KR102315282B1 - Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block - Google Patents

Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block Download PDF

Info

Publication number
KR102315282B1
KR102315282B1 KR1020200154722A KR20200154722A KR102315282B1 KR 102315282 B1 KR102315282 B1 KR 102315282B1 KR 1020200154722 A KR1020200154722 A KR 1020200154722A KR 20200154722 A KR20200154722 A KR 20200154722A KR 102315282 B1 KR102315282 B1 KR 102315282B1
Authority
KR
South Korea
Prior art keywords
interlocking
block
interlocking block
shear resistance
crushed stone
Prior art date
Application number
KR1020200154722A
Other languages
Korean (ko)
Inventor
박우선
이병욱
이오진
이원형
Original Assignee
한국해양과학기술원
(주) 코이도
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국해양과학기술원, (주) 코이도 filed Critical 한국해양과학기술원
Priority to KR1020200154722A priority Critical patent/KR102315282B1/en
Priority to KR1020210103861A priority patent/KR102601005B1/en
Application granted granted Critical
Publication of KR102315282B1 publication Critical patent/KR102315282B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a harbor construction providing an interlocking block comprising: a block main body having a prescribed length; and a protruding unit which protrudes as a pair at both ends of the block main body corresponding to both lateral sides thereof to be dislocated to each other. The present invention provides the harbor construction including the interlocking block, comprising: the interlocking block; a rubble filling space which is formed between the adjacent interlocking blocks by installing the interlocking blocks in a row for the protruding unit of the interlocking block to be closely attached to a lateral side of the other interlocking block; and a rubble pillar which is formed by filling rubbers into the rubber filling space. The interlocking block, the harbor construction using the interlocking block, and a constructing method of the harbor construction using the interlocking block secure safety of the harbor construction by strong coupling force between the upper, lower, left, and right blocks, prevent differential settlement and relative displacement between the blocks by shear resistance force, and secures economic feasibility by reduction in production cost and construction cost and improvement in construction quality.

Description

인터로킹블록 및 인터로킹블록을 이용한 항만구조물 및 인터로킹블록을 이용한 항만구조물의 축조방법{Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block}Interlocking block and port structure using interlocking block and construction method of port structure using interlocking block {Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block}

본 발명은 항만구조물에 관한 것으로, 보다 구체적으로는 상/하/좌/우 블록 간의 체결력이 견고하여 항만구조물의 안정성을 확보, 전단저항력으로 블록 간의 상대변위 및 부등침하 방지, 원가 및 시공비 절감과 더불어 시공 품질 향상으로 인해 경제성 확보할 수 있는 인터로킹블록 및 인터로킹블록을 이용한 항만구조물 및 인터로킹블록을 이용한 항만구조물의 축조방법에 관한 것이다.The present invention relates to a port structure, and more specifically, to secure the stability of the port structure by securing the fastening force between the upper/lower/left/right blocks, to prevent relative displacement and unequal settlement between blocks with shear resistance, to reduce costs and construction costs, and to In addition, it relates to an interlocking block and a port structure using the interlocking block, which can secure economic feasibility due to the improvement of construction quality, and a method of constructing a port structure using the interlocking block.

일반적으로 항만은 선박이 안전하게 입출항할 수 있는 수역시설과 외곽시설, 선박이 접안하여 여객 또는 화물을 신속하고 안전하게 싣고 내릴 수 있는 안벽(Quay Wall) 등과 같은 계류시설, 화물을 배후의 산업단지 등으로 수송하는 임항교통시설이 기본적으로 구비되어야 하고, 고부가가치 항만 클러스터를 구축하고 종합물류기지로 육성하기 위한 기능시설 및 지원시설이 종합적으로 연계되어야 한다.In general, a port consists of water body facilities and outlying facilities where ships can safely enter and depart, mooring facilities such as a quay wall where ships can dock and load and unload passengers or cargo quickly and safely, and industrial complexes behind cargo. The port transportation facilities for transport should be basically provided, and functional facilities and support facilities to build a high value-added port cluster and foster it as a comprehensive logistics base should be comprehensively linked.

특히, 안벽은 여객선의 승/하선 및 화물의 하역을 위해 만들어진 벽면을 가진 선박 계류시설로서, 선박이 안전하게 접안하여 화물 및 여객을 처리할 수 있도록 설치한 부두의 바다 방향에 수직으로 쌓은 벽. 즉 전면 수심(水深)이 4.5m 이상인 계류시설로서, 1천톤 이상의 선박이 접안하는 부두시설을 말하며, 전면의 수심이 4.5m 이내인 물양장과 구별하는 것이 일반적이다.In particular, the quay wall is a ship mooring facility with a wall made for boarding/unloading of passenger ships and loading and unloading of cargo. A wall built vertically in the sea direction of the pier so that ships can safely dock and handle cargo and passengers. In other words, it is a mooring facility with a front water depth of 4.5m or more, and refers to a quay facility where ships of 1,000 tons or more are docked.

이러한 안벽 구조물의 구조형식에 따라 중력식, 잔교식, 선반식, 강널말뚝식 및 부잔교 등으로 구분되며, 건설된 사례를 살펴보면 중력식 안벽은 77%이고, 잔교식 안벽은 20%이며, 그외 선반식, 강널말뚝식, 부잔교 등과 같은 기타형식의 안벽은 3% 정도로 분포되어 있다.According to the structural type of these quay wall structures, they are divided into gravity type, pier type, shelf type, steel pile type, and auxiliary pier. Other types of quay walls such as steel piles and floating piers are distributed around 3%.

그리고, 중력식 안벽은 또다시 벽체에 사용되는 구조물에 따라 인터로킹블록식(Concrete Block Type), 케이슨식(Caisson Type), 셀블록식(Cellular Block Type) 등으로 분류할 수 있는데, 우리나라에서 건설된 사례를 살펴보면 인터로킹블록식(79%), 케이슨식(15%), 셀블록식(6%)로 조사되었다. 따라서 우리나라 안벽 구조물 중 절반 이상인 60%가 중력식 안벽 인터로킹블록식이다.In addition, the gravity-type quay wall can be classified into an interlocking block type, a caisson type, and a cellular block type according to the structure used for the wall. When looking at the cases, interlocking block type (79%), caisson type (15%), and cell block type (6%) were investigated. Therefore, more than half of the quay wall structures in Korea, more than 60%, are gravity-type quay wall interlocking block type.

중력식 안벽은 기초지반이 단단한 해저지지층까지 굴착하고 기초사석으로 마운드를 조성한 후 구조체로서 인터로킹블록 또는 케이슨 또는 셀블록을 거치하여 벽체의 자중과 마찰력으로 토압, 수압, 상재하중 등 외력에 저항하게 한 구조물 형식으로서 이 형식의 장점은 공종이 단순하고 시공성이 양호하며, 유지관리가 용이한 반면, 잔교식 안벽에 비해 공사기간이 비교적 길고 초기 공사비가 많이 소요되는 단점이 있다.Gravity-type quay walls are designed to resist external forces such as earth pressure, water pressure, and superimposed loads with the wall's own weight and frictional force by excavating to the seabed support layer with a solid foundation, forming a mound with foundation stones, and then mounting an interlocking block or caisson or cell block as a structure. As a structure type, the advantages of this type are simple construction, good constructability, and easy maintenance. However, compared to the pier-type quay wall, the construction period is relatively long and the initial construction cost is high.

인터로킹블록식은 육상에서 인터로킹블록을 무근 콘크리트로 미리 제작하여 기초 사석 위에 여러 단으로 거치한 후 그 상부에 상치콘크리트를 타설하여 완성하는 형태이다.The interlocking block type is a form of pre-fabricating interlocking blocks on land with unrooted concrete, mounting them in several stages on the foundation stone, and then pouring concrete on the top to complete it.

비교적 소형의 해상장비로 시공이 가능하여 가장 일반적으로 적용하는 공법이지만 공사비가 많이 소요되는 단점이 있다.It is the most commonly applied construction method because it can be constructed with relatively small offshore equipment, but it has the disadvantage that it requires a lot of construction cost.

케이슨식은 대형 콘크리트 함체의 케이슨을 육상 혹은 플로팅도크(Floating dock)에서 제작하여 해상크레인 또는 예인선 등에 의해 계획 위치에 거치하는 일련의 과정에서 케이슨의 진수시설이 필요하며, 특히 케이슨을 해상에 띄워서 거치하기 때문에 충분한 수심이 확보되어야 하고, 거치 즉시 케이슨내 속채움을 해야 케이슨의 변위를 방지할 수 있다.The caisson type requires a launching facility for the caisson in the series of processes of manufacturing the caisson of a large concrete enclosure on land or on a floating dock and mounting it at the planned location by an offshore crane or tugboat, etc. Therefore, sufficient water depth must be secured, and the caisson must be filled immediately after installation to prevent displacement of the caisson.

구조 일체성이 좋고, 해상작업시간을 단축할 수 있는 장점이 있으나, 대형 해상장비가 필요하며, 시공비가 고가로 소요되고, 계획공기를 맞추지 않으면 이용상의 어려움이 내재한 것이며, 안벽 연장이 짧을 경우에는 이를 설치하기 위한 준비시설 비용이 많이 소요되어 오히려 비경제적인 단점이 있다.It has good structural integrity and has the advantage of shortening offshore work time, but it requires large offshore equipment, requires high construction costs, and has difficulties in use if the planned schedule is not met. There is a disadvantage in that it is rather uneconomical because it takes a lot of cost for preparation facilities to install it.

셀블록식은 셀룰러(Cellular)라는 철근 콘크리트로 제작한 상자형 중공블록을 육상에서 미리 제작하여 기초 사석 위에 거치한 후 셀 내부에 사석 등으로 속채움 한 후 상치콘크리트를 타설하여 완성하는 형태이므로 콘크리트 블록식에 비해 공사비가 저렴하지만, 다공종의 과정을 여러 번에 걸쳐 반복 시공함으로써 진척도에 비해 매우 복잡한 시공관리과정을 거치게 되므로 부대장비가 부가적으로 소요되고, 공기기간, 품질관리, 안전관리 측면(11) 등에서 불리한 점이 많다.The cell block type is a form in which a box-shaped hollow block made of reinforced concrete called cellular is manufactured in advance on land, mounted on the foundation gravel, filled inside the cell with gravel, etc. Although the cost of construction is lower than that of the formula, the construction management process is very complicated compared to the progress by repeating the process of multiple types of construction several times, so additional equipment is required, 11) has many disadvantages.

여기서, 안벽의 구조물 중에서 인터로킹블록식이 많이 채택되고 있는 지에 대해 이를 구체적으로 살펴보면 다음과 같다.Here, a detailed look at whether the interlocking block type is widely adopted among the structures of the quay wall is as follows.

먼저, 케이슨식은 타 형식에 비해 케이슨 제작 및 진수시설비가 더 많이 소요되더라도 안벽 연장이 긴 대형 안벽구조물에서 경제성이 있다. 즉 케이슨 격실내의 속채움 재료를 콘크리트보다 저렴한 재료로 대체할 수 있기 때문에 속채움 재료는 일반적으로 모래, 깬 잡석, 사석, 철강 슬래그 등이 많이 사용된다.First, the caisson type is economical in a large quay wall structure with a long quay wall extension, even if the caisson manufacturing and launching facility costs are higher than other types. That is, since the filling material in the caisson compartment can be replaced with a material cheaper than concrete, the filling material is generally sand, crushed rubble, sandstone, and steel slag.

케이슨은 통상 1,000톤급 이상의 대형 콘크리트 함체로서, 그 크기는 최소한 B 20m×L 8m×H 15m 이상이다. 이에 따라, 케이슨식은 대형 해상장비가 필요하며, 케이슨 거치 즉시 케이슨내 속채움을 하지 않으면 파랑 및 항행하는 선박의 항주파에 의해 공사 기준선을 이탈하여 재 거치하는 사례가 다수 발생하기도 한다.A caisson is usually a large concrete enclosure of 1,000 tons or more, and its size is at least B 20m×L 8m×H 15m or more. Accordingly, the caisson type requires large offshore equipment, and if the caisson is not filled immediately after the caisson is mounted, there are many cases of deviated from the construction baseline and remounted due to waves and sailing waves.

그리고, 셀블록식은 상자형 중공블록으로 상하면이 오픈되어 있다. 셀블록 거치후 셀 내부에는 속채움 재료로 사석 등을 채우는 일련의 공사과정에서 다단계 시공에 따른 공종이 매우 복잡하고, 해상작업시간이 길어 시공관리에 취약성이 있어 안전사고의 우려가 매우 높고, 주변환경 불비로 근로자 선별이 어려운 단점이 있는 반면에 공사비는 인터로킹블록식에 비해서 저렴한 점이 그 장점으로 볼 수 있다.And, the cell block type is a box-shaped hollow block, and the upper and lower surfaces are open. In a series of construction processes that fill the inside of the cell with a filling material after the cell block is completed, the multi-step construction process is very complicated, and the sea work time is long, which makes the construction management vulnerable. On the other hand, the disadvantage is that it is difficult to select workers due to environmental imperfections, while the construction cost is cheaper than the interlocking block type.

이에 대해, 인터로킹블록식은 단위 m당 공사비가 가장 많이 소요되는 단점이 있으나, 품질관리, 안전관리, 시공관리 등이 타 형식에 비해 비교적 손쉽고, 안전하며 소규모의 해상장비로도 시공 가능하고 공사기간이 짧아 안벽 구조물에서 가장 많이 채택되는 공법으로 지칭된다.On the other hand, the interlocking block type has the disadvantage that it requires the most construction cost per unit m, but it is relatively easy and safe compared to other types such as quality control, safety management, and construction management, and it can be constructed with small-scale offshore equipment, and the construction period is short. This short length is referred to as the most widely adopted construction method for quay wall structures.

한편, 계류시설인 안벽 구조물 중 79%를 차지하는 중력식 구조인 인터로킹블록은 폭 2~4m, 두께 2m 내외, 길이 4~8m의 무근 콘크리트로서, 최대 단점인 고가의 공사비를 어떻게 절감하고 친환경블록을 제작할 것인지가 시급히 개선해야 하며, 외곽시설인 방파제의 상치콘크리트는 거대한 매스(mass) 콘크리트 구조물로서 블록당 상치 폭 10~20m, 두께 4~6m, 길이 10~30m의 무근 콘크리트로서 방파제 연장만큼 상치콘크리트를 현장타설 하여야 하므로 단위 공사비가 매우 크며, 콘크리트 타설이 거의 해상에서 현장타설로 이루어지므로 공사비 절감과 공사기간 단축 등을 시급히 개선해야 할 필요가 있다.Meanwhile, interlocking blocks, a gravity-type structure that accounts for 79% of the quay wall structures that are mooring facilities, are unrooted concrete with a width of 2 to 4 m, a thickness of about 2 m, and a length of 4 to 8 m. It is urgently necessary to improve whether or not to manufacture it, and the upper concrete of the breakwater, which is an outer facility, is a huge mass concrete structure. The unit construction cost is very high as the construction cost is very high, and since most concrete pouring is done at sea, it is necessary to urgently improve the reduction of the construction cost and the shortening of the construction period.

도 1 및 도 2에 의하면, 현재 설계 기준에서는 전단키의 역할을 설계에 반영되지 못하는 이유는 전단키의 여유 간극이 약 5cm ~ 10cm의 여유 간극 때문에 항만에서는 육지와 같이 정밀시공을 수행할 수 없기 때문에 여유 간을 두었지만, 구조물의 자중을 줄이게 되면 여유 간극만큼 항만구조물이 밀려서 전체적인 구조물의 법선에 대해 전체적으로 틀어짐이 발생하는 문제점이 있다.1 and 2, the reason that the role of the shear key is not reflected in the design in the current design standard is because the clearance gap of the shear key is about 5 cm to 10 cm. However, if the self-weight of the structure is reduced, the harbor structure is pushed as much as the clearance gap, and there is a problem that the overall distortion occurs with respect to the normal line of the entire structure.

KR 10-1487131 B1KR 10-1487131 B1

상기한 문제점을 해결하기 위하여 본 발명은 전/후 양단부에 상호 엇갈리게 일측으로 둘출부를 갖는 다수의 인터로킹블록을 일렬로 설치한 채움공간에 쇄석기둥의 형성을 통해 상/하/좌/우 블록 간의 체결력이 견고하여 항만구조물의 안정성을 확보, 전단저항력으로 블록 간의 상대변위 및 부등침하 방지, 원가 및 시공비 절감과 더불어 시공 품질 향상으로 인해 경제성 확보할 수 있는 인터로킹블록 및 인터로킹블록을 이용한 항만구조물 및 인터로킹블록을 이용한 항만구조물의 축조방법을 제공하는데 목적이 있다.In order to solve the above problems, the present invention provides a space between the upper/lower/left/right blocks through the formation of crushed stone pillars in a filling space in which a plurality of interlocking blocks having protrusions on one side alternately at both ends are installed in a line. Port structures using interlocking blocks and interlocking blocks that can secure stability of harbor structures with strong fastening force, prevent relative displacement and unequal settlement between blocks with shear resistance, reduce costs and construction costs, and secure economic feasibility by improving construction quality and to provide a method of constructing a port structure using an interlocking block.

상기한 목적을 달성하기 위하여, 본 발명은 소정의 길이를 갖는 블록본체(10a)와; 상기 블록본체(10a)의 양쪽 측면(11)에 대응하여 상호 엇갈리게 양쪽 끝에 한쌍으로 돌출 형성된 돌출부(12)를 포함하여 콘크리트로 일체 형성된 것을 특징으로 하는 인터로킹블록을 제공한다.In order to achieve the above object, the present invention includes a block body 10a having a predetermined length; It provides an interlocking block, characterized in that it is integrally formed with concrete, including a pair of protrusions 12 protruding in pairs at both ends of the block body 10a to correspond to both sides 11 of the block body 10a.

여기서, 상기 돌출부(12)의 평저면에는 상호 엇갈리게 전단저항턱(16)이 돌출 형성되고, 상기 전단저항턱(16)에 대응하여 반대쪽 평저면에는 전단저항홈(15)이 형성된 것을 특징으로 한다.Here, on the flat bottom surface of the protrusion 12, shear resistance jaws 16 are formed to protrude alternately, and shear resistance grooves 15 are formed on the flat bottom surface opposite to the shear resistance jaw 16. .

상기 블록본체(10a)의 길이방향을 따라서 상기 전단저항턱(16) 내부의 일부분을 관통하면서 유입구와 유출구가 동일면에 형성되어 입수된 유체를 배출하면서 소파하는 소파공(16a)이 구비된 것을 특징으로 한다.The inlet and outlet are formed on the same surface while penetrating a portion of the inside of the shear resistance sill 16 along the longitudinal direction of the block body 10a, and a breakout 16a is provided for discharging the obtained fluid. do it with

즉, 절단저항턱(16)이 파압에 의해 밀리더라도, 쇄석채움공간(20)에 채워진 쇄석기둥(30)이 받치고, 이 쇄석기둥(30)이 후방에 있는 다른 절단저항턱(16)에 지지되어 인로킹블록(10)이 법선에 대해 후방으로 밀리지 않고 축조상태를 유지할 수 있다.That is, even if the cutting resistance jaw 16 is pushed by the wave pressure, the crushed stone pillar 30 filled in the crushed stone filling space 20 is supported, and this crushed stone pillar 30 is supported by the other cutting resistance jaw 16 at the rear. Thus, the in-locking block 10 can be maintained in a built-up state without being pushed backward with respect to the normal line.

그리고, 상기 돌출부(12)의 일측면에는 결속홈(17)이 함몰 형성되고, 상기 돌출부(12)의 반대쪽 측면에는 상기 결속홈(17)에 끼워지는 결속돌기(17a)가 돌출 형성된 것을 특징으로 한다.In addition, a binding groove 17 is recessed on one side of the protrusion 12, and a binding protrusion 17a fitted into the binding groove 17 is formed on the opposite side of the protrusion 12 to protrude. do.

한편, 상기와 같이, 소정의 길이를 갖는 블록본체(10a)와; 상기 블록본체(10a)의 양쪽 측면(11)에 대응하여 상호 엇갈리게 양쪽 끝에 한쌍으로 돌출 형성된 돌출부(12)를 포함하여 콘크리트로 일체 형성되는 인터로킹블록(10)과; 상기 인터로킹블록(10)의 돌출부(12)가 인접하는 다른 인터로킹블록(10)의 측면(11)에 밀착되도록 인터로킹블록(10)을 일렬로 설치하여 인접하는 인터로킹블록(10)의 사이에 형성되는 쇄석채움공간(20)과; 상기 쇄석채움공간(20)에 쇄석을 채워서 형성되는 쇄석기둥(30)으로 이루어진 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물을 제공할 수 있다.On the other hand, as described above, the block body 10a having a predetermined length and; an interlocking block 10 integrally formed of concrete including a pair of protrusions 12 protruding in pairs at both ends of the block body 10a to correspond to both sides 11 of the block body 10a; The interlocking blocks 10 are installed in a line so that the protrusions 12 of the interlocking block 10 are in close contact with the side surfaces 11 of the other interlocking blocks 10 adjacent to each other. a crushed stone filling space 20 formed therebetween; It is possible to provide a harbor structure using an interlocking block, characterized in that it consists of crushed stone pillars 30 formed by filling crushed stone in the crushed stone filling space 20 .

또한, 전술한 인터로킹블록을 이용한 항만구조물(S)에 있어서, 상기 돌출부(12)의 평저면에는 상호 엇갈리게 전단저항턱(16)이 돌출 형성되고, 상기 전단저항턱(16)에 대응하여 반대쪽 평저면에는 전단저항홈(15)이 형성된 것을 특징으로 한다.In addition, in the harbor structure (S) using the above-described interlocking block, shear resistance jaws 16 are formed to protrude alternately on the flat bottom surface of the protrusion portion 12, and corresponding to the shear resistance jaw 16, the opposite side It is characterized in that the shear resistance groove (15) is formed on the flat bottom surface.

여기서, 상기 항만구조물(S)은 다수의 인터로킹블록(10)이 일렬로 배열하는 제1단어셈블리(100)와; 상기 제1단어셈블리(100)의 상부에 일렬로 적층되는 제2단어셈블리(200)와; 상기 제2단어셈블리(200)의 상부에 일렬로 적층되는 제3단어셈블리(300)로 이루어지되, 상기 제2단어셈블리(200)는 상기 제1단어셈블리(100)의 상단에 서로 반대 방향을 따라 인터로킹블록(10)을 일렬로 적층함과 동시에, 상기 제2단어셈블리(200)를 구성하는 인터로킹블록(10)의 블록본체(10a)가 제1단어셈블리(100)를 구성하는 인터로킹블록(10)의 블록본체(10a) 상단에 중첩되도록 적층되며, 상기 제3단어셈블리(300)는 상기 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층되는 것을 특징으로 한다.Here, the port structure (S) includes a first word assembly 100 in which a plurality of interlocking blocks 10 are arranged in a line; a second word assembly 200 stacked on top of the first word assembly 100 in a line; It consists of a third word assembly 300 stacked in a line on top of the second word assembly 200, and the second word assembly 200 is opposite to each other on the upper end of the first word assembly 100. Accordingly, the interlocking blocks 10 are stacked in a line, and at the same time, the block body 10a of the interlocking block 10 constituting the second word assembly 200 is interlocked with the interlocking block 10 constituting the first word assembly 100 . The locking block 10 is stacked so as to overlap the top of the block body 10a, and the third word assembly 300 is characterized in that the interlocking block 10 is stacked in the same direction as the first word assembly 100. do it with

상기 제1, 제2 및 제3단어셈블리(100,200,300)를 형성하는 상기 상부 인터로킹블록(10)의 전단저항턱(16)과 하부에 적층되는 상기 하부 인터로킹블록(10) 사이에 형성되는 공간을 상기 상부 인터로킹블록(10)의 전단저항턱(16)이 상기 쇄석채움공간(20)에 채워진 쇄석에 작용하고, 상기 하부 인터로킹블록(10)의 전단저항턱(16)에 작용하여 결속력을 강화하는 것을 특징으로 한다.A space formed between the shear resistance sill 16 of the upper interlocking block 10 forming the first, second and third word assemblies 100, 200, and 300 and the lower interlocking block 10 stacked thereunder The shear resistance jaw 16 of the upper interlocking block 10 acts on the crushed stone filled in the crushed stone filling space 20, and acts on the shear resistance jaw 16 of the lower interlocking block 10 to form a binding force is characterized by strengthening the

한편, 상기와 같이, 구성된 인터로킹블록을 이용한 항만구조물의 축조방법에 있어서, 해저면의 지반을 보강하고 사석마운드(40)를 설치하는 단계(S10)와; 상기 사석마운드(40) 위에 인터로킹블록(10)을 일렬로 설치하여 제1단어셈블리(100)를 구성하는 단계(S20)와; 상기 제1단어셈블리(100)의 상단에 인터로킹블록(10)을 반대방향이 되도록 일렬로 적층하여 제2단어셈블리(200)를 구성하는 단계(S30)와; 상기 제2단어셈블리(200)의 상단에 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층하여 제3단어셈블리(300)를 구성하는 단계(S40)와; 상기 인터로킹블록(10)의 사이에 형성된 쇄석채움공간(20)에 쇄석을 채워 쇄석기둥(30)을 형성하는 단계(S50)와; 상기 제3단어셈블리(300)의 상단에 콘크리트를 타설하여 상치콘크리트(50)를 형성하는 단계(S60)를 포함하는 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물의 축조방법을 제공한다.On the other hand, in the method of constructing a port structure using the interlocking block configured as described above, the method comprising: reinforcing the ground of the seabed and installing a sandstone mound 40 (S10); A step (S20) of configuring the first word assembly 100 by installing the interlocking blocks 10 in a line on the sandstone mound 40; constructing the second word assembly 200 by stacking the interlocking blocks 10 on the upper end of the first word assembly 100 in a line in the opposite direction (S30); constructing a third word assembly 300 by stacking an interlocking block 10 on an upper end of the second word assembly 200 in the same direction as the first word assembly 100 (S40); forming crushed stone pillars 30 by filling crushed stone in the crushed stone filling space 20 formed between the interlocking blocks 10 (S50); It provides a method of constructing a harbor structure using an interlocking block, characterized in that it comprises the step (S60) of pouring concrete on the upper end of the third word assembly (300) to form the upper concrete (50).

여기서, 상기 상치콘크리트(50)의 형성단계(S60) 후에 상기 제1,2,3단어셈블리(100,200,300)의 후방에 뒷채움잡석(60)을 채우는 단계(S70)와; 상기 뒷채움잡석(60)의 표면에 필터매트(61)를 포설하는 단계(S80)와; 상기 필터매트(61)의 상부에 매립토(62)를 매립한 후 상치콘크리트(50)와 수평면을 이루도록 포장로(63)를 포장하는 단계(S90)를 포함하는 것을 을 특징으로 한다.Here, after the forming step (S60) of the upper concrete 50, filling the backfilling rubble 60 in the rear of the first, second, and third word assemblies 100, 200, 300 (S70); Laying the filter mat 61 on the surface of the backfilling rubble 60 (S80) and; It characterized in that it comprises the step (S90) of paving the pavement path 63 to form a horizontal plane with the standing concrete 50 after embedding the buried soil 62 in the upper part of the filter mat 61.

이때, 상기 제3단어셈블리(300)의 구성단계(S40) 후에 상기 제3단어셈블리(300)의 상단에 설계되는 항만구조물(S)의 높이에 따라 인터로킹블록(10)을 추가 적층하여 추가어셈블리(400)를 더 구성하는 것을 특징으로 한다.At this time, after the configuration step (S40) of the third word assembly 300, the interlocking block 10 is additionally stacked and added according to the height of the port structure (S) designed on the top of the third word assembly 300. It is characterized in that the assembly 400 is further configured.

그리고, 상기 사석마운드(40)의 설치단계(S10) 후 상기 사석마운드(40)에 대응하여 다수의 요홈(71)을 갖는 기초블록(70)이 설치되는 단계(S100)를 더 포함하는 것을 특징으로 한다.And, after the installation step (S10) of the sandstone mound 40, the step (S100) of installing a foundation block 70 having a plurality of grooves 71 corresponding to the sandstone mound 40 is further included (S100) do it with

상기와 같이 구성된 본 발명을 제공함으로써, 상/하/좌/우 블록 간의 체결력이 견고하여 항만구조물의 안정성을 확보, 전단저항력으로 블록 간의 상대변위 및 부등침하 방지, 원가 및 시공비 절감과 더불어 시공 품질 향상으로 인해 경제성 확보할 수 있는 효과가 있다.By providing the present invention configured as above, the fastening force between the upper/lower/left/right blocks is strong to secure the stability of the port structure, to prevent relative displacement and unequal settlement between blocks with shear resistance, and to reduce costs and construction costs as well as construction quality The improvement has the effect of securing economic feasibility.

도 3은 본 발명에 따른 인터로킹블록이 적용된 항만구조물의 축조상태를 나타내는 측면도.
도 4는 본 발명에 따른 인터로킹블록의 사시도.
도 5은 본 발명에 따른 인터로킹블록을 1단 설치한 상태의 사시도.
도 6는 본 발명에 따른 인터로킹블록을 2단 설치한 상태의 사시도.
도 7는 본 발명에 따른 인터로킹블록이 1단 설치된 상태의 평면도.
도 8은 본 발명에 따른 인터로킹블록이 2단 설치된 상태의 평면도.
도 9은 본 발명 도 8의 A-A선 단면도.
도 10은 본 발명에 따른 인터로킹블록에 결속돌기 및 보강리브가 형성된 상태의 평면도.
도 11는 본 발명 다른 실시 예 인터로킹블록들(a), (b) 및 (c)의 사시도.
도 12은 본 발명 다른 실시 예 인터로킹블록을 이용한 방파제의 축조상태 측면도.
도 13은 본 발명의 보조돌출부가 형성된 인터로킹블록의 설치상태 평면도.
도 14는 본 발명 기초블록의 사시도.
도 15은 본 발명의 기초블록을 사용한 방파제의 축조상태 측면도.
도 16는 본 발명에 따른 인터로킹블록이 병렬로 설치된 상태의 사시도.
도 17는 본 발명이 적용된 물양장의 축조상태 측면도.
도 18은 본 발명 다른 실시 예 인터로킹블록을 이용한 방파제의 축조상태 사시도.
도 19는 본 발명에 따른 항만구조물의 축조방법을 나타내는 순서도.
Figure 3 is a side view showing the construction state of the port structure to which the interlocking block according to the present invention is applied.
Figure 4 is a perspective view of an interlocking block according to the present invention.
5 is a perspective view of a state in which the interlocking block according to the present invention is installed in one stage.
Figure 6 is a perspective view of a state in which the interlocking block according to the present invention is installed in two stages.
7 is a plan view of a state in which the interlocking block according to the present invention is installed in one stage.
8 is a plan view of a state in which the interlocking block according to the present invention is installed in two stages.
9 is a cross-sectional view taken along line AA of FIG. 8 of the present invention.
10 is a plan view of a state in which binding protrusions and reinforcing ribs are formed on the interlocking block according to the present invention;
11 is a perspective view of another embodiment of the present invention interlocking blocks (a), (b) and (c).
12 is a side view of the construction state of a breakwater using an interlocking block according to another embodiment of the present invention.
13 is a plan view of the installation state of the interlocking block formed with the auxiliary protrusion of the present invention.
14 is a perspective view of a basic block of the present invention.
Figure 15 is a side view of the construction state of the breakwater using the foundation block of the present invention.
Figure 16 is a perspective view of the interlocking block according to the present invention is installed in parallel.
17 is a side view of the construction state of the water yangjang to which the present invention is applied.
18 is a perspective view of the construction of a breakwater using an interlocking block according to another embodiment of the present invention.
19 is a flowchart showing a method of constructing a harbor structure according to the present invention.

이하, 본 발명에 대하여 동일한 기술분야에 속하는 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 첨부도면을 참조하여 바람직한 실시 예를 상세하게 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the same technical field can easily carry out the present invention.

본 발명의 인터로킹블록(10)은 도 4, 도 11, 도 13에 도시된 바와 같이, 소정의 길이를 갖는 블록본체(10a)와; 상기 블록본체(10a)의 양쪽 측면(11)에 대응하여 상호 엇갈리게 양쪽 끝에 한쌍으로 돌출 형성된 돌출부(12)를 포함하여 콘크리트로 일체 형성될 수 있다.The interlocking block 10 of the present invention includes a block body 10a having a predetermined length, as shown in FIGS. 4, 11 and 13; Corresponding to both side surfaces 11 of the block body 10a, it may be integrally formed of concrete including a pair of protrusions 12 protruding in pairs at both ends of the block body 10a.

상기 인터로킹블록(10)에 경우 일렬로 설치하는 경우 블록본체(10a)의 측면(11)에 대응되는 사이에 쇄석채움공간(20)이 형성될 수 있다.When the interlocking block 10 is installed in a line, a crushed stone filling space 20 may be formed between the side surfaces 11 of the block body 10a.

한편, 상기 돌출부(12)의 평저면에는 상호 엇갈리게 전단저항턱(16)이 돌출 형성되고, 상기 전단저항턱(16)에 대응하여 반대쪽 평저면에는 전단저항홈(15)이 형성될 수 있다.On the other hand, on the flat bottom surface of the protrusion 12, the shear resistance jaws 16 are formed to protrude alternately, and the shear resistance grooves 15 may be formed in the flat bottom surface opposite to the shear resistance jaw 16.

즉, 상기 전단저항턱(16)과 전단저항홈(15)이 축조로 상호 대응 결합되어 파압에 의해 상하관계에 있는 인터로킹블록(10)의 상대변위 발생을 억제할 수 있다.That is, the shear resistance jaw 16 and the shear resistance groove 15 are coupled to each other in the construction to suppress the relative displacement of the interlocking block 10 in the vertical relationship by the wave pressure.

또한, 상기 돌출부(12)의 일측면에는 결속홈(17)이 함몰 형성되고 상기 돌출부(12)의 반대쪽 측면에는 상기 결속홈(17)에 끼워지는 결속돌기(17a)가 돌출 형성되어 파압에 의해 일렬로 연속되는 인터로킹블록(10)의 상대변위 발생을 억제할 수 있다.In addition, a binding groove 17 is recessed on one side of the protrusion 12, and a binding protrusion 17a fitted into the binding groove 17 is formed on the opposite side of the protrusion 12 to protrude. It is possible to suppress the occurrence of relative displacement of the interlocking blocks 10 continuous in a line.

또한, 블록본체(10a)의 길이방향을 따라서 전단저항턱(16) 내부의 일부분을 관통하면서 유입구와 유출구가 동일면에 형성되어 입수된 유체를 배출하면서 소파하는 소파공(16a)이 구비될 수 있다. In addition, along the longitudinal direction of the block body 10a, the inlet and the outlet are formed on the same surface while penetrating a portion of the inside of the shearing resistance ridge 16, and a sofa hole 16a which is waved while discharging the obtained fluid may be provided. .

구체적으로, 소파공(16a)은 전단저항턱(16)의 내부 일부분을 관통하면서 유자나 디귿자 형상으로 형성되며, 유입구와 유출구를 동일한 평면상에 위치시키서 유입구를 통해서 해수을 유입하면서 충격을 흡수하고 소파하여 다시 같은 방향의 배출구로 출수시킬 수 있다. 또한, 소파공(16a)은 전단저항턱의 양끝을 가로지르는 형상으로 형성되어 해수 등의 흐름을 유도할 수도 있다. Specifically, the sofa hole 16a is formed in the shape of a citron or digwan while penetrating the inner part of the shear resistance jaw 16, and the inlet and outlet are positioned on the same plane to absorb shock while introducing seawater through the inlet and It can be turned off and the water can be discharged again through the outlet in the same direction. In addition, the breakout 16a may be formed in a shape that crosses both ends of the shear resistance jaw to induce the flow of seawater and the like.

본 발명의 바람직한 실시예에 따른 전체적인 구성을 첨부된 도면에 의거 개략적으로 살펴보면, 다수의 인터로킹블록(10)이 적층됨에 따라 형성되는 쇄석채움공간(20)에 쇄석을 채워 쇄석기둥(30)을 형성하여 항만구조물(S)로 구성될 수 있다.Looking at the overall configuration according to a preferred embodiment of the present invention schematically based on the accompanying drawings, crushed stone pillars 30 are filled with crushed stone in the crushed stone filling space 20 formed as a plurality of interlocking blocks 10 are stacked. It may be formed into a port structure (S).

상기와 같이, 소정의 길이를 갖는 블록본체(10a)와; 상기 블록본체(10a)의 양쪽 측면(11)에 대응하여 상호 엇갈리게 양쪽 끝에 한쌍으로 돌출 형성된 돌출부(12)를 포함하여 콘크리트로 일체 형성되는 인터로킹블록(10)과; 상기 인터로킹블록(10)의 돌출부(12)가 인접하는 다른 인터로킹블록(10)의 측면(11)에 밀착되도록 인터로킹블록(10)을 일렬로 설치하여 인접하는 인터로킹블록(10)의 사이에 형성되는 쇄석채움공간(20)과; 상기 쇄석채움공간(20)에 쇄석을 채워서 형성되는 쇄석기둥(30)으로 이루어질 수 있다.As described above, the block body 10a having a predetermined length and; an interlocking block 10 integrally formed of concrete including a pair of protrusions 12 protruding in pairs at both ends of the block body 10a to correspond to both sides 11 of the block body 10a; The interlocking blocks 10 are installed in a line so that the protrusions 12 of the interlocking block 10 are in close contact with the side surfaces 11 of the other interlocking blocks 10 adjacent to each other. a crushed stone filling space 20 formed therebetween; The crushed stone filling space 20 may be formed of crushed stone pillars 30 formed by filling crushed stone.

또한, 항만구조물은 전술한 구성요소와 함께 상기 돌출부(12)의 평저면에는 상호 엇갈리게 전단저항턱(16)이 돌출 형성되고, 상기 전단저항턱(16)에 대응하여 반대쪽 평저면에는 전단저항홈(15)이 형성된 것을 특징으로 하는 인터로킹블록을 이용할 수 있다.In addition, in the harbor structure, shear resistance jaws 16 are formed to protrude alternately on the flat bottom surface of the protrusion 12 together with the above-described components, and shear resistance grooves are formed on the opposite flat bottom surface to correspond to the shear resistance projection 16. (15) It is possible to use an interlocking block, characterized in that formed.

상기 항만구조물(S)은 다수의 인터로킹블록(10)이 일렬로 배열하는 제1단어셈블리(100)와; 상기 제1단어셈블리(100)의 상부에 일렬로 적층되는 제2단어셈블리(200)와; 상기 제2단어셈블리(200)의 상부에 일렬로 적층되는 제3단어셈블리(300)로 이루어지되, 상기 제2단어셈블리(200)는 상기 제1단어셈블리(100)의 상단에 서로 반대 방향을 따라 인터로킹블록(10)을 일렬로 적층함과 동시에, 상기 제2단어셈블리(200)를 구성하는 인터로킹블록(10)의 블록본체(10a)가 제1단어셈블리(100)를 구성하는 인터로킹블록(10)의 블록본체(10a) 상단에 중첩되도록 적층되며, 상기 제3단어셈블리(300)는 상기 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층될 수 있다.The harbor structure (S) includes a first word assembly 100 in which a plurality of interlocking blocks 10 are arranged in a line; a second word assembly 200 stacked on top of the first word assembly 100 in a line; It consists of a third word assembly 300 stacked in a line on top of the second word assembly 200, and the second word assembly 200 is opposite to each other on the upper end of the first word assembly 100. Accordingly, the interlocking blocks 10 are stacked in a line, and at the same time, the block body 10a of the interlocking block 10 constituting the second word assembly 200 is interlocked with the interlocking block 10 constituting the first word assembly 100 . The locking block 10 is stacked so as to overlap the top of the block body 10a, and the third word assembly 300 can be stacked with the interlocking block 10 in the same direction as the first word assembly 100. .

또한, 상기 제1, 제2 및 제3단어셈블리(100,200,300)를 형성하는 상기 상부 인터로킹블록(10)의 전단저항턱(16)과 하부에 적층되는 상기 하부 인터로킹블록(10) 사이에 형성되는 공간을 상기 상부 인터로킹블록(10)의 전단저항턱(16)이 상기 쇄석채움공간(20)에 채워진 쇄석에 작용하고, 상기 하부 인터로킹블록(10)의 전단저항턱(16)에 작용하여 결속력을 강화할 수 있다. 구체적으로, 상기 제1, 제2 및 제3단어셈블리(100,200,300)를 형성하는 상기 상부 인터로킹블록(10)의 전단저항턱(16)과 하부에 적층되는 상기 하부 인터로킹블록(10) 사이에 형성되는 공간을 상기 상부 인터로킹블록(10)의 전단저항턱(16)이 상기 쇄석채움공간(20)에 채워진 쇄석에 작용하고, 상기 하부 인터로킹블록(10)의 전단저항턱(16)에 작용하여 결속력을 강화할 수 있다.In addition, the first, second and third word assemblies 100, 200, 300 are formed between the shear resistance sill 16 of the upper interlocking block 10 and the lower interlocking block 10 stacked thereunder. The shear resistance jaw 16 of the upper interlocking block 10 acts on the crushed stone filled in the crushed stone filling space 20, and acts on the shear resistance jaw 16 of the lower interlocking block 10. This can strengthen the bonding force. Specifically, between the shear resistance sill 16 of the upper interlocking block 10 forming the first, second and third word assemblies 100 , 200 , and the lower interlocking block 10 stacked on the lower side. In the space formed, the shear resistance jaw 16 of the upper interlocking block 10 acts on the crushed stone filled in the crushed stone filling space 20, and the shear resistance jaw 16 of the lower interlocking block 10 is applied to the It can work to strengthen the bonding force.

구체적으로, 상기 상부 인터로킹블록(10)의 전단저항턱(16)과 상기 하부 인터로킹블록(10)의 사이에 이격된 공간이 존재 하지만 상기 상부 인터로킹블록(10)의 전단저항턱(16)이 상기 쇄석채움공간(20)에 채워진 쇄석에 작용하고 이 쇄석은 다시 상기 하부 인터로킹블록(10)의 전단저항턱(16)에 작용하기 때문에 서로 다른 블록들이 밀리지 않고 제위치를 유지할 수 있도록하여 결속력을 강화시켜줄 수 있다.Specifically, although a spaced space exists between the shear resistance threshold 16 of the upper interlocking block 10 and the lower interlocking block 10, the shear resistance threshold 16 of the upper interlocking block 10 is ) acts on the crushed stone filled in the crushed stone filling space 20, and the crushed stone again acts on the shear-resisting jaw 16 of the lower interlocking block 10, so that different blocks can be maintained in place without being pushed. This can strengthen the bonding force.

이하, 상기 개략적인 구성으로 이루어진 본 발명을 실시 용이하도록 좀더 상세하게 설명하기로 한다.Hereinafter, the present invention having the above schematic configuration will be described in more detail to facilitate implementation.

본 발명의 인터로킹블록(10)은 콘크리트를 이용하여 도 4와 같이 사각형 단면 형상의 긴 길이로 형성되고, 길이방향 전후 양 측면(11)에는 상호 엇갈리게 한 쌍의 돌출부(12)가 형성된다.The interlocking block 10 of the present invention is formed with a long length of a rectangular cross-sectional shape as shown in FIG. 4 by using concrete, and a pair of protrusions 12 are formed on both sides 11 in the longitudinal direction to alternate with each other.

여기에서 상기 돌출부(12)는 측면(11)과 돌출부(12)의 내면 사이에 쇄석을 채워 넣을 수 있는 쇄석채움공간(20)을 확보하기 위한 본 발명의 핵심기술이다.Here, the protrusion 12 is a core technology of the present invention for securing the crushed stone filling space 20 between the side surface 11 and the inner surface of the protrusion 12 .

즉 상기 인터로킹블록(10)의 돌출부(12)를 도 5과 같이 다른 인터로킹블록(10)의 측면(11)에 밀착되도록 일렬로 연속하여 설치하면 인접하는 인터로킹블록(10)의 사이에는 쇄석을 채워 넣을 수 있는 쇄석채움공간(20)이 형성될 수 있게 된다.That is, when the protrusions 12 of the interlocking block 10 are installed in a line so as to be in close contact with the side surface 11 of the other interlocking block 10 as shown in FIG. 5, between adjacent interlocking blocks 10 A crushed stone filling space 20 that can be filled with crushed stone can be formed.

이러한 쇄석채움공간(20)은 인접하는 한 쌍의 인터로킹블록(10)의 돌출부(12)가 전후 방향으로 동일 선상에 위치함에 따라 상기 돌출부(12) 및 측면(11) 사이에 사각형의 형태를 이루도록 형성된다.This crushed stone filling space 20 has a rectangular shape between the protrusion 12 and the side surface 11 as the protrusions 12 of a pair of adjacent interlocking blocks 10 are positioned on the same line in the front-rear direction. formed to achieve

따라서 상기 쇄석채움공간(20)에는 쇄석을 채워 쇄석기둥(30)을 형성할 수 있고, 이러한 쇄석기둥(30)은 항만구조물(S) 또는 물양장(L)을 축조하기 위해 도 6 및 도 9과 같이 일렬로 다단 설치되는 다수의 인터로킹블록(10)을 항만구조물(S) 또는 물양장(L)의 법선방향으로 인터로킹을 함으로써 상하 인터로킹블록(10) 간의 체결력을 더욱 견고하게 유지하면서 항만구조물(S)의 안정성을 제공하고, 상기 쇄석기둥(30) 간의 전단저항력으로 인해 인터로킹블록(10) 간의 상대변위를 최소화하는 효과를 제공한다.Therefore, the crushed stone filling space 20 can be filled with crushed stone to form crushed stone pillars 30, which are shown in Figs. By interlocking a plurality of interlocking blocks 10 installed in multiple stages in a line in the normal direction of the port structure (S) or the water landing (L), the port structure while maintaining the fastening force between the upper and lower interlocking blocks (10) more firmly (S) provides stability and provides the effect of minimizing the relative displacement between the interlocking blocks 10 due to the shear resistance between the crushed stone pillars (30).

상기 인터로킹블록(10)은 양 측면(11)에 도 10과 같이 쇄석돌기(13)가 추가로 돌출 형성되고, 상기 쇄석돌기(13)는 쇄석기둥(30)과 맞물리면서 쇄석기둥(30)과의 결속력을 강화하여 더욱 견고한 시공성을 확보함은 물론 돌출부(12)의 내측 모서리부분에는 보강리브(14)가 형성됨으로써 돌출부(12)의 강도를 개선할 수 있게 된다.The interlocking block 10 is further formed with crushed stone projections 13 protruding from both side surfaces 11 as shown in FIG. 10, and the crushed stone projections 13 are engaged with the crushed stone pillars 30 and The strength of the protrusion 12 can be improved by forming the reinforcing rib 14 on the inner edge of the protrusion 12 as well as securing more robust workability by strengthening the binding force of the protrusion 12 .

그리고 상기 돌출부(12)의 측면(11)에 결속홈(17)이 함몰 형성되고, 상기 결속홈(17)에 끼워지는 결속돌기(17a)가 상기 결속홈(17)과 대응하는 일 측면(11)에 돌출 형성됨으로써 연속적으로 설치되는 다수의 인터로킹블록(10)은 상호 인터로킹을 강화하여 파압에도 더욱 견고함을 유지하고, 결속돌기(17a)와 결속홈(17)의 맞물림 부위는 굴곡을 이루면서 쇄석채움공간(20)에 채워진 쇄석이 외부로 유출됨을 효과적으로 방지한다.And a binding groove 17 is recessed in the side surface 11 of the protrusion 12 , and a binding protrusion 17a fitted into the binding groove 17 has a side 11 corresponding to the binding groove 17 . ), a plurality of interlocking blocks 10 that are continuously installed by protruding from each other strengthen mutual interlocking to maintain more robustness in the face of wave pressure, and the engaging portion of the binding protrusion 17a and the binding groove 17 is curved. It effectively prevents the crushed stone filled in the crushed stone filling space 20 from leaking to the outside.

아울러 상기 인터로킹블록(10)은 동일한 길이의 항만구조물(S)을 축조함에 있어서 설치 개수를 줄여 공사비를 절감할 수 있도록 도 13과 같이 돌출부(12)의 대향된 측면(11)에 보조돌출부(18)가 각각 돌출 형성되고, 이러한 보조돌출부(18)는 전체적으로 인터로킹블록(10)의 좌우 두께를 확장함으로써 동일한 길이의 항만구조물(S)을 축조함에도 일반적인 인터로킹블록(10)에 비해 설치 개수를 대폭 줄여 공사비를 절감할 수 있는 특별한 효과를 제공한다.In addition, the interlocking block 10 is an auxiliary protrusion ( 18) is formed to protrude, respectively, and these auxiliary protrusions 18 are installed compared to the general interlocking block 10 even though the port structure S of the same length is constructed by expanding the left and right thickness of the interlocking block 10 as a whole. It provides a special effect that can significantly reduce the construction cost.

한편, 상기 인터로킹블록(10)은 항만구조물을 축조하기 위해서는 일렬로 설치된 상태에서 상부로 다단 설치되어야만 한다.On the other hand, the interlocking block 10 must be installed in multiple steps upward in a state in which they are installed in a line in order to construct a port structure.

즉, 상기와 같이, 구성된 인터로킹블록을 이용한 항만구조물의 축조방법은 다음과 같다.That is, the construction method of the port structure using the interlocking block configured as described above is as follows.

도 19에 의하면, 해저면의 지반을 보강하고 사석마운드(40)를 설치하는 단계(S10)를 갖는다.According to FIG. 19 , there is a step (S10) of reinforcing the ground of the seabed and installing the sandstone mound 40.

상기 사석마운드(40) 위에 인터로킹블록(10)을 일렬로 설치하여 제1단어셈블리(100)를 구성하는 단계(S20)를 갖는다.There is a step (S20) of configuring the first word assembly 100 by installing the interlocking blocks 10 in a line on the sandstone mound 40.

상기 제1단어셈블리(100)의 상단에 인터로킹블록(10)을 반대방향이 되도록 일렬로 적층하여 제2단어셈블리(200)를 구성하는 단계(S30)를 갖는다.There is a step (S30) of configuring the second word assembly 200 by stacking the interlocking blocks 10 in a line so as to be in the opposite direction on the upper end of the first word assembly 100 (S30).

상기 제2단어셈블리(200)의 상단에 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층하여 제3단어셈블리(300)를 구성하는 단계(S40)를 갖는다.There is a step (S40) of configuring the third word assembly 300 by stacking the interlocking block 10 on the upper end of the second word assembly 200 in the same direction as the first word assembly 100.

상기 인터로킹블록(10)의 사이에 형성된 쇄석채움공간(20)에 쇄석을 채워 쇄석기둥(30)을 형성하는 단계(S50)를 갖는다.The crushed stone filling space 20 formed between the interlocking blocks 10 is filled with crushed stone to form crushed stone pillars 30 (S50).

상기 제3단어셈블리(300)의 상단에 콘크리트를 타설하여 상치콘크리트(50)를 형성하는 단계(S60)를 갖는다.It has a step (S60) of pouring concrete on the upper end of the third word assembly (300) to form the upper concrete (50).

여기서, 상기 상치콘크리트(50)의 형성단계(S60) 후에 상기 제1,2,3단어셈블리(100,200,300)의 후방에 뒷채움잡석(60)을 채우는 단계(S70)를 갖는다.Here, after the forming step (S60) of the upper concrete 50, a step (S70) of filling the backfilling rubble 60 in the rear of the first, second, and third-level assemblies 100, 200, and 300 is performed.

이때, 상기 뒷채움잡석(60)의 표면에 필터매트(61)를 포설하는 단계(S80)와, 상기 필터매트(61)의 상부에 매립토(62)를 매립한 후 상치콘크리트(50)와 수평면을 이루도록 포장로(63)를 포장하는 단계(S90)를 더 포함할 수 있다.At this time, the step of laying the filter mat 61 on the surface of the backfilling rubble 60 (S80), and after embedding the buried soil 62 in the upper part of the filter mat 61, the standing concrete 50 and the horizontal surface It may further include a step (S90) of paving the pavement path 63 to achieve this.

상기 제3단어셈블리(300)의 구성단계(S40) 후에 상기 제3단어셈블리(300)의 상단에 설계되는 항만구조물(S)의 높이에 따라 인터로킹블록(10)을 추가 적층하여 추가어셈블리(400)를 더 구성할 수 있다.After the construction step (S40) of the third word assembly 300, an additional assembly ( 400) can be further configured.

한편, 상기 사석마운드(40)의 설치단계(S10) 후 상기 사석마운드(40)에 대응하여 다수의 요홈(71)을 갖는 기초블록(70)이 설치되는 단계(S100)를 더 포함할 수 있다.On the other hand, after the installation step (S10) of the sandstone mound 40, the step (S100) of installing a foundation block 70 having a plurality of grooves 71 corresponding to the sandstone mound 40 may be further included (S100). .

이를 위해 일렬로 설치된 다수의 인터로킹블록(10)은 도 5 및 도 7와 같이 제1단어셈블리(100)를 구성하고, 이러한 제1단어셈블리(100)의 상단에는 도 6 및 도 8과 같이 제1단어셈블리(100)와 서로 반대방향이 되도록 다른 인터로킹블록(10)을 일렬로 적층하여 제2단어셈블리(200)를 구성하는데, 이때 상기 제2단어셈블리(200)를 구성하는 인터로킹블록(10)의 돌출부(12)는 인접된 제1단어셈블리(100)를 구성하는 인터로킹블록(10)의 돌출부(12) 상단에 중첩되도록 적층됨으로써 다단으로 설치되는 제1단어셈블리(100) 및 제2단어셈블리(200)는 상호 벽돌을 지그재그로 반복하여 조적하는 것 같은 효과를 발휘하여 더욱더 견고함을 유지할 수 있게 된다.For this purpose, a plurality of interlocking blocks 10 installed in a line constitute the first word assembly 100 as shown in FIGS. 5 and 7 , and at the upper end of the first word assembly 100 as shown in FIGS. The second word assembly 200 is constructed by stacking other interlocking blocks 10 in a line so as to be opposite to the first word assembly 100, and at this time, the interlocking constituting the second word assembly 200 is The protrusion 12 of the block 10 is installed in multiple stages by being stacked so as to overlap the upper end of the protrusion 12 of the interlocking block 10 constituting the adjacent first word assembly 100, the first stage assembly 100. And the second word assembly 200 exhibits the same effect as repeatedly masonry zigzag mutual bricks can be maintained even more robust.

그리고 상기 제2단어셈블리(200)의 상단에는 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층하여 제3단어셈블리(300)를 구성하므로 결국에는 제2단어셈블리(200)와 반대방향이 되도록 제3단어셈블리(300)가 적층되는 결과를 갖게 된다.And on the upper end of the second word assembly 200, the interlocking block 10 is laminated in the same direction as the first word assembly 100 to constitute the third word assembly 300, so that in the end, the second word assembly 200 ) and have the result that the third word assembly 300 is stacked in the opposite direction.

이러한 제1단어셈블리(100), 제2단어셈블리(200), 제3단어셈블리(300)는 항만구조물(S)의 전후 폭이 넓은 대형으로 축조시 도 16와 같이 2열 또는 다수의 열을 이루도록 병렬로 설치할 수도 있게 된다.The first word assembly 100, the second word assembly 200, and the third word assembly 300 are large in size with a wide front and rear width of the port structure (S). It is also possible to install them in parallel to achieve this.

또한, 상기 인터로킹블록(10)은 전단저항력을 극대화하기 위한 기술이 추가로 접목된다.In addition, the interlocking block 10 is additionally grafted with a technology for maximizing shear resistance.

이를 위한 기술구성으로 도 11 내지 도 12과 같이 파랑에 의한 파압을 받는 반대 방향 쪽의 돌출부(12) 및 하단에 전단저항홈(15)이 함몰 형성되고, 상기 돌출부(12) 및 상단에는 전단저항홈(15)과 대응하는 전단저항턱(16)이 형성됨으로써 다단으로 적층되는 인터로킹블록(10)은 상하 견고한 결속력을 유지하면서 전후 방향으로 발생하는 전단저항력을 더욱 강화하여 우수한 시공성을 발휘할 뿐만 아니라 쇄석채움공간(20)에 채워진 쇄석은 파압이 작용하더라도 상기 전단저항턱(16)에 의해 더 밀리지 않고 쇄석기둥(30)의 견고함을 유지함으로써 파압을 더욱 효율적으로 견딜 수 있는 특별한 효과를 제공한다.As a technical configuration for this, as shown in FIGS. 11 to 12, the protrusion 12 on the opposite side to which the wave pressure is applied and the shear resistance groove 15 are recessed at the lower end, and the shear resistance is formed at the protrusion 12 and the upper end. The interlocking block 10 stacked in multiple stages by forming the shear resistance jaw 16 corresponding to the groove 15 exhibits excellent workability by further strengthening the shear resistance generated in the front and rear directions while maintaining a solid upper and lower binding force. The crushed stone filled in the crushed stone filling space 20 is not pushed further by the shear resistance sill 16 even when wave pressure is applied, and maintains the rigidity of the crushed stone pillar 30 It provides a special effect that can withstand the pressure more efficiently .

즉, 도 18에 도시된 바와 같이, 상기 전단저항홈(15)과 전단저항턱(16)이 각각 상하 블록본체(10a)에 대응하여 유격 없이 적층으로 인터로킹블록(10)이 축조되는 경우 항외에서 파압이 불규칙하게 발생하더라도 항내로 인터로킹블록(10)이 법선을 이탈하지 않고 견고하게 버틸 수 있다.That is, as shown in Fig. 18, the shear resistance groove 15 and the shear resistance jaw 16 respectively correspond to the upper and lower block body 10a, and when the interlocking block 10 is constructed by lamination without play. Even if the wave pressure is irregularly generated from the outside, the interlocking block 10 into the harbor can withstand the normal without deviating from the normal line.

따라서, 결혹홈(17)과 결속돌기(17a)를 측면(11)에 형성하는 불필요한 공정을 삭제할 수 있어, 인터로킹블록(10)이 제적 비용을 절감할 수 있다.Accordingly, an unnecessary process of forming the knot groove 17 and the binding protrusion 17a on the side surface 11 can be eliminated, and the interlocking block 10 can reduce the weeding cost.

다음으로, 상기한 구성으로 이루어진 본 발명의 쇄석기둥(30)과 인터로킹블록(10)을 이용한 항만구조물의 축조공법에 대해 설명하기로 한다.Next, the construction method of the port structure using the crushed stone pillar 30 and the interlocking block 10 of the present invention having the above-described configuration will be described.

우선적으로 항만구조물 중 항만구조물(S)을 축조하기 위해서는 해저면의 지반을 보강한 후 그 위에 사석마운드(40)를 설치하는 단계와, 상기 사석마운드(40) 위에 인터로킹블록(10)을 일렬로 설치하여 제1단어셈블리(100)를 구성하는 단계 및 상기 제1단어셈블리(100)의 양 측면(11) 토우(TOE) 부분에는 피복석(41)을 보강 구축하는 단계를 포함하고, 상기 제1단어셈블리(100)의 상단에 인터로킹블록(10)을 반대방향이 되도록 일렬로 적층하여 제2단어셈블리(200)를 구성하는 단계와, 상기 제2단어셈블리(200)의 상단에 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층하여 제3단어셈블리(300)를 구성하는 단계와, 상기 인터로킹블록(10)의 사이에 형성된 쇄석채움공간(20)에 쇄석을 채워 쇄석기둥(30)을 형성하는 단계와, 상기 제3단어셈블리(300)의 상단에 상치콘크리트(50)를 타설하는 단계를 포함함으로써 항만구조물(S)을 간편하게 구축할 수 있게 된다.First of all, in order to construct a port structure (S) among port structures, the steps of reinforcing the ground of the seabed and then installing the sandstone mound 40 thereon, and the interlocking block 10 on the sandstone mound 40 are lined up Comprising the steps of constructing the first word assembly 100 by installing the The step of forming the second word assembly 200 by stacking the interlocking blocks 10 in a line in the opposite direction on the upper end of the first word assembly 100, and the first on the upper end of the second word assembly 200 The step of constructing the third word assembly 300 by stacking the interlocking blocks 10 in the same direction as the word assembly 100, and crushed stone in the crushed stone filling space 20 formed between the interlocking blocks 10 By including the steps of filling the crushed stone pillar 30 to form the crushed stone pillar 30 and pouring the upper concrete 50 on the upper end of the third word assembly 300, the port structure S can be easily constructed.

이러한 본 발명은 기존의 콘크리트 블록에 비해 쇄석을 채우는 공정이 추가되었으나 인터로킹블록(10)의 적층 후 수상에서 쇄석의 투하 작업이 가능함으로써 이러한 공정 추가에 따른 문제점을 상쇄하고, 인터로킹블록(10)의 구조가 단순하여 제작 및 시공 과정이 매우 용이하다.In this invention, the process of filling crushed stone is added compared to the conventional concrete block, but since it is possible to drop the crushed stone from the water after lamination of the interlocking block 10, the problem caused by the addition of this process is offset, and the interlocking block 10 ) structure is simple, so the manufacturing and construction process is very easy.

도 15에 의하면, 상기 사석마운드(40)에는 제1단어셈블리(100), 제2단어셈블리(200), 제3단어셈블리(300)가 다단으로 설치될 수도 있지만 사석마운드(40)의 상단에는 도 14와 같은 직사각형 형태의 기초블록(70)을 먼저 설치한 후 상기 기초블록(70)의 상단에 제1단어셈블리(100)를 설치함으로써 지반에서 상기 제1단어셈블리(100)에 작용하는 지반 반력을 보강하여 더욱 견고한 시공성을 확보할 수 있고, 상기 사석마운드(40)와 접하는 기초블록(70)의 저면에 등간격으로 형성된 다수의 요홈(71)에 사석이 채워지면서 미끄럼을 방지하여 튼튼한 기초를 제공할 수 있게 된다.According to FIG. 15 , the first word assembly 100 , the second word assembly 200 , and the third word assembly 300 may be installed in multiple stages in the sandstone mound 40 , but at the upper end of the sandstone mound 40 . The ground acting on the first word assembly 100 in the ground by installing the first word assembly 100 on the upper end of the base block 70 after first installing the rectangular base block 70 as shown in FIG. 14 . It is possible to secure more robust workability by reinforcing the reaction force, and prevent slipping while filling the multiple grooves 71 formed at equal intervals on the bottom surface of the foundation block 70 in contact with the sandstone mound 40 to prevent sliding. be able to provide

또한, 항만구조물 중 물양장(L)을 축조하기 위해서는 도 17과 같이 해저면의 지반을 보강한 후 그 위에 사석마운드(40)를 설치하는 단계와, 상기 사석마운드(40) 위에 인터로킹블록(10)을 일렬로 설치하여 제1단어셈블리(100)를 구성하는 단계 및 상기 제1단어셈블리(100)의 양 측면(11) 토우(TOE) 부분에는 피복석(41)을 보강 구축하는 단계를 포함하고, 상기 제1단어셈블리(100)의 상단에 인터로킹블록(10)을 반대방향이 되도록 일렬로 적층하되 제1단어셈블리(100)보다 짧은 길이의 인터로킹블록(10)을 적층하여 제2단어셈블리(200)를 구성하는 단계와, 상기 제2단어셈블리(200)의 상단에 제1단어셈블리(100)와 동일한 방향으로 인터로킹블록(10)을 적층하되, 제2단어셈블리(200)보다 짧은 길이의 인터로킹블록(10)을 적층하여 제3단어셈블리(300)를 구성하는 단계와, 상기 인터로킹블록(10)의 사이에 형성된 쇄석채움공간(20)에 쇄석을 채워 쇄석기둥(30)을 형성하는 단계와, 상기 제2단어셈블리(200)나 3단어셈블리(300)의 상단에 상치콘크리트(50)를 타설하는 단계와, 상기 인터로킹블록(10)의 후방, 즉 단차를 이루는 제1단어셈블리(100), 제2단어셈블리(200), 제3단어셈블리(300)의 단차부 및 후방에 뒷채움잡석(60)을 채우는 단계와, 뒷채움잡석(60)의 표면에 필터매트(61)를 포설하는 단계와, 상기 필터매트(61)의 상부에 매립토(62)를 매립한 후 상치콘크리트(50)와 수평면을 이루도록 포장로(63)를 포장하는 단계를 포함함으로써 물양장(L)을 간편하게 구축할 수 있게 된다.In addition, in order to build the water storage (L) among the port structures, as shown in FIG. 17 , after reinforcing the ground of the seabed, installing a sandstone mound 40 thereon, and an interlocking block 10 on the sandstone mound 40 ) to configure the first word assembly 100 by installing them in a line, and the step of reinforcing the covering stone 41 on both sides 11 of the first word assembly 100 and the toe (TOE) part, and , The interlocking blocks 10 are stacked in a line so as to be opposite to each other on the upper end of the first word assembly 100 , but the interlocking blocks 10 having a shorter length than the first word assembly 100 are stacked to the second stage The step of constructing the assembly 200 and stacking the interlocking block 10 on the upper end of the second word assembly 200 in the same direction as the first word assembly 100, but rather than the second word assembly 200 The step of constructing the third-word assembly 300 by stacking the short-length interlocking blocks 10, and filling the crushed stone filling space 20 formed between the interlocking blocks 10 with crushed stone pillars 30 ), the steps of pouring the upper concrete 50 on the upper end of the second-level assembly 200 or the third-level assembly 300, and the rear of the interlocking block 10, that is, forming a step difference The step of filling the backfilling rubble 60 in the step portion and the rear of the first word assembly 100, the second word assembly 200, and the third word assembly 300, and a filter mat on the surface of the backfilling rubbish 60 By including the steps of laying 61) and paving the pavement 63 so as to form a horizontal plane with the standing concrete 50 after embedding the buried soil 62 in the upper part of the filter mat 61, the water storage (L) can be easily built.

여기에서 상기 단차를 이루도록 다단으로 설치되는 인터로킹블록(10)의 사이에 형성된 쇄석채움공간(20)은 도 17과 같이 단차를 형성함에 따라 상부에서 한꺼번에 쇄석을 투입할 수도 있으나 이 경우 하측으로 갈수록 단면적이 커서 쇄석이 촘촘하게 채워지지 않음을 고려하여 제1단어셈블리(100)를 설치한 후 쇄석을 채워 넣고, 제2단어셈블리(200)를 설치한 후 쇄석을 채워 넣고, 제3단어셈블리(300)를 설치한 후 쇄석을 채워 넣는 방식으로 각각 나누어 투입하는 방법을 통해 쇄석을 더욱 촘촘하게 채워 넣어 인터로킹의 효과를 극대화할 수 있게 된다.Here, the crushed stone filling space 20 formed between the interlocking blocks 10 installed in multiple stages to achieve the step difference may be put into the crushed stone at once from the upper portion as the level difference is formed as shown in FIG. Considering that the crushed stone is not densely filled due to the large cross-sectional area, the crushed stone is installed after the first assembly 100 is installed, and the crushed stone is installed after the second assembly 200 is installed, and the crushed stone is filled in, and the third assembly 300 ) is installed, and the crushed stone is filled in separately.

그리고 상기 항만구조물(S) 및 물양장(L)의 축조시 상기 제3단어셈블리(300)의 상단에는 설계된 항만구조물의 높이에 따라 인터로킹블록(10)을 다단으로 추가 적층하여 블록 어셈블리를 구성할 수 있는 것으로, 본 발명에서는 이를 3단 설치로 예시하였지만 반드시 이에 한정하지 않고, 다만 이와 동일 유사한 구성을 갖는 이상 설치되는 단수를 달리하는 것만으로는 본 발명의 범주를 벗어날 수 없음은 자명하다고 할 수 있다.And when constructing the port structure (S) and the water storage (L), the interlocking block 10 is additionally stacked in multiple stages according to the height of the designed port structure on the upper end of the third word assembly 300 to configure the block assembly. In the present invention, it is exemplified as a three-stage installation, but it is not necessarily limited thereto, but it can be said that it is self-evident that it cannot deviate from the scope of the present invention by simply changing the number of stages installed as long as it has the same and similar configuration. have.

상기와 같이 구성된 본 발명을 제공함으로써, 상/하/좌/우 블록 간의 체결력이 견고하여 항만구조물의 안정성을 확보, 전단저항력으로 블록 간의 상대변위 및 부등침하 방지, 원가 및 시공비 절감과 더불어 시공 품질 향상으로 인해 경제성 확보할 수 있는 효과가 있다.By providing the present invention configured as above, the fastening force between the upper/lower/left/right blocks is strong to secure the stability of the port structure, to prevent relative displacement and unequal settlement between blocks with shear resistance, and to reduce costs and construction costs as well as construction quality The improvement has the effect of securing economic feasibility.

이상에 설명한 본 명세서 및 청구범위에 사용되는 용어 및 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 본 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms and words used in the present specification and claims described above should not be construed as being limited to conventional or dictionary meanings, and the present inventors have adequately defined the concept of terms to describe their invention in the best way. It should be interpreted as meaning and concept consistent with the technical idea of the present invention based on the principle that it can be defined in

따라서, 본 명세서에 기재된 도면 및 실시 예에 도시된 구성은 본 발명의 가장 바람직한 하나의 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것이 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.Therefore, the configurations shown in the drawings and embodiments described in this specification are only one of the most preferred embodiments of the present invention, and do not represent all the technical spirit of the present invention, so they can be substituted at the time of the present application. It should be understood that there may be various equivalents and variations that exist.

10: 인터로킹블록
10a: 블록본체
11: 측면
12: 돌출부
13: 쇄석돌기
14: 보강리브
15: 전단저항홈
16: 전단저항턱
16a:소파공
17: 결속홈
17a: 결속돌기
18: 보조돌출부
20: 쇄석채움공간
30: 쇄석기둥
40: 사석마운드
41: 피복석
50: 상치콘크리트
60: 뒷채움잡석
61: 필터매트
62: 매립토
63: 포장로
70: 기초블록
71: 요홈
100: 제1단어셈블리
200: 제2단어셈블리
300: 제3단어셈블리
S10: 사석마운드 설치단계
S20: 제1단어셈블리 구성단계
S30: 제2단어셈블리 구성단계
S40: 제3단어셈블리 구성단계
S50: 쇄석기둥 형성단계
S60: 상치콘크리트 형성단계
S70: 뒷채움잡석 채움단계
S80: 필터매트 포설단계
S90: 매립토 매립 및 포장로 포장 단계
S100: 기초블록 설치단계
S: 항만구조물
L: 물양장
10: interlocking block
10a: block body
11: side
12: protrusion
13: crushed stone
14: reinforcement rib
15: shear resistance groove
16: shear resistance jaw
16a: sofa ball
17: bond home
17a: binding process
18: auxiliary protrusion
20: crushed stone filling space
30: crushed stone column
40: sandstone mound
41: covered stone
50: Sangchi concrete
60: backfill rubble
61: filter mat
62: reclaimed soil
63: pavement
70: basic block
71: groove
100: first word assembly
200: second word assembly
300: third word assembly
S10: sandstone mound installation stage
S20: first word assembly construction step
S30: Second word assembly construction step
S40: 3rd word assembly construction step
S50: crushed stone pillar formation stage
S60: Concrete formation stage
S70: Backfilling rubble filling step
S80: Filter mat installation step
S90: Reclamation of landfill and pavement of pavement path
S100: Basic block installation step
S: port structure
L: water farm

Claims (10)

인터로킹블록에 있어서,
소정의 길이를 갖는 블록본체(10a)와;
상기 블록본체(10a)의 양쪽 측면(11)에 대응하여 상호 엇갈리게 양쪽 끝에 한쌍으로 돌출 형성되고, 내측 모서리에 보강리브가 형성된 돌출부(12)를 포함하여 콘크리트로 일체 형성되며,
상기 돌출부(12)의 평저면에는 상호 엇갈리게 전단저항턱(16)이 돌출 형성되고, 상기 전단저항턱(16)에 대응하여 반대쪽 평저면에는 전단저항홈(15)이 함몰 형성되며,
상기 블록본체(10a)의 양쪽 측면(11)에 쇄석돌기(13)가 엇갈려 돌출 형성되고,
상기 블록본체(10a)의 길이방향을 따라서 상기 전단저항턱(16) 내부의 일부분을 관통하면서 유입구와 유출구가 동일면에 형성되어 입수된 유체를 배출하면서 소파하는 소파공(16a)이 구비되며,
상기 인터로킹블록의 돌출부(12)에 형성된 전단저항턱(16) 및 전단저항홈(15)이 각각 상부에 배치된 다른 인터로킹블록의 돌출부에 형성된 전단저항홈(15) 및 전단저항턱(16)과 상호 대응 결합되어 상하 결속되는 것을 특징으로 하는 인터로킹블록.
In the interlocking block,
a block body 10a having a predetermined length;
Corresponding to both side surfaces 11 of the block body 10a, a pair of protrusions are formed at both ends to cross each other, and are integrally formed of concrete, including the protrusions 12 having reinforcing ribs formed at the inner corners,
On the flat bottom surface of the protrusion 12, the shear resistance jaws 16 are formed to protrude alternately, and the shear resistance grooves 15 are recessed in the flat bottom surface opposite to the shear resistance jaw 16.
The crushed stone protrusions 13 are alternately formed on both side surfaces 11 of the block body 10a,
Along the longitudinal direction of the block body 10a, an inlet and an outlet are formed on the same surface while penetrating a portion of the inside of the shearing resistance sill 16, and a sofa hole 16a is provided, which breaks while discharging the obtained fluid,
The shear resistance groove 15 and the shear resistance jaw 16 formed in the protrusion of another interlocking block having the shear resistance jaw 16 and the shear resistance groove 15 formed in the protrusion 12 of the interlocking block respectively disposed thereon. ) and interlocking blocks, characterized in that they are coupled to each other and are vertically bound.
삭제delete 청구항 1에 있어서,
상기 돌출부(12)의 일측면에는 결속홈(17)이 함몰 형성되고,
상기 돌출부(12)의 반대쪽 측면에는 상기 결속홈(17)에 끼워지는 결속돌기(17a)가 돌출 형성된 것을 특징으로 하는 인터로킹블록.
The method according to claim 1,
A binding groove 17 is recessed in one side of the protrusion 12,
An interlocking block, characterized in that a binding protrusion (17a) fitted into the binding groove (17) is formed on the opposite side of the protrusion (12) to protrude.
소정의 길이를 갖는 블록본체(10a)와, 상기 블록본체(10a)의 양쪽 측면(11)에 대응하여 상호 엇갈리게 양쪽 끝에 한쌍으로 돌출 형성되고, 내측 모서리에 보강리브가 형성된 돌출부(12)를 포함하여 콘크리트로 일체 형성되는 인터로킹블록(10)과;
상기 인터로킹블록(10)의 돌출부(12)가 인접하는 다른 인터로킹블록(10)의 측면(11)에 밀착되도록 인터로킹블록(10)을 일렬로 설치하여 인접하는 인터로킹블록(10)의 사이에 형성되는 쇄석채움공간(20)과;
상기 쇄석채움공간(20)에 쇄석을 채워서 형성되는 쇄석기둥(30)으로 이루어지고,
상기 인터로킹블록(10)은,
상기 돌출부(12)의 평저면에는 상호 엇갈리게 전단저항턱(16)이 돌출 형성되고, 상기 전단저항턱(16)에 대응하여 반대쪽 평저면에는 전단저항홈(15)이 함몰 형성되며,
상기 블록본체(10a)의 양쪽 측면(11)에 쇄석돌기(13)가 엇갈려 돌출 형성되고,
상기 블록본체(10a)의 길이방향을 따라서 상기 전단저항턱(16) 내부의 일부분을 관통하면서 유입구와 유출구가 동일면에 형성되어 입수된 유체를 배출하면서 소파하는 소파공(16a)이 구비되며,
상기 인터로킹블록의 돌출부(12)에 형성된 전단저항턱(16) 및 전단저항홈(15)이 각각 상부에 배치된 다른 인터로킹블록의 돌출부에 형성된 전단저항홈(15) 및 전단저항턱(16)과 상호 대응 결합되어 상하 결속되는 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물.
A block body 10a having a predetermined length, and a pair of protrusions formed at both ends to cross each other corresponding to both side surfaces 11 of the block body 10a, and a protrusion 12 having a reinforcing rib formed at the inner corner. an interlocking block 10 integrally formed of concrete;
The interlocking blocks 10 are installed in a line so that the protrusions 12 of the interlocking block 10 are in close contact with the side surfaces 11 of the other interlocking blocks 10 adjacent to each other. a crushed stone filling space 20 formed therebetween;
It consists of a crushed stone column (30) formed by filling crushed stone in the crushed stone filling space (20),
The interlocking block 10,
On the flat bottom surface of the protrusion 12, the shear resistance jaws 16 are formed to protrude alternately, and the shear resistance grooves 15 are recessed in the flat bottom surface opposite to the shear resistance jaw 16.
The crushed stone protrusions 13 are alternately formed on both side surfaces 11 of the block body 10a,
Along the longitudinal direction of the block body 10a, an inlet and an outlet are formed on the same surface while penetrating a portion of the inside of the shearing resistance sill 16, and a sofa hole 16a is provided, which breaks while discharging the obtained fluid,
The shear resistance groove 15 and the shear resistance jaw 16 formed in the protrusion of another interlocking block having the shear resistance jaw 16 and the shear resistance groove 15 formed in the protrusion 12 of the interlocking block respectively disposed thereon. ) and a port structure using an interlocking block, characterized in that it is coupled up and down to correspond to each other.
삭제delete 청구항 4에 있어서,
상기 항만구조물은,
다수의 인터로킹블록(10)이 일렬로 배열하는 제1단어셈블리(100)와;
상기 제1단어셈블리(100)의 상부에 일렬로 적층되는 제2단어셈블리(200);로 이루어지되.
상기 제2단어셈블리(200)는 상기 제1단어셈블리(100)의 상단에 서로 반대 방향을 따라 인터로킹블록(10)을 일렬로 적층함과 동시에, 상기 제2단어셈블리(200)를 구성하는 인터로킹블록(10)의 블록본체(10a)가 제1단어셈블리(100)를 구성하는 인터로킹블록(10)의 블록본체(10a) 상단에 중첩되도록 적층되는 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물.
5. The method according to claim 4,
The port structure is
a first word assembly 100 in which a plurality of interlocking blocks 10 are arranged in a line;
A second word assembly 200 stacked in a line on the upper portion of the first word assembly 100;
The second word assembly 200 is configured by stacking the interlocking blocks 10 in a line on the upper end of the first word assembly 100 in opposite directions and at the same time composing the second word assembly 200 Using an interlocking block, characterized in that the block body (10a) of the interlocking block (10) is stacked so as to overlap the top of the block body (10a) of the interlocking block (10) constituting the first word assembly (100) port structures.
청구항 6에 있어서,
상기 제1 및 제2 단어셈블리(100,200)를 형성하는 상기 상부 인터로킹블록(10)의 전단저항턱(16)과 하부에 적층되는 상기 하부 인터로킹블록(10) 사이에 형성되는 공간을 상기 상부 인터로킹블록(10)의 전단저항턱(16)이 상기 쇄석채움공간(20)에 채워진 쇄석에 작용하고, 상기 하부 인터로킹블록(10)의 전단저항턱(16)에 작용하여 결속력을 강화하는 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물.
7. The method of claim 6,
A space formed between the shear resistance sill 16 of the upper interlocking block 10 forming the first and second word assemblies 100 and 200 and the lower interlocking block 10 stacked on the lower portion is formed in the upper part of the upper interlocking block 10 . The shear resistance jaw 16 of the interlocking block 10 acts on the crushed stone filled in the crushed stone filling space 20, and acts on the shear resistance jaw 16 of the lower interlocking block 10 to strengthen the binding force. A port structure using an interlocking block, characterized in that.
청구항 4에 의해 구성된 인터로킹블록을 이용한 항만구조물의 축조방법에 있어서,
해저면의 지반을 보강하고 사석마운드(40)를 설치하는 단계(S10)와;
상기 사석마운드(40) 위에 인터로킹블록(10)을 일렬로 설치하여 제1단어셈블리(100)를 구성하는 단계(S20)와;
상기 제1단어셈블리(100)의 상단에 인터로킹블록(10)을 반대방향이 되도록 일렬로 적층하여 제2단어셈블리(200)를 구성하는 단계(S30)와;
상기 인터로킹블록(10)의 사이에 형성된 쇄석채움공간(20)에 쇄석을 채워 쇄석기둥(30)을 형성하는 단계(S50)와;
상기 제2단어셈블리(200)의 상단에 콘크리트를 타설하여 상치콘크리트(50)를 형성하는 단계(S60)를 포함하는 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물의 축조방법.
In the method of constructing a port structure using the interlocking block configured according to claim 4,
Reinforcing the ground of the seabed and installing a sandstone mound 40 (S10);
The step of configuring the first word assembly 100 by installing the interlocking block 10 in a line on the sandstone mound 40 (S20);
constructing the second word assembly 200 by stacking the interlocking blocks 10 on the upper end of the first word assembly 100 in a line in the opposite direction (S30);
forming crushed stone pillars 30 by filling crushed stone in the crushed stone filling space 20 formed between the interlocking blocks 10 (S50);
Constructing a port structure using an interlocking block, characterized in that it comprises the step (S60) of pouring concrete on the upper end of the second word assembly (200) to form the upper concrete (50).
청구항 8에 있어서,
상기 상치콘크리트(50)의 형성단계(S60) 후에
상기 제1,2단어셈블리(100,200)의 후방에 뒷채움잡석(60)을 채우는 단계(S70)와;
상기 뒷채움잡석(60)의 표면에 필터매트(61)를 포설하는 단계(S80)와;
상기 필터매트(61)의 상부에 매립토(62)를 매립한 후 상치콘크리트(50)와 수평면을 이루도록 포장로(63)를 포장하는 단계(S90)를 포함하는 것을 을 특징으로 하는 인터로킹블록을 이용한 항만구조물의 축조방법.
9. The method of claim 8,
After the forming step (S60) of the upper concrete 50
Filling the backfilling rubble 60 in the rear of the first and second word assemblies 100 and 200 (S70);
Laying the filter mat 61 on the surface of the backfilling rubble 60 (S80) and;
Interlocking block, characterized in that it comprises a step (S90) of paving the pavement 63 so as to form a horizontal plane with the standing concrete 50 after embedding the buried soil 62 in the upper part of the filter mat 61 A method of constructing a port structure using
청구항 8 또는 청구항 9에 있어서,
상기 사석마운드(40)의 설치단계(S10) 후
상기 사석마운드(40)에 대응하여 다수의 요홈(71)을 갖는 기초블록(70)이 설치되는 단계(S100)를 더 포함하는 것을 특징으로 하는 인터로킹블록을 이용한 항만구조물의 축조방법.
10. The method according to claim 8 or 9,
After the installation step (S10) of the sandstone mound 40
A method of constructing a harbor structure using an interlocking block, characterized in that it further comprises a step (S100) of installing a foundation block (70) having a plurality of grooves (71) corresponding to the sandstone mound (40).
KR1020200154722A 2020-11-18 2020-11-18 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block KR102315282B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020200154722A KR102315282B1 (en) 2020-11-18 2020-11-18 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block
KR1020210103861A KR102601005B1 (en) 2020-11-18 2021-08-06 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200154722A KR102315282B1 (en) 2020-11-18 2020-11-18 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020210103861A Division KR102601005B1 (en) 2020-11-18 2021-08-06 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block

Publications (1)

Publication Number Publication Date
KR102315282B1 true KR102315282B1 (en) 2021-10-21

Family

ID=78268752

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020200154722A KR102315282B1 (en) 2020-11-18 2020-11-18 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block
KR1020210103861A KR102601005B1 (en) 2020-11-18 2021-08-06 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020210103861A KR102601005B1 (en) 2020-11-18 2021-08-06 Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block

Country Status (1)

Country Link
KR (2) KR102315282B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855890A (en) * 2022-06-17 2022-08-05 中交第一航务工程局有限公司 Offshore wind power pile scouring treatment construction method based on bionic grass

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5082501U (en) * 1973-11-29 1975-07-15
KR200310145Y1 (en) * 2002-12-31 2003-04-26 고양종합건설 주식회사 a block for lighter's wharf or quay wall.
KR20120107366A (en) * 2011-03-21 2012-10-02 한국해양연구원 Caisson
KR101331449B1 (en) * 2011-07-26 2013-11-20 삼성물산 주식회사 Precasting block for foundation work and the method of foundation work using it
KR101487131B1 (en) 2014-02-27 2015-01-28 이명호 Fill gabion built in concrete block and on the concrete block of cap concrete
KR20200012274A (en) * 2018-07-26 2020-02-05 (주)유주 Wave dissipating block and concrete structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070075118A (en) * 2006-01-12 2007-07-18 (유) 이도건설 Rabbet joint block and structure using thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5082501U (en) * 1973-11-29 1975-07-15
KR200310145Y1 (en) * 2002-12-31 2003-04-26 고양종합건설 주식회사 a block for lighter's wharf or quay wall.
KR20120107366A (en) * 2011-03-21 2012-10-02 한국해양연구원 Caisson
KR101331449B1 (en) * 2011-07-26 2013-11-20 삼성물산 주식회사 Precasting block for foundation work and the method of foundation work using it
KR101487131B1 (en) 2014-02-27 2015-01-28 이명호 Fill gabion built in concrete block and on the concrete block of cap concrete
KR20200012274A (en) * 2018-07-26 2020-02-05 (주)유주 Wave dissipating block and concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855890A (en) * 2022-06-17 2022-08-05 中交第一航务工程局有限公司 Offshore wind power pile scouring treatment construction method based on bionic grass

Also Published As

Publication number Publication date
KR102601005B1 (en) 2023-11-13
KR20220068125A (en) 2022-05-25

Similar Documents

Publication Publication Date Title
CN103321241B (en) Deep water open type combination foundation harbour and construction method thereof
KR101448092B1 (en) Prefabricated caisson blocks and breakwater, seawall using it
KR101095496B1 (en) Renewal construction method of decrepit open type wharf and gravity type structure of sheet pile a wharf
US6082931A (en) Modular maritime dock design
KR102315282B1 (en) Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block
KR101666626B1 (en) Shore bank using frame and geotextile, and method for constructing this same
JP5846150B2 (en) Construction method of river revetment structure
US11787514B2 (en) Marine construction and a method for constructing the same
KR20110046209A (en) Method Of Construction For Scour Prevension And Reinforcement Of Bridge Pier, And Structure Of The Same
CN106149624A (en) A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof
KR101487131B1 (en) Fill gabion built in concrete block and on the concrete block of cap concrete
KR20050092144A (en) Arch steel pipe sheet piles use of arching effect and its wall
Galal A numerical study for upgrading the container terminal of port-said west port
KR20230157125A (en) concrete block and port structure construction method using same
KR102383736B1 (en) Crane rail foundation integrated caisson and construction method
KR102483534B1 (en) Sofa block caisson and its installation method
KR102483537B1 (en) Seawater penetrating block caisson and its installation method
CN210636370U (en) Steel-pipe pile short sheet pile wall combination formula high pile pier
KR20240025325A (en) Crushed Stone Column Bound Concrete Block and Port Structure Using the Same
KR100708895B1 (en) Stack-type block, multistage stack-type civil work structure and construction method thereof
KR101032923B1 (en) Retaining wall
Ospina et al. Optimized Design Addresses Site and Constructability Challenges for Container Wharf in Iraq
CN118065301A (en) Semi-gravity wharf based on embedded foundation and construction method thereof
Coviello et al. From 2D to 3D: Modeling to Refine Design of a New King-Pile Bulkhead
Sircar et al. Toe Wall Design and Construction for Busy Container Berth Deepening

Legal Events

Date Code Title Description
GRNT Written decision to grant