KR102252685B1 KR1020190027589A KR20190027589A KR102252685B1 KR 102252685 B1 KR102252685 B1 KR 102252685B1 KR 1020190027589 A KR1020190027589 A KR 1020190027589A KR 20190027589 A KR20190027589 A KR 20190027589A KR 102252685 B1 KR102252685 B1 KR 102252685B1
Authority
KR
South Korea
Prior art keywords
lower plate
anchor socket
support
anchor
bridge
Prior art date
Application number
KR1020190027589A
Other languages
Korean (ko)
Other versions
KR20200108654A (en
Inventor
희민 박
안창모
Original Assignee
대창이엔지 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대창이엔지 주식회사 filed Critical 대창이엔지 주식회사
Priority to KR1020190027589A priority Critical patent/KR102252685B1/en
Publication of KR20200108654A publication Critical patent/KR20200108654A/en
Application granted granted Critical
Publication of KR102252685B1 publication Critical patent/KR102252685B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

받침부에 설치된 교량받침을 앵커소켓부를 이용하여 받침부에 손상없이 교체가 가능하도록 하되, 잭-업시키지 않고서도 교량받침을 교체할 수 있어 신속하교 경제적인 분리형 하판을 이용한 교량받침 및 그 시공방법으로서, 상기 교량받침은 받침부를 손상시키지 않고 교량받침을 교체하기 위한 앵커소켓부를 이용한 교량받침으로서, 받침부 상면에 조립 설치된 분리형 하판의 상면에 앵커소켓부의 앵커소켓에 의하여 고정 설치된 하판; 및 앵커소켓부의 앵커소켓 두부가 분리형 하판을 관통하여 하판의 하판저면삽입홈에 삽입된 상태에서, 하판의 상부에서 하판저면삽입홈을 관통하여 앵커소켓의 상면체결홈에 체결된 체결볼트;를 포함한다.The bridge support installed on the support part can be replaced without damage to the support part using the anchor socket part, but the bridge support can be replaced without a jack-up, so the bridge support and its construction method using the economical detachable lower plate for quick dismissal As, the bridge support is a bridge support using an anchor socket for replacing the bridge support without damaging the support, the lower plate fixedly installed by the anchor socket of the anchor socket on the upper surface of the detachable lower plate assembled and installed on the upper surface of the support; And a fastening bolt of the anchor socket portion through the detachable lower plate and inserted into the lower plate bottom insertion groove of the lower plate, penetrating the lower plate bottom insertion groove from the upper portion of the lower plate and fastened to the upper surface fastening groove of the anchor socket; do.

Description

분리형 하판을 이용한 교량받침 및 그 시공방법{BRIDGE BEARING USING SEPERATABLE UPPER PLATE AND CONSTRUCTION METHOD THEREWITH}Bridge support and its construction method using a separate lower plate {BRIDGE BEARING USING SEPERATABLE UPPER PLATE AND CONSTRUCTION METHOD THEREWITH}

본 발명은 분리형 하판을 이용한 교량받침 및 그 시공방법에 관한 것이다. 더욱 구체적으로 교량하부구조물에 설치된 받침부 상면에 시공된 교량받침을 앵커소켓부를 이용하여 받침부에 손상없이 교체가 가능하도록 하되, 교량상부구조물도 잭-업시키지 않고서 교량받침을 바로 교체할 수 있어 보다 경제적인 분리형 하판을 이용한 교량받침 및 그 시공방법에 관한 것이다.The present invention relates to a bridge support using a separate lower plate and a construction method thereof. More specifically, it is possible to replace the bridge support installed on the upper surface of the support part installed on the bridge substructure without damage to the support part using the anchor socket, but the bridge support can be replaced immediately without jacking up the bridge upper structure. It relates to a bridge support using a more economical separable lower plate and its construction method.

도 1a, 도 1b, 도 1c는 종래 앵커소켓 수용관을 이용한 교량받침 교체 순서도를 도시한 것이다.1A, 1B, and 1C are a flow chart illustrating a bridge bearing replacement flow chart using a conventional anchor socket receiving pipe.

즉, 도 1a와 같이 최종 시공 완료된 교량받침(20)은 받침 콘크리트(30, 무수축 몰탈)에 앵커소켓(11)에 의하여 고정 설치되어 있는데 교량받침을 교체할 필요가 있을 때, 받침 콘크리트(30, 무수축 몰탈 포함)을 손상시키지 않고 교량받침만 교체할 수 있다.That is, as shown in Figure 1a, the final construction of the bridge bearing 20 is fixedly installed on the bearing concrete (30, non-shrinkable mortar) by the anchor socket 11, and when it is necessary to replace the bridge bearing, the bearing concrete 30 , Non-shrink mortar included) can only be replaced without damaging the bridge bearing.

구체적으로 살펴보면 도 1b와 같이 먼저 체결볼트(13)의 체결방향과 반대방향으로 체결볼트를 회전시키게 되면 체결된 앵커소켓(11)은 앵커소켓 수용관(12)을 따라 하강하게 되며 저면이 부반력방지 디스크(14) 상면에 접하게 된다.Specifically, as shown in FIG. 1B, when the fastening bolt is first rotated in the opposite direction to the fastening direction of the fastening bolt 13, the fastened anchor socket 11 descends along the anchor socket receiving pipe 12, and the bottom surface is negative reaction force. It comes into contact with the upper surface of the prevention disk 14.

이에 체결볼트(13)의 체결을 완전히 풀어 하판(21)으로부터도 분리되도록 하고, 앵커소켓의 하강 깊이는 앵커소켓의 상부가 하판(21)의 삽입홈(22)으로부터 완전히 빠지도록 세팅되어 있어 앵커소켓(11)이 하판(21)의 수평이동에 방해가 되지 않도록 하게 된다.Accordingly, the fastening bolt 13 is completely unfastened so that it is separated from the lower plate 21, and the depth of the anchor socket is set so that the upper part of the anchor socket is completely removed from the insertion groove 22 of the lower plate 21. The socket 11 is prevented from interfering with the horizontal movement of the lower plate 21.

이에 도 1c와 같이 하판(21)을 수평으로 빼내고 새로운 하판(21a)을 다시 세팅하되, 삽입홈(22)이 앵커소켓(11)의 상부에 위치하도록 하게 된다.Accordingly, as shown in FIG. 1C, the lower plate 21 is removed horizontally and a new lower plate 21a is set again, but the insertion groove 22 is positioned above the anchor socket 11.

이에 다시 체결볼트(13)를 하판(21)을 관통하여 삽입홈(21)을 경유하여 앵커소켓(11)의 상부에 형성된 체결공에 체결시키되 앵커소켓(11)이 삽입홈(22)에 완전히 삽입될 때 까지 회전시키게 된다.Accordingly, the fastening bolt 13 is passed through the lower plate 21 and is fastened to the fastening hole formed in the upper portion of the anchor socket 11 through the insertion groove 21, but the anchor socket 11 is completely in the insertion groove 22. It will rotate until it is inserted.

이에 앵커소켓(11)의 하부에 체결된 지지볼트(15)의 볼트머리가 다시 부반력 방지디스크(14)의 저면에 접하면서 전체적으로 앵커(10)를 다시 원상복귀 시킬 수 있게 됨을 알 수 있다.Accordingly, it can be seen that the bolt head of the support bolt 15 fastened to the lower portion of the anchor socket 11 comes into contact with the bottom surface of the negative reaction force prevention disk 14 again, and the anchor 10 can be restored to its original state as a whole.

이에 받침 콘크리트(30)을 손상시키지 않고 하판(21)을 수평이동시키면서 교체할 수 있다는 장점이 있지만, 상기 교량받침(20)의 하판(21)을 교체하기 위해서는 미도시된 잭업장치에 의하여 교량상부구조물인 거더를 상방으로 잭-업시켜 하판(21)을 수평으로 빼내기 위한 작업공간을 확보해야 하기 때문에 잭업장치 운용에 많은 노력과 비용이 소요된다는 문제가 있었다.This has the advantage of being able to replace the lower plate 21 while horizontally moving the lower plate 21 without damaging the concrete support 30, but in order to replace the lower plate 21 of the bridge support 20, the upper part of the bridge is not shown by a jack-up device. There is a problem that a lot of effort and cost is required to operate the jack-up device because it is necessary to secure a working space for horizontally removing the lower plate 21 by jacking up the structure girder upward.

또한, 하판(21)을 받침 콘크리트(30) 상면에 직접 세팅하다보니 하판(21)을 수평으로 빼낼 때 마찰력에 의하여 작업성이 떨어진다는 문제점이 있었다.In addition, since the lower plate 21 is directly set on the upper surface of the supporting concrete 30, there is a problem that workability is deteriorated due to frictional force when the lower plate 21 is taken out horizontally.

대한민국 특허 제10-1230599호(발명의 명칭: 앵커소켓 수용관을 이용한 교량받침용 앵커 및 이를 이용한 교량받침 교체방법, 공개일자: 2013년02월06일)Korean Patent No. 10-1230599 (Name of invention: Anchor for bridge support using anchor socket receiving pipe and method of replacing bridge support using the same, Publication date: February 6, 2013) 대한민국 특허 제10-1608620호(발명의 명칭: 교량용 내진받침, 공개일자: 2016년04월04일)Korean Patent No. 10-1608620 (Name of invention: Seismic support for bridges, Publication date: April 4, 2016)

이에 본 발명은 앵커소켓부를 이용하여 받침부에 손상이 가지않도록 하면서 교량받침의 교체할 수 있도록 하고, 나아가 교량상부구조를 잭-업시키지 않아도 교량받침을 수평이동시켜 교체할 수 있도록 함으로서 교량받침 교체의 안정성 및 효율성을 확보할 수 있는 분리형하판을 이용한 교량받침 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.Accordingly, the present invention enables the replacement of the bridge support while preventing damage to the support by using the anchor socket, and further, the bridge support can be replaced by moving the bridge support horizontally without jacking up the upper structure of the bridge. This is a technical task to solve the provision of a bridge support and its construction method using a separable lower plate that can secure the stability and efficiency of

또한 본 발명은 앵커소켓부를 이용하여 교량받침을 교체함에 있어서, 교량받침의 하판이 받침부와 직접 접하여 마찰력에 의하여 작업성이 떨어지지 않도록 함으로서 신속하게 교량받침을 수평으로 빼낼 수 있는 분리형하판을 이용한 교량받침 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, in the present invention, in replacing the bridge support using the anchor socket part, the lower plate of the bridge support is in direct contact with the support part, so that the workability does not fall due to frictional force, so that the bridge using a separate lower plate that can quickly pull out the bridge support horizontally It is a technical task to solve the provision of the support and its construction method.

상기 기술적 과제를 해결하기 위한 본 발명의 분리형하판을 이용한 교량받침은, Bridge support using the separable lower plate of the present invention for solving the above technical problem,

받침부를 손상시키지 않고 교량받침을 교체하기 위한 앵커소켓부를 이용한 교량받침으로서, 받침부 상면에 적어도 2개 이상으로 분리된 것을 조립하여 원래의 형태로 설치되는 분리형 하판의 상면에 앵커소켓부의 앵커소켓에 의하여 고정 설치된 하판; 및 상기 앵커소켓부의 앵커소켓 두부가 분리형 하판을 관통하여 하판의 하판저면삽입홈에 삽입된 상태에서, 하판의 상부에서 상기 하판저면삽입홈을 관통하여 앵커소켓의 상면체결홈에 체결된 체결볼트;를 포함하여, 상기 체결볼트를 분리한 후, 자성으로 조립 설치된 분리형 하판을 분리하면 하판이 분리된 분리형 하판에 의하여 형성된 작업공간으로 하강되도록 함으로서 교량받침을 수평으로 빼낼 수 있도록 하며, 하판(250)과 분리형 하판 사이에 형성되어 분리형 하판 제거 시, 하판이 받침부에 직접 접하지 않도록 하여 하판이 슬라이딩 되도록 강판에 앵커소켓이 관통될 수 있도록 소켓홀을 형성되는 보강판이 형성되어, 분리형 하판의 분리에 의하여 형성된 작업공간으로 하강된 하판을 보강판 상면에서 수평으로 빼낼 수 있도록 하되, 상기 앵커소켓부는, 받침부에 수직으로 매설되며, 저면은 폐색되고 받침부 상면과 맞추어진 상면이 개방된 원통형 부재인 앵커소켓 수용관; 하판과 연결된 앵커소켓이 인발되려고 할 때 인발되지 않도록 하는 저항판 역할을 하도록 미리 앵커소켓 수용관을 수평으로 관통하도록 형성되며 받침부에 매설된 부반력디스크; 및 상기 부반력디스크 중앙부를 나사부가 수직으로 관통하여 앵커소켓의 저면삽입홀에 삽입될 수 있도록 하면서 볼트머리가 부반력디스크 저면에 지지될 수 있도록 세팅된 지지볼트;를 포함하며, 상기 앵커소켓부는, 상기 앵커소켓 수용관에 삽입되는 부재로서 저면체결홀과 상면체결홀이 형성되어 있으며 두부는 하판의 저면에 형성된 하판저면삽입홀에 삽입될 수 있을 정도의 직경을 가진 봉부재인 앵커소켓; 및 상기 앵커소켓을 상부에서 구속하는 역할을 하는 것으로서 하판의 하판저면삽입홀을 관통하여 앵커소켓의 상면체결홀에 체결되는 체결볼트;를 포함하며, 상기 하판 상부에서 하판을 관통하여 체결볼트가 앵커소켓 수용관에 삽입된 앵커소켓의 상면체결홈에 체결된 상태에서는 앵커소켓이 하판의 수평이동을 제어하는 앵커 역할을 하게 되고, 체결볼트가 하판과 분리되면 앵커소켓은 앵커소켓 수용관 상면 아래로 하강 되어 앵커소켓이 더 이상 앵커 역할을 하지 못하게 되어 하판(250)을 수평 이동시켜 빼 낼 수 있는 분리형 하판을 이용한 교량받침을 제공하게 된다.It is a bridge support using an anchor socket to replace the bridge support without damaging the support, assembling at least two or more separated ones on the upper surface of the support and attaching to the anchor socket of the anchor socket part on the upper surface of the detachable lower plate installed in the original form. Lower plate fixedly installed by means of; And a fastening bolt which penetrates the lower plate bottom inserting groove of the lower plate and penetrates the lower plate bottom inserting groove at the upper part of the lower plate and is fastened to the upper fastening groove of the anchor socket while the anchor socket head of the anchor socket part penetrates the separable lower plate. Including, after separating the fastening bolts, when the detachable lower plate assembled and installed magnetically is separated, the lower plate descends to the working space formed by the separated detachable lower plate, so that the bridge support can be removed horizontally, and the lower plate 250 A reinforcing plate is formed between the and the detachable lower plate so that the lower plate does not come into direct contact with the support part and forms a socket hole so that the anchor socket can penetrate the steel plate so that the lower plate slides when removing the detachable lower plate. The lower plate lowered to the working space formed by the reinforcing plate can be horizontally removed from the upper surface of the reinforcing plate, but the anchor socket part is vertically buried in the support part, the lower surface is closed, and the upper surface aligned with the upper surface of the support part is an open cylindrical member. Anchor socket receiving pipe; A negative reaction disk formed to horizontally penetrate the anchor socket receiving pipe in advance so as to serve as a resistance plate preventing the anchor socket from being pulled when the anchor socket connected to the lower plate is about to be pulled out, and buried in the support portion; And a support bolt set so that the bolt head can be supported on the bottom surface of the negative reaction disk while allowing the screw portion to vertically penetrate the central portion of the negative reaction disk to be inserted into the bottom insertion hole of the anchor socket, and wherein the anchor socket part , An anchor socket which is a member inserted into the anchor socket receiving tube and has a bottom fastening hole and an upper fastening hole, and the head is a rod member having a diameter enough to be inserted into the bottom inserting hole formed on the bottom of the lower plate; And a fastening bolt that penetrates the lower plate bottom insertion hole of the lower plate and is fastened to the upper surface fastening hole of the anchor socket, which serves to restrain the anchor socket from the upper side, wherein the fastening bolt penetrates the lower plate from the upper side of the lower plate. When the anchor socket is inserted into the socket housing pipe, the anchor socket acts as an anchor that controls the horizontal movement of the lower plate, and when the fastening bolt is separated from the lower plate, the anchor socket moves down the upper surface of the anchor socket housing pipe. As the anchor socket is lowered, the anchor socket can no longer serve as an anchor, so that the lower plate 250 is horizontally moved to provide a bridge support using a detachable lower plate that can be removed.

상기 기술적 과제를 해결하기 위한 본 발명의 분리형하판을 이용한 교량받침 시공방법은 Bridge support construction method using a separate lower plate of the present invention for solving the above technical problem

(a) 상기 분리형 하판을 이용한 교량받침이 받침부에 의하여 설치된 교량하부구조물 상면에 지지장치(A3)만에 의하여 교량상부구조물이 지지되도록 설치하는 단계; (b) 상기 분리형 하판을 이용한 교량받침의 체결볼트를 분리한 후, 분리형 하판을 분리하여 하판이 분리형 하판의 분리에 의하여 형성된 작업공간으로 하강되도록 하여 수평으로 빼내는 단계;를 포함하도록 하게 된다.(a) installing the bridge support using the separable lower plate so that the upper bridge structure is supported by only the support device (A3) on the upper surface of the bridge substructure installed by the support part; (b) after separating the fastening bolts of the bridge support using the separable lower plate, separating the separable lower plate so that the lower plate descends into the work space formed by the separation of the separable lower plate, and then pulling it out horizontally.

본 발명에 의한 분리형하판을 이용한 교량받침 및 그 시공방법에 의하면 고소작업을 이루어지는 잭-업작업 없이, 받침부에 손상을 주지 않고서도 교량받침을 신속하게 교체할 수 있게 된다.According to the bridge support and its construction method using the detachable lower plate according to the present invention, it is possible to quickly replace the bridge support without damaging the support without a jack-up operation that performs high place work.

또한 분리형하판을 이용한 교량받침 및 그 시공방법에 의하면 받침부와 직접 접하지 않고 보강판을 이용하여 수평으로 슬라이딩시키기 때문에 보다 신속하고 정밀한 교량받침 재설치가 가능하게 된다.In addition, according to the bridge support using the separable lower plate and its construction method, it is possible to re-install the bridge support more quickly and precisely because it slides horizontally using the reinforcement plate without direct contact with the support.

도 1a, 도 1b, 도 1c는 종래 앵커소켓 수용관을 이용한 교량받침 교체 순서도,
도 2a 및 도 2b는 본 발명의 분리형 하판을 이용한 교량받침의 구성사시도,
도 3a, 도 3b 및 도 3c는 본 발명의 분리형 하판을 이용한 교량받침의 작용도,
도 4a, 도 4b 및 도 4c는 본 발명의 분리형 하판을 이용한 교량받침의 시공순서도이다.
1A, 1B, and 1C are a flow chart of a bridge support replacement using a conventional anchor socket receiving pipe,
Figures 2a and 2b is a perspective view of the configuration of the bridge support using the separable lower plate of the present invention,
Figures 3a, 3b and 3c is a view of the action of the bridge support using the separable lower plate of the present invention,
Figures 4a, 4b and 4c is a construction flow chart of a bridge support using a separate lower plate of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art can easily implement the present invention. However, the present invention may be implemented in various different forms and is not limited to the embodiments described herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and similar reference numerals are attached to similar parts throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when a part "includes" a certain component, it means that other components may be further included rather than excluding other components unless specifically stated to the contrary.

[ 본 발명의 분리형 하판(240)을 이용한 교량받침(200) ][Bridge support 200 using the detachable lower plate 240 of the present invention]

도 2a 및 도 2b는 본 발명의 분리형 하판을 이용한 교량받침(200)의 구성사시도이다.Figures 2a and 2b is a perspective view of the construction of the bridge support 200 using the separable lower plate of the present invention.

상기 분리형 하판을 이용한 교량받침(200)은 앵커소켓부(220)를 이용하기 때문에 받침부(210)를 손상시키지 않고 교량받침을 교체할 수 있도록 하고, 나아가 교량상부구조물(300)의 잭-업 작업 없이도 교량받침(200)을 신속하게 수평 이동시켜 교체할 수 있도록 한 것이다.Since the bridge support 200 using the separable lower plate uses the anchor socket part 220, it is possible to replace the bridge support without damaging the support part 210, and further, the jack-up of the bridge upper structure 300 The bridge support 200 can be quickly moved horizontally and replaced without any work.

이에 본 발명의 분리형하판(240)을 이용한 교량받침(200)은 받침부(210), 앵커소켓부(220), 보강판(230), 분리형하판(240), 하판(250)을 포함하여 구성되도록 하게 된다.Accordingly, the bridge support 200 using the detachable lower plate 240 of the present invention includes a support part 210, an anchor socket part 220, a reinforcing plate 230, a detachable lower plate 240, and a lower plate 250 It will be done.

먼저 상기 받침부(210)는 도 2a 및 도 2b와 같이, 교량하부구조물(100, 교대, 교각) 상면에 하판(250)을 설치하기 위한 받침콘크리트 및/또는 무수축몰탈을 의미한다.First, the support part 210 refers to concrete support and/or non-shrink mortar for installing the lower plate 250 on the upper surface of the bridge substructure 100, as shown in FIGS. 2A and 2B.

이러한 받침부(210)는 교량받침의 하판(250) 세팅높이를 조정하면서 하판(250)을 수평으로 설치하기 위한 평탄성을 확보하기 위하여 받침콘크리트(211) 상면에 추가로 무수축몰탈(212)을 이용하게 된다.Such a support part 210 is an additional non-shrink mortar 212 on the upper surface of the concrete support 211 in order to secure the flatness for installing the lower plate 250 horizontally while adjusting the setting height of the lower plate 250 of the bridge support. Will be used.

도 2a에 의하면 받침콘크리트(211)는 상대적으로 무수축몰탈(212) 보다 형성 두께 및 상면 단면적이 더 크고, 무수축몰탈(212)은 평탄성 확보를 위한 것이다.According to FIG. 2A, the backing concrete 211 has a relatively larger thickness and upper cross-sectional area than the non-shrinkable mortar 212, and the non-shrinkable mortar 212 is for securing flatness.

이때 후술되는 앵커소켓부(220)가 받침부(210)에 매설된다. At this time, the anchor socket part 220 to be described later is buried in the support part 210.

이를 위해 거푸집 내부에 앵커소켓부(220)를 먼저 설치하고, 받침부용 콘크리트를 타설하여 받침콘크리트(211)가 앵커소켓부를 수직으로 매설시킬 수 있을 정도의 높이를 가지도록 형성시키고, To this end, the anchor socket part 220 is first installed inside the formwork, and concrete for the base is poured to form the base concrete 211 to have a height enough to bury the anchor socket part vertically,

받침콘크리트(211)가 완성되면 앵커소켓부(220)의 상면 높이까지 무수축몰탈을 받침콘크리트(211) 상면에 형성시켜 평탄성을 확보하게 된다.When the backing concrete 211 is completed, a non-shrinkable mortar is formed on the top surface of the backing concrete 211 up to the height of the upper surface of the anchor socket part 220 to secure flatness.

다음으로 상기 앵커소켓부(220)는 도 2a 및 도 2b와 같이, 종래 받침부(210)에 앵커볼트(앵커소켓부 대신 앵커볼트가 설치된 경우)에 의하여 고정되어 있는 교량받침(200)의 경우 교체를 위하여 받침부(210)를 파쇄하여 앵커볼트를 제거해야 했지만 받침부(210) 손상 없이 교량받침(200)을 수평이동시켜 빼낼 수 있게 된다.Next, the anchor socket part 220 is the case of the bridge support 200 fixed by an anchor bolt (when an anchor bolt is installed instead of the anchor socket part) to the conventional support part 210 as shown in FIGS. 2A and 2B. For replacement, the anchor bolt had to be removed by crushing the support part 210, but it is possible to remove the bridge support 200 by moving horizontally without damaging the support part 210.

이를 위해 상기 앵커소켓부(220)는 앵커소켓 수용관(221), 부반력디스크(222), 지지볼트(223), 앵커소켓(224), 체결볼트(225)을 포함되도록 하게 된다.To this end, the anchor socket part 220 includes an anchor socket receiving pipe 221, a negative reaction disk 222, a support bolt 223, an anchor socket 224, and a fastening bolt 225.

먼저 상기 앵커소켓 수용관(221)은 도 2a 및 도 2b와 같이, 받침부(210)에 수직으로 매설되어 있다. 예컨대 1개의 교량받침(200)을 기준으로 하판(250) 네 모서리에 1개씩 총 4개를 설치할 수 있고, 저면은 폐색되고 상면은 개방된 원통형 부재이다.First, the anchor socket receiving pipe 221 is vertically buried in the support part 210 as shown in FIGS. 2A and 2B. For example, a total of four can be installed at four corners of the lower plate 250 based on one bridge support 200, and the lower surface is closed and the upper surface is an open cylindrical member.

이러한 앵커소켓 수용관(221)은 앵커소켓(224)이 상,하 이동할 수 있는 가이드관 역할을 하게 되며 부반력디스크(222)가 하부에 세팅되어 있어 앵커소켓(224)과 체결된 지지볼트(223)가 내부에서 부반력디스크(222)가 걸져지면서 앵커소켓(224)이 하중에 의하여 인발되지 않도록 하는 역할도 하게 된다.The anchor socket receiving pipe 221 serves as a guide pipe through which the anchor socket 224 can move up and down, and the negative reaction disk 222 is set at the bottom, so that the support bolts fastened to the anchor socket 224 ( 223) also serves to prevent the anchor socket 224 from being pulled out by the load as the negative reaction disk 222 is hooked therein.

상기 부반력디스크(222)는 도 2a 및 도 2b와 같이, 하판(250)과 연결된 앵커소켓(224)이 인발되려고 할 때 인발되지 않도록 하는 저항판 역할을 하게 되며 미리 앵커소켓 수용관(221)의 하부를 수평으로 관통하도록 형성시킨 것을 이용하면 된다. The negative reaction disk 222 serves as a resistance plate that prevents pulling when the anchor socket 224 connected to the lower plate 250 is about to be pulled, as shown in Figs. 2A and 2B, and the anchor socket receiving pipe 221 in advance What is formed so as to penetrate the lower part of the horizontally can be used.

이에 앵커소켓관(221)을 받침부(210)에 매설할 때 함께 세팅되도록 하여 앵커소켓 수용관(221)과 함께 받침부(210)에 매설시키게 된다.Accordingly, when the anchor socket pipe 221 is buried in the support part 210, it is set together so that it is embedded in the support part 210 together with the anchor socket receiving pipe 221.

상기 지지볼트(223)는 도 2a 및 도 2b와 같이, 부반력디스크(222) 중앙부를 나사부가 수직으로 관통하여 앵커소켓(224)의 저면삽입홀에 삽입될 수 있도록 하면서 볼트머리가 부반력디스크(222) 저면에 지지될 수 있도록 세팅됨으로서, 앵커소켓(224)의 세팅위치를 세팅시키는 역할을 하게 된다.2A and 2B, as shown in Figs. 2A and 2B, the bolt head is a negative reaction disk so that the screw portion vertically penetrates the central portion of the negative reaction disk 222 to be inserted into the bottom insertion hole of the anchor socket 224. (222) As it is set to be supported on the bottom surface, it serves to set the setting position of the anchor socket 224.

즉, 앵커소켓(224)은 지지볼트(233)가 체결되어 있어 함께 부반력디스트(222)에 지지볼트(233)의 위치가 제어되면 함께 앵커소켓(224)도 위치가 제어되도록 할 수 있게 된다.That is, the anchor socket 224 has the support bolt 233 fastened so that when the position of the support bolt 233 is controlled to the sub-reaction disk 222 together, the anchor socket 224 can also be controlled in the position. .

상기 앵커소켓(224)은 도 2a 및 도 2b와 같이, 앵커소켓 수용관(221)에 삽입되는 부재로서 저면체결홀과 상면체결홀이 형성되어 있으며 두부는 후술되는 하판(250)의 저면에 형성된 하판저면삽입홀(251)에 삽입될 수 있을 정도의 직경을 가진 봉부재를 이용하게 된다.The anchor socket 224 is a member inserted into the anchor socket receiving pipe 221 as shown in FIGS. 2A and 2B, and has a bottom fastening hole and an upper fastening hole, and the head is formed on the bottom of the lower plate 250 to be described later. A rod member having a diameter sufficient to be inserted into the lower plate bottom insertion hole 251 is used.

이에 하판(250) 상부에서 하판(250)의 하판저면삽입홀(251)을 관통하여 체결볼트(225)가 앵커소켓 수용관(221)에 삽입된 앵커소켓(224)의 상면체결홈에 체결된 상태에서는 앵커소켓(241)이 하판(250)의 수평이동을 제어하는 앵커 역할을 하게 되고,Accordingly, from the upper part of the lower plate 250, the fastening bolt 225 penetrates the lower plate bottom insertion hole 251 of the lower plate 250 and is fastened to the upper surface fastening groove of the anchor socket 224 inserted into the anchor socket receiving pipe 221. In the state, the anchor socket 241 serves as an anchor controlling the horizontal movement of the lower plate 250,

체결볼트(225)가 하판(250)과 분리되면 앵커소켓(224)은 앵커소켓 수용관(221) 상면 아래로 하강 되어 앵커소켓(224)이 더 이상 앵커 역할을 하지 못하게 되어 하판(250)을 수평 이동시켜 빼 낼 수 있게 된다.When the fastening bolt 225 is separated from the lower plate 250, the anchor socket 224 is lowered below the upper surface of the anchor socket receiving pipe 221 so that the anchor socket 224 no longer serves as an anchor, and thus the lower plate 250 is removed. It can be moved horizontally and removed.

상기 체결볼트(225)는 도 2a 및 도 2b와 같이, 앵커소켓(224)을 상부에서 구속하는 역할을 하는 것으로서 하판(250)의 하판저면삽입홀(251)을 관통하여 앵커소켓(224)의 상면체결홀에 체결된다. The fastening bolt 225, as shown in Figs. 2A and 2B, serves to constrain the anchor socket 224 from the top, and penetrates the lower plate bottom insertion hole 251 of the lower plate 250 so that the anchor socket 224 is It is fastened to the upper surface fastening hole.

이에 앵커소켓(224)과 분리되면 앵커소켓(224)은 하강되도록 하게 되고, 앵커소켓(224)와 체결되면 앵커소켓(224)은 앵커 역할을 하게 된다.Accordingly, when the anchor socket 224 is separated from the anchor socket 224, the anchor socket 224 is lowered, and when it is fastened with the anchor socket 224, the anchor socket 224 serves as an anchor.

상기 보강판(230)은 도 2a 및 도 2b와 같이, 일종의 슬라이딩판으로서 하판(250)이 분리형 하판(240) 제거 시, 받침부(210)에 직접 접하지 않도록 하여 하판의 슬라이딩을 용이하게 하기 위한 것이다. 강판 등을 사용하면 되고, 앵커소켓(224)이 관통될 수 있도록 소켓홀(231)을 형성시키게 된다.As shown in FIGS. 2A and 2B, the reinforcing plate 230 is a type of sliding plate so that when the lower plate 250 is removed from the detachable lower plate 240, it does not directly contact the support part 210 to facilitate the sliding of the lower plate. For. A steel plate or the like may be used, and a socket hole 231 is formed so that the anchor socket 224 can pass therethrough.

상기 분리형 하판(240)은 도 2a 및 도 2b와 같이, 보강판(230) 상면에 세팅되도록 하는데 예컨대 사각판으로 형성되도록 하되, 적어도 2개 이상으로 분리된 것을 조립하여 원래의 형태로 설치될 수 있도록 하게 된다.The separable lower plate 240 is set on the upper surface of the reinforcing plate 230, as shown in Figs. 2A and 2B. For example, it is formed as a square plate. Is made to be.

이에 도 3b를 참조하면 상기 분리형 하판(240)을 수평으로 분리하게 되면 그 두께만큼 작업공간이 형성되므로 하판(250)은 하방으로 하강되어, 하강된 하판(250)을 수평으로 빼낼 수 있기 때문에 교량상부구조물(300)을 잭-업하지 않아도 된다.Accordingly, referring to FIG. 3B, when the separable lower plate 240 is separated horizontally, a working space is formed as much as its thickness, so the lower plate 250 is lowered downward, so that the lowered lower plate 250 can be removed horizontally. It is not necessary to jack-up the superstructure 300.

앞서 살펴본 보강판(230)이 있기 때문에 하강된 하판(250)을 용이하게 슬라이딩 시키면서 빼 낼수 있게 된다. 역시 앵커소켓(224)이 관통될 수 있도록 소켓홀(241)을 형성시키게 된다.Since there is the reinforcing plate 230 discussed above, the lower plate 250 can be easily removed while sliding. Also, the socket hole 241 is formed so that the anchor socket 224 can pass therethrough.

이러한 분리형하판(240)은 조립된 상태를 유지하기 위하여 자성을 가지도록 하여 보강판(230)과 간단하게 탈착이 가능하게 하고 조립도 용이하도록 하게 된다.The detachable lower plate 240 has magnetic properties to maintain the assembled state, so that it can be easily detached from the reinforcing plate 230 and is also easy to assemble.

상기 하판(250)은 도 2a 및 도 2b와 같이, 교량받침의 상판(253)과 더불어 베어링(252)이 안착되는 부위로서 앞서 살펴본 앵커소켓(224)이 받침부(210)의 앵커소켓 수용관(221) 내부로 하강하게 되면 하판(250)을 구속하는 앵커 작용이 없어지게 되므로 분리형 하판(240)을 분리하여 수평이동을 위한 작업공간을 확보할 수 있어, 수평으로 빼낼 수 있게 된다.The lower plate 250 is a portion where the bearing 252 is seated together with the upper plate 253 of the bridge support, as shown in FIGS. 2A and 2B, and the anchor socket 224 described above is an anchor socket receiving pipe of the support part 210 (221) When descending to the inside, the anchor action for restraining the lower plate 250 disappears, so that a working space for horizontal movement can be secured by separating the detachable lower plate 240, so that it can be pulled out horizontally.

상기 하판(250)에는 하판저면삽입홈(251)이 모서리에 형성되어 있다. 이는 앵커소켓(224)의 두부가 삽입되는 홈이다. 이러한 삽입되는 두부가 하판(250)의 수평이동을 제어하는 앵커 역할을 하게 되고, 두부가 하판저면삽입홈(251) 하방으로 하강하게 되면 하판(250)의 수평이동이 가능하여 하판을 수평으로 뺄 수 있게 된다.The lower plate 250 has a lower plate bottom insertion groove 251 formed at a corner. This is a groove into which the head of the anchor socket 224 is inserted. The inserted head serves as an anchor controlling the horizontal movement of the lower plate 250, and when the head descends below the lower plate bottom insertion groove 251, horizontal movement of the lower plate 250 is possible and the lower plate is removed horizontally. You will be able to.

상기 하판저면삽입홈(251)은 앵커소켓 두부의 단면형태에 대응하며 체결볼트가 삽입될 수 있도록 하판저면삽입홈(251)은 체결홀과 연통되도록 하게 된다.The lower plate bottom inserting groove 251 corresponds to the cross-sectional shape of the head of the anchor socket, and the lower plate bottom inserting groove 251 communicates with the fastening hole so that the fastening bolt can be inserted.

또한 하판(250)의 상면에는 베어링(252) 주위로 상면링(254)이 형성되어 있어 이물질등이 베어링쪽으로 침투하지 못하하도록 하여 유지관리에 유리하도록 하게 된다.In addition, the upper surface ring 254 is formed around the bearing 252 on the upper surface of the lower plate 250 to prevent foreign matters from penetrating into the bearing so as to be advantageous for maintenance.

이러한 상면링(254)은 하판 상면에 원형, 사각형 홈을 형성시키고, 고무링의 하부가 홈에 삽입되도록 하여 탈착이 가능하도록 형성시키는 것이 바람직하다.The upper ring 254 is preferably formed to be detachable by forming a circular and square groove on the upper surface of the lower plate, and inserting the lower part of the rubber ring into the groove.

이로서 본 발명의 교량받침(200)은 분리형 하판(240)을 분리시키게 되면 작업공간이 형성되어 교량상부구조물(300)을 잭-업시키지 않고 하판(250)을 빼낼 수 있도록 하고, 교체된 하판(250)과 함께 새로운 교량받침(200a)를 다시 원위치로 세팅한 다음 앵커소켓(224)의 두부가 하판저면삽입홈(251)에 삽입되도록 체결볼트(225)를 다시 체결시켜 교량받침 교체 시공을 완료시킬 수 있도록 하게 된다.Thereby, when the detachable lower plate 240 is separated, a working space is formed in the bridge support 200 of the present invention, so that the lower plate 250 can be removed without jack-up of the bridge upper structure 300, and the replaced lower plate ( 250) and set the new bridge support (200a) back to its original position, and then refasten the fastening bolt 225 so that the head of the anchor socket 224 is inserted into the lower plate bottom insertion groove 251 to complete the bridge support replacement construction. You will be able to do it.

[ 본 발명의 보강판(23)과 분리형 하판(240)의 작용 ][Action of the reinforcing plate 23 and the separable lower plate 240 of the present invention]

도 3a, 도 3b 및 도 3c는 본 발명의 보강판(23)과 분리형 하판(240)의 작용도를 도시한 것이다.3A, 3B, and 3C are diagrams illustrating the operation of the reinforcing plate 23 and the separable lower plate 240 of the present invention.

특히 분리형 하판(240)이 교량받침(200==>200a)의 교체에 어떻게 작용하는 가를 살펴본 것이다.In particular, how the detachable lower plate 240 acts on the replacement of the bridge support (200==>200a).

이에 도 3a에 의하면 기존 교량받침(200)이 설치된 상태이고, 도 3b는 분리형 하판(240)이 분리되어 교량받침(200)을 수평분리시킨 상태, 도 3c는 분리된 분리형 하판(240)을 재설치하고 새로운 교량받침(200a)을 설치한 상태를 도시한 것이다.Accordingly, according to Fig. 3a, the existing bridge support 200 is installed, Fig. 3b is a state in which the detachable lower plate 240 is separated and the bridge support 200 is horizontally separated, and Fig. 3c is the separated detachable lower plate 240 is reinstalled. And it shows a state in which the new bridge support (200a) is installed.

먼저, 도 3a에 의하면 앵커소켓부(220)는 First, according to FIG. 3A, the anchor socket part 220

받침부(210)에 앵커소켓 수용관(221)이 매립되어 있고 그 상면은 받침부(210) 상면에 맞추어져 있음을 알 수 있다. It can be seen that the anchor socket receiving pipe 221 is embedded in the support part 210 and its upper surface is aligned with the upper surface of the support part 210.

또한, 부반력디스크(222)도 앵커소켓 수용관(221)의 하부에 위치하여 받침부(210)에 매립되어 있다. In addition, the sub-reaction disk 222 is also located under the anchor socket receiving pipe 221 and is embedded in the receiving part 210.

또한, 앵커소™U 수용관(221) 내측에 나사부는 부반력디스크(222)를 관통하고, 볼트머리는 부반력디스크(222) 저면에 지지되도록 지지볼트(223)가 세팅되어 있음을 알 수 있다.In addition, it can be seen that the support bolt 223 is set so that the screw portion inside the anchorso™ U receiving pipe 221 penetrates the negative reaction disk 222, and the bolt head is supported on the bottom surface of the negative reaction disk 222. have.

또한, 앵커소켓(224)의 저면체결홈에는 지지볼트(223)의 나사부가 체결되어 있고 두부는 하판(250)의 하판저면삽입홈(251)에 삽입되어 있다. In addition, the screw portion of the support bolt 223 is fastened to the bottom fastening groove of the anchor socket 224 and the head is inserted into the lower plate bottom insertion groove 251 of the lower plate 250.

또한, 체결볼트(225)는 하판(250) 상부에서 하방으로 하판(250)과 하판저면삽입홈(251)에 삽입된 앵커소켓(224)의 상면체결홀에 체결되어 있다.In addition, the fastening bolt 225 is fastened to the upper surface fastening hole of the anchor socket 224 inserted into the lower plate 250 and the lower plate bottom insertion groove 251 from the upper portion of the lower plate 250 downward.

다음으로 도 3a에 의하면 보강판(230)의 소켓홀(231)에 앵커소켓(224) 두부가 관통되도록 하여 받침부(210) 상면에 세팅되어 있음을 알 수 있다.Next, according to FIG. 3A, it can be seen that the head of the anchor socket 224 passes through the socket hole 231 of the reinforcing plate 230 and is set on the upper surface of the support part 210.

다음으로 도 3a에 의하면 분리형 하판(240)의 소켓홀(241)에 역시 앵커소켓(224) 두부가 관통되도록 하여 보강판(230) 상면에 세팅되어 있음을 알 수 있다.Next, according to FIG. 3A, it can be seen that the socket hole 241 of the detachable lower plate 240 is also set on the upper surface of the reinforcing plate 230 by allowing the head of the anchor socket 224 to pass through.

다음으로 하판(250)은 분리형 하판(240) 상면에 하판저면삽입홀(251)에 앵커소켓(224)의 두부가 삽입된 상태로 체결볼트(225)가 관통되어 앵커소켓의 상면체결홀에 체결볼트(225)에 의하여 세팅되어 있음을 알 수 있다.Next, the lower plate 250 passes through the fastening bolt 225 with the head of the anchor socket 224 inserted into the lower plate bottom insertion hole 251 on the upper surface of the detachable lower plate 240 and is fastened to the upper surface fastening hole of the anchor socket. It can be seen that it is set by the bolt 225.

이에 앵커소켓(224)의 두부가 받침부(210) 상면 위로 돌출되어 하판(250)의 하판저면삽입홈(251)에 삽입된 상태에서는 하판(250)이 수평으로 구속되기 때문에 앵커소켓(224)이 앵커의 역할을 하게 되고, 하판(250)은 수직으로도 받침부(210)에 역시 구속되어 있어 교량받침(200)은 고정되어 사용된다.Accordingly, in a state where the head of the anchor socket 224 protrudes above the upper surface of the support portion 210 and is inserted into the lower plate bottom insertion groove 251 of the lower plate 250, the lower plate 250 is horizontally constrained, so the anchor socket 224 This serves as an anchor, and the lower plate 250 is also vertically constrained to the support part 210 so that the bridge support 200 is fixed and used.

이때 사용과정에서 하자가 발생하는 경우, 본 발명은 교량상부구조(300)를 잭-업 시키지 않고, 체결볼트(225), 분리형 하판(240)만을 분리하여 교량받침(200)을 수평으로 빼내게 된다.At this time, if a defect occurs in the process of use, the present invention does not jack-up the upper bridge structure 300, but separates only the fastening bolt 225 and the detachable lower plate 240 to pull out the bridge support 200 horizontally. do.

즉, 도 3b와 같이, 체결볼트(225)를 하판(250)으로부터 체결방향과 반대방향으로 회전시켜 분리시키게 되면 앵커소켓(224)은 받침부(210)에 매설된 앵커소켓 수용관(221)으로 하강하여 상면이 앵커소켓 수용관(221) 상면보다 아래에 위치하게 된다.That is, as shown in FIG. 3B, when the fastening bolt 225 is rotated and separated from the lower plate 250 in the opposite direction to the fastening direction, the anchor socket 224 is an anchor socket receiving pipe 221 embedded in the support part 210 As it descends, the upper surface is located below the upper surface of the anchor socket receiving pipe 221.

다음으로는 분리형 하판(240)을 분리하게 되는데 자성으로 결합되어 있으므로 용이하게 분리하여 수평으로 빼낼 수 있다. 이에 하판(250)과 보강판(240) 사이의 공간이 형성되므로 하판(250)은 하강되어 보강판(230) 상에서 교량받침(200)을 한꺼번에 수평으로 이동시켜 분리시킬 수 있은 작업공간 확보가 가능하게 된다.Next, the detachable lower plate 240 is separated. Since it is magnetically coupled, it can be easily separated and taken out horizontally. Accordingly, since a space between the lower plate 250 and the reinforcing plate 240 is formed, the lower plate 250 is lowered, and a working space that can be separated by moving the bridge support 200 horizontally on the reinforcing plate 230 at a time can be secured. It is done.

말하자면 분리형 하판(240)의 분리에 의하여 제거함으로서 잭-업에 의한 하판(250)의 수평이동 작업공간이 확보되도록 한 것이다.That is to say, by removing by separating the detachable lower plate 240, the working space for horizontal movement of the lower plate 250 by jack-up is secured.

이에 새로운 교량받침(200a)은 역순으로 설치하면 되는데, 먼저 분리된 분리형 하판(240)을 원래의 위치로 조립 설치하며 소켓홀(241)이 보강판(230)의 소켓홀(231)과 연통되도록 하게 된다.Accordingly, the new bridge support (200a) can be installed in the reverse order. First, the detachable lower plate 240 is assembled to its original position, and the socket hole 241 communicates with the socket hole 231 of the reinforcing plate 230. It is done.

이에 도 3c와 같이, 새로운 교량받침(200a)의 하판(250)에 형성된 하판저면삽입홀(251)도 연통되도록 하여 분리형 하판(240) 상면에 하판(250)이 위치하도록 하게 된다.Accordingly, as shown in FIG. 3C, the lower plate bottom insertion hole 251 formed in the lower plate 250 of the new bridge support 200a is also communicated so that the lower plate 250 is positioned on the upper surface of the detachable lower plate 240.

이에 분리된 체결볼트(225)를 하판(250)의 하판저면삽입홀을 관통하여 앵커소켓(242)의 상면체결홀에 체결되도록 하여 볼트머리가 하판 상면에 접한 상태에서 계속 회전시키게 되면 앵커소켓(242)의 두부가 하판저면삽입홀(252)로 상승하면서 삽입되어 앵커로서 작용하게 되어 교량받침(200a)의 교체가 완성된다.Thus, the separated fastening bolt 225 penetrates the lower plate bottom insertion hole of the lower plate 250 and is fastened to the upper surface fastening hole of the anchor socket 242, so that if the bolt head is continuously rotated in contact with the upper surface of the lower plate, the anchor socket ( The head of the 242 is inserted as it rises into the lower plate bottom insertion hole 252 and acts as an anchor, thereby completing the replacement of the bridge support 200a.

[ 본 발명의 분리형 하판(240)을 이용한 교량받침(200)의 시공방법][Construction method of the bridge support 200 using the detachable lower plate 240 of the present invention]

도 4a, 도 4b 및 도 4c는 본 발명의 분리형 하판(240)을 이용한 교량받침(200)의 시공방법 순서도를 도시한 것이다.Figures 4a, 4b and 4c shows a flow chart of the construction method of the bridge support 200 using the detachable lower plate 240 of the present invention.

상기 시공방법은 기존에 앵커소켓부(220)에 의하여 설치된 교량받침(200)을 분리형 하판(240)을 이용하여 교체하는 방법이다.The above construction method is a method of replacing the bridge support 200 previously installed by the anchor socket part 220 using a separate lower plate 240.

이에 먼저 도 4a와 같이, 교량하부구조물(100) 상면에 앞서 살펴본 받침부(210)에 앵커소켓부(220)가 매설되어 있으며, 보강판(230)과 분리형 하판(240)에 의하여 교량받침(200)이 세팅되도록 시공된 상태이다.First, as shown in Figure 4a, the anchor socket portion 220 is buried in the supporting portion 210 previously examined on the upper surface of the bridge substructure 100, and the bridge support ( 200) has been constructed so that it is set.

이때 교량상부구조물(300)는 지지장치(A3)에 의하여 지지만 되어 있으며 이는 교량받침을 수평이동시켰을 때 그 위치를 유지하도록 하기 위한 것이고 잭-업을 위한 것이 아니다.At this time, the upper bridge structure 300 is only supported by the support device A3, which is to maintain its position when the bridge support is horizontally moved, and is not for jack-up.

이에 상기 교량받침(200)을 교체할 필요가 있을 경우 체결볼트(225)를 제거함으로서 앵커소켓(224)이 앵커소켓 수용관(222)의 상면 아래로 하강됨을 알 수 있으며 이러한 앵커소켓 수용관(222)의 상면은 받침부(210)의 상면에 맞추어져 있으므로 교량받침은 앵커에 의한 고정 상태가 해제된다.Accordingly, when it is necessary to replace the bridge support 200, it can be seen that the anchor socket 224 descends below the upper surface of the anchor socket receiving pipe 222 by removing the fastening bolt 225, and such an anchor socket receiving pipe ( Since the upper surface of the 222) is aligned with the upper surface of the support part 210, the fixed state of the bridge support by the anchor is released.

이에 도 4b와 같이, 조립되어 있는 분리형 하판(240)을 수평으로 빼내게 되면 분리형 하판이 차지하는 두께만큼 작업공간을 확보할 수 있게 되며, 교량받침(200)은 하강하여 보강판(230) 상면에 접할 수 있게 된다. 이때 지지장치(A3)에 의하여 교량상부구조(300)는 위치가 그대로 세팅된 상태이고 상판과 교량상부구조물의 연결상태를 해제하면 교량받침(200)을 분리할 수 있는 상태가 된다.Accordingly, as shown in FIG. 4B, when the assembled detachable lower plate 240 is pulled out horizontally, a working space can be secured as much as the thickness occupied by the detachable lower plate, and the bridge support 200 descends to the upper surface of the reinforcing plate 230. You will be able to touch it. At this time, the position of the bridge upper structure 300 is set as it is by the support device A3, and when the connection state of the upper plate and the bridge upper structure is released, the bridge support 200 can be separated.

이에 이에 도 4c와 같이, 분리된 교량받침(200)에서 손상된 부분등을 처리하여 새로운 교량받침(200a)을 구비한 후, 분리형 하판(240)을 다시 보강판(230) 상면에 세팅시키게 된다.Accordingly, as shown in FIG. 4C, the damaged portion of the separated bridge support 200 is treated to provide a new bridge support 200a, and then the detachable lower plate 240 is set on the upper surface of the reinforcement plate 230 again.

다음으로는 새로운 교량받침(200a)을 설치하고, 체결볼트(225)를 다시 하판(250)의 상부로부터 하판저면삽입홀(251)에 삽입되도록 하면서 앵커소켓(224)의 상면체결홀에 체결되도록 하여 최종 앵커소켓(224)의 두부가 상기 하판저면삽입홀(251)에 삽입되면 다시 앵커에 의한 고정상태가 된다.Next, a new bridge support (200a) is installed, and the fastening bolt 225 is inserted into the lower plate bottom insertion hole 251 from the top of the lower plate 250 again, while being fastened to the upper surface fastening hole of the anchor socket 224. Thus, when the head of the final anchor socket 224 is inserted into the lower plate bottom insertion hole 251, it is fixed again by the anchor.

이로서 간단하게 본 발명은 분리형 하판(240)을 자성에 의하여 분리, 조립하는 것으로 달리 잭업장치를 별도로 다수 설치하는 공종이 없어지게 되므로 신속하고 경제적이며 보다 안정적인 교량받침 교체가 가능하며 교량받침은 하판이 별도 또는 상판과 베어링등과 함께 일체로 되어있는 것이면 모두 해당되므로 달리 제한은 없다.As a result, the present invention simply separates and assembles the detachable lower plate 240 by magnetism, and unlike the construction of installing a large number of jack-up devices separately, it is possible to quickly, economically, and more stable bridge support replacement. As long as it is separately or integrated with the top plate and bearings, it is applicable, so there is no other limitation.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustrative purposes only, and those of ordinary skill in the art to which the present invention pertains will be able to understand that other specific forms can be easily modified without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative and non-limiting in all respects. For example, each component described as a single type may be implemented in a distributed manner, and similarly, components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the claims to be described later rather than the detailed description, and all changes or modified forms derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention. do.

100: 교량하부구조물
200: 분리형 하판을 이용한 교량받침
210: 받침부 211: 받침콘크리트
222: 무수축몰탈 220: 앵커소켓부
221: 앵커소켓 수용관 222: 부반력디스크
223: 지지볼트 224: 앵커소켓
225: 체결볼트 226: 하판저면삽입홈
230: 보강판 231: 소켓홀
240: 분리형 하판 241: 소켓홀
250: 하판 300: 교량상부구조물
100: bridge substructure
200: Bridge support using a separate lower plate
210: base 211: base concrete
222: non-shrink mortar 220: anchor socket part
221: anchor socket receiving pipe 222: negative reaction disk
223: support bolt 224: anchor socket
225: fastening bolt 226: lower plate bottom insertion groove
230: reinforcement plate 231: socket hole
240: detachable lower plate 241: socket hole
250: lower plate 300: upper bridge structure

Claims (7)

받침부를 손상시키지 않고 교량받침을 교체하기 위한 앵커소켓부를 이용한 교량받침으로서,
받침부(210) 상면에 적어도 2개 이상으로 분리된 것을 조립하여 원래의 형태로 설치되는 분리형 하판(240)의 상면에 앵커소켓부(220)의 앵커소켓(224)에 의하여 고정 설치된 하판(250); 및
상기 앵커소켓부(220)의 앵커소켓(224) 두부가 분리형 하판(240)을 관통하여 하판의 하판저면삽입홈에 삽입된 상태에서, 하판(250)의 상부에서 상기 하판저면삽입홈을 관통하여 앵커소켓(220)의 상면체결홈에 체결된 체결볼트(225);를 포함하여,
상기 체결볼트(225)를 분리한 후, 자성으로 조립 설치된 분리형 하판(240)을 분리하면 하판(250)이 분리된 분리형 하판에 의하여 형성된 작업공간으로 하강되도록 함으로서 교량받침(200)을 수평으로 빼낼 수 있도록 하며,
하판(250)과 분리형 하판(240) 사이에 형성되어 분리형 하판(240) 제거 시, 하판(250)이 받침부(210)에 직접 접하지 않도록 하여 하판(250)이 슬라이딩 되도록 강판에 앵커소켓(224)이 관통될 수 있도록 소켓홀(231)을 형성되는 보강판(230)이 형성되어, 분리형 하판(240)의 분리에 의하여 형성된 작업공간으로 하강된 하판(250)을 보강판(230) 상면에서 수평으로 빼낼 수 있도록 하되,
상기 앵커소켓부(220)는, 받침부(210)에 수직으로 매설되며, 저면은 폐색되고 받침부 상면과 맞추어진 상면이 개방된 원통형 부재인 앵커소켓 수용관(221); 하판(250)과 연결된 앵커소켓(224)이 인발되려고 할 때 인발되지 않도록 하는 저항판 역할을 하도록 미리 앵커소켓 수용관(221)을 수평으로 관통하도록 형성되며 받침부에 매설된 부반력디스크(222); 및 상기 부반력디스크(222) 중앙부를 나사부가 수직으로 관통하여 앵커소켓(224)의 저면삽입홀에 삽입될 수 있도록 하면서 볼트머리가 부반력디스크(222) 저면에 지지될 수 있도록 세팅된 지지볼트(223);를 포함하며,
상기 앵커소켓부(220)는, 상기 앵커소켓 수용관(221)에 삽입되는 부재로서 저면체결홀과 상면체결홀이 형성되어 있으며 두부는 하판(250)의 저면에 형성된 하판저면삽입홀(251)에 삽입될 수 있을 정도의 직경을 가진 봉부재인 앵커소켓(224); 및 상기 앵커소켓(224)을 상부에서 구속하는 역할을 하는 것으로서 하판(250)의 하판저면삽입홀(251)을 관통하여 앵커소켓(224)의 상면체결홀에 체결되는 체결볼트(225);를 포함하며, 상기 하판(250) 상부에서 하판(250)을 관통하여 체결볼트(225)가 앵커소켓 수용관(221)에 삽입된 앵커소켓(224)의 상면체결홈에 체결된 상태에서는 앵커소켓(241)이 하판(250)의 수평이동을 제어하는 앵커 역할을 하게 되고, 체결볼트(225)가 하판(250)과 분리되면 앵커소켓(224)은 앵커소켓 수용관(221) 상면 아래로 하강 되어 앵커소켓(224)이 더 이상 앵커 역할을 하지 못하게 되어 하판(250)을 수평 이동시켜 빼 낼 수 있는 분리형 하판을 이용한 교량받침.
As a bridge support using an anchor socket to replace the bridge support without damaging the support
The lower plate 250 fixedly installed by the anchor socket 224 of the anchor socket part 220 on the upper surface of the detachable lower plate 240 installed in the original form by assembling at least two separated ones on the upper surface of the support part 210 ); And
In a state where the head of the anchor socket 224 of the anchor socket part 220 penetrates the detachable lower plate 240 and is inserted into the lower plate bottom insertion groove of the lower plate, Including; a fastening bolt 225 fastened to the upper surface fastening groove of the anchor socket 220;
After separating the fastening bolts 225, when the detachable lower plate 240 is magnetically assembled and installed, the lower plate 250 is lowered to the working space formed by the separated detachable lower plate, thereby removing the bridge support 200 horizontally. To be able to
It is formed between the lower plate 250 and the detachable lower plate 240 so that when the detachable lower plate 240 is removed, the lower plate 250 does not come into direct contact with the support part 210 so that the lower plate 250 slides, so that the anchor socket ( A reinforcing plate 230 is formed to form a socket hole 231 so that the 224 can pass through, so that the lower plate 250 lowered into the working space formed by the separation of the separable lower plate 240 is transferred to the upper surface of the reinforcing plate 230. So that it can be pulled out horizontally,
The anchor socket part 220, an anchor socket receiving pipe 221, which is a cylindrical member that is vertically buried in the support part 210, the bottom surface is closed, and the upper surface aligned with the upper surface of the support part is open; When the anchor socket 224 connected to the lower plate 250 is about to be pulled out, it is formed to horizontally penetrate the anchor socket receiving pipe 221 in advance to serve as a resistance plate to prevent pulling out, and the negative reaction disk 222 embedded in the support portion ); And a support bolt set so that the bolt head can be supported on the bottom of the negative reaction disk 222 while allowing the central portion of the negative reaction disk 222 to penetrate vertically through the screw portion to be inserted into the bottom insertion hole of the anchor socket 224. (223); includes,
The anchor socket part 220 is a member inserted into the anchor socket receiving pipe 221 and has a bottom fastening hole and an upper fastening hole, and the head is a bottom inserting hole 251 formed on the bottom of the bottom plate 250 Anchor socket 224, which is a rod member having a diameter enough to be inserted into the rod; And a fastening bolt 225 which penetrates the lower plate bottom insertion hole 251 of the lower plate 250 and is fastened to the upper surface fastening hole of the anchor socket 224 as serving to restrain the anchor socket 224 from the upper side. Including, in the state of being fastened to the upper surface fastening groove of the anchor socket 224 inserted into the anchor socket receiving pipe 221 by penetrating the lower plate 250 from the top of the lower plate 250, the anchor socket ( 241) serves as an anchor that controls the horizontal movement of the lower plate 250, and when the fastening bolt 225 is separated from the lower plate 250, the anchor socket 224 descends below the upper surface of the anchor socket receiving pipe 221 The anchor socket 224 can no longer serve as an anchor, so the lower plate 250 is horizontally moved to remove the bridge support using a detachable lower plate.
삭제delete 삭제delete 삭제delete 제 1항에 있어서,
상기 하판(250)의 상면에는 베어링(252) 주위로 상면링(254)이 형성되어 있어 이물질이 베어링쪽으로 침투하지 못하하도록 하되, 상기 상면링(254)은 하판 상면에 홈을 형성시키고, 고무링의 하부가 홈에 삽입되도록 하여 탈착이 가능하도록 형성시키는 분리형 하판을 이용한 교량받침.
The method of claim 1,
On the upper surface of the lower plate 250, an upper ring 254 is formed around the bearing 252 to prevent foreign substances from penetrating into the bearing, but the upper ring 254 forms a groove on the upper surface of the lower plate, and a rubber ring Bridge support using a detachable lower plate that is formed to be detachable by allowing the lower part of the to be inserted into the groove.
(a) 제 1항의 분리형 하판을 이용한 교량받침(200)이 받침부에 의하여 설치된 교량하부구조물(100) 상면에 지지장치(A3)만에 의하여 교량상부구조물(300)이 지지되도록 설치하는 단계; 및
(b) 상기 분리형 하판을 이용한 교량받침(200)의 체결볼트를 분리한 후, 분리형 하판을 분리하여 하판이 분리형 하판의 분리에 의하여 형성된 작업공간으로 하강되도록 하여 수평으로 빼내는 단계;를 포함하는 분리형 하판을 이용한 교량받침 시공방법.
(a) installing the bridge support 200 using the detachable lower plate of paragraph 1 to support the upper bridge structure 300 by only the support device (A3) on the upper surface of the bridge substructure 100 installed by the support; And
(b) After separating the fastening bolts of the bridge support 200 using the detachable lower plate, separating the detachable lower plate so that the lower plate descends into a working space formed by separating the detachable lower plate, and then pulling it out horizontally; Bridge support construction method using the lower plate.
삭제delete
KR1020190027589A 2019-03-11 2019-03-11 Bridge bearing using seperatable upper plate and construction method therewith KR102252685B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190027589A KR102252685B1 (en) 2019-03-11 2019-03-11 Bridge bearing using seperatable upper plate and construction method therewith

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190027589A KR102252685B1 (en) 2019-03-11 2019-03-11 Bridge bearing using seperatable upper plate and construction method therewith

Publications (2)

Publication Number Publication Date
KR20200108654A KR20200108654A (en) 2020-09-21
KR102252685B1 true KR102252685B1 (en) 2021-05-17

Family

ID=72707874

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190027589A KR102252685B1 (en) 2019-03-11 2019-03-11 Bridge bearing using seperatable upper plate and construction method therewith

Country Status (1)

Country Link
KR (1) KR102252685B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100891169B1 (en) * 2008-05-30 2009-04-01 덕주건설(주) Aseismatic bridge support device using magnet
KR101230599B1 (en) * 2012-07-27 2013-02-06 대창이엔지 주식회사 Anchor for bearing of bridge with anchor pipe and bearing repairing method using the same
KR101599822B1 (en) * 2015-05-13 2016-03-14 유니슨이테크(주) Separate spherical bearings

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101608620B1 (en) 2015-05-22 2016-04-04 진형건설(주) Bridge bearings

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100891169B1 (en) * 2008-05-30 2009-04-01 덕주건설(주) Aseismatic bridge support device using magnet
KR101230599B1 (en) * 2012-07-27 2013-02-06 대창이엔지 주식회사 Anchor for bearing of bridge with anchor pipe and bearing repairing method using the same
KR101599822B1 (en) * 2015-05-13 2016-03-14 유니슨이테크(주) Separate spherical bearings

Also Published As

Publication number Publication date
KR20200108654A (en) 2020-09-21

Similar Documents

Publication Publication Date Title
KR101230599B1 (en) Anchor for bearing of bridge with anchor pipe and bearing repairing method using the same
KR101659250B1 (en) Bridge pc beam rising device for bridge bearing change
AU2015255301B2 (en) Screen panel fixing system and methods
JP5420030B1 (en) Wooden pole installation structure
KR102252685B1 (en) Bridge bearing using seperatable upper plate and construction method therewith
KR101133771B1 (en) Structure consecutive lifting apparatus and lifting method using that
JP5192251B2 (en) Tower crane support structure and construction method thereof
KR101193470B1 (en) Bearing and constructing method for bridge
JP2006257741A (en) Tool for placing rubber support
KR101540353B1 (en) Lift for Tensioning Jack
JP6204153B2 (en) Lined lining concrete construction method and shaft platform
JP5754920B2 (en) Mobilization method of support part in bridge
KR100944007B1 (en) The bridge adjustable bearing for change off PC-beam puilling up system and the method
KR101696138B1 (en) Bridge bearing change method
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
JP2011127367A (en) Method for forming building
JP6508958B2 (en) Demolition system and demolition method
JP4625692B2 (en) Building construction method of base-isolated structure with laminated rubber bearing
JP5635173B2 (en) Wooden pole support device
JP3143401U (en) Simple foundation structure
KR100956811B1 (en) Reclamation type guardrail post fixing apparatus having function of increasing shearing force
JP2016145497A (en) Demolition system and demolition method
JP2007270424A (en) Anchor mounting method
JP2014181529A (en) Method and system for base isolation of existing building
JP2013181322A (en) Reconstruction method of pile foundation and pile foundation structure

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant