KR102226460B1 - Hydraulic pressure alarm system of oil filled cable - Google Patents

Hydraulic pressure alarm system of oil filled cable Download PDF

Info

Publication number
KR102226460B1
KR102226460B1 KR1020190135712A KR20190135712A KR102226460B1 KR 102226460 B1 KR102226460 B1 KR 102226460B1 KR 1020190135712 A KR1020190135712 A KR 1020190135712A KR 20190135712 A KR20190135712 A KR 20190135712A KR 102226460 B1 KR102226460 B1 KR 102226460B1
Authority
KR
South Korea
Prior art keywords
pressure
insulating oil
oil
oil supply
supply pipe
Prior art date
Application number
KR1020190135712A
Other languages
Korean (ko)
Inventor
이진희
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020190135712A priority Critical patent/KR102226460B1/en
Application granted granted Critical
Publication of KR102226460B1 publication Critical patent/KR102226460B1/en

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/20Cable fittings for cables filled with or surrounded by gas or oil

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Gas Or Oil Filled Cable Accessories (AREA)

Abstract

The present invention provides a hydraulic alarm system of an OF cable, which comprises: a first oil supply pipe into which the insulating oil was introduced; a second oil supply pipe through which the insulating oil was introduced through the first oil supply pipe; a pressure measuring unit which measures the insulating oil pressure according to a drop of the insulating oil introduced into the second oil supply pipe, and generates a first alarm when the insulating oil pressure is lower than a set reference pressure; and a hydraulic check unit which separates the first and second oil supply pipes from each other and temporarily stores the insulating oil flowing into the second oil supply pipe, so that the pressure measuring unit measures the insulating oil pressure.

Description

OF 케이블의 유압경보시스템{Hydraulic pressure alarm system of oil filled cable}OF hydraulic pressure alarm system of oil filled cable

본 발명은 OF 케이블의 유압경보시스템에 관한 것으로서, 더욱 상세하게는 압력 측정부의 정상 동작 여부를 점검하기 용이한 OF 케이블의 유압경보시스템에 관한 것이다.The present invention relates to a hydraulic alarm system of an OF cable, and more particularly, to a hydraulic alarm system of an OF cable that is easy to check whether a pressure measuring unit is operating normally.

OF(Oil Filled) 케이블은 내부에 절연유가 채워져 있는 지중송전 케이블로서, OF케이블에는 이로 절연유를 공급하기 위한 급유설비가 연결되어 있으며, 급유설비에는 OF케이블 내부의 절연유 수축 및 팽창을 조절하기 위한 절연유 탱크(유조)가 구비되어 있다.OF (Oil Filled) cable is an underground transmission cable filled with insulating oil inside, and a lubrication facility to supply insulating oil is connected to the OF cable, and the lubrication facility is an insulating oil to control the shrinkage and expansion of the insulating oil inside the OF cable. A tank (oil tank) is provided.

일반적으로, OF 케이블은 절연유가 일정 압력 이상을 유지할 때 절연성능을 발휘하며, 절연유 압력이 해당 OF 케이블 설치 시 설정된 압력 하한치 이하로 낮아지는 경우 절연 내력 약화로 인하여 OF 케이블에서 절연파괴 현상이 발생할 수 있다.In general, OF cables exhibit insulating performance when the insulating oil maintains a certain pressure or more, and if the insulating oil pressure falls below the lower pressure limit set when installing the corresponding OF cable, insulation breakdown may occur in the OF cable due to weakening of the dielectric strength. have.

OF 케이블 사용 중 절연유 누수 등으로 인한 절연유 손실이 발생하는 경우, 절연유 압력은 하강하게 되며, 지속된 절연유의 손실로 인해 OF 케이블이 절연파괴 고장에 이르지 않도록, 절연유 압력의 저항에 대한 신속한 감지를 위해 압력 측정부(압력게이지판넬)에서부터 설비담당자 및 변전소 담당자에게 경보를 발생시키는 전기적인 유압경보회로가 구축되어 있다.In case of loss of insulating oil due to leakage of insulating oil while using OF cable, the pressure of insulating oil decreases, so that the OF cable does not break down due to continuous loss of insulating oil, and to quickly detect the resistance of insulating oil pressure. From the pressure measurement unit (pressure gauge panel), an electric hydraulic alarm circuit is built to generate an alarm to the person in charge of the facility and the person in charge of the substation.

하지만, 유압경보회로는 경보를 발생시키는 전체경로 중에서 압력게이지 내부고장, 압력게이지 전기적 단자 접촉불량, 중간 연결단자 접촉불량, 신호선 단선, 경보판넬의 수신장치 이상 등 다양한 원인에 의하여 부동작 할 수 있으며, 이러한 부동작이 발생할 경우 OF케이블에서 절연유 손실이 발생하여도 설비담당자가 유압 저하 여부를 인지할 수 없으므로, OF케이블 유압 저하에 따른 절연파괴 고장으로의 진전을 사전에 예방할 수 없고, 이로 인한 초고압 대용량 송전선로의 고장 발생시 광역정전으로 확대 및 절연유 분출에 의한 화재발생 등의 우려가 있다.However, the hydraulic alarm circuit may fail due to various causes such as internal failure of the pressure gauge, poor contact with the electrical terminal of the pressure gauge, poor contact with the intermediate connection terminal, disconnection of the signal line, and abnormality of the receiving device of the alarm panel among the entire paths that generate the alarm. If such a malfunction occurs, even if the OF cable loses insulating oil, the facility manager cannot recognize whether the hydraulic pressure is lowered, so it is not possible to prevent the progress of the insulation breakdown due to the decrease in the hydraulic pressure of the OF cable in advance. In the event of a breakdown of a large-capacity transmission line, there is a concern that it may be expanded to a wide area power failure and a fire may occur due to the jet of insulating oil.

따라서 유압경보회로 구성에 있어, 압력 측정부, 즉 유압경보회로의 정상동작 여부를 주기적으로 확인할 필요가 있다.Therefore, in the configuration of the hydraulic alarm circuit, it is necessary to periodically check whether the pressure measuring unit, that is, the hydraulic alarm circuit is operating normally.

일반적으로, 압력 측정부(유압경보회로)의 정상 동작 여부를 확인하기 위하여, 압력 측정부에 포함된 공통 급유관으로 절연유를 외부로 배출하고, 절연유의 배출에 의한 압력 측정부에서 측정한 절연유 압력과 기준 압력(하한치)를 비교하여 경보의 발생 여부에 따라 압력 측정부의 정상 동작 여부를 확인하였다.In general, in order to check whether the pressure measuring unit (hydraulic pressure alarm circuit) is operating normally, the insulating oil is discharged to the outside through a common oil supply pipe included in the pressure measuring unit, and the insulating oil pressure measured by the pressure measuring unit due to the discharge of the insulating oil. Compared with the reference pressure (lower limit), the normal operation of the pressure measuring unit was confirmed according to whether or not an alarm occurred.

하지만, 압력 측정부의 정상 동작 여부를 점검하는 경우, 절연유의 손실이 발생하고 절연유를 보충함으로써 점검비용이 증가하고, 절연유의 배출에 의한 회로 단자의 단락에 의한 접촉 불량이 발생하여 유지보수 비용이 증가할 수 있다.However, when checking the normal operation of the pressure measuring unit, loss of insulating oil occurs, and inspection costs increase by replenishing the insulating oil, and contact failure occurs due to short circuit terminals due to the discharge of insulating oil, which increases maintenance costs. can do.

최근들어, 압력 측정부의 정상 도작 여부를 점검하는 경우, 절연유의 손실 및 회로 단자의 파손을 방지하기 위한 연구를 진행하고 있다.In recent years, when checking whether the pressure measuring unit is properly energized, research is being conducted to prevent loss of insulating oil and damage to circuit terminals.

본 발명의 목적은, 압력 측정부의 정상 동작 여부를 점검하기 용이한 OF 케이블의 유압경보시스템을 제공함에 있다.It is an object of the present invention to provide a hydraulic alarm system of an OF cable that is easy to check whether a pressure measuring unit is operating normally.

또한, 본 발명의 목적은, 압력 측정부의 정상 동작 여부를 점검하는 경우 절연유의 손실을 방지하는 OF 케이블의 유압경보시스템을 제공함에 있다.In addition, it is an object of the present invention to provide a hydraulic alarm system of an OF cable that prevents loss of insulating oil when checking whether a pressure measuring unit is operating normally.

또한, 본 발명의 목적은, 압력 측정부의 정상 동작 여부를 점검하는 경우 절연유를 임시 저장하고, 압력 측정부의 점검이 완료되는 경우 임시 저장된 절연유를 보충하는 OF 케이블의 유압경보시스템을 제공함에 있다.In addition, an object of the present invention is to provide a hydraulic alarm system of an OF cable that temporarily stores insulating oil when checking whether the pressure measuring unit is in normal operation, and supplements the temporarily stored insulating oil when the inspection of the pressure measuring unit is completed.

본 발명의 목적들은 이상에서 언급한 목적으로 제한되지 않으며, 언급되지 않은 본 발명의 다른 목적 및 장점들은 하기의 설명에 의해서 이해될 수 있고, 본 발명의 실시예에 의해 보다 분명하게 이해될 것이다. 또한, 본 발명의 목적 및 장점들은 특허 청구 범위에 나타낸 수단 및 그 조합에 의해 실현될 수 있음을 쉽게 알 수 있을 것이다.The objects of the present invention are not limited to the above-mentioned objects, and other objects and advantages of the present invention that are not mentioned can be understood by the following description, and will be more clearly understood by examples of the present invention. In addition, it will be easily understood that the objects and advantages of the present invention can be realized by the means shown in the claims and combinations thereof.

본 발명에 따른 OF 케이블의 유압경보시스템은, 절연유가 유입된 제1 급유관, 상기 제1 급유관을 통하여 상기 절연유가 유입된 제2 급유관, 상기 제2 급유관 내에 유입된 상기 절연유의 강하에 따른 절연유 압력을 측정하여, 상기 절연유 압력이 설정된 기준 압력보다 낮으면 제1 경보를 발생시키는 압력 측정부 및 상기 압력 측정부에서 상기 절연유 압력이 측정되게, 상기 제1, 2 급유관을 서로 분리하고 상기 제2 급유관에 유입된 상기 절연유를 강하시켜 임시 저장하는 유압 점검부를 포함할 수 있다.The hydraulic alarm system of the OF cable according to the present invention includes a first oil supply pipe into which insulating oil is introduced, a second oil supply pipe into which the insulating oil flows through the first oil supply pipe, and a drop of the insulating oil introduced into the second oil supply pipe. Separate the first and second oil supply pipes from each other so that the insulating oil pressure is measured in the pressure measuring unit and the pressure measuring unit for generating a first alarm when the insulating oil pressure is lower than the set reference pressure by measuring the insulating oil pressure according to And a hydraulic pressure check unit for temporarily storing the insulating oil flowing into the second oil supply pipe by dropping it.

상기 제1 급유관은, OF(Oil Filled) 케이블 내에서, 상기 절연유가 유입된 제1 하단 급유관 및 상기 제1 하단 급유관으로 상기 절연유를 공급하는 급유 유조(PT)에 연결된 제2 하단 급유관을 포함할 수 있다.The first oil supply pipe is, in an OF (Oil Filled) cable, a first lower oil supply pipe into which the insulating oil is introduced, and a second lower oil supply connected to a oil tank (PT) supplying the insulating oil to the first lower oil supply pipe. It may include related.

상기 압력 측정부의 정상 동작 여부를 점검하는 경우, 상기 유압 점검부는, 상기 제1, 2 급유관 사이가 서로 분리되게 턴오프 동작하는 전동 밸브, 상기 제1, 2 급유관이 서로 분리되는 경우, 상기 절연유를 강하시켜 임시저장하는 실린더 및 상기 전동 밸브 및 상기 실린더의 동작을 제어하는 제어부를 포함할 수 있다.When checking whether the pressure measuring unit is in normal operation, the hydraulic pressure check unit may include an electric valve that is turned off so that the first and second oil supply pipes are separated from each other, and when the first and second oil supply pipes are separated from each other, the It may include a cylinder for temporarily storing the insulating oil by dropping, and a control unit for controlling the operation of the electric valve and the cylinder.

상기 제어부는, 상기 전동 밸브를 턴오프 동작시키는 경우, 상기 실린더를 하강시켜 상기 절연유를 강하시켜 임시 저장할 수 있다.The control unit may temporarily store the insulating oil by lowering the cylinder when turning off the electric valve.

상기 전동 밸브를 턴오프 동작시킨 후, 소정 시간이 경과되면, 상기 제어부는, 상기 전동 밸브를 턴온 동작시키고, 상기 실린더를 상승시켜 상기 절연유가 상기 제2 급유관으로 유입되게 동작시킬 수 있다.When a predetermined time elapses after turning off the electric valve, the control unit may operate the electric valve to turn on and raise the cylinder so that the insulating oil flows into the second oil supply pipe.

본 발명에 따른 OF 케이블의 유압경보시스템은, 상기 제2 급유관에 유입된 상기 절연유를 배출하거나, 또는 상기 절연유를 보충하기 위한 공통 연결관 및 상기 압력 측정부에서 상기 절연유 압력을 측정하기 위해, 상기 공통 연결관을 닫힘 상태로 전환하는 체크 밸브를 더 포함할 수 있다.The hydraulic alarm system of the OF cable according to the present invention discharges the insulating oil flowing into the second oil supply pipe, or measures the insulating oil pressure in the common connection pipe and the pressure measuring unit for replenishing the insulating oil, It may further include a check valve for switching the common connection pipe to a closed state.

상기 체크 밸브는, 상기 공통 연결관으로 상기 절연유를 보충하기 위해, 상기 공통 연결관을 열림 상태로 전환할 수 있다.The check valve may switch the common connection pipe to an open state in order to supplement the insulating oil with the common connection pipe.

상기 압력 측정부는, 상기 절연유 압력을 측정하는 압력 게이지 및 압력 센서 중 적어도 하나를 포함할 수 있다.The pressure measuring unit may include at least one of a pressure gauge and a pressure sensor measuring the pressure of the insulating oil.

상기 압력 측정부는, 상기 절연유 압력이 상기 기준 압력보다 낮으면 정상 동작임을 알리는 상기 제1 경보를 발생시키며, 상기 유압 점검부로 상기 제1 경보에 대응하는 제1 신호를 출력할 수 있다.When the pressure of the insulating oil is lower than the reference pressure, the pressure measuring unit may generate the first alarm indicating normal operation, and may output a first signal corresponding to the first alarm to the hydraulic pressure check unit.

상기 압력 측정부는, 상기 절연유 압력이 상기 기준 압력보다 높으면 이상 동작임을 알리는 제2 경보를 발생시키고, 상기 유압 점검부로 상기 제2 경보에 대응하는 제2 신호를 출력할 수 있다.When the pressure of the insulating oil is higher than the reference pressure, the pressure measuring unit may generate a second alarm indicating an abnormal operation, and may output a second signal corresponding to the second alarm to the hydraulic pressure check unit.

본 발명에 따른 OF 케이블의 유압경보시스템은, 압력 측정부의 정상 동작 여부 점검 시, 절연유의 손실을 방지할 수 있는 이점이 있다.The hydraulic alarm system of the OF cable according to the present invention has the advantage of preventing loss of insulating oil when checking whether the pressure measuring unit is operating normally.

또한, 본 발명에 따른 OF 케이블의 유압경보시스템은, 압력 측정부의 정상 동작 여부 점검 시, 절연유의 손실에 따른 절연유의 보충이 필요없음으로써, 점검 비용을 줄일 수 있는 이점이 있다.In addition, the hydraulic alarm system of the OF cable according to the present invention has the advantage of reducing the maintenance cost by eliminating the need to supplement the insulating oil due to the loss of the insulating oil when checking whether the pressure measuring unit is operating normally.

또한, 본 발명에 따른 OF 케이블의 유압경보시스템은, 압력 측정부의 정상 동작 여부 점검이 용이해짐에 따라 점검주기를 단축시킬 수 있어, 설비 신뢰성을 향상시킬 수 있는 이점이 있다.In addition, the hydraulic alarm system of the OF cable according to the present invention has the advantage of improving the reliability of equipment, since it is possible to shorten the inspection period as it becomes easy to check whether the pressure measuring unit is operating normally.

상술한 효과와 더불어 본 발명의 구체적인 효과는 이하 발명을 실시하기 위한 구체적인 사항을 설명하면서 함께 기술한다. In addition to the above-described effects, specific effects of the present invention will be described together with explanation of specific matters for carrying out the present invention.

도 1은 본 발명에 따른 OF 케이블의 유압경보시스템을 간략하게 나타낸 배관도이다.
도 2는 본 발명에 따른 OF 케이블의 유압경보시스템을 나타낸 제어 블록도이다.
도 3 내지 도 6은 본 발명에 따른 OF 케이블의 유압경보시스템에 대한 동작을 나타낸 예시도이다.
1 is a piping diagram schematically showing a hydraulic alarm system of an OF cable according to the present invention.
2 is a control block diagram showing the hydraulic alarm system of the OF cable according to the present invention.
3 to 6 are exemplary views showing the operation of the hydraulic alarm system of the OF cable according to the present invention.

하기의 설명에서는 본 발명의 실시예를 이해하는데 필요한 부분만이 설명되며, 그 이외 부분의 설명은 본 발명의 요지를 흩트리지 않도록 생략될 것이라는 것을 유의하여야 한다.In the following description, it should be noted that only parts necessary to understand the embodiments of the present invention will be described, and descriptions of other parts will be omitted so as not to obscure the gist of the present invention.

이하에서 설명되는 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념으로 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 바람직한 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Terms or words used in the present specification and claims described below should not be construed as being limited to a conventional or dictionary meaning, and the inventor is appropriate as a concept of terms in order to describe his own invention in the best way. It should be interpreted as a meaning and concept consistent with the technical idea of the present invention on the basis of the principle that it can be defined as such. Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only preferred embodiments of the present invention, and do not represent all the technical spirit of the present invention, and various equivalents that can replace them at the time of application It should be understood that there may be variations and variations.

이하, 첨부된 도면을 참조하여 본 발명의 실시예를 보다 상세하게 설명하고자 한다.Hereinafter, embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 OF 케이블의 유압경보시스템을 간략하게 나타낸 배관도이다.1 is a piping diagram schematically showing a hydraulic alarm system of an OF cable according to the present invention.

도 1을 참조하면, OF 케이블의 유압경보시스템(110)은 제1 급유관(110), 압력 측정부(120) 및 유압 점검부(130)를 포함할 수 있다.Referring to FIG. 1, the hydraulic alarm system 110 of the OF cable may include a first oil supply pipe 110, a pressure measurement unit 120, and a hydraulic pressure check unit 130.

먼저, 제1 급유관(110)은 A상 OF 케이블 내에서 절연유가 유입된 제1 하단 급유관(A_C) 및 제1 하단 급유관(A_C)으로 절연유를 공급하는 급유 유조(PT)에 연결된 제2 하단 급유관(A_PT)를 포함할 수 있다.First, the first oil supply pipe 110 is connected to the oil supply tank (PT) that supplies insulating oil to the first lower oil supply pipe (A_C) and the first lower oil supply pipe (A_C) into which insulating oil flows in the A-phase OF cable. 2 It may include a lower oil supply pipe (A_PT).

또한, 제1 급유관(110)은 B상 OF 케이블 내에서 절연유가 유입된 제1 하단 급유관(B_C) 및 제1 하단 급유관(B_C)으로 절연유를 공급하는 급유 유조(PT)에 연결된 제2 하단 급유관(B_PT)를 포함할 수 있다.In addition, the first oil supply pipe 110 is connected to the oil supply tank (PT) that supplies insulating oil to the first lower oil supply pipe (B_C) and the first lower oil supply pipe (B_C) into which insulating oil flows into the B-phase OF cable. 2 It may include a lower oil supply pipe (B_PT).

마지막으로, 제1 급유관(110)은 C상 OF 케이블 내에서 절연유가 유입된 제1 하단 급유관(C_C) 및 제1 하단 급유관(C_C)으로 절연유를 공급하는 급유 유조(PT)에 연결된 제2 하단 급유관(C_PT)를 포함할 수 있다.Finally, the first oil supply pipe 110 is connected to the oil supply tank (PT) that supplies insulating oil to the first lower oil supply pipe (C_C) and the first lower oil supply pipe (C_C) into which insulating oil flows in the C phase OF cable. It may include a second lower oil supply pipe (C_PT).

여기서, 제1, 2 하단 급유관(A_C, B_C, C_C, A_PT, B_PT, C_PT)는 A상, B상, C 상 전력을 공급하는 각 상 급유관 및 급유 유조에 연결된 관일 수 있으며, 이에 한정을 두지 않는다.Here, the first and second lower oil supply pipes (A_C, B_C, C_C, A_PT, B_PT, C_PT) may be each phase oil supply pipe supplying power to the A phase, B phase, and C phase and a pipe connected to the oil tank, limited to this. Do not put it.

압력 측정부(120)는 압력게이지판넬로 구현될 수 있다.The pressure measuring unit 120 may be implemented as a pressure gauge panel.

여기서, 압력 측정부(120)는 A, B, C상 압력 게이지(P_A, P_B, P_C) 및 A, B, C상 압력 센서(P_AS, P_BS, P_CS)를 포함할 수 있다.Here, the pressure measurement unit 120 may include A, B, C phase pressure gauges P_A, P_B, P_C and A, B, C phase pressure sensors P_AS, P_BS, P_CS.

여기서, A, B, C상 압력 게이지(P_A, P_B, P_C) 및 A, B, C상 압력 센서(P_AS, P_BS, P_CS)는 제2 급유관(PPA, PPB, PPC)에서 분기된 관에 배치되어 절연유 압력을 측정할 수 있다.Here, the A, B, C phase pressure gauges (P_A, P_B, P_C) and A, B, C phase pressure sensors (P_AS, P_BS, P_CS) are connected to the pipe branched from the second oil supply pipe (PPA, PPB, PPC). Can be arranged to measure the pressure of the insulating oil.

또한, 제2 급유관(PPA, PPB, PPC)은 공통 연결관(CP)에 연결될 수 있다.In addition, the second oil supply pipes PPA, PPB, and PPC may be connected to the common connection pipe CP.

먼저, 공통 연결관(CP)은 제2 급유관(PPA, PPB, PPC)에 유입된 절연유를 배출하거나, 또는 절연유를 보충하기 위한 연결관일 수 있으며, 이에 한정을 두지 않는다.First, the common connection pipe CP may be a connection pipe for discharging the insulating oil flowing into the second oil supply pipes PPA, PPB, and PPC, or supplementing the insulating oil, but is not limited thereto.

또한, 압력측정부(120)에서 절연유 압력을 측정하기 위해, 공통 연결관(CP)를 닫힘 상태가 되도록 하는 체크 밸브(CPV)를 더 포함할 수 있다.In addition, in order to measure the pressure of the insulating oil in the pressure measuring unit 120, a check valve CPV for closing the common connection pipe CP may be further included.

체크 밸브(CPV)는 공통 연결관(CP)를 열림 상태로 전환시킬 수 있으며, 이에 한정을 두지 않는다.The check valve CPV may convert the common connection pipe CP into an open state, but is not limited thereto.

공통 연결관(CP)에는 제2 급유관(PPA, PPB, PPC)에서 절연유를 공급 또는 차단할 수 있는 밸브들(미도시)을 포함할 수 있으며, 이에 한정을 두지 않는다.The common connection pipe CP may include valves (not shown) capable of supplying or blocking the insulating oil from the second oil supply pipes PPA, PPB, and PPC, but is not limited thereto.

유압 점검부(130)는 A, B, C 상 별로 전동 밸브(AV, BV, CV), 제1, 2 밸브(ACV, BCB, CCV, APV, BPV, CPV) 및 실린더(AC, BC, CC)를 포함할 수 있다.The hydraulic check unit 130 includes electric valves (AV, BV, CV), first and second valves (ACV, BCB, CCV, APV, BPV, CPV) and cylinders (AC, BC, CC) for each of the A, B, and C phases. ) Can be included.

여기서, 전동 밸브(AV, BV, CV)는 제어부(미도시)에 의해 턴오프 및 턴온 동작을 수행하여, 제1, 2 하단 급유관(A_C, B_C, C_C, A_PT, B_PT, C_PT)과 제2 급유관(PPA, PPB, PPC)을 분리하거나, 또는 연결시킬 수 있다.Here, the electric valves (AV, BV, CV) perform turn-off and turn-on operations by a control unit (not shown), so that the first and second lower oil supply pipes (A_C, B_C, C_C, A_PT, B_PT, C_PT) and 2 Oil supply pipes (PPA, PPB, PPC) can be separated or connected.

또한, 제1, 2 밸브(ACV, BCB, CCV, APV, BPV, CPV) 각각은 OF 케이블 내에서 절연유가 유입된 제1 하단 급유(A_C, B_C, C_C) 및 제1 하단 급유(A_C, B_C, C_C)으로 절연유를 공급하는 급유 유조에 연결된 제2 하단 급유관(A_PT, B_PT, C_PT)에서 절연유의 이동을 조절할 수 있다.In addition, each of the first and second valves (ACV, BCB, CCV, APV, BPV, CPV) is the first lower oil supply (A_C, B_C, C_C) and the first lower oil supply (A_C, B_C) in which insulating oil flows in the OF cable. , C_C), it is possible to control the movement of the insulating oil in the second lower oil supply pipe (A_PT, B_PT, C_PT) connected to the oil tank supplying the insulating oil.

도 2는 본 발명에 따른 OF 케이블의 유압경보시스템을 나타낸 제어 블록도이다.2 is a control block diagram showing the hydraulic alarm system of the OF cable according to the present invention.

도 2를 참조하면, 유압경보시스템(100)은 압력 측정부(120) 및 유압 점검부(130)를 포함할 수 있다.Referring to FIG. 2, the hydraulic alarm system 100 may include a pressure measurement unit 120 and a hydraulic pressure check unit 130.

압력 측정부(120)는 제1 급유관(110)의 절연유 압력을 측정할 수 있다.The pressure measuring unit 120 may measure the insulating oil pressure of the first oil supply pipe 110.

여기서, 압력 측정부(120)는 제1 급유관(110)과 연결된 제2 급유관(PPA, PPB, PPC) 각각에 대한 절연유 압력을 측정할 수 있으며, 압력 게이지(P_A, P_B, P_C) 및 압력 센서(P_AS, P_BS, P_CS)를 포함할 수 있다.Here, the pressure measuring unit 120 may measure the insulating oil pressure for each of the second oil supply pipes PPA, PPB, and PPC connected to the first oil supply pipe 110, and the pressure gauges P_A, P_B, P_C, and It may include a pressure sensor (P_AS, P_BS, P_CS).

이때, 압력 측정부(120)는 압력 게이지(P_A, P_B, P_C) 및 압력 센서(P_AS, P_BS, P_CS) 중 적어도 하나에서 측정된 절연유 압력을 설정된 기준 압력과 비교할 수 있다.In this case, the pressure measuring unit 120 may compare the insulating oil pressure measured by at least one of the pressure gauges P_A, P_B, and P_C and the pressure sensors P_AS, P_BS, and P_CS with a set reference pressure.

압력 게이지(P_A, P_B, P_C) 및 압력 센서(P_AS, P_BS, P_CS) 중 적어도 하나는 유압 점검부(130)의 동작에 의해 제2 급유관(PPA, PPB, PPC) 중 적어도 하나에서 절연유의 강하에 따른 절연유 압력을 측정할 수 있다.At least one of the pressure gauges (P_A, P_B, P_C) and the pressure sensors (P_AS, P_BS, P_CS) is the second oil supply pipe (PPA, PPB, PPC) by the operation of the hydraulic check unit 130 Insulating oil pressure according to the drop can be measured.

이때, 압력 측정부(120)는 절연유 압력을 외부 장치(미도시) 또는 비교부(미도시)에 의해 절연유 압력과 기준 압력을 비교하며, 절연유 압력이 기준 압력보다 낮으면 정상 동작임을 알리는 제1 경보를 발생시키며, 유압 점검부(130)로 제1 경보에 대응하는 제1 신호(S1)를 출력할 수 있다.At this time, the pressure measuring unit 120 compares the insulating oil pressure with the reference pressure by an external device (not shown) or a comparison unit (not shown), and when the insulating oil pressure is lower than the reference pressure, the first An alarm may be generated, and a first signal S1 corresponding to the first alarm may be output to the hydraulic pressure check unit 130.

또한, 압력 측정부(120)는 절연유 압력이 기준 압력보다 높으면 이상 동작임을 알리는 제2 경보를 발생시키고, 유압 점검부(130)로 제2 경보에 대응하는 제2 신호(S2)를 출력할 수 있다.In addition, when the pressure of the insulating oil is higher than the reference pressure, the pressure measuring unit 120 may generate a second alarm indicating abnormal operation, and output a second signal S2 corresponding to the second alarm to the hydraulic pressure check unit 130. have.

유압 점검부(130)는 A, B, C 상 별로 전동 밸브(AV, BV, CV), 제1, 2 밸브(ACV, BCB, CCV, APV, BPV, CPV), 실린더(AC, BC, CC) 및 제어부(135)를 포함할 수 있다.The hydraulic check unit 130 includes electric valves (AV, BV, CV), first and second valves (ACV, BCB, CCV, APV, BPV, CPV), cylinders (AC, BC, CC) for each of the A, B, and C phases. ) And a control unit 135.

여기서, 전동 밸브(AV, BV, CV)는 제어부(미도시)에 의해 턴오프 및 턴온 동작을 수행하여, 제1, 2 하단 급유관(A_C, B_C, C_C, A_PT, B_PT, C_PT)과 제2 급유관(PPA, PPB, PPC)을 분리하거나, 또는 연결시킬 수 있다.Here, the electric valves (AV, BV, CV) perform turn-off and turn-on operations by a control unit (not shown), so that the first and second lower oil supply pipes (A_C, B_C, C_C, A_PT, B_PT, C_PT) and 2 Oil supply pipes (PPA, PPB, PPC) can be separated or connected.

또한, 제1, 2 밸브(ACV, BCB, CCV, APV, BPV, CPV) 각각은 OF 케이블 내에서 절연유가 유입된 제1 하단 급유(A_C, B_C, C_C) 및 제1 하단 급유(A_C, B_C, C_C)으로 절연유를 공급하는 급유 유조에 연결된 제2 하단 급유관(A_PT, B_PT, C_PT)에서 절연유의 이동을 조절할 수 있다.In addition, each of the first and second valves (ACV, BCB, CCV, APV, BPV, CPV) is the first lower oil supply (A_C, B_C, C_C) and the first lower oil supply (A_C, B_C) in which insulating oil flows in the OF cable. , C_C), it is possible to control the movement of the insulating oil in the second lower oil supply pipe (A_PT, B_PT, C_PT) connected to the oil tank supplying the insulating oil.

압력 측정부(120)의 정상 동작 여부를 점검하는 경우, 제어부(135)는 전동 밸브(AV, BV, CV)를 턴오프 동작시키는 경우, 실린더(AC, BC, CC)를 하강시켜 상기 절연유를 강하시켜 임시 저장할 수 있다.When checking whether the pressure measurement unit 120 is in normal operation, the control unit 135 lowers the cylinders AC, BC, and CC when turning off the electric valves (AV, BV, CV) to supply the insulating oil. You can descend and temporarily store.

이 경우, 상술한 바와 같이 압력 측정부(120)는 절연유 압력을 측정할 수 있다.In this case, as described above, the pressure measuring unit 120 may measure the insulating oil pressure.

또한, 제어부(135)는 전동 밸브(AV, BV, CV)를 턴오프 동작시킨 후, 소정 시간이 경과되면, 전동 밸브(AV, BV, CV)를 턴온 동작시키고, 실린더(AC, BC, CC)를 상승시켜 절연유가 제2 급유관(PPA, PPB, PPC)으로 유입되게 동작시킬 수 있다.In addition, the control unit 135 turns off the electric valves (AV, BV, CV) and then, when a predetermined time elapses, turns on the electric valves (AV, BV, CV) and operates the cylinders (AC, BC, CC). ) Is raised to allow the insulating oil to flow into the second oil supply pipe (PPA, PPB, PPC).

또 다르게, 제어부(135)는 압력 측정부(120)로부터 제1 신호(S1)가 입력되면, 전동 밸브(AV, BV, CV)를 턴온 동작시킬 수 있다. 그리고, 제어부(135)는 압력 측정부(120)로부터 제2 신호(S2)가 입력되면, 전동 밸브(AV, BV, CV)가 턴오프 동작으로 유지되게 제어할 수 있다.Alternatively, when the first signal S1 is input from the pressure measuring unit 120, the control unit 135 may turn on the electric valves AV, BV, and CV. In addition, when the second signal S2 is input from the pressure measuring unit 120, the control unit 135 may control the electric valves AV, BV, and CV to be maintained in a turn-off operation.

만약, 제어부(135)는 전동 밸브(AV, BV, CV)가 턴오프 동작으로 유지되면, 점검자 또는 관리자에게 압력 측정부(120)의 이상 동작 정보를 전송할 수 있으며, 이에 한정을 두지 않는다.If the electric valves AV, BV, and CV are maintained in a turn-off operation, the control unit 135 may transmit abnormal operation information of the pressure measuring unit 120 to an inspector or a manager, but is not limited thereto.

도 3 내지 도 6은 본 발명에 따른 OF 케이블의 유압경보시스템에 대한 동작을 나타낸 예시도이다.3 to 6 are exemplary views showing the operation of the hydraulic alarm system of the OF cable according to the present invention.

먼저, 도 3은 도 1에서 설명한 A상 OF 케이블 내에서 절연유가 유입된 제1 하단 급유관(A_C) 및 제1 하단 급유관(A_C)으로 절연유를 공급하는 급유 유조(PT)에 연결된 제2 하단 급유관(A_PT), A상 압력 게이지(P_A), A상 압력 센서(P_AS), 제2 급유관(PPA), 공통 연결관(CP) 및 A상 전동 밸브(AV), 제1, 2 밸브(ACV, APV) 및 실린더(AC)를 나타낸다.First, FIG. 3 shows a second oil supply tank (PT) that supplies insulating oil to the first lower oil supply pipe (A_C) and the first lower oil supply pipe (A_C) into which insulating oil flows in the A-phase OF cable described in FIG. 1. Lower oil supply pipe (A_PT), A phase pressure gauge (P_A), A phase pressure sensor (P_AS), second oil supply pipe (PPA), common connection pipe (CP) and A phase electric valve (AV), 1st, 2nd The valves ACV and APV and the cylinder AC are shown.

즉, 도 3 내지 도 6은 A상 압력 측정부(120)의 정상 동작 여부를 점검하는 예시도이면, B상 및 C상도 동일하게 점검할 수 있으며, 이에 한정을 두지 않는다.That is, FIGS. 3 to 6 are exemplary diagrams for checking whether the phase A pressure measuring unit 120 operates normally, and phases B and C may be checked in the same manner, but the present invention is not limited thereto.

도 3은 정상 동작하는 압력 측정부(120)의 압력 게이지(P_A) 및 압력 센서(P_AS)가 절연유 압력을 측정할 수 있다.3, a pressure gauge P_A and a pressure sensor P_AS of the pressure measuring unit 120 operating normally may measure the pressure of the insulating oil.

즉, 압력 측정부(120)는 공통 연결관(CP)에 연결된 밸브(미도시)를 닫힘 상태로 유지하면, 제1, 2 하단 급유관(A_C, A_PT), 유압 점검부(130)를 통해 제2 급유관(PPA)에 유입된 절연유에 대한 절연유 압력을 측정할 수 있다.That is, when the pressure measurement unit 120 maintains the valve (not shown) connected to the common connection pipe CP in a closed state, the first and second lower oil supply pipes (A_C, A_PT), and the hydraulic pressure check unit 130 The insulating oil pressure of the insulating oil flowing into the second oil supply pipe PPA may be measured.

도 4는 압력 측정부(120)의 정상 동작 여부를 판단하기 위해, 제1, 2 하단 급유관(A_C, A_PT)과 제2 급유관(PPA)를 분리된다.4 shows the first and second lower oil supply pipes A_C and A_PT and the second oil supply pipe PPA in order to determine whether the pressure measurement unit 120 operates normally.

즉, 유압 점검부(130)의 제어부(135)는 전동 밸브(AV)를 턴온 상태(열림)에서 턴오프(닫힘) 동작시킬 수 있다.That is, the control unit 135 of the hydraulic pressure check unit 130 may operate the electric valve AV to turn off (closed) in the turned-on state (open).

이때, 절연유는 유압 점검부(130)의 배관 및 제2 급유관(PPA)에 유입된 상태로 존재할 수 있다.In this case, the insulating oil may exist in a state flowing into the pipe of the hydraulic pressure check unit 130 and the second oil supply pipe (PPA).

도 5(a) 및 도 5(b)는 압력 측정부(120)에서 절연유 압력을 측정하기 위해, 유압 점검부(130)의 실린더(AC)를 하강시켜 공간에 절연유를 하강시켜 임시 저장하는 것을 나타낸다.5(a) and 5(b) show that in order to measure the insulating oil pressure in the pressure measuring unit 120, the cylinder AC of the hydraulic pressure check unit 130 is lowered to lower the insulating oil in the space and temporarily store it. Show.

즉, 유압 점검부(130)의 제어부(135)는 전동 밸브(AV)를 턴오프 동작시킨 후, 실린더(AC)를 하강시켜 빈 공간에 절연유를 강하시킬 수 있다.That is, after turning off the electric valve AV, the control unit 135 of the hydraulic pressure check unit 130 may lower the cylinder AC to lower the insulating oil into the empty space.

이때, 압력 측정부(120)의 압력 게이지(P_A) 및 압력 센서(P_AS)는 제2 급유관(PPA)의 절연유가 실린더(AC) 내부로 강하되므로 진공 상태가 발생되어, 절연유 압력이 낮아지는 것을 측정할 수 있다.At this time, the pressure gauge (P_A) and the pressure sensor (P_AS) of the pressure measuring unit 120 are vacuum because the insulating oil of the second oil supply pipe (PPA) falls into the cylinder (AC), the insulating oil pressure is lowered. You can measure it.

이후, 압력 측정부(120)는 절연유 압력과 설정된 기준 압력을 비교하여, 상술한 바와 같이 비교 결과를 유압 점검부(130) 또는 외부 장치로 전달할 수 있으며, 이에 한정을 두지 않는다.Thereafter, the pressure measurement unit 120 may compare the insulating oil pressure and the set reference pressure and transmit the comparison result to the hydraulic pressure check unit 130 or an external device, as described above, but is not limited thereto.

도 6(a) 및 도 6(b)는 압력 측정부(120)에서 절연유 압력을 측정한 후, 실린더(AC)를 상승시켜 공간에 유입된 절연유를 원상복구하는 것을 나타낸다.6(a) and 6(b) show that after measuring the pressure of the insulating oil in the pressure measuring unit 120, the cylinder AC is raised to restore the insulating oil flowing into the space to its original state.

즉, 도 6(a) 및 도 6(b)는 도 5(a)와 같은 상태로 원상복구를 할 수 있도록 할 수 있다. That is, FIGS. 6(a) and 6(b) can be restored to their original state in the same state as in FIG. 5(a).

이상에서 실시 예들에 설명된 특징, 구조, 효과 등은 본 발명의 적어도 하나의 실시 예에 포함되며, 반드시 하나의 실시 예에만 한정되는 것은 아니다. 나아가, 각 실시 예에서 예시된 특징, 구조, 효과 등은 실시 예들이 속하는 분야의 통상의 지식을 가지는 자에 의해 다른 실시 예들에 대해서도 조합 또는 변형되어 실시 가능하다. 따라서 이러한 조합과 변형에 관계된 내용들은 본 발명의 범위에 포함되는 것으로 해석되어야 할 것이다.Features, structures, effects, and the like described in the embodiments above are included in at least one embodiment of the present invention, and are not necessarily limited to only one embodiment. Further, the features, structures, effects, etc. illustrated in each embodiment may be combined or modified for other embodiments by a person having ordinary knowledge in the field to which the embodiments belong. Therefore, contents related to such combinations and modifications should be construed as being included in the scope of the present invention.

또한, 이상에서 실시 예를 중심으로 설명하였으나 이는 단지 예시일 뿐 본 발명을 한정하는 것이 아니며, 본 발명이 속하는 분야의 통상의 지식을 가진 자라면 본 실시 예의 본질적인 특성을 벗어나지 않는 범위에서 이상에 예시되지 않은 여러가지의 변형과 응용이 가능함을 알 수 있을 것이다. 예를 들어, 실시 예에 구체적으로 나타난 각 구성 요소는 변형하여 실시할 수 있는 것이다. 그리고 이러한 변형과 응용에 관계된 차이점들은 첨부된 청구 범위에서 규정하는 본 발명의 범위에 포함되는 것으로 해석되어야 할 것이다.In addition, although the embodiments have been described above, these are only examples and do not limit the present invention, and those of ordinary skill in the field to which the present invention belongs are illustrated above without departing from the essential characteristics of the present embodiment. It will be seen that various modifications and applications that have not been made are possible. For example, each component specifically shown in the embodiment can be modified and implemented. And differences related to these modifications and applications should be construed as being included in the scope of the present invention defined in the appended claims.

100: 유압경보시스템
110: 제1 급유관
120: 압력 측정부
130: 유압 점검부
100: hydraulic alarm system
110: first oil supply pipe
120: pressure measuring unit
130: hydraulic check unit

Claims (10)

절연유가 유입된 제1 급유관;
상기 제1 급유관을 통하여 상기 절연유가 유입된 제2 급유관;
상기 제2 급유관 내에 유입된 상기 절연유의 강하에 따른 절연유 압력을 측정하여, 상기 절연유 압력이 설정된 기준 압력보다 낮으면 제1 경보를 발생시키는 압력 측정부; 및
상기 압력 측정부에서 상기 절연유 압력이 측정되게, 상기 제1, 2 급유관을 서로 분리하고 상기 제2 급유관에 유입된 상기 절연유를 강하시켜 임시 저장하는 유압 점검부를 포함하는,
OF 케이블의 유압경보시스템.
A first oil supply pipe into which insulating oil is introduced;
A second oil supply pipe through which the insulating oil flows through the first oil supply pipe;
A pressure measuring unit that measures an insulating oil pressure according to a drop of the insulating oil introduced into the second oil supply pipe and generates a first alarm when the insulating oil pressure is lower than a set reference pressure; And
Including a hydraulic pressure check unit for separating the first and second oil supply pipes from each other and temporarily storing the insulating oil introduced into the second oil supply pipe by dropping and temporarily storing the insulating oil pressure in the pressure measuring unit,
OF cable hydraulic alarm system.
제 1 항에 있어서,
상기 제1 급유관은,
OF(Oil Filled) 케이블 내에서, 상기 절연유가 유입된 제1 하단 급유관; 및
상기 제1 하단 급유관으로 상기 절연유를 공급하는 급유 유조(PT)에 연결된 제2 하단 급유관을 포함하는,
OF 케이블의 유압경보시스템.
The method of claim 1,
The first oil supply pipe,
In an OF (Oil Filled) cable, a first lower oil supply pipe into which the insulating oil is introduced; And
Including a second lower oil supply pipe connected to the oil supply tank (PT) supplying the insulating oil to the first lower oil supply pipe,
OF cable hydraulic alarm system.
제 1 항에 있어서,
상기 압력 측정부의 정상 동작 여부를 점검하는 경우,
상기 유압 점검부는,
상기 제1, 2 급유관 사이가 서로 분리되게 턴오프 동작하는 전동 밸브;
상기 제1, 2 급유관이 서로 분리되는 경우, 상기 절연유를 강하시켜 임시저장하는 실린더; 및
상기 전동 밸브 및 상기 실린더의 동작을 제어하는 제어부를 포함하는,
OF 케이블의 유압경보시스템.
The method of claim 1,
In the case of checking whether the pressure measuring unit is operating normally,
The hydraulic pressure check unit,
An electric valve that is turned off so that the first and second oil supply pipes are separated from each other;
A cylinder for temporarily storing the insulating oil by dropping the insulating oil when the first and second oil supply pipes are separated from each other; And
Including a control unit for controlling the operation of the electric valve and the cylinder,
OF cable hydraulic alarm system.
제 3 항에 있어서,
상기 제어부는,
상기 전동 밸브를 턴오프 동작시키는 경우, 상기 실린더를 하강시켜 상기 절연유를 강하시켜 임시 저장하는,
OF 케이블의 유압경보시스템.
The method of claim 3,
The control unit,
When the electric valve is turned off, the cylinder is lowered to lower the insulating oil to temporarily store,
OF cable hydraulic alarm system.
제 3 항에 있어서,
상기 전동 밸브를 턴오프 동작시킨 후, 소정 시간이 경과되면,
상기 제어부는,
상기 전동 밸브를 턴온 동작시키고, 상기 실린더를 상승시켜 상기 절연유가 상기 제2 급유관으로 유입되게 동작시키는,
OF 케이블의 유압경보시스템.
The method of claim 3,
After turning off the electric valve, when a predetermined time elapses,
The control unit,
Turning on the electric valve and raising the cylinder to operate the insulating oil to flow into the second oil supply pipe,
OF cable hydraulic alarm system.
제 1 항에 있어서,
상기 제2 급유관에 유입된 상기 절연유를 배출하거나, 또는 상기 절연유를 보충하기 위한 공통 연결관; 및
상기 압력 측정부에서 상기 절연유 압력을 측정하기 위해, 상기 공통 연결관을 닫힘 상태로 전환하는 체크 밸브를 더 포함하는,
OF 케이블의 유압경보시스템.
The method of claim 1,
A common connection pipe for discharging the insulating oil flowing into the second oil supply pipe or supplementing the insulating oil; And
In order to measure the insulating oil pressure in the pressure measuring unit, further comprising a check valve for switching the common connection pipe to a closed state,
OF cable hydraulic alarm system.
제 6 항에 있어서,
상기 체크 밸브는,
상기 공통 연결관으로 상기 절연유를 보충하기 위해, 상기 공통 연결관을 열림 상태로 전환하는,
OF 케이블의 유압경보시스템.
The method of claim 6,
The check valve,
To replenish the insulating oil with the common connection pipe, switching the common connection pipe to an open state,
OF cable hydraulic alarm system.
제 1 항에 있어서,
상기 압력 측정부는,
상기 절연유 압력을 측정하는 압력 게이지 및 압력 센서 중 적어도 하나를 포함하는,
OF 케이블의 유압경보시스템.
The method of claim 1,
The pressure measuring unit,
Including at least one of a pressure gauge and a pressure sensor for measuring the pressure of the insulating oil,
OF cable hydraulic alarm system.
제 1 항에 있어서,
상기 압력 측정부는,
상기 절연유 압력이 상기 기준 압력보다 낮으면 정상 동작임을 알리는 상기 제1 경보를 발생시키며, 상기 유압 점검부로 상기 제1 경보에 대응하는 제1 신호를 출력하는,
OF 케이블의 유압경보시스템.
The method of claim 1,
The pressure measuring unit,
When the insulating oil pressure is lower than the reference pressure, generating the first alarm notifying that the operation is normal, and outputting a first signal corresponding to the first alarm to the hydraulic pressure check unit,
OF cable hydraulic alarm system.
제 1 항에 있어서,
상기 압력 측정부는,
상기 절연유 압력이 상기 기준 압력보다 높으면 이상 동작임을 알리는 제2 경보를 발생시키고, 상기 유압 점검부로 상기 제2 경보에 대응하는 제2 신호를 출력하는,
OF 케이블의 유압경보시스템.
The method of claim 1,
The pressure measuring unit,
When the insulating oil pressure is higher than the reference pressure, generating a second alarm indicating an abnormal operation, and outputting a second signal corresponding to the second alarm to the hydraulic pressure check unit,
OF cable hydraulic alarm system.
KR1020190135712A 2019-10-29 2019-10-29 Hydraulic pressure alarm system of oil filled cable KR102226460B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190135712A KR102226460B1 (en) 2019-10-29 2019-10-29 Hydraulic pressure alarm system of oil filled cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190135712A KR102226460B1 (en) 2019-10-29 2019-10-29 Hydraulic pressure alarm system of oil filled cable

Publications (1)

Publication Number Publication Date
KR102226460B1 true KR102226460B1 (en) 2021-03-11

Family

ID=75142859

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190135712A KR102226460B1 (en) 2019-10-29 2019-10-29 Hydraulic pressure alarm system of oil filled cable

Country Status (1)

Country Link
KR (1) KR102226460B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826638U (en) * 1981-08-11 1983-02-21 昭和電線電纜株式会社 OF cable oil leak monitoring device
JPH07218371A (en) * 1994-02-03 1995-08-18 Nobuo Watanabe Pressure gage inspecting apparatus
JPH10141086A (en) * 1996-11-08 1998-05-26 Mitsubishi Heavy Ind Ltd Method and device for confirming operation of pressure detecting means
JP2000032622A (en) * 1998-07-14 2000-01-28 Mitsubishi Electric Corp Soundness diagnosing method of gas pressure detecting apparatus, gas pressure detecting apparatus, gas density detecting apparatus, and gas density monitoring apparatus
JP2008131748A (en) * 2006-11-21 2008-06-05 Tokyo Electric Power Co Inc:The Oil pressure monitoring system for of cable
KR200456420Y1 (en) * 2010-10-05 2011-10-28 한국수력원자력 주식회사 Test Equipment for Oil Filled Transformer Mechanical Protective Relays
KR20190000554A (en) * 2017-06-23 2019-01-03 한국전력공사 Apparatus and computer readable recording medium for totally managing supplementary installation of Oil-Filled cable

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826638U (en) * 1981-08-11 1983-02-21 昭和電線電纜株式会社 OF cable oil leak monitoring device
JPH07218371A (en) * 1994-02-03 1995-08-18 Nobuo Watanabe Pressure gage inspecting apparatus
JPH10141086A (en) * 1996-11-08 1998-05-26 Mitsubishi Heavy Ind Ltd Method and device for confirming operation of pressure detecting means
JP2000032622A (en) * 1998-07-14 2000-01-28 Mitsubishi Electric Corp Soundness diagnosing method of gas pressure detecting apparatus, gas pressure detecting apparatus, gas density detecting apparatus, and gas density monitoring apparatus
JP2008131748A (en) * 2006-11-21 2008-06-05 Tokyo Electric Power Co Inc:The Oil pressure monitoring system for of cable
KR200456420Y1 (en) * 2010-10-05 2011-10-28 한국수력원자력 주식회사 Test Equipment for Oil Filled Transformer Mechanical Protective Relays
KR20190000554A (en) * 2017-06-23 2019-01-03 한국전력공사 Apparatus and computer readable recording medium for totally managing supplementary installation of Oil-Filled cable

Similar Documents

Publication Publication Date Title
CN105652190B (en) Utilize the switch state inspection of the circuit block of insulated monitor
US9413164B2 (en) Protection system for electrical power distribution system using directional current detection and logic within protective relays
US9112247B2 (en) Battery system
CN105765812B (en) Method for the electric fault in detection circuit
US9714974B2 (en) Device for detecting open phase of connection line of standby transformer in nuclear power plant by using Rogowski coil
CN107731625A (en) A kind of Buchholz relay
CN104426128B (en) Broken neutral line detects circuit and corresponding residual current circuit breaker
CN110121755B (en) Capacitor with a capacitor element
JP2012145363A (en) Failure detection and protection circuit of dc power supply system
KR102226460B1 (en) Hydraulic pressure alarm system of oil filled cable
US10530149B2 (en) Methods for detecting an interruption of an active conductor in an ungrounded direct-voltage power supply system
CN212007636U (en) SF6 density relay inspection gas circuit connecting device
EP2961919B1 (en) Subsea electrical unit and system
KR101444921B1 (en) APPARATUS AND METHOD FOR test of instant pressure rise detecting switch
KR101073056B1 (en) A system and method for detecting faults of gas insulated switchgear
US11150282B2 (en) Meter arranged to open a switching member when the upstream voltage falls below a threshold voltage
US9969341B2 (en) Assistance device and method for a power generation system of an aircraft
US11277007B2 (en) Power conversion device, power system and method of suppressing reactive power in power system
CN114355250A (en) Detection apparatus based on low-voltage electrical fault
US11385268B2 (en) Bypass detection modules and related devices and methods
CN103904773B (en) The shunting device of controller switching equipment and the control method of distribution network
CN207148266U (en) A kind of device for realizing high-voltage switch gear three-phase mechanical locking
JP2018046636A (en) Apparatus and method for preventing harmonic resonance
CN208539573U (en) A kind of phase-change switch that can prevent detection automatically
EP2469674A1 (en) Protective device for electrical installations

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant