KR102283765B1 - Spiral corrugated steel pipe with zinc film formed on the inner wall of the collecting hole and its manufacturing method - Google Patents
Spiral corrugated steel pipe with zinc film formed on the inner wall of the collecting hole and its manufacturing method Download PDFInfo
- Publication number
- KR102283765B1 KR102283765B1 KR1020200140024A KR20200140024A KR102283765B1 KR 102283765 B1 KR102283765 B1 KR 102283765B1 KR 1020200140024 A KR1020200140024 A KR 1020200140024A KR 20200140024 A KR20200140024 A KR 20200140024A KR 102283765 B1 KR102283765 B1 KR 102283765B1
- Authority
- KR
- South Korea
- Prior art keywords
- collecting hole
- wall
- zinc
- zinc film
- manufacturing
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/12—Making tubes or metal hoses with helically arranged seams
- B21C37/123—Making tubes or metal hoses with helically arranged seams of coated strip material; Making multi-wall tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/12—Making tubes or metal hoses with helically arranged seams
- B21C37/127—Tube treating or manipulating combined with or specially adapted for use in connection with tube making machines, e.g. drawing-off devices, cutting-off
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D19/00—Flanging or other edge treatment, e.g. of tubes
- B21D19/08—Flanging or other edge treatment, e.g. of tubes by single or successive action of pressing tools, e.g. vice jaws
- B21D19/10—Flanging or other edge treatment, e.g. of tubes by single or successive action of pressing tools, e.g. vice jaws working inwardly
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D28/00—Shaping by press-cutting; Perforating
- B21D28/24—Perforating, i.e. punching holes
- B21D28/26—Perforating, i.e. punching holes in sheets or flat parts
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
- Coating With Molten Metal (AREA)
Abstract
Description
본 발명은 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 및 그 제조방법에 관한 것으로서, 더욱 상세하게는 스파이럴 파형강관 배수관을 제조할 때, 아연 도금 강판에 천공되는 다수 개의 집수 홀의 내벽에 아연 피막을 형성하여 부식을 방지하고 수명을 연장하여 상기 파형강관 배수관의 품질을 제고 할 수 있는 스파이럴 파형강관 배수관 및 그 제조방법에 관한 것이다.The present invention relates to a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of a water collecting hole, and a method for manufacturing the same, and more particularly, when manufacturing a spiral corrugated steel pipe drain pipe, a zinc film is applied to the inner wall of a plurality of collecting holes perforated in a galvanized steel sheet It relates to a spiral corrugated steel pipe drain pipe capable of improving the quality of the corrugated steel pipe drain pipe by forming a corrugated steel pipe to prevent corrosion and extend the lifespan, and a method for manufacturing the same.
스파이럴 파형강관 배수관은 철 금속이나 동 및 알루미늄 등의 비철금속과 같은 판상 소재를 비틀어 감으면서 소정의 직경과 길이의 파이프 형상으로 만든다.The spiral corrugated steel pipe drain pipe is made into a pipe shape of a predetermined diameter and length while twisting and winding a plate-like material such as ferrous metal or non-ferrous metal such as copper and aluminum.
상기 스파이럴 파형강관 배수관은 배관의 표면에 다수 개의 집수 홀을 형성하고 부직포로 표면을 싸서 수분만 배관 내에 집수하여 배수 이송하도록 구성함으로서, 수위를 낮추어 토질을 안정시키고 서리피해를 예방하며, 지하수 및 우수를 한곳으로 모아 흐르게 하여 물고임 및 붕괴사고를 예방한다. 주로 국도, 고속국도, 철도 등 터널현장, 골프장, 운동장, 지하도, 소택지, 비행장 등에 사용된다.The spiral corrugated steel pipe drain pipe forms a plurality of collecting holes on the surface of the pipe and wraps the surface with a non-woven fabric so that only moisture can be collected in the pipe and drained, thereby lowering the water level to stabilize the soil and prevent frost damage, Prevents pooling and collapsing accidents by collecting and flowing water in one place. It is mainly used for tunnel sites such as national roads, high-speed national roads, railways, golf courses, sports fields, underpasses, swamps, and airfields.
상기 집수 홀이 천공된 스파이럴 파형강관 배수관은 아연 도금 강판을 소재로 하고 있으며, 천공작업 시 천공되는 부위에 강판이 노출됨으로서 부식되는 문제점이 있는데, 일반적으로 이러한 문제점을 해소하기 위하여 강판이 노출된 부위를 아연으로 재도장하는 공정을 수행하나, 이러한 공정은 제품의 품질을 저하하고, 제조원가를 상승시키는 문제점을 수반한다. The drain pipe of the spiral corrugated steel pipe in which the water collecting hole is perforated is made of galvanized steel sheet, and there is a problem in that the steel sheet is exposed to the perforated area during the perforation operation and there is a problem of corrosion. In general, to solve this problem, the steel sheet is exposed A process of repainting with zinc is performed, but this process is accompanied by problems of lowering the quality of the product and increasing the manufacturing cost.
본 출원인은 상기 집수 홀을 벤딩 공정, 천공 공정 및 확경 공정을 동시에 수행하여 강판이 노출되는 집수 홀 내벽에 아연 피막을 형성함으로서 상술한 문제점을 해소한 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 및 그 제조방법을 제공하고자 한다.The present applicant has solved the above problems by forming a zinc film on the inner wall of the collecting hole where the steel sheet is exposed by simultaneously performing a bending process, a drilling process, and a diameter expansion process for the collecting hole. and to provide a method for manufacturing the same.
상술한 문제점을 해결하기 위한 본 발명의 목적은, (a) 일정한 폭과 두께를 가지는 아연 도금 강판 또는 피복된 아연 도금 강판을 준비하는 단계, (b) 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하는 집수 홀 벤딩 단계, (c) 상기 요철부에 일정한 간격으로 소정 크기의 집수 홀을 천공하는 집수 홀 천공 단계, (d) 상기 천공된 홀을 확경하여 홀 내벽에 아연 피막을 형성하는 아연 피막 형성 단계, (e) 상기 아연 피막 형성단계를 거친 상기 아연 도금 강판을 비틀어 감아서 스파이럴 파형강관 배수관 제조 단계를 포함하여 이루어지는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.An object of the present invention for solving the above problems is, (a) preparing a galvanized steel sheet or a coated galvanized steel sheet having a constant width and thickness, (b) a galvanized steel sheet having a predetermined size at regular intervals on the galvanized steel sheet A step of bending a collecting hole to form an uneven portion, (c) a step of drilling a water collecting hole of a predetermined size at regular intervals in the uneven portion, (d) a zinc coating on the inner wall of the hole by expanding the diameter of the drilled hole A method of manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of a collecting hole, comprising the step of forming a zinc film to form a zinc film, (e) twisting and winding the galvanized steel sheet that has passed through the zinc film forming step to manufacture a spiral corrugated steel pipe drain pipe is to provide
본 발명의 다른 목적은, 상기 (a) 소재 준비단계는, 아연이 양면 600g/m2 이상 부착된 아연 도금 강판 또는 상기 아연 도금 강판에 부식방지를 위한 PE, PVC, PU 등을 피복한 소재로 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that the (a) material preparation step is a galvanized steel sheet having zinc on both sides of 600 g/m 2 or more or a material coated with PE, PVC, PU, etc. for corrosion prevention on the galvanized steel sheet. An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole.
본 발명의 또 다른 목적은, 상기 (b) 집수 홀 벤딩 단계는, 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하도록 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that, in the step (b) bending the water collecting hole, a zinc film is formed on the inner wall of the collecting hole configured to form irregularities of a predetermined size at regular intervals on the galvanized steel sheet. To provide a manufacturing method.
본 발명의 또 다른 목적은, 상기 (b) 집수 홀 벤딩 단계는, 프레스의 인입 측에서 공급되는 상기 아연 도금 강판의 소정 면적에 다수 개의 벤딩 핀에 의해 요철(凹凸) 형상의 벤딩 홈부가 형성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that, in the step (b) bending the water collecting hole, a bending groove portion having a concave-convex shape is formed by a plurality of bending pins in a predetermined area of the galvanized steel sheet supplied from the inlet side of the press. An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on an inner wall of a collecting hole.
본 발명의 또 다른 목적은, 상기 (c) 집수 홀 천공단계는, 프레스의 상·하 동작으로 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 홀을 천공하도록 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that, in the step (c) drilling the water collecting hole, a zinc film is formed on the inner wall of the water collecting hole, which is configured to drill holes of a predetermined size at regular intervals in the galvanized steel sheet by up and down operations of the press. To provide a method for manufacturing a spiral corrugated steel pipe drainage pipe.
본 발명의 또 다른 목적은, 상기 (c) 집수 홀 천공 단계는, 상기 프레스의 인입 측에서 공급되는 상기 아연 도금 강판의 소정 면적에 다수 개의 천공 핀에 의해 천공 홀이 형성되도록 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that, in the step of (c) drilling the water collecting hole, the water collecting hole inner wall is configured such that the perforated hole is formed by a plurality of perforating pins in a predetermined area of the galvanized steel sheet supplied from the inlet side of the press. An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed.
본 발명의 또 다른 목적은, 상기 천공 핀은 천공 시 상부의 아연 피막을 천공 홀의 내벽에 밀고 내려와서 홀 내벽 피막을 형성하는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of a water collecting hole by which the perforation pin pushes the zinc film on the upper part to the inner wall of the perforated hole during drilling to form the inner wall film of the hole. .
본 발명의 또 다른 목적은, 상기 (d) 아연 피막 형성단계는, 프레스의 같은 상·하 동작으로 상기 천공된 홀을 확경하여 천공된 집수 홀 내벽 전면에 아연 피막을 형성하는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is to manufacture a spiral corrugated steel pipe drain pipe in which the zinc film forming step (d) forms a zinc film on the entire inner wall of the perforated water collecting hole by expanding the diameter of the perforated hole with the same up and down operation of the press is to provide a way.
본 발명의 또 다른 목적은, 상기 (d) 아연 피막 형성단계는, 상기 천공작업이 끝난 아연 도금 강판이 공급되면 상기 천공 홀의 수와 같은 확경 핀에 의해 상기 천공 홀이 확경 되도록 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that, in the (d) zinc film forming step, when the galvanized steel sheet on which the drilling operation has been completed is supplied, the inner wall of the water collecting hole is configured such that the drilling holes are enlarged by the same diameter expansion pins as the number of the drilled holes. An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed.
본 발명의 또 다른 목적은, 상기 (d) 아연 피막 형성단계는, 상기 확경 핀의 직경이 상기 천공 핀보다 더 크게 형성되어, 상기 확경 핀의 수직 하강 동작으로 상기 집수 홀의 내벽 전체에 피막이 형성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that, in the step (d) of forming a zinc film, the diameter of the enlarged diameter pin is formed to be larger than that of the perforated pin, so that a film is formed on the entire inner wall of the water collecting hole by the vertical lowering operation of the enlarged diameter pin. An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on an inner wall of a collecting hole.
본 발명의 또 다른 목적은, 상기 확경 핀은 첨단부와 천공 핀의 직경보다 큰 확경 부로 형성되며, 상기 첨단부와 확경부는 단이 형성되어 상부의 아연 피막을 긁어내리도록 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention, the diameter expansion pin is formed with an enlarged diameter larger than the diameter of the tip and the perforated pin, and the tip and the diameter expansion part are formed in stages and the inner wall of the water collecting hole configured to scrape off the zinc coating on the top An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed.
본 발명의 또 다른 목적은, 상기 (b) 집수 홀 벤딩 단계, (c) 집수 홀 천공단계 및 (d) 아연 피막 형성단계는, 같은 프레스의 같은 상·하 동작으로 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that the (b) water collecting hole bending step, (c) water collecting hole drilling step, and (d) zinc film forming step are performed by applying zinc to the inner wall of the water collecting hole, which consists of the same up and down operations of the same press. An object of the present invention is to provide a method for manufacturing a spiral corrugated steel pipe drain pipe in which a film is formed.
본 발명의 또 다른 목적은, 상기 (b) 집수 홀 벤딩 단계, (c) 집수 홀 천공단계 및 (d) 아연 피막 형성단계는, 소재 공급부에서 띠 모양으로 된 금속 소재가 공급되면 프레스 가공부의 상기 벤딩부의 벤딩 핀에 의해 일정 면적이 벤딩되고, 다음 단계 상기 벤딩 부위에 천공부의 천공 핀으로 천공하고, 끝으로 확경부에서 확경 핀에 의해 집수 홀이 확대되는 구성되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다.Another object of the present invention is that the (b) water collecting hole bending step, (c) water collecting hole drilling step, and (d) zinc film forming step are performed by the press working part when the metal material in a band shape is supplied from the material supply unit. A certain area is bent by the bending pin of the bending part, and in the next step, a zinc film is formed on the inner wall of the water collecting hole, which is formed by drilling the bending part with the perforating pin of the perforated part, and finally expanding the water collecting hole by the enlarged diameter pin at the enlarged diameter part. To provide a method for manufacturing a spiral corrugated steel pipe drain pipe.
본 발명의 또 다른 목적은, 상기 (e) 스파이럴 관 제조 단계는, 상기 프레스 가공부의 (d) 아연 피막 형성단계를 통과한 다수 개의 집수 홀이 천공된 아연 도금 강판을 스파이럴 관 성형기를 이용하여 파이프 형상으로 비틀어 감아서 만들어지는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하는데 있다. Another object of the present invention is that the (e) spiral pipe manufacturing step is performed by using a spiral pipe forming machine to pipe a galvanized steel sheet having a plurality of water collecting holes that have passed through the (d) zinc film forming step of the press working part. An object of the present invention is to provide a method for manufacturing a drain pipe for a spiral corrugated steel pipe in which a zinc film is formed on the inner wall of a collecting hole made by twisting and winding into a shape.
이와 같은 목적을 달성하기 위한 본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 특징은, (a) 일정한 폭과 두께를 가지는 아연 도금 강판 또는 피복된 아연 도금 강판을 준비하는 단계, (b) 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하는 집수 홀 벤딩 단계, (c) 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 집수 홀을 천공하는 단계, (d) 상기 천공된 홀을 확경하여 홀 내벽에 아연 피막을 형성하는 단계, (e) 스파이럴 파형강관 배수관을 제조하는 단계를 포함하여 이루어진다.A feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention for achieving the above object is, (a) preparing a galvanized steel sheet or a coated galvanized steel sheet having a constant width and thickness , (b) bending the water collecting hole to form irregularities of a predetermined size at regular intervals in the galvanized steel sheet, (c) drilling water collecting holes of a predetermined size in the galvanized steel sheet at regular intervals, (d) ) forming a zinc film on the inner wall of the hole by expanding the diameter of the perforated hole, and (e) manufacturing a spiral corrugated steel pipe drain pipe.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 다른 특징은, 상기 (a) 소재 준비단계는, 아연이 양면 600g/m2 이상 부착된 아연 도금 강판 또는 상기 아연 도금 강판에 부식방지를 위한 PE, PVC, PU 등을 피복한 소재로 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention is that the (a) material preparation step includes a galvanized steel sheet or a galvanized steel sheet having zinc attached to 600 g/m 2 or more on both sides. It is composed of materials coated with PE, PVC, PU, etc. to prevent corrosion.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (b) 집수 홀 벤딩 단계는, 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하도록 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is that, in the step (b) bending the collecting hole, irregularities of a predetermined size are formed in the galvanized steel sheet at regular intervals. configured to do
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (b) 집수 홀 벤딩 단계는, 프레스의 인입 측에서 공급되는 상기 아연 도금 강판의 소정 면적에 다수 개의 벤딩 핀에 의해 요철(凹凸) 형상의 벤딩 홈부가 형성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention is that (b) the collecting hole bending step includes a plurality of A bending groove portion having a concave-convex shape is formed by the bending pin.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (c) 집수 홀 천공단계는, 상기 벤딩 부위를 프레스의 상·하 동작으로 소정 크기의 홀을 천공하도록 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is that, in the (c) collecting hole drilling step, a hole of a predetermined size is drilled by pressing the bending portion up and down by pressing. configured to do
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (c) 집수 홀 천공 단계는, 상기 프레스의 인입 측에서 공급되는 상기 아연 도금 강판의 소정 면적에 다수 개의 천공 핀에 의해 천공 홀이 형성되도록 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is that (c) the collecting hole drilling step is performed in a predetermined area of the galvanized steel sheet supplied from the inlet side of the press. It is configured such that the drilling hole is formed by the four drilling pins.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 천공 핀은 천공 시 상부의 아연 피막을 천공 홀의 내벽에 밀고 내려와서 홀 내벽 피막을 형성한다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is that the perforated pin pushes the zinc film on the upper part to the inner wall of the perforated hole during drilling and descends to form the inner wall of the hole.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (d) 아연 피막 형성단계는, 프레스의 같은 상·하 동작으로 상기 천공된 홀을 확경한다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is that in the (d) zinc film forming step, the drilled hole is enlarged by the same up and down operation of the press.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (d) 아연 피막 형성단계는, 상기 천공작업이 끝난 아연 도금 강판이 공급되면 상기 천공 홀의 수와 같은 확경 핀에 의해 상기 천공 홀이 확경 되도록 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention is that the (d) zinc film forming step is the same as the number of drilled holes when the galvanized steel sheet after the drilling operation is supplied. It is configured so that the drilling hole is enlarged by the diameter expansion pin.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (d) 아연 피막 형성단계는, 상기 확경 핀의 직경이 상기 천공 핀보다 더 크게 형성되어, 상기 확경 핀의 수직 하강 동작으로 상기 집수 홀의 내벽 전체에 피막이 형성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention is that in the (d) zinc film forming step, the diameter of the diameter expansion pin is formed larger than that of the drill pin, A film is formed on the entire inner wall of the water collecting hole by the vertical lowering operation of the pin.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 확경 핀은 첨단부와 천공 핀의 직경보다 큰 확경 부로 형성되며, 상기 첨단부와 확경부는 단이 형성되어 상부의 아연 피막을 긁어내리도록 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc coating is formed on the inner wall of the water collecting hole of the present invention is that the diameter expansion pin is formed with an enlarged diameter larger than the diameter of the tip and the drilling pin, and the tip and the expanded diameter are single It is formed and is configured to scrape off the zinc coating on the top.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (b) 집수 홀 벤딩 단계, (c) 집수 홀 천공단계 및 (d) 아연 피막 형성단계는, 같은 프레스의 같은 상·하 동작으로 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention is that (b) the collecting hole bending step, (c) the collecting hole drilling step and (d) the zinc film forming step are the same It consists of the same up and down movements of the press.
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (b) 집수 홀 벤딩 단계, (c) 집수 홀 천공단계 및 (d) 아연 피막 형성단계는, 소재 공급부에서 띠 모양으로 된 금속 소재가 공급되면 프레스 가공부의 상기 벤딩부의 벤딩 핀에 의해 일정 면적이 벤딩되고, 다음 단계 천공부의 천공 핀에 의해 상기 벤딩부가 천공되고, 끝으로 확경부에서 확경 핀에 의해 집수 홀이 확대되도록 구성된다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole of the present invention is that (b) the collecting hole bending step, (c) the collecting hole drilling step and (d) the zinc film forming step are, When a band-shaped metal material is supplied from the supply unit, a certain area is bent by the bending pin of the bending unit of the press working unit, and the bending unit is perforated by the perforated pin of the next step perforation, and finally, from the enlarged diameter to the enlarged diameter pin It is configured such that the water collecting hole is enlarged by the
본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 또 다른 특징은, 상기 (e) 스파이럴 관 제조 단계는, 상기 프레스 가공부의 (d) 아연 피막 형성단계를 통과한 다수 개의 집수 홀이 천공된 아연 도금 강판을 스파이럴 관 성형기를 이용하여 파이프 형상으로 비틀어 감아서 만들어진다.Another feature of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is that the (e) spiral pipe manufacturing step includes a plurality of water collecting pipes passing through the (d) zinc coating forming step of the press working part. It is made by twisting a galvanized steel sheet with perforated holes into a pipe shape using a spiral tube forming machine.
이상에서와 같은 본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법은, 집수 홀을 벤딩하는 공정, 천공하는 공정 및 상기 집수 홀을 확경하는 공정을 통하여 집수 홀의 내벽을 아연 피막을 형성하고 한다. 따라서 일반적인 제조방법과 같이 추가되는 공정 없이 집수 홀의 내벽에 아연 피막을 형성함으로서 제조원가를 낮출 수 있는 장점이 있다.As described above, in the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention, the inner wall of the water collecting hole is coated with a zinc film through the process of bending the collecting hole, drilling the collecting hole, and expanding the diameter of the collecting hole. form and do Therefore, there is an advantage in that the manufacturing cost can be lowered by forming a zinc film on the inner wall of the water collecting hole without an additional process like a general manufacturing method.
또한, 본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법은, 집수 홀을 벤딩하는 공정, 천공하는 공정 및 확경하는 공정을 동시에 수행하도록 구성된다. 따라서 추가 공정 없이 집수 홀의 내벽에 아연 피막이 형성됨으로서 고품질의 파형강관 배수관을 제공할 수 있다.In addition, the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is configured to simultaneously perform the process of bending the collecting hole, the process of drilling, and the process of expanding the diameter. Therefore, it is possible to provide a high-quality corrugated steel pipe drainage pipe by forming a zinc film on the inner wall of the water collecting hole without an additional process.
또한, 본 발명에 따라 제조되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관은, 벤딩 · 천공하고 확경하면서 집수 홀의 내벽에 아연 피막을 형성한다. 따라서 일반적으로 재도장하는 제품에 비해 품질이 우수하고 수명을 연장할 수 있는 장점이 있다.In addition, the spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole manufactured according to the present invention forms a zinc film on the inner wall of the water collecting hole by bending and drilling and expanding the diameter. Therefore, it has the advantage of being superior in quality and extending the lifespan compared to products that are generally repainted.
도 1은 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 단계별 공정도이다.
도 2는 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관이 제조되는 과정을 소재부터 완성품까지 개략적으로 나타낸 순서도이다.
도 3은 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 집수 홀 벤딩 단계를 나타내는 공정도이다.
도 4는 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 집수 홀 천공단계를 나타내는 공정도이다.
도 5는 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 아연 피막 형성단계를 나타내는 공정도이다.
도 6은 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 집수 홀 내벽에 아연 피막이 형성되는 과정을 상기 벤딩 · 천공 및 아연 피막 형성단계로 개략적으로 나타내는 그림이다.
도 7은 본 발명에 따라 제조된 천공된 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관을 나타내는 사진이다.1 is a step-by-step process diagram of a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on an inner wall of a collecting hole according to the present invention.
2 is a flowchart schematically showing the manufacturing process of a spiral corrugated steel pipe drain pipe in which a zinc film is formed on an inner wall of a water collecting hole according to the present invention from a material to a finished product.
3 is a process diagram showing the bending step of the collecting hole in the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention.
4 is a process diagram showing the step of drilling the collecting hole in the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention.
5 is a process diagram illustrating a zinc film forming step of a method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on an inner wall of a water collecting hole according to the present invention.
6 is a diagram schematically showing the process of forming a zinc film on the inner wall of the collecting hole in the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention as the bending/perforating and zinc film forming steps.
7 is a photograph showing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of a perforated water collecting hole manufactured according to the present invention.
본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시 예를 가질 수 있는바, 특정 실시 예들을 도면에 예시하고 발명의 설명에 상세하게 설명하고자 한다.Since the present invention can have various changes and can have various embodiments, specific embodiments are illustrated in the drawings and described in detail in the description of the invention.
그러나 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.However, this is not intended to limit the present invention to a specific embodiment, it should be understood to include all modifications, equivalents and substitutes included in the spirit and scope of the present invention.
본 발명에 사용된 용어나 단어는 단지 특정한 실시 예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합되는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present invention are only used to describe specific embodiments, and are not intended to limit the present invention. Based on the principle that the concept of a term can be appropriately defined in order to explain one's invention in the best way, it should be interpreted as meaning and concept consistent with the technical idea of the present invention.
스파이럴 파형강관 배수관은 배관의 표면에 다수 개의 집수 홀을 형성하고 부직포로 표면을 싸서 수분만 배관 내에 집수하여 배수 이송하도록 구성하였으며, 지하 수위를 낮추어 토질을 안정시키고 서리피해를 예방하여 주며 지하수 및 수로를 한곳으로 모아 흐르도록 하여 물의 고임 및 붕괴사고를 예방하기 위하여 주로 국도, 고속국도, 철도 등 터널현장, 골프장, 운동장, 지하도, 소택지, 비행장 등에 사용된다.The spiral corrugated steel pipe drain pipe has a number of collecting holes on the surface of the pipe, and the surface is wrapped with a non-woven fabric so that only moisture can be collected in the pipe and drained. It is mainly used in tunnel sites such as national roads, high-speed national roads, railways, golf courses, sports fields, underpasses, marshes, and airfields to prevent water stagnant and collapse accidents by collecting them in one place.
상기 집수 홀이 천공된 스파이럴 파형강관 배수관은 아연 도금 강판을 소재로 하고 있으며, 상기 집수 홀 천공작업 시 천공 부위의 강판이 노출되면서 그곳에서부터 부식되는 문제점을 가지고 있었다. 일반적으로 이러한 문제점을 해소하기 위하여 아연 도금이 벗겨진 부위를 재도장하는데, 이러한 공정은 제품의 품질을 저하하고, 제조원가를 상승시키는 문제점을 수반한다. The drain pipe of the spiral corrugated steel pipe in which the water collecting hole is perforated is made of a galvanized steel sheet, and when the water collecting hole is drilled, the steel sheet in the perforated area is exposed and corroded from there. In general, in order to solve this problem, the part where the zinc plating is peeled off is repainted, but this process is accompanied by problems of lowering the quality of the product and increasing the manufacturing cost.
이와 같은 문제점을 해소하기 위하여 본 발명은 스파이럴 파형강관 배수관의 소재로 사용되는 아연(Zn)이 양면 600g/m2 이상 부착된 열연 용융 아연 도금 강판(10) 또는 상기 아연 도금 강판에 부식방지를 위한 PE, PVC, PU 등을 피복한 소재를 사용하여 천공과 동시에 확경하여 집수 홀(1.1) 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법을 제공하고자 한다.In order to solve this problem, the present invention provides a hot-dip galvanized
본 발명에 따른 스파이럴 파형강관 배수관의 제조공정을 살펴보면, 띠 모양으로 된 금속 소재를 공급하는 소재 공급부, 상기 소재 공급부에서 인입되는 판상의 소재에 다수 개의 홀을 가공하는 프레스 가공부, 상기 프레스 가공부에서 가공을 마친 판상의 소재를 비틀어 감으면서 소정의 직경과 길이의 파이프 형상을 만드는 스파이럴 관 성형부로 대별된다.Looking at the manufacturing process of the spiral corrugated steel pipe drain pipe according to the present invention, a material supply unit for supplying a strip-shaped metal material, a press working unit for processing a plurality of holes in a plate-shaped material introduced from the material supply unit, and the press working unit It is roughly classified into a spiral tube forming part that creates a pipe shape with a predetermined diameter and length while twisting and winding the plate-like material processed in the process.
본 발명의 구체적인 특징 및 이점은 첨부된 도면을 참조한 이하의 설명으로 더욱 명확해 질 것이다.Specific features and advantages of the present invention will become more apparent from the following description with reference to the accompanying drawings.
도 1은 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 단계별 공정도이고, 도 2는 본 발명에 따른 천공된 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관이 제조되는 과정을 소재부터 완성품까지 개략적으로 나타낸 순서도이고, 도 3은 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 집수 홀 벤딩 단계를 나타내는 공정도이고, 도 4는 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 집수 홀 천공단계를 나타내는 공정도이고, 도 5는 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 아연 피막 형성단계를 나타내는 공정도이고, 도 6은 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 집수 홀 내벽에 아연 피막이 형성되는 과정을 상기 벤딩 · 천공 및 아연 피막 형성단계로 개략적으로 나타내는 그림이고, 도 7은 본 발명에 따라 제조된 천공된 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관을 나타내는 사진이다.1 is a step-by-step process diagram of a method for manufacturing a spiral corrugated steel pipe drainage pipe in which a zinc film is formed on an inner wall of a water collecting hole according to the present invention, and FIG. It is a flowchart schematically showing the process from the material to the finished product, and FIG. 3 is a process diagram showing the bending step of the collecting hole in the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention, and FIG. A process chart showing the step of drilling a collecting hole in a method for manufacturing a drain pipe for a spiral corrugated steel pipe in which a zinc film is formed on the inner wall of the collecting hole, and FIG. 6 is a process diagram showing the process of forming a zinc film on the inner wall of the collecting hole in the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention, schematically showing the bending/perforating and zinc film forming steps 7 is a photograph showing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the perforated water collecting hole manufactured according to the present invention.
도 1을 참조하여 설명하면, 본 발명에 따른 천공된 집수 홀(1.1) 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법은, (a) 일정한 폭과 두께를 가지는 아연 도금 강판(10) 또는 피복된 아연 도금 강판(10)을 준비하는, 소재 준비 단계(S100), (b) 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하는, 집수 홀 벤딩 단계(S200), (c) 상기 요철부에 일정한 간격으로 소정 크기의 집수 홀(1.1)을 천공하는, 집수 홀 천공 단계(S300), (d) 상기 천공된 홀을 확경하여 홀 내벽에 아연 피막을 형성하는, 아연 피막 형성 단계(S400), (e) 상기 아연 피막 형성단계를 거친 상기 아연 도금 강판(10)을 비틀어 감아서 스파이럴 파형강관 배수관 제조 단계(S500)를 포함하여 이루어진다.1, the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the perforated water collecting hole 1.1 according to the present invention is (a) a galvanized
본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 상기 (a) 소재 준비 단계(S100)는, 아연(Zn)이 양면 600g/m2 이상 부착된 열연 용융 아연 도금 강판을 준비한다.The (a) material preparation step (S100) of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention is a hot-rolled hot-dip galvanized steel sheet having zinc (Zn) attached to both sides of 600 g/m 2 or more. Prepare.
이때, 상기 아연은 강판의 표면에 상하면에 모두 부착되어 있으며, 윗면에 300g/m2 이상, 아랫면에 300g/m2 이상 부착된 것을 사용한다. At this time, the zinc is adhered to both the upper and lower surfaces on the surface of the steel sheet and, 300g / m 2 or more to the upper side, was used as the at least 300g / m 2 on the underside.
이러한 본 발명의 상기 (a) 소재 준비 단계(S100)는, 상기 아연 도금 강판에 부식방지를 위한 PE, PVC, PU 등의 합성수지로 피복한 소재를 사용하여 SPS 강관(부식방지 피복 나선형 강관)을 제조할 수 있다. In the (a) material preparation step (S100) of the present invention, an SPS steel pipe (corrosion-resistant coated spiral steel pipe) is prepared by using a material coated with a synthetic resin such as PE, PVC, and PU for corrosion prevention on the galvanized steel sheet. can be manufactured.
도 3을 참조하여 설명하면, 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 상기 (b) 집수 홀 벤딩 단계(S200)는, 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하도록 구성된다.Referring to FIG. 3 , the (b) collecting hole bending step (S200) of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention includes the galvanized steel sheet having a predetermined size at regular intervals. is configured to form an uneven (凹凸) portion of the.
이러한 본 발명의 상기 (b) 집수 홀 벤딩 단계(S200)는, 프레스의 인입 측에서 공급되는 상기 아연 도금 강판(10)의 소정 면적에 다수 개의 벤딩 핀(120)에 의해 요철(凹凸) 형상의 벤딩 홈부(12)가 형성된다.The (b) water collecting hole bending step (S200) of the present invention is performed in a concave-convex shape by a plurality of bending
이때, 상기 벤딩 핀(120)은 프레스의 상승작용에 의해 상기 벤딩 홈부(12)가 생기고 상면의 돌출된 부분은 철(凸)부(12-1), 하면의 함몰 부분은 요(凸)부(12-2)이다.At this time, in the
또한 이때, 본 발명에 따른 상기 벤딩 핀(120)의 직경은 천공 핀의 직경에 비해 10 ~ 15% 크게 형성된다.In addition, at this time, the diameter of the
도 4를 참조하여 설명하면, 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 상기 (c) 집수 홀 천공 단계(S300)는, 프레스의 상·하 동작으로 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 홀을 천공하도록 구성된다. 4, the (c) collecting hole drilling step (S300) of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole according to the present invention is performed by performing the galvanizing operation by the up and down operations of the press. It is configured to drill holes of a predetermined size at regular intervals in the steel plate.
이러한 본 발명의 상기 (c) 집수 홀 천공 단계(S300)는, 상기 벤딩 단계에서 형성된 벤딩 홈부(12)에 다수 개의 천공 핀(130)으로 천공 홀(13)을 타공하도록 구성된다.The (c) water collecting hole drilling step (S300) of the present invention is configured to perforate the
이때, 본 발명에 따른 천공 홀(13)의 직경은 바람직하게는 4.8 ~ 9.5mm, 가장 바람직하게는 9.0mm이다.At this time, the diameter of the
또한, 이러한 본 발명의 상기 천공 핀(130)은 천공 시 상부의 아연 피막을 천공 홀(13)의 내벽에 밀고 내려와서 홀 내벽 피막(13.1)을 형성하게 되고, 내벽 일부에는 피막이 형성되지 않은 피막 미형성부(13.2)가 남는다.(도 6(c) 참조)In addition, the
도 5를 참조하여 설명하면, 본 출원인이 실험한 결과에 의하면, 상기 홀 내벽 피막(13.1)은, 강판 두께(1.6mm)의 1/2 정도인 0.7 ~ 0.9mm 형성되며, 두께는 0.05mm 정도로 형성된다.Referring to FIG. 5 , according to the test results of the present applicant, the hole inner wall film 13.1 is formed to be 0.7 to 0.9 mm, which is about 1/2 of the thickness of the steel plate (1.6 mm), and the thickness is about 0.05 mm. is formed
계속해서 도 5를 참조하여 설명하면, 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 상기 (d) 아연 피막 형성 단계(S400)는, 프레스의 같은 상·하 동작으로 상기 천공된 홀을 확경하여 천공된 집수 홀 내벽 전면에 아연 피막을 형성한다.5, the (d) zinc film forming step (S400) of the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention is performed by the same up and down operation of the press. A zinc film is formed on the entire inner wall of the perforated water collecting hole by expanding the diameter of the perforated hole.
이러한 본 발명의 상기 (d) 아연 피막 형성 단계(S400)는, 상기 천공작업이 끝난 아연 도금 강판(10)이 공급되면 상기 천공 홀(13)의 수와 같은 확경 핀(140)으로 상기 천공 홀(13)을 확대하도록 구성된다.In the (d) zinc film forming step (S400) of the present invention, when the galvanized
이러한 본 발명의 상기 (d) 아연 피막 형성 단계(S400)는, 상기 확경 핀(140)의 직경이 상기 천공 핀(130)보다 더 크게 형성되어, 상기 확경 핀(140)의 수직 하강 동작으로 상기 확경 홀(14)의 내벽 전체에 홀 내벽 피막(14.1)이 형성된다.In the (d) zinc film forming step (S400) of the present invention, the diameter of the
이때, 본 발명에 따른 상기 확경 핀(140)에 의한 확경 홀(14)의 직경은, 바람직하게는 천공 홀의 약 2.3% 넓게 구성되며, 가장 바람직하게는 9.2mm로 구성된다.At this time, the diameter of the
또한, 본 발명에 따른 상기 확경 핀(140)은 첨단부(141)와 천공 핀(130)의 직경보다 큰 확경 부(142)로 형성되며, 상기 첨단부(141)와 확경부(142)는 단이 형성되어 상부의 아연 피막을 긁어내리도록 구성된다.In addition, the
이때, 본 발명의 상기 첨단부(141)와 확경부(142)는 단은 약 0.15mm 정도로 구성되어, 상부의 아연을 집수 홀의 내벽 전체에 골고루 긁어내리며, 이러한 공정에 의해 상기 집수 홀의 내벽 전체에는 약 0.10mm 두께의 피막을 형성된다. 이러한 단계를 거치면, 상기 피막 미형성부(13.2)가 없이 내벽 전체에 피막이 골고루 형성된다.(도 6(d) 참조)At this time, the
도 6을 참조하여 설명하면, 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 상기 (b) 집수 홀 벤딩 단계(S200), (c) 집수 홀 천공 단계(S300) 및 (d) 아연 피막 형성 단계(S400)는, 같은 프레스의 같은 상·하 동작으로 구성된다. 6, the (b) collecting hole bending step (S200), (c) collecting water collecting hole drilling step (S300) and (d) The zinc film forming step ( S400 ) consists of the same up and down operations of the same press.
이러한 본 발명의 상기 (b) 집수 홀 벤딩 단계(S200), (c) 집수 홀 천공 단계(S300) 및 (d) 아연 피막 형성 단계(S400)는, 소재 공급부(미도시)에서 띠 모양으로 된 금속 소재가 공급되면 프레스 가공부(벤딩부+천공부+확경부)의 상기 벤딩부의 벤딩 핀(120)에 의해 일정 면적이 벤딩되고, 다음 단계 상기 천공부의 천공 핀(130)에 의해 벤딩 부분이 천공되고, 끝으로 확경부에서 확경 핀(140)에 의해 확경된다(이상 최초공정 수행). 이후에는 공급되는 띠 모양으로 된 금속 소재에 프레스의 동일한 상하 동작으로 일 측에서는 벤딩 작업이, 중간에는 천공작업이, 다른 일 측에는 확경 작업이 동시에 이루어진다(이상 연속공정 수행).The (b) water collecting hole bending step (S200), (c) water collecting hole drilling step (S300) and (d) zinc film forming step (S400) of the present invention are performed in a band shape in the material supply unit (not shown). When the metal material is supplied, a certain area is bent by the bending
본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법의 상기 (e) 스파이럴 관 제조 단계(S500)는, 상기 프레스 가공부(미도시)의 (d) 아연 피막 형성 단계(S400)를 통과한 다수 개의 집수 홀(1.1)이 천공된 아연 도금 강판(10)을 스파이럴 관 성형기(미도시)를 이용하여 파이프 형상으로 비틀어 감아서 만들어지도록 구성된다.The (e) spiral pipe manufacturing step (S500) of the method for manufacturing a drain pipe of a spiral corrugated steel pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention, (d) zinc film forming step (S400) of the press working part (not shown) ) is configured to be made by twisting and winding the perforated galvanized
본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관은 상술한 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법으로 제조된다.The spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention is manufactured by the method for manufacturing a spiral corrugated steel pipe drain in which a zinc film is formed on the inner wall of the collecting hole.
이러한 본 발명에 따른 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 및 그 제조방법은 다음과 같은 특징이 있다.The spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole according to the present invention and a method for manufacturing the same have the following characteristics.
먼저, 본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법은, 집수 홀을 벤딩하는 공정, 천공하는 공정 및 상기 집수 홀을 확경하는 공정을 통하여 집수 홀의 내벽을 아연 피막을 형성하고 한다.First, the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention comprises forming a zinc film on the inner wall of the collecting hole through the process of bending the collecting hole, drilling the collecting hole, and expanding the diameter of the collecting hole, do.
따라서 일반적인 제조방법과 같이 추가되는 공정 없이 집수 홀의 내벽에 아연 피막을 형성함으로서 제조원가를 낮출 수 있는 장점이 있다.Therefore, there is an advantage in that the manufacturing cost can be lowered by forming a zinc film on the inner wall of the water collecting hole without an additional process like a general manufacturing method.
또한, 본 발명의 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법은, 집수 홀을 벤딩하는 공정, 천공하는 공정 및 확경하는 공정을 동시에 수행하도록 구성된다.In addition, the method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole of the present invention is configured to simultaneously perform the process of bending the collecting hole, the process of drilling, and the process of expanding the diameter.
따라서 추가 공정 없이 집수 홀의 내벽에 아연 피막이 형성됨으로서 고품질의 파형강관 배수관을 제공할 수 있다.Therefore, it is possible to provide a high-quality corrugated steel pipe drainage pipe by forming a zinc film on the inner wall of the water collecting hole without an additional process.
또한, 본 발명에 따라 제조되는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관은 벤딩 · 천공하고 확경하면서 집수 홀의 내벽에 아연 피막을 형성한다.In addition, the spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the water collecting hole manufactured according to the present invention forms a zinc film on the inner wall of the water collecting hole while bending and drilling and expanding the diameter.
따라서 일반적으로 재도장하는 제품에 비해 품질이 우수하고 수명을 연장할 수 있는 장점이 있다.Therefore, it has the advantage of being superior in quality and extending the lifespan compared to products that are generally repainted.
1 : 스파이럴 파형강관 배수관
1.1 : 집수 홀
1.2 : 락심
10 : 아연 도금 강판(금속 시트)
11 : 강판(1.6mm)
11-2 : 아연 도금층
12 : 벤딩 홈부
12-1 : 철(凸)부
12-2 : 요(凹)부
13 : 천공 홀
13.1 : 내벽 피막
13.2 : 피막 미부착벽
14 : 확경 홀
14.1 : 내벽 피막
100 : 밴딩 · 천공 및 확경 부(프레스)
120 ; 밴딩 핀
130 : 천공 핀
140 : 확경 핀
141 : 첨단부
142 : 확경부
200 : 락심(Lock seam) 부1: Spiral corrugated steel pipe drain pipe
1.1: catchment hole
1.2: lock sim
10: galvanized steel sheet (metal sheet)
11: steel plate (1.6mm)
11-2: galvanized layer
12: bending groove
12-1: iron part
12-2: Yo (凹) part
13: perforated hole
13.1: inner wall coating
13.2: uncoated wall
14 : expansion hole
14.1: inner wall coating
100: banding, perforation and enlargement part (press)
120 ; banding pin
130: punched pin
140: expansion pin
141: tip
142: expansion
200: lock seam part
Claims (8)
(a) 일정한 폭과 두께를 가지는 아연 도금 강판 또는 피복된 아연 도금 강판(10)을 준비하는, 소재 준비 단계(S100);
(b) 상기 아연 도금 강판에 일정한 간격으로 소정 크기의 요철(凹凸)부를 형성하는, 집수 홀 벤딩 단계(S200);
(c) 상기 요철부에 소정 크기의 홀을 천공하는, 집수 홀 천공 단계(S300);
(d) 상기 천공된 홀을 확대하여 홀 내벽에 아연 피막을 형성하는, 아연 피막 형성 단계(S400);
(e) 상기 아연 피막 형성단계를 거친 상기 아연 도금 강판(10)을 비틀어 감아서 스파이럴 파형강관 배수관을 제조하는, 스파이럴 파형강관 배수관 제조 단계(S500);를 포함하며,
상기 (b) 집수 홀 벤딩 단계(S200), (c) 집수 홀 천공 단계(S300) 및 (d) 아연 피막 형성 단계(S400)는, 같은 프레스에서 같은 상·하 동작으로 이루어지도록 구성되며,
상기 (b) 집수 홀 벤딩 단계(S200)는, 프레스의 인입 측에서 공급되는 상기 아연 도금 강판(10)의 소정 면적에 다수 개의 벤딩 핀(120)의 상승 동작에 의해 요철(凹凸) 형상의 벤딩 홈부(12)가 형성되며,
상기 (c) 집수 홀 천공 단계(S300)는, 상기 프레스의 인입 측에서 공급되어, 상기 벤딩 작업이 끝난 아연 도금 강판(10)의 상면 철(凸)부에 상기 벤딩 홈부(12)의 수와 같은 천공 핀(130)으로 천공 홀(13)을 타공하도록 구성되며,
상기 (d) 아연 피막 형성 단계(S400)는, 상기 천공작업이 끝난 아연 도금 강판(10)이 공급되면 상기 천공 홀(13)의 수와 같은 확경 핀(140)으로 상기 천공 홀(13)을 확대하며, 상기 확경 핀(140)의 수직 하강 동작으로 상기 확경 홀(14)의 내벽 전체에 아연 피막이 형성되도록 구성되며,
상기 벤딩 핀(120)은, 상기 천공 핀(130)의 직경보다 10 ~ 15% 더 크게 형성되며,
상기 확경 핀(140)은, 상기 천공 핀(130)의 직경보다 큰 단이 진 확경부(142)로 형성되어, 상기 천공 홀(13)이 2.3% 더 크게 확장되도록 구성되며,
상기 확경 핀(140)에 의해 더 크게 확장된 집수 홀(1.1)의 내벽 전체에는, 0.1mm 두께의 내벽 피막(14.1)이 형성되는 것을 특징으로 하는 집수 홀 내벽에 아연 피막이 형성되는 스파이럴 파형강관 배수관 제조방법.
When manufacturing a spiral corrugated steel pipe drain pipe (1) made by twisting a galvanized steel sheet (10) having a plurality of collecting holes (1.1) perforated into a pipe shape, 600 g/m 2 of zinc (Zn) is attached to both sides In the method for manufacturing a spiral corrugated steel pipe drain pipe (1), in which zinc on the upper part of the galvanized steel sheet is scraped down to form a zinc film on the entire inner wall of the water collecting hole (1.1) to prevent corrosion due to exposure of the steel sheet,
(a) preparing a galvanized steel sheet or a coated galvanized steel sheet 10 having a constant width and thickness, a material preparation step (S100);
(b) forming concavo-convex portions of a predetermined size in the galvanized steel sheet at regular intervals, bending the water collecting hole (S200);
(c) drilling a hole of a predetermined size in the concave-convex portion, a water collecting hole drilling step (S300);
(d) forming a zinc film on the inner wall of the hole by expanding the perforated hole, a zinc film forming step (S400);
(e) manufacturing a spiral corrugated steel pipe drain pipe by twisting and winding the galvanized steel sheet 10 that has undergone the zinc film forming step, a spiral corrugated steel pipe drain pipe manufacturing step (S500);
The (b) water collecting hole bending step (S200), (c) water collecting hole drilling step (S300) and (d) zinc film forming step (S400) are configured to be performed in the same up and down motions in the same press,
In the (b) water collecting hole bending step ( S200 ), bending of an uneven shape is performed by a lifting operation of a plurality of bending pins 120 on a predetermined area of the galvanized steel sheet 10 supplied from the inlet side of the press. A groove portion 12 is formed,
In the (c) water collecting hole drilling step (S300), the number of bending grooves 12 and It is configured to perforate the perforated hole 13 with the same perforated pin 130,
In the (d) zinc film forming step (S400), when the galvanized steel sheet 10 on which the drilling operation has been completed is supplied, the drilling holes 13 are formed with the same diameter expansion pins 140 as the number of the drilling holes 13. It is configured so that a zinc film is formed on the entire inner wall of the enlarged diameter hole 14 by the vertical descending operation of the enlarged diameter pin 140,
The bending pin 120 is formed 10 to 15% larger than the diameter of the perforated pin 130,
The enlarged diameter pin 140 is formed with an enlarged diameter portion 142 with a step greater than the diameter of the drilling pin 130, and the drilling hole 13 is configured to expand 2.3% larger,
A spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of the collecting hole, characterized in that an inner wall film 14.1 with a thickness of 0.1 mm is formed on the entire inner wall of the collecting hole 1.1 that is enlarged by the enlarged diameter pin 140 manufacturing method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200140024A KR102283765B1 (en) | 2020-10-27 | 2020-10-27 | Spiral corrugated steel pipe with zinc film formed on the inner wall of the collecting hole and its manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200140024A KR102283765B1 (en) | 2020-10-27 | 2020-10-27 | Spiral corrugated steel pipe with zinc film formed on the inner wall of the collecting hole and its manufacturing method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102283765B1 true KR102283765B1 (en) | 2021-07-30 |
Family
ID=77148655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020200140024A KR102283765B1 (en) | 2020-10-27 | 2020-10-27 | Spiral corrugated steel pipe with zinc film formed on the inner wall of the collecting hole and its manufacturing method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102283765B1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6453710B1 (en) * | 1999-09-06 | 2002-09-24 | Lindab Ab | Method and apparatus for manufacturing a helically-wound lock-seam tube having air nozzles |
KR100737152B1 (en) | 2006-10-20 | 2007-07-06 | 주식회사천일공조 | Supplier of sealant for spiralpipe |
KR200438447Y1 (en) | 2006-10-20 | 2008-02-15 | 주식회사천일공조 | Spiral pipe |
JP2016175105A (en) * | 2015-03-20 | 2016-10-06 | アスモ株式会社 | Manufacturing method of press product |
-
2020
- 2020-10-27 KR KR1020200140024A patent/KR102283765B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6453710B1 (en) * | 1999-09-06 | 2002-09-24 | Lindab Ab | Method and apparatus for manufacturing a helically-wound lock-seam tube having air nozzles |
KR100737152B1 (en) | 2006-10-20 | 2007-07-06 | 주식회사천일공조 | Supplier of sealant for spiralpipe |
KR200438447Y1 (en) | 2006-10-20 | 2008-02-15 | 주식회사천일공조 | Spiral pipe |
JP2016175105A (en) * | 2015-03-20 | 2016-10-06 | アスモ株式会社 | Manufacturing method of press product |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69430368T2 (en) | Process for changing the properties of a metal surface | |
US1879663A (en) | Process and apparatus for manufacturing flexible tubes | |
KR102283765B1 (en) | Spiral corrugated steel pipe with zinc film formed on the inner wall of the collecting hole and its manufacturing method | |
DE60220191D1 (en) | HIGH-FIXED FIRE-GRAINED GALVANIZED STEEL PLATE AND FIRE-PLATED BLEED STEEL PLATE WITH RESISTANCE TO FATIGUE, CORROSION RESISTANCE, DUCTILITY AND PLATING RESILIENCE, TO STRONG DEFORMATION, AND METHOD FOR THE PRODUCTION THEREOF | |
ATE515355T1 (en) | METHOD FOR PRODUCING A PLATED STAINLESS STEEL SUBSTRATE | |
KR102229304B1 (en) | Method for manufacturing a spiral corrugated steel pipe drain pipe in which a zinc film is formed on the inner wall of a perforated catchment hole | |
JP5698981B2 (en) | Roofing material | |
CA2440375C (en) | Tube manufacture | |
DE60113554T2 (en) | TOOL OF A BENDING DIE WITH CERTAIN SURFACES | |
EP1057931A3 (en) | Soft roll and process for making such a roll | |
CN201817540U (en) | Plant for continuously galvanizing tubes by heat | |
CN103851277A (en) | Production method for steel-plastic warping and soldering pipe | |
DE60204120D1 (en) | Method of marking a paper web, paper web with a watermark pattern | |
JP6404086B2 (en) | Expanded metal and manufacturing method thereof | |
EP1304176A3 (en) | Method for the continuous production of longitudinally seam welded metal tubes | |
ATE432374T1 (en) | METHOD FOR PRODUCING FLAT STEEL PRODUCTS FROM A MULTIPHASE STEEL ALLOYED WITH ALUMINUM | |
ATE314898T1 (en) | METHOD FOR PRODUCING A PART FROM A SUPPORT STRUT MEMBER OF AN OCEAN DRILLING PLATFORM | |
KR19990028826A (en) | Roll Forming Method of Galvanized Structural Steel Profile | |
JP2006214463A (en) | Method for manufacturing pipe joint | |
JPH06307034A (en) | Eave gutter and its manufacture | |
DE60015507D1 (en) | METHOD FOR SMOOTHING AN OBJECT IN PLATE SHAPE AND SMOOTHING TOOL | |
KR102418503B1 (en) | Manufacturing method of a pipe using carbon fiber and pipe manufactured by this | |
CN117703387A (en) | Grouting construction process for inner wall of vertical shaft | |
JP3540903B2 (en) | Temper rolling roll for plated steel strip with excellent foreign matter adhesion resistance | |
DE602004014891D1 (en) | A method for thickening a sheet, and from such a sheet existing gasket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |