KR101926086B1 KR1020180086327A KR20180086327A KR101926086B1 KR 101926086 B1 KR101926086 B1 KR 101926086B1 KR 1020180086327 A KR1020180086327 A KR 1020180086327A KR 20180086327 A KR20180086327 A KR 20180086327A KR 101926086 B1 KR101926086 B1 KR 101926086B1
Authority
KR
South Korea
Prior art keywords
steel pipe
urethane
hollow tube
main body
plastic hollow
Prior art date
Application number
KR1020180086327A
Other languages
Korean (ko)
Inventor
장기수
Original Assignee
주식회사 보강테크
(주)진양비지엠텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 보강테크, (주)진양비지엠텍 filed Critical 주식회사 보강테크
Priority to KR1020180086327A priority Critical patent/KR101926086B1/en
Application granted granted Critical
Publication of KR101926086B1 publication Critical patent/KR101926086B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a tunnel reinforcement grouting device using a rapid urethane injection system and a grouting method using the same, in which construction costs are reduced and manpower handling convenience is improved by reducing the weight of inner hollow pipes, and a barrier material is mounted in a steel pipe so as to divide a chemical solution injection space, thereby improving construction environment. The present invention for implementing the same includes: a steel pipe main body (10) having a plurality of check valves (11) coupled for external ejection of urethane chemicals; a plastic hollow pipe (20) formed of a synthetic resin material and inserted into the steel pipe main body (10); a spacer (30) provided for maintaining a certain interval between the plastic hollow pipe (20) and the steel pipe main body (10); a front part injection pipe (40) connected for supplying the urethane chemicals to the front end side of the steel pipe main body (10); a rear part injection pipe (50) connected for supplying the urethane chemicals to the rear end side of the steel pipe main body (10); a barrier material (60) fitted into the center portion of the plastic hollow pipe (20) so as to divide the inner space of the steel pipe main body (10) into the front end portion and the rear end portion; a steel pipe closure cap (70) coupled to the inlet side of the steel pipe main body (10) so as to prevent the leakage of the urethane chemicals supplied to the inside of the steel pipe main body (10); and hollow pipe closure caps (80) respectively coupled to the front end portion and the rear end portion so as to prevent the introduction of the urethane chemicals to the inside of the plastic hollow pipe (20).

Description

우레탄 급속 주입 시스템을 이용한 터널 보강 그라우팅 장치 및 이를 이용한 그라우팅 공법{TUNNEL REINFORCING GROUTING DEVICE USING URETHAN RAPID INJECTION SYSTEM AND GROUTING METHOD}TECHNICAL FIELD [0001] The present invention relates to a tunnel reinforcement grouting apparatus using a urethane quick injection system and a grouting method using the tunnel reinforcement grouting apparatus.

본 발명은 터널 보강 그라우팅 장치 및 공법에 관한 것으로서, 더욱 상세하게는 겔타임이 짧은 우레탄 급속 주입 시스템을 이용하여 터널 막장면의 보강을 위한 그라우팅 작업을 실시하게 되는 그라우팅 장치 및 이를 이용한 그라우팅 공법에 관한 것이다.The present invention relates to a tunnel reinforcing grouting apparatus and method, and more particularly, to a grouting apparatus for performing a grouting operation for reinforcing a surface of a tunnel by using a urethane quick injection system having a short gel time, and a grouting method using the grouting apparatus will be.

일반적으로, 터널 시공 등과 같은 토목현장에서 연약지반의 보강 및 차수를 위해 다양한 종류의 약액 주입공법이 사용되고 있으며 주로 우레탄계열의 약액 또는 시멘트그라우트 약액이 사용된다.Generally, various kinds of chemical solution injection methods are used for reinforcement and order of soft ground in civil engineering sites such as tunnel construction, and a urethane-based chemical solution or cement grout chemical solution is mainly used.

특히, 우레탄 약액은 겔타임(경화시간)이 짧기 때문에(약 60초 내외) 빠른 보강효과와 작업시간을 단축시킬 수 있는 장점이 있는 반면, 약액의 짧은 겔타임으로 인해 주입길이(또는 유하거리, 流下距離)를 6m로 제한되어지게 됨으로서, 수량 증가 등으로 시공성 및 경제성이 떨어지는 문제점이 있었다.Particularly, the urethane chemical liquid has advantages of shortening the gel time (curing time) (about 60 seconds) and shortening the working time. On the other hand, due to the short gel time of the chemical liquid, The flow-down distance) is limited to 6 m, which causes a problem of poor workability and economical efficiency due to an increase in the amount of water.

이를 개선하기 위해 최근에는 보강재 강관의 내측에 직경이 다소 작은 내부강관을 삽입한 상태에서 보강재 강관과 내부강관 사이의 공간으로 우레탄 약액을 주입시킴으로서, 우레탄 약액의 주입시 약액의 유하면적을 감소시켜 보강길이를 12m로 개선하는 기술이 실시되고 있다.In order to improve this, recently, an urethane chemical liquid is injected into a space between a stiffener steel pipe and an inner steel pipe in a state where an inner steel pipe having a somewhat smaller diameter is inserted inside a stiffener steel pipe, A technique of improving the length to 12 m has been carried out.

그러나, 상기한 종래 기술에서는 내부강관이 추가된 이중강관 구조를 이루게 됨으로 공사비를 증가시키고, 중량의 무게로 인한 인력 취급이 어려워 시공성을 저하시키며, 강관 직경 등 기성자재 규격의 제한과 약액 특성 등을 고려하여 실효적으로 결정되어 감소된 유하면적 조건상에서도 작업시간과 겔타임 간의 시간여유가 거의 없어 조금만 작업이 지체되어도 약액 주입이 어려워져 시공환경이 저하되는 문제점이 있었다.However, in the above-mentioned prior art, since the inner steel pipe is added to the double steel pipe structure, it increases the construction cost, and it is difficult to handle the workforce due to the weight of the steel, thereby lowering the workability. It is difficult to inject the chemical liquid even if the work is delayed for a short time, so that the construction environment is degraded.

아울러 현장여건상 지반이 매우 연약하여 강관의 직경을 확대시킬 필요가 있거나 또는 강관의 길이를 증가시킬 필요로 유하면적과 유하거리가 증가될 경우 겔타임 제한에 따라 적용이 불가능한 실정이다.In addition, it is necessary to increase the diameter of the steel pipe or to increase the length of the steel pipe because the ground is very soft due to the site conditions.

(선행기술 0001) 대한민국 실용신안등록 제482898호(2017.03.08.등록)(Prior Art 0001) Korean Utility Model Registration No. 482898 (Registered on March 3, 2017) (선행기술 0002) 대한민국 특허등록 제899621호(2009.05.20.등록)(Prior Art 0002) Korean Patent Registration No. 899621 (Registered May 20, 2009)

본 발명은 상기한 종래 기술에서의 문제점을 개선하기 위해 제안된 것으로서, 2중관 형태를 이루는 그라우팅 강관의 무게를 경량화 하여 인력 취급이 용이하도록 함과 함께 공사비를 절감시키도록 하는데 목적이 있다.The present invention has been made in order to solve the problems in the prior art described above, and it is an object of the present invention to reduce the weight of a double-pipe type grouting steel pipe to facilitate manpower handling and reduce a construction cost.

또한, 우레탄 약재의 유하면적 감소를 통하여 주입시간을 단축시킴과 함께 시공성을 개선하도록 하는데 목적이 있다.Also, it is an object of the present invention to shorten the injection time and improve the workability by reducing the area of the urethane rubber material.

상기 목적을 이루기 위한 본 발명의 그라우팅 장치는, 우레탄 약재의 외부 분출을 위한 다수의 체크밸브가 결합되어져 있는 강관본체와; 상기 강관본체 내부에 삽입되는 합성수지 재질의 플라스틱 중공관과; 상기 플라스틱 중공관과 강관본체 사이의 일정 간격을 유지하기 위해 구비되는 스페이서와; 상기 강관본체의 선단측으로 우레탄 약제를 공급하기 위해 연결 구성되는 전방부 주입관과; 상기 강관본체의 후단측으로 우레탄 약제를 공급하기 위해 연결 구성된 후방부 주입관과; 상기 플라스틱 중공관의 중단부에 끼워 짐으로서 강관본체의 내부 공간을 분할하는 격벽재와; 상기 강관본체의 입구측에 결합되어 내부에 공급된 우레탄 약제의 누출을 방지하는 강관 폐색캡과; 상기 플라스틱 중공관의 내부로 우레탄 약제가 유입되는 것을 방지하기 위해 선단부와 후단부에 각각 결합되는 중공관 폐색캡을 포함하는 구성을 이루는 것을 특징으로 한다.According to an aspect of the present invention, there is provided a grouting apparatus comprising: a steel pipe main body having a plurality of check valves for ejecting an urethane rubber material; A plastic hollow tube of a synthetic resin material inserted into the inside of the steel pipe body; A spacer provided to maintain a predetermined gap between the plastic hollow tube and the steel pipe main body; A front injection pipe connected to supply the urethane medicament to the tip side of the steel pipe main body; A rear injection pipe connected to supply the urethane medicament to the rear end side of the steel pipe main body; A partition wall member which is inserted into the hollow portion of the plastic hollow tube and divides an internal space of the steel pipe main body; A steel pipe closure cap coupled to an inlet side of the steel pipe main body to prevent leakage of the urethane chemical supplied to the inside of the steel pipe main body; And a hollow tube closure cap coupled to the distal end and the rear end, respectively, to prevent the urethane agent from flowing into the plastic hollow tube.

이러한 본 발명은, 우레탄 약액의 유하면적 감소를 목적으로 설치되는 내부 중공관을 경량의 플라스틱 재료로 대체함으로서 공사비 절감 및 인력취급 용이에 따른 작업효율 개선의 효과를 나타낼 수 있게 된다.The present invention replaces the inner hollow tube installed with the lightweight plastic material for the purpose of reducing the area under the urea chemical solution, thereby reducing the construction cost and improving the working efficiency according to the ease of manpower handling.

또한, 격벽재를 이용하여 강관 내부공간을 다수로 분할시킨 가운데 각각의 분할된 공간으로 동시주입에 의한 약액 공급이 이루어짐으로서 유하면적 감소에 이어 추가로 유하길이 감소에 따른 작업시간 단축, 작업시간과 겔타임 간의 추가의 여유시간 확보 및 이에 따른 시공성 개선의 효과를 나타낸다.In addition, since the inner space of the steel pipe is divided into a plurality of spaces by using the barrier rib material, the chemical solution is supplied by simultaneous injection into each divided space, so that the reduction of the area of the submerged area is followed by further reduction of the working time due to the reduction of the submerged length, Securing additional time between gel times and thus improving the workability.

도 1은 본 발명의 제1 실시 예에 따른 그라우팅 장치 내부 단면도.
도 2는 도 1의 A-A부 단면도.
도 3은 도 1의 B-B부 단면도.
도 4는 본 발명에서 환형 격벽재 단면 확대도.
도 5는 본 발명 그라우팅 장치의 플라스틱 중공관 삽입시 격벽재 형상 확대도.
도 6은 본 발명 그라우팅 장치의 우레탄 공급시 격벽재 형상 변형상태도.
도 7은 본 발명의 제2 실시 예에 따른 직천공 형식의 그라우팅 장치 구조도.
도 8은 도 7의 C부 확대도.
도 9는 본 발명의 제2 실시 예에서 강관 폐색캡 분리상태 단면도.
도 10은 본 발명의 제3 실시 예에 따른 그라우팅 장치 단면 구조도.
1 is a sectional view of a grouting device according to a first embodiment of the present invention.
2 is a sectional view taken along the line AA in Fig.
3 is a sectional view taken along the line BB in Fig.
4 is an enlarged sectional view of the annular partition wall in the present invention.
Fig. 5 is an enlarged view of the shape of the partition wall member when the plastic hollow tube is inserted into the grouting device of the present invention. Fig.
6 is a state in which the partition wall member is deformed when urethane is supplied to the grouting apparatus of the present invention.
FIG. 7 is a structural view of a grouting apparatus of a straight hole type according to a second embodiment of the present invention. FIG.
8 is an enlarged view of a portion C in Fig.
9 is a cross-sectional view showing a state in which a steel pipe closure cap is removed in a second embodiment of the present invention.
10 is a cross-sectional structural view of a grouting apparatus according to a third embodiment of the present invention.

이하, 본 발명의 구체적인 실시 예를 첨부 도면을 참조하여 상세히 살펴보기로 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

먼저, 본 발명의 제1 실시 예에 따른 우레탄 급속 주입 시스템을 이용한 터널 보강 그라우팅 장치의 구성을 도 1 내지 도 4를 통해 살펴보면 다음과 같다.First, the construction of a tunnel reinforcement grouting apparatus using the urethane quick injection system according to the first embodiment of the present invention will be described with reference to FIG. 1 to FIG.

본 실시 예에서는, 우레탄 약재의 외부 분출을 위한 다수의 체크밸브(11)가 주입홀에 끼워져 결합되어져 있는 원통 형태의 강관본체(10)와, 강관본체(10) 보다 작은 직경으로 성형 제작되어 내부에 삽입되는 경량 합성수지 재질의 플라스틱 중공관(20)과, 플라스틱 중공관(20)과 강관본체(10) 사이의 일정 간격을 유지하기 위해 구비되는 스페이서(30)와, 강관본체(10)의 선단측으로 우레탄 약제를 공급하기 위해 연결 구성되는 전방부 주입관(40)과, 강관본체(10)의 후단측으로 우레탄 약제를 공급하기 위해 연결 구성된 후방부 주입관(50)과, 플라스틱 중공관(20)의 중단부에 끼워 짐으로서 강관본체(10)의 내부 주입공간을 선단측과 후단측으로 분할하는 격벽재(60)와, 강관본체(10)의 입구측에 고정 형태로 결합되어 내부에 공급된 우레탄 약제의 누출을 방지하는 강관 폐색캡(70)과, 플라스틱 중공관(20)의 내부로 우레탄 약제가 유입되는 것을 방지하기 위해 선단부와 후단부에 각각 결합되는 중공관 폐색캡(80)으로 구성된다.In this embodiment, a cylindrical tube body 10 having a plurality of check valves 11 for external ejection of a urethane rubber material is inserted and joined to an injection hole, A plastic hollow tube 20 made of a lightweight synthetic resin material inserted into the hollow tube 20 and a spacer 30 provided to maintain a predetermined distance between the plastic hollow tube 20 and the steel pipe body 10, A rear inflow pipe 50 connected to supply a urethane medicament to the rear end side of the steel pipe main body 10, a plastic hollow tube 20 connected to the front side inflow pipe 40, A partition wall member 60 which is fitted in the intermediate portion of the steel pipe main body 10 and divides the internal injection space of the steel pipe main body 10 into a front end side and a rear end side; Steel to prevent leakage of medicines It consists of a closed cap 70, and a hollow plastic tube closed cap 80 coupled respectively to the front end and the rear end portion to prevent the polyurethane drug flows into the interior of the hollow tube 20.

이때, 격벽재(60)는 연질고무 재질로 이루어지는 가운데 도 4에서와 같은 환형의 형상을 이루어 플라스틱 중공관(20)의 외측 중단에 압입 형태로 끼워지게 된다.At this time, the partition member 60 is made of a soft rubber material and has an annular shape as shown in Fig. 4, and is inserted into the plastic hollow tube 20 in the form of an indentation.

또한, 전방부 주입관(40)은 후방부 주입관(50) 보다 길이를 길게 구비하여 플라스틱 중공관(20) 내부를 관통하는 형태로 구성이 이루어지는 것을 확인할 수 있다.Also, it can be seen that the front injection pipe 40 has a length longer than the rear injection pipe 50 and penetrates the inside of the plastic hollow pipe 20.

본 실시 예에서의 플라스틱 중공관(20)은 단일의 일체형 구조를 이루어 중단부에 격벽재(60)를 위치시키거나, 필요에 따라서는 2개를 연결시킨 후 그 연결부위에 소켓을 이용하여 격벽재(60)를 결합시킬 수도 있게 된다.The plastic hollow tube 20 according to the present embodiment has a single integral structure to position the barrier rib material 60 at the intermediate portion or to connect two of them if necessary, It is also possible to join the ash 60.

이와 같은 구성을 이루는 본 발명 그라우팅 장치의 사용에 따른 작용효과를 살펴보기로 한다.Hereinafter, effects of the grouting apparatus according to the present invention will be described.

터널의 굴진 시공시 막장 천공홀에 본 발명의 그라우팅 장치를 삽입시킨 상태에서 우레탄 약액을 고압으로 공급함에 따라 터널 막장면에 대한 지반 보강작업이 이루어지게 된다.When the urethane chemical liquid is supplied at a high pressure in a state where the grouting device of the present invention is inserted into the tunnel hole at the time of the tunnel construction, the ground reinforcement work is performed on the tunnel surface.

즉, 이때 본 발명에서는 강관본체(10) 내부에 유하면적의 감소를 목적으로 경량의 플라스틱 중공관(20)이 기 장착되어져 있기 때문에 천공홀 삽입과정에서 인력 취급 용이에 따른 작업 및 시공성이 향상되어질 수 있게 된다.That is, at this time, since the lightweight plastic hollow tube 20 is installed in the inside of the steel pipe body 10 for the purpose of reducing the area of the steel pipe, the work and the workability according to the ease of handling of the human hand are improved in the process of inserting the hole .

한편, 우레탄 약액 공급 과정에서는 전방부 주입관(40)과 후방부 주입관(50)을 통해 동시에 우레탄 약액의 공급이 이루어지게 됨으로서 격벽재(60)에 의해 분할되어진 전방부와 후방부에서의 유하거리가 1/2로 감소되어 실제 강관본체(10)가 12m로 사용되더라도 실질적으로 주입길이는 6m로 단축되는 효과를 나타낼 수 있게 된다.Meanwhile, in the urethane chemical liquid supply process, the urethane chemical liquid is simultaneously supplied through the front injecting pipe 40 and the rear injecting pipe 50, so that the urethane chemical liquid is supplied to the front and rear parts divided by the partition member 60, The distance is reduced to 1/2, so that even if the actual steel pipe body 10 is used for 12 m, the injection length can be effectively shortened to 6 m.

특히, 본 발명에서 환형의 격벽재(60)는 초기 플라스틱 중공관(20) 삽입시에는 도 5에서와 같이 외측이 강관본체(10)의 내벽면과 마찰에 의해 일측으로 휘어진 변형된 상태를 이루게 되나, 우레탄 약액의 공급이 이루어지게 되면 상대적으로 길이가 짧은 후방부 주입관(50)을 통해 먼저 공급되는 약액의 압력에 의해 도 6과 같이 격벽재(60)의 변형이 이루어진 후 후차적으로 길이가 긴 전방부 주입관(40)을 통해 공급되는 약액의 압력이 가해짐으로서 강관본체(10) 내벽면과 밀착력이 증대되어진 상태가 유지되어질 수 있게 된다.Particularly, in the present invention, when the initial plastic hollow tube 20 is inserted, the annular partition wall member 60 is deformed in one direction by friction with the inner wall surface of the steel pipe body 10 as shown in FIG. 5 However, when the urethane chemical liquid is supplied, the partition wall member 60 is deformed by the pressure of the chemical liquid supplied through the rear injection pipe 50 having a relatively short length as shown in FIG. 6, The pressure of the chemical liquid supplied through the long front injecting pipe 40 is increased so that the state in which the adhesion with the inner wall surface of the steel pipe body 10 is increased can be maintained.

그리고, 그라우팅 강관의 내부 약액 압력이 일정량 이상이 되면 체크밸브(11)를 통해 터널 막장면의 지반으로 토출이 신속하게 이루어지게 된다.When the pressure of the inner chemical liquid in the grouting steel pipe reaches a predetermined amount or more, the discharge is rapidly performed through the check valve 11 to the ground on the tunnel surface.

따라서, 본 발명은 유하면적 감소를 목적으로 설치되는 내부 중공관을 경량의 플라스틱 중공관(20)으로 대체하여 사용함으로서 공사비 절감 및 시공성이 개선되어질 수 있게 되며, 격벽재(60)를 이용하여 내부 약액 주입공간을 2개로 분할한 상태에서 전,후방에 동시 주입이 이루어짐으로서 유하거리의 1/2 감소에 따른 주입길이 12m를 6m로 단축하여 유하면적 감소에 이어 추가로 유하길이 감소에 따른 작업시간 단축, 작업시간과 겔타임 간의 추가의 여유시간 확보 및 이에 따른 시공성 개선의 효과를 나타낸다.Therefore, the present invention can reduce the construction cost and improve the workability by replacing the inner hollow tube installed for the purpose of decreasing the area of the lowered portion with the lightweight plastic hollow tube 20. By using the partition wall material 60, Simultaneous injection is performed both forward and backward in the state where the chemical solution injection space is divided into two, so that the injection length 12m according to the reduction of the dropping distance is shortened to 6m, and the operation time Shortening the time, securing additional time between work time and gel time, and thus improving the workability.

한편, 도 7 내지 도 9는 본 발명의 제2 실시 예에 따른 굴착과 동시에 강관이 설치되는 직천공 형태의 그라우팅 강관 구조를 나타낸 것으로서, 강관본체(10)는 선단부가 개방된 형태를 이루는 가운데 개방된 선단부에는 직천공 굴착을 위한 직천공비트(90)가 구성된다.7 to 9 show a grouting steel pipe structure in the form of a straight hole in which a steel pipe is installed at the same time as the excavation according to the second embodiment of the present invention. The drilled bit 90 for the drilling of the straight drill is constituted.

그리고, 강관본체(10)의 후단부에는 강관 폐색캡(70)의 착탈을 위한 착탈구(71)가 체결볼트(72)에 의해 고정 설치되며, 상기 강관 폐색캡(70) 내측에는 강관본체(10) 입구부와의 가압에 따른 기밀성 유지를 위한 고무마개(73)가 구성되고, 상기 착탈구(71) 및 강관 폐색캡(70)에는 상호간에 나사 체결을 위한 나사탭부(70a,71a)가 형성된다.A fitting hole 71 for attaching and detaching the steel pipe closure cap 70 is fixed to the rear end of the steel pipe body 10 by means of a fastening bolt 72. Inside the steel pipe closure cap 70, The screw cap tabs 70a and 71a for screw tightening are formed in the attachment / detachment port 71 and the steel pipe closure cap 70, .

이와 같은 구성을 이루는 본 실시 예에서의 그라우팅 강관은 굴착시공시에는 직천공비트(90)를 이용하여 천공작업을 실시하고, 천공작업이 완료되면 강관본체(10)의 내부에 본 발명의 격벽재(60)가 중단에 체결된 플라스틱 중공관(20)을 삽입한 후 후단부에 강관 폐색캡(70)을 장착시킨 상태에서 우레탄 약액의 전,후방부 동시 주입작업이 이루어지게 된다.In the grouting steel pipe according to the present embodiment having such a structure, the drilling operation is performed by using the drilling bit 90 when the drilling is performed. When the drilling operation is completed, (60) is inserted into the plastic hollow tube (20) fastened to the stop, and the steel pipe closure cap (70) is attached to the rear end. Simultaneous injection of the front and rear parts of the urethane chemical liquid is performed.

이때, 설치과정에서 강관 폐색캡(70)은 착탈구(71)와 나사탭부(70a,71a)에 의해 나사체결이 이루어지게 됨으로 결합작업이 보다 신속하고 용이하게 이루어질 수 있게 되며, 고무마개(73)에 대한 가압력이 극대화되어짐으로서 약액의 누출 발생이 방지되어질 수 있게 된다.At this time, in the installation process, the steel pipe closure cap 70 is screwed by the attaching / detaching port 71 and the screw tab portions 70a and 71a, so that the joining operation can be performed more quickly and easily. The leakage of the chemical liquid can be prevented.

도 10은 본 발명의 제3 실시 예에 따른 구성을 나타낸 것으로서, 강관내 주입공간을 추가로 분할하여 유하거리 감소 및 적정 유하거리를 유지하기 위한 실시 예를 나타낸 것이다.FIG. 10 shows a configuration according to the third embodiment of the present invention, in which the injection space in the steel pipe is further divided to reduce the dropping distance and maintain the appropriate dropping distance.

즉, 이때에는 플라스틱 중공관(20)을 다수로 분할하되, 분할된 부위에는 양측에 각각 변단면을 이루는 연결소켓(21,22)이 체결되며, 상기 양측 연결소켓(21,22)은 경량 플라스틱 재질의 연결 중공관(23)에 의해 연결 구성된다.That is, at this time, the plastic hollow tube 20 is divided into a plurality of connection sockets 21 and 22, which are formed at both sides of the divided connection sockets, and the both connection sockets 21 and 22 are made of lightweight plastic And is connected by a connecting hollow tube (23) made of a material.

특히, 연결 중공관(23)은 플라스틱 중공관(20) 보다 작은 구경을 이루어 구성되며, 상기 연결소켓(21,22)은 플라스틱 중공관(20)측으로 부터 연결 중공관(23)측으로 갈수록 외경이 점차 감소되는 테이퍼 형상을 이루고, 상기 연결소켓(21,22) 설치부위의 연결 중공관(23) 외측 공간으로 우레탄 약제를 공급하기 위한 중단부 주입관(24)이 추가로 연결 구성된 것을 확인할 수 있다.Particularly, the connecting hollow tube 23 is formed to have a diameter smaller than that of the plastic hollow tube 20, and the connecting sockets 21 and 22 have outer diameters from the plastic hollow tube 20 side toward the connecting hollow tube 23 side It can be confirmed that the intermediate portion injection pipe 24 for supplying the urethane medicament to the space outside the connection hollow pipe 23 at the installation site of the connection sockets 21 and 22 is additionally connected .

이와 같은 구성을 이루게 되면, 강관본체(10)내의 주입공간이 2개 이상의 격벽재(60)에 의해 추가로 분할되는 가운데 각 분할공간으로 전방부 주입관(40), 중단부 주입관(24) 및 후방부 주입관(50)을 통해 개별적인 우레탄 약액의 동시 공급이 이루어질 수 있게 된다.The injection space in the steel pipe main body 10 is further divided by at least two partition members 60 while the front part injection pipe 40 and the middle part injection pipe 24 are inserted into the respective divided spaces, The simultaneous supply of the respective urethane chemical liquids can be performed through the front and rear injection pipes 50,

특히, 연결소켓(21,22)을 변단면 형태로 구비함과 함께 상대적으로 작은 구경을 이루는 연결 중공관(23)이 구비됨으로서 연결 중공관(23)에 의한 중단부의 약액 공급이 가능하게 된다.Particularly, since the connection hollow tubes 23 having a relatively small diameter are provided in the connection socket 21 or 22 in the form of a cross section, the chemical liquid can be supplied from the connection hollow tube 23 to the intermediate portion.

따라서, 현장여건상 단층대 등 매우 불량한 지반의 분포로 강관 직경의 증가 및 보강길이의 증가가 필요한 경우 본 실시 예의 구성을 적용하게 되면, 주입공간의 추가 분할로 인하여 유하거리 감소, 적정 유하거리 유지로 우레탄 약액 겔타임에 영향없이 시공이 가능한 이점을 나타낼 수 있게 된다.Therefore, when the structure of the present embodiment is applied to increase the diameter of the steel pipe and increase the length of reinforcement, it is necessary to reduce the distance of the submerged pipe, maintain the proper submerged distance It is possible to exhibit an advantage that construction can be performed without affecting the urethane chemical solution gel time.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

그리고, 상기에서 본 발명의 특정한 실시 예가 설명 및 도시되었지만 본 발명의 그라우팅 장치 구조가 당업자에 의해 다양하게 변형되어 실시될 수 있음은 자명한 일이다. Although specific embodiments of the present invention have been described and illustrated above, it is to be understood that the grouting device structure of the present invention can be variously modified by those skilled in the art.

그러나, 이와 같은 변형된 실시예들은 본 발명의 기술적 사상이나 범위로부터 개별적으로 이해되어져서는 안되며, 이와 같은 변형된 실시 예들은 본 발명의 첨부된 특허청구범위 내에 포함된다 해야 할 것이다. It should be understood, however, that such modified embodiments are not to be understood individually from the spirit and scope of the invention, and such modified embodiments are intended to be included within the scope of the appended claims.

10 : 강관본체 11 : 체크밸브
20 : 플라스틱 중공관 30 : 스페이서
40 : 전방부 주입관 50 : 후방부 주입관
60 : 격벽재 70 : 강관 폐색캡
80 : 중공관 폐색캡 90 : 직천공비트
10: Steel pipe body 11: Check valve
20: plastic hollow tube 30: spacer
40: front inflow pipe 50: rear inflow pipe
60: barrier rib material 70: steel tube closure cap
80: Hollow tube closure cap 90: Direct drilling bit

Claims (6)

우레탄 약재의 외부 분출을 위한 다수의 체크밸브(11)가 결합되어져 있는 강관본체(10)와;
다수로 분할된 구조를 이루어 상기 강관본체(10) 내부에 삽입 구성되되, 상기 분할된 부위에는 양측에 각각 연결소켓(21,22)이 체결되며, 상기 양측 연결소켓(21)은 연결 중공관(23)에 의해 연결 구성되고, 상기 연결 중공관(23)은 플라스틱 중공관(20) 보다 작은 구경을 이루어 구성되며, 상기 연결소켓(21,22)은 플라스틱 중공관(20)측으로 부터 연결 중공관(23)측으로 갈수록 외경이 점차 감소되는 테이퍼 형상을 이루고, 상기 연결소켓(21,22) 설치부위의 연결 중공관(23) 외측 공간으로 우레탄 약제를 공급하기 위한 중단부 주입관(24)이 추가로 연결 구성되는 합성수지 재질의 플라스틱 중공관(20)과;
상기 플라스틱 중공관(20)과 강관본체(10) 사이의 일정 간격을 유지하기 위해 구비되는 스페이서(30)와;
상기 강관본체(10)의 선단측으로 우레탄 약제를 공급하기 위해 연결 구성되는 전방부 주입관(40)과;
상기 강관본체(10)의 후단측으로 우레탄 약제를 공급하기 위해 연결 구성된 후방부 주입관(50)과;
상기 플라스틱 중공관(20)의 중단부에 끼워 짐으로서 강관본체(10)의 내부 공간을 선단측과 후단측으로 분할하는 격벽재(60)와;
상기 강관본체(10)의 입구측에 결합되어 내부에 공급된 우레탄 약제의 누출을 방지하는 강관 폐색캡(70)과;
상기 플라스틱 중공관(20)의 내부로 우레탄 약제가 유입되는 것을 방지하기 위해 선단부와 후단부에 각각 결합되는 중공관 폐색캡(80);
을 포함하는 구성을 이루는 것을 특징으로 하는 우레탄 급속 주입 시스템을 이용한 터널 보강 그라우팅 장치.
A steel pipe main body 10 to which a plurality of check valves 11 for external ejection of the urethane rubber material are coupled;
(21, 22) are fastened to both sides of the divided part, and the both side connection sockets (21) are connected to a connection hollow tube And the connection hollow tube 23 is formed to have a diameter smaller than that of the plastic hollow tube 20 and the connection sockets 21 and 22 are connected to each other through the connection hollow tube 20 from the plastic hollow tube 20 side, (24) for supplying the urethane medicine to the space outside the connection hollow tube (23) at the installation site of the connection socket (21, 22) is added to the connection socket A plastic hollow tube 20 made of a synthetic resin material connected to the hollow tube 20;
A spacer 30 provided to maintain a predetermined gap between the plastic hollow tube 20 and the steel pipe body 10;
A front injection pipe 40 connected to the leading end side of the steel pipe main body 10 to supply a urethane medicine;
A rear injection pipe (50) connected to supply the urethane medicament to the rear end side of the steel pipe body (10);
A partition wall member (60) for dividing the inner space of the steel pipe main body (10) into a front end side and a rear end side by being fitted into a middle portion of the plastic hollow tube (20);
A steel pipe closure cap 70 coupled to the inlet side of the steel pipe body 10 to prevent leakage of the urethane agent supplied therein;
A hollow tube closure cap 80 coupled to the distal end and the rear end, respectively, for preventing the urethane agent from flowing into the plastic hollow tube 20;
Wherein the tunnel reinforcement grouting apparatus comprises a tunneling reinforcement grouting apparatus using a urethane quick injection system.
청구항 1에 있어서,
상기 강관본체(10)의 선단부에는 직천공비트(90)가 구성되고, 강관본체(10)의 후단부에는 강관 폐색캡(70)의 착탈을 위한 착탈구(71)가 체결볼트(72)에 의해 고정 설치되며, 상기 강관 폐색캡(70) 내측에는 강관본체(10) 입구부와의 가압에 따른 기밀성 유지를 위한 고무마개(73)가 구성되고, 상기 착탈구(71) 및 강관 폐색캡(70)에는 상호간에 나사 체결을 위한 나사탭부(70a,71a)가 형성된 것을 특징으로 하는 우레탄 급속 주입 시스템을 이용한 터널 보강 그라우팅 장치.
The method according to claim 1,
A straight hole 90 is formed in the front end portion of the steel pipe body 10 and a detachment hole 71 for attaching and detaching the steel pipe closing cap 70 is attached to the fastening bolt 72 at the rear end of the steel pipe body 10 And a rubber plug 73 for maintaining the airtightness due to the pressure with the inlet of the steel pipe main body 10 is formed inside the steel pipe closure cap 70. The rubber stopper 73 and the steel pipe closure cap 70 70 are formed with threaded tabs 70a, 71a for fastening the screws to each other.
삭제delete 삭제delete 삭제delete 청구항 1 또는 청구항 2중 어느 한 항의 그라우팅 장치를 이용하여 터널 막장면에 우레탄 약재를 급속 주입하는 것을 특징으로 하는 우레탄 급속 주입 시스템을 이용한 터널 보강 그라우팅 공법.A tunnel reinforcement grouting method using a urethane quick injection system, characterized in that a urethane rubber material is rapidly injected into a tunnel surface by using a grouting device according to any one of claims 1 and 2.
KR1020180086327A 2018-07-25 2018-07-25 Tunnel reinforcing grouting device using urethan rapid injection system and grouting method KR101926086B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180086327A KR101926086B1 (en) 2018-07-25 2018-07-25 Tunnel reinforcing grouting device using urethan rapid injection system and grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180086327A KR101926086B1 (en) 2018-07-25 2018-07-25 Tunnel reinforcing grouting device using urethan rapid injection system and grouting method

Publications (1)

Publication Number Publication Date
KR101926086B1 true KR101926086B1 (en) 2018-12-06

Family

ID=64671407

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180086327A KR101926086B1 (en) 2018-07-25 2018-07-25 Tunnel reinforcing grouting device using urethan rapid injection system and grouting method

Country Status (1)

Country Link
KR (1) KR101926086B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047848A (en) * 2021-05-14 2021-06-29 中铁二十四局集团有限公司 Full-section radiation type grouting process and equipment
KR102676037B1 (en) 2023-12-15 2024-06-18 스마트이앤씨 주식회사 Grouting device for tunnel reinforcement equipped with smart steel pipe displacement sensor and tunnel monitoring system using the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100923744B1 (en) * 2008-08-07 2009-10-27 안태현 Packer equipped with double injection pipe which this was used ground waterproofing and reinforcement construction method
KR200482898Y1 (en) * 2016-01-28 2017-03-14 주식회사 파이프텍코리아 Double tube urethane liquid injection injection device
KR101851959B1 (en) * 2017-06-13 2018-04-25 최제인 Grout same time injection apparatus and a method of construction using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100923744B1 (en) * 2008-08-07 2009-10-27 안태현 Packer equipped with double injection pipe which this was used ground waterproofing and reinforcement construction method
KR200482898Y1 (en) * 2016-01-28 2017-03-14 주식회사 파이프텍코리아 Double tube urethane liquid injection injection device
KR101851959B1 (en) * 2017-06-13 2018-04-25 최제인 Grout same time injection apparatus and a method of construction using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047848A (en) * 2021-05-14 2021-06-29 中铁二十四局集团有限公司 Full-section radiation type grouting process and equipment
KR102676037B1 (en) 2023-12-15 2024-06-18 스마트이앤씨 주식회사 Grouting device for tunnel reinforcement equipped with smart steel pipe displacement sensor and tunnel monitoring system using the same

Similar Documents

Publication Publication Date Title
KR102015016B1 (en) Grout same time injection pipe and grouting construction method
US8240958B2 (en) Injection bolt with a fixed static mixer
KR101919084B1 (en) Simultaneous Injection System of Steel Pipe Grouting with Double Packers
KR101015222B1 (en) Multistage grouting apparatus using packer
KR100973714B1 (en) Grouting space-time that use grouting pouring in device and this method
CA2523278A1 (en) Device for rock bolting and for automatized rock bolting and rock bolting method
KR101926086B1 (en) Tunnel reinforcing grouting device using urethan rapid injection system and grouting method
CN110300826B (en) Duct piece, duct piece assembly and grouting device
US7779908B2 (en) Arrangement for affixing an expandable packer in a hole
KR20070020312A (en) The ground reinforcement apparatus and ground reinforcement method grouting type using steel pipe
CN112664251A (en) Hydraulic expansion type grouting anchor rod and anchoring method
KR100814419B1 (en) Apparatus for direct-boring and grout injection
KR20070105419A (en) Innovation one shot grouting prefabricated steel pipe installation and using reinforcing tunnelling method
KR102229640B1 (en) Construction method of steel pipe reinforcing system by simultaneous grouting without sealing
KR200410574Y1 (en) Hollow tube for grouting
SE1950866A1 (en) Nozzle, system and method for securing a bolt in a rock hole
US8267608B1 (en) Ramming tool for filling surface voids
WO2008120948A1 (en) Grouting apparatus and grouting method using the same
JP2003343190A (en) Method and structure for connecting short steel pipe for pipe roofing method
KR100981433B1 (en) Double packer apparatus of rod reinforcement grouting and caulking method of injection hole using this
KR101314335B1 (en) A double pipe type grouting device
JP2000213053A (en) Existing old pipe regenerating construction method, and timbering device therefor method, and blocking member
KR200361250Y1 (en) a coupler for rockbolt
KR101645010B1 (en) Nailing apparatus of pressing type
JP2954307B2 (en) Crack injection equipment

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant