KR102177228B1 - Platform installation method for lng storage tank - Google Patents

Platform installation method for lng storage tank Download PDF

Info

Publication number
KR102177228B1
KR102177228B1 KR1020190000738A KR20190000738A KR102177228B1 KR 102177228 B1 KR102177228 B1 KR 102177228B1 KR 1020190000738 A KR1020190000738 A KR 1020190000738A KR 20190000738 A KR20190000738 A KR 20190000738A KR 102177228 B1 KR102177228 B1 KR 102177228B1
Authority
KR
South Korea
Prior art keywords
worktable
pipe
storage tank
work table
natural gas
Prior art date
Application number
KR1020190000738A
Other languages
Korean (ko)
Other versions
KR20200084627A (en
Inventor
박상일
장광수
김용기
최영
Original Assignee
주식회사 한국가스기술공사
주식회사 두용기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국가스기술공사, 주식회사 두용기술 filed Critical 주식회사 한국가스기술공사
Priority to KR1020190000738A priority Critical patent/KR102177228B1/en
Publication of KR20200084627A publication Critical patent/KR20200084627A/en
Application granted granted Critical
Publication of KR102177228B1 publication Critical patent/KR102177228B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C3/00Vessels not under pressure
    • F17C3/02Vessels not under pressure with provision for thermal insulation
    • F17C3/022Land-based bulk storage containers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

본 발명은 액화천연가스 저장탱크의 서스펜디드 데크의 하부면과 하역배관의 상부를 유지 보수하기 위한 작업을 수행할 수 있는 작업대를 용이하게 인양시켜 비계를 이용하지 않고 서스펜디드 데크의 하부면까지 쉽게 도달할 수 있으며, 비계 제작을 위한 자재를 절감할 수 있으며, 안전사고를 예방할 수 있도록 그 구조가 개선된 액화 천연가스 저장탱크용 작업대 설치방법에 관한 것이다.The present invention is to easily lift a work table capable of performing work for maintenance of the lower surface of the suspended deck of the liquefied natural gas storage tank and the upper part of the loading and unloading pipe, so that it can easily reach the lower surface of the suspended deck without using a scaffold. It is possible to reduce materials for scaffolding, and to a method of installing a worktable for a liquefied natural gas storage tank with an improved structure to prevent safety accidents.

Description

액화 천연가스 저장탱크용 작업대 설치방법{PLATFORM INSTALLATION METHOD FOR LNG STORAGE TANK}Installation method of workbench for liquefied natural gas storage tank {PLATFORM INSTALLATION METHOD FOR LNG STORAGE TANK}

본 발명은 액화 천연가스 저장탱크용 작업대 설치방법에 관한 것으로, 특히액화천연가스 저장탱크의 서스펜디드 데크의 하부면과 하역배관의 상부를 유지 보수하기 위한 작업을 수행할 수 있는 작업대를 용이하게 인양시켜 비계를 이용하지 않고 서스펜디드 데크의 하부면까지 쉽게 도달할 수 있으며, 비계 제작을 위한 자재를 절감할 수 있으며, 안전사고를 예방할 수 있도록 그 구조가 개선된 액화 천연가스 저장탱크용 작업대 설치방법에 관한 것이다.The present invention relates to a method of installing a workbench for a liquefied natural gas storage tank, and in particular, by easily lifting a workbench capable of performing work for maintenance of the lower surface of the suspended deck of the liquefied natural gas storage tank and the upper part of the loading and unloading pipe. Regarding the method of installing a workbench for a liquefied natural gas storage tank with an improved structure so that it can easily reach the lower surface of the suspended deck without using a scaffold, and save materials for scaffolding, and prevent safety accidents. will be.

일반적으로 비계(飛階, Scaffold) 또는 족장은 건설, 선박건조 현장에서 필요한 각종 자재를 들어 올리거나 작업자가 높은 곳에서 작업을 할 수 있도록 만드는 가설 발판구조물을 말한다.In general, a scaffold or chief refers to a temporary scaffolding structure that lifts various materials required at construction and shipbuilding sites, or allows workers to work at high places.

상기 비계를 이용한 작업공간의 제공은 승강로 바닥에서부터 점차적으로 많은 부품들을 상호 결합시켜 쌓아 올려서 이루어지므로 승강로 최상층 인접 부위까지 비계를 쌓아 올리는데는 많은 불필요한 자재 및 노동력의 소모를 필요로 하여, 최근과 같이 건물이 고층화된 경우에는 너무나 비효율적인 방법이 되고 있다. 또한, 작업자가 비계를 타고 상,하 이동을 하며 작업을 해야 하므로 추락 사고등 안전사고의 위험성이 매우 크다.Since the provision of the working space using the scaffolding is achieved by gradually stacking many components from the bottom of the hoistway, it takes a lot of unnecessary material and labor consumption to build the scaffold to the adjacent part of the uppermost floor of the hoistway. In this high-rise case, it is becoming too inefficient. In addition, the risk of safety accidents such as a fall is very high because the worker has to work while moving up and down on a scaffold.

기존 작업대와 관련된 선행기술로는 한국 등록특허공보 제10-0551151호 "이동이 편리한 구성을 갖는 작업대 및 작업대 설치방법"(등록일자 : 2006.02.03)에 개시된 바와 같이, 수직통로를 형성하는 벽에 상기 수직통로와 통하도록 형성된 출입통로를 갖는 구조물에, 지지대와, 일 단부가 상기 지지대의 상면의 일 단부에 결합되어 있고 타 단부가 상방으로 연장된 발판을 갖는 작업대를 설치하는 방법에 있어서, a) 상기 수직통로에 인접하는 상기 출입통로에 상기 발판이 상기 수직통로를 향하도록 하여 위치시키는 단계, b) 상기 지지대를 상기 지지대 일 단부의 인접부분에서 회전 가능하게 상기 출입통로 바닥에 고정하는 단계, c) 상기 지지대의 타 단부에 상기 출입통로의 폭 보다 큰 길이를 갖는 가로 지지대를 결합하는 단계, d) 상기 가로 지지대가 상기 벽에 접촉할 때까지 상기 지지대의 타 단부를 상기 지지대의 일 단부를 중심으로 회전시키는 단계, e) 상기 가로 지지대를 상기 벽에 고정시키는 단계, 그리고 f) 상기 발판의 타 단부를 상기 출입통로에 대향하는 상기 벽에 고정시키는 단계를 포함하는 것이다.As for the prior art related to the existing workbench, as disclosed in Korean Patent Publication No. 10-0551151, "Workbench and Workbench Installation Method with Convenient Configuration" (Registration Date: 2006.02.03), on the wall forming a vertical passageway. In the method of installing a work table having a support and a footrest, one end of which is coupled to one end of the upper surface of the support and the other end of which is extended upward, to a structure having an entrance passage formed to communicate with the vertical passage, a ) Positioning the footboard toward the vertical passage in the entrance passage adjacent to the vertical passage, b) fixing the support to the bottom of the entry passage so as to be rotatable at an adjacent portion of one end of the support, c) coupling a horizontal support having a length greater than the width of the access passage to the other end of the support, d) attaching the other end of the support to one end of the support until the horizontal support contacts the wall. Rotating about the center, e) fixing the horizontal support to the wall, and f) fixing the other end of the footboard to the wall opposite to the entrance passage.

기존 작업대와 관련된 다른 선행기술로는 한국 등록특허공보 제10-1859114호 "다단 적치가 가능한 선박용 작업대 설치 방법"(등록일자 : 2018.05.11)에 개시된 바와 같이, 상하부가 개구된 프레임과, 상하로 개구된 이동부를 구비하여 프레임의 상부에 설치되는 상부발판부재와, 프레임의 하부와 상부발판부재의 이동부를 연결하는 사다리 및, 프레임의 상부에 구비되는 연결링을 갖추도록 작업대를 제작하는 작업대 제작 단계와; 상기 작업대의 연결링에 크레인 와이어를 연결하고, 크레인을 이용하여 작업대를 선박에 이웃되게 배치한 후, 별도의 체결부재를 매개로 작업대를 선박에 착탈가능하게 설치하는 작업대 설치 단계 및; 또 다른 작업대의 연결링에 크레인 와이어를 연결하고, 크레인을 이용하여 상기 또 다른 작업대를 작업대 설치단계에서 설치된 작업대의 측방에 배치하며, 별도의 체결부재를 매개로 상기 또 다른 작업대를 선박에 착탈가능하게 설치한 후, 작업대의 상부발판부재 사이에 연결발판부재를 설치하거나, 또 다른 작업대의 연결링에 크레인 와이어를 연결하고, 크레인을 이용하여 상기 또 다른 작업대를 작업대 설치 단계에서 설치된 작업대의 상방에 배치하며, 별도의 체결부재를 매개로 상기 또 다른 작업대를 선박 및 작업대 설치 단계에서 설치된 작업대에 각각 착탈가능하게 설치하는 작업대 추가 설치 단계를 포함하는 것이다.[ A worktable manufacturing step of manufacturing a worktable to have an upper scaffolding member installed on the upper part of the frame with an opened moving part, a ladder connecting the moving part of the lower part of the frame and the upper scaffolding member, and a connecting ring provided on the upper part of the frame Wow; A worktable installation step of connecting a crane wire to the connection ring of the worktable, arranging the worktable adjacent to the ship by using a crane, and then installing the worktable detachably on the ship through a separate fastening member; Another workbench is connected to the connecting ring of another workbench, and the other workbench is placed on the side of the workbench installed in the workbench installation step using a crane, and the another workbench can be attached and detached from the ship through a separate fastening member. After installation, a connecting scaffolding member is installed between the upper scaffolding members of the workbench, or a crane wire is connected to the connecting ring of another workbench, and the other worktable is placed above the worktable installed in the workbench installation step using a crane. And a further installation step of attaching and detaching the other worktable to the ship and the worktable installed in the worktable installation step via a separate fastening member.

기존 LNG 저장탱크는 단열재에 화물의 하중이 직접적으로 작용하는 지에 따라 멤브레인형과 독립탱크형으로 구분된다.Existing LNG storage tanks are divided into membrane type and independent tank type depending on whether the load of cargo directly acts on the insulation.

기존 LNG 저장탱크와 관련된 선행기술로는 한국 등록특허공보 제10-796815호 "LNG탱크의 단열 시스템 설치방법"(등록일자: 2008.01.15)에 개시된 바와 같이, 탱크 내벽의 소정의 위치에 탱크의 길이방향을 따라 지지구조물을 이동가능하게 설치하는 설치단계와, 상기 지지구조물을 따라 자재 또는 작업자를 이동시키는 이동단계와, 상기 이동단계에서 이동된 자재를 상기 대형 구조물의 내벽에 설치하는 자재설치단계를 포함한다.As a prior art related to the existing LNG storage tank, as disclosed in Korean Patent Publication No. 10-796815, "Installation Method of LNG Tank Insulation System" (Registration Date: January 15, 2008), the tank is located at a predetermined location on the inner wall of the tank. An installation step of movably installing a support structure along the longitudinal direction, a moving step of moving materials or workers along the support structure, and a material installation step of installing the material moved in the moving step on the inner wall of the large structure Includes.

그런데, 기존 액화천연가스 저장탱크의 경우에는 외조의 내부에 내조가 배치되고 내조의 상부에 서스펜디드 데크(Suspended Deck)가 배치되며, 서스펜디드 데크의 내부에는 수직방향으로 하역배관이 배치되어 있으며, 상기 하역배관은 알루미늄 재질로 4개의 써포트 파이프에 의해 외조의 지붕에 마련된 철재빔에 매달리도록 배치된다.However, in the case of the existing liquefied natural gas storage tank, the inner tank is arranged inside the outer tank, the suspended deck is arranged above the inner tank, and the loading and unloading pipes are arranged in the vertical direction inside the suspended deck. The pipes are made of aluminum and are arranged to be suspended from the steel beams provided on the roof of the outer tank by four support pipes.

기존 하역배관은 시간이 경과됨에 따라 LNG 하역시 상,하로 거동하게 되며 좌,우로 휨이 발생할 우려가 있으며, 심하게는 상하 좌우로 변형되어 써포트 파이프와 철재빔을 연결하는 러그 등이 파손 및 변형될 우려가 있다.Existing unloading pipes move up and down when unloading LNG as time passes, and there is a risk of bending left and right, and severely deformed up and down, and the lugs connecting the support pipe and the steel beam will be damaged and deformed. There is concern.

이에 따라, 상기한 하역배관의 보수작업이나 서스펜디드 데크의 보수작업시 내조 바닥에서부터 상측으로 높이 대략 31m 가량의 강관비계로 이루어진 작업대를 설치해야만 보수작업이 가능하며, 이 경우에는 비계 설치를 위한 자재 및 부재가 많이 소요되어 제작비용이 많이 소모되고 비계의 설치작업시간이 오래 걸릴 뿐만 아니라, 작업자가 비계의 계단을 타고 올라가 작업대의 발판에 도달하기까지 접근이 용이하지 않으며 추락의 위험이 있는 안전사고의 위험이 있었다.Accordingly, during the above-described maintenance work of the cargo piping or the maintenance work of the suspended deck, maintenance work is possible only by installing a workbench made of steel pipe scaffolding approximately 31m in height from the bottom of the inner tank to the top.In this case, materials and materials for scaffolding installation and Not only does it take a long time to install the scaffold because it takes a lot of parts, it is difficult to access until the operator climbs the steps of the scaffold and reaches the scaffolding, and there is a risk of falling. There was a danger.

한국 등록특허공보 제10-0551151호 "이동이 편리한 구성을 갖는 작업대 및 작업대 설치방법"(등록일자 : 2006.02.03)Korean Registered Patent Publication No. 10-0551151 "Workbench and Workbench Installation Method with Convenient Configuration" (Registration Date: 2006.02.03) 한국 등록특허공보 제10-1859114호 "다단 적치가 가능한 선박용 작업대 설치 방법"(등록일자 : 2018.05.11)Korean Registered Patent Publication No. 10-1859114 "How to install a worktable for ships capable of multi-stage stacking"

본 발명은 상기한 제반문제점을 감안하여 이를 해결하고자 창출된 것으로, 그 목적은 비계를 이용하지 않고 서스펜디드 데크의 하부면까지 쉽게 도달할 수 있으며, 비계 제작을 위한 자재를 절감할 수 있으며, 안전사고를 예방할 수 있도록 그 구조가 개선된 액화 천연가스 저장탱크용 작업대 설치방법을 제공하는 데 있다.The present invention was created to solve these problems in consideration of the above problems, and its purpose is to easily reach the lower surface of the suspended deck without using a scaffold, and to reduce materials for scaffolding, and to prevent safety accidents. It is to provide a method of installing a workbench for a liquefied natural gas storage tank whose structure has been improved to prevent the problem.

상기한 목적을 달성하기 위한 본 발명은 액화천연가스용 저장탱크의 외조 지붕에 마련된 철재빔에 리프팅 러그를 설치하는 러그 설치단계와; 상기 액화천연가스용 저장탱크의 내조 바닥에서 작업대를 제작하는 작업대 제작단계와; 상기 내조의 상부에 배치된 서스펜디드 데크에 상기 작업대에 마련된 관통파이프가 관통되도록 관통공을 천공함과 아울러, 상기 서스펜디드 데크에 상기 작업대로의 진출입공을 천공 형성시키는 천공단계와; 상기 작업대에 와이어 로프의 단부를 연결하고 상기 리프팅 러그를 통해 와이어 윈치와 상기 작업대를 상기 와이어 로프로 연결하는 로프 연결단계와; 상기 작업대를 와이어 로프와 와이어 윈치로 상측으로 인양하는 인양단계와; 상기 인양단계에서 상기 관통공을 통과한 상기 작업대의 관통파이프를 상기 외조의 지붕에 고정시키는 고정단계; 및 상기 진출입공을 통해 작업대측으로 출입할 수 있는 사다리 및 추락방지안전망을 설치하는 마무리단계;를 포함하여 이루어진 것을 특징으로 한다.The present invention for achieving the above object is a lug installation step of installing a lifting lug on a steel beam provided on the outer shell roof of a storage tank for liquefied natural gas; A worktable manufacturing step of producing a worktable at the bottom of the inner tank of the liquefied natural gas storage tank; A drilling step of drilling a through hole through the suspended deck disposed on the upper portion of the inner tank so that the through pipe provided on the work table penetrates, and forming an entry and exit hole into the work bench in the suspended deck; A rope connecting step of connecting an end of a wire rope to the worktable and connecting the wire winch and the worktable to the wire rope through the lifting lug; A lifting step of lifting the worktable upward with a wire rope and a wire winch; A fixing step of fixing the through pipe of the worktable passing through the through hole in the lifting step to the roof of the outer tank; And a finishing step of installing a ladder and a fall prevention safety net for entering and leaving the work table through the entrance/exit hole.

상기 작업대는 상기 하역배관의 외주 둘레를 따라 구성되고, 중앙에 상기 내조에 수직방향으로 배치되는 하역배관이 수용되도록 중공이 형성된 구조로 된 것이다.The worktable is constructed along the outer periphery of the loading and unloading pipe, and has a structure in which a hollow is formed in the center to accommodate the unloading pipe arranged in a vertical direction in the inner tank.

상기 리프팅 러그는 상기 철재빔에 용접으로 일체로 결합되는 것이다.The lifting lug is integrally coupled to the steel beam by welding.

상기 고정단계는 상기 철재빔에 제1클램프를 이용하여 연결파이프의 상단부를 착탈 가능하게 결합시키고, 상기 연결파이프의 하단부를 상기 관통공을 통과한 상기 작업대의 관통파이프에 제2클램프로 착탈 가능하게 연결시키는 것이다.In the fixing step, the upper end of the connection pipe is detachably coupled to the steel beam using a first clamp, and the lower end of the connection pipe is detachably attached to the through pipe of the worktable through the through hole with a second clamp. To connect.

본 발명은 액화천연가스 저장탱크의 서스펜디드 데크의 하부면과 하역배관의 상부의 유지 보수 작업용 작업대를 내조의 바닥에서부터 쌓아 올리는 것이 아니라, 외조의 천장으로 와이어 로프와 와이어 윈치를 이용하여 인양하고 와이어 로프에 의해 인양된 상태에서 천장에 마련된 철재빔에 고정시킨 후에, 서스펜디드 데크에 천공된 진출입공을 통해 작업대측으로 진입할 수 있게 되어 자재를 절약하면서 간편하게 작업대를 설치할 수 있을 뿐만 아니라, 기존 비계적층타입 작업대를 올라가는 중에 작업자의 추락 등 안전사고를 예방할 수 있는 이점을 갖는다.The present invention does not stack the workbench for maintenance work on the lower surface of the suspended deck of the liquefied natural gas storage tank and the upper part of the loading and unloading pipe from the bottom of the inner tank, but lifted by using a wire rope and a wire winch to the ceiling of the outer tank. It is possible to enter the worktable side through the entry and exit holes drilled in the suspended deck after being fixed to the steel beam provided in the ceiling while being lifted by the system, so it is not only possible to install the worktable while saving materials, but also the existing scaffolding type worktable It has the advantage of preventing safety accidents such as falls of workers while climbing.

또한, 본 발명은 와이어 로프의 인양작업시 작업대에 마련된 관통파이프가 서스펜디드 데크에 천공된 관통공을 통과하여 서스펜디드 데크의 상측으로 돌출된 상태에서 철재빔에 고정된 연결파이프에 제2클램프를 이용하여 견고하고 분해 조립 가능하게 연결시킬 수 있으므로, 안정감있게 작업대를 고정시킬 수 있을 뿐만 아니라, 작업이 완료된 후에 작업대를 다른 작업현장으로 이동시켜 재활용할 수 있는 이점을 갖는다.In addition, the present invention uses a second clamp on the connecting pipe fixed to the steel beam in a state in which the through pipe provided on the worktable passes through the through hole drilled in the suspended deck and protrudes upward from the suspended deck during the lifting operation of the wire rope. Since it can be connected in a sturdy and disassembled manner, not only can the worktable be securely fixed, but also have the advantage of being able to recycle the worktable by moving it to another worksite after the work is completed.

도 1은 본 발명에 따른 액화 천연가스 저장탱크용 작업대 설치방법을 순차적으로 나타낸 플로우챠트.
도 2는 본 발명 액화 천연가스 저장탱크에 작업대가 인양된 상태를 보인 사용상태도.
도 3은 본 발명 서스펜디드 데크와 작업대의 개략적 구성도.
도 4는 본 발명 철재빔에 리프팅 러그와 와이어 로프가 연결된 상태를 보인 사진.
도 5는 본 발명 작업대가 내조의 바닥에 제작된 상태를 보인 사진.
1 is a flowchart sequentially showing a method of installing a worktable for a liquefied natural gas storage tank according to the present invention.
Figure 2 is a state diagram showing a state in which the workbench is lifted to the present invention liquefied natural gas storage tank.
3 is a schematic configuration diagram of the present invention suspended deck and worktable.
Figure 4 is a photograph showing a state in which a lifting lug and a wire rope are connected to the steel beam of the present invention.
5 is a photograph showing a state in which the present invention worktable is manufactured on the bottom of the inner tank.

본 발명은 액화천연가스 저장탱크의 서스펜디드 데크의 하부면과 하역배관의 상부를 유지 보수하기 위한 작업을 수행할 수 있는 작업대를 내조의 바닥에서부터 쌓아 올리는 것이 아니라, 외조의 천장으로 인양하고 천장에 마련된 철재빔에 고정시켜 자재를 절약하면서 간편하게 작업대를 설치할 수 있도록 한다.The present invention does not stack a worktable capable of performing work for maintaining the lower surface of the suspended deck of the liquefied natural gas storage tank and the upper part of the loading and unloading pipe from the bottom of the inner tank, but lifting it to the ceiling of the outer tank and provided on the ceiling. It is fixed to the steel beam so that the workbench can be easily installed while saving material.

이하, 도면을 참조한 실시 예들의 상세한 설명을 통하여 본 발명에 따른 액화 천연가스 저장탱크용 작업대 설치방법에 대해 보다 상세하게 기술하기로 한다. Hereinafter, a method of installing a working table for a liquefied natural gas storage tank according to the present invention will be described in more detail through a detailed description of embodiments with reference to the drawings.

본 발명을 설명함에 있어서, 관련된 공지기술 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그에 대한 상세한 설명은 생략될 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 사용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다. 또한, 어떤 구성 요소를 '포함'한다는 것은 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수도 있다는 것을 의미한다. In describing the present invention, if it is determined that a detailed description of a related known technology or configuration may unnecessarily obscure the subject matter of the present invention, a detailed description thereof will be omitted. In addition, terms to be described later are terms defined in consideration of functions in the present invention and may vary according to user intentions or customs. Therefore, the definition should be made based on the contents throughout this specification. In addition, "including" a certain component means that other components may be further included rather than excluding other components unless specifically stated to the contrary.

본 발명에 따른 액화 천연가스 저장탱크용 작업대 설치방법은 도 1 내지 도 5를 참조하여 설명하면, 액화천연가스용 저장탱크(10)의 외조(12) 지붕에 마련된 철재빔(15)에 리프팅 러그(50)를 설치하는 러그 설치단계(S1)와; 상기 액화천연가스용 저장탱크(10)의 내조(14) 바닥에서 작업대(100)를 제작하는 작업대 제작단계(S2)와; 상기 내조(14)의 상부에 배치된 서스펜디드 데크(20)에 상기 작업대(100)에 마련된 관통파이프(110)가 관통되도록 관통공(22)을 천공함과 아울러, 상기 서스펜디드 데크(20)에 상기 작업대(100)로의 진출입공(25)을 천공 형성시키는 천공단계(S3)와; 상기 작업대(100)에 와이어 로프(200)의 단부를 연결하고 상기 리프팅 러그(50)를 통해 와이어 윈치(250)와 상기 작업대(100)를 상기 와이어 로프(200)로 연결하는 로프 연결단계(S4)와; 상기 작업대(100)를 와이어 로프(200)와 와이어 윈치(250)로 상측으로 인양하는 인양단계(S5)와; 상기 인양단계(S5)에서 상기 관통공(22)을 통과한 상기 작업대(100)의 관통파이프(110)를 상기 외조(12)의 지붕에 고정시키는 고정단계(S6); 및 상기 진출입공(25)을 통해 작업대(100)측으로 출입할 수 있는 사다리 및 추락방지안전망을 설치하는 마무리단계(S7);를 포함하여 이루어진 것이다.A method of installing a working table for a liquefied natural gas storage tank according to the present invention will be described with reference to FIGS. 1 to 5, and a lifting lug on the steel beam 15 provided on the roof of the outer tank 12 of the storage tank 10 for liquefied natural gas A lug installation step (S1) to install 50; A working table manufacturing step (S2) of manufacturing a working table 100 from the bottom of the inner tank 14 of the liquefied natural gas storage tank 10; A through hole 22 is drilled through the suspended deck 20 disposed on the inner tank 14 so that the through pipe 110 provided in the work table 100 penetrates, and the suspended deck 20 A perforation step (S3) of perforating the entry and exit holes 25 into the work table 100; Rope connection step of connecting the end of the wire rope 200 to the work table 100 and connecting the wire winch 250 and the work table 100 to the wire rope 200 through the lifting lug 50 (S4) )Wow; A lifting step (S5) of lifting the worktable 100 upward with a wire rope 200 and a wire winch 250; A fixing step (S6) of fixing the through pipe 110 of the worktable 100 that passed through the through hole 22 in the lifting step (S5) to the roof of the outer tank 12; And a finishing step (S7) of installing a ladder and a fall prevention safety net that can be accessed to the work table 100 through the entrance/exit hole 25.

상기 러그 설치단계(S1)는 상기 리프팅 러그(50; lifting lug)가 철재빔(15)의 하측에 용접으로 일체로 결합된다.In the lug installation step (S1), the lifting lug 50 is integrally coupled to the lower side of the steel beam 15 by welding.

상기 작업대 제작단계(S2)는 내조(14) 바닥에서 하역배관(30)의 외주 둘레를 따라 구성되고, 중앙에 상기 내조(14)에 수직방향으로 배치되는 하역배관(30)이 수용되도록 중공이 형성된 구조로 제작한다.The worktable manufacturing step (S2) is configured along the outer periphery of the loading and unloading pipes 30 from the bottom of the inner tank 14, and a hollow to accommodate the loading and unloading pipes 30 arranged vertically in the inner tank 14 at the center. It is manufactured in a formed structure.

또한, 상기 작업대(100)는 중공이 형성되고 발판을 갖는 사각형으로 제작되며, 4개의 각 모서리의 상측으로 인양작업시 관통공(22)을 통과하는 관통파이프(110)가 마련된다.In addition, the worktable 100 is formed in a square shape having a hollow and a footrest, and is provided with a through pipe 110 passing through the through hole 22 at the upper side of each of the four corners during the lifting operation.

이에 대응하도록 상기 서스펜디드 데크(20)에는 상기 작업대(100)의 인양작업시 관통파이프(110)가 통과되도록 관통공(22)이 4개 형성된다.In response to this, four through holes 22 are formed in the suspended deck 20 so that the through pipe 110 passes during the lifting operation of the work table 100.

또, 상기 서스펜디드 데크(20)는 상기 내조(14)의 상부측에 마련되고, 작업자가 작업대(100)측으로 사다리를 통해 진출입 가능하도록 진출입공(25)을 천공 형성한다.In addition, the suspended deck 20 is provided on the upper side of the inner tank 14, and the entry and exit holes 25 are perforated so that the operator can enter and exit the worktable 100 through a ladder.

상기 로프 연결단계(S4)는 와이어 로프(200)의 일단부를 작업대(100)에 결속시키도록 연결하고, 관통공(22)과 리프팅 러그(50)를 통해 와이어 윈치(250)에 감도록 와이어 로프(200)를 연결시킨다.In the rope connection step (S4), a wire rope is connected to bind one end of the wire rope 200 to the work table 100 and wound around the wire winch 250 through the through hole 22 and the lifting lug 50. Connect 200.

이에 따라 와이어 윈치(250)의 동작에 따라 와이어 로프(200)를 감아서 작업대(100)를 상측으로 인양할 수 있으며, 작업대(100)를 서스펜디드 데크(20)의 하부면 및 하역배관(30)의 상부를 유지 보수할 수 있는 높이까지 인양할 경우 관통파이프(110)가 관통공(22)을 통과하여 서스펜디드 데크(20)의 상측으로 돌출된다.Accordingly, by winding the wire rope 200 according to the operation of the wire winch 250, the worktable 100 can be lifted upward, and the worktable 100 is mounted on the lower surface of the suspended deck 20 and the unloading pipe 30 When the upper portion of the unit is lifted to a height capable of maintenance, the through pipe 110 passes through the through hole 22 and protrudes above the suspended deck 20.

상기 고정단계(S6)는 상기 철재빔(15)에 제1클램프(410)를 이용하여 연결파이프(310)의 상단부를 착탈 가능하게 결합시키고, 상기 연결파이프(310)의 하단부를 상기 관통공(22)을 통과한 상기 작업대(100)의 관통파이프(110)에 제2클램프(420)로 착탈 가능하게 연결시키는 것이다.In the fixing step (S6), the upper end of the connection pipe 310 is detachably coupled to the steel beam 15 using a first clamp 410, and the lower end of the connection pipe 310 is attached to the through hole ( The second clamp 420 is detachably connected to the through pipe 110 of the worktable 100 that has passed through 22).

이로 인해, 상기 고정단계(S6)에서 작업대(100)의 인양작업시 관통공(22)을 통과한 관통파이프(110)의 상부를 철재빔(15)에 제1클램프(410)로 연결된 연결파이프(310)의 하부와 제2클램프(420)로 결합시켜 작업대(100)가 와이어 로프(200)에 매달린 상태에서 견고하게 고정시킬 수 있으며, 필요시에는 연결파이프(310)와 관통파이프(110)를 분리시킬 수 있도록 착탈 가능하게 결합된다.For this reason, in the fixing step (S6), when the worktable 100 is lifted, the upper part of the through pipe 110 that has passed through the through hole 22 is connected to the steel beam 15 by the first clamp 410 The lower portion of the 310 and the second clamp 420 can be combined to be firmly fixed while the worktable 100 is suspended from the wire rope 200, and if necessary, the connection pipe 310 and the through pipe 110 It is detachably coupled so that it can be separated.

이때, 상기 연결파이프(310)는 상단부가 철재빔(15)에 제1클램프(410)로 착탈 가능하게 결합되고, 하단부가 제2클램프(420)를 매개로 관통파이프(110)와 착탈 가능하게 연결된다.At this time, the connection pipe 310 is detachably coupled to the steel beam 15 by the first clamp 410 at the upper end, and the through pipe 110 and detachably at the lower end through the second clamp 420 Connected.

이어서, 서스펜디드 데크(20)의 진출입공(25)에 사다리를 설치하고, 작업대(100)의 하측에 추락방지안전망(미도시)을 설치한다.Subsequently, a ladder is installed in the entry/exit hole 25 of the suspended deck 20, and a fall prevention safety net (not shown) is installed under the work table 100.

이후에는 작업자가 서스펜디드 데크(20)의 상측에서 사다리를 통해 진출입공(25)을 통과하여 작업대(100)측으로 진입할 수 있으며, 작업대(100)에서 서스펜디드 데크(20)의 하측면 또는 하역배관(30)의 상부를 유지 또는 보수작업을 수행할 수 있다.After that, the operator can enter the worktable 100 side by passing through the entry/exit hole 25 through the ladder from the upper side of the suspended deck 20, and the lower side of the suspended deck 20 or the loading and unloading pipe ( 30) can perform maintenance or repair work.

상기한 작업이 완료된 후에는 제2클램프(420)의 결합상태를 해제하여 연결파이프(310)로부터 관통파이프(110)를 분리시킨 후에, 와이어 윈치(250)를 역방향으로 구동시켜 와이어 로프(200)를 이용하여 작업대(100)를 내조(14)의 바닥까지 인하시키고, 다른 작업장소로 이동시킨 후에 재활용할 수 있다.After the above operation is completed, the coupling state of the second clamp 420 is released to separate the through pipe 110 from the connection pipe 310, and then the wire winch 250 is driven in the reverse direction to the wire rope 200. It can be recycled after lowering the worktable 100 to the bottom of the inner tank 14 by using and moving it to another work place.

따라서, 본 발명은 액화천연가스 저장탱크(10)의 서스펜디드 데크(20)의 하부면과 하역배관(30)의 상부의 유지 보수 작업용 작업대(100)를 내조(14)의 바닥에서부터 쌓아 올리는 것이 아니라, 외조(12)의 천장으로 와이어 로프(200)와 와이어 윈치(250)를 이용하여 인양하고 와이어 로프(200)에 의해 인양된 상태에서 천장에 마련된 철재빔(15)에 고정시킨 후에, 서스펜디드 데크(20)에 천공된 진출입공(25)을 통해 작업대(100)측으로 진입할 수 있게 되어 자재를 절약하면서 간편하게 작업대(100)를 설치할 수 있을 뿐만 아니라, 기존 비계적층타입 작업대(100)를 올라가는 중에 작업자의 추락 등 안전사고를 예방할 수 있는 이점을 갖는다.Therefore, the present invention does not stack the work table 100 for maintenance work on the lower surface of the suspended deck 20 of the liquefied natural gas storage tank 10 and the upper part of the loading and unloading pipe 30 from the bottom of the inner tank 14 , The ceiling of the outer tank 12 is lifted using a wire rope 200 and a wire winch 250 and fixed to the steel beam 15 provided on the ceiling while being lifted by the wire rope 200, the suspended deck It is possible to enter the worktable 100 side through the entry and exit holes 25 drilled in (20), so it is not only possible to install the worktable 100 while saving materials, but also while climbing the existing scaffolding type worktable 100 It has the advantage of preventing safety accidents such as falls of workers.

또한, 본 발명은 와이어 로프(200)의 인양작업시 작업대(100)에 마련된 관통파이프(110)가 서스펜디드 데크(20)에 천공된 관통공(22)을 통과하여 서스펜디드 데크(20)의 상측으로 돌출된 상태에서 철재빔(15)에 고정된 연결파이프(310)에 제2클램프(420)를 이용하여 견고하고 분해 조립 가능하게 연결시킬 수 있으므로, 안정감있게 작업대(100)를 고정시킬 수 있을 뿐만 아니라, 작업이 완료된 후에 작업대(100)를 다른 작업현장으로 이동시켜 재활용할 수 있는 이점을 갖는다.In addition, in the present invention, when the wire rope 200 is lifted, the through pipe 110 provided in the work table 100 passes through the through hole 22 drilled in the suspended deck 20 to the upper side of the suspended deck 20. In the protruding state, since the second clamp 420 can be connected to the connection pipe 310 fixed to the steel beam 15 in a robust and disassembled manner, the worktable 100 can be securely fixed. Rather, it has the advantage of being able to recycle by moving the worktable 100 to another work site after the work is completed.

10 : (액화천연가스) 저장탱크 12 : 외조
14 : 내조 15 : 철재빔
20 : 서스펜디드 데크 22 : 관통공
25 : 진출입공 30 : 하역배관
50 : 리프팅 러그 100 : 작업대
110 : 관통파이프 200 : 와이어 로프
250 : 와이어 윈치 310 : 연결파이프
410 : 제1클램프 420 : 제2클램프
10: (liquefied natural gas) storage tank 12: external tank
14: inner tank 15: steel beam
20: suspended deck 22: through hole
25: entry and exit 30: loading and unloading piping
50: lifting lug 100: worktable
110: through pipe 200: wire rope
250: wire winch 310: connecting pipe
410: first clamp 420: second clamp

Claims (4)

액화천연가스용 저장탱크(10)의 외조(12) 지붕에 마련된 철재빔(15)에 리프팅 러그(50)를 설치하는 러그 설치단계(S1)와;
상기 액화천연가스용 저장탱크(10)의 내조(14) 바닥에서 작업대(100)를 제작하는 작업대 제작단계(S2)와;
상기 내조(14)의 상부에 배치된 서스펜디드 데크(20)에 상기 작업대(100)에 마련된 관통파이프(110)가 관통되도록 관통공(22)을 천공함과 아울러, 상기 서스펜디드 데크(20)에 상기 작업대(100)로의 진출입공(25)을 천공 형성시키는 천공단계(S3)와;
상기 작업대(100)에 와이어 로프(200)의 단부를 연결하고 상기 리프팅 러그(50)를 통해 와이어 윈치(250)와 상기 작업대(100)를 상기 와이어 로프(200)로 연결하는 로프 연결단계(S4)와;
상기 작업대(100)를 와이어 로프(200)와 와이어 윈치(250)로 상측으로 인양하는 인양단계(S5)와;
상기 인양단계(S5)에서 상기 관통공(22)을 통과한 상기 작업대(100)의 관통파이프(110)를 상기 외조(12)의 지붕에 고정시키는 고정단계(S6); 및
상기 진출입공(25)을 통해 작업대(100)측으로 출입할 수 있는 사다리 및 추락방지안전망을 설치하는 마무리단계(S7)를 포함하여 이루어지고,
상기 작업대(100)는 상기 하역배관(30)의 외주 둘레를 따라 구성되고, 중앙에 상기 내조(14)에 수직방향으로 배치되는 하역배관(30)이 수용되도록 중공이 형성된 구조로 되고, 상기 고정단계(S6)는 상기 철재빔(15)에 제1클램프(410)를 이용하여 연결파이프(310)의 상단부를 착탈 가능하게 결합시키고, 상기 연결파이프(310)의 하단부를 상기 관통공(22)을 통과한 상기 작업대(100)의 관통파이프(110)에 제2클램프(420)로 착탈 가능하게 연결시키고, 상기 연결파이프(310)는 상단부가 철재빔(15)에 제1클램프(410)로 착탈 가능하게 결합되고, 하단부가 제2클램프(420)를 매개로 관통파이프(110)와 착탈 가능하게 연결되는 것을 특징으로 하는 액화 천연가스 저장용 탱크 작업대 설치방법
A lug installation step (S1) of installing a lifting lug 50 on the steel beam 15 provided on the roof of the outer tank 12 of the liquefied natural gas storage tank 10;
A working table manufacturing step (S2) of manufacturing a working table 100 from the bottom of the inner tank 14 of the liquefied natural gas storage tank 10;
A through hole 22 is drilled through the suspended deck 20 disposed on the inner tank 14 so that the through pipe 110 provided in the work table 100 penetrates, and the suspended deck 20 A perforation step (S3) of perforating the entry and exit holes 25 into the work table 100;
A rope connection step of connecting the end of the wire rope 200 to the work table 100 and connecting the wire winch 250 and the work table 100 to the wire rope 200 through the lifting lug 50 (S4) )Wow;
A lifting step (S5) of lifting the worktable 100 upward with a wire rope 200 and a wire winch 250;
A fixing step (S6) of fixing the through pipe 110 of the worktable 100 that passed through the through hole 22 in the lifting step (S5) to the roof of the outer tank 12; And
It is made including a finishing step (S7) of installing a ladder and a fall prevention safety net that can enter the work table 100 through the entry and exit hole 25,
The worktable 100 is configured along the outer circumference of the loading and unloading pipe 30, and has a structure in which a hollow is formed to accommodate the unloading pipe 30 disposed in the vertical direction in the inner tank 14 at the center, and the fixing Step (S6) is to detachably couple the upper end of the connection pipe 310 to the steel beam 15 using a first clamp 410, and the lower end of the connection pipe 310 is the through hole 22 A second clamp 420 is detachably connected to the through pipe 110 of the work table 100 that has passed through, and the upper end of the connection pipe 310 is attached to the steel beam 15 as a first clamp 410. Liquefied natural gas storage tank workbench installation method characterized in that it is detachably coupled and the lower end is detachably connected to the through pipe 110 via the second clamp 420
삭제delete 청구항 1에 있어서,
상기 리프팅 러그(50)는 상기 철재빔(15)에 용접으로 일체로 결합되는 것을 특징으로 하는 액화 천연가스 저장탱크용 작업대 설치방법.
The method according to claim 1,
The lifting lug 50 is a method for installing a worktable for a liquefied natural gas storage tank, characterized in that it is integrally coupled to the steel beam 15 by welding.
삭제delete
KR1020190000738A 2019-01-03 2019-01-03 Platform installation method for lng storage tank KR102177228B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190000738A KR102177228B1 (en) 2019-01-03 2019-01-03 Platform installation method for lng storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190000738A KR102177228B1 (en) 2019-01-03 2019-01-03 Platform installation method for lng storage tank

Publications (2)

Publication Number Publication Date
KR20200084627A KR20200084627A (en) 2020-07-13
KR102177228B1 true KR102177228B1 (en) 2020-11-10

Family

ID=71570968

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190000738A KR102177228B1 (en) 2019-01-03 2019-01-03 Platform installation method for lng storage tank

Country Status (1)

Country Link
KR (1) KR102177228B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004278134A (en) * 2003-03-17 2004-10-07 Hitachi Plant Eng & Constr Co Ltd Temporary scaffold for vertical piping

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018582A (en) * 1996-07-05 1998-01-20 Kouchi Marutaka:Kk Scaffold device for temporary work
JPH10252261A (en) * 1997-03-12 1998-09-22 Nippon Steel Corp Scaffold structure and construction method for low temperature tank
KR100551151B1 (en) 2004-01-07 2006-02-13 오티스 엘리베이터 컴파니 Platform having a configuration of easy mobility and method for installing the platform
KR101816698B1 (en) * 2016-05-11 2018-01-09 대우조선해양 주식회사 Scaffold apparatus for offshore plant
KR101859114B1 (en) * 2016-10-05 2018-05-18 현대삼호중공업 주식회사 Method for installing scaffold

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004278134A (en) * 2003-03-17 2004-10-07 Hitachi Plant Eng & Constr Co Ltd Temporary scaffold for vertical piping

Also Published As

Publication number Publication date
KR20200084627A (en) 2020-07-13

Similar Documents

Publication Publication Date Title
JP5059357B2 (en) Construction method of boiler cage section floor
KR20200030196A (en) Outside workbench for offshore structures
KR101808289B1 (en) Multi-type lifting scaffold
KR102177228B1 (en) Platform installation method for lng storage tank
WO2024104449A1 (en) Nuclear island reactor plant construction equipment integration platform and climbing method therefor
KR101068229B1 (en) Dismantled tower crane cargo handling system and cargo handling method using thereof
CN105926918A (en) Foldable elevator shaft operation steel platform device and erecting method
JP3579816B2 (en) Multipurpose stage for building frame
JP4071249B2 (en) Thread hanging jig
CN205472479U (en) A supplementary transfer device for wallboard
KR100929311B1 (en) Dabbit device
JP2012210884A (en) Portable scaffold
KR20070053967A (en) Crane master apparatus for scaffolding
JP5773343B2 (en) Method for constructing multi-story building and lifting device for multi-story scaffold used therefor
KR101295641B1 (en) Shackle for fulling of gang form with prevent fall apparatus
TWI557299B (en) Method for constructing cylindrical tank
JP3220397B2 (en) Elevating scaffold
CN112982933A (en) Simple scaffold device for spherical tank construction
JP2006057337A (en) Suspended scaffolding and method of constructing the same
JPS6356383B2 (en)
JPH07158300A (en) Method for installing vertical type vessel
CN212671301U (en) Movable construction safety steel stair for assembly type building stairwell
KR101911222B1 (en) Installation crane constructing method for the flaretip replacement of ocean structure construction
JPH0726727A (en) Building lifting device and construction using thereof
JP6429638B2 (en) Climbing crane mast

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant