 유량측정부는, 상기 구획벽의 상류에 위치되어 하단부가 폐쇄되고, 상측으로 개방되도록 형성되어 계류가 채워지는 저수관, 상기 저수관을 보호하기 위해 감싸도록 상기 구획벽에 구비되되, 하단부가 저수관의 하단부보다 높게 형성되는 보호캡, 상기 보호캡의 하측으로 위치된 저수관의 하단부 외주면을 따라 복수 개 형성되어 계류가 유입되기 위한 유량유입구, 상기 저수관의 개방된 상단부를 개폐하도록 구비되는 저수관덮개, 및 상기 저수관에 채워진 계류의 수위를 측정하기 위한 계측기,를 포함한다.In addition, the flow rate measuring unit is located upstream of the partition wall, has a lower end closed, and is formed to open upward and is provided in the partition wall to protect a water reservoir filled with moorings and to protect the water storage pipe, the lower end A protective cap formed higher than the lower end of the water storage pipe, a plurality of flow inlets formed along the outer circumferential surface of the lower end of the water pipe located below the protective cap to allow streams to flow in, and provided to open and close the open upper end of the water pipe It includes a water storage pipe cover, and a meter for measuring the water level of the mooring filled in the water storage pipe.

그리고 상기 타설단계는, 상기 신선암반에 몸체부의 하단부를 타설하는 하단부타설단계, 상기 하단부타설단계 시, 하단부가 타설되도록 상기 노치부를 설치하는 노치부 설치단계, 상기 몸체부의 하단부의 상측으로 구획벽에 의해 구획되는 제1유로와 제2유로를 갖는 상단부를 타설하되, 상기 노치부의 상단부가 제1유로와 제2유로의 저면 상측으로 돌출되도록 상단부를 타설하는 상단부타설단계, 상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽을 타설하는 차단벽타설단계, 및 상기 구획벽의 상류에 위치되도록 상기 유량측정부를 설치하는 유량측정부 설치단계,를 포함한다.And the pouring step, the lower part pouring step of pouring the lower end of the body part on the fresh rock mass, the notch part installation step of installing the notch part so that the lower part is poured during the lower part pouring step, and the upper part of the lower part of the body part to the partition wall The upper part pouring step of placing the upper part having the first and second passages partitioned by, but placing the upper part so that the upper end of the notch protrudes upward from the bottom of the first and second passages, and blocking the mooring to the body It includes a barrier wall casting step of constructing a barrier wall for inducing mooring to a negative flow path, and a flow rate measurement unit installation step of installing the flow rate measurement unit to be located upstream of the partition wall.

또한, 상기 노치부는, 상기 배출구에 일정 높이로 돌출형성되게 상기 몸체부에 타설되는 노치, 및 돌출된 상기 노치와 상기 몸체부가 접하는 부분을 밀폐시키도록 노치밀폐부,를 포함하고, 상기 상단부타설단계 후, 상기 노치밀폐부를 형성하는 노치밀폐부 형성단계,를 더 포함한다.In addition, the notch part includes a notch cast in the body part so as to protrude from the outlet at a certain height, and a notch sealing part to seal a part in contact with the protruding notch and the body part, and the upper end casting step After that, a notch sealing part forming step of forming the notch sealing part is further included.

그리고 상기 노치가이드의 경사각도는 노치 상면을 기준으로 60ㅀ이다.And the inclination angle of the notch guide is 60 degrees based on the upper surface of the notch.

또한, 상기 노치가이드는 노치 두께의 80%로 형성된다.In addition, the notch guide is formed with 80% of the notch thickness.

그리고 상기 유량유입구가 형성된 저수관의 하단부로 부유물이 근접하는 것을 방지하기 위한 부유물차단부,를 더 포함하고, 상기 유량측정부 설치단계 후, 상기 부유물차단부를 설치하는 부유물차단부 설치단계,를 더 포함한다.And further comprising a floating matter blocking unit for preventing the floating matter from approaching the lower end of the water storage pipe in which the flow inlet is formed, and after the flow rate measuring unit installation step, the floating matter blocking part installation step of installing the floating matter blocking part, further include

또한, 상기 부유물차단부는, 상기 유로의 상류로 구비되는 부유물차단프레임, 및 상기 부유물차단프레임에 구비되어 부유물이 걸리기 위한 부유물차단망,을 포함한다.In addition, the floating matter blocking unit includes a floating matter blocking frame provided upstream of the passage, and a floating matter blocking net provided in the floating matter blocking frame to catch floating matter.

그리고 상기 차단벽은, 상기 몸체부의 양측단부에 각각 구비되며, 계류가 흐르는 방향과 직교되도록 형성된다.And the blocking wall is provided at both ends of the body portion, and is formed to be orthogonal to the direction in which the mooring stream flows.

또한, 상기 차단벽은, 상기 몸체부의 양측단부에 각각 구비되며, 계류를 상기 유로로 가이드하도록 계류 흐르는 방향과 경사지게 형성된다.In addition, the blocking wall is provided at both ends of the body portion, and is formed to be inclined with the flow direction of the mooring stream to guide the mooring stream to the flow path.

그리고 상기 신선암반에 타설된 상기 몸체부의 상류 하단부를 따라 누수를 방지하기 위한 누수방지부,를 더 포함하고, 상기 하단부타설단계후, 신선암반에 타설된 몸체부의 하단부 상류 경계선을 따라 누수방지부를 형성하는 누수방지부설치단계,를 더 포함한다.And a leak prevention part for preventing water leakage along the upper lower end of the body part cast in the fresh rock mass, and further including, after the lower part casting step, the leakage prevention part is formed along the upper boundary line of the lower part of the body part cast in the fresh rock mass. It further includes a leak prevention unit installation step to do.

또한, 상기 누수방지부는, 진흙으로 충진된다.In addition, the leak prevention part is filled with mud.

그리고 상기 몸체부는 내부가이드부를 더 포함하고, 상기 하단부타설단계전에 상기 내부가이드를 거치시키기 위한 내부가이드 거치단계,를 더 포함하며, 하단부타설단계 시, 함께 타설된다.And the body part further includes an inner guide part, and further includes an inner guide mounting step for mounting the inner guide before the lower part casting step, and is cast together during the lower part casting step.

또한, 상기 내부가이드부는, 상기 몸체부의 중앙부를 기준으로, 양측방향에 각각 구비되되, 중앙부로 갈수록 햐류로 경사지게 구비된다.In addition, the inner guide parts are provided in both directions with respect to the central part of the body, respectively, and are inclined toward the downstream direction toward the central part.

그리고 상기 내부가이드부는, 적어도 하나 이상 구비된다.And the inner guide part, at least one or more are provided.

