KR102334297B1 - A module and method for rapid repair and greening of eco friendly slope using the greening packs - Google Patents

A module and method for rapid repair and greening of eco friendly slope using the greening packs Download PDF

Info

Publication number
KR102334297B1
KR102334297B1 KR1020210029926A KR20210029926A KR102334297B1 KR 102334297 B1 KR102334297 B1 KR 102334297B1 KR 1020210029926 A KR1020210029926 A KR 1020210029926A KR 20210029926 A KR20210029926 A KR 20210029926A KR 102334297 B1 KR102334297 B1 KR 102334297B1
Authority
KR
South Korea
Prior art keywords
vegetation soil
greening
vegetation
soil pack
pack
Prior art date
Application number
KR1020210029926A
Other languages
Korean (ko)
Inventor
이갑중
Original Assignee
주식회사 도건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 도건 filed Critical 주식회사 도건
Priority to KR1020210029926A priority Critical patent/KR102334297B1/en
Application granted granted Critical
Publication of KR102334297B1 publication Critical patent/KR102334297B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/40Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/50Growth substrates; Culture media; Apparatus or methods therefor contained within a flexible envelope
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/103Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a module and a construction method for rapidly repairing and greening an eco-friendly slope by using fixture of greening packs, which can repair a local arc destruction that occurs on a slope due to natural disasters such as torrential rain, quickly and in an environmentally friendly manner without using special heavy equipment. The module for rapidly repairing and greening an eco-friendly slope by using fixture of greening packs comprises: greening packs for filling a depressed repair area in a shape and greening the same through vegetation layer material; and fixing means for fixing the greening packs in the repair area. The greening packs are divided into two or more types of greening packs storing vegetation layer materials for foundation and vegetation, respectively, and include a first type of greening packs (20), a second type of greening packs (30), and a third type of greening packs (40) stacked from the bottom of the repair area according to user purposes. The fixing means include: an internal fixing plate (10) installed at the bottom of the repair area to install the greening packs thereon; a wire mesh (50) installed on a surface side of the greening packs; an external fixing plate (60) installed on the wire mesh; and a tension member (70) connected to the internal fixing plate and the external fixing plate.

Description

식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈 및 공법{A module and method for rapid repair and greening of eco friendly slope using the greening packs}{A module and method for rapid repair and greening of eco friendly slope using the greening packs}

본 발명은 사면 보수 녹화 공법에 관한 것으로, 더욱 상세하게는 사면의 국부적 원호파괴를 특수 중장비 없이 친환경적으로 급속 보수하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈 및 공법에 관한 것이다.The present invention relates to a slope repair and greening method, and more particularly, to an eco-friendly rapid repair and greening module and method using a vegetation soil pack that rapidly repairs the local arc destruction of a slope in an environmentally friendly manner without special heavy equipment.

이 부분은 본 출원 내용과 관련된 배경 정보를 제공할 뿐 반드시 선행기술이 되는 것은 아니다.This section provides background information related to the content of the present application and is not necessarily prior art.

사면 안정화를 위한 공법으로는 토체를 절삭하고 보강토 옹벽, 콘크리트 옹벽 등을 설치하는 옹벽공법, 및 소일네일링, 어스앵커 같은 앵커재를 지중에 설치하는 앵커재 공법 등을 들 수 있으며, 이러한 방법은 장시간을 두고 계획된 사면 안정화 공법이라 할 수 있고, 사면의 파괴빈도를 매우 높이는 주요 요인들인 이상기후 현상(비정상적인 강우강도의 집중호우, 높은 빈도의 태풍 그리고 국내 기후 특성상 해마다 도래하는 해빙기)으로 인하여 발생하는 국부적인 사면 파괴구역의 긴급 보수용으로는 부적합하다.Methods for slope stabilization include the retaining wall method of cutting the soil and installing reinforced earth retaining walls and concrete retaining walls, and the anchor material method of installing anchor materials such as soil nailing and earth anchors underground. It can be said that it is a slope stabilization method planned for a long time, and it is caused by abnormal weather phenomena (intensive heavy rain of abnormal rainfall intensity, high frequency typhoons, and annual thawing season due to the characteristics of the domestic climate), which are major factors that greatly increase the frequency of slope destruction. It is not suitable for emergency repair of local slope failure areas.

사면의 국부적인 원호파괴는 그 규모가 작더라도 도로의 낙석을 발생하여 인명피해와 도로 손상 등 일으키고 2차 사고도 유발할 수 있어 신속한 보수를 필요로 한다.Even if the scale is small, the local arc destruction of a slope may cause casualties, road damage, etc., and may cause secondary accidents, so prompt repair is required.

본 발명의 배경을 확인할 수 있는 특허문헌으로 등록특허 제10-1443241호는 사면의 국부적 유실부분을 정리하는 제1단계와; 상기 국부적 유실부분에 상호 간에 일정 간격을 두고 지반 보강체 삽입홀을 천공하고 상기 지반 보강체 삽입홀에 지반 보강체를 삽입하되 상기 지반 보강체가 상기 제1단계를 통해 정리된 기초면의 상부로 돌출되도록 삽입 및 상기 삽입홀 내부를 그라우팅하는 제2단계와; 상기 제1단계에서 조성한 기초면에 상기 지반 보강체가 각각 관통되도록 녹화겸용 수압판을 설치하는 제3단계와; 상기 제3단계 이후 상기 지반 보강체를 설계 하중으로 인장한 후 보호캡을 설치하는 제4단계와; 상기 제4단계 이후 상기 녹화겸용 수압판에 녹화 종자를 살포하여 녹화하는 제5단계로 이루어지는 것이며, 앵커 등의 지반 보강체를 이용한 방식이기 때문에 특수 중장비인 천공장비와 그라우팅 장비가 필요하고 결국 긴급 보수를 위한 작업성이 좋지 못하다.As a patent document that can confirm the background of the present invention, Registered Patent No. 10-1443241 includes a first step of arranging the local loss of a slope; A ground reinforcing body insertion hole is drilled at a predetermined distance from each other in the local loss portion, and a ground reinforcing body is inserted into the ground reinforcing body insertion hole, but the ground reinforcing body protrudes above the ground surface arranged through the first step a second step of inserting and grouting the inside of the insertion hole so as to be inserted; a third step of installing a water pressure plate combined with greening so that the ground reinforcement body passes through the base surface created in the first step; a fourth step of installing a protective cap after tensioning the ground reinforcement body with a design load after the third step; After the fourth step, it consists of a fifth step of greening by spraying greening seeds on the water pressure plate combined with greening. workability is not good for

등록특허 제10-1016047호는 암사면에 앵커를 삽입할 수 있도록 천공홀을 천공하는 단계와, 이중 외곽비트를 이용하여 상기 천공홀을 천공하면서 동시에 상기 천공홀의 입구 측에는 상기 천공홀보다 확장된 내경과 판판한 바닥면을 갖는 장착홈을 천공하는 단계로 이루어진 천공단계; 상기 천공홀에 상기 앵커를 삽입하고 고정하는 고정단계; 상기 장착홈의 바닥면에 밀착되도록 상기 장착홈에 지압판을 안착시키는 안착단계; 및 상기 지압판을 관통하여 외부로 노출되는 상기 앵커의 두부에 프리스트레스를 가하고 상기 지압판의 타측면에 밀착되는 헤드플레이트를 결속시키는 결속단계; 를 단계적으로 실시하여 상기 지압판과 앵커와 암사면이 일체로 거동하도록 보강하는 것이지만, 그 방식 상 특수 중장비인 천공장비와 그라우팅 장비가 필요하고 결국 긴급 보수를 위한 작업성이 좋지 못하다.Registered Patent No. 10-1016047 discloses the steps of drilling a drilling hole so that an anchor can be inserted into the female slope, and at the same time drilling the drilling hole using a double outer bit, the inlet side of the drilling hole has an inner diameter larger than the drilling hole A drilling step comprising the step of drilling a mounting groove having a flat bottom surface; a fixing step of inserting and fixing the anchor into the drilling hole; a seating step of seating the acupressure plate in the mounting groove so as to be in close contact with the bottom surface of the mounting groove; and a binding step of applying prestress to the head of the anchor exposed to the outside through the acupressure plate and binding the head plate in close contact with the other side of the acupressure plate; is implemented in stages to reinforce the acupressure plate, anchor, and rock slope so that they behave integrally, but special heavy equipment such as drilling equipment and grouting equipment are required for that method, and consequently, workability for emergency repair is not good.

한편, 도로나 철도 등의 건설을 위한 절취 또는 성토 사면에 대한 안정성 확보와 친환경적 조성을 위하여 식생매트를 설치하는 기술로서 예를 들어 등록특허 제10-0514576호 등이 있으나, 이들 특허는 국부적인 원호파괴에 적합하지 못하다.On the other hand, as a technology for installing vegetation mats to secure stability and eco-friendly composition for cutting or embankment slopes for construction of roads or railways, for example, there are registered patents No. 10-0514576, etc., but these patents are for local arc destruction not suitable for

등록특허 제10-1443241호Registered Patent No. 10-1443241 등록특허 제10-1016047호Registered Patent No. 10-1016047

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 집중호우 등 천재지변으로 사면에 생기는 국부적인 원호파괴를 신속하게, 친환경적으로, 특수 중장비를 사용하지 않고 보수하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 공법 및 모듈을 제공하려는데 그 목적이 있다. The present invention is to solve the problems described above, and it is an eco-friendly slope using the settlement of vegetation soil pack that repairs the local arc destruction that occurs on the slope due to natural disasters such as localized heavy rain quickly, environmentally, and without using special heavy equipment. The purpose is to provide a rapid repair greening method and module.

본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈은, 사면에 함몰 형태로 생긴 보수구역을 메우고 식생층 재료를 통해 녹화하는 식생토팩과; 상기 식생토팩을 상기 보수구역 안에 정착하는 정착수단을 포함하며, 상기 식생토팩은 각각 내부에 기초용과 식생용의 식생층 재료가 담기는 2종 이상의 식생토팩으로 구분되어 상기 보수구역의 바닥에서부터 용도별로 적층되고, 상기 정착수단은 상기 2종 이상의 식생토팩을 서로 당기는 힘과 상기 사면을 향하는 힘을 통해 정착하는 것을 특징으로 한다.The eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack according to the present invention comprises: a vegetation soil pack for filling the repair area formed in the shape of a depression on the slope and greening through the vegetation layer material; and fixing means for fixing the vegetation soil pack in the maintenance area, wherein the vegetation soil pack is divided into two or more types of vegetation soil packs containing vegetation layer materials for foundation and vegetation, respectively, from the bottom of the maintenance zone to each use. It is stacked, and the fixing means is characterized in that the two or more types of vegetation soil packs are fixed through a force pulling each other and a force toward the slope.

바람직하게, 상기 정착수단은 상기 보수구역의 바닥부에 설치되어 그 위에 상기 식생토팩이 설치되는 내부 정착판, 상기 식생토팩의 표면쪽에 설치되는 외부 정착판, 상기 내부 정착판과 외부 정착판에 연결되는 인장재를 포함한다.Preferably, the fixing means is installed at the bottom of the maintenance area and connected to an internal fixing plate on which the vegetation soil pack is installed, an external fixing plate installed on the surface side of the vegetation soil pack, and the internal fixing plate and the external fixing plate Includes tension members that become

본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 공법 및 모듈에 의하면, 천재지변 등으로 인하여 사면에 국부적으로 원호파괴를 자생 녹화가 가능한 식생토팩으로 보수하여 신속한 복구가 가능하고 사면을 친환경적으로 조성하는 효과가 있으며, 식생토팩을 식생재료의 기능별로 구분하면서 국부적인 곳에 용이한 시공이 가능하도록 일정 크기로 패키지화 함으로써 경제성과 시공성도 향상하는 효과가 있고, 식생토팩들을 인장력을 통해 식생층이 견고해지므로 장기간의 녹화도 가능한 효과도 있다.According to the eco-friendly slope rapid repair and greening method and module using the settlement of vegetation soil pack according to the present invention, it is possible to quickly restore the slope due to natural disasters, etc. It has the effect of composing the vegetation soil packs according to the function of the vegetation material and packaging them in a certain size to enable easy construction in local areas, thereby improving economic efficiency and constructability. Since it is sturdy, it has the effect of being able to record for a long period of time.

본 발명은 기존 옹벽 방법이나 앵커 방법과 전혀 다른 개념의 해결원리를 이용한 것으로 국부적인 원호파괴의 보수 공사 시 쉽고 적은 비용으로 적용이 가능하다.The present invention uses a solution principle of a completely different concept from the existing retaining wall method or anchor method, and can be easily and inexpensively applied in the repair work of local arc destruction.

도 1은 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈의 분해 사시도.
도 2는 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈에 적용된 내부 정착판의 예시도.
도 3은 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈에 적용된 내부 정착판 전단키의 예시도.
도 4는 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈에 적용된 외부 정착판의 예시도.
도 5는 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈에 적용된 인장재가 3종 식생토팩에 고정된 예를 보인 도면.
도 6은 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈에 적용된 정착수단의 다른 예시도.
도 7은 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈에 적용된 식생토팩의 현장 제조 시설의 예시도.
도 8은 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 공정도.
도 9는 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈이 격자형의 콘크리트 블록과 연계하여 시공된 예시도.
1 is an exploded perspective view of an eco-friendly slope rapid repair greening module using the settlement of vegetation soil pack according to the present invention.
Figure 2 is an exemplary view of the internal fixing plate applied to the eco-friendly slope rapid repair greening module using the settlement of the vegetation soil pack according to the present invention.
Figure 3 is an exemplary view of the internal anchoring plate shear key applied to the eco-friendly slope rapid repair and greening module using the settlement of the vegetation soil pack according to the present invention.
Figure 4 is an exemplary view of an external fixing plate applied to the eco-friendly slope rapid repair greening module using the settlement of the vegetation soil pack according to the present invention.
5 is a view showing an example in which the tension member applied to the eco-friendly slope rapid repair and greening module using the fixation of the vegetation soil pack according to the present invention is fixed to the three types of vegetation soil pack.
6 is another exemplary view of the fixing means applied to the eco-friendly slope rapid repair and greening module using the settlement of the vegetation soil pack according to the present invention.
7 is an exemplary view of an on-site manufacturing facility of the vegetation soil pack applied to the eco-friendly slope rapid repair and greening module using the settlement of the vegetation soil pack according to the present invention.
8 is an eco-friendly slope rapid repair and greening process diagram using the settlement of vegetation soil pack according to the present invention.
9 is an exemplary view in which an eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack according to the present invention is constructed in connection with a grid-type concrete block.

하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related well-known function or configuration may unnecessarily obscure the gist of the present invention, the detailed description thereof will be omitted. And the terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators. Therefore, the definition should be made based on the content throughout this specification.

도 1에서 보이는 바와 같이, 본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈(100)은, 내부 정착판(10), 식생토팩으로서 1종 내지 3종 식생토팩(20,30,40), 유실방지부재로서 와이어 메쉬(50)) 또는 토목섬유, 외부 정착판(60), 외부 정착판(60)과 와이어 메쉬(50)의 유지를 위한 인장재(70)를 구성으로 한다. 상기 구성 중에서 내부 정착판(10)과 유실방지부재와 외부 정착판(60) 및 인장재(70)는 식생토팩들을 사면에 안정적으로 정착하기 위한 정착수단이다.As shown in FIG. 1, the eco-friendly slope rapid repair and greening module 100 using the fixation of the vegetation soil pack according to the present invention is an internal fixing plate 10 and one to three types of vegetation soil packs (20, 30, 40), as a loss preventing member, wire mesh 50) or geotextiles, an external fixing plate 60, an external fixing plate 60 and a tension member 70 for maintaining the wire mesh 50 are configured. Among the configurations, the internal anchoring plate 10, the loss prevention member, the external anchoring plate 60, and the tension member 70 are fixing means for stably fixing the vegetation soil packs on the slope.

상기 정착수단의 구성 중에서 내부 정착판(10)은 필수구성요소는 아니며 보수구역(원호파괴)(1)의 규모가 작은 경우 생략될 수 있고 이 때 인장재(70)는 식생토팩에 고정되며 상기 구성의 수량은 보수구역의 크기에 따라 달라지며, 또한, 유실방지부재도 식생토팩을 통해 유실방지가 가능할 수 있으므로 필요에 따라 선택되어 사용된다.Among the components of the fixing means, the internal fixing plate 10 is not an essential component and may be omitted when the size of the repair zone (arc destruction) 1 is small. At this time, the tension member 70 is fixed to the vegetation soil pack and the configuration The quantity of water varies depending on the size of the maintenance area, and the loss prevention member can also be used to prevent loss through the vegetation soil pack, so it is selected and used as needed.

1. 내부 정착판(10).1. Inner fixing plate (10).

내부 정착판(10)은 보수구역(1)의 바닥부에 정착되어 보수구역(1)의 추가 파괴가 발생하여도 녹화 모듈이 시공 상태를 유지하도록 하고 또한, 인장재(70)를 매개로 하는 외부 정착판(60)의 시공 상태를 유지하도록 한다.The internal fixing plate 10 is fixed to the bottom of the maintenance zone 1 so that the greening module maintains the construction state even if additional destruction of the maintenance zone 1 occurs, and the external To maintain the construction state of the fixing plate (60).

내부 정착판(10)의 구조는 보수구역(1)의 바닥면에 지지되는 내부정착판 몸체(11)를 기본 구성으로 하며, 그 형상은 원형, 사각형, 육각형, 격자형 등 다양한 형태가 가능하고 재질은 금속, 콘크리트, FRP, 플라스틱 수지계열 등 다양한 재질이 가능하며 취급성(보관, 운반)과 시공성을 향상하기 위하여 경량의 재질이 바람직하다. 또한, 내부 정착판(10)은 양쪽이 막힌 판의 구조도 가능하지만, 다공성(격자형태)도 가능하다.The structure of the internal fixing plate 10 is based on the internal fixing plate body 11 supported on the bottom surface of the maintenance area 1, and its shape is available in various forms such as round, square, hexagonal, grid type, etc. Various materials such as metal, concrete, FRP, and plastic resin are available, and lightweight materials are preferable to improve handling (storage, transport) and workability. In addition, the internal fixing plate 10 may have a structure of a plate in which both sides are blocked, but a porous (lattice form) is also possible.

내부 정착판(10)은 인장재 연결부(12)를 포함한다.The inner fixing plate 10 includes a tension member connecting portion 12 .

인장재 연결부(12)는 인장재(70)의 바닥쪽 끝이 연결되는 부분으로 인장재(70)의 다양한 연결방식이 가능하게 구성되는 것으로 도면은 일 예를 도시한 것이다.The tension member connection part 12 is a part to which the bottom end of the tension member 70 is connected, and is configured to enable various connection methods of the tension member 70 , and the drawing shows an example.

도 2에서 보이는 것처럼, 인장재 연결부(12)는 일체형 인장재 연결부(12-1)(A) 또는 분리형 인장재 연결부(12-2)(B)가 가능하다.As shown in FIG. 2 , the tension member connection part 12 may be an integral tension member connection part 12-1 (A) or a separate tension member connection part 12-2 (B).

일체형의 인장재 연결부(12-1)는 내부정착판 몸체(11)의 도면 기준 상면에 돌출 형성되는 봉의 형태이며 인장재 연결부(예를 들어 인장재가 삽입 고정되는 구멍 또는 링)를 갖는 구조이고 하단부가 내부정착판 몸체(11)에 용접 등으로 고정되어 일체화된다.The integral tension member connection part 12-1 is in the form of a rod protruding from the upper surface of the drawing reference of the inner fixing plate body 11, and has a structure having a tension member connection part (for example, a hole or a ring into which the tension member is inserted and fixed), and the lower part is internal It is fixed to the fixing plate body 11 by welding or the like and integrated.

분리형 인장재 연결부(12-2)는 내부정착판 몸체(11)와 분리된 단품이며, 이들의 고정방법은 예컨대, 예를 들어 내부정착판 몸체(11)의 대략 중앙에 연결구멍을 형성하고 봉 형상인 분리형의 인장재 연결부(12-2)를 내부정착판 몸체(11)의 연결구멍의 밑에서 위쪽으로 끼워 고정하는 것이고, 이 때, 분리형의 인장재 연결부(12-2)가 내부정착판 몸체(11)의 위쪽으로 빠지지 않도록 분리형의 인장재 연결부(12-2)는 하단부에 턱이 포함된다.The separable tension member connecting part 12-2 is a single piece separated from the inner fixing plate body 11, and their fixing method is, for example, forming a connection hole in the approximately center of the internal fixing plate body 11 and forming a rod shape. The phosphorus separation type tension member connection part 12-2 is inserted and fixed from the bottom of the connection hole of the inner fixing plate body 11 upward, and at this time, the separate type tension member connection part 12-2 is connected to the inner fixing plate body 11 The separable tension member connection part 12-2 includes a chin at the lower end so as not to fall out of the upper part.

또한, 내부 정착판(10)은 보수구역(1)의 바닥부에 삽입 정착되는 정착수단으로 하나 이상의 전단키(13)를 포함한다.In addition, the internal fixing plate 10 includes one or more shear keys 13 as fixing means inserted and fixed at the bottom of the maintenance area 1 .

전단키(13)는 내부정착판 몸체(11)의 저면에서 하부를 향해 돌출되는 뾰족한 돌기의 형태로서 보수구역(1)의 바닥부 안에 삽입 정착되어 내부 정착판(10)을 이탈없이 고정한다.The shear key 13 is in the form of a pointed protrusion protruding downward from the bottom of the inner fixing plate body 11, and is inserted and fixed in the bottom of the maintenance area 1 to fix the internal fixing plate 10 without separation.

도 3에서 보이는 것처럼, 전단키(13)도 인장재 연결부(12-1,12-2)와 마찬가지로 일체형 전단키(13-1)(A), 분리형 전단키(13-2)(B)가 가능하다.As shown in Figure 3, the shear key 13 is also an integral shear key (13-1) (A), like the tension member connection portion (12-1, 12-2), it is possible to separate the shear key (13-2) (B).

일체형 전단키(13-1)는 내부정착판 몸체(11)의 저면에 용접 등으로 고정되고 이 때, 일체형 인장재 연결부(12-1)와 하나의 몸체인 것이 바람직하다.The integral shear key 13-1 is fixed to the bottom surface of the inner fixing plate body 11 by welding or the like.

분리형 전단키(13-2)는 바람직하게 분리형 인장재 연결부(12-2)와 하나의 몸체로 제조 즉 분리형 인장재 연결부(12-2)의 저부에 뾰쪽하게 형성되는 구조이고, 내부정착판 몸체(11)와 분리 상태로 취급되다가 시공 현장에서 사용된다.The separable shear key 13-2 is preferably manufactured as a single body with the separable tension member connecting portion 12-2, that is, a structure formed sharply at the bottom of the separable tension member connecting portion 12-2, and the inner fixing plate body 11 It is treated as a separate state and then used at the construction site.

내부 정착판(10)은 인장재 연결부(12)와 전단키(13)의 형태(일체형과 분리형)에 따라 시공 작업이 달라지며, 일체형의 경우 내부 정착판(10)의 단일 설치로 가능하고, 분리형의 경우 예를 들어 인장재(70)가 연결된 분리형 전단키(13-2)의 정착 후 내부정착판 몸체(11)를 분리형 전단키(13-2)에 조립하는 방법으로 시공한다.The construction work of the internal fixing plate 10 varies depending on the shape (integral type and separate type) of the tension member connection part 12 and the shear key 13, and in the case of an integral type, it is possible with a single installation of the internal fixing plate 10, and In this case, for example, after fixing the separable shear key 13-2 to which the tension member 70 is connected, it is constructed by assembling the inner fixing plate body 11 to the separable shear key 13-2.

상기 정착수단은 보수구역(1)의 경사가 심한 경우 또는 보수 규모가 큰 경우 또는 설치가 어려운 경우에 바람직하다.The fixing means is preferable when the inclination of the repair zone 1 is severe, or when the repair scale is large, or when installation is difficult.

본 발명은 도 6에서 보이는 것처럼, 기성품의 앵커(80), 록볼트, 소일네일 등 지반보강수단이 추가로 적용되는 것도 가능하다.In the present invention, as shown in FIG. 6, it is also possible that ground reinforcement means such as a ready-made anchor 80, a rock bolt, and a soil nail are additionally applied.

앵커(80) 등의 지반보강수단은 내부 정착판(10)을 관통하면서 지중에 설치되어 내부 보강판(10)의 고정과 지반 보강을 함께 하는 것 또는 내부 보강판(10)과 연결되지 않고 지반만 보강하는 것이 가능하다.Ground reinforcement means such as anchor 80 are installed in the ground while penetrating the internal fixing plate 10 to fix the internal reinforcement plate 10 and reinforce the ground together, or the internal reinforcement plate 10 is not connected to the ground. It is only possible to reinforce

2. 식생토팩(20,30,40).2. Vegetation soil pack (20, 30, 40).

녹화 작업이 용이하고 장기간 녹화를 유지하도록 식생층은 3개의 층, 아래에서부터 기초층 - 양분공급층 - 발아층으로 이루어지며, 작업성과 시공성 및 안정성을 향상하고 장기간 녹화의 유지를 위하여 각각의 층은 패키지화되어 사용된다.The vegetation layer consists of three layers, from the bottom to the base layer - nutrient supply layer - germination layer, so that greening work is easy and greening is maintained for a long time. packaged and used.

즉, 식생토팩은 1종 식생토팩(20), 2종 식생토팩(30), 3종 식생토팩(40)으로 구분되며, 이들의 식생토팩(20,30,40)은 토목섬유낭이나 그물망의 안에 사면 구조안정성과 경제성의 최적화를 위하여 서로 다른 조성의 식생토가 충진되는 구성이다. 물론, 식생층 재료의 유실이 없다면 토목섬유낭이나 그물망을 사용하지 않고 벌크 형태(포장되지 않은 상태)로 시공할 수도 있다.That is, the vegetation soil pack is divided into a type 1 vegetation soil pack (20), a type 2 vegetation soil pack (30), and a type 3 vegetation soil pack (40), and these vegetation soil packs (20, 30, 40) are geotextile fibrous bags or meshes. It is a composition in which vegetation soil of different composition is filled inside for the optimization of structural stability and economic feasibility of the slope. Of course, if there is no loss of vegetation layer material, it can be constructed in bulk (unpackaged state) without using a geotextile bag or mesh.

본 발명은 식생층을 위한 식생층 재료가 기초층 - 양분공급층 - 발아층의 용도에 따라 구분되며, 상기 층별 식생층 재료는 1종 내지 3종 식생토팩(20,30,40)에서 구분된다.In the present invention, the vegetation layer material for the vegetation layer is classified according to the use of the base layer - the nutrient supply layer - the germination layer. .

1종 식생토팩(20)은 발아용 재료로서 흙, 씨앗, 양분토 등을 모두 섞어 만든 팩으로서 사면에 표면부에만 최소로 설치되어 경제성을 확보한다.The first-class vegetation soil pack 20 is a pack made by mixing all of soil, seeds, and nutrient soil as a germination material, and is minimally installed only on the surface of the slope to secure economic efficiency.

2종 식생토팩(30)은 1종 식생토팩(20)과 비교하면 씨앗을 제외한 흙과 양분토 등 즉 양분공급용 재료로 구성되어 1종 식생토팩(20)의 씨앗이 안정적으로 식생하도록 양분을 공급하고 안정화하는 식생기반 팩이다.Compared to the first-class vegetation soil pack 20, the second-class vegetation soil pack 30 is composed of soil and nutrient soil excluding seeds, that is, materials for nutrient supply, so that the seeds of the first-type vegetation soil pack 20 can be stably vegetated. It is a vegetation-based pack that supplies and stabilizes.

3종 식생토팩(40)은 기초용 재료로서 약간의 흙과 대부분 골재(쇄석)으로 이루어져 있으며, 보수구역(1)의 가장 안쪽, 내부 정착판(10)이 적용된 경우 내부 정착판(10)의 바로 위에 설치되어 전단마찰저항 증가를 통한 구조안정성 확보용 팩이다.The three-type vegetation soil pack 40 is a basic material and consists of some soil and mostly aggregate (crushed stone). It is a pack for securing structural stability by increasing shear friction resistance by being installed directly above it.

본 발명에 따르면, 보수구역(1)의 바닥에서부터 3종 식생토팩(40) - 2종 식생토팩(30) - 1종 식생토팩(20)이 위쪽에 적층되는 형태의 식생층을 형성하며 자연상태에서의 토층구조에 가장 적합한 형태로 사면이 복원되는 원리이다.According to the present invention, from the bottom of the maintenance area (1), a vegetation layer of the type 3 vegetation soil pack 40 - the type 2 vegetation soil pack 30 - the type 1 vegetation soil pack 20 is stacked on top of it, and it is in a natural state It is the principle that the slope is restored to the most suitable shape for the soil structure in

한편, 2종 식생토팩(30)과 3종 식생토팩(40)은 전단마찰저항을 높이기 위하여 내부의 재료가 소일 시멘트를 포함할 수 있다. 소일 시멘트는 2종 또는 3종 식생토팩(30,40) 재료의 전체 100중량부에 대하여 2~10중량부를 혼합비율로 한다.On the other hand, the type 2 vegetation soil pack 30 and the type 3 vegetation soil pack 40 may include soil cement as an internal material to increase shear friction resistance. Soil cement is used as a mixing ratio of 2 to 10 parts by weight based on 100 parts by weight of the total of 2 or 3 types of vegetation soil pack (30, 40).

한편, 식생층은 2개의 식생토팩으로 가능하고, 예를 들어 전술한 1종과 2종 식생토팩(10,20)을 하나로 합쳐 기초층과 식생층의 2층 구조도 가능하다.On the other hand, the vegetation layer is possible with two vegetation soil packs, for example, a two-layer structure of a base layer and a vegetation layer is also possible by combining the above-mentioned type 1 and type 2 vegetation soil packs 10 and 20 into one.

또는 2종과 3종 식생토팩(20,30)만을 사용하고 단 2종 식생토팩(20)에 씨앗을 심는 시드 스프레이 공정이 필요하다.Alternatively, the seed spray process of using only the 2 and 3 types of vegetation soil packs (20, 30) and planting seeds in only the 2 types of vegetation soil packs (20) is required.

1종 내 3종 식생토팩(20,30,40)은 시공 현장에서 제조되어 사용될 수 있으며, 현장 제조 시설의 일 예로서 도 7에서 보이는 것처럼, 현장 제조 차량(200)은 자주식과 견인식 모두가 가능하고 식생재료(현지토 등의 흙, 양분, 자갈, 씨앗 등으로서 종별 식생토팩에 따라 재료를 선택)를 투입하는 호퍼(210), 호퍼(210)의 하측 배출단에 식생낭(220)이 거치되도록 하여 식생낭(220) 안에 호퍼(210)에서 낙하하는 식생재료가 충진되도록 하고 식생재료의 충진이 완료된 식생낭(220)을 이송하는 이송수단으로서 예컨대 컨베이어(230), 컨베이어(230)를 통해 이송된 식생낭을 다짐하는 다짐기(240)를 포함하여 식생토팩(20,30,40)을 제조한다.Type 1 within 3 types of vegetation soil packs (20, 30, 40) can be manufactured and used at the construction site, and as shown in FIG. 7 as an example of a field manufacturing facility, the field manufacturing vehicle 200 can be both self-propelled and towed A hopper 210 that puts vegetation materials (such as soil, nutrients, gravel, seeds, etc., according to the type of vegetation soil pack, etc.) into the hopper 210, and the vegetation bag 220 is mounted at the lower discharge end of the hopper 210. As a transfer means for transferring the vegetation material falling from the hopper 210 into the vegetation bag 220 so as to be filled and the filling of the vegetation material is completed, for example, the conveyor 230, through the conveyor 230. Including a compactor 240 for compacting the transferred vegetation bag, the vegetation soil pack (20, 30, 40) is manufactured.

3. 와이어 메쉬(50).3. Wire mesh (50).

유실부재로서 와이어 메쉬(50)는 식생층이 유실되지 않도록 1종 식생토팩(20)을 덮어 보호하며, 외부 정착판(60)을 통해 고정되고 부가적으로 가장자리가 보수구역(1)의 둘레부인 사면에 앵커로 정착될 수 있다.As a loss member, the wire mesh 50 covers and protects the first-class vegetation soil pack 20 so that the vegetation layer is not lost, and is fixed through the external fixing plate 60 and additionally the edge is the periphery of the maintenance area (1). Can be anchored on slopes.

유실부재를 사용하지 않으면서 1종 식생토팩(20)들이 유실되지 않도록 하기 위해서는 모든 1종 식생토팩(20)들이 외부 정착판(60)에 의해 고정되어야 하지만, 유실부재를 사용함으로써 1종 식생토팩(20)이 많은 수량으로 설치되더라도 와이어 메쉬(50)를 통해 고정하는 것이 가능하고 와이어 메쉬(50)는 1종 식생토팩(20)보다 적은 소수의 외부 정착판(60)으로 고정이 가능하므로 결국 모든 1종 식생토팩(20)들의 유실 방지가 가능하다.In order to prevent the loss of the first-class vegetation soil packs 20 without using the loss member, all the first-class vegetation soil packs 20 must be fixed by the external fixing plate 60, but by using the loss member, the first-class vegetation soil packs are used. Even if (20) is installed in a large quantity, it is possible to fix it through the wire mesh 50, and the wire mesh 50 is fixed with a small number of external fixing plates 60 less than the type 1 vegetation soil pack 20, so eventually It is possible to prevent the loss of all type 1 vegetation soil pack (20).

4. 외부 정착판(60).4. External fixing plate (60).

외부 정착판(60)은 식생토팩(20,30,40)을 시공 상태로 정착하는 것이며, 인장재(70)의 인장력을 이용하는 것을 예로 들어 설명한다.The external fixing plate 60 is to fix the vegetation soil packs 20, 30, and 40 in a construction state, and the use of the tensile force of the tension member 70 will be described as an example.

외부 정착판(60)의 구조는 예를 들어 평평한 판상이며 물론 형태로 한정되는 것은 아니며 특히 외부 정착판(60)은 1종 식생토팩(20)의 씨앗이 발아하는 것을 막지 않아야 하므로 다공성이 바람직하다.The structure of the external fixation plate 60 is, for example, a flat plate shape, and of course it is not limited to the shape. In particular, the external fixation plate 60 should not prevent the seeds of the first-class vegetation soil pack 20 from germinating, so it is preferable to have porosity. .

외부 정착판(60)이 씨앗의 발아를 막지 않는 방법으로는 크기를 최소화하여 상호 간에 넓은 공간을 확보하는 방법도 가능하다.As a method in which the external fixing plate 60 does not block the germination of seeds, it is also possible to secure a large space between them by minimizing the size.

외부 정착판(60)은 인장재(70)의 지상쪽 단부가 정착(고정)되도록 구성되어야 하고, 예를 들어 도 4의 (A)에서 보이는 것처럼, 외부정착판 몸체(61)의 대략 중앙에 정착공(62)을 형성하여 인장재(70)의 지상측 단부를 정착공(62)에 삽입한 후 둘레부에 쐐기(71)를 끼워 쐐기(71)가 정착공(62)에 쐐기 결합되는 방식이 있고, 도 4의 (B)처럼 인장재(70)의 지상측 단부에 볼트(72)를 형성하여 볼트(72)를 정착공(61)에 관통시킨 후 너트(72)를 체결하는 방식이 있다.The external fixing plate 60 should be configured such that the above-ground end of the tension member 70 is fixed (fixed), for example, as shown in FIG. A method in which a ball 62 is formed and the above-ground end of the tension member 70 is inserted into the anchorage hole 62, and then a wedge 71 is inserted around the periphery so that the wedge 71 is wedge-coupled to the anchorage hole 62 There is a method of fastening the nut 72 after forming the bolt 72 on the ground side end of the tension member 70 as shown in FIG. 4B , passing the bolt 72 through the fixing hole 61 .

외부 정착판(60)은 필요에 따라 1종 식생토팩(20)에 삽입되는 스파이크가 포함될 수도 있다.The external fixing plate 60 may include spikes inserted into the first-class vegetation soil pack 20 as needed.

외부 정착판(60)은 내부 정착판(10)과 1 : 1로 연결되도록 동일한 수량으로 적용되거나 내부 정착판(10)보다 적은 수량이 적용되는 것도 가능하다.The external fixing plate 60 may be applied in the same quantity to be connected 1:1 with the internal fixing plate 10 or a smaller quantity than the internal fixing plate 10 may be applied.

5. 인장재(70).5. Tension member (70).

인장재(70)는 인장력을 통해 외부 정착판(60)을 당겨 식생층이 안정성을 유지하도록 하며, 지상측 단부는 외부 정착판(60)에 고정되어야 하지만 지중측 단부는 내부 정착판(10) 또는 식생층 또는 보수구역(1)의 지중에 고정되는 것이 가능하다.The tension member 70 pulls the external anchorage plate 60 through a tensile force so that the vegetation layer maintains stability, and the ground end must be fixed to the external anchorage plate 60, but the underground end is the inner anchorage plate 10 or It is possible to be fixed in the vegetation layer or underground of the maintenance area (1).

내부 정착판 고정식은 인장재(70)의 단부를 내부 정착판(10)의 인장재 연결부(12)에 연결하는 것이다.The internal fixing plate fixing type connects the end of the tension member 70 to the tension member connection part 12 of the internal fixing plate 10 .

식생층 고정식은 도 5에서 보이는 것처럼, 인장재(70)의 단부를 식생층 중에서 가장 아래쪽에 배치되는 3종 식생토팩(40)에 고정하는 것이고, 지중 고정식은 인장재(70)의 단부를 지중에 앵커링으로 고정하는 것이며, 이 두가지 방식을 통해 내부 정착판(10)의 생략이 가능하다.As shown in FIG. 5, the vegetation layer fixing type is to fix the end of the tension member 70 to the three-type vegetation soil pack 40 disposed at the bottom of the vegetation layer, and the underground fixing type anchors the end of the tension member 70 in the ground. is to be fixed, and it is possible to omit the internal fixing plate 10 through these two methods.

본 발명에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 공법은 다음과 같으며 내부 정착판(10)과 와이어 메쉬(50)를 사용하는 것을 예로 들어 설명한다(도 8 참고).The eco-friendly slope rapid repair and greening method using the settlement of the vegetation soil pack according to the present invention is as follows, and it will be described using the internal fixing plate 10 and the wire mesh 50 as an example (refer to FIG. 8 ).

(S10) 내부 정착판 설치.(S10) Installation of the internal fixing plate.

사면의 보수구역(1)의 바닥에 내부 정착판(10)을 설치한다.Install the internal fixing plate (10) on the bottom of the maintenance area (1) of the slope.

내부 정착판(10)은 후속 공정에서 설치되는 1종 내지 3종 식생토팩(20,30,40)이 유실되지 않고 적층을 유지하도록 상호 간에 적절한 간격을 두고 설치한다. 전단키(13)가 적용된 경우 전단키(13)가 보수구역(1)에 삽입 정착되어 내부 정착판(10)은 전단력을 통해 안정성을 확보한다.The internal anchoring plate 10 is installed at an appropriate distance from each other so that the first to third types of vegetation soil packs 20, 30, and 40 installed in the subsequent process are not lost and the stack is maintained. When the shear key 13 is applied, the shear key 13 is inserted and fixed in the maintenance area 1, so that the internal fixing plate 10 secures stability through shear force.

(S20) 인장재 연결.(S20) Tension member connection.

내부 정착판(10)의 인장재 연결부(12)에 인장재(70)의 일측 단부를 고정하여 인장재(70)를 내부 정착판(10)에 연결한다.One end of the tension member 70 is fixed to the tension member connection part 12 of the internal fixing plate 10 to connect the tension member 70 to the internal fixing plate 10 .

이 때, 인장재(70)는 보수구역(1)의 바닥에서부터 외부 정착판(60)의 위치를 고려하여 여유있는 길이로 재단되어 준비될 수 있다.At this time, the tension member 70 may be prepared by cutting it to a sufficient length in consideration of the position of the external fixing plate 60 from the bottom of the repair zone 1 .

(S30) 식생층 시공.(S30) Vegetation layer construction.

내부 정착판(10)들에 의해 형성된 내부 정착층 위에 3종 식생토팩(40)을 설치하고, 3종 식생토팩(40) 위에 2종 식생토팩(30)을 설치하며, 최종 2종 식생토팩(30) 위에 1종 식생토팩(20)을 설치하여 식생층을 시공한다.Install the 3-type vegetation soil pack 40 on the internal anchoring layer formed by the internal anchoring plates 10, install the 2-type vegetation soil pack 30 on the 3-type vegetation soil pack 40, and finally install the 2-type vegetation soil pack ( 30) Install the 1st type vegetation soil pack 20 on the top to construct the vegetation layer.

이와 같이 식생층을 시공할 때 긴장재(70)가 묻히지 않도록 한다.When constructing the vegetation layer in this way, the tension material 70 is not buried.

(S40) 와이어 메쉬 설치.(S40) Wire mesh installation.

1종 식생토팩(20) 위에 와이어 메쉬(50)를 설치한다. 와이어 메쉬(50)가 외부 정착판(60)을 설치할 때까지 유실되지 않는다면 별도의 고정작업을 하지 않는다.A wire mesh 50 is installed on the type 1 vegetation soil pack 20 . If the wire mesh 50 is not lost until the external fixing plate 60 is installed, a separate fixing operation is not performed.

(S50) 외부 정착판 설치와 인장재 연결 및 긴장.(S50) External fixing plate installation and tension member connection and tension.

와이어 메쉬(50) 위에 다수의 외부 정착판(60)을 설치하고, 인장재(70)의 단부를 외부 정착판(60)의 정착공(62)에 관통시킨 후 쐐기(71)로 고정하거나, 인장재(70)의 볼트(72)를 정착공(62)에 관통시킨 후 너트(73)를 체결하여 고정한다.A plurality of external fixing plates 60 are installed on the wire mesh 50 and the ends of the tension members 70 are penetrated through the fixing holes 62 of the external fixing plates 60 and then fixed with wedges 71, or tension members. After the bolt 72 of (70) is passed through the fixing hole 62, the nut 73 is fastened to fix it.

인장재(70)를 긴장하여 1종 내지 3종 식생토팩(20,30,40)들을 압축하며 결국 1종 내지 3종 식생토팩(20,30,40)들이 서로 모아지는 방향으로 견고하게 지지됨으로써 식생층이 안정화된다. 또한, 1종 내지 3종 식생토팩(20,30,40)들은 자중을 통해 사면을 향하는 힘도 발생하여 원호파괴의 보수구역(1)에 안정적으로 설치된다. 또한, 1종 식생토팩(2)의 씨앗이 발아하여 성장하면서 그 뿌리를 통해 식생층 주변의 사면과 연결되어 동질감을 갖게 되면서 안정성이 더욱 커지게 된다.By tensioning the tension member 70, the 1st to 3rd type vegetation soil packs 20, 30, and 40 are compressed, and eventually the 1st to 3rd type vegetation soil packs 20, 30, 40 are firmly supported in the direction in which they are gathered, thereby forming vegetation. The layer is stabilized. In addition, the 1st to 3rd types of vegetation soil packs 20, 30, and 40 generate a force toward the slope through their own weight and are stably installed in the repair area 1 of the arc destruction. In addition, as the seeds of the type 1 vegetation soil pack (2) germinate and grow, they are connected to the slopes around the vegetation layer through their roots and have a sense of homogeneity, resulting in greater stability.

인장재(70)의 설치를 완료하면 외부 정착판(60)으로부터 돌출된 부분을 절단하여 마감한다.When the installation of the tension member 70 is completed, the portion protruding from the external fixing plate 60 is cut and finished.

이상의 공정을 통해 본 발명의 보수 녹화 공법을 완료한다.Through the above process, the maintenance greening method of the present invention is completed.

지금까지 설명한 것처럼, 본 발명은 사면에 원호파괴된 부분을 본 발명만을 사용하여 급속 보수 녹화하는 것이 가능하며, 다른 시공 예로서 도 9에서 보이는 것처럼, 격자형의 콘크리트 블록(300)과 연계하여 시공되는 것도 가능하고, 격자형의 콘크리트 블록(300)에 격자형태로 형성되는 공간에 본 발명의 모듈(100)을 설치하는 것이다.As described so far, in the present invention, it is possible to rapidly repair and record the arc-destroyed portion on the slope using only the present invention, and as another construction example, as shown in FIG. It is also possible to install the module 100 of the present invention in a space formed in a grid shape in the grid-type concrete block 300 .

또한, 본 발명은 사면의 보수나 보강이나 녹화를 위하여 사용되는 섬유시트 거푸집(예를 들어 등록특허 제10-0839233호 등)과 병행하는 것도 가능하다.In addition, the present invention can also be used in parallel with the fiber sheet formwork (eg, Patent Registration No. 10-0839233 No. 10-0839233, etc.) used for the repair, reinforcement, or greening of the slope.

즉, 본 발명은 기존의 모든 사면 보수 녹화 기술과 병행하여 시공될 수 있는 것이다.That is, the present invention can be constructed in parallel with all existing slope repair and greening technologies.

10 : 내부 정착판, 11 : 내부정착판 몸체
12,12-1,2-2 : 인장재 연결부, 13,13-1,13-2 : 전단키
20,30,40 : 1종 내지 3종 식생토팩,
50 : 와이어 메쉬,
60 : 외부 정착판, 61 : 외부정착판 몸체
61 : 정착공,
70 : 인장재, 71 : 쐐기
72 : 볼트, 73 : 너트
80 : 앵커,
100 : 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈,
200 : 현장 제조 차량,
210 : 호퍼, 220 : 식생낭
230 : 컨베이어, 240 : 다짐기
300 : 격자형의 콘크리트 블록,
10: internal fixing plate, 11: internal fixing plate body
12,12-1,2-2: Tension member connection, 13,13-1,13-2: Shear key
20, 30, 40: 1 to 3 types of vegetation soil pack,
50: wire mesh;
60: external fixing plate, 61: external fixing plate body
61: setter,
70: tension member, 71: wedge
72: bolt, 73: nut
80: anchor;
100: Eco-friendly slope rapid repair recording module using the settlement of vegetation soil pack,
200: field-manufactured vehicle;
210: hopper, 220: vegetation bag
230: conveyor, 240: compactor
300: grid-type concrete block,

Claims (10)

사면에 함몰 형태로 생긴 보수구역을 메우고 식생층 재료를 통해 녹화하는 식생토팩과;
상기 식생토팩을 상기 보수구역 안에 정착하는 정착수단을 포함하며,
상기 식생토팩은 각각 내부에 기초용과 식생용의 식생층 재료가 담기는 2종 이상의 식생토팩으로 구분되어 상기 보수구역의 바닥에서부터 용도별로 적층되고,
상기 정착수단은 상기 보수구역의 바닥부에 설치되어 그 위에 상기 식생토팩이 설치되며 인장재 연결부를 포함하는 내부 정착판, 상기 내부 정착판의 저면에 하부를 향해 돌출되는 뾰족한 돌기의 형태로 형성되며 보수구역의 바닥부 안에 삽입 정착되어 상기 내부 정착판을 고정하는 전단키, 상기 식생토팩의 표면쪽에 설치되는 외부 정착판, 일측이 상기 내부 정착판의 인장재 연결부에 연결되는 한편 타측이 상기 외부 정착판에 연결되는 인장재를 포함하여, 상기 2종 이상의 식생토팩을 서로 당기는 힘과 상기 사면을 향하는 힘을 통해 정착하는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈.
Vegetation soil pack for filling the repair area in the shape of a depression on the slope and greening it through the vegetation layer material;
It includes a fixing means for fixing the vegetation soil pack in the repair area,
The vegetation soil pack is divided into two or more types of vegetation soil pack containing the vegetation layer material for foundation and vegetation, respectively, and is stacked from the bottom of the maintenance area for each use,
The fixing means is installed at the bottom of the repair zone, the vegetation soil pack is installed thereon, an internal fixing plate including a tension member connection part, and a pointed protrusion protruding downward from the bottom of the internal fixing plate. A shear key that is inserted and fixed in the bottom of the zone to fix the internal anchoring plate, an external anchoring plate installed on the surface side of the vegetation soil pack, one side is connected to the tension member connection part of the inner anchorage plate, while the other side is connected to the external anchorage plate Eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack, characterized in that it is settled through the force of pulling the two or more types of vegetation soil pack to each other and the force toward the slope, including a tension member.
삭제delete 삭제delete 삭제delete 청구항 1에 있어서, 상기 보수구역의 바닥부에 지지되면서 지중에 삽입 설치되는 지반보강수단을 포함하는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈.The eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack according to claim 1, further comprising a ground reinforcing means installed in the ground while being supported on the bottom of the repair zone. 청구항 1에 있어서, 상기 식생토팩은 발아용 재료가 충진된 1종 식생토팩, 양분공급용 재료가 충진된 2종 식생토팩, 기초용 재료가 충진된 3종 식생토팩으로 구분되며, 바닥에서부터 상기 3종 식생토팩과 2종 식생토팩 및 1종 식생토팩의 순서로 적층되는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈.The method according to claim 1, The vegetation soil pack is divided into a type 1 vegetation soil pack filled with a material for germination, a type 2 vegetation soil pack filled with a material for nutrient supply, and a type 3 vegetation soil pack filled with a basic material, An eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack, characterized in that it is stacked in the order of species vegetation soil pack, type 2 vegetation soil pack, and type 1 vegetation soil pack. 청구항 6에 있어서, 상기 1종 식생토팩과 2종 식생토팩은 현지토를 포함하는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈.The eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack according to claim 6, wherein the type 1 vegetation soil pack and the type 2 vegetation soil pack include local soil. 청구항 6에 있어서, 상기 2종 식생토팩과 3종 식생토팩은 소일 시멘트를 포함하는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈.[Claim 7] The eco-friendly slope rapid repair and greening module using the settling of the vegetation soil pack according to claim 6, wherein the type 2 vegetation soil pack and the type 3 vegetation soil pack contain soil cement. 청구항 1에 있어서, 상기 외부 정착판 전에 상기 식생토팩의 표면에 설치되는 유실방지부재를 포함하는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈.The eco-friendly slope rapid repair and greening module using the settlement of vegetation soil pack according to claim 1, characterized in that it comprises a loss preventing member installed on the surface of the vegetation soil pack before the external fixing plate. 청구항 1에 의한 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 모듈을 이용한 사면 급속 보수 녹화 방법으로서,
사면에 생긴 함몰 형태의 보수구역에 식생토팩을 삽입하여 메우는 식생토팩 설치단계와;
상기 식생토팩을 정착하는 식생토팩 정착단계를 포함하고,
상기 식생토팩 설치단계는 상기 보수구역의 바닥부에서부터 기초용 재료가 담긴 식생토팩을 설치하고 그 위에 식생용 재료가 담긴 식생토팩을 설치하며,
상기 식생토팩 정착단계는 식생토팩들을 서로 당기는 힘이 작용하도록 긴장하는 긴장단계를 포함하는 것을 특징으로 하는 식생토팩의 정착을 이용한 친환경 사면 급속 보수 녹화 방법.




A method of rapid maintenance of a slope using an eco-friendly rapid maintenance and greening module of a slope using the settlement of the vegetation soil pack according to claim 1,
A vegetation soil pack installation step of inserting a vegetation soil pack into the repair area of the depression formed on the slope to fill it;
Including a vegetation soil pack fixing step of fixing the vegetation soil pack,
In the vegetation soil pack installation step, a vegetation soil pack containing a material for a foundation is installed from the bottom of the maintenance area, and a vegetation soil pack containing a material for vegetation is installed thereon,
The planting soil pack settling step is an eco-friendly slope rapid repair and greening method using the vegetation soil pack settlement, characterized in that it includes a tension step of tensioning the vegetation soil packs so that the pulling force acts.




KR1020210029926A 2021-03-08 2021-03-08 A module and method for rapid repair and greening of eco friendly slope using the greening packs KR102334297B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210029926A KR102334297B1 (en) 2021-03-08 2021-03-08 A module and method for rapid repair and greening of eco friendly slope using the greening packs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210029926A KR102334297B1 (en) 2021-03-08 2021-03-08 A module and method for rapid repair and greening of eco friendly slope using the greening packs

Publications (1)

Publication Number Publication Date
KR102334297B1 true KR102334297B1 (en) 2021-12-03

Family

ID=78866625

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210029926A KR102334297B1 (en) 2021-03-08 2021-03-08 A module and method for rapid repair and greening of eco friendly slope using the greening packs

Country Status (1)

Country Link
KR (1) KR102334297B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080000510U (en) * 2008-03-24 2008-04-16 김광호 A support gunny bag for construction
KR100974353B1 (en) * 2010-03-25 2010-08-05 주식회사 삼우공간건축사사무소 Combining loop of horizontal connecting member for greening bag of retaining wall
KR101016047B1 (en) 2009-12-14 2011-02-23 광성지엠(주) Apparatus for reinforcing anchor and construction method thereof
KR101137323B1 (en) * 2011-09-22 2012-04-19 황익현 Plant germination bag with plant germination pocket, retaining wall structure and packing plate for fixing plant germination bag
KR101443241B1 (en) 2013-12-27 2014-09-22 주식회사 대성방재기술 Method for repairing and reinforcing local sweep of slope
CN112281876A (en) * 2020-11-18 2021-01-29 山东科技大学 Construction method based on interlocking type ecological geogrid

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080000510U (en) * 2008-03-24 2008-04-16 김광호 A support gunny bag for construction
KR101016047B1 (en) 2009-12-14 2011-02-23 광성지엠(주) Apparatus for reinforcing anchor and construction method thereof
KR100974353B1 (en) * 2010-03-25 2010-08-05 주식회사 삼우공간건축사사무소 Combining loop of horizontal connecting member for greening bag of retaining wall
KR101137323B1 (en) * 2011-09-22 2012-04-19 황익현 Plant germination bag with plant germination pocket, retaining wall structure and packing plate for fixing plant germination bag
KR101443241B1 (en) 2013-12-27 2014-09-22 주식회사 대성방재기술 Method for repairing and reinforcing local sweep of slope
CN112281876A (en) * 2020-11-18 2021-01-29 山东科技大学 Construction method based on interlocking type ecological geogrid

Similar Documents

Publication Publication Date Title
KR100813236B1 (en) The structure for a slope reinforcement and eco slope reinforcement method
KR200185875Y1 (en) Reinforced earth retaining-wall for using sand-bag
JP3083250B2 (en) Slope reinforcement and greening
KR102334297B1 (en) A module and method for rapid repair and greening of eco friendly slope using the greening packs
JP2007297889A (en) Slope planting method
KR100744043B1 (en) Reinforced Soil Retaining Wall Prestressed To The Horizontal Direction And The Construction Method Using The Same
KR20090065039A (en) A vegetation slope structure
KR100935176B1 (en) A road slope keeping for ecological planting and method
KR100414779B1 (en) Reinforcing structure for a slope of ground cutted area
AT10280U1 (en) ARRANGEMENT FOR SAFEGUARDING LAUSSEBOLS
KR101443241B1 (en) Method for repairing and reinforcing local sweep of slope
KR100815837B1 (en) Method for constructing environmental affinity reinforcement soil retaining wall using environmental affinity block with lower open portion and side plate rear portion
KR102116085B1 (en) A Eco-friendly retain wall structure
KR100467234B1 (en) Retaining wall and its construction method of steel panel
CN111501795B (en) Anchor net device for reinforcing and protecting high and steep slope and construction method thereof
CN212427130U (en) Mudstone high-fill side slope structure
KR20010086663A (en) A method and apparatus for reinforcing slope stability using connecting wire
KR100930115B1 (en) Environment-friendly slope type fill section structure and its construction method
KR100992076B1 (en) Structure of raising the ground level and excecution method thereof
KR100840155B1 (en) Anchor system of concrete retaining wall and slops frame for reinforcement anchor
KR100918195B1 (en) Slope reinforcement method
KR102172176B1 (en) Apparatus and method for reinforcing basic of steel tower
JP2004003257A (en) Slope vegetation structure and its slope construction method
KR100892080B1 (en) Slope block capable of vegetation, and structure and method of construction using the same
KR102484636B1 (en) Retain wall structure

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant