KR102225166B1 - Transparent flood wall and construction method thereof - Google Patents

Transparent flood wall and construction method thereof Download PDF

Info

Publication number
KR102225166B1
KR102225166B1 KR1020200150398A KR20200150398A KR102225166B1 KR 102225166 B1 KR102225166 B1 KR 102225166B1 KR 1020200150398 A KR1020200150398 A KR 1020200150398A KR 20200150398 A KR20200150398 A KR 20200150398A KR 102225166 B1 KR102225166 B1 KR 102225166B1
Authority
KR
South Korea
Prior art keywords
post
defense
vertical reinforcement
submerged
reinforcement part
Prior art date
Application number
KR1020200150398A
Other languages
Korean (ko)
Inventor
장정수
Original Assignee
(주)대도엔텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)대도엔텍 filed Critical (주)대도엔텍
Priority to KR1020200150398A priority Critical patent/KR102225166B1/en
Application granted granted Critical
Publication of KR102225166B1 publication Critical patent/KR102225166B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • E04H9/145Floods

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a transparent flood wall which allows looking at beautiful scenery in normal times, can increase resistance to water pressure in case of flooding such as a tsunami, and is economical, and a construction method thereof. The transparent flood wall comprises: support units including posts; a flood protection unit including a flood protection wall supported by the support units; a rear cover; and vertical reinforcement units for increasing support force together with the support units. The transparent flood wall can prevent cracks by coupling portions of the flood protection unit which have a groove shape formed by cutting side portions thereof, can flexibly deal with water pressure when water overflows through the vertical reinforcement units and horizontal reinforcement units, can include first vertical reinforcement unit coupling holes which couple the vertical reinforcement units and include horizontal and vertical holes so that during construction, second coupling members are previously coupled to the vertical reinforcement units and then disposed and fastened in the field, thereby shortening the construction time, and enables the support units to be manufactured to the same size and then constructed in the field by only varying the positions of the vertical and horizontal reinforcement units, thereby ensuring economic feasibility.

Description

투명 침수 방어벽 및 이의 시공방법{Transparent flood wall and construction method thereof}Transparent flood wall and construction method thereof

본 발명은 평상시 미려한 풍광을 조망할 수 있으면서 해일과 같은 물의 범람시 수압에 대한 저항을 높이면서 경제적인 투명 침수 방어벽 및 이의 시공방법에 관한 것이다.The present invention relates to an economical transparent submerged defense wall and a construction method thereof while increasing resistance to water pressure when flooding of water such as a tsunami while allowing a beautiful scenery to be viewed normally.

연안(沿岸)에는 물의 범람을 방지하여 수해를 방지하기 위한 콘크리트 등으로 형성된 옹벽구조물이 형성된다.On the coast, a retaining wall structure formed of concrete, etc. is formed to prevent flooding of water and prevent flood damage.

그런데 기상 이변이나 태풍 등에 의하여 상기 옹벽구조물의 높이보다 수위가 높아지는 일이 종종 발생함에 따라, 상기 옹벽구조물에 별도의 홍수범람 방지장치를 설치하여 사용하고 있다.However, as it often occurs that the water level rises higher than the height of the retaining wall structure due to abnormal weather or typhoons, a separate flood inundation prevention device is installed and used in the retaining wall structure.

종래의 기술을 살펴보면, 한국등록특허공보 제10-1565147호(이하, '특허문헌 1'이라 함)"투명 홍수벽"은 옹벽구조물에 투명 차수부를 설치하여 물의 범람을 방지하면서 주변 경관성을 높일 수 있도록 구성되어 있다.Looking at the conventional technology, Korean Patent Publication No. 10-1565147 (hereinafter referred to as'Patent Document 1') "Transparent flood wall" is a retaining wall structure to prevent flooding of water by installing a transparent water shield to increase the surrounding landscape. It is structured to be able to.

그런데 수위가 옹벽구조물 보다 높아져서 투명 차수부의 상측으로 범람하면, 투명 차수부의 하측부위에 큰 힘이 작용한다. 이로 인해, 투명 차수부(50)의 하측 부위가 용이하게 파손될 수 있다.However, when the water level rises higher than the retaining wall structure and overflows to the upper side of the transparent ordering part, a large force acts on the lower part of the transparent ordering part. Due to this, the lower portion of the transparent order portion 50 may be easily damaged.

그리고, 지수 및 범람을 방지하기 위한 구성이 매우 복잡하므로, 시공 작업이 복잡하고, 시공 시간이 장시간 소요되어, 원가가 상승할 수 있다.In addition, since the composition for preventing water and flooding is very complex, the construction work is complicated, the construction time is long, and the cost may increase.

이러한, 문제점을 해결하기 위해 대한민국 등록특허 제10-1715144호(이하, '특허문헌 2'라 함)가 제안된 바 있다.In order to solve this problem, Korean Patent Registration No. 10-1715144 (hereinafter referred to as'Patent Document 2') has been proposed.

상기 특허문헌 2는 위의 문제점을 해결하기 위해 차수벽의 상, 하 위치에 제, 2 지지부를 형성하여 하측의 수압상승에 유연하게 대처할 수 있는 효과를 얻을 수 있었다.In order to solve the above problems, Patent Document 2 has an effect of flexibly coping with an increase in water pressure on the lower side by forming second and second supports at the upper and lower positions of the order wall.

하지만, 상술한 특허문헌 2는 제1, 2 지지부의 결합이 차수벽에 홀을 뚫은 후 볼트/너트를 이용해 결합하는 구조로 이루어져 있어 물의 범람시 수압에 의해 균열이 생겨 파손되는 위험성을 가지고 있었다.However, the above-described Patent Document 2 has a structure in which the first and second support parts are joined using bolts/nuts after drilling holes in the order wall, so there is a risk of damage due to water pressure when water overflows.

또한, 현장상황에 따라 매번 포스트 및 제1, 2 지지부를 제작하여야 하기 때문에 경제성 및 시공성이 저하되는 문제가 발생하였다.In addition, there was a problem that economic feasibility and constructability were deteriorated because the posts and the first and second supports had to be manufactured every time according to the site situation.

상기와 같은 문제점을 해결하기 위한 본 발명에 따른 투명 침수 방어벽 및 이의 시공방법은 침수방어유닛을 구성하는 침수 방어벽에 지주부와 결합하기 위한 결합홈이 홀 형태가 아니라 2개소의 침수 방어벽이 맞닿았을 때에 결합할 수 있도록 측면부를 깎아 형성하여 물의 범람시 수압에 의한 파손을 방지할 수 있는 투명 침수 방어벽 및 이의 시공방법을 제공하는데 그 목적이 있다.In the transparent submerged defense wall and its construction method according to the present invention for solving the above problems, two submerged defense walls are in contact with the submerged defense wall constituting the submerged defense unit, not in the form of a hole, but the coupling groove for coupling with the post. The purpose of this is to provide a transparent submerged defense wall and a construction method thereof that can prevent damage due to hydraulic pressure in the event of flooding by shaving the side part so that it can be bonded in the event of water.

본 발명이 또 다른 목적은 침수방어유닛을 수압으로부터 지지하기 위한 지지부 이외에 수직보강부를 더 형성하여 수압에 대응할 수 있으며, 현장상황에 의해 침수방어유닛의 높이가 달라지더라도 수직보강부의 결합위치만을 변경하여 시공하더라도 수압을 충분히 견딜 수 있어 단일 부품 사용으로 인한 경제성 향상 및 구조적 신뢰성을 향상시킬 수 있도록 하는데 있다.Another object of the present invention is to respond to water pressure by forming a vertical reinforcement part in addition to the support part for supporting the immersion defense unit from water pressure, and even if the height of the immersion defense unit varies depending on the field situation, only the coupling position of the vertical reinforcement unit is changed. Even if it is constructed, it can withstand water pressure sufficiently, so that economic efficiency and structural reliability can be improved due to the use of a single component.

본 발명의 또 다른 목적은 수직보강부 이외에 수평보강부 및 보조 수직보강부를 더 형성하여 수압에 충분히 대응할 수 있도록 하는데 있다.Another object of the present invention is to provide a horizontal reinforcement portion and an auxiliary vertical reinforcement portion in addition to the vertical reinforcement portion to sufficiently respond to water pressure.

본 발명의 또 다른 목적은 포스트에 형성된 수평홀과 수직홀로 이루어진 제1 수직보강부 결합홀을 통해 공장에서 사전에 수평보강부에 제2 결합부재를 결합한 후 현장에서 수평홀 및 수직홀에 제2 결합부재를 배치한 후 너트를 체결하여 수직보강부의 결합이 이루어질 수 있어 시공시간을 단축시킬 수 있음은 물론, 시공 후에도 작업자가 쉽게 수직보강부의 위치를 가변시킬 수 있어 현장 상황에 능동적으로 시공이 가능할 수 있도록 하는데 있다.Another object of the present invention is to connect the second coupling member to the horizontal reinforcement part in advance at the factory through the first vertical reinforcement part coupling hole made of a horizontal hole and a vertical hole formed in the post, and then to the horizontal hole and the vertical hole at the site. The vertical reinforcement part can be combined by fastening the nut after placing the coupling member, which shortens the construction time, and the operator can easily change the position of the vertical reinforcement part even after construction, enabling active construction in the field situation. It is supposed to be able to.

본 발명은 침수방어유닛을 구성하는 침수 방어벽에 지주부와 결합하기 위한 결합홈이 홀 형태가 아니라 2개소의 침수 방어벽이 맞닿았을 때에 결합할 수 있도록 측면부를 깎아 형성하여 물의 범람시 수압에 의한 파손을 방지할 수 있다.In the present invention, the coupling groove for coupling with the post is not in the form of a hole in the submerged defense wall constituting the submerged defense unit, but is formed by shaving the side part so that it can be combined when the two submerged defense walls abut. It can prevent breakage.

또한, 침수방어유닛을 수압으로부터 지지하기 위한 지지부 이외에 수직보강부를 더 형성하여 수압에 대응할 수 있으며, 현장상황에 의해 침수방어유닛의 높이가 달라지더라도 수직보강부의 결합위치만을 변경하여 시공하더라도 수압을 충분히 견딜 수 있어 단일 부품 사용으로 인한 경제성 향상 및 구조적 신뢰성을 향상시킬 수 있다.In addition, it is possible to respond to water pressure by forming a vertical reinforcement part in addition to the support part for supporting the immersion defense unit from water pressure, and even if the height of the immersion defense unit varies depending on the site situation, the water pressure can be reduced even if only the joint position of the vertical reinforcement part is changed. As it can withstand enough, it can improve economic efficiency and structural reliability due to the use of a single component.

그리고 수직보강부 이외에 수평보강부 및 보조 수직보강부를 더 형성하여 수압에 충분히 대응할 수 있다.Further, in addition to the vertical reinforcement part, a horizontal reinforcement part and an auxiliary vertical reinforcement part are further formed to sufficiently respond to water pressure.

아울러, 포스트에 형성된 수평홀과 수직홀로 이루어진 제1 수직보강부 결합홀을 통해 공장에서 사전에 수평보강부에 제2 결합부재를 결합한 후 현장에서 수평홀 및 수직홀에 제2 결합부재를 배치한 후 너트를 체결하여 수직보강부의 결합이 이루어질 수 있어 시공시간을 단축시킬 수 있음은 물론, 시공 후에도 작업자가 쉽게 수직보강부의 위치를 가변시킬 수 있어 현장 상황에 능동적으로 시공이 가능할 수 있는 유용한 발명이다.In addition, through the first vertical reinforcement unit coupling hole formed in the post and the first vertical reinforcement unit coupling hole, the second coupling member is arranged in the horizontal hole and the vertical hole in the field after the second coupling member is previously coupled to the horizontal reinforcement unit at the factory. It is a useful invention that can be combined with the vertical reinforcement part by fastening the nut afterwards, so that the construction time can be shortened, as well as the operator can easily change the position of the vertical reinforcement part even after construction, enabling active construction in the field situation. .

도 1은 본 발명에 따른 투명 침수 방어벽의 사시도.
도 2는 도 1의 분해 사시도.
도 3은 도 1을 다른 각도에서 도시한 분해 사시도.
1 is a perspective view of a transparent submerged barrier wall according to the present invention.
Figure 2 is an exploded perspective view of Figure 1;
Figure 3 is an exploded perspective view showing Figure 1 from a different angle.

이하, 첨부된 도면을 이용하여 본 발명에 대해 보다 상세하게 살펴보면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

1. 투명 침수 방어벽1. Transparent submerged barrier

우선, 기초콘크리트(1)는 도 1 내지 도 3에서 도시된 바와 같이 통상의 콘크리트로서 지면에는 다수의 앵커볼트(1a)가 형성되어 있다.First, the foundation concrete 1 is a conventional concrete, as shown in FIGS. 1 to 3, and a plurality of anchor bolts 1a are formed on the ground.

다음으로, 지주부(10)는 상기 기초콘크리트(1)의 상측에 배치되는 구성으로 2개소 이상이 일정 간격으로 두고 형성된다.Next, the holding portion 10 is a configuration that is disposed on the upper side of the base concrete 1, and is formed at two or more places at regular intervals.

이러한, 지주부(10)는 기초콘크리트(1)에 형성되어 있는 앵커볼트(1a)가 결합할 수 있는 앵커볼트 고정홀(11a)이 형성되어 도면에서는 도시하지 않았지만 너트를 통해 기초콘크리트(1)에 고정설치되는 바닥면(11)과 상기 바닥면(11)에서 수직방향으로 연장되는 포스트(12)로 이루어져 있다.Such, the holding portion 10 is formed with an anchor bolt fixing hole (11a) to which the anchor bolt (1a) formed in the foundation concrete (1) is formed, and although not shown in the drawing, the foundation concrete (1) through a nut It consists of a bottom surface 11 fixedly installed on and a post 12 extending in a vertical direction from the bottom surface 11.

또한, 상기 포스트(12)는 후면에는 볼트/너트(B1, N1)로 이루어진 제1 결합부재(J1)가 결합할 수 있는 제1 침수방어유닛 결합홀(12a)이 형성되고, 양 측면으로는 제1 수직보강부 결합홀(12b)이 형성된다.In addition, the post 12 has a first immersion protection unit coupling hole 12a to which a first coupling member J1 made of a bolt/nut (B1, N1) can be coupled on the rear side thereof, and on both sides of the post 12 The first vertical reinforcement part coupling hole 12b is formed.

더욱 구체적으로는, 상기 포스트(12)는 전면에는 전면에서 후면방향으로 연장되되 관통되지 않는 홈형태로 이루어진 홈부(12c)가 형성되어 있고, 상기 홈(12c)과 마주하는 후면에 상술한 제1 침수방어유닛 결합홀(12a)이 형성된다.More specifically, the post 12 has a groove portion 12c formed in a groove shape extending from the front to the rear direction but not penetrating through the front surface, and the above-described first The immersion defense unit coupling hole 12a is formed.

또한, 상기 홈부(12c)를 기준으로 양 측면에는 제1 수직보강부 결합홀(12b)이 형성된 구조로 이루어져 있다.In addition, first vertical reinforcement part coupling holes 12b are formed on both sides of the groove part 12c.

여기서, 상기 포스트(12)에 형성되어 있는 제1 수직보강부 결합홀(12b)은 전면에서 후면방향으로 연장되는 수평홀(H)과 상기 수평홀(H)에서 수직 하향되게 형성되는 수직홀(V)이 연결된 구조로 이루어져 있다.Here, the first vertical reinforcement part coupling hole 12b formed in the post 12 is a horizontal hole H extending from the front to the rear and a vertical hole formed vertically downward from the horizontal hole H. V) consists of a connected structure.

특히, 상술한 제1 수직보강부 결합홀(12b)은 수직방향으로 다수가 일정간격으로 형성될 수 있다.In particular, a plurality of the first vertical reinforcing part coupling holes 12b described above may be formed at regular intervals in the vertical direction.

다음으로, 침수방어유닛(20)은 기초콘크리트(1) 상의 지주부(10)의 전면에 배치되어 제내지 반대편의 강, 호수 또는 바다에서의 물의 범람을 막을 수 있도록 형성되는 구성이다.Next, the immersion defense unit 20 is disposed on the front side of the holding portion 10 on the base concrete 1 to be formed to prevent flooding of water in a river, lake, or sea opposite to the paper mill.

이러한, 침수방어유닛(20)은 제1 결합부재(J1)가 결합할 수 있도록 일측면 또는 양 측면의 측단부에서 내측방향으로 연장되며 수직방향으로 장공형태로 이루어진 결합홈(21a)을 포함하는 침수 방어벽(21)을 포함하여 이루어져 있다.The immersion defense unit 20 includes a coupling groove 21a extending inward from the side end portions of one or both sides so that the first coupling member J1 can be coupled and having a long hole shape in the vertical direction. Consists of including a flooded barrier (21).

여기서, 상기 결합홈(21a)은 홀 형태로 가공된 것이 아니라 침수 방어벽(21)의 측단부 부터 시작하여 수평방향으로 깍아 형성되되 수직방향으로는 장공형태로 형성된 구조로 이루어져 외력에 의핸 균열을 최소화할 수 있는 형태로 제작되며, 상기 침수 방어벽(21)은 투명재질로 이루어진 것으로 이중강화유리 또는 그에 상응하는 강도를 지닌 재질로 이루어질 수 있다.Here, the coupling groove (21a) is not processed in the form of a hole, but is formed by cutting in the horizontal direction starting from the side end of the submerged barrier 21, but is formed in a long hole shape in the vertical direction to minimize cracks caused by external force. The immersion barrier 21 is made of a transparent material and may be made of double tempered glass or a material having a corresponding strength.

또한, 상기 침수방어유닛(20)을 구성하는 침수 방어벽(21)의 상측으로는 상단 연결재(22)가 더 포함되어 구성될 수 있다.In addition, an upper connecting member 22 may be further included on the upper side of the immersion defense wall 21 constituting the immersion defense unit 20.

다음으로, 후면커버(30)는 상기 침수 방어벽유닛(20)을 구성하는 침수 방어벽(21)의 후면에 배치되어 제2 침수방어유닛 결합홀(32)을 형성하여 지주부(10)의 포스트(12)와 함께 제1 결합부재(J1)에 의해 체결되어 침수방어유닛(20)을 지주부(10)에 고정시키기 위한 구성이다.Next, the rear cover 30 is disposed on the rear surface of the immersion defense wall 21 constituting the immersion defense wall unit 20 to form a second immersion defense unit coupling hole 32 to form a post of the post 10 ( 12) is fastened by the first coupling member (J1) together with the structure for fixing the immersion defense unit 20 to the holding portion (10).

다음으로, 수직보강부(40)는 지주부(10)에 결합되어 물의 범람시 발생하는 수압을 지지부(10)와 함께 지지하기 위해 형성되는 구성이다.Next, the vertical reinforcement part 40 is coupled to the holding part 10 and is formed to support the water pressure generated when the water overflows together with the support part 10.

이러한, 수직보강부(40)는 지주부(10)의 포스트(12)에 형성되어 있는 제1 수직보강부 결합홀(12)과 대응하는 제2 수직보강부 결합홀(42)을 포함하여 구성되어 제2 결합부재(J2)에 의해 고정 결합할 수 있도록 되어 있다.The vertical reinforcement part 40 comprises a first vertical reinforcement part coupling hole 12 and a second vertical reinforcement part coupling hole 42 formed in the post 12 of the holding part 10 It is designed to be fixedly coupled by the second coupling member (J2).

여기서, 상기 제2 수직보강부 결합홀(42)과 이와 대응하는 포스트(12)의 제1 수직보강부 결합홀(12b)은 수직방향으로 일정간격 이격되어 다수가 형성될 수 있다.Here, a plurality of the second vertical reinforcement part coupling holes 42 and the first vertical reinforcement part coupling holes 12b of the post 12 corresponding thereto may be formed at regular intervals in the vertical direction.

상기와 같은 수직보강부(40)는 지주부(10)를 구성하는 포스트(12)의 양 측면 및 상측면을 감싸는 형상으로 구성된다.The vertical reinforcement portion 40 as described above is configured in a shape surrounding both side surfaces and upper side surfaces of the post 12 constituting the holding portion 10.

한편, 본 발명에서는 상기 지주부(10)의 포스트(12)의 전면에는 포스트(12)에 형성되어 있는 홈부(12c)를 덮을 수 있도록 볼트(B)에 의해 결합하되 포스트(12)의 제1 수직보강부 결합홀(12b)의 수평홀(H)에 결합되는 제1 수직보강부 결합홀(12b)의 개수만큼 형성되는 고정턱(51)을 포함하는 전면커버(50)가 더 형성될 수 있다.On the other hand, in the present invention, the front of the post 12 of the post portion 10 is coupled by a bolt (B) so as to cover the groove portion 12c formed in the post 12, but the first of the post 12 A front cover 50 including a fixed jaw 51 formed as many as the number of first vertical reinforcement part coupling holes 12b coupled to the horizontal hole H of the vertical reinforcement part coupling hole 12b may be further formed. have.

여기서, 상술한 지주부(10)의 포스트(12)를 구성하는 제1 수직보강부 결합홀(12b)은 앞서 설명한 것과 같이 수평홀(H)과 수직홀(V)로 이루어져 있는데, 상기 수평홀(H)과 수직홀(V)은 제2 결합부재(J2)를 구성하는 제2 볼트(B2)가 결합할 수 있는 크기로 형성하여야 하며, 상기 수직방향으로 하향 연장되는 수직홀(V)은 제2 결합부재(J2)의 볼트(B2) 결합시 전면커버(50)의 고정턱(51)과 간섭이 발생하지 않으면서 고정턱(51)에 의해 수직홀(V)에 삽입 결합된 볼트(B2)가 상하방향으로 거동이 이루어지지 않는 깊이로 형성하는 것이 좋다.Here, the first vertical reinforcement part coupling hole 12b constituting the post 12 of the post part 10 described above is composed of a horizontal hole H and a vertical hole V, and the horizontal hole (H) and the vertical hole (V) should be formed in a size that can be coupled to the second bolt (B2) constituting the second coupling member (J2), the vertical hole (V) extending downward in the vertical direction When the bolt (B2) of the second coupling member (J2) is coupled, a bolt inserted into the vertical hole (V) by the fixed jaw (51) without causing interference with the fixed jaw (51) of the front cover (50) ( It is better to form B2) to a depth where it does not move in the vertical direction.

또한, 본 발명에서는 지주부(10)의 포스트(12)와 침수방어유닛(20)의 침수 방어벽(21) 사이와, 후면커버(40)와 침수 방어벽(21) 사이에는 제1, 2 지수재(E1, E2)가 더 포함되어 구성될 수 있다.In addition, in the present invention, between the post 12 of the post part 10 and the immersion defense wall 21 of the immersion defense unit 20, and between the rear cover 40 and the immersion defense wall 21, the first and second waterstop materials (E1, E2) may be further included.

또한, 본 발명에서의 수직보강부(40)에서 연장되는 형태이며, 원형 또는 장공홀 형태의 수평보강부 결합홀(41)을 양 단부에 형성한 수평보강부(60)가 더 포함되어 구성될 수 있다.In addition, it is a form extending from the vertical reinforcement part 40 in the present invention, and the horizontal reinforcement part 60 formed at both ends of the horizontal reinforcement part coupling hole 41 in the form of a circular or long hole is further included to be configured. I can.

상기 수평보강부(60)는 수직보강부(40)와 수직보강부(40) 사이에 형성되어 각각의 수직보강부(40)를 연결할 수 있는 형태로 형성될 수도 있다.The horizontal reinforcing part 60 may be formed between the vertical reinforcing part 40 and the vertical reinforcing part 40 to connect each of the vertical reinforcing parts 40 to each other.

특히, 상기 수평보강부(60)는 수직보강부(40)에서 연장되는 보조 수직보강부(70)를 더 포함하여 구성할 수 있으며, 상기와 같이 보조 수직보강부(70)가 형성될 경우에는 지주부(10)의 포스트(12)에 형성된 수직보강부 결합홀(12b)에 결합할 수 있는 보조 수직보강부 결합홀(71)을 더 포함하여 구성할 수 있다.In particular, the horizontal reinforcement part 60 may further include an auxiliary vertical reinforcement part 70 extending from the vertical reinforcement part 40, and when the auxiliary vertical reinforcement part 70 is formed as described above, It may be configured to further include an auxiliary vertical reinforcement part coupling hole 71 that can be coupled to the vertical reinforcement part coupling hole 12b formed in the post 12 of the holding part 10.

2. 투명 침수 방어벽 시공방법2. Construction method of transparent submerged barrier

상기와 같은 구성으로 이루어진 본 발명에 따른 투명 침수 방어벽의 시공방법에 대해 살펴보면 다음과 같다.A method of constructing a transparent submerged defense wall according to the present invention having the above configuration is as follows.

가. 지주부 설치단계 end. Steps to install the support

본 단계는 기초콘크리트(1)에 지주부(10)를 설치하기 위한 단계이다.This step is a step for installing the strut 10 on the foundation concrete (1).

본 단계를 실시하기 위해서는 우선 기초콘크리트(1)의 바탕면을 정리하는 과정과 기초콘크리트(1)에 앵커볼트(1a)를 설치하는 과정이 선행되어야 한다.In order to carry out this step, first, the process of arranging the base surface of the foundation concrete 1 and the process of installing the anchor bolts 1a on the foundation concrete 1 must be preceded.

그런 후, 지주부(10)를 구성하는 바닥면(11)의 앵커볼트 고정홀(11a)에 앵커볼트(1a)를 결합할 수 있도록 지주부(10)를 배치하고 통상의 너트(도면에 미도시)를 체결하여 지주부(10)의 설치를 완료할 수 있게 된다.Thereafter, the support portion 10 is disposed so that the anchor bolt 1a can be coupled to the anchor bolt fixing hole 11a of the bottom surface 11 constituting the support portion 10, and a conventional nut (not shown in the drawing) Si) it is possible to complete the installation of the holding portion (10).

나. 침수방어유닛 설치단계 I. Immersion Defense Unit Installation Step

본 단계는 지주부(10)의 설치 이후 지주부(10)를 기준으로 제내지 반대 방향으로 침수방어유닛(20)을 설치하기 위한 단계이다.This step is a step for installing the immersion defense unit 20 in a direction opposite to the paper-making base with respect to the holding portion 10 after the installation of the holding portion 10.

본 단계는 침수방어유닛(20)을 구성하는 투명 침수방어벽(21)을 지주부(10)를 기준으로 제내지 반대 방향으로 배치하되, 지주부(10)가 설치된 위치에 2개소의 투명 침수방어벽(21)이 맞닿도록 배치한다.In this step, the transparent immersion defense wall 21 constituting the immersion defense unit 20 is disposed in a direction opposite to the paper base with respect to the holding part 10, but there are two transparent immersion defense walls at the position where the support part 10 is installed. Arrange so that (21) abuts.

또한, 투명 침수방어벽(21)을 기준으로 제내지 반대방향으로는 후면커버(30)를 배치한 후 후면커버(30)의 제2 침수방어유닛 결합홀(32), 침수방어유닛(20)을 구성하는 침수 방어벽(21)의 결합홈(21a), 지주부(10)를 구성하는 포스트(12)의 제1 침수 방어유닛 결합홀(12a)에 제1 결합부재(J1)를 결합하여 기초콘크리트(1)에 고정설치된 지주부(10)에 침수방어유닛(20)을 고정 설치하여 본 단계를 완료할 수 있다.In addition, after disposing the rear cover 30 in the direction opposite to the paper-making based on the transparent submerged defense wall 21, the second submerged defense unit coupling hole 32 and the submerged defense unit 20 of the rear cover 30 are opened. The first coupling member (J1) is coupled to the first immersion defense unit coupling hole (12a) of the post (12) constituting the submerged defense wall (21) and the post (12) constituting the base concrete. (1) It is possible to complete this step by fixing the immersion defense unit 20 to the holding unit 10 fixedly installed in (1).

여기서, 상기 투명 침수방어벽(21)의 결합홈(21a)은 홀 형태로 가공된 것이 아니라 측면을 깍아 가공한 후 2개소의 투명 침수방어벽(21)을 맞대어 놓은 후 포스트(12)와 후면커버(30)를 이용해 결합되는 구조로 이루어져 있어 설치 완료 후 물의 범람이 발생하더라도 침수방어유닛(20)의 침수 방어벽(21)의 균열이 발생하는 않는 구조로 이루어져 내구성을 향상시킬 수 있는 효과를 얻을 수 있게 된다.Here, the coupling groove (21a) of the transparent submerged defense wall (21) is not processed in the form of a hole, but after the side is cut and processed, the two transparent submerged defense walls (21) are butted, and the post (12) and the rear cover ( 30), so that even if water overflows after installation is completed, the submerged defense wall 21 of the submerged defense unit 20 has a structure that does not crack, so that the effect of improving the durability can be obtained. do.

다. 수직보강부 설치단계 All. Installation stage of vertical reinforcement part

본 단계는 침수방어유닛(20)을 지지하여 수압을 견디도록 형성되는 지지부(10)에 추가의 지지력을 형성하기 위한 수직보강부(40)를 설치하는 단계이다.This step is a step of installing a vertical reinforcement part 40 for forming an additional support force on the support part 10 formed to withstand the water pressure by supporting the immersion defense unit 20.

이를 위해, 본 발명에서는 지주부(10)를 구성하는 포스트(12)에 수직보강부(40)를 배치한 후 포스트(12)의 수직보강부 결합홀(12b)과 수직보강부(40)의 제2 수직 보강부 결합홀(42)에 제2 결합부재(J2)를 결합하여 완료할 수 있게 된다.To this end, in the present invention, after the vertical reinforcement part 40 is disposed on the post 12 constituting the post part 10, the vertical reinforcement part coupling hole 12b of the post 12 and the vertical reinforcement part 40 are It can be completed by coupling the second coupling member (J2) to the second vertical reinforcing part coupling hole (42).

여기서, 상기 지주부(10)를 구성하는 포스트(12)의 제2 수직보강부 결합홀(12b)은 수평홀(H)과 수직홀(V)로 이루어지고, 수평홀(H)은 전면이 개방되도록 전면에서 후면 방향으로 연장되어 형성되고, 상기 수평홀(H)과 연결되는 수직홀(V)은 수평홀(H)에서 수직방향으로 하향 연장되는 형태로 형성되어 있으며, 포스트(12)의 전면에 형성된 홈부(12c)를 덮을 수 있도록 형성되되, 상기 수직홀(V)에 결합하는 고정턱(51)을 포함한 전면커버(50)가 형성되어 있다.Here, the second vertical reinforcement part coupling hole 12b of the post 12 constituting the holding part 10 is composed of a horizontal hole H and a vertical hole V, and the horizontal hole H has a front surface. It is formed extending from the front to the rear so as to be opened, and the vertical hole (V) connected to the horizontal hole (H) is formed in a form extending downward from the horizontal hole (H) in the vertical direction. The front cover 50 is formed to cover the groove portion 12c formed on the front surface, and includes a fixed jaw 51 coupled to the vertical hole V.

따라서, 본 단계는 수직보강부(40)를 배치한 상태에서 제2 결합부재(J2)의 볼트(B2)를 수직보강부(40)의 제2 수직보강부 결합홀(42) 및 포스트(12)의 제1 수직보강부 결합홀(12b)에 결합한 후 너트(N2)를 체결하여 고정한 후 전면커버(50)를 볼트(B)를 이용해 체결하면 전면커버(50)의 고정턱(51)에 의해 제2 결합부재(J2)의 볼트(B2)가 수직홀(V)에서 상,하 거동이 이루어지지 않는 고정된 상태로 결합되어 설치를 완료할 수 있다.Therefore, in this step, in the state in which the vertical reinforcement part 40 is disposed, the bolt B2 of the second coupling member J2 is attached to the second vertical reinforcement part coupling hole 42 and the post 12 of the vertical reinforcement part 40. ) Of the first vertical reinforcement part coupling hole (12b), and then fasten the nut (N2) and fasten the front cover (50) with a bolt (B) to the fixing jaw (51) of the front cover (50). Accordingly, the bolt B2 of the second coupling member J2 is coupled in a fixed state in which the vertical hole V does not move up and down, so that the installation can be completed.

한편, 본 발명에서는 상기 침수방어유닛 설치단계에서 지주부(10)의 포스트(12)와 침수방어유닛(20)의 침수 방어벽(21) 사이, 후면커버(30)와 침수 방어벽(21) 사이에는 제1, 2 지수재(E1, E2)가 더 포함되어 구성될 수 있다.On the other hand, in the present invention, in the immersion defense unit installation step, between the post 12 of the holding unit 10 and the immersion defense wall 21 of the immersion defense unit 20, the rear cover 30 and the immersion defense wall 21 The first and second water resistant materials E1 and E2 may be further included.

또한, 상기 침수방어유닛 설치단계에서 침수 방어벽(21)의 상단에는 상단 연결재(22)를 결합하는 단계가 더 포함될 수 있고, 침수 방어벽(21)의 하단에는 제3 지수재(E3)를 설치하는 단계가 더 포함될 수 있다.In addition, in the immersion defense unit installation step, a step of coupling the upper connector 22 to the upper end of the immersion defense wall 21 may be further included, and a third water stopper (E3) is installed at the lower end of the immersion defense wall 21. Further steps may be included.

그리고 상기 수직보강부 설치단계에서 침수방어유닛(20)을 구성하는 침수 방어벽(21)에는 수평방향으로 연장되며, 수직보강부(40)와 볼트/너트(B3, N3)로 이루어진 제3 연결부재(J3)에 의해 수평보강부(60)가 결합되는 수평보강부 설치단계가 더 포함되어 구성될 수 있다.And in the installation step of the vertical reinforcement unit, the third connection member extends in the horizontal direction to the immersion defense wall 21 constituting the immersion defense unit 20, and consists of a vertical reinforcement part 40 and bolts/nuts (B3, N3). The horizontal reinforcement unit installation step in which the horizontal reinforcement unit 60 is coupled by (J3) may be further included and configured.

여기서, 상기 수평보강부 설치단계에서 수평보강부(60)에는 보조 수직보강부(70)가 더 포함되어 구성될 수 있다.Here, in the step of installing the horizontal reinforcing part, the horizontal reinforcing part 60 may further include an auxiliary vertical reinforcing part 70 to be configured.

또한, 상기 수직보강부 설치단계에서 침수 방어벽(21)과 수직보강부(40) 사이에는 실링재(S)를 설치하는 단계가 더 포함될 수 있으며, 특히, 수직보강부(40)에 수평보강부(60) 및 보조 수직보강부(70)가 형성될 경우에는 침수 방어벽(21)과 수직보강부(40), 수평보강부(60) 및 보조 수직보강부(70) 사이에 실링재(S)를 설치하는 단계를 포함할 수 있다.In addition, the step of installing a sealing material (S) between the submerged barrier wall 21 and the vertical reinforcement part 40 in the vertical reinforcement part installation step may be further included, and in particular, the horizontal reinforcement part ( 60) and the auxiliary vertical reinforcement part 70 is formed, a sealing material (S) is installed between the submerged defense wall 21 and the vertical reinforcement part 40, the horizontal reinforcement part 60 and the auxiliary vertical reinforcement part 70 It may include the step of.

상기와 같은 구성으로 이루어진 본 발명에 따른 투명 침수 방어벽의 작용효과에 대해 살펴보면 다음과 같다.Looking at the effect of the transparent submerged barrier according to the present invention having the configuration as described above is as follows.

우선, 본 발명에 따른 투명 침수 방어벽(100)은 지주부(10)와 침수방어유닛(20)을 구성하는 침수 방어벽(21)의 결합시 침수 방어벽(21)에 홀을 형성하지 않고, 단부에 홈 형태로 형성한 결합홈(21a)을 형성하여 결합하는 구조로 이루어져 있어 물의 범람시 수압이 작용하더라도 균열이 발생하지 않아 내구성이 향상되는 효과를 얻을 수 있다.First, the transparent immersion defense wall 100 according to the present invention does not form a hole in the immersion defense wall 21 when the column 10 and the immersion defense wall 21 constituting the immersion defense unit 20 are combined, and at the end Since it is composed of a structure that combines by forming a coupling groove (21a) formed in the form of a groove, cracks do not occur even when water pressure acts upon flooding of water, thereby improving durability.

또한, 본 발명에서는 침수방어유닛(20)을 지지하기 위한 지주부(10) 이외에 수직보강부(40)를 지주부(10)에 연결하여 물의 범람시 발생하는 수압에 대응할 수 있다.In addition, in the present invention, by connecting the vertical reinforcement portion 40 to the holding portion 10 in addition to the holding portion 10 for supporting the immersion defense unit 20, it is possible to respond to the water pressure generated when the water overflows.

즉, 지주부(10)에 수직보강부(40)가 연결된 상태이기 때문에 지주부(10)의 크기는 그대로 형성한 상태에서 수직보상부(40)의 길이만 조정하더라도 충분한 수압을 견딜 수 있게 된다.That is, since the vertical reinforcement portion 40 is connected to the holding portion 10, it is possible to withstand sufficient hydraulic pressure even if only the length of the vertical compensation portion 40 is adjusted while the size of the holding portion 10 is formed as it is. .

여기서, 수압은 하측에서 작용하는 힘이 상측에서 작용하는 힘보다 더 크게 되는데, 본 발명에서의 지주부(10)의 포스트(12)에 형성된 제1 침수방어유닛 결합홀(12a)과 수직보강부(40)의 제2 수직보강부 결합홀(42)을 수직방향으로 다수를 일정간격으로 이격시켜 형성함으로써, 지주부(10)의 크기는 고정시켜 어떠한 현장에서도 작용하도록 하고, 수직보강부(40)를 침수방어유닛(10)의 높이에 따라 위치를 가변하여 설치하더라도 수압을 충분히 견딜 수 있어 경제성 향상, 구조적인 신뢰성 향상 및 지주부(10)와 수직보강부(40) 사이의 공간을 통해 시야 확보가 가능하여 투시면적을 최대화 시킬 수 있는 효과를 얻을 수 있게 된다.Here, the hydraulic pressure is greater than the force acting on the lower side than the force acting on the upper side, and the first immersion defense unit coupling hole 12a formed in the post 12 of the holding part 10 in the present invention and the vertical reinforcing part By forming a plurality of the second vertical reinforcement part coupling holes 42 of (40) vertically spaced apart at regular intervals, the size of the holding part 10 is fixed so that it can act at any site, and the vertical reinforcement part 40 ) Is installed in a variable position according to the height of the immersion defense unit 10, so it can withstand water pressure sufficiently, thus improving economic efficiency, improving structural reliability, and viewing through the space between the holding unit 10 and the vertical reinforcing unit 40 As it can be secured, the effect of maximizing the perspective area can be obtained.

또한, 본 발명에서는 수평보강부(60)를 더 설치할 수 있는데, 이럴 경우 침수방어유닛(20)의 하측에서 수평방향으로의 수압 저항력이 향상되어 구조설계시 지주부(10) 및 침수방어유닛(20)의 크기를 작게 형성하더라도 충분히 수압에 저항할 수 있어 경제성을 향상시킬 수 있는 효과를 얻을 수 있으며, 수평보강부(60)의 수평보강부 결합홀(61)을 원형 또는 장공홀 형태로 제작하여 시공시 오차가 발생하더라도 이에 능동적으로 대응하여 연결하여 시공성을 향상시킬 수 있는 효과도 얻을 수 있게 된다.In addition, in the present invention, a horizontal reinforcing part 60 may be further installed. In this case, the water pressure resistance from the lower side of the immersion defense unit 20 in the horizontal direction is improved, so that the holding part 10 and the immersion defense unit ( Even if the size of 20) is small, it is possible to sufficiently resist water pressure to obtain an effect of improving economic efficiency, and the horizontal reinforcement part coupling hole 61 of the horizontal reinforcement part 60 is manufactured in a circular or long hole shape. Thus, even if an error occurs during construction, the effect of actively responding to and connecting it to improve the workability can also be obtained.

특히, 상술한 수평보강부(60)에 보조 수직보강부(70)를 결합시킬 경우, 수직보강부(40)도 지주부(10)와 마찬가지로 일정한 크기로 규격화시켜 제작 가능함으로서 다양한 현장에 규격화된 부품의 적용이 가능하여 경제성을 향상시킬 수 있게 된다.In particular, when the auxiliary vertical reinforcement part 70 is combined with the horizontal reinforcement part 60 described above, the vertical reinforcement part 40 can also be standardized and manufactured in a certain size like the holding part 10, so that it is standardized in various sites. The application of parts is possible, so that economic efficiency can be improved.

여기서, 상기 수직보강부(40), 수평보강부(60) 및 보조 수직보강부(70)는 침수방어유닛(20)을 구성하는 투명 침수방어벽(21)과 직접 닿지 않고 실링재(S)에 의해 간접 접촉되어 있어 수압발생시 투명 침수방어벽(21)의 파손 방지는 물론 완충작용을 통해 수압에 더욱 능동적으로 저항할 수 있게 된다.Here, the vertical reinforcement part 40, the horizontal reinforcement part 60 and the auxiliary vertical reinforcement part 70 do not directly contact the transparent immersion defense wall 21 constituting the immersion defense unit 20, but by a sealing material (S). Since it is in indirect contact, it is possible to more actively resist water pressure through buffering action as well as preventing damage to the transparent immersion barrier 21 when water pressure occurs.

한편, 본 발명은 상술한 지주부(10)의 포스트(12)에 형성되어 있는 제1 수직보강부 결합홀(12b)이 수평홀(H)과 수직홀(V)로 이루어져 있다.On the other hand, in the present invention, the first vertical reinforcement part coupling hole 12b formed in the post 12 of the holding part 10 is composed of a horizontal hole H and a vertical hole V.

따라서, 시공시 작업자가 수직보강부(40)의 제2 수직보강부 결합홀(42)에 제2 결합부재(J2)를 미리 결합해 놓은 상태에서 현장에서 설치시에는 제2 결합부재(J2)의 제2 볼트(B2)를 포스트(12)의 제1 수직보강부 결합홀(12b)의 수평홀(H)에 삽입한 후 수직홀(V)에 안착시킨 후 제2 결합부재(J2)의 너트(N2)를 체결하면 설치가 완료되기 때문에 현장에서의 작업시간을 단축할 수 있게 된다.Therefore, during construction, the second coupling member (J2) is pre-coupled to the second vertical reinforcement part coupling hole 42 of the vertical reinforcement part 40, and when installed at the site, the second coupling member (J2) After inserting the second bolt (B2) of the post 12 into the horizontal hole (H) of the first vertical reinforcement part coupling hole (12b) of the post (12) and seated in the vertical hole (V), the second coupling member (J2) Since the installation is completed when the nut (N2) is fastened, the working time in the field can be shortened.

특히, 시공 후에도 쉽게 수직보강부(40)의 위치를 가변시킬 수 있기 때문에 현장 상황에 능동적으로 시공이 가능한 효과를 얻을 수 있게 된다.In particular, since the position of the vertical reinforcement part 40 can be easily changed even after construction, it is possible to obtain an effect that can be actively constructed in the field situation.

더욱이, 본 발명은 지주부(10)의 포스트(12)에 전면커버(50)를 형성하여 제1 결합부재(J1) 및 제2 결합부재(J2)의 노출을 최소화시킴으로써 보행자의 안전 및 미려한 외관을 제공할 수 있는 효과도 얻을 수 있게 되는 것이다.Moreover, the present invention minimizes the exposure of the first coupling member (J1) and the second coupling member (J2) by forming the front cover 50 on the post 12 of the holding portion 10, thereby providing a safe and beautiful appearance for pedestrians. It will also be possible to obtain an effect that can provide.

상술한 실시 예는 본 발명의 가장 바람직한 예에 대하여 설명한 것이지만, 상기 실시 예에만 한정되는 것은 아니며, 본 발명의 기술적 사상을 벗어나지 않는 범위내에서 다양한 변형이 가능하다는 것은 본 발명이 속하는 기술분야에서 통상의 기술자들에게 있어 명백한 것이다.Although the above-described embodiment has been described with respect to the most preferred example of the present invention, it is not limited to the above embodiment, and that various modifications can be made within the scope of the technical spirit of the present invention. It's obvious to the technologists.

J1 : 제1 결합부재 J2 : 제2 결합부재 J3 : 제3 결합부재
1 : 기초콘크리트 1a : 앵커볼트
10 : 지주부
11 : 바닥면 11a : 앵커볼트 고정홀
12 : 포스트
12a : 제1 침수방어유닛 결합홀
12b : 수직보강부 결합홀
H : 수평홀 V : 수직홀
12c : 홈부
20 : 침수방어유닛
21 : 투명 침수 방어벽 21a : 결합홈
22 : 상단 연결재
30 : 후면커버
32 : 제2 침수방어유닛 결합홀
40 : 수직보강부
42 : 제2 수직보강부 결합홀
50 : 전면커버
51 : 고정턱
E1 : 제1 지수재 E2 : 제2 지수재 E3 : 제3 지수재
60 : 수평보강부
61 : 수평보강부 결합홀
70 : 보조 수직보강부
71 : 보조 수직보강부 결합홀
S : 실링재
100 : 투명 침수 방어벽
J1: first coupling member J2: second coupling member J3: third coupling member
1: foundation concrete 1a: anchor bolt
10: support
11: bottom surface 11a: anchor bolt fixing hole
12: post
12a: 1st submerged defense unit coupling hole
12b: vertical reinforcement part coupling hole
H: horizontal hole V: vertical hole
12c: groove
20: immersion defense unit
21: transparent submerged barrier 21a: coupling groove
22: upper connector
30: rear cover
32: second immersion defense unit coupling hole
40: vertical reinforcement part
42: second vertical reinforcement part coupling hole
50: front cover
51: fixed jaw
E1: 1st index material E2: 2nd index material E3: 3rd index material
60: horizontal reinforcement part
61: horizontal reinforcement part coupling hole
70: auxiliary vertical reinforcement part
71: auxiliary vertical reinforcement part coupling hole
S: sealing material
100: transparent submerged barrier

Claims (19)

앵커볼트를 포함하는 기초콘크리트;
상기 기초콘크리트의 앵커볼트에 의해 고정할 수 있도록 앵커볼트 고정홀을 포함하는 바닥면과, 상기 바닥면에서 상측방향으로 연장되어 형성되며 제1 결합부재가 결합할 수 있도록 후면에 형성되는 제1 침수방어유닛 결합홀과 양 측면의 제1 수직보강부 결합홀을 포함하는 포스트로 이루어진 지주부;
상기 기초콘크리트 상에서 지주부의 전면에 배치되며, 상기 제1 결합부재가 결합할 수 있도록 일측면 또는 양 측면으로 측단부에서 내측방향으로 연장되되 수직방향으로 장공형태로 이루어진 결합홈을 포함하는 투명 침수 방어벽을 포함하는 침수방어유닛;
상기 침수방어유닛을 구성하는 투명 침수 방어벽의 후면에 배치되며 지주부의 포스트에 형성된 제1 침수방어유닛 결합홀과 대응하는 제2 침수방어유닛 결합홀을 형성하여 제1 결합부재 및 지주부에 의해 침수방어유닛을 고정하기 위한 후면커버;
상기 지주부를 구성하는 포스트의 제1 수직보강부 결합홀과 대응하는 제2 수직보강부 결합홀을 포함하여 볼트/너트로 이루어진 제2 결합부재에 의해 포스트에 고정 결합되는 수직보강부;를 포함하여 이루어지되,
상기 지주부를 구성하는 포스트는,
전면에서 후면방향으로 연장되는 홈부가 형성되고, 후면에는 제1 결합부재가 결합할 수 있는 제1 침수방어유닛 결합홀을 형성하고 있으며,
상기 전면의 홈부 양 측면으로 수직보강부의 제2 수직보강부 결합홀과 결합하기 위해 볼트/너트로 이루어진 제2 결합부재의 볼트가 결합하되, 전면이 개방되도록 전면에서 후면 방향으로 연장되는 수평홀과 상기 수평홀에서 수직방향으로 하향 연장되는 수직홀로 이루어진 제1 수직보강부 결합홀이 형성되며,
상기 포스트의 전면에는 볼트에 의해 포스트의 전면에 결합하며, 포스트의 제1 수직보강부 결합홀의 수평홀에 결합되는 고정턱을 포함하는 전면커버가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽.
Foundation concrete including anchor bolts;
A bottom surface including an anchor bolt fixing hole so as to be fixed by the anchor bolts of the foundation concrete, and a first submerged formed on the rear surface so as to extend upward from the bottom surface and allow the first coupling member to be coupled A post comprising a defense unit coupling hole and a first vertical reinforcement coupling hole on both sides;
A transparent submerged barrier wall disposed on the front of the pillar on the foundation concrete and extending from the side end to the inward direction on one or both sides so that the first coupling member can be coupled, but including a coupling groove formed in a long hole shape in a vertical direction Immersion defense unit comprising a;
It is disposed on the rear surface of the transparent immersion defense wall constituting the immersion defense unit, and forms a second immersion defense unit coupling hole corresponding to the first immersion defense unit coupling hole formed in the post of the post, and is submerged by the first coupling member and the holding part. A rear cover for fixing the defense unit;
Including; a vertical reinforcement portion fixedly coupled to the post by a second coupling member made of bolts/nuts including a first vertical reinforcement portion coupling hole of the post constituting the post and a second vertical reinforcement portion coupling hole corresponding to the post constituting the post. Done,
The post constituting the holding part,
A groove extending from the front to the rear is formed, and a first immersion protection unit coupling hole to which the first coupling member can be coupled is formed on the rear side,
In order to couple with the second vertical reinforcement part coupling hole of the vertical reinforcement part on both sides of the groove part of the front side, the bolt of the second coupling member consisting of bolts/nuts is coupled, and a horizontal hole extending from the front to the rear so that the front surface is opened. A first vertical reinforcement part coupling hole formed of a vertical hole extending downward in a vertical direction from the horizontal hole is formed,
The front of the post is coupled to the front of the post by bolts, the transparent submerged defense wall characterized in that the configuration further comprises a front cover including a fixed jaw coupled to the horizontal hole of the first vertical reinforcement part coupling hole of the post.
삭제delete 제1항에 있어서, 상기 지주부의 포스트를 구성하는 제1 수직보강부 결합홀의 수직홀은 제2 결합부재의 볼트 결합시 전면커버의 고정턱과의 간섭이 발생하지 않으면서 고정턱에 의해 볼트가 상, 하 방향으로 거동이 이루어지지 않는 깊이로 형성되는 것에 특징이 있는 투명 침수 방어벽.
The bolt according to claim 1, wherein the vertical hole of the first vertical reinforcement part coupling hole constituting the post of the holding part does not interfere with the fixed jaw of the front cover when the second coupling member is bolted. A transparent submerged barrier that is characterized by being formed to a depth that does not move upward or downward.
제1항에 있어서, 상기 지주부를 구성하는 포스트의 제1 수직보강부 결합홀과 수직보강부의 제2 수직보강부 결합홀은 다수가 수직방향으로 형성되되, 일정 간격으로 이격되게 형성하여 침수방어유닛을 구성하는 투명 침수 방어벽의 높이에 따라 수직보강부의 높이 위치를 조절하여 결합하는 것에 특징이 있는 투명 침수 방어벽.
The immersion defense unit according to claim 1, wherein a plurality of the first vertical reinforcement part coupling hole of the post constituting the holding part and the second vertical reinforcement part coupling hole of the vertical reinforcement part are formed in a vertical direction, and are formed to be spaced apart at regular intervals. A transparent submerged defense wall characterized by adjusting and combining the height position of the vertical reinforcement part according to the height of the transparent submerged defense wall constituting a.
제1항에 있어서, 상기 침수방어유닛의 투명 침수 방어벽의 상단에는 상단 연결재가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽.
The transparent submerged defense wall according to claim 1, wherein the upper end of the transparent submerged defense wall of the submerged defense unit further includes an upper end connector.
제1항에 있어서, 상기 지주부의 포스트와 침수방어유닛의 투명 침수 방어벽 사이와 후면커버와 투명 침수 방어벽 사이에는 제1, 2 지수재가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽.
The transparent submerged defense wall according to claim 1, wherein first and second water resistant materials are further included between the post of the post and the transparent submerged barrier of the submerged defense unit, and between the rear cover and the transparent submerged barrier.
제1항에 있어서, 상기 수직보강부는 지주부를 구성하는 포스트의 양 측면 및 상측면을 감싸는 형상으로 이루어진 것에 특징이 있는 투명 침수 방어벽.
The transparent submerged defense wall of claim 1, wherein the vertical reinforcement part has a shape surrounding both side surfaces and upper side surfaces of the posts constituting the post.
제1항에 있어서, 상기 침수방어유닛을 구성하는 투명 침수 방어벽에는 원형 또는 장공홀 형태의 수평보강부 결합홀을 양 단부에 형성하되, 수평방향으로 연장되는 수평보강부가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽.
The method of claim 1, wherein the transparent immersion defense wall constituting the immersion defense unit comprises a circular or long hole-shaped horizontal reinforcement part coupling hole formed at both ends, and further includes a horizontal reinforcement part extending in the horizontal direction. Invisible submerged barriers with teeth.
제8항에 있어서, 상기 수평보강부는 수직보강부에서 연장되는 보조 수직보강부와 결합되는 것에 특징이 있는 투명 침수 방어벽.
The transparent submerged defense wall according to claim 8, wherein the horizontal reinforcement part is coupled with an auxiliary vertical reinforcement part extending from the vertical reinforcement part.
제8항에 있어서, 상기 수직보강부 및 수평보강부와 침수방어유닛의 투명 침수 방어벽 사이에는 실링재가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽.
The transparent submerged defense wall according to claim 8, wherein a sealing material is further included between the vertical and horizontal reinforcing parts and the transparent submerged barrier of the submerged defense unit.
제1항의 투명 침수 방어벽의 시공방법에 있어서,
기초콘크리트 상측의 바탕면을 정리하고, 기초콘크리트에 앵커볼트를 설치한 후 지주부를 구성하는 바닥면의 앵커볼트 고정홀에 앵커볼트 및 너트를 이용해 둘 이상의 지주부를 고정설치하는 지주부 설치단계;
상기 지주부 설치단계 이후에 침수방어유닛의 투명 침수 방어벽을 지주부를 기준으로 제내지 반대 방향에 배치하되, 지주부가 설치된 위치에 2개소의 투명 침수 방어벽이 맞닿도록 배치하고, 제내지 반대방향으로는 후면커버가 배치되도록 한 후 지주부의 제1 침수방어유닛 결합홀, 투명 침수 방어벽에 형성된 결합홈 및 후면커버의 제2 침수방어유닛 결합홀에 제1 결합부재를 체결하여 침수방어유닛을 설치하는 침수방어유닛 설치단계;
상기 지주부 설치단계에서의 지주부를 구성하는 포스트에 수직보강부를 배치한 후 제2 결합부재를 이용해 포스트에 고정 결합하는 수직보강부 설치단계;를 포함하여 이루어진 것에 특징이 있는 투명 침수 방어벽의 시공방법.
In the construction method of the transparent submerged defense wall of claim 1,
Post installation step of arranging the base surface on the upper side of the foundation concrete, installing anchor bolts on the foundation concrete, and then fixing and installing two or more posts using anchor bolts and nuts in the anchor bolt fixing holes on the floor surface constituting the post;
After the post installation step, the transparent submerged defense wall of the submerged defense unit is placed in a direction opposite to the paper base based on the support, but the two transparent submerged defense walls are placed in contact with the support at the position where the support is installed, and in the opposite direction After the rear cover is arranged, the first coupling member is connected to the first immersion defense unit coupling hole of the column, the coupling groove formed in the transparent immersion defense wall, and the second immersion defense unit coupling hole of the rear cover to install the immersion defense unit. Defense unit installation step;
A method for constructing a transparent submerged defense wall characterized by comprising; installing a vertical reinforcement part fixedly coupled to the post using a second coupling member after arranging the vertical reinforcement part on the post constituting the post part in the post part installation step. .
제11항에 있어서, 상기 지주부 설치단계에서 지주부를 구성하는 포스트는,
전면에서 후면방향으로 연장되는 홈부가 형성되고, 후면에는 제1 결합부재가 결합할 수 있는 제1 침수방어유닛 결합홀을 형성하고 있으며, 상기 전면의 홈부 양 측면으로 수직보강부의 제2 수직보강부 결합홀과 결합하기 위해 볼트/너트로 이루어진 제2 결합부재의 볼트가 결합하되, 전면이 개방되도록 전면에서 후면 방향으로 연장되는 수평홀과 상기 수평홀에서 수직방향으로 하향 연장되는 수직홀로 이루어진 제1 수직보강부 결합홀이 형성되며, 상기 포스트의 전면에는 볼트에 의해 포스트의 전면에 결합하며, 포스트의 제1 수직보강부 결합홀의 수평홀에 결합되는 고정턱을 포함하는 전면커버가 더 포함되어 구성되어 있어,
침수방어유닛 설치단계에서 지주부의 포스트와 침수방어유닛의 투명 침수 방어벽 및 후면커버를 제1 결합부재를 통해 결합하고, 수직보강부 설치단계에서 수직보강부를 제2 결합부재를 이용해 결합한 후 포스트의 전면에 전면커버를 결합하여 제1 결합부재가 노출되지 않도록 하는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
The method of claim 11, wherein the post constituting the post in the post installation step,
A groove extending from the front to the rear is formed, and a first immersion protection unit coupling hole is formed on the rear side, and a second vertical reinforcement part of the vertical reinforcement part on both sides of the groove part of the front side In order to couple with the coupling hole, the bolt of the second coupling member made of bolts/nuts is coupled, but a first consisting of a horizontal hole extending from the front to the rear direction so that the front is opened and a vertical hole extending downward in the vertical direction from the horizontal hole. The vertical reinforcement part coupling hole is formed, and the front cover of the post further includes a front cover that is coupled to the front surface of the post by a bolt, and includes a fixed jaw coupled to the horizontal hole of the first vertical reinforcement part coupling hole of the post. It's done,
In the submerged defense unit installation step, the post of the post and the transparent submerged defense wall and the rear cover of the submerged defense unit are joined through a first coupling member, and in the vertical reinforcement installation step, the vertical reinforcement part is joined using a second coupling member, and then the front of the post. A method of constructing a transparent submerged defense wall characterized in that the first coupling member is not exposed by attaching the front cover to.
제12항에 있어서, 상기 수직보강부 설치단계에서의 지주부의 포스트를 구성하는 제1 수직보강부 결합홀의 수직홀은 제2 결합부재의 볼트 결합시 전면커버의 고정턱과의 간섭이 발생하지 않으면서 고정턱에 의해 볼트가 상, 하 방향으로 거동이 이루어지지 않는 깊이로 형성되어 전면커버의 고정턱에 의해 수직보강부가 포스트에서 흔들리지 않고 결합된 상태를 유지하는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
The method of claim 12, wherein the vertical hole of the first vertical reinforcement part coupling hole constituting the post of the post in the vertical reinforcement part installation step does not interfere with the fixed jaw of the front cover when the second coupling member is bolted. Construction of a transparent submerged defense wall characterized by the fact that the vertical reinforcement part is not swayed at the post by the fixed jaw of the front cover and the vertical reinforcement part is formed to a depth where the bolt does not move in the vertical direction by the fixed jaw. Way.
제12항에 있어서, 상기 수직보강부 설치단계에서의 지주부를 구성하는 포스트의 제1 수직보강부 결합홀과 수직보강부의 제2 수직보강부 결합홀은 다수가 수직방향으로 형성되되, 일정 간격으로 이격되게 형성하여 침수방어유닛을 구성하는 투명 침수 방어벽의 높이에 따라 수직보강부의 높이 위치를 조절하여 결합하는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
The method of claim 12, wherein the first vertical reinforcement part coupling hole of the post constituting the post in the vertical reinforcement part installation step and the second vertical reinforcement part coupling hole of the vertical reinforcement part are formed in a vertical direction, at regular intervals. A method of constructing a transparent submerged defense wall characterized in that the height of the vertical reinforcement part is adjusted and combined according to the height of the transparent submerged defense wall constituting the submerged defense unit by being formed at a distance.
제11항에 있어서, 상기 지주부 설치단계에서 침수방어유닛의 투명 침수 방어벽의 상단에 상단 연결재를 결합하는 단계가 포함되어 있는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
12. The method of claim 11, wherein in the step of installing the support, the step of coupling the upper connecting member to the upper end of the transparent submerged defense wall of the submerged defense unit is included.
제11항에 있어서, 상기 침수방어유닛 설치단계에서 지주부의 포스트와 침수방어유닛의 투명 침수 방어벽 사이와 후면커버와 투명 침수 방어벽 사이에는 제1, 2 지수재를 결합하는 단계가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
The method of claim 11, wherein in the installation of the immersion defense unit, the step of coupling the first and second waterstop materials between the post of the holding unit and the transparent immersion defense wall of the immersion defense unit and between the rear cover and the transparent immersion defense wall is further included. A method of constructing a transparent submerged defense wall characterized by one.
제11항에 있어서, 상기 수직보강부 설치단계에서 침수방어유닛을 구성하는 투명 침수 방어벽에는 원형 또는 장공홀 형태의 수평보강부 결합홀을 양 단부에 형성하되, 수평방향으로 연장되는 수평보강부을 설치하는 수평보강부 설치단계가 더 포함되어 구성되는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
12. The method of claim 11, wherein in the installation step of the vertical reinforcement unit, horizontal reinforcement unit coupling holes in the form of circular or long holes are formed at both ends of the transparent submerged defense wall constituting the immersion defense unit, and horizontal reinforcement parts extending in the horizontal direction are installed. A method of constructing a transparent submerged defense wall characterized in that the horizontal reinforcement part installation step is further included.
제17항에 있어서, 상기 수직보강부 설치단계에서 상기 수평보강부에는 수직보강부에서 연장되는 보조 수직 보강부 결합홀을 포함하는 보조 수직보강부를 더 설치하는 것에 특징이 있는 투명 침수 방어벽의 시공방법.
The method of claim 17, wherein in the step of installing the vertical reinforcement part, an auxiliary vertical reinforcement part including an auxiliary vertical reinforcement part coupling hole extending from the vertical reinforcement part is further installed in the horizontal reinforcement part. .
제 11항에 있어서, 상기 수직보강부 설치단계에서 침수방어유닛을 구성하는 투명 침수 방어벽과 수직보강부 사이에 실링재를 설치하는 단계가 더 포함되는 것에 특징이 있는 투명 침수 방어벽의 시공방법.12. The method of claim 11, further comprising installing a sealing material between the transparent submerged defense wall and the vertical reinforcement unit constituting the submerged defense unit in the vertical reinforcement installation step.
KR1020200150398A 2020-11-11 2020-11-11 Transparent flood wall and construction method thereof KR102225166B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200150398A KR102225166B1 (en) 2020-11-11 2020-11-11 Transparent flood wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200150398A KR102225166B1 (en) 2020-11-11 2020-11-11 Transparent flood wall and construction method thereof

Publications (1)

Publication Number Publication Date
KR102225166B1 true KR102225166B1 (en) 2021-03-09

Family

ID=75179928

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200150398A KR102225166B1 (en) 2020-11-11 2020-11-11 Transparent flood wall and construction method thereof

Country Status (1)

Country Link
KR (1) KR102225166B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102485888B1 (en) * 2022-04-26 2023-01-09 주식회사 제이콥스 Transparent barrier for flood protection and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101565147B1 (en) * 2015-03-16 2015-11-06 (주)에스엔비 A transparent flood wall
KR101715144B1 (en) * 2016-12-02 2017-03-22 주식회사 이도 Flood overflow prevention apparatus and construction method of the same
KR20200113567A (en) * 2019-03-26 2020-10-07 주식회사 한가람산업 A transparent flood wall and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101565147B1 (en) * 2015-03-16 2015-11-06 (주)에스엔비 A transparent flood wall
KR101715144B1 (en) * 2016-12-02 2017-03-22 주식회사 이도 Flood overflow prevention apparatus and construction method of the same
KR20200113567A (en) * 2019-03-26 2020-10-07 주식회사 한가람산업 A transparent flood wall and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102485888B1 (en) * 2022-04-26 2023-01-09 주식회사 제이콥스 Transparent barrier for flood protection and its construction method

Similar Documents

Publication Publication Date Title
EP2596187B1 (en) Guy anchor reinforcement
KR102314601B1 (en) A transparent flood wall and construction method thereof
KR102225166B1 (en) Transparent flood wall and construction method thereof
WO2011136359A1 (en) Sheet-like body support mount and solar photovoltaic power generation device
JP6650257B2 (en) Mountain retaining structure and construction method thereof
JP3680294B2 (en) Mountain retaining method using braided piles consisting of diagonal piles
JP2015104245A (en) Photovoltaic power generation panel frame
KR102190622B1 (en) Multi-steel boxes for connecting structures and construction method using the same
KR102158274B1 (en) A transparent flood wall and construction method thereof
JP2008031682A (en) Aseismically supporting structure during temporary bearing of building, and aseismically supporting method during temporary bearing of building
KR102076969B1 (en) Top-down construction method for concrete building structure using steel pile underground wall and shear support plate
US20140224751A1 (en) Solar panel mounting stand
JP4787010B2 (en) Mechanical parking lot on the basement floor
JP4866264B2 (en) Underground box
KR101127475B1 (en) Device for connecting wales
JP2003268770A (en) Earth retaining construction method and reinforcing structure of sheet pile used for this construction method
JP4737855B2 (en) Building basic structure
JP7280632B2 (en) How to install concrete blocks and concrete blocks
JP2015098725A (en) Photovoltaic power generation panel stand and installation method for the same
JP5769996B2 (en) Foundation structure
JP2001164573A (en) Earth retaining frame and strut end face used therefor
TWM552580U (en) Pile type solar panel supporting frame
TWM552582U (en) Section steel type solar panel supporting frame
JP2010255406A (en) Foundation structure of building
JP5058308B2 (en) Building foundation formation method

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant