KR102136300B1 - Guide member and construction method for underground wall using sheet pile using the same - Google Patents

Guide member and construction method for underground wall using sheet pile using the same Download PDF

Info

Publication number
KR102136300B1
KR102136300B1 KR1020190114029A KR20190114029A KR102136300B1 KR 102136300 B1 KR102136300 B1 KR 102136300B1 KR 1020190114029 A KR1020190114029 A KR 1020190114029A KR 20190114029 A KR20190114029 A KR 20190114029A KR 102136300 B1 KR102136300 B1 KR 102136300B1
Authority
KR
South Korea
Prior art keywords
sheet pile
casing
guide member
underground wall
sheet
Prior art date
Application number
KR1020190114029A
Other languages
Korean (ko)
Inventor
권영진
Original Assignee
권영진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 권영진 filed Critical 권영진
Priority to KR1020190114029A priority Critical patent/KR102136300B1/en
Application granted granted Critical
Publication of KR102136300B1 publication Critical patent/KR102136300B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention provides a guide member (200) for constructing an underground wall of a sheet pile, which includes: a casing guide part (210) formed on the other side so that a casing (20) for ground excavation is guided in a vertical direction; and a sheet pile guide part (220) formed on one side of the casing guide part (210) so that the other end of the sheet pile (100) is coupled thereto to be guided in the vertical direction, thereby minimizing a diameter of a bore hole and obtaining excellent verticality of the bore hole as well.

Description

시트파일 지중벽체 시공용 가이드부재 및 이를 이용한 시트파일 지중벽체 시공방법{GUIDE MEMBER AND CONSTRUCTION METHOD FOR UNDERGROUND WALL USING SHEET PILE USING THE SAME}Guide member for construction of sheet pile underground wall and method of construction of sheet pile underground wall using the same{GUIDE MEMBER AND CONSTRUCTION METHOD FOR UNDERGROUND WALL USING SHEET PILE USING THE SAME}

본 발명은 건설 분야에 관한 것으로서, 상세하게는 시트파일 지중벽체 시공방법에 관한 것이다.The present invention relates to the construction field, and more particularly, to a method for constructing a sheet pile underground wall.

시트파일은 일반적으로 항타에 의한 매립 및 상호결합에 의해 지중벽체를 형성하기 위한 구조로 사용된다.Sheet piles are generally used as structures for forming underground walls by landfill and cross-linking by driving.

이는 지반에 대하여 연속하여 다수의 시트파일을 일정방향을 따라 순차적으로 매립함과 아울러, 상호 단부에 형성된 고리 단면의 결합구조에 의해 결합하여 지중벽체를 형성하는 방식으로 시공된다.It is constructed in such a way that a number of sheet piles are continuously buried in a certain direction with respect to the ground, and the underground walls are formed by joining by a coupling structure of a ring cross section formed at mutual ends.

시트파일에 의한 지중벽체는 차수성능이 중시되고, 이를 위해서는 각각의 시트파일의 수직도가 우수할 것이 요구되며, 이러한 시트파일의 수직도는 시트파일이 매립되도록 천공하는 천공 홀의 수직도에 의해 좌우된다.Underground wall by the sheet pile is considered to have a high degree of order performance, and for this purpose, it is required that the verticality of each sheet pile is excellent, and the verticality of these sheet piles is influenced by the verticality of the perforated holes punched so that the sheet piles are buried. do.

또한 천공 홀의 직경이 증가하는 경우, 시공비용 및 기간이 증대하므로, 천공 홀의 직경을 최소화하면서 위 수직도를 얻는 것이 필요하다.In addition, when the diameter of the punched hole increases, the construction cost and duration increase, so it is necessary to obtain the above verticality while minimizing the diameter of the punched hole.

그런데, 종래에는 천공 홀의 직경을 최소화하면서 천공 홀의 우수한 수직도를 얻을 수 있는 공법이 개발되어 있지 않아 문제로 지적되어 왔다.However, in the related art, it has been pointed out as a problem because a method for obtaining an excellent verticality of a hole has been developed while minimizing the diameter of the hole.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 천공 홀의 직경을 최소화하면서도, 천공 홀의 우수한 수직도를 얻을 수 있도록 하는 시트파일 지중벽체 시공용 가이드부재 및 이를 이용한 시트파일 지중벽체 시공방법을 제시하는 것을 그 목적으로 한다.The present invention has been derived to solve the above problems, while minimizing the diameter of the perforated hole, a guide member for constructing a sheet pile underground wall and a method of constructing a sheet pile underground wall using the same, to obtain an excellent verticality of the hole. The purpose is to present.

상기 과제의 해결을 위하여, 본 발명은 지반굴착을 위한 케이싱(20)이 상하방향을 따라 가이드되도록 타측에 형성된 케이싱 가이드부(210); 시트파일(100)의 타단이 결합하여 상하방향을 따라 가이드되도록, 상기 케이싱 가이드부(210)의 일측에 형성된 시트파일 가이드부(220);를 포함하는 것을 특징으로 하는 시트파일 지중벽체 시공용 가이드부재(200)를 제시한다.In order to solve the above problems, the present invention is a casing guide portion 210 formed on the other side so that the casing 20 for ground excavation is guided along the vertical direction; Sheet pile underground wall construction guide, characterized in that it comprises;; seat pile guide portion 220 formed on one side of the casing guide portion 210, so that the other end of the seat pile 100 is coupled and guided along the vertical direction The member 200 is presented.

상기 케이싱 가이드부(210)는, 함몰부의 중앙부에 상기 시트파일 가이드부(220)가 형성된 가이드용 시트파일(100a);을 포함하는 것이 바람직하다.The casing guide portion 210, it is preferable to include; the sheet pile guide portion (100a) for the guide sheet 220 is formed in the center of the depression.

상기 케이싱 가이드부(210)는, 중앙부에 비해 양단이 타측으로 돌출된 함몰구조인 것이 바람직하다.The casing guide portion 210 is preferably a recessed structure with both ends protruding to the other side compared to the central portion.

상기 케이싱 가이드부(210)는, 원통형 구조의 케이싱(20)의 외면에 접촉하도록, 원호(圓弧)형 단면구조로 형성된 것이 바람직하다.The casing guide portion 210 is preferably formed in an arc-shaped cross-sectional structure so as to contact the outer surface of the casing 20 of a cylindrical structure.

상기 시트파일 가이드부(220)는, 시트파일(100)의 타단이 삽입되도록, 상호 간격을 두고 상기 케이싱 가이드부(210)의 일측에 돌출형성된 한 쌍의 돌출부(221);를 포함하는 것이 바람직하다.The sheet pile guide portion 220, a pair of protrusions 221 formed protruding on one side of the casing guide portion 210 at a mutual interval, so that the other end of the sheet pile 100 is inserted, preferably comprises; Do.

상기 시트파일 가이드부(220)는, 시트파일(100)의 타단에 대응하는 고리형 단면구조로 형성된 고리형 가이드부(222);를 포함하는 것이 바람직하다.It is preferable that the sheet pile guide part 220 includes an annular guide part 222 formed in an annular cross-sectional structure corresponding to the other end of the sheet pile 100.

본 발명은 상기 가이드부재(200)를 이용하여, 지반에 대하여 연속하여 다수의 시트파일(100)을 측방향을 따라 순차적으로 매립함과 아울러, 상호 결합하여 지중벽체를 형성하기 위한 시트파일 지중벽체 시공방법에 있어서, 지반에 대하여 1번 천공 홀(11)을 형성하는 단계; 상기 다수의 시트파일(100) 중 1번 시트파일(110)의 타단에 상기 가이드부재(200)를 결합하여, 상기 1번 천공 홀(11)에 삽입하고 되메움하는 단계; 상기 가이드부재(200)의 일측에 인접한 지반에 대하여 2번 천공 홀(12)을 형성함과 아울러 케이싱(20)을 삽입하되, 상기 케이싱(20)이 상기 가이드부재(200)의 케이싱 가이드부(210)에 의해 가이드되도록 하는 천공단계; 상기 1번 시트파일(110)은 상기 1번 천공 홀(11)에 매립된 채로 두고, 상기 가이드부재(200)는 상기 1번 시트파일(110)과 분리함과 아울러, 상기 1번 천공 홀(11)로부터 인발하는 가이드부재 인발단계; 상기 다수의 시트파일(100) 중 2번 시트파일(120)의 타단에 상기 가이드부재(200)를 결합하여 상기 2번 천공 홀(12)에 삽입하되, 상기 2번 시트파일(120)의 일단은 상기 1번 시트파일(110)의 타단에 결합하고, 상기 2번 천공 홀(12)을 되메움하는 시트파일 매립단계; 상기 천공단계, 가이드부재 인발단계 및 시트파일 매립단계를 순차적으로 반복하여, 상기 지중벽체를 형성하는 단계;를 포함하는 것을 특징으로 하는 시트파일 지중벽체 시공방법을 제시한다.The present invention uses the guide member 200, the sheet pile underground wall for forming a subterranean wall by sequentially embedding a plurality of sheet piles 100 sequentially along the lateral direction with respect to the ground. In the construction method, forming a first hole (11) with respect to the ground; Coupling the guide member 200 to the other end of the first sheet pile 110 among the plurality of sheet piles 100, inserting and refilling the first punching hole 11; While forming a second punching hole 12 with respect to the ground adjacent to one side of the guide member 200, and inserting a casing 20, the casing 20 has a casing guide portion of the guide member 200 ( 210) to be guided by; The first sheet pile 110 is left buried in the first drilling hole 11, the guide member 200 is separated from the first sheet pile 110, and the first drilling hole ( 11) drawing the guide member from the drawing step; The guide member 200 is coupled to the other end of the second sheet pile 120 among the plurality of sheet piles 100 to be inserted into the second drilling hole 12, but one end of the second sheet pile 120 Is coupled to the other end of the first sheet pile 110, the filling step of the sheet pile filling the second hole (12); It proposes a method for constructing a sheet pile underground wall, comprising the steps of sequentially forming the underground wall by sequentially repeating the drilling step, the guide member drawing step, and the sheet pile embedding step.

본 발명은 천공 홀의 직경을 최소화하면서도, 천공 홀의 우수한 수직도를 얻을 수 있도록 하는 시트파일 지중벽체 시공용 가이드부재 및 이를 이용한 시트파일 지중벽체 시공방법을 제시한다.The present invention proposes a sheet pile underground wall construction guide member and a sheet pile underground wall construction method using the same, while minimizing the diameter of the perforated hole and obtaining excellent verticality of the perforated hole.

도 1 이하는 본 발명의 실시예를 도시한 것으로서,
도 1은 가이드부재의 제1 실시예의 평면도.
도 2는 가이드부재의 제2 실시예의 평면도.
도 3은 가이드부재의 제3 실시예의 평면도.
도 4는 가이드부재의 제4 실시예의 평면도.
도 5는 가이드부재의 제5 실시예의 평면도.
도 6은 가이드부재의 제6 실시예의 평면도.
도 7 내지 9는 시트파일 지중벽체 시공방법의 일실시예의 공정도.
1 or less shows an embodiment of the present invention,
1 is a plan view of a first embodiment of a guide member.
2 is a plan view of a second embodiment of the guide member.
3 is a plan view of a third embodiment of the guide member.
4 is a plan view of a fourth embodiment of a guide member.
5 is a plan view of a fifth embodiment of the guide member.
6 is a plan view of a sixth embodiment of the guide member.
7 to 9 is a process diagram of an embodiment of a sheet pile underground wall construction method.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 이하에 도시된 바와 같이, 본 발명에 의한 시트파일 지중벽체 시공용 가이드부재(200)는 기본적으로, 지반굴착을 위한 케이싱(20)이 상하방향을 따라 가이드되도록 타측에 형성된 케이싱 가이드부(210); 시트파일(100)의 타단이 결합하여 상하방향을 따라 가이드되도록, 케이싱 가이드부(210)의 일측에 형성된 시트파일 가이드부(220);를 포함하여 구성된다(도 1 내지 6).As shown in FIG. 1 or less, the sheet pile underground wall construction guide member 200 according to the present invention basically has a casing guide portion formed on the other side so that the casing 20 for ground excavation is guided along the vertical direction. 210); It is configured to include; sheet pile guide portion 220 formed on one side of the casing guide portion 210, so that the other end of the sheet pile 100 is coupled and guided along the vertical direction (FIGS. 1 to 6).

이러한 가이드부재(200)를 이용하여, 지반에 대하여 연속하여 다수의 시트파일(100)을 측방향을 따라 순차적으로 매립함과 아울러, 상호 결합하여 지중벽체를 형성하기 위한 시트파일 지중벽체 시공방법은 다음과 같은 공정에 의해 이루어진다.Using such a guide member 200, the sheet pile underground wall construction method for successively embedding a plurality of sheet piles 100 in a lateral direction along with the ground, and combining them to form an underground wall It is made by the following process.

지반에 대하여 1번 천공 홀(11)을 형성하고, 다수의 시트파일(100) 중 1번 시트파일(110)의 타단에 가이드부재(200)를 결합하여, 1번 천공 홀(11)에 삽입하고 되메움한다(도 7).Forming a first hole (11) with respect to the ground, by combining the guide member 200 to the other end of the first sheet pile (110) of a plurality of sheet piles (100), inserted into the first hole (11) And backfill (FIG. 7).

가이드부재(200)의 일측에 인접한 지반에 대하여 2번 천공 홀(12)을 형성함과 아울러 케이싱(20)을 삽입하되, 케이싱(20)이 가이드부재(200)의 케이싱 가이드부(210)에 의해 가이드되도록 한다(도 8).While forming the second punching hole 12 with respect to the ground adjacent to one side of the guide member 200, and inserting the casing 20, the casing 20 is attached to the casing guide portion 210 of the guide member 200. Guided by (Fig. 8).

1번 시트파일(110)은 1번 천공 홀(11)에 매립된 채로 두고, 가이드부재(200)는 1번 시트파일(110)과 분리함과 아울러, 1번 천공 홀(11)로부터 인발한다.The first sheet pile 110 is left buried in the first punching hole 11, the guide member 200 is separated from the first sheet pile 110, and also drawn from the first drilling hole 11 .

다수의 시트파일(100) 중 2번 시트파일(120)의 타단에 가이드부재(200)를 결합하여 2번 천공 홀(12)에 삽입하되, 2번 시트파일(120)의 일단은 1번 시트파일(110)의 타단에 결합하고, 2번 천공 홀(12)을 되메움한다(도 9).The guide member 200 is coupled to the other end of the second sheet pile 120 among the plurality of sheet piles 100 to be inserted into the second punching hole 12, but one end of the second sheet pile 120 is the first sheet It is coupled to the other end of the pile 110, and fills the second drilling hole 12 (Fig. 9).

상기 천공단계, 가이드부재 인발단계 및 시트파일 매립단계를 순차적으로 반복하여, 지중벽체를 형성한다.The perforation step, the drawing step of the guide member and the step of filling the sheet pile are sequentially repeated to form an underground wall.

즉, 2번 천공 홀(12)에 대한 2번 시트파일(120)의 매립설치 후, 3번 천공 홀(13)의 천공작업을 실시함에 있어서, 2번 시트파일(120)의 타단에 가이드부재(200)를 임시로 설치하고, 이에 의해 천공작업에 사용되는 케이싱(20)이 가이드되도록 한 것이다(도 9).That is, after the buried installation of the second sheet pile 120 with respect to the second drill hole 12, in performing the drilling operation of the third drill hole 13, the guide member at the other end of the second seat pile 120 (200) is temporarily installed, whereby the casing 20 used for the drilling operation is guided (FIG. 9).

따라서 안정적인 천공작업에 의해 수직도가 우수한 천공 홀을 얻을 수 있고, 이에 따라 각각의 시트파일의 우수한 수직도를 얻을 수 있으므로, 결국 시트파일에 의한 지중벽체의 우수한 차수성능을 얻을 수 있다.Therefore, a stable punching operation can be used to obtain a punching hole having excellent verticality, and accordingly, good verticality of each sheet pile can be obtained, and thus, excellent order performance of the underground wall by the sheet pile can be obtained.

이하, 가이드부재(200)의 구체적 구조에 관한 실시예에 대하여 설명한다.Hereinafter, embodiments of the specific structure of the guide member 200 will be described.

본 발명에 의한 가이드부재(200)는 기본적으로, 지반굴착을 위한 케이싱(20)이 상하방향을 따라 가이드되도록 타측에 형성된 케이싱 가이드부(210); 시트파일(100)의 타단이 결합하여 상하방향을 따라 가이드되도록, 케이싱 가이드부(210)의 일측에 형성된 시트파일 가이드부(220);를 포함하여 구성된다.The guide member 200 according to the present invention basically, a casing guide portion 210 formed on the other side so that the casing 20 for ground excavation is guided along the vertical direction; It is configured to include; the sheet pile guide portion 220 formed on one side of the casing guide portion 210, so that the other end of the sheet pile 100 is coupled and guided along the vertical direction.

천공 홀의 크기의 증대를 최소화하면서 위 효과를 얻기 위해서는, 시트파일 가이드부(220)가 작은 크기이면서도, 케이싱(20)에 대한 안정적인 가이드가 가능한 구조를 취하여야 한다.In order to obtain the above effect while minimizing the increase in the size of the perforated hole, the sheet pile guide unit 220 must have a small size and a structure capable of stably guiding the casing 20.

이에 관하여 3가지 실시예를 제시한다.Three examples are presented in this regard.

첫째, 도 1,2의 실시예이다.First, it is an embodiment of FIGS. 1 and 2.

여기서 케이싱 가이드부(210)는, 함몰부의 중앙부에 시트파일 가이드부(220)가 형성된 가이드용 시트파일(100a);을 포함하여 구성된다.Here, the casing guide portion 210 is configured to include; a sheet pile guide portion 100a for which the sheet pile guide portion 220 is formed in the center of the depression.

즉, 다수의 시트파일(20) 중 하나를 가이드용 시트파일(100a)로 선택하고, 그 함몰부의 중앙부에 시트파일 가이드부(220)를 형성하여 가이드부재(200)로 활용하는 것이다.That is, one of the plurality of sheet piles 20 is selected as the guide sheet pile 100a, and the sheet pile guide portion 220 is formed in the center of the depression to be utilized as the guide member 200.

가이드용 시트파일(100a)의 함몰부가 일측(시트파일(100) 측)을 향하도록 하므로, 그 반대방향으로 설치되는 경우에 비해, 천공 홀의 크기 증대를 최소화할 수 있다.Since the recessed portion of the guide sheet pile 100a faces one side (the side of the sheet pile 100), it is possible to minimize the increase in the size of the perforated hole compared to the case in which it is installed in the opposite direction.

이는 기존의 자재에 대하여 최소한의 변형을 가하고, 그대로 사용한다는 장점이 있다.This has the advantage of applying minimal modification to the existing material and using it as it is.

둘째, 도 3,4의 실시예이다.Second, it is the embodiment of FIGS. 3 and 4.

여기서 케이싱 가이드부(210)는, 중앙부에 비해 양단이 타측으로 돌출된 함몰구조를 취한다.Here, the casing guide part 210 has a recessed structure in which both ends protrude to the other side as compared to the central part.

이는 천공 홀의 크기의 증대를 최소화하기 위하여, 양단의 돌출부의 돌출정도를 최소화함과 아울러, 타측 함몰부에 의해 케이싱(20)을 안정적으로 가이드할 수 있다는 장점이 있다.This has the advantage that, in order to minimize the increase in the size of the perforated hole, it is possible to stably guide the casing 20 by the other recessed portion while minimizing the degree of protrusion of the protrusions at both ends.

셋째, 도 5,6의 실시예이다.Third, the embodiments of FIGS. 5 and 6.

여기서 케이싱 가이드부(210)는, 원통형 구조의 케이싱(20)의 외면에 접촉하도록, 원호(圓弧)형 단면구조로 형성된다.Here, the casing guide part 210 is formed in an arc-shaped cross-sectional structure so as to contact the outer surface of the casing 20 having a cylindrical structure.

이는 케이싱 가이드부(210)의 타측 함몰부가 원통형 구조의 케이싱(20)의 외면에 대응하는 구조인 원호(圓弧)형 단면구조로 형성되므로, 케이싱(20)을 더욱 안정적으로 가이드할 수 있다는 장점이 있다.This is because the other recessed portion of the casing guide portion 210 is formed in an arc-shaped cross-sectional structure that is a structure corresponding to the outer surface of the casing 20 of a cylindrical structure, so that the casing 20 can be guided more stably. There is this.

시트파일 가이드부(220)는 시트파일(100)의 타단이 결합하여 상하방향을 따라 가이드되도록, 케이싱 가이드부(210)의 일측에 형성되는데, 이에 관하여 2가지 실시예를 제시한다.The sheet pile guide unit 220 is formed on one side of the casing guide unit 210 so that the other end of the sheet pile 100 is coupled and guided along the vertical direction, and two embodiments are provided.

첫째, 도 1,3,5의 실시예이다.First, it is an embodiment of FIGS. 1, 3, and 5.

여기서 시트파일 가이드부(220)는, 시트파일(100)의 타단이 삽입되도록, 상호 간격을 상기 케이싱 가이드부(210)의 일측에 돌출형성된 한 쌍의 돌출부(221);를 포함하는 구조를 취한다.Here, the sheet pile guide portion 220, a pair of protrusions 221 formed to protrude on one side of the casing guide portion 210, so that the other end of the sheet pile 100 is inserted, take a structure comprising a do.

이는 단지 한 쌍의 돌출부(221) 사이에 시트파일(100)의 타단이 삽입되어 결합하는 구조이므로 결합의 강도는 약하지만, 시트파일(100)과 가이드부재(200)의 결합작업, 가이드부재(200)의 인발작업이 용이하다는 장점이 있다.This is a structure in which the other end of the sheet pile 100 is inserted and coupled between only a pair of protrusions 221, so the strength of the coupling is weak, but the bonding operation between the sheet pile 100 and the guide member 200, the guide member ( 200) has the advantage of easy drawing.

둘째, 도 2,4,6의 실시예이다.Second, the embodiments of Figs. 2,4,6.

여기서 시트파일 가이드부(220)는, 시트파일(100)의 타단에 대응하는 고리형 단면구조로 형성된 고리형 가이드부(222);를 포함하는 구조를 취한다.Here, the sheet pile guide part 220 has a structure including; a ring-shaped guide part 222 formed of an annular cross-sectional structure corresponding to the other end of the sheet pile 100.

즉, 종래의 시트파일의 단부의 결합구조와 동일한 구조를 시트파일 가이드부(220)로 적용하는 것이다.That is, the same structure as that of the conventional end portion of the sheet pile is applied to the sheet pile guide portion 220.

이는 결합의 강도가 강하므로, 인접 천공 홀의 천공작업 시 케이싱(20)을 더욱 안정적으로 가이드할 수 있다는 장점이 있다.This has the advantage of being able to guide the casing 20 more stably during the drilling operation of the adjacent drilling hole because the strength of the coupling is strong.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.The above is merely a description of some of the preferred embodiments that can be implemented by the present invention, and as is well known, the scope of the present invention should not be construed as being limited to the above embodiments, and the present invention described above. It will be said that both the technical idea and the technical idea together with the fundamental are included in the scope of the present invention.

11,12,13 : 천공 홀 20 : 케이싱
100,110,120 : 시트파일 100a : 가이드용 시트파일
200 : 가이드부재 210 : 케이싱 가이드부
220 : 시트파일 가이드부 221 : 돌출부
222 : 고리형 가이드부
11,12,13: Drilling hole 20: Casing
100,110,120: sheet file 100a: sheet file for guide
200: guide member 210: casing guide unit
220: sheet pile guide portion 221: protrusion
222: annular guide portion

Claims (7)

지반굴착을 위한 케이싱(20)이 상하방향을 따라 가이드되도록 타측에 형성된 케이싱 가이드부(210);
시트파일(100)의 타단이 결합하여 상하방향을 따라 가이드되도록, 상기 케이싱 가이드부(210)의 일측에 형성된 시트파일 가이드부(220);를
포함하는 시트파일 지중벽체 시공용 가이드부재(200)를 이용하여, 지반에 대하여 연속하여 다수의 시트파일(100)을 측방향을 따라 순차적으로 매립함과 아울러, 상호 결합하여 지중벽체를 형성하기 위한 시트파일 지중벽체 시공방법에 있어서,
상기 시트파일 지중벽체 시공용 가이드부재(200)의 상기 케이싱 가이드부(210)는,
중앙부에 비해 양단이 타측으로 돌출된 함몰구조로서, 원통형 구조의 케이싱(20)의 외면에 접촉하도록, 원호(圓弧)형 단면구조로 형성되고,
상기 시트파일 지중벽체 시공방법은,
지반에 대하여 1번 천공 홀(11)을 형성하는 단계;
상기 다수의 시트파일(100) 중 1번 시트파일(110)의 타단에 상기 가이드부재(200)를 결합하여, 상기 1번 천공 홀(11)에 삽입하고 되메움하는 단계;
상기 가이드부재(200)의 일측에 인접한 지반에 대하여 2번 천공 홀(12)을 형성함과 아울러 케이싱(20)을 삽입하되, 상기 케이싱(20)이 상기 가이드부재(200)의 케이싱 가이드부(210)에 의해 가이드되도록 하는 천공단계;
상기 1번 시트파일(110)은 상기 1번 천공 홀(11)에 매립된 채로 두고, 상기 가이드부재(200)는 상기 1번 시트파일(110)과 분리함과 아울러, 상기 1번 천공 홀(11)로부터 인발하는 가이드부재 인발단계;
상기 다수의 시트파일(100) 중 2번 시트파일(120)의 타단에 상기 가이드부재(200)를 결합하여 상기 2번 천공 홀(12)에 삽입하되, 상기 2번 시트파일(120)의 일단은 상기 1번 시트파일(110)의 타단에 결합하고, 상기 2번 천공 홀(12)을 되메움하는 시트파일 매립단계;
상기 천공단계, 가이드부재 인발단계 및 시트파일 매립단계를 순차적으로 반복하여, 상기 지중벽체를 형성하는 단계;를
포함하는 것을 특징으로 하는 시트파일 지중벽체 시공방법.
A casing guide portion 210 formed on the other side so that the casing 20 for ground excavation is guided along the vertical direction;
A seat pile guide portion 220 formed on one side of the casing guide portion 210 so that the other end of the seat pile 100 is coupled and guided along the vertical direction;
For using the sheet pile underground wall construction guide member 200 to continuously embed a plurality of sheet piles 100 sequentially along the lateral direction with respect to the ground, and to combine with each other to form an underground wall In the method of constructing a sheet pile underground wall,
The casing guide portion 210 of the sheet pile underground wall construction guide member 200,
It is a recessed structure with both ends projecting to the other side as compared to the central portion, and is formed in an arc-shaped cross-sectional structure so as to contact the outer surface of the casing 20 having a cylindrical structure,
The sheet pile underground wall construction method,
Forming a first hole (11) with respect to the ground;
Coupling the guide member 200 to the other end of the first sheet pile 110 among the plurality of sheet piles 100, inserting and refilling the first punching hole 11;
While forming the second drilling hole 12 with respect to the ground adjacent to one side of the guide member 200, and inserting a casing 20, the casing 20 is a casing guide portion of the guide member 200 ( 210) to be guided by;
The first sheet pile 110 is left buried in the first drilling hole 11, the guide member 200 is separated from the first sheet pile 110, and the first drilling hole ( 11) drawing the guide member from the drawing step;
The guide member 200 is coupled to the other end of the second sheet pile 120 among the plurality of sheet piles 100 to be inserted into the second drilling hole 12, but one end of the second sheet pile 120 Is coupled to the other end of the first sheet pile 110, the filling step of the sheet pile filling the second hole (12);
Forming the underground wall by sequentially repeating the drilling step, the guide member drawing step, and the sheet pile embedding step;
Seat pile underground wall construction method comprising a.
삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 시트파일 가이드부(220)는,
시트파일(100)의 타단이 삽입되도록, 상호 간격을 두고 상기 케이싱 가이드부(210)의 일측에 돌출형성된 한 쌍의 돌출부(221);를 포함하는 것을 특징으로 하는 시트파일 지중벽체 시공방법.
According to claim 1,
The sheet file guide unit 220,
Seat pile underground wall construction method, characterized in that it comprises; a pair of protrusions 221 formed protruding on one side of the casing guide portion 210 at a mutual distance so that the other end of the sheet pile 100 is inserted.
제1항에 있어서,
상기 시트파일 가이드부(220)는,
시트파일(100)의 타단에 대응하는 고리형 단면구조로 형성된 고리형 가이드부(222);를 포함하는 것을 특징으로 하는 시트파일 지중벽체 시공방법.
According to claim 1,
The sheet file guide unit 220,
Seat pile underground wall construction method characterized in that it comprises a; a ring-shaped guide portion 222 formed of an annular cross-sectional structure corresponding to the other end of the sheet pile (100).
삭제delete
KR1020190114029A 2019-09-17 2019-09-17 Guide member and construction method for underground wall using sheet pile using the same KR102136300B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190114029A KR102136300B1 (en) 2019-09-17 2019-09-17 Guide member and construction method for underground wall using sheet pile using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190114029A KR102136300B1 (en) 2019-09-17 2019-09-17 Guide member and construction method for underground wall using sheet pile using the same

Publications (1)

Publication Number Publication Date
KR102136300B1 true KR102136300B1 (en) 2020-07-21

Family

ID=71832584

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190114029A KR102136300B1 (en) 2019-09-17 2019-09-17 Guide member and construction method for underground wall using sheet pile using the same

Country Status (1)

Country Link
KR (1) KR102136300B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102301824B1 (en) 2021-02-15 2021-09-14 무성토건 주식회사 Construction Method of Sheet Pile Using Special Casing
KR102405533B1 (en) 2021-07-14 2022-06-07 무성토건 주식회사 Construction method for continuous construction including special casing wire end anti-departure member and sheet file construction method for rock bottom layer using it

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100507983B1 (en) * 2005-01-28 2005-08-10 (주)중앙건설 Method for piling sheet in the base rock
KR100652558B1 (en) * 2005-09-27 2006-12-01 (주)코아지질 Guide pipe for sheet pile and construction method using the same
KR20110010862A (en) * 2009-07-27 2011-02-08 백남진 Guide casing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100507983B1 (en) * 2005-01-28 2005-08-10 (주)중앙건설 Method for piling sheet in the base rock
KR100652558B1 (en) * 2005-09-27 2006-12-01 (주)코아지질 Guide pipe for sheet pile and construction method using the same
KR20110010862A (en) * 2009-07-27 2011-02-08 백남진 Guide casing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102301824B1 (en) 2021-02-15 2021-09-14 무성토건 주식회사 Construction Method of Sheet Pile Using Special Casing
KR102405533B1 (en) 2021-07-14 2022-06-07 무성토건 주식회사 Construction method for continuous construction including special casing wire end anti-departure member and sheet file construction method for rock bottom layer using it

Similar Documents

Publication Publication Date Title
KR102136300B1 (en) Guide member and construction method for underground wall using sheet pile using the same
KR20160015099A (en) Micropile reinforcement structure and Reinforcing method of foot concrete using it
KR20090131338A (en) Casing and sheet pile structuring method using thereof
KR20000046138A (en) Nailing construction method for removing nail
JP2017110362A (en) Ground stabilization structure and ground stabilization method
KR101534036B1 (en) Combination type anchor assembly of and Constructing method thereof
KR102124772B1 (en) Self-supporting retaining wall and construction method using it
KR102119948B1 (en) Connector assembly and pile wall structure
KR20180079676A (en) The core for Cast In Place pile and the continuous wall using thereof and the construction apparatus thereof
KR101204193B1 (en) Guide member for down hole method for down hole using the same
KR101517884B1 (en) Construction method for wall structure of underground using the semicircular sheet pile
KR20160132343A (en) Micro pile and construction method therefor
JP2013044103A (en) Shear reinforcement method of reinforced concrete structure and auxiliary device
KR101836416B1 (en) Plastic Sheet Pile Installation Method
KR101997342B1 (en) Micro pile improved lateral load resistance
KR101865075B1 (en) Method of Forming for Grouting Root
KR102052559B1 (en) Construction method for underground wall using sheet pile
KR102256698B1 (en) Two-Way Guide casing of cast in place type overlap drilling and Method for Drilling Ground using the same
KR102619673B1 (en) Concrete Reinforcing Method Using Micropile And Dispersion Plate
KR101181543B1 (en) Micropile comprising function of compression and inflation for ends
KR101593879B1 (en) Cast in place concrete pile and construction method using the same
KR102514988B1 (en) Pile construction device and method using earth anchor
KR20190061785A (en) Method and structure for reinforcing foundation
KR20180114353A (en) Pile Construction Method of Deep Depth Filing Hole
KR102304600B1 (en) Steel pile with improved horizontal resistance and construction method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant