KR102118881B1 - Frame for constructing bathroom and method for constructing bathroom floor using the same - Google Patents

Frame for constructing bathroom and method for constructing bathroom floor using the same Download PDF

Info

Publication number
KR102118881B1
KR102118881B1 KR1020180108337A KR20180108337A KR102118881B1 KR 102118881 B1 KR102118881 B1 KR 102118881B1 KR 1020180108337 A KR1020180108337 A KR 1020180108337A KR 20180108337 A KR20180108337 A KR 20180108337A KR 102118881 B1 KR102118881 B1 KR 102118881B1
Authority
KR
South Korea
Prior art keywords
formwork
floor
waterproof plate
construction
concrete
Prior art date
Application number
KR1020180108337A
Other languages
Korean (ko)
Other versions
KR20200029825A (en
Inventor
장세준
양우석
정남철
Original Assignee
현대건설(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대건설(주) filed Critical 현대건설(주)
Priority to KR1020180108337A priority Critical patent/KR102118881B1/en
Publication of KR20200029825A publication Critical patent/KR20200029825A/en
Application granted granted Critical
Publication of KR102118881B1 publication Critical patent/KR102118881B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements

Abstract

본 발명은 화장실 바닥층 시공에 관한 것으로서, 본 발명에 의하면, 판상의 바닥부와, 상기 바닥부로부터 위로 연장되어 형성되는 측벽부를 구비하고 방수 재질로 이루어지는 방수판; 및 상기 방수판에 일체로 형성되고 상기 바닥부로부터 아래로 돌출되는 적어도 하나의 배관 슬리브를 포함하는 화장실 시공용 형틀체 및 이를 이용한 화장실 바닥층 시공방법으로서, 시공 대상 화장실의 바닥층을 포함하는 영역에 대한 콘크리트 타설을 위한 거푸집을 설치하는 바닥 거푸집 설치 단계; 상기 거푸집 내에서 시공 대상 화장실에 대응하는 영역에 상기 형틀체를 상기 배관 슬리브의 끝단이 상기 거푸집의 바닥과 접하도록 배치하는 형틀체 배치 단계; 및 상기 거푸집의 바닥과 상기 방수판의 바닥부 사이에 형성되는 공간으로 콘크리트가 타설되는 콘크리트 타설 단계를 포함하는 화장실 바닥층 시공방법이 제공된다.The present invention relates to the construction of the floor of the bathroom, according to the present invention, a waterproof plate made of a waterproof material having a plate-shaped bottom portion and a side wall portion extending upward from the bottom portion; And an at least one pipe sleeve integrally formed on the waterproof plate and protruding downward from the bottom portion, and a method for constructing a toilet floor layer using the same, comprising: a floor layer of a toilet to be constructed; Floor formwork installation step of installing the formwork for concrete pouring; Placing a mold body in an area corresponding to a construction target toilet in the formwork so that an end of the pipe sleeve is in contact with the bottom of the formwork; And a concrete pouring step of pouring concrete into a space formed between the bottom of the formwork and the bottom of the waterproof plate.

Description

화장실 시공용 형틀체 및 이를 이용한 화장실 바닥층 시공방법 {FRAME FOR CONSTRUCTING BATHROOM AND METHOD FOR CONSTRUCTING BATHROOM FLOOR USING THE SAME}A mold for toilet construction and a method for constructing the floor of a toilet using the same {FRAME FOR CONSTRUCTING BATHROOM AND METHOD FOR CONSTRUCTING BATHROOM FLOOR USING THE SAME}

본 발명은 화장실 시공 기술에 관한 것으로서, 더욱 상세하게는 화장실 바닥층의 시공 기술에 관한 것이다.The present invention relates to a toilet construction technique, and more particularly, to a construction technique of the floor of the toilet.

일반적으로 철근콘크리트 건물은 거푸집 설치, 철근 배근, 콘크리트 타설 및 콘크리트 양생의 시공 단계를 거치게 되는데, 화장실의 경우 배수구, 방수턱 및 방수층 형성을 위하여, 다른 곳에 비해 더 복잡한 시공 단계를 거치게 된다. 예를 들어서, 슬래브 다운을 위한 별도의 형틀을 제작하여 설치한 후 배관 슬리브를 설치하고, 콘크리트 양생 후 별도로 설치된 형틀을 해체하고 방수 시공을 추가로 실시해야 하는 번거로움이 있다.In general, reinforced concrete buildings go through the installation steps of formwork installation, rebar reinforcement, concrete pouring and concrete curing. In the case of toilets, more complicated construction steps are performed compared to other places in order to form drains, waterproof jaws and waterproof layers. For example, there is a hassle of installing and installing a separate mold for slab down, installing a piping sleeve, dismantling the separately installed mold after curing the concrete, and additionally performing waterproof construction.

최근에는 이러한 화장실 바닥층의 시공에 있어서 복잡함을 해소하고자 화장실 바닥층을 사전 제작된 PC(precast concrete) 슬래브를 이용하여 시공하는 방법이 개발되고 있으나, 무거운 PC 슬래브를 시공 위치로 운반하는 작업에 어려움이 있다는 문제가 있다.Recently, a method for constructing a bathroom floor layer using a prefabricated PC (precast concrete) slab has been developed to solve the complexity of the construction of the bathroom floor layer, but there is difficulty in transporting a heavy PC slab to a construction location. there is a problem.

대한민국 공개특허공보 공개번호 제10-2009-0055245호 (2009.06.02.)Republic of Korea Patent Publication No. 10-2009-0055245 (2009.06.02.)

본 발명의 목적은 화장실 바닥층 시공의 작업성을 향상시킬 수 있는 화장실 시공용 형틀체 및 이를 이용한 화장실 바닥층 시공방법을 제공하는 것이다.An object of the present invention is to provide a mold for the construction of a toilet that can improve the workability of the floor construction of the toilet and a floor construction method of the toilet using the same.

상기한 본 발명의 목적을 달성하기 위하여, 본 발명의 일 측면에 따르면, 판상의 바닥부와, 상기 바닥부로부터 위로 연장되어 형성되는 측벽부를 구비하고 방수 재질로 이루어지는 방수판; 및 상기 방수판에 일체로 형성되고 상기 바닥부로부터 아래로 돌출되는 적어도 하나의 배관 슬리브를 포함하는 화장실 시공용 형틀체가 제공된다.In order to achieve the above object of the present invention, according to one aspect of the present invention, a plate-shaped bottom portion, and a side wall portion formed extending upward from the bottom portion and a waterproof plate made of a waterproof material; And at least one pipe sleeve formed integrally with the waterproof plate and protruding downward from the bottom portion.

상기한 본 발명의 목적을 달성하기 위하여, 본 발명의 다른 측면에 따르면, 화장실 바닥층을 시공하는 방법으로서, 시공 대상 화장실의 바닥층을 포함하는 영역에 대한 콘크리트 타설을 위한 거푸집을 설치하는 바닥 거푸집 설치 단계; 상기 거푸집 내에서 시공 대상 화장실에 대응하는 영역에 상기 형틀체를 상기 배관 슬리브의 끝단이 상기 거푸집의 바닥과 접하도록 배치하는 형틀체 배치 단계; 및 상기 거푸집의 바닥과 상기 방수판의 바닥부 사이에 형성되는 공간으로 콘크리트가 타설되는 콘크리트 타설 단계를 포함하는 화장실 바닥층 시공방법이 제공된다.In order to achieve the above object of the present invention, according to another aspect of the present invention, as a method of constructing a bathroom floor layer, a floor formwork installation step of installing a formwork for pouring concrete in an area including the floor layer of the bathroom to be constructed ; Placing a mold body in an area corresponding to a construction target toilet in the formwork so that an end of the pipe sleeve is in contact with the bottom of the formwork; And a concrete pouring step of pouring concrete into a space formed between the bottom of the formwork and the bottom of the waterproof plate.

본 발명에 의하면 앞서서 기재한 본 발명의 목적을 모두 달성할 수 있다. 구체적으로는, 슬래브다운을 제공하는 방수판과 방수판에 일체로 형성된 배관 슬리브를 구비하며 콘크리트 타설 시 형틀로서 기능하는 형틀체가 사용되므로, 종래의 시공 방식에서 슬래브다운을 위한 별도의 형틀 제작 및 배관 슬리브 설치, 형틀의 해제 및 방수 시공 단계가 필요없게 되어서, 작업성이 현저하게 향상되고, 균일한 품질을 확보할 수 있게 된다.According to the present invention, it is possible to achieve all the objects of the present invention described above. Specifically, since a watertight plate providing a slab down and a pipe sleeve integrally formed with the watertight plate are used, and a mold body serving as a mold when pouring concrete is used, in the conventional construction method, separate mold making and piping for slab down is produced. The installation of the sleeve, the release of the mold and the step of waterproof construction are eliminated, so that workability is significantly improved and uniform quality can be secured.

도 1은 본 발명의 일 실시예에 따른 화장실용 시공용 형틀체의 사시도이다.
도 2는 도 1에 도시된 화장실용 시공용 형틀체를 이용한 본 발명의 일 실시예에 따른 화장실 바닥층 시공 방법을 도시한 순서도이다.
도 3은 도 2에 도시된 화장실 바닥층 시공방법에서 형틀체 설치 단계가 수행된 상태를 도시한 사시도이다.
도 4는 도 3의 A-A'선에 대한 단면도이다.
도 5는 도 2에 도시된 화장실 바닥층 시공방법에서 콘크리트 타설 단계가 수행된 상태를 도시한 사시도이다.
1 is a perspective view of a mold for construction of a toilet according to an embodiment of the present invention.
FIG. 2 is a flow chart showing a method of constructing a floor layer of a toilet according to an embodiment of the present invention using a mold for toilet construction shown in FIG. 1.
FIG. 3 is a perspective view showing a state in which a mold body installation step is performed in the bathroom floor layer construction method illustrated in FIG. 2.
4 is a cross-sectional view taken along line A-A' in FIG. 3.
FIG. 5 is a perspective view showing a state in which a concrete pouring step is performed in the bathroom floor layer construction method illustrated in FIG. 2.

이하, 도면을 참조하여 본 발명의 실시예의 구성 및 작용을 상세하게 설명한다.Hereinafter, the configuration and operation of the embodiment of the present invention will be described in detail with reference to the drawings.

도 1에는 본 발명의 일 실시예에 따른 화장실 시공용 형틀체가 사시도로서 도시되어 있다. 도 1을 참조하면, 본 발명의 일 실시예에 따른 화장실 시공용 형틀체(100)는 방수판(110)과, 방수판(110)에 일체로 형성된 복수개의 배관 슬리브(sleeve)(120)들을 구비한다. 화장실 시공용 형틀체(100)는 화장실의 슬래브 다운(slab down)을 형성하기 위한 형틀 및 방수판으로서 기능한다.1 is a perspective view of a mold for toilet construction according to an embodiment of the present invention. Referring to FIG. 1, the mold 100 for toilet construction according to an embodiment of the present invention includes a waterproof plate 110 and a plurality of pipe sleeves 120 integrally formed on the waterproof plate 110. To be equipped. The mold body 100 for toilet construction functions as a mold and a waterproof plate for forming a slab down of the toilet.

방수판(110)은 대체로 편평한 판상의 바닥부(111)와, 바닥부(111)의 가장자리로부터 위로 연장되는 측벽부(115)와, 측벽부(115)의 상단으로부터 바깥쪽으로 연장되는 플랜지부(118)를 구비한다. 방수판(110)은 합성수지재로서, 플라스틱 사출성형 또는 프레스 금형을 이용한 프레스 가공을 통해 원하는 형상 및 크기로 제작될 수 있다. 바닥부(111)는 대체로 편평한 판상으로서, 화장실의 바닥면에 대응하여 배치된다. 바닥부(111)에는 복수개의 배관 슬리브(120)들이 일체로 형성된다. 바닥부(111)에는 복수개의 배관 슬리브(120)들이 각각 결합되는 복수개의 관통구(112)들이 형성된다. 측벽부(115)는 바닥부(111)의 가장자리로부터 위로 연장되어서 형성된다. 플랜지부(118)는 측벽부(115)의 상단으로부터 바깥쪽으로 연장되어서 형성된다. 도 1에는 도시되지는 않았으나, 방수판(110)에는 복수개의 지지대들과 복수개의 결합부들이 형성되는데, 이에 대해서는 이후 도 4를 참조하여 구체적으로 설명될 것이다. 본 실시예에서는 방수판(110)이 합성수지재인 것으로 설명하지만, 이와는 달리 스테인리스강과 같은 금속 재질일 수도 있으며, 이 또한 본 발명의 범위에 속하는 것이다.The waterproof plate 110 includes a flat plate-like bottom portion 111, a side wall portion 115 extending upward from the edge of the bottom portion 111, and a flange portion extending outward from the top of the side wall portion 115 ( 118). The waterproof plate 110 is a synthetic resin material, and may be manufactured in a desired shape and size through plastic injection molding or press processing using a press mold. The bottom portion 111 is generally flat, and is disposed corresponding to the bottom surface of the toilet. A plurality of pipe sleeves 120 are integrally formed on the bottom portion 111. A plurality of through holes 112 to which the plurality of pipe sleeves 120 are coupled are formed on the bottom portion 111. The side wall portion 115 is formed to extend upward from the edge of the bottom portion 111. The flange portion 118 is formed by extending outward from the top of the side wall portion 115. Although not shown in FIG. 1, the waterproof plate 110 has a plurality of supports and a plurality of coupling parts, which will be described in detail later with reference to FIG. 4. In this embodiment, although the waterproof plate 110 is described as being a synthetic resin material, unlike this, it may be a metal material such as stainless steel, and this also belongs to the scope of the present invention.

복수개의 배관 슬리브(120)들은 방수판(110)과 일체로 형성되며, 방수판(110)의 바닥부(111)로부터 아래로 돌출된다. 배관 슬리브(120)에 의해 배관 통로가 확보된다. 방수판(110)이 사출성형에 의해 제작되는 경우, 배관 슬리브(120)는 인서트 사출성형에 의해 방수판(110)과 일체로 형성될 수 있다. 방수판(110)이 프레스 가공을 통해 제작되는 경우, 프레스 가공을 통해 제작된 방수판(110)에 복수개의 배관 슬리브(120)가 고정되어서 일체로 형성될 수 있다. 본 실시예에서는 배관 슬리브(120)가 복수개인 것으로 설명하지만, 이와는 달리 하나만 구비될 수 있으며 이 또한 본 발명의 범위에 속하는 것이다.The plurality of pipe sleeves 120 are formed integrally with the waterproof plate 110 and protrude downward from the bottom portion 111 of the waterproof plate 110. A pipe passage is secured by the pipe sleeve 120. When the waterproof plate 110 is manufactured by injection molding, the pipe sleeve 120 may be integrally formed with the waterproof plate 110 by insert injection molding. When the waterproof plate 110 is manufactured through press processing, a plurality of pipe sleeves 120 may be fixed to the waterproof plate 110 manufactured through press processing to be integrally formed. In this embodiment, although a plurality of pipe sleeves 120 are described, unlike this, only one may be provided, and this also belongs to the scope of the present invention.

도 2에는 도 1에 도시된 화장실 시공용 형틀체를 이용한 본 발명의 일 실시예에 따른 화장실 바닥층 시공 방법이 순서도로서 도시되어 있다. 도 2를 참조하면, 본 발명의 일 실시예에 따른 화장실 바닥층 시공 방법은, 시공 대상 화장실의 바닥층을 포함하는 영역에 대한 콘크리트 타설을 위한 거푸집을 설치하는 바닥 거푸집 설치 단계(S10)와, 바닥 거푸집 설치 단계(S10)를 통해 설치된 거푸집 내에 철근을 배근하는 철근 배근 단계(S20)와, 철근 배근 단계(S20)를 통한 철근 배근 후 시공 대상 화장실 영역에 앞서서 설명된 구성의 형틀체(100)를 배치시키는 형틀체 배치 단계(S30)와, 형틀체 배치 단계(S30)를 통해 형틀체(100)가 배치된 후에 콘크리트를 타설하는 콘크리트 타설 단계(S40)와, 콘크리트 타설 단계(S40) 후에 타설된 콘크리트가 양생되는 콘크리트 양생 단계(S50)를 포함한다.FIG. 2 is a flowchart illustrating a method of constructing a floor layer of a toilet according to an embodiment of the present invention using the mold for toilet construction shown in FIG. 1. Referring to Figure 2, the floor floor construction method according to an embodiment of the present invention, the floor formwork installation step (S10) for installing the formwork for pouring concrete for the area including the floor layer of the construction target toilet, floor formwork Rebar reinforcement step (S20) for reinforcing the reinforcing bar in the formwork installed through the installation step (S10), and rebar reinforcement through the reinforcing bar reinforcement step (S20). Concrete pouring step (S40) to pour concrete after the mold body placement step (S30) to be placed, and the mold body 100 is placed through the mold body placement step (S30), and concrete poured after the concrete pouring step (S40) It includes a concrete curing step (S50) to be cured.

바닥 거푸집 설치 단계(S10)에서는 시공 대상 화장실의 바닥층을 포함하는 영역에 대한 콘크리트 타설을 위한 거푸집이 설치된다. 바닥 거푸집 설치 단계(S10)는 철근콘크리트 구조에서 통상적으로 슬래브 형성을 위해 거푸집이 설치되는 방식과 동일하므로 이에 대한 상세한 설명은 생략한다. 바닥 거푸집 설치 단계(S10)가 완료된 후에는 철근 배근 단계(S20)가 수행된다.In the floor formwork installation step (S10), a formwork for pouring concrete into an area including a floor layer of a bathroom to be constructed is installed. The floor formwork installation step (S10) is the same as the method in which the formwork is installed to form a slab in a reinforced concrete structure, so a detailed description thereof will be omitted. After the floor formwork installation step (S10) is completed, the reinforcing bar reinforcement step (S20) is performed.

철근 배근 단계(S20)는 바닥 거푸집 설치 단계(S10)가 완료된 후 수행되며, 철근 배근 단계(S20)에서는 바닥 거푸집 설치 단계(S10)를 통해 설치된 거푸집 내에 철근콘크리트 구조 형성을 위한 철근이 배근된다. 철근 배근 단계(S20)에서 수행되는 철근 배근은 철근콘크리트 구조 형성시 통상적으로 사용되는 방식이 사용되므로 이에 대한 상세한 설명은 생략한다. 철근 배근 단계(S20)가 완료된 후에는 형틀체 배치 단계(S30)가 수행된다.The reinforcing bar reinforcement step (S20) is performed after the floor formwork installation step (S10) is completed, and in the reinforcing bar reinforcement step (S20), the reinforcing bar for forming a reinforced concrete structure in the formwork installed through the bottom formwork installation step (S10) is reinforced. Reinforcing bar reinforcement performed in the reinforcing bar reinforcement step (S20), since a method commonly used when forming a reinforced concrete structure is used, detailed description thereof will be omitted. After the reinforcing bar reinforcement step (S20) is completed, the mold body placement step (S30) is performed.

형틀체 배치 단계(S30)는 철근 배근 단계(S20)가 완료된 후 수행되며, 형틀체 배치 단계(S30)에서는 도 1을 참조하여 앞서서 설명된 구성의 형틀체(100)가 시공 대상 화장실 영역에 대응하여 배치된다. 도 3과 도 4에는 형틀체 배치 단계(S30)를 통해 형틀체(100)가 배치된 상태가 도시되어 있다. 도 3과 도 4를 참조하면, 형틀체(100)는 철근(10)이 설치된 거푸집(20) 내에 방수판(110)의 플랜지부(118)가 위를 향하고 복수개의 배관 슬리브(120)들이 아래를 향하도록 배치된다. 도 4를 참조하면, 배관 슬리브(120)의 하단은 거푸집(20)의 상면과 접한다.The mold placement step (S30) is performed after the reinforcing bar reinforcement step (S20) is completed, and in the mold placement step (S30), the mold body 100 of the configuration described above with reference to FIG. 1 corresponds to the construction target toilet area Is placed. 3 and 4 show a state in which the mold body 100 is disposed through the mold body placement step (S30). Referring to FIGS. 3 and 4, the mold body 100 has a flange portion 118 of the waterproof plate 110 facing upwards in the formwork 20 in which the reinforcing bars 10 are installed, and a plurality of pipe sleeves 120 are below. It is arranged to face. Referring to Figure 4, the lower end of the pipe sleeve 120 is in contact with the upper surface of the formwork (20).

형틀체(100)는 방수판(110)의 바닥부(111)로부터 아래로 돌출된 복수개의 지지대(113)을 더 구비할 수 있다. 복수개의 지지대(113)들 각각의 끝단(하단)은 거푸집(20)의 상면과 접촉하여 형틀체(100)가 기울어지지 않도록 한다. 복수개의 지지대(113)들은 방수판(110)의 사출성형 제작시 함께 일체로 형성될 수 있다. 또한, 복수개의 지지대(113)들 각각의 끝단은 뾰족하게 형성되어서 거푸집(10)에 약간 박혀있도록 함으로써, 콘크리트 타설(S40) 및 콘크리트 양생(S50) 등 이후 시공 단계에서 정위치를 안정적으로 유지하도록 할 수 있다. 이 경우, 복수개의 지지대(113)들은 금속재로 이루어지는 것이 바람직하며, 배관 슬리브(120)와 함께 인서트 사출성형을 이용하여 방수판(110)과 함께 일체로 제작될 수 있다.The mold body 100 may further include a plurality of supports 113 protruding downward from the bottom portion 111 of the waterproof plate 110. The end (lower end) of each of the plurality of supports 113 is in contact with the upper surface of the formwork 20 so that the mold body 100 is not inclined. The plurality of supports 113 may be integrally formed together during the production of injection molding of the waterproof plate 110. In addition, the ends of each of the plurality of supports 113 are sharply formed to be slightly embedded in the formwork 10, so that concrete placement (S40) and concrete curing (S50) and the like are maintained in a stable position in subsequent construction steps. can do. In this case, the plurality of supports 113 is preferably made of a metal material, and may be integrally manufactured with the waterproof plate 110 using insert injection molding together with the pipe sleeve 120.

형틀체(100)는 방수판(110)의 바닥부(111)의 밑면에 돌출되어서 형성된 복수개의 결합부(114)들을 더 구비할 수 있다. 복수개의 결합부(114)들은 끝으로 갈수록 넓어지도록 형성되어서 콘크리트와의 결합력을 향상시키게 된다. 형틀체 배치 단계(S30)가 완료된 후에는 콘크리트 타설 단계(S40)가 수행된다.The mold body 100 may further include a plurality of coupling portions 114 formed by protruding from the bottom surface of the bottom portion 111 of the waterproof plate 110. The plurality of coupling parts 114 are formed to be wider toward the end, thereby improving the bonding force with the concrete. After the mold placement step (S30) is completed, the concrete pouring step (S40) is performed.

콘크리트 타설 단계(S40)에서는 거푸집(20)과 방수판(110)의 사이에 형성된 공간으로 콘크리트가 타설된다. 콘크리트 타설 단계(S40)에서 방수판(110)은 형틀로서의 기능을 수행하게 된다. 콘크리트 타설 단계(S40)가 완료된 후에는 콘크리트 양생 단계(S40)가 수행된다.In the concrete pouring step (S40 ), concrete is poured into the space formed between the formwork 20 and the waterproof plate 110. In the concrete pouring step (S40), the waterproof plate 110 functions as a mold. After the concrete pouring step (S40) is completed, the concrete curing step (S40) is performed.

콘크리트 양생 단계(S50)에서는 콘크리트 타설 단계(S40)를 통해 거푸집(20)과 방수판(110)의 사이로 타설된 콘크리트가 양생된다. 콘크리트 양생 단계(S50) 후 도 5에 도시된 바와 같이 거푸집(20)의 바닥과 형틀체(100)의 방수판(110)의 사이에 콘크리트층(20)이 형성된다.In the concrete curing step (S50), the concrete poured between the formwork 20 and the waterproof plate 110 is cured through the concrete pouring step (S40). After the concrete curing step (S50), a concrete layer 20 is formed between the bottom of the formwork 20 and the waterproof plate 110 of the formwork 100 as shown in FIG. 5.

도시되지는 않았으나, 이후 방수판(110)의 상면으로 모르타르 및 타일 시공이 이루어져서 화장실 바닥층 시공이 완료된다.Although not shown, since the mortar and tile construction is made on the top surface of the waterproof plate 110, the floor construction of the bathroom is completed.

이상 실시예를 통해 본 발명을 설명하였으나, 본 발명은 이에 제한되는 것은 아니다. 상기 실시예는 본 발명의 취지 및 범위를 벗어나지 않고 수정되거나 변경될 수 있으며, 본 기술분야의 통상의 기술자는 이러한 수정과 변경도 본 발명에 속하는 것임을 알 수 있을 것이다.The present invention has been described through the above embodiments, but the present invention is not limited thereto. The above embodiments can be modified or changed without departing from the spirit and scope of the present invention, and those skilled in the art will recognize that such modifications and changes also belong to the present invention.

100 : 화장실 시공용 형틀체 110 : 방수판
111 : 바닥부 113 : 지지대
114 : 결합부 115 : 측벽부
118 : 플랜지부 120 : 배관 슬리브
100: mold for bathroom construction 110: waterproof plate
111: bottom 113: support
114: engaging portion 115: side wall portion
118: flange portion 120: piping sleeve

Claims (10)

판상의 바닥부와, 상기 바닥부로부터 위로 연장되어 형성되는 측벽부를 구비하고 방수 재질로 이루어지는 방수판;
상기 바닥부로부터 아래로 연장되어서 형성되는 복수개의 지지대들; 및
상기 방수판에 일체로 형성되고 상기 바닥부로부터 아래로 돌출되는 적어도 하나의 배관 슬리브를 포함하며,
상기 방수판은 수지재이고, 상기 복수개의 지지대들 각각은 끝단이 뾰족한 금속재인 화장실 시공용 형틀체.
A waterproof plate having a plate-shaped bottom portion and a side wall portion extending upward from the bottom portion and made of a waterproof material;
A plurality of supports formed by extending downward from the bottom portion; And
It is formed integrally with the waterproof plate and includes at least one pipe sleeve protruding downward from the bottom,
The waterproof plate is a resin material, and each of the plurality of supports is a metal molded body for the construction of a toilet with a sharp metal end.
삭제delete 삭제delete 청구항 1에 있어서,
상기 복수개의 지지대들과 상기 배관 슬리브는 인서트 사출성형에 의해 상기 방수판과 일체로 형성되는 화장실 시공용 형틀체.
The method according to claim 1,
The plurality of supports and the pipe sleeve are molded body for the bathroom construction is formed integrally with the waterproof plate by insert injection molding.
청구항 1에 있어서,
상기 바닥부의 밑면으로부터 아래로 돌출되어서 형성되는 복수개의 결합부들을 더 구비하는 화장실 시공용 형틀체.
The method according to claim 1,
A mold for body construction further comprising a plurality of coupling portions formed by protruding downward from the bottom surface of the bottom portion.
청구항 5에 있어서,
상기 복수개의 결합부들 각각은 끝단으로 갈수록 넓어지는 형상인 화장실 시공용 형틀체.
The method according to claim 5,
Each of the plurality of coupling parts is a mold for toilet construction that is wider toward the end.
화장실 바닥층을 시공하는 방법으로서,
시공 대상 화장실의 바닥층을 포함하는 영역에 대한 콘크리트 타설을 위한 거푸집을 설치하는 바닥 거푸집 설치 단계;
상기 거푸집 내에서 시공 대상 화장실에 대응하는 영역에 청구항 1에 기재된 형틀체를 상기 배관 슬리브의 끝단과 상기 복수개의 지지대들의 끝단이 상기 거푸집의 바닥과 접하도록 배치하는 형틀체 배치 단계; 및
상기 거푸집의 바닥과 상기 방수판의 바닥부 사이에 형성되는 공간으로 콘크리트가 타설되는 콘크리트 타설 단계를 포함하며,
상기 형틀체 배치 단계에서 상기 복수개의 지지대들 각각의 뾰족한 끝단이 상기 거푸집에 박혀서 상기 형틀체가 지지되는 화장실 바닥층 시공방법.
As a method of constructing the bathroom floor,
A floor formwork installation step of installing a formwork for pouring concrete into an area including a floor layer of a toilet to be constructed;
Placing a mold body according to claim 1 in an area corresponding to a construction target toilet in the formwork such that an end of the pipe sleeve and an end of the plurality of supports contact the bottom of the formwork; And
And a concrete pouring step in which concrete is poured into a space formed between the bottom of the formwork and the bottom of the waterproof plate,
In the step of arranging the mold body, a sharp bottom end of each of the plurality of supports is embedded in the formwork so that the mold body is supported.
삭제delete 청구항 7에 있어서,
상기 방수판은 상기 바닥부의 밑면으로부터 아래로 돌출되어서 형성되는 복수개의 결합부들을 더 구비하며,
상기 콘크리트 타설 단계에서 타설되는 콘크리트가 상기 복수개의 결합부에 의해 상기 방수판과의 결합력이 향상되는 화장실 바닥층 시공방법.
The method according to claim 7,
The waterproof plate further includes a plurality of coupling portions formed by protruding downward from the bottom surface of the bottom portion,
A method of constructing a floor in a bathroom where the concrete poured in the concrete pouring step improves the bonding strength with the waterproof plate by the plurality of coupling parts.
청구항 7에 있어서,
상기 형틀체 배치 단계를 수행하기 앞서서 상기 바닥 거푸집 설치 단계에서 설치된 거푸집 내에 철근을 배근하는 철근 배근 단계를 더 포함하는 화장실 바닥층 시공방법.
The method according to claim 7,
The method of constructing a floor layer of a bathroom further comprising a reinforcing bar reinforcement step of reinforcing a reinforcing bar in the formwork installed in the floor formwork installation step before performing the step of arranging the mold.
KR1020180108337A 2018-09-11 2018-09-11 Frame for constructing bathroom and method for constructing bathroom floor using the same KR102118881B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180108337A KR102118881B1 (en) 2018-09-11 2018-09-11 Frame for constructing bathroom and method for constructing bathroom floor using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180108337A KR102118881B1 (en) 2018-09-11 2018-09-11 Frame for constructing bathroom and method for constructing bathroom floor using the same

Publications (2)

Publication Number Publication Date
KR20200029825A KR20200029825A (en) 2020-03-19
KR102118881B1 true KR102118881B1 (en) 2020-06-04

Family

ID=69957215

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180108337A KR102118881B1 (en) 2018-09-11 2018-09-11 Frame for constructing bathroom and method for constructing bathroom floor using the same

Country Status (1)

Country Link
KR (1) KR102118881B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102583751B1 (en) * 2021-11-24 2023-09-27 삼성물산 (주) Fixed structure for the completed toilet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200404731Y1 (en) * 2005-10-18 2005-12-27 봉종근 Sheet for corrosion prevention of concrete structure
KR200431681Y1 (en) * 2006-09-08 2006-11-24 김용욱 Panel Waterproof
KR100726111B1 (en) * 2006-07-13 2007-06-12 삼성물산 주식회사 Bathroom bottom manufacture method using precast concreat slab
JP2017048547A (en) * 2015-08-31 2017-03-09 株式会社長谷工コーポレーション Fitting structure and fitting method of grating

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090055245A (en) 2007-11-28 2009-06-02 삼성물산 주식회사 Partial down slab of bathroom for having pipe on concerned floor and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200404731Y1 (en) * 2005-10-18 2005-12-27 봉종근 Sheet for corrosion prevention of concrete structure
KR100726111B1 (en) * 2006-07-13 2007-06-12 삼성물산 주식회사 Bathroom bottom manufacture method using precast concreat slab
KR200431681Y1 (en) * 2006-09-08 2006-11-24 김용욱 Panel Waterproof
JP2017048547A (en) * 2015-08-31 2017-03-09 株式会社長谷工コーポレーション Fitting structure and fitting method of grating

Also Published As

Publication number Publication date
KR20200029825A (en) 2020-03-19

Similar Documents

Publication Publication Date Title
CN106121094B (en) The precast concrete shell structure of concrete shear force wall based on 3D printing
US10422133B2 (en) Precast concrete composite wall
KR102118881B1 (en) Frame for constructing bathroom and method for constructing bathroom floor using the same
KR20190050550A (en) Textile reinforcing panel of high durability for combined usage of permanent form, and construction method using the same
KR101590180B1 (en) Precast concrete slab having lightweight body and ribs provided with wide head and, manufacturing methods of the same
KR100759586B1 (en) A waterproof panel
KR100726111B1 (en) Bathroom bottom manufacture method using precast concreat slab
KR100226168B1 (en) Architecture and method for making a stair using a precast concrete
KR20100057293A (en) Method for the continuous construction concrete wall using slide form
KR102105771B1 (en) Water proofing plate installed with forms
JPH1181660A (en) Form construction method for staircase
KR200400855Y1 (en) Half slab having hollow structure
KR101962709B1 (en) Composite deck slab construction method with trench
KR100550469B1 (en) Precast concrete member for open hole in slab and method for constructing the same
KR20090044961A (en) Concrete elevator pit structure
JP4489644B2 (en) Side groove cover embedded form and method for forming side groove cover
CN217621304U (en) Tenon molding die assembly, production die of prefabricated sheet pile and prefabricated sheet pile
CN101148917A (en) Hollow box used for cast-in-situ concrete hollow slab
CN110778110B (en) Post-pouring method for plugging plate at hollow-out structure of hyperboloid diagonal grid concrete member
KR100403239B1 (en) The mold panel of floor slabe for architecture
KR101575201B1 (en) Method for constructing steel structure using hole deck plate
CN112659356A (en) Mold and method for manufacturing concrete excrement discharging groove
KR100673995B1 (en) Method for manufacturing invert for manhole, assembly invert for manhole produced by thereby and manhole using the same
JP4587714B2 (en) Residual decorative form for housing and construction method for housing foundation
JP5166225B2 (en) Driving form for fixing the floor of the floating formwork and construction method of the edge treatment structure of the waterproof layer using it

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right