또한, 유량측정장치를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정하는 위치설정단계, 상기 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착하는 굴착단계, 산림 계류가를 따라 설치되는 측벽을 형성하는 측벽설치단계, 노출된 상기 신선암반에 상기 유량측정장치를 타설하기 위한 타설단계, 및 상기 타설된 유량측정장치의 상단부가 노출되도록 덮어 상기 산림 계류를 복원시키는 복토단계,를 포함하고, 상기 타설단계는, 상기 신선암반에 몸체부의 하단부를 타설하는 하단부타설단계, 상기 하단부타설단계 시, 하단부가 타설되도록 상기 노치부를 설치하는 노치부 설치단계, 상기 몸체부의 하단부의 상측으로 구획벽에 의해 구획되는 제1유로와 제2유로를 갖는 상단부를 타설하되, 상기 노치부의 상단부가 제1유로와 제2유로의 저면 상측으로 돌출되도록 상단부를 타설하는 상단부타설단계, 상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽을 타설하는 차단벽타설단계, 및 상기 구획벽의 상류에 위치되도록 상기 유량측정부를 설치하는 유량측정부 설치단계,를 포함한다.In addition, a position setting step of setting an installation location by examining the surroundings of a forest mooring for installing a flow measurement device, an excavation step of excavating the bottom surface of a forest mooring at the installation location so that fresh bedrock is exposed, and a forest mooring A sidewall installation step of forming a sidewall installed along the line, a pouring step of placing the flow rate measuring device on the exposed fresh bedrock, and a cover step of restoring the forest mooring by covering the upper end of the poured flow measuring device to be exposed. , Including, the pouring step, the lower part pouring step of pouring the lower end of the body part on the fresh bedrock, the notch part installation step of installing the notch part so that the lower part is poured during the lower part pouring step, the upper side of the lower part of the body part The upper end pouring step of pouring the upper end having the first and second flow passages partitioned by the partition wall, but pouring the upper end so that the upper end of the notch protrudes upward from the bottom of the first and second flow passages, the mooring It includes a blocking wall casting step of constructing a blocking wall for inducing mooring to the flow path of the body by blocking it, and a flow measurement unit installation step of installing the flow measurement unit so as to be located upstream of the partition wall.

그리고 유량측정장치를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정하는 위치설정단계, 상기 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착하는 굴착단계, 산림 계류가를 따라 설치되는 측벽을 형성하는 측벽설치단계, 노출된 상기 신선암반에 상기 유량측정장치를 타설하기 위한 타설단계, 및 상기 타설된 유량측정장치의 상단부가 노출되도록 덮어 상기 산림 계류를 복원시키는 복토단계,를 포함하고, 상기 타설단계는, 상기 신선암반에 몸체부의 하단부를 타설하는 하단부타설단계, 상기 하단부타설단계 시, 하단부가 타설되도록 상기 노치부를 설치하는 노치부 설치단계, 상기 몸체부의 하단부의 상측으로 구획벽에 의해 구획되는 제1유로와 제2유로를 갖는 상단부를 타설하되, 상기 노치부의 상단부가 제1유로와 제2유로의 저면 상측으로 돌출되도록 상단부를 타설하는 상단부타설단계, 상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽을 타설하는 차단벽타설단계, 및 상기 구획벽의 상류에 위치되도록 상기 유량측정부를 설치하는 유량측정부 설치단계,를 포함하며, 상기 노치부는, 상기 배출구에 일정 높이로 돌출형성되게 상기 몸체부에 타설되는 노치, 및 돌출된 상기 노치와 상기 몸체부가 접하는 부분을 밀폐시키도록 노치밀폐부,를 포함하고, 상기 상단부타설단계 후, 상기 노치밀폐부를 형성하는 노치밀폐부 형성단계,를 더 포함한다.And a position setting step of setting an installation location by examining the surroundings of a forest mooring for installing a flow measurement device, an excavation step of excavating the bottom of the forest mooring at the installation location so that fresh rock mass is exposed, and a forest mooring price A side wall installation step of forming a side wall installed along, a pouring step of placing the flow measurement device on the exposed fresh rock mass, and a cover step of restoring the forest mooring by covering the upper end of the poured flow measurement device to be exposed, Including, the pouring step, the lower part pouring step of pouring the lower end of the body part on the fresh bedrock, the notch part installation step of installing the notch part so that the lower part is poured during the lower part pouring step, to the upper side of the lower part of the body part An upper end pouring step of pouring an upper end having a first and second flow passage partitioned by a partition wall, but placing an upper end so that the upper end of the notch protrudes upward from the bottom of the first and second flow passages, blocking the mooring A barrier wall casting step of constructing a barrier wall for inducing mooring into the passage of the body portion, and a flow rate measurement unit installation step of installing the flow rate measurement unit to be located upstream of the partition wall, wherein the notch portion, It includes a notch cast in the body so as to protrude from the outlet at a certain height, and a notch closure to seal a portion where the protruding notch and the body come into contact, and after the upper end casting step, the notch closure Forming a notch sealing portion forming step, further comprising.

상기한 바와 같이, 본 발명에 의한 수문방식의 산림 유량측정장치의 설치방법에 의하면, 산림에 비 올때는 물론, 비 오지 않을때에도 계류의 수량을 정밀하게 측정할 수 있어 신뢰성을 향상시킬 수 있게 하는 매우 유용하고 효과적인 발명이다.As described above, according to the installation method of the sluice-type forest flow measuring device according to the present invention, it is possible to precisely measure the quantity of streams even when it is raining in the forest as well as when it is not raining, so that reliability can be improved. It is a useful and effective invention.

도 1은 본 발명에 따른 수문방식의 산림 유량측정장치의 설치방법의 순서도를 도시한 도면이고,
도 2는 본 발명에 따른 유량측정장치를 도시한 도면이며,
도 3은 본 발명에 따른 유량측정장치의 측면을 도시한 도면이고,
도 4는 본 발명에 따른 유량측정부를 도시한 도면이며,
도 5는 본 발명에 따른 타설단계를 도시한 도면이고,
도 6은 본 발명에 따른 노치부를 도시한 도면이며,
도 7은 본 발명에 따른 다른 실시 예의 타설단계를 도시한 도면이고,
도 8은 본 발명에 따른 내부가이드부가 더 구비된 상태를 도시한 도면이며,
도 9는 본 발명에 따른 또 다른 실시 예의 타설단계를 도시한 도면이다.
1 is a diagram showing a flow chart of a method of installing a forest flow rate measuring device of a floodgate method according to the present invention,
2 is a view showing a flow rate measuring device according to the present invention,
3 is a view showing the side of the flow measuring device according to the present invention,
4 is a view showing a flow rate measuring unit according to the present invention,
5 is a view showing the casting step according to the present invention,
6 is a view showing a notch portion according to the present invention,
7 is a view showing the casting step of another embodiment according to the present invention,
8 is a view showing a state in which an inner guide unit is further provided according to the present invention;
9 is a view showing a casting step of another embodiment according to the present invention.

이하, 본 발명에 따른 바람직한 실시 형태를 첨부된 도면을 참조하여 상세하게 설명한다. 첨부된 도면과 함께 이하에 개시될 상세한 설명은 본 발명의 예시적인 실시형태를 설명하고자 하는 것이며, 본 발명이 실시될 수 있는 유일한 실시형태를 나타내고자 하는 것이 아니다. 이하의 상세한 설명은 본 발명의 완전한 이해를 제공하기 위해서 구체적 세부사항을 포함한다. 그러나, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명이 이러한 구체적 세부사항 없이도 실시될 수 있음을 안다.Hereinafter, preferred embodiments according to the present invention will be described in detail with reference to the accompanying drawings. The detailed description set forth below in conjunction with the accompanying drawings is intended to describe exemplary embodiments of the present invention and is not intended to represent the only embodiments in which the present invention may be practiced. The following detailed description includes specific details for the purpose of providing a thorough understanding of the present invention. However, those skilled in the art to which the present invention pertains understand that the present invention may be practiced without these specific details.

몇몇 경우, 본 발명의 개념이 모호해지는 것을 피하기 위하여 공지의 구조 및 장치는 생략되거나, 각 구조 및 장치의 핵심기능을 중심으로 한 블록도 형식으로 도시될 수 있다.In some cases, in order to avoid obscuring the concept of the present invention, well-known structures and devices may be omitted or may be shown in block diagram form centering on core functions of each structure and device.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함(comprising 또는 including)"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서에 기재된 "…부"의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미한다. 또한, "일(a 또는 an)", "하나(one)", "그(the)" 및 유사 관련어는 본 발명을 기술하는 문맥에 있어서(특히, 이하의 청구항의 문맥에서) 본 명세서에 달리 지시되거나 문맥에 의해 분명하게 반박되지 않는 한, 단수 및 복수 모두를 포함하는 의미로 사용될 수 있다.Throughout the specification, when a part is said to "comprising" or "including" a certain element, it means that it may further include other elements, not excluding other elements, unless otherwise stated. do. Also, the term "... unit" described in the specification means a unit that processes at least one function or operation. Also, "a or an", "one", "the" and similar related words in the context of describing the invention (particularly in the context of the claims below) Unless indicated or otherwise clearly contradicted by context, both the singular and the plural can be used.

본 발명의 실시예들을 설명함에 있어서 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략할 것이다. 그리고 후술되는 용어들은 본 발명의 실시예에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In describing the embodiments of the present invention, if it is determined that a detailed description of a known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description will be omitted. In addition, terms to be described later are terms defined in consideration of functions in the embodiment of the present invention, which may vary according to the intention or custom of a user or operator. Therefore, the definition should be made based on the contents throughout this specification.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 설명한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명에 따른 수문방식의 산림 유량측정장치의 설치방법의 순서도를 도시한 도면이고, 도 2는 본 발명에 따른 유량측정장치를 도시한 도면이며, 도 3은 본 발명에 따른 유량측정장치의 측면을 도시한 도면이고, 도 4는 본 발명에 따른 유량측정부를 도시한 도면이며, 도 5는 본 발명에 따른 타설단계를 도시한 도면이고, 도 6은 본 발명에 따른 노치부를 도시한 도면이며, 도 7은 본 발명에 따른 다른 실시 예의 타설단계를 도시한 도면이고, 도 8은 본 발명에 따른 내부가이드부가 더 구비된 상태를 도시한 도면이며, 도 9는 본 발명에 따른 또 다른 실시 예의 타설단계를 도시한 도면이다.1 is a flow chart showing a method of installing a floodgate-type forest flow measuring device according to the present invention, FIG. 2 is a diagram showing a flow measuring device according to the present invention, and FIG. 3 is a flow measurement according to the present invention. It is a view showing the side of the device, Figure 4 is a view showing the flow rate measurement unit according to the present invention, Figure 5 is a view showing the pouring step according to the present invention, Figure 6 is a view showing a notch according to the present invention Figure 7 is a view showing the casting step of another embodiment according to the present invention, Figure 8 is a view showing a state further provided with an inner guide according to the present invention, Figure 9 is another according to the present invention It is a drawing showing the pouring step of the embodiment.

도면에서 도시한 바와 같이, 수문방식의 산림 유량측정장치의 설치방법은 위치설정단계(S10)와 굴착단계(S20), 측벽설치단계(S30), 타설단계(S40) 및 복토단계(S50)를 포함한다.As shown in the drawing, the installation method of the floodgate type forest flow measurement device includes a position setting step (S10), an excavation step (S20), a side wall installation step (S30), a pouring step (S40) and a soil cover step (S50). include

위치설정단계(S10)는 유량측정장치(10)를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정한다.In the position setting step (S10), an installation position is set by examining the surroundings of a forest mooring for installing the flow measuring device 10.

그리고 굴착단계(S20)는 위치설정단계(S10)에서 설정된 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착한다.In the excavation step (S20), the bottom surface of the forest mooring at the installation position set in the position setting step (S10) is excavated, but excavated so that fresh bedrock is exposed.

측벽설치단계(S30)는 산림 계류가를 따라 설치되는 측벽(3)을 형성한다.In the sidewall installation step (S30), sidewalls 3 installed along the forest stream are formed.

또한 타설단계(S40)는 노출된 신선암반(2)에 유량측정장치(10)를 타설하기 위해 구비된다.In addition, the pouring step (S40) is provided to pour the flow rate measuring device 10 on the exposed fresh bedrock 2.

복토단계(S50)는 타설된 유량측정장치(10)의 상단부가 노출되도록 덮어 산림 계류를 복원시킨다.In the soil cover step (S50), the forest mooring is restored by covering the top of the poured flow measurement device 10 so as to be exposed.

이러한 집수방식의 산림유량 측정장치의 설치방법에 의하면, 고경사에 의한 빠른 유속을 방지하여 토사 등의 유실을 방지함은 물론, 산림 계류와 계류 지중으로 흐르는 물을 일정수위로 유지시킬 수 있어 수자원 확보와 유량 등의 측정을 용이하게 할 수 있다.According to the installation method of the forest flow rate measurement device of the collection method, it is possible to prevent the loss of soil by preventing the rapid flow rate due to the high slope, as well as to maintain the water flowing into the forest mountain stream and the mooring ground at a constant water level. It can facilitate the measurement of securing and flow rate.

이를 위한, 수문방식의 산림 유량측정장치(10)는 도 2 내지 도 3에서 도시한 바와 같이, 몸체부(100)와 차단벽(200), 노치부(300) 및 유량측정부(400)를 포함한다.For this purpose, the floodgate type forest flow rate measuring device 10 includes the body portion 100, the barrier wall 200, the notch portion 300, and the flow rate measurement unit 400, as shown in FIGS. 2 and 3. include

몸체부(100)는 산림 계류가 통과되도록 유로(110)가 형성된다.The body portion 100 is formed with a flow path 110 through which forest moorings pass.

그리고 차단벽(200)은 계류를 차단시켜 몸체부(100)의 유로(110)로 계류를 유도하기 위해 구비된다.In addition, the blocking wall 200 is provided to induce mooring into the channel 110 of the body 100 by blocking the mooring.

노치부(300)는 몸체부(100)의 유로(110) 저면부에 돌출되도록 구비되어 일정 수위 이상일 경우, 계류가 넘어서 이동되기 위해 구비된다.The notch part 300 is provided to protrude from the bottom surface of the flow path 110 of the body part 100 and is provided to move beyond the mooring when the water level is above a certain level.

또한 유량측정부(400)는 몸체부(100)에 구비되어 계류의 유량을 측정하기 위해 구비된다.In addition, the flow rate measurement unit 400 is provided on the body portion 100 to measure the flow rate of mooring.

이러한 수문방식의 산림 유량측정장치(10)에 의하면, 산림 계류의 수위를 일정량 유지할 수 있음은 물론, 우천 시, 계류량을 정밀하게 측정할 수 있다.According to the forest flow rate measuring device 10 of the floodgate method, it is possible to maintain a constant amount of water level in forest streams and precisely measure the amount of streams in rainy weather.

이에, 중류나 하류에 대한 수위와 유속 등을 제어할 수 있는 기반이 된다.Accordingly, it becomes a basis for controlling the water level and flow velocity for the middle or downstream.

여기서, 몸체부(100)는 도 2 내지 3에 도시한 바와 같이, 유로(110)와 배출구(120) 및 물방석(130)을 포함한다.Here, the body portion 100 includes a flow path 110, an outlet 120, and a water cushion 130, as shown in FIGS. 2 and 3.

먼저, 유로(110)는 제1유로(112)와 제2유로(114)를 포함한다.First, the flow path 110 includes a first flow path 112 and a second flow path 114 .

제1유로(112)는 계류 지중의 신선암반(2)에 타설되며, 하류방향으로 일정 길이를 갖고, 계류가 하류쪽으로 이동되도록 중앙부와 일측부에 형성된다.The first flow path 112 is cast in the fresh bedrock 2 of the mooring ground, has a certain length in the downstream direction, and is formed at the center and one side so that the mooring stream moves downstream.

그리고 제2유로(114)는 구획벽(116)에 의해 제1유로(112)와 구획되어 타측부에 형성되되, 저면이 제1유로(112)의 저면보다 낮게 형성된다.And, the second flow path 114 is partitioned from the first flow path 112 by the partition wall 116 and formed on the other side, and the bottom surface is formed lower than the bottom surface of the first flow path 112 .

여기서, 계류의 수량이 일정 기준보다 적을 경우, 제2유로(114)를 통해 하류로 이동되며, 일정 기준 이상이 될 경우, 제1유로(112)도 함께 계류가 하류로 이동된다.Here, when the quantity of mooring is less than a certain standard, it is moved downstream through the second passage 114, and when it exceeds a certain standard, the mooring is moved downstream along with the first passage 112.

또한 배출구(120)는 제1유로(112)와 제2유로(114)를 통해 계류를 하류쪽으로 배출시키기 위해 구비된다.In addition, the outlet 120 is provided to discharge the mooring stream downstream through the first flow path 112 and the second flow path 114.

물방석(130)은 배출구(120)를 통해 배출되는 계류에 의해 계류바닥에 소가 형성되는 것을 방지하기 위해 구비된다.The water cushion 130 is provided to prevent cattle from being formed on the mooring bottom by the mooring discharged through the outlet 120.

그리고 유량측정부(400)는 도 4에서 도시한 바와 같이, 저수관(410)과 보호캡(420), 유량유입구(430), 저수관덮개(440) 및 계측기(450)를 포함한다.And, as shown in FIG. 4, the flow measurement unit 400 includes a water reservoir 410, a protective cap 420, a flow inlet 430, a water reservoir cover 440, and a meter 450.

저수관(410)은 구획벽(116)의 상류에 위치되어 하단부가 폐쇄되고, 상측으로 개방되도록 형성되어 계류가 채워진다.The water storage pipe 410 is located upstream of the partition wall 116, has a lower end closed, and is formed to open upward to fill the mooring.

또한 보호캡(420)은 저수관(410)을 보호하기 위해 감싸도록 구획벽(116)에 구비되되, 하단부가 저수관(410)의 하단부보다 높게 형성된다.In addition, the protective cap 420 is provided on the partition wall 116 to protect the water storage pipe 410, and the lower end is formed higher than the lower end of the water storage pipe 410.

유량유입구(430)는 보호캡(420)의 하측으로 위치된 저수관(410)의 하단부 외주면을 따라 복수 개 형성되어 계류가 유입되기 위해 구입된다.A plurality of flow inlets 430 are formed along the outer circumferential surface of the lower end of the water storage pipe 410 located below the protective cap 420, and are purchased to allow mooring to flow in.

그리고 저수관덮개(440)는 저수관(410)의 개방된 상단부를 개폐하도록 구비된다.And the water storage pipe cover 440 is provided to open and close the open upper end of the water storage pipe 410.

계측기(450)는 저수관(410)에 채워진 계류의 수위를 측정하기 위해 구비된다.The meter 450 is provided to measure the water level of the mooring filled in the water storage pipe 410.

이에, 계류가 제2유로(114)만 이동될 경우만 아니라, 제1유로(112)와 함께 이동될 경우도, 유량을 측정할 수 있다.Thus, the flow rate can be measured not only when the mooring is moved along with the first flow path 112 as well as when only the second flow path 114 is moved.

여기서, 유량유입구(430)를 부유물이 막는 것을 방지하기 위해 부유물차단부(600)이 더 포함된다.Here, a floating matter blocking unit 600 is further included to prevent the flow inlet 430 from being blocked by floating matter.

이 부유물차단부(600)는 부유물차단프레임(610)과 부유물차단망(620)을 포함한다.The floating object blocking unit 600 includes a floating object blocking frame 610 and a floating object blocking network 620.

부유물차단프레임(610)은 유량유입구(430)를 감싸되, 일정 간격 이격되도록 형성된다.The floating matter blocking frame 610 surrounds the flow inlet 430 and is formed to be spaced apart at regular intervals.

또한 부유물차단망(620)은 부유물차단프레임(610)에 구비되어 부유물이 걸리기 위해 구비된다.In addition, the floating object blocking net 620 is provided in the floating object blocking frame 610 to catch floating objects.

이 부유물차단망(620)은 유량유입구(430)의 상류방향인 부유물차단프레임(610)의 외주면을 따라 형성되는 것으로, 하측단에도 형성되어 유량유입구(430)의 하단부로 이동되는 부유물이 유입되는 것을 차단시킬 수도 있다.The floating object blocking network 620 is formed along the outer circumferential surface of the floating object blocking frame 610 in the upstream direction of the flow inlet 430, and is also formed at the lower end so that floating objects moving to the lower end of the flow inlet 430 are introduced. may block it.

이에, 부유물이 유량측정부(400)를 막아 유량 측정 오류가 발생되는 것을 방지함이 바람직하다.Accordingly, it is preferable to prevent flow measurement errors from occurring by blocking the flow rate measuring unit 400 with the floating matter.

여기서, 차단벽(200)은 몸체부(100)의 양측단부에 각각 구비되며, 계류가 흐르는 방향과 직교되도록 형성된다.Here, the blocking walls 200 are provided at both ends of the body portion 100, respectively, and are formed to be orthogonal to the direction in which the mooring stream flows.

한편, 차단벽(200)은 몸체부(100)의 양측단부에 각각 구비되며, 계류를 유로(110)로 가이드하도록 계류 흐르는 방향과 경사지게 형성된다.Meanwhile, the blocking walls 200 are provided at both ends of the body portion 100, and are formed to be inclined with respect to the flow direction of the mooring stream to guide the mooring stream to the flow path 110.

각 실시 예의 차단벽(200)은 해당 계류의 수량이나 폭 등에 의해 가장 좋은 방법으로 설치됨에 당연하다.It is natural that the blocking wall 200 of each embodiment is installed in the best way according to the quantity or width of the mooring.

그리고 산림 계류가를 따라 측벽(3)을 설치하여 계류가 몸체부(100)로 집수시켜 정밀한 수량을 측정할 수 있도록함이 바람직하다.In addition, it is preferable to install the side wall 3 along the forest stream to collect the water into the body part 100 so that the water quantity can be accurately measured.

이러한 집수방식의 산림 유량측정장치(10)의 타설단계(S30)는 도 5에서 도시한 바와 같이, 하단부타설단계(S31)와 노치부 설치단계(S32), 상단부타설단계(S33), 차단벽타설단계(S34) 및 유량측정부 설치단계(S35)를 포함한다.As shown in FIG. 5, the pouring step (S30) of the forest flow rate measuring device 10 of the water collection method includes the lower casting step (S31), the notch installation step (S32), the upper casting step (S33), and the barrier wall. It includes a pouring step (S34) and a flow measurement unit installation step (S35).

하단부타설단계(S31)는 굴착되어 노출된 신선암반(2)에 몸체부(100)의 하단부를 타설한다.In the lower part casting step (S31), the lower part of the body part 100 is poured into the excavated and exposed fresh bedrock 2.

그리고 노치부 설치단계(S32)는 하단부타설단계(S31) 시, 하단부가 타설되도록 노치부(300)를 설치한다.And the notch part installation step (S32) installs the notch part 300 so that the lower part is poured at the time of the lower part casting step (S31).

상단부타설단계(S33)는 몸체부(100)의 하단부의 상측으로 구획벽(116)에 의해 구획되는 제1유로(112)와 제2유로(114)를 갖는 상단부를 타설하되, 노치부(300)의 상단부가 제1유로(112)와 제2유로(114)의 저면 상측으로 돌출되도록 상단부를 타설한다.In the upper part casting step (S33), the upper part having the first flow path 112 and the second flow path 114 partitioned by the partition wall 116 is poured to the upper side of the lower end of the body part 100, but the notch part 300 ) The upper ends are cast so that the upper ends of the first flow passage 112 and the second flow passage 114 protrude upwards.

또한 차단벽타설단계(S34)는 산림 계류를 차단시켜 몸체부(100)의 유로(110)로 계류를 유도하기 위한 차단벽(200)을 타설한다.In addition, in the barrier wall casting step (S34), a barrier wall 200 for inducing mooring to the channel 110 of the body part 100 is cast by blocking the forest mooring.

유량측정부 설치단계(S35)는 구획벽(116)의 상류에 위치되도록 유량측정부(400)를 설치한다.In the flow rate measurement unit installation step (S35), the flow rate measurement unit 400 is installed to be located upstream of the partition wall 116.

이에, 산림 계류를 몸체부(100)의 유로(110)로 집수하여 일정 수위로 유지시키며, 일정 수위를 넘을 경우, 노치부(300)를 넘어 하류로 흐른다.Therefore, the forest mountain stream is collected into the flow path 110 of the body part 100 and maintained at a certain water level, and when the water level exceeds a certain level, it flows downstream beyond the notch part 300.

여기서, 산림 유량측정장치(10)의 노치부(300)는 도 6 내지 도 7에서 도시한 바와 같이, 노치(310)와 노치밀폐부(320)를 포함한다.Here, the notch part 300 of the forest flow rate measuring device 10 includes a notch 310 and a notch sealing part 320 as shown in FIGS. 6 and 7 .

노치(310)는 유로(110)에 일정 높이로 돌출형성되게 몸체부(100)의 내부에 타설되는 것으로, 해당 몸체부(100)의 설치 시, 함께 설치된다.The notch 310 is cast inside the body portion 100 so as to protrude from the flow path 110 at a certain height, and is installed together when the corresponding body portion 100 is installed.

그리고 노치밀폐부(320)는 돌출된 노치(310)와 몸체부(100)가 접하는 부분을 밀폐시킨다.And the notch sealing part 320 seals the contact part of the protruding notch 310 and the body part 100.

이 노치밀폐부(320)는 상단부타설단계(S33) 후, 노치밀폐부 형성단계(S36)에서 형성된다.The notch sealing part 320 is formed in the notch sealing part forming step (S36) after the upper casting step (S33).

그리고 노치밀폐부(320)는 에폭시를 이용하여 혹시 몸체부(100)에 침투된 물이 하류로 이동되는 것을 방지한다.In addition, the notch sealing part 320 prevents water penetrating into the body part 100 from moving downstream by using epoxy.

여기서, 노치부(300)는 노치가이드(330)를 더 포함한다.Here, the notch part 300 further includes a notch guide 330 .

이 노치가이드(330)는 노치(310)의 상단부 후단부를 따라 경사지게 형성되어 노치(310)를 넘어 흐르는 계류를 하측으로 가이드하기 위해 구비된다.The notch guide 330 is formed to be inclined along the rear end of the upper end of the notch 310 and is provided to guide a mountain stream flowing beyond the notch 310 downward.

이러한 노치가이드(330)의 경사각도는 노치(310) 상면을 기준으로 60ㅀ로 형성되며, 노치(310) 두께의 80%로 형성된다.The inclination angle of the notch guide 330 is formed at 60° based on the upper surface of the notch 310, and is formed at 80% of the thickness of the notch 310.

이에, 노치부(300)를 넘어 이동되는 계류에 의해 물방석(130)이 파손되는 것을 방지할 수 있다.Thus, it is possible to prevent the water cushion 130 from being damaged by mooring moving beyond the notch 300 .

여기서, 각 실시 예의 산림유량 측정시스템은 누수방지부(700)를 더 포함한다.Here, the forest flow measurement system of each embodiment further includes a water leakage prevention unit 700.

이 누수방지부(700)는 신선암반(2)에 타설된 몸체부(100)의 상류 하단부를 따라 누수를 방지하기 위해 구비된다.The water leakage prevention part 700 is provided to prevent water leakage along the upstream lower end of the body part 100 cast in the fresh bedrock 2.

이러한 누수방지부(700)는 진흙으로 충진되어 내부에 기포층을 최소화시켜 누수를 효과적으로 방지할 수 있다.The leak prevention unit 700 is filled with mud to minimize a bubble layer therein, thereby effectively preventing leaks.

이는, 각 유량측정부(400)를 통해 해당 계류의 정밀한 수량에 대한 측정이 이루어질 수 있어 신뢰성을 향상시킬 수 있다.This can improve reliability because the precise quantity of water of the mooring can be measured through each flow measurement unit 400 .

이러한 누수방지부(700)는 하단부타설단계(S31) 후, 누수방지부설치단계(S37)에서 형성된다.This leak prevention unit 700 is formed in the leakage prevention unit installation step (S37) after the lower casting step (S31).

그리고 유로(110)로 부유물이 배출되는 것을 방지하기 위한 부유물차단부(미 도시)를 더 포함한다.And it further includes a floating matter blocker (not shown) for preventing the floating matter from being discharged into the flow path 110 .

이 부유물차단부는 부유물차단프레임과 부유물차단망을 포함한다.The floating object blocking unit includes a floating object blocking frame and a floating object blocking network.

부유물차단프레임은 해당 유로(112, 114)의 후측으로 구비되는 것으로, 계류의 상류방향으로 형성된다.The floating object blocking frame is provided on the rear side of the flow passages 112 and 114 and is formed in the upstream direction of the mooring.

또한 부유물차단망은 부유물차단프레임에 구비되어 부유물이 걸리기 위해 구비된다.In addition, the floating matter blocking net is provided in the floating matter blocking frame to catch the floating matter.

이 부유물차단망은 부유물차단프레임의 외주면을 따라 형성되는 것으로, 하측단에도 형성되어 수중으로 이동되는 부유물이 유입되는 것을 차단시킬 수도 있다.The floating matter blocking net is formed along the outer circumferential surface of the floating matter blocking frame, and is also formed at the lower end to block the inflow of floating matter moving into the water.

이에, 부유물이 해당 유로(112, 114)로 유입되는 것을 방지할 수 있다.Accordingly, it is possible to prevent the floating matter from flowing into the corresponding passages 112 and 114 .

그리고 도 8에서 도시한 바와 같이, 몸체부(100)는 내부가이드부(150)를 더 포함한다.And as shown in Figure 8, the body portion 100 further includes an inner guide portion (150).

내부가이드부(150)는 몸체부(100) 내부로 흡수되는 물을 집수하여 산림 계류의 중앙부로 이동되도록 가이드한다.The inner guide part 150 collects water absorbed into the body part 100 and guides it to be moved to the central part of the forest mountain stream.

이러한 내부가이드부(150)는 몸체부(100)의 중앙부를 기준으로, 양측방향에 각각 구비되되, 중앙부로 갈수록 햐류로 경사지게 구비된다.These inner guide parts 150 are provided on both sides of the body part 100 based on the central part, and are provided with an inclination towards the central part in a downstream direction.

이에, 산림 계류 중 몸체부(100)의 내부로 흡수되는 물을 계류 주변 지중으로 흐르는 것을 방지 및 최소화시켜 계류로 가이드함에 따라, 산림 계류의 유량을 유지시킴은 물론, 주변으로 흘러 지반이 약해지는 것을 방지할 수 있다.Therefore, by preventing and minimizing the flow of water absorbed into the body part 100 during forest mooring to the ground around the mooring and guiding it to the mooring, the flow rate of the forest mooring is maintained and the ground is weakened by flowing to the surroundings. can prevent

여기서, 산림 계류는 수중에 위치된 몸체부(100)의 내부로 흡수되는 것과 계류 지중으로 유입되어 흐르는 것이 흡수되는 것을 포함함은 물론, 계류로 모이는 물 역시 몸체부(100)로 흡수된다.Here, the forest mooring includes absorption into the body part 100 located underwater and absorption of flowing into the mooring ground, as well as water collected in the mountain stream is also absorbed into the body part 100.

이와 같은, 내부가이드부(150)는 적어도 하나 이상 구비되는 것으로, 물을 용이하게 가이드한다.As such, at least one inner guide part 150 is provided, and guides water easily.

이러한 내부가이드부(150)는 하단부타설단계(S31) 전에 내부가이드 거치단계(S38)에서 거치되며, 하단부타설단계(S31) 시, 함께 타설된다.This inner guide part 150 is mounted in the inner guide mounting step (S38) before the lower casting step (S31), and is cast together during the lower casting step (S31).

100 : 몸체부 200 : 차단벽
300 : 노치부 310 : 노치
320 : 노치밀폐부 330 : 노치가이드
400 : 유량측정부
410 : 저수관 420 : 보호캡
430 : 유량유입구 440 : 저수관덮개
450 : 계측기 600 : 부유물차단부
100: body part 200: blocking wall
300: notch part 310: notch
320: notch sealing part 330: notch guide
400: flow measurement unit
410: water pipe 420: protection cap
430: flow inlet 440: water pipe cover
450: measuring instrument 600: floating object blocking unit

Claims (10)

유량측정장치를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정하는 위치설정단계;
상기 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착하는 굴착단계;
산림 계류가를 따라 설치되는 측벽을 형성하는 측벽설치단계;
노출된 상기 신선암반에 상기 유량측정장치를 타설하기 위한 타설단계; 및
상기 타설된 유량측정장치의 상단부가 노출되도록 덮어 상기 산림 계류를 복원시키는 복토단계;를 포함하고,
상기 유량측정장치는,
산림 계류가 통과되도록 유로가 형성되는 몸체부;
상기 산림 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽;
상기 몸체부의 유로 저면에 돌출되도록 구비되어 일정 수위 이상일 경우, 계류가 넘어서 이동되는 노치부; 및
상기 몸체부에 구비되어 계류의 유량을 측정하기 위한 유량측정부;를 포함하고,
상기 몸체부는,
하류방향으로 일정 길이를 갖고, 계류가 하류쪽으로 이동되도록 중앙부와 일측부에 형성되는 제1유로와 구획벽에 의해 상기 제1유로와 구획되어 타측부에 형성되는 제2유로를 갖는 유로;
상기 제1유로와 제2유로를 통해 계류를 하류쪽으로 배출시키기 위한 배출구; 및
상기 배출구를 통해 배출되는 계류에 의해 계류바닥에 소가 형성되는 것을 방지하기 위한 물방석;을 포함하며,
상기 제2유로의 폭은 상기 제1유로의 폭보다 작게 형성되고,
상기 제2유로의 저면은 상기 제1유로의 저면보다 낮게 형성되어 산림 계류가 상기 제2유로를 통해 하류로 이동되되, 수위가 올라갈 경우, 제1유로와 함께 하류로 이동되는 것을 특징으로 하는 수문방식의 산림 유량측정장치의 설치방법.
A location setting step of setting an installation location by examining the surroundings of a forest mooring for installing a flow measuring device;
An excavation step of excavating the bottom surface of the forest mountain stream at the installation location so that fresh bedrock is exposed;
A sidewall installation step of forming a sidewall installed along a mountain stream in the forest;
A pouring step for placing the flow measurement device on the exposed fresh rock mass; and
A soil cover step of restoring the forest mooring by covering the upper end of the poured flow measuring device to be exposed;
The flow measuring device,
A body portion in which a flow path is formed so that a forest mountain stream passes through;
a blocking wall for inducing a mooring to a channel of the body part by blocking the forest mooring;
a notch portion provided so as to protrude from the lower surface of the flow passage of the body portion and moving beyond a mooring stream when the water level is higher than a certain level; and
Including; a flow rate measuring unit provided in the body portion to measure the flow rate of mooring;
The body part,
a flow path having a certain length in the downstream direction and having a first flow path formed at a central portion and one side so that the mooring stream moves downstream, and a second flow path formed on the other side and partitioned from the first flow path by a partition wall;
an outlet for discharging moorings downstream through the first and second passages; and
It includes; a water cushion for preventing cattle from being formed on the mooring bottom by the mooring discharged through the outlet,
The width of the second passage is formed smaller than the width of the first passage,
The bottom of the second flow passage is formed lower than the bottom of the first flow passage, so that the forest mountain stream moves downstream through the second flow passage, and when the water level rises, it moves downstream along with the first flow passage. Method of installing a forest flow measuring device of the method.
삭제delete 삭제delete 제1항에 있어서, 상기 유량측정부는,
상기 구획벽의 상류에 위치되어 하단부가 폐쇄되고, 상측으로 개방되도록 형성되어 계류가 채워지는 저수관;
상기 저수관을 보호하기 위해 감싸도록 상기 구획벽에 구비되되, 하단부가 저수관의 하단부보다 높게 형성되는 보호캡;
상기 보호캡의 하측으로 위치된 저수관의 하단부 외주면을 따라 복수 개 형성되어 계류가 유입되기 위한 유량유입구;
상기 저수관의 개방된 상단부를 개폐하도록 구비되는 저수관덮개; 및
상기 저수관에 채워진 계류의 수위를 측정하기 위한 계측기;를 포함하는 수문방식의 산림 유량측정장치의 설치방법.
The method of claim 1, wherein the flow rate measuring unit,
A water storage pipe located upstream of the partition wall, closed at the lower end and opened upward to fill the mooring;
a protective cap provided on the partition wall to protect the water storage pipe and having a lower end higher than the lower end of the water storage pipe;
a plurality of flow inlets formed along the outer circumferential surface of the lower end of the water storage pipe located below the protective cap, through which mooring flows;
a water storage pipe cover provided to open and close the open upper end of the water storage pipe; and
Installation method of a floodgate-type forest flow measuring device comprising a; measuring instrument for measuring the water level of the mooring filled in the water storage pipe.
제4항에 있어서, 상기 타설단계는,
상기 신선암반에 몸체부의 하단부를 타설하는 하단부타설단계;
상기 하단부타설단계 시, 하단부가 타설되도록 상기 노치부를 설치하는 노치부 설치단계;
상기 몸체부의 하단부의 상측으로 구획벽에 의해 구획되는 제1유로와 제2유로를 갖는 상단부를 타설하되, 상기 노치부의 상단부가 제1유로와 제2유로의 저면 상측으로 돌출되도록 상단부를 타설하는 상단부타설단계;
상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽을 타설하는 차단벽타설단계; 및
상기 구획벽의 상류에 위치되도록 상기 유량측정부를 설치하는 유량측정부 설치단계;를 포함하는 수문방식의 산림 유량측정장치의 설치방법.
The method of claim 4, wherein the pouring step,
A lower part pouring step of pouring the lower part of the body part into the fresh bedrock;
During the lower casting step, a notch portion installation step of installing the notch portion so that the lower portion is poured;
An upper end portion for casting an upper end portion having a first flow path and a second flow path partitioned by a partition wall to the upper side of the lower end portion of the body portion, and placing an upper end portion such that the upper end portion of the notch protrudes upward from the bottom surface of the first flow path and the second flow path. pouring step;
Blocking wall casting step of blocking the mooring and constructing a blocking wall for inducing the mooring to the passage of the body part; and
A method of installing a floodgate type forest flow rate measuring device comprising a flow rate measurement unit installation step of installing the flow rate measurement unit so as to be located upstream of the partition wall.
제5항에 있어서, 상기 노치부는,
상기 배출구에 일정 높이로 돌출형성되게 상기 몸체부에 타설되는 노치; 및
돌출된 상기 노치와 상기 몸체부가 접하는 부분을 밀폐시키도록 노치밀폐부;를 포함하고,
상기 상단부타설단계 후, 상기 노치밀폐부를 형성하는 노치밀폐부 형성단계;를 더 포함하는 수문방식의 산림 유량측정장치의 설치방법.
The method of claim 5, wherein the notch portion,
a notch cast into the body so as to protrude from the outlet at a certain height; and
And a notch sealing part to seal a part where the protruding notch and the body part contact,
After the upper part casting step, the notch sealing part forming step of forming the notch sealing part; installation method of the forest flow rate measuring device of the floodgate method further comprising.
제6항에 있어서,
상기 유량유입구가 형성된 저수관의 하단부로 부유물이 근접하는 것을 방지하기 위한 부유물차단부;를 더 포함하고, 상기 유량측정부 설치단계 후, 상기 부유물차단부를 설치하는 부유물차단부 설치단계;를 더 포함하는 수문방식의 산림 유량측정장치의 설치방법.
According to claim 6,
It further includes; a floating matter blocking part for preventing the floating matter from approaching the lower end of the water storage pipe in which the flow inlet is formed, and a floating matter blocking part installation step of installing the floating matter blocking part after the flow rate measuring unit installation step. Installation method of forest flow measuring device of flood gate method.
제7항에 있어서, 상기 부유물차단부는,
상기 구획벽의 상류로 구비되는 부유물차단프레임; 및
상기 부유물차단프레임에 구비되어 부유물이 걸리기 위한 부유물차단망;을 포함하는 수문방식의 산림 유량측정장치.
The method of claim 7, wherein the floating object blocking unit,
a floating object blocking frame provided upstream of the partition wall; and
Forest flow rate measuring device of a floodgate method comprising a; floating matter blocking net provided in the floating matter blocking frame to catch the floating matter.
유량측정장치를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정하는 위치설정단계;
상기 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착하는 굴착단계;
산림 계류가를 따라 설치되는 측벽을 형성하는 측벽설치단계;
노출된 상기 신선암반에 상기 유량측정장치를 타설하기 위한 타설단계; 및
상기 타설된 유량측정장치의 상단부가 노출되도록 덮어 상기 산림 계류를 복원시키는 복토단계;를 포함하고,
상기 타설단계는,
상기 신선암반에 몸체부의 하단부를 타설하는 하단부타설단계;
상기 하단부타설단계 시, 하단부가 타설되도록 노치부를 설치하는 노치부 설치단계;
상기 몸체부의 하단부의 상측으로 구획벽에 의해 구획되는 제1유로와 제2유로를 갖는 상단부를 타설하되, 상기 노치부의 상단부가 제1유로와 제2유로의 저면 상측으로 돌출되도록 상단부를 타설하는 상단부타설단계;
상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽을 타설하는 차단벽타설단계; 및
상기 구획벽의 상류에 위치되도록 유량측정부를 설치하는 유량측정부 설치단계;를 포함하는 수문방식의 산림 유량측정장치의 설치방법.
A location setting step of setting an installation location by examining the surroundings of a forest mooring for installing a flow measuring device;
An excavation step of excavating the bottom surface of the forest mountain stream at the installation location so that fresh bedrock is exposed;
A sidewall installation step of forming a sidewall installed along a mountain stream in the forest;
A pouring step for placing the flow measurement device on the exposed fresh rock mass; and
A soil cover step of restoring the forest mooring by covering the upper end of the poured flow measuring device to be exposed;
In the pouring step,
A lower part pouring step of pouring the lower part of the body part into the fresh bedrock;
During the lower casting step, a notch portion installation step of installing a notch portion so that the lower portion is poured;
An upper end portion for casting an upper end portion having a first flow path and a second flow path partitioned by a partition wall to the upper side of the lower end portion of the body portion, and casting an upper end portion such that the upper end portion of the notch protrudes upward from the bottom surface of the first flow path and the second flow path. pouring step;
Blocking wall casting step of blocking the mooring and constructing a blocking wall for inducing the mooring to the passage of the body part; and
A method of installing a forest flow measuring device of a floodgate method comprising a; flow rate measuring unit installation step of installing a flow rate measuring unit to be located upstream of the partition wall.
유량측정장치를 설치하기 위한 산림 계류 주변을 조사하여 설치위치를 설정하는 위치설정단계;
상기 설치위치의 산림 계류의 바닥면을 굴착하되, 신선암반이 노출되도록 굴착하는 굴착단계;
산림 계류가를 따라 설치되는 측벽을 형성하는 측벽설치단계;
노출된 상기 신선암반에 상기 유량측정장치를 타설하기 위한 타설단계; 및
상기 타설된 유량측정장치의 상단부가 노출되도록 덮어 상기 산림 계류를 복원시키는 복토단계;를 포함하고,
상기 타설단계는,
상기 신선암반에 몸체부의 하단부를 타설하는 하단부타설단계;
상기 하단부타설단계 시, 하단부가 타설되도록 노치부를 설치하는 노치부 설치단계;
상기 몸체부의 하단부의 상측으로 구획벽에 의해 구획되는 제1유로와 제2유로를 갖는 상단부를 타설하되, 상기 노치부의 상단부가 제1유로와 제2유로의 저면 상측으로 돌출되도록 상단부를 타설하는 상단부타설단계;
상기 계류를 차단시켜 상기 몸체부의 유로로 계류를 유도하기 위한 차단벽을 타설하는 차단벽타설단계; 및
상기 구획벽의 상류에 위치되도록 유량측정부를 설치하는 유량측정부 설치단계;를 포함하며,
상기 노치부는,
배출구에 일정 높이로 돌출형성되게 상기 몸체부에 타설되는 노치; 및
돌출된 상기 노치와 상기 몸체부가 접하는 부분을 밀폐시키도록 노치밀폐부;를 포함하고,
상기 상단부타설단계 후, 상기 노치밀폐부를 형성하는 노치밀폐부 형성단계를 더 포함하는 수문방식의 산림 유량측정장치의 설치방법.
A location setting step of setting an installation location by examining the surroundings of a forest mooring for installing a flow measuring device;
An excavation step of excavating the bottom surface of the forest mountain stream at the installation location so that fresh bedrock is exposed;
A sidewall installation step of forming a sidewall installed along a mountain stream in the forest;
A pouring step for placing the flow measurement device on the exposed fresh rock mass; and
A soil cover step of restoring the forest mooring by covering the upper end of the poured flow measuring device to be exposed;
In the pouring step,
A lower part pouring step of pouring the lower part of the body part into the fresh bedrock;
During the lower part casting step, a notch part installation step of installing a notch part so that the lower part is poured;
An upper end portion for casting an upper end portion having a first flow path and a second flow path partitioned by a partition wall to the upper side of the lower end portion of the body portion, and casting an upper end portion such that the upper end portion of the notch protrudes upward from the bottom surface of the first flow path and the second flow path. pouring step;
Blocking wall casting step of blocking the mooring and constructing a blocking wall for inducing the mooring to the passage of the body part; and
A flow rate measurement unit installation step of installing a flow rate measurement unit so as to be located upstream of the partition wall; including,
The notch part,
A notch cast in the body so as to protrude from the outlet at a certain height; and
And a notch sealing part to seal a part where the protruding notch and the body part contact,
After the upper part casting step, the installation method of the forest flow rate measuring device of the floodgate method further comprising a notch sealing part forming step of forming the notch sealing part.
KR1020200154094A 2020-11-17 2020-11-17 Installation method of forest flow measuring device of water gate type KR102496880B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200154094A KR102496880B1 (en) 2020-11-17 2020-11-17 Installation method of forest flow measuring device of water gate type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200154094A KR102496880B1 (en) 2020-11-17 2020-11-17 Installation method of forest flow measuring device of water gate type

Publications (2)

Publication Number Publication Date
KR20220067421A KR20220067421A (en) 2022-05-24
KR102496880B1 true KR102496880B1 (en) 2023-02-07

Family

ID=81806221

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200154094A KR102496880B1 (en) 2020-11-17 2020-11-17 Installation method of forest flow measuring device of water gate type

Country Status (1)

Country Link
KR (1) KR102496880B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006023181A (en) * 2004-07-08 2006-01-26 Aichi Tokei Denki Co Ltd Flow meter
KR101941560B1 (en) * 2018-03-27 2019-01-30 대한민국 Fixed flumes for small river field investigation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101632049B1 (en) * 2014-03-04 2016-06-20 변찬우 A system for supplying water to a wetlet with a dam having fishways, and the river with the system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006023181A (en) * 2004-07-08 2006-01-26 Aichi Tokei Denki Co Ltd Flow meter
KR101941560B1 (en) * 2018-03-27 2019-01-30 대한민국 Fixed flumes for small river field investigation

Also Published As

Publication number Publication date
KR20220067421A (en) 2022-05-24

Similar Documents

Publication Publication Date Title
CN208899603U (en) A kind of useless three pipes unification drainage system of the dirt that sponge urban construction mode is rainy
KR101383579B1 (en) Water retention experimental device
KR102496880B1 (en) Installation method of forest flow measuring device of water gate type
IT201800005132A1 (en) System of interception and collection of waste and debris in the water
KR102496873B1 (en) Forest flow measuring device of water gate type
KR102496889B1 (en) Installation method of forest flow rate measuring device of catchment type
KR102496884B1 (en) Forest flow rate measuring device of catchment type
JP2012072622A (en) Rainwater management system, and operation method and management method therefor
JP2008115545A (en) River flow leveling method
KR102065141B1 (en) Emission system to remove the pressurized air in large storage-drainage tunnel
CN206941385U (en) Novel road bridge draining device
KR102632011B1 (en) Installation method of Erosion control dam with a forest flow measurement device
KR102632009B1 (en) Installation method of forest flow measurement device for Erosion control dam
KR20230001422A (en) forest flow measuring device for erosion control dam
KR20230001430A (en) Erosion control dam with forest flow measuring device
US3293862A (en) Overflow fishway
KR101262093B1 (en) Anti-overflow type fill dam using crest pavement and intermediate channel
KR101367937B1 (en) Device for increasing infiltration of water permeability paving material
KR101281422B1 (en) Open type waterway
KR100502111B1 (en) Underground Dam Structure having Gate for Controlling the Ground Water Level
KR100696068B1 (en) Facilities for guiding escape an animal of ground cutted area
KR200260051Y1 (en) A road with under water wasting structure in sides
KR20120121791A (en) Anti-overflow type fill dam using partial pavement slope and slope channel
Ukarande Spillways and Gates
KR20160000775U (en) A rain water treatment device for drain pipes

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant