KR102452587B1 - Panel-type retaining wall with self-standing construction structure using EPS block and H-beam and method thereof - Google Patents
Panel-type retaining wall with self-standing construction structure using EPS block and H-beam and method thereof Download PDFInfo
- Publication number
- KR102452587B1 KR102452587B1 KR1020220005603A KR20220005603A KR102452587B1 KR 102452587 B1 KR102452587 B1 KR 102452587B1 KR 1020220005603 A KR1020220005603 A KR 1020220005603A KR 20220005603 A KR20220005603 A KR 20220005603A KR 102452587 B1 KR102452587 B1 KR 102452587B1
- Authority
- KR
- South Korea
- Prior art keywords
- retaining wall
- panel retaining
- panel
- support
- eps block
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0283—Retaining or protecting walls characterised by constructional features of mixed type
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Abstract
Description
본 발명은 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체 및 그 시공 방법에 관한 것으로서, 더 상세하게는 패널옹벽의 후방에 H빔을 설치하여 패널옹벽을 지지하도록 구성하되, 패널옹벽과 H빔 사이에 EPS블럭을 설치하여 EPS블럭을 통해 패널옹벽의 후면부를 지지함으로써, 지지부재를 통해 패널옹벽과 H빔을 연결하는 과정에서 패널옹벽의 안정적인 지지가 가능할 뿐만 아니라, 간단한 구조를 통해 시공 비용의 절감은 물론, 시공 시간을 효율적으로 단축시킬 수 있는 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체 및 그 시공 방법에 관한 것이다.The present invention relates to a self-standing panel retaining wall construction structure using EPS blocks and H-beams and a construction method thereof, and more particularly, to install H-beams at the rear of the panel retaining walls to support the panel retaining walls, By installing an EPS block between the beams and supporting the rear part of the panel retaining wall through the EPS block, stable support of the panel retaining wall is possible in the process of connecting the panel retaining wall and the H-beam through the support member, but also construction cost through a simple structure It relates to a self-supporting panel retaining wall construction structure using EPS blocks and H-beams that can reduce construction time efficiently as well as reduce construction time, and a construction method thereof.
또한, H빔을 패널옹벽의 후방 정중앙에 위치시키고, 패널옹벽의 후면부 양측으로부터 연결되는 지지부재가 H빔에 고정설치된 결속부재를 통해 연결되도록 구성함으로써, 패널옹벽의 후방 정중앙에 위치하는 H빔으로 균등하게 힘이 전달되는 것이 가능하므로, 패널옹벽의 구조적인 안정성을 확보하는 것이 가능한 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체 및 그 시공 방법에 관한 것이다.In addition, by locating the H-beam at the center of the rear of the panel retaining wall, and configuring the support members connected from both sides of the rear part of the panel retaining wall to be connected through the binding members fixed to the H-beam, the H-beam located in the center of the rear of the panel retaining wall Since it is possible to transmit the force evenly, it relates to a self-supporting panel retaining wall construction structure using EPS blocks and H-beams capable of securing the structural stability of the panel retaining wall, and a construction method thereof.
일반적으로 옹벽 구조물은, 주택부지 및 노변 등에 형성된 경사지, 절토지 및 암반 등의 전면에 이들이 토압 또는 우수 등에 의해 붕괴되는 것을 방지할 수 있도록 형성되는 벽체를 말한다.In general, a retaining wall structure refers to a wall formed on the entire surface of a slope, cut land, and bedrock formed on a housing site and roadside, etc. to prevent them from collapsing due to earth pressure or rainwater.
종래의 패널옹벽은 가설재를 통해 적층구조로 시공되는 것으로, 이는 자립식이지 못한 시공 구조로 인해 공사지연과 안전성 문제 및 공사비 상승을 부추기는 문제를 초래하고 있다. 또한, 종래의 옹벽 시공방법은 안정적인 구조를 위해 절토부 사면의 절취 구역이 필연적으로 넓어야 하는 것으로, 이는 토공을 위한 수용지 외의 국유지나 사유지 등 타인의 토지를 간섭하게 될 우려가 있고, 이를 해결하기 위해서는 공사용 토지를 과하게 보상 구입해야 하는 바, 결국 공사비 상승을 야기하는 원인이 되고 있는 실정이다.Conventional panel retaining walls are constructed in a laminated structure through temporary materials, which causes delays in construction, safety problems, and increases in construction costs due to the non-self-standing construction structure. In addition, the conventional retaining wall construction method inevitably requires that the cut-out area of the cut slope be wide for a stable structure, which may interfere with other people's land such as public land or private land other than the receiving site for earthwork. In order to achieve this, the land for construction must be purchased with excessive compensation, which in turn causes an increase in construction costs.
상기와 같은 문제점을 해소하기 위한 '자립식 패널옹벽 시공방법 및 상기 시공방법에 의해 시공된 자립식 패널옹벽 구조물'이 등록특허 제10-2015564호(이하, '특허문헌 1'이라 함.)에 개시되어 있다.In order to solve the above problems, 'a self-supporting panel retaining wall construction method and a self-standing panel retaining wall structure constructed by the construction method' are disclosed in Registered Patent No. 10-2015564 (hereinafter referred to as 'Patent Document 1'). has been disclosed.
상기 특허문헌 1은 다수개의 H-파일(110)을 등간격으로 세워 말뚝지지체(100)를 이루도록하되, 상기 H-파일(110)은 전체 길이 중 60% 이상이 지반 홀(120)에 삽입될 수 있도록 천공하고, 천공에 삽입된 H-파일(110)의 매립측 지반 홀(120) 부분에는 현장 콘크리트(130)를 충진하여 타설 및 양생시키도록 하는 말뚝 시공단계(S100)와; 말뚝지지체(100)가 기립된 양면 중 법면 절취측에 패널옹벽(200)이 시공되도록하되, 상기 패널옹벽(200)은 버림 콘크리트에 의해 형성된 기초블럭(210)과 피씨 구조의 옹벽패널(220) 또는 옹벽패널(220)과 옹벽패널(220) 간 상하부 밀착면에 각각 암수 요철형 전단키(230) 및 전단키홈(240)이 형성되어 기초블럭(210)을 기준으로 다수개의 옹벽패널(220)이 별도의 가시설 부재 없이 순차적으로 자립하면서 적층 조립되도록 하는 패널옹벽 시공단계(S200)와; 기초 블럭(210)으로부터 자립한 옹벽패널(220)은 보강재(300)에 의해 H-파일(110)과 결속되도록 하되, 상기 보강재(300)는 나사철근(310)의 일측 단부가 H-파일(110)의 수평판(111)에 형성된 고정공(112)을 관통한 후 지압판(320)과 고정너트(330)로 하여금 고정되도록 형성되고, 나사철근(310)의 타측 단부는 옹벽패널(220)의 중앙부에 구비된 결합공(221)을 관통한 후 일부 분기되면 지지판(222)을 기준으로 조임너트(223)가 채워져 결속되도록 하는 패널옹벽 고정단계(S300);로 구성되어 이루어진 자립식 패널옹벽 시공방법에 있어서,In the Patent Document 1, a plurality of H-
상기 패널옹벽 시공단계(S200)에서 좌우 폭방향으로 옹벽패널(220) 적층 시 이음부를 기준으로 외주면에 돌기부(252)가 형성되는 탄성체로 이루어지는 디귿자형 클립바(251) 및 상기 클립바(251)가 삽입, 결합되도록 클립바(251)의 형상에 대응되도록 반구형 내입홈(229)이 형성되는 클립홈(228)이 상기 옹벽패널(220)에 구비되어 있어, 상기 클립바(251)를 클립홈(228)에 결합하는 것을 더 포함하고 있으며, 상기 패널옹벽 고정단계(S300) 이후, 말뚝지지체(100)와 자립식 패널옹벽(200) 및 보강재(300)가 조립 완료되면 절취된 법면과 자립식 패널옹벽(200) 사이에 잡석을 채워 되메우기 단계(S400)를 수행하도록 형성되고, 상기 되메우기 단계(S400)는 기초블럭의 배면에 유공관(400)이 매립되어 우수 또는 지하수 발생시 물빠짐이 용이하도록 형성되는 것이 특징이다.When the retaining wall panels 220 are laminated in the left and right width direction in the panel retaining wall construction step (S200), a diggle-shaped clip bar 251 and the clip bar 251 made of an elastic body having protrusions 252 formed on the outer circumferential surface based on the joint. The retaining wall panel 220 is provided with a clip groove 228 in which a hemispherical inner groove 229 is formed to correspond to the shape of the clip bar 251 so that the clip bar 251 is inserted and coupled, so that the clip bar 251 is inserted into the clip groove. It further includes coupling to (228), and after the panel retaining wall fixing step (S300), when the pile support 100 and the self-standing
상기 특허문헌 1은 국유지 도로나 타인의 사유지로부터 경계된 지구 구획선(대지 경계선)에 초근접(최대한 근접)하여 절토부 사면 붕괴를 방지하도록 말뚝지지체(다수개의 H-파일 조합구조)가 시공되도록 하되, 상기 말뚝지지체는 패널옹벽의 전체 높이 대비 60% 이상 깊게 매립되도록 형성되어 옹벽패널의 고정 지지력이 크게 향상되도록 형성되고, 상기 패널옹벽은 상하부 밀착면에 각각 암수 요철형 전단키 및 전단키홈이 형성되어 기초블럭을 기준으로 다수개의 옹벽패널이 별도의 가시설 부재 없이 순차적으로 자립하면서 적층 조립되도록 형성되며, 상기 말뚝지지체와 수평으로 기립 또는 자립한 패널옹벽은 강선형 보강재로 하여금 조인트 결속되어 구속력과 고정력이 강화되도록 하는 바, 이로 인하여, 옹벽 성능이 크게 개선됨은 물론 실제 공사 부지 사용량을 최소화할 수 있도록 구성되는 것이나, 지지판(222), 지압판(320), 캡-빔(500), 토류판(700), 나사철근(310), 볼트, 간격재(250), 고정너트(330), 전단키(230), 전단키홈(240), 수평판(111), 기준판(113), 보강재(300), 고정공(112) 등 H-파일(110)을 통해 패널옹벽(200)을 지지하기 위한 구조가 매우 복잡하여 시공 비용 및 시간이 많이 소요되는 문제점이 있었다.The patent document 1 is super close (as close as possible) to the district dividing line (site boundary line) bounded by a national road or other's private land so that a pile support (multiple H-pillar combination structure) is constructed to prevent the collapse of the cut slope, but , The pile support is formed to be deeply buried by at least 60% of the total height of the panel retaining wall, so that the fixing support power of the retaining wall panel is greatly improved, and the panel retaining wall is formed with male and female concavo-convex shear keys and shear key grooves on the upper and lower contact surfaces, respectively. Based on the foundation block, a plurality of retaining wall panels are formed to be laminated and assembled while standing up sequentially without a separate temporary member. As a result of this, the retaining wall performance is greatly improved and the actual construction site usage is minimized, but the support plate 222, the acupressure plate 320, the cap-
또한, 패널옹벽(200)의 중앙부에 형성된 결합공(221)에 연결되는 보강재(300)가 H-파일(110)의 전면수직프레임과 후면수직프레임을 관통하여 일자형태로 설치되도록 구성됨에 따라 H-파일(110)이 정중앙이 아닌 일측으로 편향된 상태에 위치하게 되므로, H-파일(110)이 제대로 힘을 발휘하지 못해 패널옹벽(200)의 견고한 지지가 용이하지 않을 뿐만 아니라, 패널옹벽(200) 1개당 1개의 보강재(300)가 연결되도록 구성됨에 따라 H-파일(110)의 간격 조절이 잘못되는 경우, 보강재(300)가 휘게 되는 현상이 발생하는 등 구조적 결함에 의해 패널옹벽의 안정성을 확보하는 것이 어려운 문제점이 있었다.In addition, as the
본 발명은 상술한 문제점을 해결하고자 안출된 것으로서, 본 발명의 목적은 패널옹벽의 후방에 H빔을 설치하여 패널옹벽을 지지하도록 구성하되, 패널옹벽과 H빔 사이에 EPS블럭을 설치하여 EPS블럭을 통해 패널옹벽의 후면부를 지지함으로써, 지지부재를 통해 패널옹벽과 H빔을 연결하는 과정에서 패널옹벽의 안정적인 지지가 가능할 뿐만 아니라, 간단한 구조를 통해 시공 비용의 절감은 물론, 시공 시간을 효율적으로 단축시키는 것이 가능한 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체 및 그 시공 방법을 제공하는 것이다.The present invention has been devised to solve the above problems, and an object of the present invention is to install an H-beam at the rear of the panel retaining wall to support the panel retaining wall, but install an EPS block between the panel retaining wall and the H-beam to provide an EPS block By supporting the rear part of the panel retaining wall through the It is to provide a self-standing panel retaining wall construction structure using an EPS block and H-beam that can be shortened and a construction method thereof.
또한, H빔을 패널옹벽의 후방 정중앙에 위치시키고, 패널옹벽의 후면부 양측으로부터 연결되는 지지부재가 H빔에 고정설치된 결속부재를 통해 연결되도록 구성함으로써, 패널옹벽의 후방 정중앙에 위치하는 H빔으로 균등하게 힘이 전달되는 것이 가능하므로, 패널옹벽의 구조적인 안정성을 확보하는 것이 가능한 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체 및 그 시공 방법을 제공하는 것이다.In addition, by locating the H-beam at the center of the rear of the panel retaining wall, and configuring the support members connected from both sides of the rear part of the panel retaining wall to be connected through the binding members fixed to the H-beam, the H-beam located in the center of the rear of the panel retaining wall Since it is possible to evenly transmit the force, it is to provide a self-supporting panel retaining wall construction structure using EPS blocks and H-beams capable of securing the structural stability of the panel retaining wall, and a construction method thereof.
상기와 같은 문제점을 해결하기 위하여 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체는, 적어도 하나 이상이 수직 방향으로 적층되어 옹벽을 구성하는 패널옹벽; 상기 패널옹벽의 후방에 위치하여 상기 패널옹벽을 지지하도록 구성되는 H빔; 상기 패널옹벽의 후면부 및 상기 H빔의 전면부에 밀착된 상태로 위치하며, 상기 패널옹벽을 시공하는 과정에서 상기 패널옹벽이 뒤로 밀리는 것을 방지하는 EPS블럭; 상기 H빔에 고정설치되며, 상기 패널옹벽과 연결되는 지지부재가 결속되는 결속부재; 및 일측은 상기 패널옹벽에 연결되고 타측은 상기 결속부재에 결속되어 상기 H빔을 통해 상기 패널옹벽을 지지하도록 구성되되, 그 양측에 제1,2전산볼트가 각각 나사결합되도록 결합부가 구비되며 회전에 의해 상기 제1,2전산볼트의 간격을 조절하는 몸체부와, 상기 제1,2전산볼트의 각 말단에 구비되는 제1,2후크부로 이루어지는 지지부재;를 포함하는 것을 특징으로 한다.In order to solve the above problems, a self-standing panel retaining wall construction structure using an EPS block and an H-beam according to a preferred embodiment of the present invention includes: a panel retaining wall in which at least one is stacked in a vertical direction to constitute a retaining wall; an H-beam positioned at the rear of the panel retaining wall and configured to support the panel retaining wall; an EPS block positioned in close contact with the rear portion of the panel retaining wall and the front portion of the H-beam, and preventing the panel retaining wall from being pushed back in the process of constructing the panel retaining wall; a binding member fixedly installed to the H-beam and to which a support member connected to the panel retaining wall is bound; And one side is connected to the panel retaining wall and the other end is bound to the binding member and configured to support the panel retaining wall through the H-beam, and a coupling part is provided on both sides so that the first and second computerized bolts are screwed, respectively, and rotates and a support member comprising a body portion for adjusting the distance between the first and second computational bolts by the and first and second hook portions provided at respective ends of the first and second computational bolts.
또한, 상기 지지부재는 상기 패널옹벽의 후면부 양측에 각각 연결되는 한 쌍으로 이루어지며, 상기 패널옹벽의 후면부 양측에는 상기 한 쌍의 지지부재의 제1후크부가 각각 연결되는 것이 가능하도록 한 쌍의 후크걸이가 구비되는 것을 특징으로 한다.In addition, the support member is made of a pair connected to both sides of the rear portion of the panel retaining wall, and a pair of hooks to enable the first hook portions of the pair of support members to be connected to both sides of the rear portion of the panel retaining wall, respectively. It is characterized in that the hook is provided.
또한, 상기 H빔에는 상기 결속부재가 관통설치되는 것이 가능하도록 관통홀이 형성되는 것을 특징으로 한다.In addition, the H-beam is characterized in that a through hole is formed so that the binding member can be installed therethrough.
또한, 상기 결속부재는, 상기 H빔의 관통홀에 관통설치되는 제3전산볼트; 및 상기 제3전산볼트의 양측으로부터 각각 결합되되, 제3전산볼트와 나사결합되는 너트부와, 상기 너트부로부터 연장되어 제2후크부가 연결되는 연결부로 이루어지는 연결부재;를 포함하는 것을 특징으로 한다.In addition, the binding member, a third computational bolt installed through the through hole of the H-beam; and a connecting member coupled from both sides of the third computational bolt, respectively, comprising a nut portion screwed with the third computational bolt, and a connecting portion extending from the nut portion to which the second hook portion is connected. .
한편, 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 방법은, 옹벽 시공을 위한 토사절취 및 결속부재가 관통설치되는 것이 가능하도록 관통홀이 형성되는 H빔의 하부를 지반에 삽입 설치하고 콘크리트를 충진하는 단계; 그 후면부 양측에 한 쌍의 후크걸이가 구비되는 패널옹벽을 상기 H빔의 전방에 상기 H빔과 소정 간격 이격된 상태로 설치하는 단계; 상기 패널옹벽과 H빔 사이에 EPS블럭을 설치하되, 상기 패널옹벽의 후면부와 H빔의 전면부에 밀착되도록 EPS블럭을 설치하는 단계; 상기 패널옹벽과 연결되는 지지부재의 결속이 가능하도록 상기 H빔의 관통홀에 관통설치되는 제3전산볼트와, 상기 제3전산볼트의 양측으로부터 각각 결합되되, 제3전산볼트와 나사결합되는 너트부 및 상기 너트부로부터 연장되어 제2후크부가 연결되는 연결부로 이루어지는 연결부재를 포함하는 결속부재를 상기 H빔에 고정설치하는 단계; 상기 H빔에 의해 상기 패널옹벽을 지지하도록, 그 양측에 제1,2전산볼트가 각각 나사결합되도록 결합부가 구비되며 회전에 의해 상기 제1,2전산볼트의 간격을 조절하는 몸체부와, 상기 제1,2전산볼트의 각 말단에 구비되는 제1,2후크부로 이루어지는 지지부재를 상기 패널옹벽과 결속부재에 각각 연결하되, 상기 제1후크부는 상기 패널옹벽의 후크걸이에 연결하고, 상기 제2후크부는 상기 결속부재의 연결부에 결속하는 단계; 및 절취된 법면과 패널옹벽 사이에 뒷채움 토사를 수행하는 단계;를 포함하되, 상기 패널옹벽의 상부에 적어도 하나 이상의 패널옹벽이 수직 방향으로 적층되도록 구성되고, 상기 지지부재는 상기 패널옹벽의 후면부 양측에 각각 연결되는 한 쌍으로 구성되는 것을 특징으로 한다.On the other hand, in the self-standing panel retaining wall construction method using the EPS block and the H-beam according to the preferred embodiment of the present invention, the lower part of the H-beam in which the through-hole is formed so that the soil cutting and the binding member for the retaining wall construction can be installed through it. inserting into the ground and filling the concrete; Installing a panel retaining wall provided with a pair of hook hooks on both sides of the rear portion in a state in which the H-beam and the H-beam are spaced apart from each other by a predetermined distance in front of the H-beam; Installing an EPS block between the panel retaining wall and the H-beam, installing the EPS block so as to be in close contact with the rear portion of the panel retaining wall and the front portion of the H-beam; A third computerized bolt installed through the through hole of the H-beam to enable binding of the support member connected to the panel retaining wall, and a nut coupled from both sides of the third computerized bolt, respectively, screwed with the third computerized bolt fixing and installing a binding member including a connecting member extending from the part and the nut part and including a connecting part to which a second hook part is connected to the H-beam; A body portion for supporting the panel retaining wall by the H-beam, a coupling portion is provided on both sides of the first and second computational bolts so that the first and second computational bolts are screwed, respectively, and adjusting an interval between the first and second computational bolts by rotation; A support member comprising first and second hook portions provided at each end of the first and second transmission bolts is respectively connected to the panel retaining wall and the binding member, wherein the first hook portion is connected to a hook hook of the panel retaining wall, and binding the second hook part to the connection part of the binding member; and performing backfilling between the cut-off slope and the panel retaining wall; including, wherein at least one panel retaining wall is vertically stacked on an upper portion of the panel retaining wall, and the support member is provided on both sides of the rear surface of the panel retaining wall It is characterized in that it consists of a pair connected to each.
이상 상술한 바와 같이 본 발명에 따르면 패널옹벽의 후방에 H빔을 설치하여 패널옹벽을 지지하도록 구성하되, 패널옹벽과 H빔 사이에 EPS블럭을 설치하여 EPS블럭을 통해 패널옹벽의 후면부를 지지함으로써, 지지부재를 통해 패널옹벽과 H빔을 연결하는 과정에서 패널옹벽의 안정적인 지지가 가능할 뿐만 아니라, 간단한 구조를 통해 시공 비용의 절감은 물론, 시공 시간을 효율적으로 단축시킬 수 있는 장점이 있다.As described above, according to the present invention, an H-beam is installed at the rear of the panel retaining wall to support the panel retaining wall, but an EPS block is installed between the panel retaining wall and the H-beam to support the rear part of the panel retaining wall through the EPS block. In the process of connecting the panel retaining wall and the H-beam through the support member, it is possible to stably support the panel retaining wall, and through a simple structure, it has the advantage of not only reducing the construction cost but also effectively shortening the construction time.
또한, H빔을 패널옹벽의 후방 정중앙에 위치시키고, 패널옹벽의 후면부 양측으로부터 연결되는 지지부재가 H빔에 고정설치된 결속부재를 통해 연결되도록 구성함으로써, 패널옹벽의 후방 정중앙에 위치하는 H빔으로 균등하게 힘이 전달되는 것이 가능하므로, 패널옹벽의 구조적인 안정성을 확보하는 것이 가능한 장점이 있다.In addition, by locating the H-beam at the center of the rear of the panel retaining wall, and configuring the support members connected from both sides of the rear part of the panel retaining wall to be connected through the binding members fixed to the H-beam, the H-beam located in the center of the rear of the panel retaining wall Since it is possible to transmit the force evenly, there is an advantage that it is possible to secure the structural stability of the panel retaining wall.
도 1은 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체의 구성을 보인 사시도.
도 2는 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체의 구성을 보인 측면도.
도 3은 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체의 구성을 보인 평면도.
도 4 내지 11은 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 방법의 과정을 보인 설명도.1 is a perspective view showing the configuration of a self-standing panel retaining wall construction structure using an EPS block and an H-beam according to a preferred embodiment of the present invention.
Figure 2 is a side view showing the configuration of a self-standing panel retaining wall construction structure using an EPS block and H-beam according to a preferred embodiment of the present invention.
3 is a plan view showing the configuration of a self-standing panel retaining wall construction structure using EPS blocks and H-beams according to a preferred embodiment of the present invention.
4 to 11 are explanatory views showing the process of a self-standing panel retaining wall construction method using EPS blocks and H-beams according to a preferred embodiment of the present invention.
이하, 도면을 참조하여 본 발명을 상세히 설명하기로 한다. 각 도면에 제시된 동일한 참조부호는 동일한 부재를 나타낸다.Hereinafter, the present invention will be described in detail with reference to the drawings. Like reference numerals in each figure indicate like elements.
도 1은 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체의 구성을 보인 사시도이고, 도 2는 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체의 구성을 보인 측면도이며, 도 3은 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체의 구성을 보인 평면도이다.1 is a perspective view showing the configuration of a self-standing panel retaining wall construction structure using EPS blocks and H-beams according to a preferred embodiment of the present invention, and FIG. 2 is self-supporting using EPS blocks and H-beams according to a preferred embodiment of the present invention. It is a side view showing the configuration of a panel-type retaining wall construction structure, and FIG. 3 is a plan view showing the configuration of a self-standing panel retaining wall construction structure using an EPS block and an H-beam according to a preferred embodiment of the present invention.
도 1 내지 3을 참조하면, 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체는, 패널옹벽(100), H빔(200), EPS블럭(300), 결속부재(400), 지지부재(500)를 포함한다.1 to 3, the self-standing panel retaining wall construction structure using the EPS block and H-beam according to a preferred embodiment of the present invention is a
상기 패널옹벽(100)은 옹벽 시공을 위하여 설치되는 것으로서, 적어도 하나 이상이 수직 방향으로 적층하여 옹벽을 구성하게 되는데, 본 발명에 있어서, 상기 패널옹벽(100)의 후면부 양측에는 한 쌍의 지지부재(500,500')의 제1후크부(521,521')가 각각 연결되는 것이 가능하도록 한 쌍의 후크걸이(110,110')가 구비된다.The
상기 한 쌍의 후크걸이(110,110')는 간단하게는 패널옹벽(100)의 후면 중앙부 양측에 위치하도록 구성될 수 있으며, 바람직하게는 패널옹벽(100)의 후면 상부 양측과 하부 양측에 각각 위치하여 지지부재(500)를 통한 안정적인 지지가 이루어지도록 구성되는 것이 좋다.The pair of
상기 H빔(200)은 상기 패널옹벽(100)의 후방에 위치하여 패널옹벽(100)을 지지하는 것으로서, 상호 이격형성되는 한 쌍의 수직프레임과 상기 수직프레임을 연결하는 연결프레임으로 이루어지는 통상의 H빔으로 구성되는데, 본 발명에 있어서, 상기 H빔(200)에는 연결프레임에 관통홀(210)이 형성되는 것이 특징이다.The H-
상기 관통홀(210)은 결속부재(400)에 지지부재(500)가 결속된 후, 지지부재(500)의 몸체부(510) 회전에 의해 제1,2전산볼트(520,530)의 간격 조절이 이루어지는 과정에서 H빔(200)과 지지부재(500)간에 간섭이 발생하는 것을 방지하도록 연결프레임의 후방에 형성되는 것이 바람직하다.After the
또한, 상기 H빔(200)은 패널옹벽(100)의 후방 정중앙에 위치하도록 구성되며, 패널옹벽(100)의 후면부 양측으로부터 연결되는 지지부재(500)가 H빔(200)에 고정설치된 결속부재(400)를 통해 연결되도록 구성되는데, 이로 인하여, 패널옹벽(100)의 후방 정중앙에 위치하는 H빔(200)으로 균등하게 힘이 전달되는 것이 가능하므로, 패널옹벽(100)의 구조적인 안정성을 확보하는 것이 가능하게 된다.In addition, the H-
상기 EPS블럭(300)은 상기 패널옹벽(100)과 H빔(200) 사이에 설치되는 것으로서, 도 2 및 3에 도시된 바와 같이, 상기 패널옹벽(100)의 후면부 및 상기 H빔(200)의 전면부에 밀착된 상태로 위치하도록 구성되는데, 이로 인하여, 상기 패널옹벽(100)을 시공하는 과정 즉, H빔(200)을 통해 패널옹벽(100)을 지지하도록 지지부재(500)를 연결하는 과정에서 패널옹벽(100)이 뒤로 밀리는 것을 방지하게 된다.The
상기 EPS블럭(300)은 패널옹벽(100)의 후면 중앙부에 설치되는데, H빔(200)을 통한 안정적인 지지가 가능하도록 H빔(200)의 수직프레임의 넓이와 동일한 크기로 구성되는 것이 바람직하다.The
한편, 상기 EPS블럭(300)은 패널옹벽(100)의 후방 공간을 차지하도록 구성됨으로써, EPS블럭(300)이 차지하는 공간 만큼 뒷채움 토사를 최소화할 수 있으므로, 뒷채움 토사를 위한 시간을 현저하게 단축시킬 수 있을 뿐만 아니라, 골재 포설 등을 하지 않아도 되므로, 시공 비용을 절감할 수 있게 된다.On the other hand, since the
상기 결속부재(400)는 상기 H빔(200)에 고정설치되며, 상기 패널옹벽(100)과 연결되는 한 쌍의 지지부재(500,500')가 결속되는 것으로서, 상기 H빔(200)의 관통홀(210)에 관통설치되는 제3전산볼트(410) 및 상기 제3전산볼트(410)의 양측으로부터 각각 결합되되, 제3전산볼트(410)와 나사결합되는 너트부(421)와 상기 너트부(421)로부터 연장되어 제2후크부(531,531')가 연결되는 연결부(422)로 이루어지는 연결부재(420)로 구성된다.The
상기 결속부재(400)는 H빔(200)에 고정설치됨에 따라, 연결된 한 쌍의 지지부재(500,500')를 통해 H빔(200)이 패널옹벽(100)을 지지하는 것을 가능하게 한다.As the
상기 지지부재(500,500')는 일측은 상기 패널옹벽(100)에 연결되고 타측은 상기 결속부재(400)에 결속되어 상기 H빔(200)을 통해 패널옹벽(100)의 지지를 가능하게 하는 한 쌍으로 구성되는 것으로서, 몸체부(510,510'), 제1후크부(521,521'), 제2후크부(531,531')를 포함한다.One side of the
상기 몸체부(510,510')를 제1전산볼트(520,520') 및 제2전산볼트(530,530')가 결합되며, 회전에 의해 상기 제1전산볼트(520,520')와 제2전산볼트(530,530')의 간격을 조절하는 것으로서, 제1전산볼트(520,520') 및 제2전산볼트(530,530')가 각각 나사결합되도록 그 양측에 결합부(511,511')가 구비된다.The
상기 몸체부(510.510')는 일측으로 회전시에는 제1전산볼트(520,520')와 제2전산볼트(530,530')의 간격이 가까워지며, 타측으로 회전시에는 제1전산볼트(520,520')와 제2전산볼트(530,530')의 간격이 멀어지도록 구성되는데, 이로 인하여, H빔(200)의 설치시 간격에 다소 오차가 발생하더라도 제1전산볼트(520,520')와 제2전산볼트(530,530')의 간격 조절을 통해 적절한 텐션을 주며 패널옹벽(100)을 견고하게 지지하는 것이 가능하다.When the body part 510.510' rotates to one side, the distance between the first
상기 제1후크부(521,521')는 상기 제1전산볼트(520,520')의 말단에 구비되는 것으로서, 패널옹벽(100)의 후면에 구비되는 한 쌍의 후크걸이(110,110')에 각각 연결되도록 구성된다.The
상기 제2후크부(531,531')는 상기 제2전산볼트(530,530')의 말단에 구비되는 것으로서, H빔(200)에 고정설치된 결속부재(400)의 연결부(422)에 각각 연결되도록 구성된다.The
이하에서는 도 4 내지 11을 참조하여, 본 발명의 바람직한 실시예에 따른 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 방법을 설명하기로 한다.Hereinafter, a method for constructing a self-standing panel retaining wall using an EPS block and an H-beam according to a preferred embodiment of the present invention will be described with reference to FIGS. 4 to 11 .
먼저, 도 4 및 5에 도시된 바와 같이, 옹벽 시공을 위한 토사절취 및 H빔(200)의 하부를 지반에 삽입 설치하고 콘크리트를 충진하고, 도 6에 도시된 바와 같이, 기초콘크리트(C)를 타설한다.First, as shown in FIGS. 4 and 5, the lower part of the H-
다음으로, 도 7에 도시된 바와 같이, 기초콘크리트(C)의 상부에 패널옹벽(100)을 설치하게 되는데, 이때, 상기 H빔(200)과 소정 간격 이격된 상태로 H빔(200)의 전방에 설치되도록 구성된다.Next, as shown in FIG. 7 , the
상기와 같이, H빔(200)의 전방에 패널옹벽(100)의 설치가 완료되면, 도 8에 도시된 바와 같이, 상기 패널옹벽(100)과 H빔(200) 사이에 EPS블럭(300)을 설치하게 되는데, 이때, EPS블럭(300)은 상기 패널옹벽(100)의 후면부와 H빔(200)의 전면부에 밀착되도록 설치하는 것이 바람직하다. 다음으로, 패널옹벽(100)과 H빔(200) 사이에 EPS블럭(300)의 설치가 완료되면, 결속부재(400)를 H빔(200)에 고정설치하고, 지지부재(500,500')를 패널옹벽(100)과 결속부재(400)에 각각 연결하게 되는데, 이때, 지지부재(500,500')의 제1후크부(521,521')는 패널옹벽(100)의 후크걸이(110,110')에 연결하고, 제2후크부(531,531')는 결속부재(400)의 연결부(422)에 결속함으로써, H빔(200)에 의해 패널옹벽(100)을 지지하는 것이 가능하게 된다.As described above, when the installation of the
마지막으로, 도 9에 도시된 바와 같이, 절취된 법면과 패널옹벽(100) 사이에 뒷채움 토사(S)를 수행하여 마무리하게 되는데, 상기와 같은 과정을 통해 1단 패널옹벽(100)이 완료되면, 도 10 및 11에 도시된 바와 같이, 동일한 방식을 통해 1단 패널옹벽의 상부에 2단 패널옹벽 및 3단 패널옹벽을 적층하여 다층으로 패널옹벽을 구성하는 것이 가능하다. 이때, 다수의 패널옹벽은 상호 자립식으로 적층되는 것이 가능하도록 그 상면 및 하면에 결합홈 및 결합돌기가 형성되는 것이 바람직하다.Finally, as shown in FIG. 9, backfilling soil (S) is performed between the cut off slope and the
본 발명은 전술한 바와 같이, 패널옹벽(100)의 후방에 H빔(200)을 설치하여 패널옹벽(100)을 지지하도록 구성하되, 패널옹벽(100)과 H빔(200) 사이에 EPS블럭(300)을 설치하여 EPS블럭(300)을 통해 패널옹벽(100)의 후면부를 지지함으로써, 지지부재(500)를 통해 패널옹벽(100)과 H빔(200)을 연결하는 과정에서 패널옹벽(100)의 안정적인 지지가 가능할 뿐만 아니라, 간단한 구조를 통해 시공 비용의 절감은 물론, 시공 시간을 효율적으로 단축시키는 것이 가능하다.As described above, the present invention is configured to support the
도면과 명세서에서 최적 실시 예들이 개시되었다. 여기서 특정한 용어들이 사용되었으나, 이는 단지 본 발명을 설명하기 위한 목적에서 사용된 것이지 의미한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것은 아니다. 그러므로 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시 예가 가능하다는 점을 이해할 것이다. 따라서 본 발명의 진정한 기술적 보호범위는 첨부된 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.Best embodiments have been disclosed in the drawings and specification. Although specific terms are used herein, they are used only for the purpose of describing the present invention, and are not used to limit the meaning or scope of the present invention described in the claims. Therefore, those skilled in the art will understand that various modifications and equivalent other embodiments are possible therefrom. Therefore, the true technical protection scope of the present invention should be determined by the technical spirit of the appended claims.
(C): 기초콘크리트 (S): 뒷채움 토사
100: 패널옹벽 110,110': 후크걸이
200: H빔 210: 관통홀
300: EPS블럭 400: 결속부재
410: 제3전산볼트 420: 연결부재
421: 너트부 422: 연결부
500,500': 지지부재 510,510': 몸체부
511,511': 결합부 520,520': 제1전산볼트
521,521': 제1후크부 530,530': 제2전산볼트
531,531': 제2후크부(C): Foundation concrete (S): Backfill soil
100: panel retaining wall 110,110': hook hanger
200: H beam 210: through hole
300: EPS block 400: binding member
410: third computerized bolt 420: connecting member
421: nut portion 422: connection portion
500,500': support member 510,510': body part
511,511': coupling part 520,520': first computerized bolt
521,521': first hook part 530,530': second computerized bolt
531,531': second hook part
Claims (5)
상기 H빔에는 상기 결속부재가 관통설치되는 것이 가능하도록 관통홀이 형성되되, 그 위치는 상기 H빔의 연결프레임의 후방에 설치되고,
상기 EPS블럭은 상기 H빔을 통한 안정적인 지지가 가능하도록 H빔의 수직프레임의 넓이와 동일한 넓이를 가지며,
상기 지지부재는 한 쌍으로서, 상기 패널옹벽의 후면부 양측에서는 벌어지고 상기 H빔의 결속부재로 갈수록 좁아지는 역삼각형의 형태를 이루며, 패널옹벽을 H빔 방향으로 당기는 것을 특징으로 하는 EPS블럭과 H빔을 이용한 자립식 패널 옹벽 시공 구조체.
at least one or more panel retaining walls are stacked in a vertical direction to constitute a retaining wall; An H-beam positioned at the rear of the panel retaining wall and configured to support the panel retaining wall; Located in close contact with the rear portion of the panel retaining wall and the front portion of the H-beam, the panel retaining wall in the process of constructing the panel retaining wall EPS block to prevent it from being pushed back; a binding member fixedly installed to the H-beam and to which a support member connected to the panel retaining wall is bound; and a support member having one side connected to the panel retaining wall and the other end being bound to the binding member to support the panel retaining wall;
A through hole is formed in the H-beam so that the binding member can be installed therethrough, the position of which is installed at the rear of the connecting frame of the H-beam,
The EPS block has the same width as the width of the vertical frame of the H-beam to enable stable support through the H-beam,
The support member is a pair of EPS blocks and H, characterized in that they open from both sides of the rear surface of the panel retaining wall and form an inverted triangle shape that is narrower toward the binding member of the H-beam, and pulls the panel retaining wall in the H-beam direction. A self-supporting panel retaining wall construction structure using beams.
상기 결속부재는,
상기 H빔의 관통홀에 관통설치되는 제3전산볼트; 및
상기 제3전산볼트의 양측으로부터 각각 결합되되, 제3전산볼트와 나사결합되는 너트부와, 상기 너트부로부터 연장되어 제2후크부가 연결되는 연결부로 이루어지는 연결부재;를 포함하고
상기 지지부재는,
그 양측에 제1,2전산볼트가 각각 나사결합되도록 결합부가 구비되며 회전에 의해 상기 제1,2전산볼트의 간격을 조절하는 몸체부; 및 상기 제1,2전산볼트의 각 말단에 구비되는 제1,2후크부;로 이루어지는 것을 특징으로 하는 EPS블럭과 H빔을 이용한 자립식 패널옹벽 시공 구조체.The method according to claim 1,
The binding member is
a third computational bolt installed through the through hole of the H-beam; and
It includes a; and a connecting member coupled from both sides of the third electric bolt, respectively, comprising a nut portion screwed with the third electric bolt and a connecting portion extending from the nut portion to which the second hook portion is connected, and
The support member is
a body portion having a coupling portion provided on both sides thereof so that the first and second computational bolts are screw-coupled, respectively, and adjusting an interval between the first and second computational bolts by rotation; and first and second hook portions provided at each end of the first and second computerized bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220005603A KR102452587B1 (en) | 2022-01-14 | 2022-01-14 | Panel-type retaining wall with self-standing construction structure using EPS block and H-beam and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220005603A KR102452587B1 (en) | 2022-01-14 | 2022-01-14 | Panel-type retaining wall with self-standing construction structure using EPS block and H-beam and method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102452587B1 true KR102452587B1 (en) | 2022-10-07 |
Family
ID=83596179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020220005603A KR102452587B1 (en) | 2022-01-14 | 2022-01-14 | Panel-type retaining wall with self-standing construction structure using EPS block and H-beam and method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102452587B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102629507B1 (en) * | 2023-10-06 | 2024-01-25 | 주식회사 서은엔지니어링 | Self supporting retaining wall structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200235096Y1 (en) * | 2001-03-24 | 2001-10-10 | 지해산업개발 주식회사 | A apparatus for approach construction of lay type retaining wall |
JP2006037527A (en) * | 2004-07-28 | 2006-02-09 | Mitsubishi Kagaku Sanshi Corp | Lightweight landfill and construction method therefor |
KR100929763B1 (en) * | 2009-07-06 | 2009-12-03 | 손화윤 | A wall fix anchor bolt which the joining is improved |
KR200468018Y1 (en) * | 2013-05-27 | 2013-07-22 | 김병수 | An apparatus of fixing the prebricated concrete block for breast wall |
KR20150116727A (en) * | 2014-04-08 | 2015-10-16 | 최정원 | Construction method of retaining wall |
KR20160116601A (en) * | 2015-03-30 | 2016-10-10 | 유한회사 강원이앤씨 | Prefabricated concrete retaining wall using recycle aggregate |
KR101684399B1 (en) * | 2016-07-27 | 2016-12-08 | 이상현 | Retaining Wall using Precast Panels and PHC Piles, and Constructing Method of such Retaining Wall |
KR102015564B1 (en) | 2019-07-10 | 2019-08-28 | 조영현 | Panel-type retaining wall structure with h-pile and joint device and construction method thereof |
KR102028602B1 (en) * | 2018-04-19 | 2019-10-04 | 주식회사 지인산업 | Side reinforcement structure for retaining wall panel and method for constructing using the same |
-
2022
- 2022-01-14 KR KR1020220005603A patent/KR102452587B1/en active IP Right Grant
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200235096Y1 (en) * | 2001-03-24 | 2001-10-10 | 지해산업개발 주식회사 | A apparatus for approach construction of lay type retaining wall |
JP2006037527A (en) * | 2004-07-28 | 2006-02-09 | Mitsubishi Kagaku Sanshi Corp | Lightweight landfill and construction method therefor |
KR100929763B1 (en) * | 2009-07-06 | 2009-12-03 | 손화윤 | A wall fix anchor bolt which the joining is improved |
KR200468018Y1 (en) * | 2013-05-27 | 2013-07-22 | 김병수 | An apparatus of fixing the prebricated concrete block for breast wall |
KR20150116727A (en) * | 2014-04-08 | 2015-10-16 | 최정원 | Construction method of retaining wall |
KR20160116601A (en) * | 2015-03-30 | 2016-10-10 | 유한회사 강원이앤씨 | Prefabricated concrete retaining wall using recycle aggregate |
KR101684399B1 (en) * | 2016-07-27 | 2016-12-08 | 이상현 | Retaining Wall using Precast Panels and PHC Piles, and Constructing Method of such Retaining Wall |
KR102028602B1 (en) * | 2018-04-19 | 2019-10-04 | 주식회사 지인산업 | Side reinforcement structure for retaining wall panel and method for constructing using the same |
KR102015564B1 (en) | 2019-07-10 | 2019-08-28 | 조영현 | Panel-type retaining wall structure with h-pile and joint device and construction method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102629507B1 (en) * | 2023-10-06 | 2024-01-25 | 주식회사 서은엔지니어링 | Self supporting retaining wall structure |
KR102649615B1 (en) * | 2023-10-06 | 2024-03-20 | 주식회사 서은엔지니어링 | Pedestrian friendly retaining wall system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102015564B1 (en) | Panel-type retaining wall structure with h-pile and joint device and construction method thereof | |
KR100633796B1 (en) | Connecting structure of mid supporting beam for temporary soil sheathing work | |
KR100998253B1 (en) | Temporary Structure For Land-Side Protection Wall | |
KR102208793B1 (en) | Under ground structure using column wall and construction method thereof | |
JP4812324B2 (en) | Retaining wall and its construction method | |
KR100886445B1 (en) | Soil tank type land-side protection wall | |
KR102452587B1 (en) | Panel-type retaining wall with self-standing construction structure using EPS block and H-beam and method thereof | |
JP2019124036A (en) | Self-supporting retaining wall and connection block | |
KR101211469B1 (en) | Retaining wall structure having prefabricated block and method for constructing retaining wall using the same | |
KR20030064063A (en) | reinforced earth retaining wall construction method | |
KR101054696B1 (en) | Top-down construction method for underground structure with slurry wall retained by slab diaphragm effect | |
KR102220613B1 (en) | Freestanding retaining wall construction method | |
US20210222455A1 (en) | Border walls and related systems and methods | |
KR100742335B1 (en) | Landscape architecture for cutting ground using natural stone and construction method thereof | |
KR101300078B1 (en) | Variable supporting device for sheathing work pile | |
KR20040031451A (en) | Prestressed scaffolding method | |
KR100462236B1 (en) | panel for external underground wall of building, structure and construction method using the same | |
JP3185129B2 (en) | Column-integrated column base fixed foundation structure and its construction method | |
KR102307510B1 (en) | Temporary earth retaining structure and Construction method using the same | |
JP2000328586A (en) | Retaining wall | |
KR20050094972A (en) | Construction of soil nailing for build up revetment | |
JP2000064306A (en) | Reinforcing member for pile foundation structure | |
KR101058982B1 (en) | Middle beam for earth retaining wall using phc pile and construction method of the same | |
KR200308716Y1 (en) | Prestressed scaffolding method | |
KR200273547Y1 (en) | reinforced earth retaining wall construction structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |