KR102474426B1 - Finishing material for building ceiling - Google Patents

Finishing material for building ceiling Download PDF

Info

Publication number
KR102474426B1
KR102474426B1 KR1020200096162A KR20200096162A KR102474426B1 KR 102474426 B1 KR102474426 B1 KR 102474426B1 KR 1020200096162 A KR1020200096162 A KR 1020200096162A KR 20200096162 A KR20200096162 A KR 20200096162A KR 102474426 B1 KR102474426 B1 KR 102474426B1
Authority
KR
South Korea
Prior art keywords
fixing
body plate
close contact
vertical
building
Prior art date
Application number
KR1020200096162A
Other languages
Korean (ko)
Other versions
KR20220015746A (en
Inventor
유재욱
Original Assignee
유재욱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유재욱 filed Critical 유재욱
Priority to KR1020200096162A priority Critical patent/KR102474426B1/en
Publication of KR20220015746A publication Critical patent/KR20220015746A/en
Application granted granted Critical
Publication of KR102474426B1 publication Critical patent/KR102474426B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/065Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members comprising supporting beams having a folded cross-section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0435Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having connection means at the edges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0457Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having closed internal cavities

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

본 발명은 건축물에 전달되는 진동이나 충격과 같은 외력 및 하중에 의해 제2마감부재의 수직부의 사이가 벌어지는 것을 막아서, 천장에 설치된 원래 위치에서 벗어나거나 이탈하지 않도록 해주는 건축물 천장용 마감재에 관한 것으로써, 더욱 상세하게는 고정부재를 통해 건축물의 천장에 미리 정해진 간격으로 설치되는 제1마감부재와;, 제1간격 유지부재를 통해 다수의 제1마감부재의 길이 방향을 따라 미리 정해진 간격으로 설치되는 제2마감부재를 포함하며, 제1마감부재는 고정부재에 설치되며, 길이 방향으로 길이가 길고, 길이 방향을 따라 미리 정해진 간격으로 관통구멍을 외면에 형성한 몸체 판과;, 몸체 판의 양쪽을 서로 마주보도록 절곡 형성한 경사부를 포함하고, 제2마감부재는 길이 방향으로 길이가 긴 몸체 판과;, 몸체 판의 양쪽을 서로 마주보도록 절곡 형성한 수직부와;, 수직부의 한쪽을 몸체 판을 향해 절곡 형성한 걸림부와;, 수직부와 걸림부의 사이에 형성되는 삽입홈을 포함하며, 제1간격 유지부재는 경사부 및 걸림부에 밀착되며, 양쪽을 서로 마주보도록 절곡하여 수직부에 밀착되는 지지부를 형성하고, 지지부의 사이로 관통구멍을 외면에 형성한 제1고정판과;, 수직부 사이로 삽입되어 걸림부에 밀착되며, 양쪽을 서로 마주보도록 절곡하여 수직부 및 걸림부에 밀착되면서 삽입홈에 삽입되는 지지부를 형성하고, 지지부의 사이로 관통구멍을 외면에 형성한 제2고정판과;, 관통구멍을 관통하면서 제2고정판에 머리부가 밀착되는 고정볼트와;, 제1고정판에 밀착되도록 고정볼트의 수나사부에 체결되어, 지지부의 사이에 수직부를 밀착시켜 고정하면서 제1고정판 및 제2고정판의 사이에 걸림부를 밀착시켜 고정해주는 제1너트와;, 몸체 판에 밀착되도록 고정볼트의 수나사부에 체결되어 고정볼트를 몸체 판에 고정해주는 제2너트를 포함하며, 수직부의 사이의 간격은 수직부가 제1간격 유지부재의 지지부에 지지되어 유지되는 것을 특징으로 하는 건축물 천장용 마감재에 관한 것이다.The present invention relates to a finishing material for the ceiling of a building that prevents the vertical portion of the second finishing member from widening due to an external force and load such as vibration or shock transmitted to the building, thereby preventing it from moving or leaving the original position installed on the ceiling. , More specifically, a first closure member installed at predetermined intervals on the ceiling of a building through a fixing member; and a first closure member installed at predetermined intervals along the longitudinal direction of a plurality of first closure members through a first interval maintaining member. It includes a second closure member, the first closure member is installed on the fixing member, is long in the longitudinal direction, and has through holes formed on the outer surface at predetermined intervals along the longitudinal direction; a body plate; both sides of the body plate Including an inclined portion bent to face each other, and the second finishing member is a long body plate in the longitudinal direction; a vertical portion formed by bending both sides of the body plate to face each other; and one side of the vertical portion to the body plate. and an insertion groove formed between the vertical portion and the engaging portion, and the first distance maintaining member is in close contact with the inclined portion and the engaging portion, and bends both sides to face each other to form a vertical portion. A first fixing plate having a support portion in close contact with each other and having a through hole formed on the outer surface between the support portions; inserted between the vertical portions and closely attached to the hooking portion, and bent both sides to face each other to be inserted while being in close contact with the vertical portion and the hanging portion A second fixing plate having a support portion inserted into the groove and having a through hole formed on the outer surface between the support portions; a fixing bolt penetrating the through hole and having a head in close contact with the second fixing plate; and fixed to be in close contact with the first fixing plate. A first nut that is fastened to the male threaded portion of the bolt and fixes the vertical portion by closely contacting it between the support portions and fixing the engaging portion between the first fixing plate and the second fixing plate; It is fastened to and includes a second nut for fixing the fixing bolt to the body plate, and the distance between the vertical parts relates to a finishing material for building ceilings, characterized in that the vertical parts are supported and maintained by the support part of the first distance maintaining member.

Description

건축물 천장용 마감재{Finishing material for building ceiling}Finishing material for building ceiling {Finishing material for building ceiling}

본 발명은 건축물 천장용 마감재에 관한 것으로써, 특히 건축물에 전달되는 진동이나 충격과 같은 외력 및 하중에 의해 제2마감부재의 수직부의 사이가 벌어지는 것을 막아서, 천장에 설치된 원래 위치에서 벗어나거나 이탈하지 않도록 해주는 건축물 천장용 마감재에 관한 것이다.The present invention relates to a finishing material for the ceiling of a building, and in particular, prevents the vertical portion of the second finishing member from widening due to an external force and load such as vibration or impact transmitted to the building, so that it does not deviate from the original position installed on the ceiling. It is about a finishing material for the ceiling of a building that prevents

일반적으로, 천장 마감재는 건축물의 천장에 간편한게 연속적으로 연결되어 시공되도록 제작되어 왔으며, 건축물의 천장에 부착시공되어 건축물의 천장을 미려하게 하였다.In general, ceiling finishing materials have been manufactured to be conveniently and continuously connected to the ceiling of a building, and are attached to the ceiling of a building to make the ceiling of the building beautiful.

즉, 건축물의 내부 인테리어 효과를 천장 마감재로 부각하였다.In other words, the interior interior effect of the building was highlighted as a ceiling finishing material.

하지만, 천장 마감재는 안전상 천장에 안정적으로 고정되어야 했었다.However, the ceiling finish had to be stably fixed to the ceiling for safety reasons.

이와 관련하여, 특허문헌1은 지지빔에 체결되는 복수의 체결공이 형성된 수평부와, 수평부의 양측에서 하부로 절곡연장되는 측벽부와, 측벽부에 길이방향으로 일정한 간격을 두고 형성되는 것으로 양단에 걸림홈을 갖는 절곡가능한 복수의 걸림편이 일체로 구성된 연결부재와; 실내의 하부로 노출되는 수평부와, 수평부의 양측에서 상부로 절곡연장되어 상호 멀어지는 방향으로 탄성을 유지하는 측벽부와, 측벽부의 상부에는 수평방향 내측으로 절곡되어 상기 걸림홈에 걸리는 걸림턱이 일체로 구성된 루바부재로 이루어진 상기 걸림편의 양측에는 각각 절곡가능하게 형성되는 루바부재의 측벽부의 후면을 지지하는 이탈방지편이 일체로 구성된 것을 특징으로 하는 천장용 스크린 루바 고정구조를 제공하였다.In this regard, Patent Document 1 is a horizontal portion formed with a plurality of fastening holes fastened to the support beam, a side wall portion bent downward from both sides of the horizontal portion, and a side wall portion formed at regular intervals in the longitudinal direction at both ends. A connecting member integrally composed of a plurality of bendable hooking pieces having a hooking groove; A horizontal part exposed to the lower part of the room, a side wall part that is bent and extended upward from both sides of the horizontal part and maintains elasticity in a direction away from each other, and a locking jaw bent inward in the horizontal direction at the top of the side wall part and caught in the locking groove is integrated. Provided a ceiling screen louver fixing structure, characterized in that the anti-separation pieces supporting the rear surface of the side wall portion of the loubar member formed to be bendable are integrally formed on both sides of the locking piece made of a loubar member composed of.

하지만, 현재에는 특허문헌1과 다르게 루바부재가 연결부재에서 이탈하지 않도록 해주는 건축물 천장용 마감재를 요구하고 있는 실정이다.However, currently, unlike Patent Document 1, there is a demand for a finishing material for building ceilings that prevents the louver member from escaping from the connecting member.

특허문헌1 : 국내 공개실용신안 제20-2012-0004980호(2012.07.10. 공개.)Patent Document 1: Domestic Utility Model Publication No. 20-2012-0004980 (published on July 10, 2012.)

이에 본 발명은, 건축물에 전달되는 진동이나 충격과 같은 외력 및 하중에 의해 제2마감부재의 수직부의 사이가 벌어지는 것을 막아서, 천장에 설치된 원래 위치에서 벗어나거나 이탈하지 않도록 해주는 종래와 다른 건축물 천장용 마감재를 제공하는데 목적이 있다.Therefore, the present invention is for a ceiling of a building different from the prior art, which prevents the vertical portion of the second finishing member from widening due to an external force and load such as vibration or shock transmitted to the building, so that it does not deviate from or escape from the original position installed on the ceiling. Its purpose is to provide a finishing material.

상기와 같은 목적을 달성하기 위해 본 발명은, 고정부재를 통해 건축물의 천장에 설치되는 건축물 천장용 마감재에 있어서, 고정부재를 통해 건축물의 천장에 미리 정해진 간격으로 설치되는 제1마감부재와;, 제1간격 유지부재를 통해 다수의 제1마감부재의 길이 방향을 따라 미리 정해진 간격으로 설치되는 제2마감부재를 포함하며, 제1마감부재는 고정부재에 설치되며, 길이 방향으로 길이가 길고, 길이 방향을 따라 미리 정해진 간격으로 관통구멍을 외면에 형성한 몸체 판과;, 몸체 판의 양쪽을 서로 마주보도록 절곡 형성한 경사부를 포함하고, 제2마감부재는 길이 방향으로 길이가 긴 몸체 판과;, 몸체 판의 양쪽을 서로 마주보도록 절곡 형성한 수직부와;, 수직부의 한쪽을 몸체 판을 향해 절곡 형성한 걸림부와;, 수직부와 걸림부의 사이에 형성되는 삽입홈을 포함하며, 제1간격 유지부재는 경사부 및 걸림부에 밀착되며, 양쪽을 서로 마주보도록 절곡하여 수직부에 밀착되는 지지부를 형성하고, 지지부의 사이로 관통구멍을 외면에 형성한 제1고정판과;, 수직부 사이로 삽입되어 걸림부에 밀착되며, 양쪽을 서로 마주보도록 절곡하여 수직부 및 걸림부에 밀착되면서 삽입홈에 삽입되는 지지부를 형성하고, 지지부의 사이로 관통구멍을 외면에 형성한 제2고정판과;, 관통구멍을 관통하면서 제2고정판에 머리부가 밀착되는 고정볼트와;, 제1고정판에 밀착되도록 고정볼트의 수나사부에 체결되어, 지지부의 사이에 수직부를 밀착시켜 고정하면서 제1고정판 및 제2고정판의 사이에 걸림부를 밀착시켜 고정해주는 제1너트와;, 몸체 판에 밀착되도록 고정볼트의 수나사부에 체결되어 고정볼트를 몸체 판에 고정해주는 제2너트를 포함하며, 수직부의 사이의 간격은 수직부가 제1간격 유지부재의 지지부에 지지되어 유지되는 것을 특징으로 하는 건축물 천장용 마감재를 제공한다.In order to achieve the above object, the present invention is a finishing material for building ceilings installed on the ceiling of a building through a fixing member, a first finishing member installed on the ceiling of a building at predetermined intervals through a fixing member; It includes a second closure member installed at predetermined intervals along the longitudinal direction of the plurality of first closure members through the first interval maintaining member, the first closure member is installed on the fixing member, and is long in the longitudinal direction, A body plate having through-holes formed on the outer surface at predetermined intervals along the longitudinal direction; and a slope formed by bending both sides of the body plate to face each other, and the second closing member includes a body plate long in the longitudinal direction and A vertical portion formed by bending both sides of the body plate to face each other; A hooking portion formed by bending one side of the vertical portion toward the body plate; An insertion groove formed between the vertical portion and the hanging portion, The one-space maintaining member is in close contact with the inclined part and the hanging part, and bends both sides to face each other to form a support part in close contact with the vertical part, and a first fixing plate having a through hole formed on the outer surface between the support parts; and between the vertical parts A second fixing plate having a through hole formed on an outer surface between the support parts, forming a support portion inserted into the insertion groove while being inserted into the locking portion and being in close contact with each other by bending both sides to face each other while being in close contact with the vertical portion and the holding portion; A fixing bolt through which the head part is in close contact with the second fixing plate while penetrating the hole; fastened to the male threaded part of the fixing bolt so as to be in close contact with the first fixing plate, and fixing the vertical part between the support parts in close contact with the first fixing plate and the second fixing plate. A first nut that fixes the locking part in close contact with the body plate; and a second nut that is fastened to the male threaded part of the fixing bolt so as to be in close contact with the body plate and fixes the fixing bolt to the body plate. It provides a finishing material for building ceilings, characterized in that supported and maintained by the support of the first distance maintaining member.

본 발명은 제2마감부재가 제1간격 유지부재를 통해 제1마감부재에 설치되면서, 제2마감부재의 수직부가 제1간격 유지부재의 지지부에 양쪽이 지지되어 수직부의 사이의 간격이 유지되는 효과가 있다.In the present invention, while the second finishing member is installed on the first finishing member through the first spacing maintaining member, both sides of the vertical portion of the second finishing member are supported by the support portion of the first spacing maintaining member, so that the distance between the vertical portions is maintained. It works.

또한, 제2마감부재의 걸림부가 제1,2고정판에 압착되면서 제2고정판의 지지부에 걸려서 고정되기 때문에, 제2마감부재가 제1마감부재에 안정적으로 고정되는 효과가 있다.In addition, since the hooking portion of the second closing member is clamped to the first and second fixing plates while being hooked and fixed to the support portion of the second fixing plate, the second closing member has an effect of being stably fixed to the first closing member.

또한, 제2간격 유지부재가 제2마감부재의 길이 방향의 개방된 양쪽에 더 설치되어, 수직부의 사이의 간격을 더 유지해주는 효과가 있다.In addition, the second distance maintaining member is further installed on both sides of the open longitudinal direction of the second closing member, there is an effect of further maintaining the distance between the vertical parts.

즉, 건축물에 전달되는 진동이나 충격과 같은 외력 및 하중에 의해 제2마감부재의 수직부의 사이가 벌어지는 것을 막아서, 천장에 설치된 원래 위치에서 벗어나거나 이탈하지 않도록 해주는 효과가 있다.That is, by preventing the vertical portion of the second finishing member from widening due to external force and load such as vibration or shock transmitted to the building, there is an effect of preventing or leaving the original position installed on the ceiling.

다시 말해, 건축물의 천장에서 제2마감부재가 추락하는 것을 막아주는 효과가 있다.In other words, there is an effect of preventing the second finishing member from falling from the ceiling of the building.

본 발명은 제2마감부재의 수직부 양쪽이 제2간격 유지부재의 끼움부 및 제2지지부에 더 지지되기 때문에, 건축물에 전달되는 진동이나 충격과 같은 외력 및 하중에 의해 수직부의 사이가 더 벌어지지 않도록 해주는 효과가 있다.In the present invention, since both sides of the vertical part of the second finishing member are further supported by the fitting part and the second support part of the second distance maintaining member, the vertical part is further widened due to external forces and loads such as vibration or shock transmitted to the building. It has the effect of preventing you from falling.

본 발명은 다수의 제2마감부재의 수직부 길이가 동일하게 형성되기 때문에, 다수의 몸체 판이 건축물의 천장에서 평평하게 돌출되는 효과가 있다.In the present invention, since the vertical portions of the plurality of second finishing members are formed to have the same length, a plurality of body plates protrude flatly from the ceiling of the building.

본 발명은 다수의 제2마감부재 일부의 수직부 길이가 나머지 제2마감부재 수직부의 길이보다 길게 형성되기 때문에, 다수의 몸체 판이 건축물의 천장에서 울퉁불퉁하게 돌출되는 효과가 있다.In the present invention, since the length of the vertical portion of some of the plurality of second closure members is longer than the length of the other vertical portion of the second closure member, there is an effect that the plurality of body plates protrude unevenly from the ceiling of the building.

본 발명은 제2마감부재를 제1마감부재에 고정하기 전에 제1고정판을 고정볼트를 중심으로 회전시킬 수 있기 때문에, 다수의 제2마감부재 전체 또는 일부를 제1간격 유지부재를 통해 다수의 제1마감부재의 길이 방향을 따라 기울여서 설치할 수 있는 효과가 있다.Since the present invention can rotate the first fixing plate around the fixing bolt before fixing the second closure member to the first closure member, all or part of the plurality of second closure members through the first distance maintaining member There is an effect that can be installed by tilting along the longitudinal direction of the first finishing member.

즉, 제1간격 유지부재를 통해 다수의 제2마감부재 전체 또는 일부를 회전시켜서 제1마감부재에 설치할 수 있는 효과가 있다.That is, there is an effect that can be installed on the first closing member by rotating all or part of the plurality of second closing members through the first gap maintaining member.

도 1 내지 도 3은 본 발명의 실시예를 따른 건축물 천장용 마감재의 설치 상태도,
도 4 내지 도 10은 본 발명의 실시예를 따른 건축물 천장용 마감재의 부분확대도 및 상세도,
도 11은 본 발명의 다른 실시예를 따른 건축물 천장용 마감재의 설치 상태도,
도 12 및 도 13은 본 발명의 또 다른 실시예를 따른 건축물 천장용 마감재의 설치 상태도이다.
1 to 3 are installation state diagrams of finishing materials for building ceilings according to an embodiment of the present invention;
4 to 10 are partially enlarged and detailed views of the finishing material for the ceiling of a building according to an embodiment of the present invention;
11 is an installation state diagram of a finishing material for a ceiling of a building according to another embodiment of the present invention;
12 and 13 are installation state diagrams of finishing materials for building ceilings according to another embodiment of the present invention.

이에, 상기한 바와 같은 본 발명의 다양한 실시예를 첨부도면에 의거하여 상세히 설명하면 다음과 같다.Accordingly, various embodiments of the present invention as described above will be described in detail based on the accompanying drawings.

도 1 내지 도 13에 도시된 바와 같이, 본 발명의 다양한 실시예를 따른 건축물 천장용 마감재(1000)는 건축물의 천장(2)을 마감하기 위해, 상기 건축물의 천장(2)에 다수 설치된 고정부재(1)에 설치된다.As shown in FIGS. 1 to 13, the finishing material 1000 for ceiling of a building according to various embodiments of the present invention includes a plurality of fixing members installed on the ceiling 2 of the building to finish the ceiling 2 of the building. (1) is installed.

그리고, 도 1 내지 도 10에 도시된 바와 같이, 본 발명의 실시예를 따른 상기 건축물 천장용 마감재(1000)는 고정부재(1)를 통해 건축물의 천장(2)에 미리 정해진 간격 즉, 일정한 간격으로 설치되는 제1마감부재(100)와;, 제1간격 유지부재(300)를 통해 다수의 상기 제1마감부재(100)의 길이 방향을 따라 미리 정해진 간격 즉, 일정한 간격으로 설치되는 제2마감부재(200)가 포함된다.And, as shown in FIGS. 1 to 10, the building ceiling finishing material 1000 according to the embodiment of the present invention is attached to the ceiling 2 of the building through the fixing member 1 at a predetermined interval, that is, at a regular interval. A first finishing member 100 installed as; a second installed at predetermined intervals, that is, at regular intervals along the longitudinal direction of the plurality of first finishing members 100 through the first spacing maintaining member 300; The closing member 200 is included.

여기서, 상기 고정부재(1)는 건축물의 천장(2)에 고정못 등과 같은 체결부재로 체결되어 설치되는 수직프레임과;, 제1마감부재(100)의 사이가 연결되도록 상기 제1마감부재(100)의 상부면에 고정못 등과 같은 체결부재로 체결되어 설치되면서, 수직프레임에 고정못 등과 같은 체결부재로 체결되어 설치되는 수평프레임 등이 포함된다.Here, the fixing member 1 is a vertical frame fastened to the ceiling 2 of the building with a fastening member such as a fixing nail and installed; 100) includes a horizontal frame that is fastened to and installed with a fastening member such as a fixing nail on the upper surface of the vertical frame and installed with a fastening member such as a fixing nail.

또한, 상기 제1,2마감부재(100)(200) 및 제1간격 유지부재(300)는 금속 재질로 이루어진다. In addition, the first and second closing members 100 and 200 and the first spacing maintaining member 300 are made of a metal material.

그리고, 상기 제1마감부재(100)는 고정부재(1)에 설치되며, 길이 방향으로 길이가 길고, 길이 방향을 따라 미리 정해진 간격 즉, 일정한 간격으로 관통구멍(111)을 외면에 형성한 몸체 판(110)과;, 상기 몸체 판(110)의 양쪽을 서로 마주보도록 경사지게 절곡 형성한 경사부(120)가 포함된다.In addition, the first finishing member 100 is installed on the fixing member 1, is long in the longitudinal direction, and has through holes 111 formed on the outer surface at predetermined intervals along the longitudinal direction, that is, at regular intervals. A plate 110; and an inclined portion 120 formed by bending both sides of the body plate 110 at an angle to face each other are included.

여기서, 상기 몸체 판(110)과 경사부(120) 사이의 각도는 둔각으로 형성된다.Here, the angle between the body plate 110 and the inclined portion 120 is formed as an obtuse angle.

그리고, 상기 제2마감부재(200)는 길이 방향으로 길이가 긴 몸체 판(210)과;, 상기 몸체 판(210)의 양쪽을 서로 마주보도록 수직으로 절곡 형성한 수직부(220)와;, 상기 수직부(220)의 한쪽을 몸체 판(210)을 향해 경사지게 절곡 형성한 걸림부(230)와;, 상기 수직부(220)와 걸림부(230)의 사이에 형성되는 삽입홈(240)이 포함된다.In addition, the second closing member 200 includes a body plate 210 long in the longitudinal direction; a vertical portion 220 vertically bent to face each other on both sides of the body plate 210; An insertion groove 240 formed between the vertical portion 220 and the hanging portion 230; This is included.

여기서, 상기 수직부(220)와 걸림부(230) 사이의 각도는 예각으로 형성된다.Here, the angle between the vertical part 220 and the hanging part 230 is formed as an acute angle.

또한, 다수의 상기 제2마감부재(200)는 수직부(220)의 길이가 동일하게 형성된다.In addition, in the plurality of second closure members 200, the length of the vertical portion 220 is the same.

그리고, 상기 제1간격 유지부재(300)는 경사부(120) 및 걸림부(230)에 밀착되며, 양쪽을 서로 마주보도록 수직으로 절곡하여 수직부(220)에 밀착되는 지지부(311)를 형성하고, 상기 지지부(311)의 사이로 관통구멍(312)을 외면에 형성한 제1고정판(310)과;, 상기 수직부(220) 사이로 삽입되어 걸림부(230)에 밀착되며, 양쪽을 서로 마주보도록 경사지게 절곡하여 상기 수직부(220) 및 걸림부(230)에 밀착되면서 삽입홈(240)에 삽입되는 지지부(321)를 형성하고, 상기 지지부(321)의 사이로 관통구멍(322)을 외면에 형성한 제2고정판(320)과;, 상기 관통구멍(111)(312)(322)을 관통하면서 제2고정판(320)에 머리부(331)가 밀착되는 고정볼트(330)와;, 상기 제1고정판(310)에 밀착되도록 고정볼트(330)의 수나사부(332)에 체결되어, 지지부(311)(321)의 사이에 수직부(220)를 밀착시켜 고정하면서 상기 제1고정판(310) 및 제2고정판(320)의 사이에 걸림부(230)를 밀착시켜 고정해주는 제1너트(340)와;, 상기 몸체 판(110)에 밀착되도록 고정볼트(330)의 수나사부(332)에 체결되어 상기 고정볼트(330)를 몸체 판(110)에 고정해주는 제2너트(350)가 포함된다.In addition, the first distance maintaining member 300 is in close contact with the inclined part 120 and the hanging part 230, and both sides are vertically bent to face each other to form a support part 311 in close contact with the vertical part 220. and a first fixing plate 310 having through-holes 312 formed on the outer surface between the support parts 311; inserted between the vertical parts 220 and brought into close contact with the hooking part 230, both sides facing each other. It is bent obliquely to form a support part 321 inserted into the insertion groove 240 while being in close contact with the vertical part 220 and the hanging part 230, and a through hole 322 between the support parts 321 is formed on the outer surface. The formed second fixing plate 320; and a fixing bolt 330 through which the head part 331 adheres to the second fixing plate 320 while passing through the through holes 111, 312, and 322; It is fastened to the male threaded portion 332 of the fixing bolt 330 so as to be in close contact with the first fixing plate 310, and while fixing the vertical portion 220 in close contact between the support portions 311 and 321, the first fixing plate 310 ) and the second fixing plate 320, and the first nut 340 for fixing the hooking part 230 in close contact with each other; and the male screw part 332 of the fixing bolt 330 so as to be in close contact with the body plate 110 A second nut 350 which is fastened to and fixes the fixing bolt 330 to the body plate 110 is included.

여기서, 상기 제1,2고정판(310)(320)은 제2마감부재(200)의 몸체 판(210)보다 길이 방향으로 길이가 짧도록 형성된다.Here, the first and second fixing plates 310 and 320 are formed to be shorter in length than the body plate 210 of the second finishing member 200 in the longitudinal direction.

또한, 상기 제1간격 유지부재(300)는 고정볼트(330)의 수나사부(332)에 체결되는 제1,2너트(340)(350)의 풀림을 방지하는 와셔 등이 포함될 수 있다.In addition, the first distance maintaining member 300 may include a washer or the like to prevent loosening of the first and second nuts 340 and 350 fastened to the male threaded portion 332 of the fixing bolt 330 .

또한, 상기 제2고정판(320)과 지지부(321) 사이의 각도는 둔각으로 형성된다.In addition, the angle between the second fixing plate 320 and the support part 321 is formed as an obtuse angle.

그리고, 상기 건축물 천장용 마감재(1000)는 제2마감부재(200)의 길이 방향의 개방된 양쪽에 설치되어, 수직부(220)의 사이의 간격을 유지해주는 제2간격 유지부재(400)가 포함된다.In addition, the building ceiling finishing material 1000 is installed on both open sides of the second finishing member 200 in the longitudinal direction, and the second spacing maintaining member 400 maintaining the spacing between the vertical parts 220 included

여기서, 상기 제2간격 유지부재(400)는 금속 재질로 이루어진다.Here, the second distance maintaining member 400 is made of a metal material.

그리고, 상기 제2간격 유지부재(400)는 몸체 판(210) 및 수직부(220) 및 걸림부(230)에 밀착되는 몸체 판(410)과;, 상기 몸체 판(410)의 한쪽 일부를 절단하면서 절곡 형성한 돌출부(420) 및 상기 돌출부(420)의 양쪽에서 경사지게 돌출 형성되어 삽입홈(240)에 끼워지는 끼움부(430)와;, 상기 몸체 판(410)의 반대편 한쪽을 몸체 판(210)에 밀착되도록 수직으로 절곡 형성한 제1지지부(440)와;, 상기 몸체 판(410)의 나머지 양쪽을 수직부(220)에 밀착되도록 서로 마주보게 수직으로 절곡 형성한 제2지지부(450)가 포함된다.In addition, the second distance maintaining member 400 includes a body plate 410 in close contact with the body plate 210, the vertical part 220, and the hanging part 230; and one part of the body plate 410. The protruding part 420 bent while cutting and the fitting part 430 protruding obliquely from both sides of the protruding part 420 and inserted into the insertion groove 240; and the opposite side of the body plate 410 to the body plate A first support part 440 bent vertically to be in close contact with the body plate 410; and a second support part vertically bent to face each other so that the remaining both sides of the body plate 410 are in close contact with the vertical part 220 ( 450) are included.

여기서, 상기 돌출부(420)는 몸체 판(410)의 한쪽에서 수직으로 절곡 형성되고, 상기 돌출부(420)의 한쪽은 경사지게 절곡 형성된다.Here, the protruding portion 420 is vertically bent on one side of the body plate 410, and one side of the protruding portion 420 is formed obliquely.

또한, 상기 돌출부(420)와, 경사지게 절곡 형성된 상기 돌출부(420)의 한쪽 사이의 각도는 둔각으로 형성된다.In addition, an angle between the protrusion 420 and one side of the obliquely bent protrusion 420 is formed as an obtuse angle.

또한, 상기 몸체 판(410)은 돌출부(420) 및 끼움부(430) 및 제1,2지지부(440)(450)를 형성하기 전에 모서리가 절단된 형태를 가진다.In addition, the body plate 410 has a shape in which corners are cut before forming the protruding portion 420, the fitting portion 430, and the first and second support portions 440 and 450.

또한, 상기 몸체 판(410)의 길이는 수직부(220)의 길이에 대응하도록 형성된다.In addition, the length of the body plate 410 is formed to correspond to the length of the vertical portion 220.

그래서, 본 발명의 실시예를 따른 상기 건축물 천장용 마감재(1000)는 도 1 내지 도 10에 도시된 바와 같이, 다수의 제1마감부재(100)를 고정부재(1)를 통해 건축물의 천장(2)에 미리 정해진 간격으로 설치한다.So, the building ceiling finishing material 1000 according to an embodiment of the present invention, as shown in FIGS. 2) at predetermined intervals.

여기서, 상기 몸체 판(110)은 고정부재(1)에 체결부재로 체결된다.Here, the body plate 110 is fastened to the fixing member 1 as a fastening member.

그리고, 상기 제1간격 유지부재(300)의 제1고정판(310)을 제1마감부재(100)의 경사부(120)에 밀착시켜서, 상기 제1고정판(310)의 관통구멍(312)과 몸체 판(110)의 관통구멍(111)을 수직 방향으로 동일선상에 위치시킨다.In addition, by bringing the first fixing plate 310 of the first distance maintaining member 300 into close contact with the inclined portion 120 of the first finishing member 100, the through hole 312 of the first fixing plate 310 and The through holes 111 of the body plate 110 are positioned on the same line in the vertical direction.

그 다음, 상기 제2마감부재(200)의 수직부(220)를 제1고정판(310)의 지지부(311) 사이로 삽입시켜 상기 지지부(311)에 밀착시키고, 상기 제2마감부재(200)의 걸림부(230)를 제1고정판(310)에 밀착시킨다.Then, the vertical portion 220 of the second closure member 200 is inserted between the support portions 311 of the first fixing plate 310 to adhere to the support portion 311, and the second closure member 200 The clasp 230 is brought into close contact with the first fixing plate 310 .

여기서, 상기 제1고정판(310)의 지지부(311)는 수직부(220)의 바깥쪽에 밀착된다.Here, the support part 311 of the first fixing plate 310 is in close contact with the outside of the vertical part 220 .

그리고, 상기 제1간격 유지부재(300)의 제2고정판(320)을 제2마감부재(200)의 수직부(220)의 사이로 삽입시키면서, 상기 제2고정판(320)의 지지부(321)를 제2마감부재(200)의 삽입홈(240)에 삽입시킨다.And, while inserting the second fixing plate 320 of the first distance maintaining member 300 between the vertical parts 220 of the second finishing member 200, the support part 321 of the second fixing plate 320 It is inserted into the insertion groove 240 of the second finishing member 200.

여기서, 상기 제2고정판(320) 및 지지부(321)는 걸림부(230)에 밀착된다.Here, the second fixing plate 320 and the support part 321 are in close contact with the hooking part 230 .

또한, 상기 지지부(321)는 수직부(220)의 안쪽에 밀착된다.In addition, the support part 321 is in close contact with the inside of the vertical part 220 .

또한, 상기 제2고정판(320)의 관통구멍(322)은 제1고정판(310)의 관통구멍(312) 및 몸체 판(110)의 관통구멍(111)과 함께 수직 방향으로 동일선상에 위치된다.In addition, the through hole 322 of the second fixing plate 320 is located on the same line in the vertical direction with the through hole 312 of the first fixing plate 310 and the through hole 111 of the body plate 110. .

그 다음, 상기 수나사부(332)가 형성된 고정볼트(330)의 한쪽으로 순차적으로 제2고정판(320)의 관통구멍(322) 및 제1고정판(310)의 관통구멍(312)을 관통시킨 후, 제1너트(340)를 상기 제1고정판(310)의 위에 위치되도록 상기 고정볼트(330)의 수나사부(332)에 체결시킨다. Then, after sequentially passing through the through hole 322 of the second fixing plate 320 and the through hole 312 of the first fixing plate 310 to one side of the fixing bolt 330 on which the male screw portion 332 is formed, , Fasten the first nut 340 to the male threaded portion 332 of the fixing bolt 330 so as to be positioned on the first fixing plate 310 .

그리고, 상기 고정볼트(330)의 머리부(331)를 제2고정판(320)에 밀착시키면서 상기 고정볼트(330)로 몸체 판(110)의 관통구멍(111)을 관통시키고, 제1너트(340)를 제1고정판(310)에 밀착되도록 상기 고정볼트(330)의 수나사부(332)에 체결시킨다.Then, while the head 331 of the fixing bolt 330 is in close contact with the second fixing plate 320, the fixing bolt 330 passes through the through hole 111 of the body plate 110, and the first nut ( 340) is fastened to the male threaded portion 332 of the fixing bolt 330 so as to come into close contact with the first fixing plate 310.

그리고 나서, 상기 제2너트(350)를 고정볼트(330)의 수나사부(332)에 체결시켜서 몸체 판(110)에 밀착시킨다.Then, the second nut 350 is fastened to the male threaded portion 332 of the fixing bolt 330 to bring it into close contact with the body plate 110 .

그러면, 상기 지지부(311)(321)의 사이에 수직부(220)가 밀착되어서 고정되고, 제1고정판(310) 및 제2고정판(320)의 사이에 걸림부(230)가 밀착되어서 고정되며, 몸체 판(110)에 제2너트(350)가 밀착되어서 고정볼트(330)가 몸체 판(110)에 고정된다.Then, the vertical part 220 is in close contact with and fixed between the support parts 311 and 321, and the hooking part 230 is in close contact with and fixed between the first fixing plate 310 and the second fixing plate 320, , The second nut 350 is in close contact with the body plate 110, and the fixing bolt 330 is fixed to the body plate 110.

여기서, 상기 수직부(220)의 양쪽은 제1,2고정판(310)(320)의 지지부(311)(321)에 지지된다.Here, both sides of the vertical part 220 are supported by the support parts 311 and 321 of the first and second fixing plates 310 and 320 .

또한, 상기 제2마감부재(200)의 걸림부(230)는 상,하부가 제1,2고정판(310)(320)에 압착되며, 상기 제1고정판(310)의 상,하부도 제1마감부재(100)의 경사부(120) 및 제2마감부재(200)의 걸림부(230)에 압착된다.In addition, the upper and lower portions of the hooking portion 230 of the second finishing member 200 are pressed against the first and second fixing plates 310 and 320, and the upper and lower portions of the first fixing plate 310 are also first The slanted portion 120 of the finishing member 100 and the engaging portion 230 of the second finishing member 200 are compressed.

또한, 상기 걸림부(230)는 지지부(321)에 밀착되면서 걸리게 된다.In addition, the hooking part 230 is caught while being in close contact with the support part 321 .

즉, 상기 제2마감부재(200)의 한쪽은 제1간격 유지부재(300)에 의해 제1마감부재(100)에 고정된다.That is, one side of the second closure member 200 is fixed to the first closure member 100 by the first distance maintaining member 300 .

그 다음, 상기 제2마감부재(200)의 반대편 한쪽도 제1간격 유지부재(300)를 통해 이웃한 다른 제1마감부재(100)에 고정시킨다.Then, the opposite side of the second closure member 200 is also fixed to the other adjacent first closure member 100 through the first distance maintaining member 300.

그리고, 상기 제2간격 유지부재(400)를 제2마감부재(200)의 길이 방향의 개방된 양쪽에 설치한다.Then, the second distance maintaining member 400 is installed on both sides of the second closing member 200 that is open in the longitudinal direction.

여기서, 상기 제2간격 유지부재(400)의 끼움부(430)는 제2마감부재(200)의 삽입홈(240)에 끼워지며, 상기 제2간격 유지부재(400)의 몸체 판(410)은 제2마감부재(200)의 몸체 판(210) 및 수직부(220) 및 걸림부(230)에 밀착되고, 상기 제2간격 유지부재(400)의 제1,2지지부(440)(450)는 제2마감부재(200)의 몸체 판(210) 및 수직부(220)에 밀착된다.Here, the fitting part 430 of the second distance maintaining member 400 is inserted into the insertion groove 240 of the second finishing member 200, and the body plate 410 of the second distance maintaining member 400 The silver is in close contact with the body plate 210, the vertical part 220, and the hooking part 230 of the second finishing member 200, and the first and second support parts 440 and 450 of the second distance maintaining member 400 ) is in close contact with the body plate 210 and the vertical portion 220 of the second finishing member 200.

또한, 상기 제2마감부재(200)의 수직부(220) 양쪽 즉, 안쪽과 바깥쪽은 제2간격 유지부재(400)의 끼움부(430) 및 제2지지부(450)에 각각 지지된다.In addition, both sides of the vertical portion 220 of the second closing member 200, that is, the inner and outer sides are supported by the fitting portion 430 and the second support portion 450 of the second distance maintaining member 400, respectively.

또한, 상기 제2마감부재(200)의 몸체 판(210) 바깥쪽은 제2간격 유지부재(400)의 제1지지부(440)에 지지된다.In addition, the outer side of the body plate 210 of the second closing member 200 is supported by the first support part 440 of the second distance maintaining member 400.

또한, 상기 제2마감부재(200)의 길이 방향의 개방된 양쪽은 제2간격 유지부재(400)에 의해 폐쇄된다.In addition, both open sides of the second closing member 200 in the longitudinal direction are closed by the second distance maintaining member 400 .

그래서, 상기와 같은 방법으로, 다수의 상기 제2마감부재(200)를 제1간격 유지부재(300)를 통해 다수의 제1마감부재(100)의 길이 방향을 따라 미리 정해진 간격으로 설치한다.So, in the same way as described above, the plurality of second closure members 200 are installed at predetermined intervals along the longitudinal direction of the plurality of first closure members 100 through the first distance maintaining member 300.

즉, 다수의 상기 제2마감부재(200)를 다수의 제1마감부재(100)와 직교되도록 설치한다.That is, the plurality of second closure members 200 are installed to be orthogonal to the plurality of first closure members 100 .

다시 말해, 다수의 상기 제2마감부재(200)를 나란하게 설치한다.In other words, a plurality of second closure members 200 are installed side by side.

그래서, 본 발명의 실시예를 따른 상기 건축물 천장용 마감재(1000)는 건축물의 천장(2)에 설치된다.So, the building ceiling finishing material 1000 according to the embodiment of the present invention is installed on the ceiling 2 of the building.

그러면, 상기 제2마감부재(200)의 수직부(220) 양쪽은 제1간격 유지부재(300)의 지지부(311)(321)에 지지되기 때문에, 상기 수직부(220)의 사이는 벌어지지 않도록 간격이 유지된다.Then, since both sides of the vertical part 220 of the second finishing member 200 are supported by the support parts 311 and 321 of the first distance maintaining member 300, the space between the vertical parts 220 is not widened. spacing is maintained.

또한, 상기 제2마감부재(200)의 수직부(220) 양쪽은 제2간격 유지부재(400)의 끼움부(430) 및 제2지지부(450)에 더 지지되기 때문에, 상기 수직부(220)의 사이는 벌어지지 않도록 간격이 더 유지된다.In addition, since both sides of the vertical portion 220 of the second finishing member 200 are further supported by the fitting portion 430 and the second support portion 450 of the second distance maintaining member 400, the vertical portion 220 ), the interval is further maintained so that it does not widen.

그리고, 다수의 상기 제2마감부재(200)는 몸체 판(210)이 건축물의 천장(2)에서 동일하게 돌출된다.In addition, the body plate 210 of the plurality of second finishing members 200 equally protrudes from the ceiling 2 of the building.

그리고, 도 11에 도시된 바와 같이, 본 발명의 다른 실시예를 따른 상기 건축물 천장용 마감재(1000)의 다수의 제2마감부재(200) 일부는 수직부(220)의 길이가, 나머지 제2마감부재(200)의 수직부(220)의 길이보다 길게 형성된다.And, as shown in FIG. 11, some of the plurality of second finishing members 200 of the building ceiling finishing material 1000 according to another embodiment of the present invention have a length of the vertical portion 220, the remaining second It is formed longer than the length of the vertical portion 220 of the closing member 200.

그래서, 다수의 상기 제2마감부재(200) 일부는 몸체 판(210)이 건축물의 천장(2)에서, 나머지 제2마감부재(200)의 몸체 판(210)보다 더 돌출된다.Thus, the body plate 210 of some of the second closure members 200 protrudes more from the ceiling 2 of the building than the body plate 210 of the remaining second closure members 200 .

그리고, 도 12 및 도 13에 도시된 바와 같이, 본 발명의 또 다른 실시예를 따른 상기 건축물 천장용 마감재(1000)는 다수의 제1고정판(310) 전체 또는 일부를 고정볼트(330)을 중심으로 회전시킨 후 상기 고정볼트(330)의 수나사부(332)에 제1,2너트(340)(350)를 체결하여, 지지부(311)(321)의 사이에 수직부(220)를 밀착시켜 고정하고, 제1고정판(310) 및 제2고정판(320)의 사이에 걸림부(230)를 밀착시켜 고정하며, 고정볼트(330)를 몸체 판(110)에 고정한다.And, as shown in FIGS. 12 and 13, in the building ceiling finishing material 1000 according to another embodiment of the present invention, all or part of the plurality of first fixing plates 310 are centered around the fixing bolt 330. After rotating the fixing bolt 330, the first and second nuts 340 and 350 are fastened to the male threaded portion 332 of the fixing bolt 330, and the vertical portion 220 is brought into close contact between the support portions 311 and 321. and fixing the hooking part 230 between the first fixing plate 310 and the second fixing plate 320 in close contact, and fixing the fixing bolt 330 to the body plate 110.

그러면, 다수의 상기 제2마감부재(200) 전체 또는 일부는 제1간격 유지부재(300)를 통해 다수의 제1마감부재(100)의 길이 방향을 따라 기울어져서 설치된다.Then, all or part of the plurality of second closure members 200 are inclined along the longitudinal direction of the plurality of first closure members 100 through the first distance maintaining member 300 and installed.

즉, 도 12에 도시된 바와 같이, 다수의 상기 제2마감부재(200) 전체는 평면상 각각 어느 한쪽으로 기울어져서 설치된다.That is, as shown in FIG. 12, the entirety of the plurality of second closure members 200 are installed inclined to one side on a plane.

다시 말해, 다수의 상기 제2마감부재(200) 전체는 나란하게 설치되지 않는다.In other words, all of the plurality of second closure members 200 are not installed side by side.

또한, 도 13에 도시된 바와 같이, 다수의 상기 제2마감부재(200) 일부는 평면상 각각 어느 한쪽으로 기울어져서 설치되며, 나머지 다수의 제2마감부재(200)는 나란하게 설치된다.In addition, as shown in FIG. 13, some of the plurality of second closure members 200 are installed inclined to one side on a plane, and the remaining plurality of second closure members 200 are installed side by side.

이상에서는 본 발명을 특정의 바람직한 다양한 실시예를 들어 도시하고 설명하였으나, 본 발명은 상기한 다양한 실시예에 한정되지 아니하며 본 발명의 정신을 벗어나지 않는 범위 내에서 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자에 의해 다양한 변경과 수정이 가능할 것이다.In the above, the present invention has been shown and described with specific preferred various embodiments, but the present invention is not limited to the various embodiments described above and is common knowledge in the art to which the present invention pertains within the scope of not departing from the spirit of the present invention. Various changes and modifications will be possible by the person who has it.

100 : 제1마감부재 110 : 몸체 판
111 : 관통구멍 120 : 경사부
200 : 제2마감부재 210 : 몸체 판
220 : 수직부 230 : 걸림부
240 : 삽입홈 300 : 제1간격 유지부재
310 : 제1고정판 311 : 지지부
312 : 관통구멍 320 : 제2고정판
321 : 지지부 322 : 관통구멍
330 : 고정볼트 331 : 머리부
332 : 수나사부 340 : 제1너트
350 : 제2너트 400 : 제2간격 유지부재
410 : 몸체 판 420 : 돌출부
430 : 끼움부 440 : 제1지지부
450 : 제2지지부 1000 : 건축물 천장용 마감재
100: first finishing member 110: body plate
111: through hole 120: inclined portion
200: second finishing member 210: body plate
220: vertical part 230: hanging part
240: insertion groove 300: first gap maintaining member
310: first fixing plate 311: support
312: through hole 320: second fixing plate
321: support 322: through hole
330: fixing bolt 331: head
332: male screw part 340: first nut
350: second nut 400: second gap maintaining member
410: body plate 420: protrusion
430: fitting part 440: first support part
450: second support 1000: finishing material for building ceiling

Claims (6)

고정부재(1)를 통해 건축물의 천장(2)에 설치되는 건축물 천장용 마감재에 있어서,
상기 고정부재(1)를 통해 건축물의 천장(2)에 미리 정해진 간격으로 설치되는 제1마감부재(100)와;, 제1간격 유지부재(300)를 통해 다수의 상기 제1마감부재(100)의 길이 방향을 따라 미리 정해진 간격으로 설치되는 제2마감부재(200)를 포함하며,
상기 제1마감부재(100)는 고정부재(1)에 설치되며, 길이 방향으로 길이가 길고, 길이 방향을 따라 미리 정해진 간격으로 관통구멍(111)을 외면에 형성한 몸체 판(110)과;, 상기 몸체 판(110)의 양쪽을 서로 마주보도록 절곡 형성한 경사부(120)를 포함하고,
상기 제2마감부재(200)는 길이 방향으로 길이가 긴 몸체 판(210)과;, 상기 몸체 판(210)의 양쪽을 서로 마주보도록 절곡 형성한 수직부(220)와;, 상기 수직부(220)의 한쪽을 몸체 판(210)을 향해 절곡 형성한 걸림부(230)와;, 상기 수직부(220)와 걸림부(230)의 사이에 형성되는 삽입홈(240)을 포함하며,
상기 제1간격 유지부재(300)는 경사부(120) 및 걸림부(230)에 밀착되며, 양쪽을 서로 마주보도록 절곡하여 수직부(220)에 밀착되는 지지부(311)를 형성하고, 상기 지지부(311)의 사이로 관통구멍(312)을 외면에 형성한 제1고정판(310)과;, 상기 수직부(220) 사이로 삽입되어 걸림부(230)에 밀착되며, 양쪽을 서로 마주보도록 절곡하여 상기 수직부(220) 및 걸림부(230)에 밀착되면서 삽입홈(240)에 삽입되는 지지부(321)를 형성하고, 상기 지지부(321)의 사이로 관통구멍(322)을 외면에 형성한 제2고정판(320)과;, 상기 관통구멍(111)(312)(322)을 관통하면서 제2고정판(320)에 머리부(331)가 밀착되는 고정볼트(330)와;, 상기 제1고정판(310)에 밀착되도록 고정볼트(330)의 수나사부(332)에 체결되어, 지지부(311)(321)의 사이에 수직부(220)를 밀착시켜 고정하면서 상기 제1고정판(310) 및 제2고정판(320)의 사이에 걸림부(230)를 밀착시켜 고정해주는 제1너트(340)와;, 상기 몸체 판(110)에 밀착되도록 고정볼트(330)의 수나사부(332)에 체결되어 상기 고정볼트(330)를 몸체 판(110)에 고정해주는 제2너트(350)를 포함하며,
상기 수직부(220)의 사이의 간격은 상기 수직부(220)가 제1간격 유지부재(300)의 지지부(311)(321)에 지지되어 유지되고,
상기 제2마감부재(200)의 길이 방향의 개방된 양쪽에 설치되어, 수직부(220)의 사이의 간격을 유지해주는 제2간격 유지부재(400)를 포함하며,
상기 제2간격 유지부재(400)는 몸체 판(210) 및 수직부(220) 및 걸림부(230)에 밀착되는 몸체 판(410)과;, 상기 몸체 판(410)의 한쪽 일부를 절단하면서 절곡 형성한 돌출부(420) 및 상기 돌출부(420)의 양쪽에 경사지게 형성되어 삽입홈(240)에 끼워지는 끼움부(430)와;, 상기 몸체 판(410)의 반대편 한쪽을 몸체 판(210)에 밀착되도록 절곡 형성한 제1지지부(440)와;, 상기 몸체 판(410)의 나머지 양쪽을 수직부(220)에 밀착되도록 서로 마주보게 절곡 형성한 제2지지부(450)를 포함하는 것을 특징으로 하는 건축물 천장용 마감재.
In the finishing material for the ceiling of a building installed on the ceiling (2) of the building through the fixing member (1),
First closure members 100 installed at predetermined intervals on the ceiling 2 of the building through the fixing member 1; and a plurality of first closure members 100 through the first distance maintaining member 300 ) Including a second finishing member 200 installed at predetermined intervals along the length direction of,
The first closure member 100 is installed on the fixing member 1, has a long length in the longitudinal direction, and a body plate 110 having through holes 111 formed on the outer surface at predetermined intervals along the longitudinal direction; , Include an inclined portion 120 formed by bending both sides of the body plate 110 to face each other,
The second closure member 200 includes a body plate 210 long in the longitudinal direction; a vertical portion 220 formed by bending both sides of the body plate 210 to face each other; and the vertical portion ( 220) and a hooking portion 230 formed by bending one side toward the body plate 210; and an insertion groove 240 formed between the vertical portion 220 and the hanging portion 230,
The first distance maintaining member 300 is in close contact with the inclined part 120 and the hanging part 230, and both sides are bent to face each other to form a support part 311 in close contact with the vertical part 220, and the support part A first fixing plate 310 having a through hole 312 formed on the outer surface between 311; and inserted between the vertical parts 220 to be closely attached to the hooking part 230, and bent both sides to face each other, A second fixing plate having a support part 321 inserted into the insertion groove 240 while being in close contact with the vertical part 220 and the hanging part 230, and having through holes 322 formed on the outer surface between the support parts 321. (320), a fixing bolt (330) through which the head part (331) is in close contact with the second fixing plate (320) passing through the through holes (111, 312, and 322); and the first fixing plate (310). ) Is fastened to the male screw part 332 of the fixing bolt 330 so as to be in close contact with the first fixing plate 310 and the second fixing plate while fixing the vertical part 220 in close contact between the support parts 311 and 321. A first nut 340 that adheres and fixes the hooking part 230 between the 320; and is fastened to the male screw part 332 of the fixing bolt 330 so as to be in close contact with the body plate 110 to fix the fixing. It includes a second nut 350 fixing the bolt 330 to the body plate 110,
The distance between the vertical parts 220 is maintained by being supported by the support parts 311 and 321 of the first distance maintaining member 300,
It includes a second distance maintaining member 400 installed on both sides of the open lengthwise direction of the second closing member 200 to maintain a distance between the vertical parts 220,
The second distance maintaining member 400 includes a body plate 410 in close contact with the body plate 210, the vertical part 220, and the hanging part 230; while cutting one part of the body plate 410. The protruding portion 420 formed by bending and the fitting portion 430 formed obliquely on both sides of the protruding portion 420 and inserted into the insertion groove 240; characterized in that it includes a first support part 440 bent to be in close contact with the body plate 410 and a second support part 450 bent to face each other so that the remaining both sides of the body plate 410 are in close contact with the vertical part 220. Finishing materials for building ceilings made of
삭제delete 삭제delete 제1항에 있어서,
다수의 상기 제1고정판(310) 전체 또는 일부를 고정볼트(330)을 중심으로 회전시킨 후 상기 고정볼트(330)의 수나사부(332)에 제1,2너트(340)(350)를 체결하여, 지지부(311)(321)의 사이에 수직부(220)를 밀착시켜 고정하고, 제1고정판(310) 및 제2고정판(320)의 사이에 걸림부(230)를 밀착시켜 고정하며, 고정볼트(330)를 몸체 판(110)에 고정하면,
다수의 상기 제2마감부재(200) 전체 또는 일부는 제1간격 유지부재(300)를 통해 다수의 제1마감부재(100)의 길이 방향을 따라 기울어져서 설치되는 것을 특징으로 하는 건축물 천장용 마감재.
According to claim 1,
After rotating all or part of the plurality of first fixing plates 310 around the fixing bolt 330, first and second nuts 340 and 350 are fastened to the male threaded portion 332 of the fixing bolt 330. Thus, the vertical part 220 is fixed in close contact between the support parts 311 and 321, and the hooking part 230 is fixed in close contact between the first fixing plate 310 and the second fixing plate 320, When fixing the fixing bolt 330 to the body plate 110,
All or part of the plurality of second finishing members 200 is a finishing material for building ceilings, characterized in that installed inclined along the length direction of the plurality of first finishing members 100 through the first spacing member 300 .
제1항에 있어서,
다수의 상기 제2마감부재(200)는 수직부(220)의 길이를 동일하게 형성하여,
다수의 상기 제2마감부재(200)는 몸체 판(210)이 건축물의 천장(2)에서 동일하게 돌출되는 것을 특징으로 하는 건축물 천장용 마감재.
According to claim 1,
The plurality of second closure members 200 form the same length of the vertical portion 220,
In the plurality of second finishing members 200, the body plate 210 equally protrudes from the ceiling 2 of the building.
제1항에 있어서,
다수의 상기 제2마감부재(200) 일부는 수직부(220)의 길이를, 나머지 제2마감부재(200)의 수직부(220)의 길이보다 길게 형성하여,
다수의 상기 제2마감부재(200) 일부는 몸체 판(210)이 건축물의 천장(2)에서, 나머지 제2마감부재(200)의 몸체 판(210)보다 더 돌출되는 것을 특징으로 하는 건축물 천장용 마감재.
According to claim 1,
Some of the plurality of second closure members 200 form a length of the vertical portion 220 longer than the length of the vertical portion 220 of the remaining second closure member 200,
A plurality of the second finishing member (200) part of the building ceiling, characterized in that the body plate 210 protrudes more from the ceiling (2) of the building, than the body plate (210) of the remaining second finishing member (200) for finishing materials.
KR1020200096162A 2020-07-31 2020-07-31 Finishing material for building ceiling KR102474426B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200096162A KR102474426B1 (en) 2020-07-31 2020-07-31 Finishing material for building ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200096162A KR102474426B1 (en) 2020-07-31 2020-07-31 Finishing material for building ceiling

Publications (2)

Publication Number Publication Date
KR20220015746A KR20220015746A (en) 2022-02-08
KR102474426B1 true KR102474426B1 (en) 2022-12-05

Family

ID=80251883

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200096162A KR102474426B1 (en) 2020-07-31 2020-07-31 Finishing material for building ceiling

Country Status (1)

Country Link
KR (1) KR102474426B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102627313B1 (en) * 2022-02-17 2024-01-18 유재욱 Finishing material for building ceiling and interior and exterior wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002147B2 (en) * 1996-12-25 2000-01-24 大平技研工業株式会社 Prize storage case
JP2013238064A (en) * 2012-05-16 2013-11-28 Riken Light Metal Ind Co Ltd Attachment structure for ceiling louver
JP2018080524A (en) * 2016-11-17 2018-05-24 株式会社三菱地所設計 Louver installation structure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3163068B2 (en) * 1993-12-27 2001-05-08 日本建工株式会社 Field edge mounting bracket
JP3002147U (en) * 1994-03-18 1994-09-20 株式会社ブレスト工業研究所 Hanging material for channel material
KR20120004980U (en) 2010-12-30 2012-07-10 주식회사 건일 Assembling screen louver structure for ceiling
KR20140135553A (en) * 2013-05-16 2014-11-26 국일내외건축 주식회사 Connection bracket and Louver using the same
KR101851305B1 (en) * 2016-04-21 2018-04-23 (주)유창 A multi carrier and a louver installation structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002147B2 (en) * 1996-12-25 2000-01-24 大平技研工業株式会社 Prize storage case
JP2013238064A (en) * 2012-05-16 2013-11-28 Riken Light Metal Ind Co Ltd Attachment structure for ceiling louver
JP2018080524A (en) * 2016-11-17 2018-05-24 株式会社三菱地所設計 Louver installation structure

Also Published As

Publication number Publication date
KR20220015746A (en) 2022-02-08

Similar Documents

Publication Publication Date Title
US3612461A (en) Light fixture supporting clip
US2631809A (en) Furring hanger
KR102474426B1 (en) Finishing material for building ceiling
KR101663986B1 (en) Bracket for fix furniture to the wall
KR102474425B1 (en) Finishing material for building ceiling
JP2017222990A (en) Hanger for ceiling construction
KR200479587Y1 (en) Apparatus for connecting panel
JP2010229785A (en) Fixing clip
KR101751649B1 (en) Metal tile for earthquake resistance and fastening structure metal tile
KR102084704B1 (en) A fixing structure of ceiling panels
US2241991A (en) Furring mounting for metal lath
KR20140135553A (en) Connection bracket and Louver using the same
JP2020076252A (en) Metal fitting for construction
KR20220112928A (en) Finishing material for ceiling, interior and exterior wall of building
KR102532942B1 (en) Finishing material for a ceiling of building
KR200436794Y1 (en) panel for ceiling
KR100792770B1 (en) Ceiling panel for bathroom
JP7022961B2 (en) Ceiling structure and ceiling board mounting member
KR20140005485U (en) Fixing structure of ceiling panel
KR102094074B1 (en) An apparatus for mounting the ceiling panel on the ceiling surface of a building
US2962783A (en) Spring clip for connecting two parts
GB2153407A (en) Suspended ceiling
JP4782536B2 (en) Ceiling base member mounting structure
JP7474185B2 (en) Temporary water drain fixing jig
KR20170089292A (en) Structural steel assembly of celing

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant