KR101917926B1 - Control system for controlling power and service system thereusing - Google Patents

Control system for controlling power and service system thereusing Download PDF

Info

Publication number
KR101917926B1
KR101917926B1 KR1020160129123A KR20160129123A KR101917926B1 KR 101917926 B1 KR101917926 B1 KR 101917926B1 KR 1020160129123 A KR1020160129123 A KR 1020160129123A KR 20160129123 A KR20160129123 A KR 20160129123A KR 101917926 B1 KR101917926 B1 KR 101917926B1
Authority
KR
South Korea
Prior art keywords
power
control
user
information
charge
Prior art date
Application number
KR1020160129123A
Other languages
Korean (ko)
Other versions
KR20180027983A (en
Inventor
한찬희
Original Assignee
한찬희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한찬희 filed Critical 한찬희
Priority to PCT/KR2017/002874 priority Critical patent/WO2018048045A2/en
Publication of KR20180027983A publication Critical patent/KR20180027983A/en
Application granted granted Critical
Publication of KR101917926B1 publication Critical patent/KR101917926B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B13/00Burglar, theft or intruder alarms
    • G08B13/18Actuation by interference with heat, light, or radiation of shorter wavelength; Actuation by intruding sources of heat, light, or radiation of shorter wavelength
    • G08B13/189Actuation by interference with heat, light, or radiation of shorter wavelength; Actuation by intruding sources of heat, light, or radiation of shorter wavelength using passive radiation detection systems
    • G08B13/194Actuation by interference with heat, light, or radiation of shorter wavelength; Actuation by intruding sources of heat, light, or radiation of shorter wavelength using passive radiation detection systems using image scanning and comparing systems
    • G08B13/196Actuation by interference with heat, light, or radiation of shorter wavelength; Actuation by intruding sources of heat, light, or radiation of shorter wavelength using passive radiation detection systems using image scanning and comparing systems using television cameras
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J2003/146
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading

Abstract

본 발명은 전력 제어를 위한 관제시스템과 이를 이용한 서비스 시스템에 관한 것이다. 본 발명은 전력 계량제어장치와 원격지 관제센터가 유무선 통신망으로 연결된 상태에서 전력 사용자에 대한 전력량 조절 또는 전력 차단 등의 전력 제어와 공급전력 품질 측정이 가능하다. 본 발명은 전력 계량제어장치에 온도, 화재, 소음, 진동 및 지진 감지와, 침입자 감지 기능을 결합하여 그 감지 정보를 관제센터와 공유함으로써 상황에 따라 적절하게 전력량 조절 또는 전력 차단 등의 전력 제어가 가능하다. 본 발명은 공급전력 관리단위를 정하여 그 관리단위 상호간에 공급전력을 적절하게 분산함으로써 안정적인 전력 공급 체계를 확립할 수 있도록 한다. 본 발명은 전력 계량제어장치에 관련된 전력 사용자에 대한 관리비, 임대료, 수도료 및 가스료 등의 요금 청구, 수금 등의 서비스를 일괄적으로 제공하고, 더 나아가 이들 요금의 처리 정보를 바탕으로 전력량 조절 또는 전력 차단 등의 전력 제어가 가능하도록 한다. The present invention relates to a control system for power control and a service system using the same. In the present invention, it is possible to perform power control such as power amount adjustment or power cutoff for a power user and supply power quality measurement in a state where a power metering control device and a remote control center are connected to a wired / wireless communication network. The present invention combines temperature, fire, noise, vibration, and earthquake detection with an intruder detection function in a power metering control device and shares the detected information with the control center, thereby appropriately controlling the power amount, It is possible. The present invention makes it possible to establish a stable power supply system by defining supply power management units and appropriately distributing the supply power among the management units. The present invention provides services such as management fees for power users related to the electric power metering control device, billing and collection of rent, water and gas charges, and the like, and furthermore, based on the processing information of these charges, Power control such as power cut-off is enabled.

Description

전력 제어를 위한 관제시스템과 이를 이용한 서비스 시스템{CONTROL SYSTEM FOR CONTROLLING POWER AND SERVICE SYSTEM THEREUSING} BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a control system for power control,

본 발명은 전력 제어를 위한 관제시스템과 이를 이용한 서비스 시스템에 관한 것이다.The present invention relates to a control system for power control and a service system using the same.

공동주택 및 빌딩 등의 경우 전력회사에서 공급되는 전력을 통합적으로 관리하는 계량기가 설치된 상태에서, 예를 들어, 각 호실별로 별도로 계량기를 설치하여 각 호실별로 전력 사용량을 측정하고, 그에 따라 전력요금을 납부하는 곳들이 많아지고 있다. 이러한 방법은 각 호실별로 계량기를 설치해야 하는 등 비용이 증가하는 문제가 있으나, 전력 사용량에 대한 입주자간 분쟁 소지를 미연에 방지하므로 관리하는 입장에서는 매우 편리한 방법이다.In the case of apartment buildings and buildings, for example, a meter is installed separately for each room in a state in which a meter that integrally manages the electric power supplied from the electric power company is installed, and the electric power consumption is measured for each room, There are a lot of places to pay. This method has a problem of increasing the cost, such as installing a meter for each room, but it is very convenient in terms of management since it prevents the possession of a dispute about the power consumption.

그러나 이와 같이 편리한 점이 있음에도 불구하고, 예를 들어 정당하게 청구된 전력요금을 명확한 이유없이 장기간 납부하지 않을 경우, 이를 강제하거나 전력을 차단할 수 없어 관리자 입장에서는 골치거리가 되고 있다. However, in spite of this convenience, for example, if a legitimately charged electric power bill is not paid for a long period of time without a clear reason, it can not be enforced or the electric power can not be cut off, which makes it difficult for a manager.

이러한 경우 전력요금 체납시 건물의 다른 입주민이 예치한 예비비 등으로 대납하는 경우도 간혹 있어 입주자간 형평성 관점에서 또 다른 문제가 되고 있다. In such cases, it is rare that the other residents of the building pay for the electricity bill due to reserve funds deposited in the building, which is another problem in terms of equity among the tenants.

단지 전력요금에 대한 연체뿐만 아니라, 일부 입주자의 경우 사용이 금지된 전열기구를 사용하는 경우도 많아, 관리자 입장에서 보면 과다한 전력소모로 인한 공평성의 문제는 차치하고라도 화재 발생의 소지가 있는 등 안전성에서 또 다른 문제가 되고 있다.There are many cases where not only the delinquency for electricity charges but also the use of electric heater which is prohibited for some residents are used. From the viewpoint of the manager, there is a problem of fairness due to excessive power consumption. There is another problem.

해외의 경우 선불형 전력 요금 계량기가 도입되어 있으나, 이는 단순히 선불형 카드를 읽어들여 충전요금만큼만 전력을 공급하고 차단하는 기능을 수행 것으로, 온오프라인상으로 전력 제어기능을 수행할 수 없어, 상기와 같은 상황 등에 적절하게 대처할 수 없는 문제가 있다.In the case of overseas, a prepayment type electric power meter is introduced. However, this system simply reads a prepaid card to supply and shut off electric power for only a charge charge, and can not perform a power control function on and off line. There is a problem that can not cope with the situation properly.

또한, 이미 상용화되고 있는 스마트 미터의 경우, 전력 사용량을 원격에서 측정할 수 있는 등의 이점은 있으나, 예를 들어 위에 열거한 문제를 해결할 수 있는 기술은 아직 개발되지 않고 있는 실정이다.In addition, the smart meter, which has already been commercialized, has advantages such as being able to measure the power consumption remotely. However, for example, a technology capable of solving the above problems has not been developed yet.

본 발명은 상기와 같은 종래 기술에 관련된 문제점을 개선하기 위하여 이루어진 것으로써, 본 발명의 목적은 전력 계량장치와 원격 관제센터가 유무선 통신망으로 네트워크화하여 전력 사용자에 대한 전력요금 처리 정보를 공유함으로써 전력량 조절 또는 전력 차단이 가능하도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the problems associated with the related art as described above, and it is an object of the present invention to provide a power control apparatus and a remote control center which are networked by a wired / wireless communication network, Or power interruption of the power control system.

본 발명의 다른 목적은, 전력 사용자에 대한 전력조절이 수행되는 상태에서 피크전력을 초과하는 경우 지체없이 전력차단이 수행되도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다.Another object of the present invention is to provide a control system for power control, in which power cut-off is carried out without delay when the power control for the power user is performed and the peak power is exceeded.

본 발명의 다른 목적은, 온도, 화재, 진동, 지진 감지와, 침입자 감지가 가능하고, 그 정보를 원격 관제센터와 공유하여 일인의 전력 사용자 또는 일정 그룹 의 전력 사용자에 대한 전력량 조절 또는 전력 차단이 가능하도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다.It is another object of the present invention to provide a system and method for controlling a power user or a group of power users of a person or a group of power users by sharing temperature and fire, vibration, seismic detection, intruder detection, And to provide a control system for power control.

본 발명의 또 다른 목적은, 전력 요금체계, 전력 사용시간, 계절, 발전량 등을 감안하여 효율적인 전력 분산이 가능하도록 함과 동시에, 이를 관리 단위에 결부시켜 효율적으로 전력 공급이 분산되도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다.It is still another object of the present invention to provide a power control system and a power control method capable of efficiently distributing power in consideration of a power charge system, a power usage time, a season, and a power generation amount, And to provide a control system for the system.

본 발명의 또 다른 목적은, 전력 계량장치와 그 전력 사용자 정보를 통합하여 전력 사용자에 대한 임대료, 관리비, 수도료 및 가스료 등 전력 요금 이외 요금에 대한 청구 및 수금 등을 관리하여 줄 수 있도록 한, 전력 제어를 위한 관제시스템을 이용한 서비스 시스템을 제공하기 위한 것이다.It is still another object of the present invention to provide a power meter that can integrate a power meter and its power user information to manage the billing and collection of charges other than electric power charges such as rent, management fee, And a service system using a control system for power control.

본 발명의 또 다른 목적은, 전력 요금 이외 요금의 처리 정보를 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 가능하도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다. It is still another object of the present invention to provide a control system for power control that enables power amount adjustment or power cutoff for a power user based on processing information of charges other than electric power charges.

본 발명의 또 다른 목적은, 전력 사용자에 대한 전력 제어를 임대인에게도 부여함으로써 임대인의 자율적인 판단하에 전력 제어가 가능하도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다. It is still another object of the present invention to provide a control system for power control in which power control for a power user is also given to a landlord so that the power can be controlled under the autonomous determination of the landlord.

본 발명의 또 다른 목적은, 전력 사용자의 전력요금 외 요금을 금융회사에서 임대인에게 납부기한 전에 미리 대납함으로써 임대인의 임차인 관리가 용이하게 하고, 임차인은 요금 납부 지연에 따른 전력 제어를 피할 수 있어 전력 사용이 원활하게 이루어질 수 있도록 한, 전력 제어를 위한 관제시스템을 제공하기 위한 것이다. It is a further object of the present invention to provide a method and apparatus for managing a leaseholder's lease by facilitating the management of the leaseholder by paying in advance the charge of the power user other than the electric power charge to the landlord before the lease term is paid to the landlord, And to provide a control system for power control so as to be smoothly used.

본 발명의 다른 목적들은 이하에서 상세히 설명하는 바에 따라 유추 가능할 것이다.Other objects of the present invention will be apparent from the following detailed description.

상기 목적을 달성하기 위한 본 발명의 전력 제어를 위한 관제시스템은, 전력 사용자에 대한 요금 및 그에 관련된 정보를 처리하고, 전력의 품질을 측정하여 그 처리정보를 관제센터와 공유하며, 관제센터의 제어에 의해 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하는 전력 계량제어장치; 및 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 관제센터로 이루어진 것을 특징으로 한다. In order to achieve the above object, a control system for power control according to the present invention is a control system for power control that processes a fee for a power user and related information, measures the quality of the power and shares the processing information with the control center, A power metering controller for performing power adjustment or power shutdown for a power user; And electric power quality measurement processing information from a power metering control device and sharing the electric power metering control information and the power metering control information with respect to the power user based on the toll processing information and the power quality, And a control center for remotely controlling the control device.

전력 사용자에 대한 요금 처리 정보는 실시간으로 입력되어 관제센터와 공유하며, 전력량 조절 또는 전력 차단 해제 조건에 도달하면, 전력 사용자에 대해 정상전력이 공급되도록 관제센터가 전력 계량제어장치를 제어하게 된다.The charge processing information for the power user is inputted in real time and shared with the control center. When the power amount adjustment or the power cut off condition is reached, the control center controls the power metering control device so that normal power is supplied to the power user.

전력 사용자에 대한 요금 처리 정보는, 전력 요금, 전력 요금 외 요금, 납부기한, 납부여부, 납부일, 연체기간으로서 이들 정보들이 서로 연관 처리되어 전력량 조절 또는 전력 차단을 위한 정보로서 제공된다.The charge processing information for the power user is provided as information for adjusting the amount of electric power or cutting off power by associating these pieces of information with each other as electric power charges, charges other than electric power charges, payment due dates, payment details, payment dates, and delinquency periods.

전력 요금 외 요금은, 관리비, 임대로, 수도료 및 가스료 등이 있다.Electricity charge and other charges include management fee, rent, water and gas charges.

전력 사용자에 대한 전력량 조절 또는 전력 차단은, 화재, 진동, 지진 감지정보를 바탕으로 각 전력 사용자 또는 건물 차원에서 수행된다.Power regulation or power off for power users is performed at each power user or building level based on fire, vibration, and earthquake detection information.

전력 제어는 전력량 조절을 거친 후 전력 차단이 수행된다.The power control is performed after the amount of power is adjusted.

전력 사용자에 대하여 조절되는 전력량은 피크전력으로 설정될 수 있으며, 전력 사용량이 피크전력 초과시 전력 차단이 수행된다. The amount of power that is regulated for the power user may be set to peak power, and the power off is performed when the power usage exceeds the peak power.

상기 목적을 달성하기 위한 본 발명의 전력 계량제어장치는, 전력 사용자에 대한 요금 및 그에 관련된 정보와, 전력 품질을 처리한 정보를 관제센터로 전송하여 공유하며, 관제센터의 제어에 의해 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하도록 제어하는 제어부; 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 판단 신호를 상기 제어부에 입력하는 정보입력부; 정보입력부를 통해 입력되어 제어부에서 처리된 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 관제센터로 전송하고, 관제센터로부터 전송되어 오는 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 제어신호를 수신하는 통신부; 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력량을 조절하는 전력량 조절부; 및 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력을 차단하는 전력 차단부로 이루어진 것을 특징으로 한다. In order to achieve the above object, the power metering control apparatus of the present invention transmits and shares the information about the electric power user and the information related thereto, and the information processed by the power quality to the control center and shares them, A control unit for controlling the power amount adjustment or the power cutoff for the power control unit; An information input unit for inputting a judgment signal for adjusting the amount of power to the power user or cutting off the power to the control unit; The control unit transmits to the control center charge processing information and power quality information for the power user input through the information input unit and processed by the control unit and receives a control signal for power control or power cutoff for the power user transmitted from the control center A communication unit; A power amount adjustment unit for adjusting a power amount for a power user according to a control signal transmitted from a control center; And a power cutoff unit for cutting off power to the power user according to a control signal transmitted from the control center.

본 발명의 전력 계량제어장치는, 전력 계량제어장치와 그 설치된 구역, 건물의 임의의 구역에 대한 온도를 감지하는 온도센서; 전력 계량제어장치와 그 설치된 구역, 건물에 대한 소음, 진동을 감지하는 소음, 진동센서; 및 전력 계량제어장치와 그 설치된 구역, 건물의 임의의 구역에 대한 침입자를 촬영하는 촬영수단이 추가 구성되는 것을 특징으로 한다. The power metering control apparatus of the present invention includes: a temperature sensor for sensing a temperature of a power metering control apparatus, an installed area thereof, and an arbitrary area of a building; Power meter control device and its installed area, noise to building, noise to detect vibration, vibration sensor; And a photographing means for photographing an intruder for a power meter control device and a zone where it is installed, and an arbitrary area of the building.

상기 목적을 달성하기 위한 본 발명의 전력 제어를 위한 관제시스템은, 전력 사용자에 대한 요금 및 그에 관련된 정보와 전력 품질 정보를 처리하ㅇ여 관제센터와 공유하며, 관제센터의 제어에 의해 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하도록 제어하는 제어부; 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 판단 신호를 상기 제어부에 입력하는 정보입력부; 정보입력부를 통해 입력되어 제어부에서 처리된 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 관제센터로 전송하고, 관제센터로부터 전송되어 오는 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 제어신호를 수신하는 통신부; 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력량을 조절하는 전력량 조절부; 및 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력을 차단하는 전력 차단부로 구성된 전력 계량제어장치; 및 전력 계량제어장치와 공유하는 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 바탕으로 전력량 조절 또는 전력 차단을 위한 제어신호를 발생하는 서버; 전력 계량제어장치부터 전송되어 오는 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 처리하는 정보처리부; 전력 계량제어장치로부터 전송되어 처리된 전력 사용자에 대한 요금 처리 정보 및 전력 품질 정보와, 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 제어정보를 저장하는 저장부; 및 전력 계량제어장치로부터 전송되어 오는 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 수신하고, 요금 처리 정보와 저녁 품질 정보를 바탕으로 서버에서 발생하는 제어신호를 전력 계량제어장치로 전송하는 통신부로 구성된 관제센터로 이루어진 것을 특징으로 한다.In order to achieve the above object, a control system for power control according to the present invention is a system in which a charge for a power user and information related thereto and power quality information are processed and shared with a control center, A control unit for controlling the power amount adjustment or the power cutoff for the power control unit; An information input unit for inputting a judgment signal for adjusting the amount of power to the power user or cutting off the power to the control unit; The control unit transmits to the control center charge processing information and power quality information for the power user input through the information input unit and processed by the control unit and receives a control signal for power control or power cutoff for the power user transmitted from the control center A communication unit; A power amount adjustment unit for adjusting a power amount for a power user according to a control signal transmitted from a control center; And a power cutoff unit for cutting off power to the power user according to a control signal transmitted from the control center; And a server for generating a control signal for power control or power cutoff based on charge processing information and power quality information for a power user shared with the power metering control device; An information processing unit for processing charge processing information and power quality information for a power user transmitted from the power metering control apparatus; A storage unit for storing charge processing information and power quality information transmitted from the power metering control apparatus and processed by the power user, and control information for power amount adjustment or power shutdown for the power user; And a communication unit for receiving charge processing information and power quality information for a power user transmitted from the power metering control apparatus and transmitting a control signal generated in the server to the power metering control apparatus based on the toll processing information and the evening quality information And a control center configured.

상기 목적을 달성하기 위한 본 발명의 전력 제어를 위한 관제시스템은, 전력 계량값을 실시간으로 관제센터로 전송하는 전력 계량제어장치; 및 전력 계량제어장치로부터 전송받은 전력 계량값을 바탕으로 전력 공급 단위별로 사용 전력량 및 공급 전력량을 분석하고, 그 분석 결과에 따라 전력을 분산 공급하는 관제센터로 이루어진 것을 특징으로 한다.According to an aspect of the present invention, there is provided a control system for power control comprising: a power metering control device for transmitting a power metering value to a control center in real time; And a control center for analyzing power consumption and power supply amount for each power supply unit based on the power metering value received from the power metering control apparatus, and distributing power according to the analysis result.

관제센터는 일정 단위의 전력 사용자가 속하는 건물의 전력 사용량에 대한 데이터를 바탕으로 공급 전력량 대비 사용 전력량을 판단하고, 판단된 사용 전력량을 토대로 일정 단위의 전력 사용자가 속한 건물 또는 지역별로 전력을 분산하여 공급하는 것을 특징으로 한다. Based on the data on the power consumption of the building to which the power user belongs, the control center determines the amount of power to be used relative to the amount of power supplied, and distributes the power to the building or region to which the power user belongs based on the determined amount of used power .

상기 목적을 달성하기 위한 본 발명의 전력 제어를 위한 관제시스템을 이용한 서비스 시스템은, 전력 사용자에 대한 관리비, 임대료, 수도료 및 가스료 처리 정보를 통합 관리하고, 상기 요금 처리 정보와 관련하여 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하는 관제센터로 이루어진 것을 특징으로 한다.In order to achieve the above object, a service system using a control system for power control according to the present invention integrates and manages a management fee, a rent, a fee and a gas treatment information for a power user, And a control center for performing power control or power cut-off.

상기 목적을 달성하기 위한 본 발명의 전력 제어를 위한 관제시스템은, 전력 사용자에 대한 요금 및 그에 관련된 정보를 처리하고, 전력의 품질을 측정하여 그 처리정보를 관제센터와 공유하며, 임대인의 제어하에 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하는 전력 계량제어장치; 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 관제센터; 및 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치 또는 관제센터로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 임대인 장치로 이루어진 것을 특징으로 한다.According to an aspect of the present invention, there is provided a control system for power control, comprising: processing a charge for a power user and information related thereto; measuring a quality of the power; sharing the process information with a control center; A power metering controller for performing power adjustment or power shutdown for a power user; And a control unit for controlling the power metering control unit and the power metering control unit so that the power management unit controls the power metering or power cutoff for the power user based on the charge processing information and the power quality, A control center to remotely control the device; And power consumption measurement processing information from the power metering control device or the control center to share and control the power amount or cut off power to the power user based on the toll processing information and the power quality And a landlord apparatus for remotely controlling the electric power metering control apparatus.

상기 목적을 달성하기 위한 본 발명의 전력 제어를 위한 관제시스템은, 전력 사용자에 대한 요금 및 그에 관련된 정보를 처리하고, 전력의 품질을 측정하여 그 처리정보를 관제센터와 공유하며, 임대인 또는 관제센터의 제어하에 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하는 전력 계량제어장치; 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 관제센터; 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치 또는 관제센터로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 임대인 장치; 및 임대인 장치로부터 전력 사용자의 전력요금 외 요금 정보를 전송받고, 임대인에게 납부기한 전에 선납하며, 전력 사용자에 대하여는 요금에 수수료를 더한 비용을 청구하는 금융회사 장치로 이루어진 것을 특징으로 한다.In order to achieve the above object, a control system for power control according to the present invention is a control system for power control that processes a fee for a power user and related information, measures the quality of the power and shares the processing information with the control center, A power metering controller for performing power adjustment or power cutoff for a power user under the control of the control unit; And a control unit for controlling the power metering control unit and the power metering control unit so that the power management unit controls the power metering or power cutoff for the power user based on the charge processing information and the power quality, A control center to remotely control the device; And the power quality control process information is shared and transmitted from the power metering control device or the control center to the power user so that the power amount adjustment or the power cut-off for the power user is performed based on the rate process information and the power quality A landlord apparatus for remotely controlling the electric power metering control apparatus; And a financial company device that receives charge information of the electric power user from the landlord device and receives charge information of the electric power user from the landlord device and prepares the charge before the payment period to the landlord, and charges the electric power user with the fee plus the fee.

금융회사 장치는 전력요금 외 요금 납부지연에 따른 전력 사용자에 대한 전력 제어가 수행되지 않도록 전력 제어가 수행되는 기준일 전에 임대인에게 요금을 선납하는 것을 특징으로 한다.The financial institution apparatus prepares a fee to the landlord before the power control is performed so that the power control for the power user is not performed due to the delay in payment of the charge other than the electric power charge.

금융회사에서 대납하는 전력 사용자의 요금은 보험으로 대체되는 것을 특징으로 한다.The charge of power users to be paid by financial companies is replaced by insurance.

본 발명의 전력 제어를 위한 관제시스템 및 이를 이용한 서비스 시스템에 따르면, 전력 계량제어장치와 원격 관제센터가 유무선 통신망으로 네트워크화하여 전력 사용자에 대한 전력요금 처리 정보를 공유함으로써 전력 사용자에 대한 전력량 조절 또는 전력 차단을 할 수 있는 등, 예를 들어, 공동주택 또는 빌딩의 소유자 또는 관리자가 굳이 개입하지 않고도 전력 사용자가 전력요금을 성실하게 납부하도록 유도할 수 있다.According to the control system for power control of the present invention and the service system using the same, the power metering control device and the remote control center are networked through the wired / wireless communication network to share the power charge processing information for the power users, For example, the owner or manager of the apartment or the building may be forced to pay the electric power user in earnest without intervention.

또한, 본 발명에 따르면, 전력요금 및 그 외 요금 처리정보를 바탕으로 한 전력조절과 피크전력이 연계되어 처리되는 상태에서 미리 설정된 피크전력이 초과되면 즉시 전력차단이 수행되도록 하여 예를 들어, 공동주택 또는 빌딩의 소유자 또는 관리자가 굳이 개입하지 않고도 전력 사용자가 전력요금을 성실하게 납부하도록 유도할 수 있다. Also, according to the present invention, when the preset peak power is exceeded in the state where the power control based on the electric power charge and other charge processing information and the peak electric power are processed in association with each other, The owner or manager of the house or building can force the power user to pay the power bill in earnest without intervention.

또한, 본 발명에 따르면, 온도, 화재, 소음, 진동, 지진 감지와, 침입자 감지가 가능하고, 이들 감지신호를 바탕으로 원격 관제센터에서 일인의 전력 사용자 또는 일정 그룹 단위의 전력 사용자에 대하여 전력량을 조절하거나 차단하는 등, 비상상황에서도 적절하게 대처할 수 있어 인명 및 재산상 피해를 최소화할 수 있다.According to the present invention, it is possible to detect the temperature, the fire, the noise, the vibration, the earthquake, and the intruder, It is possible to cope with an emergency even in an emergency, thereby minimizing damage to persons and property.

또한, 본 발명에 따르면, 전력 요금체계, 전력 사용시간, 계절, 발전량, 전력품질 등을 바탕으로 효율적인 전력 분산이 가능하도록 함과 동시에, 이를 일정 지역 단위로 관리하여 효율적으로 전력 공급이 분산되도록 할 수도 있다.In addition, according to the present invention, it is possible to efficiently distribute electric power based on the electric power charge system, the electric power use time, the season, the electric power generation quantity, the electric power quality, etc., It is possible.

또한, 본 발명에 따르면, 전력 계량제어장치와 전력 사용자를 통합 관리하여 전력 사용자에 대한 임대료, 관리비, 수도료 및 가스료 등에 대한 청구부터 수금까지의 전 과정을 관리하여 주는 등, 전력 사용자에 관련된 각종 요금 처리상황을 일목 요연하게 확인할 수 있다.Further, according to the present invention, it is possible to manage various processes related to electric power users, such as managing the entire process from claim to collection of electricity, user fees, water and gas charges, etc., It is possible to confirm the charge processing situation in a clear manner.

또한, 본 발명에 따르면, 전력 요금 이외 요금의 처리 정보를 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 가능하도록 하는 등, 전력 사용자에 게 부과되는 전력 요금 외 요금의 성실 납부를 유도할 수 있다. Further, according to the present invention, it is possible to induce the payment of the electric power charge other than the electric power charge imposed on the electric power user, such as the power amount adjustment or power cutoff for the electric power user, .

또한, 본 발명에 따르면, 전력 사용자에 대한 전력 제어를 임대인에게도 부여함으로써 임대인의 자율적인 판단하에 전력 제어가 가능하여 전력 제어 조건을 상황에 맞게 적절하게 적용하여 실행할 수 있다. Further, according to the present invention, the power control for the power user is also given to the landlord so that the power can be controlled under the autonomous determination of the landlord, and the power control condition can be appropriately applied in accordance with the situation.

또한, 본 발명에 따르면, 전력 사용자의 전력요금 외 요금을 금융회사에서 임대인에게 납부기한 전에 미리 대납함으로써 임대인의 임차인 관리가 용이하게 하고, 임차인은 요금 납부 지연에 따른 전력 제어를 피할 수 있어 전력 사용이 원활하게 이루어질 수 있다. Further, according to the present invention, it is possible to facilitate the management of the tenant of the landlord by allowing the landlord to charge the power user other than the electric power fee before the payment time to the landlord in advance, and the tenant can avoid the power control due to the delay in the payment of the fee, Can be achieved smoothly.

도 1은 본 발명의 실시예에 따른 전력 제어를 위한 시스템의 구성도.
도 2는 본 발명의 실시예에 따른 전력 사용자에 대한 전력 제어 개념도.
도 3은 본 발명의 실시예에 따라 관제센터에 의해 전력 공급 분산 제어가 이루어지는 개념도.
도 4는 본 발명의 전력 계량제어장치의 구성도.
도 5는 본 발명의 관제센터의 구성도.
도 6은 본 발명의 실시예에 따라 전력 사용자에 대한 요금정보를 바탕으로 전력 제어가 수행되는 동작 흐름도.
도 7은 본 발명의 실시예에 따라 전력 계량제어장치의 감지정보를 바탕으로 전력 제어가 수행되는 동작 흐름도.
도 8은 본 발명의 실시예에 따라 일정 관리 단위별 전력 사용량을 바탕으로 전력 공급 제어가 수행되는 동작 흐름도.
도 9는 본 발명의 제2 실시예에 따른 전력 제어를 위한 시스템의 구성도.
도 10은 본 발명의 제2 실시예에 따라 전력 사용자에 대한 요금정보를 바탕으로 임대인에 의해 전력 제어가 수행되는 동작 흐름도.
도 11은 본 발명의 제3 실시예에 따라 금융회사를 통한 전력 사용자의 전력요금 외 요금 처리 구성도.
도 12는 본 발명의 제3 실시예에 따라 전력 사용자의 전력요금 외 요금 처리 가 수행되는 동작 흐름도.
1 is a configuration diagram of a system for power control according to an embodiment of the present invention;
2 is a conceptual diagram of power control for a power user according to an embodiment of the present invention;
3 is a conceptual diagram illustrating power supply distribution control performed by a control center according to an embodiment of the present invention;
4 is a configuration diagram of a power metering control apparatus according to the present invention;
5 is a block diagram of a control center of the present invention;
6 is a flowchart illustrating an operation in which power control is performed based on charge information for a power user according to an embodiment of the present invention.
7 is a flowchart illustrating an operation in which power control is performed based on sensing information of a power metering control apparatus according to an exemplary embodiment of the present invention.
FIG. 8 is a flowchart illustrating an operation in which power supply control is performed based on a power usage amount for each schedule management unit according to an embodiment of the present invention. FIG.
9 is a configuration diagram of a system for power control according to a second embodiment of the present invention;
10 is an operational flow diagram in which power control is performed by the landlord based on charge information for a power user according to a second embodiment of the present invention;
FIG. 11 is a block diagram of the charge processing of electric power users other than electric power charges through a financial company according to the third embodiment of the present invention; FIG.
FIG. 12 is a flowchart illustrating an operation in which a power user charges a power bill in accordance with a third embodiment of the present invention. FIG.

이하, 본 발명의 실시예를 첨부 도면을 참조하여 상세히 설명한다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and will herein be described in detail. It is to be understood, however, that the invention is not to be limited to the specific embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.

본 발명에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다.The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.

단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The singular expressions include plural expressions unless the context clearly dictates otherwise. In the present application, the terms "comprises" or "having" and the like are used to specify that there is a feature, a number, a step, an operation, an element, a component or a combination thereof described in the specification, But do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다.Unless defined otherwise, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

도 1은 본 발명의 실시예에 따른 다기능 전력 계량제어장치 및 그 관제시스템의 구성도, 도 2는 본 발명의 실시예에 따른 전력 사용자에 대한 전력 제어 개념도, 도 3은 본 발명의 실시예에 따라 관제센터에 의해 전력 공급 분산 제어가 이루어지는 개념도이다. 2 is a conceptual diagram of power control for a power user according to an embodiment of the present invention. FIG. 3 is a block diagram of a power control apparatus according to an embodiment of the present invention. And the power supply distribution control is performed by the control center.

일실시예에서 전력 계량제어장치(100)는, 전력 사용자들마다 각각의 계량기가 설치되어 전력 사용량이 계량되도록 한 것으로, 예를 들어 빌딩에 입주한 각 호실(이하, 전력 사용자와 혼용하기로 한다)에 대한 전력량 조절 또는 전력 차단 등의 전력 제어와, 전력 품질 측정을 관제센터의 제어하에 수행하는 수단으로서 유무선 통신망(N)을 통해 관제센터(200)와 네트워크화된다. In one embodiment, the power metering control apparatus 100 is provided for each power user so that each meter is installed to measure the amount of power consumption. For example, each power room in the building (hereinafter, ) And power control such as power cutoff and power quality measurement to the control center 200 through the wired / wireless communication network N as a means of performing the control under the control of the control center.

상기에서 전력량 조절은, 예를 들어 최대 10kw에서 3kw로 줄여 대용량 전열기구를 사용하지 못하도록 하는 식으로 구현될 수 있다. 전력량 조절은 또한, 사용시간이 제한되도록 공급시간대를 조절하는 식으로 이루어질 수도 있다. In this case, the power amount adjustment may be implemented by, for example, reducing the maximum power from 10 kW to 3 kW so as not to use the large-capacity heater. The power amount adjustment may also be done by adjusting the supply time zone so that the usage time is limited.

일실시예에서 전력 계량제어장치(100)는, 상기와 같이 전력 사용자에 대한 전력량 조절 또는 전력 차단 등의 전력 제어를 위하여 각 호실에 대한 전력요금 처리 정보(청구액, 납부여부, 납부기한, 납부일자, 연체기간 등)를 관제센터(200)로 전송하여 서로 공유한다. In one embodiment, the power metering control apparatus 100 is configured to calculate power rate processing information (charge amount, payment amount, payment due date, payment date, etc.) for each room in order to control power such as power amount adjustment or power cut- , Delinquency period, etc.) to the control center 200 and share them with each other.

일실시예에서 전력 계량제어장치(100)는 또한, 전력 사용자 개인 단위는 물론, 건물 차원에서의 전력량 조절 또는 전력 차단 등의 전력 제어가 수행되도록 온도, 화재, 소음, 진동, 지진 감지와, 침입자 감지 신호를 처리한 후, 이를 관제센터(200)로 전송하여 서로 공유한다. In one embodiment, the power metering control apparatus 100 may also be configured to detect temperature, fire, noise, vibration, earthquake, and so on so that power control, such as power level adjustment or power cutoff, After the detection signal is processed, the detection signal is transmitted to the control center 200 to be shared with each other.

일실시예에서 전력 계량제어장치(100)는 또한, 전력 사용자에 대한 관리비, 임대료, 수도료 및 가스료 등의 요금에 관련된 처리 정보(청구액, 납부여부, 납부기한, 납부일자, 연체기간 등)를 처리한 후, 이를 관제센터(200)로 전송하여 서로 공유한다. In one embodiment, the power metering control apparatus 100 further includes processing information (bill amount, payment date, payment term, payment date, overdue period, etc.) related to the management fee, rent, water, and gas fee for the power user And transmits them to the control center 200 to share them with each other.

일실시예에서 전력 계량제어장치(100)는 또한, 상기와 같은 전력량 조절 또는 전력 차단 등 전력 제어 원인이 소멸되는 경우, 즉 전력 사용자가 전력요금 및/또는 전력요금 이외 요금을 모두 납부하거나, 화재, 진동 또는 지진이 소멸하는 등 전력 공급이 원활하게 이루어지는 상황으로 복귀되면 본래 설정된 바에 따라 전력 사용자에 대한 전력 공급이 정상적으로 이루어지도록 그 정보를 관제센터(200)로 전송한다. 이러한 정보로는 예를 들어, 전력요금 및/또는 임대료 납부, 납부일자 등이 있을 수 있다. In one embodiment, the power metering control apparatus 100 may also be configured such that when the cause of the power control such as the power amount adjustment or the power cutoff disappears, that is, when the power user pays all the charges other than the power rate and / The control center 200 transmits the information to the control center 200 so that the power supply to the power user can be normally performed according to the originally set state. Such information may include, for example, electricity charges and / or rent payments, payment dates, and the like.

일실시예에서 전력 계량제어장치(100)는 또한, 전력요금 처리 정보 및/또는 전력요금 외 요금 처리 정보를 바탕으로 전력조절이 수행되는 경우 전력 사용량이 피크전력을 초과하는 경우 즉시 전력차단을 수행하게 된다. In one embodiment, the power metering control apparatus 100 also performs power interruption immediately when the power usage exceeds the peak power when the power adjustment is performed based on the power rate processing information and / or the power fare processing information .

일실시예에서 관제센터(200)는, 전력 계량제어장치(100)와 함께 공유하는 전력 요금 처리 정보와 전력요금 외 요금 처리 정보를 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단 등의 전력 제어를 위한 원격 제어신호와, 전력량 조절이 수행되는 전력 사용자에 대하여 설정되는 피크전력을 위한 원격 제어신호와, 화재 및/또는 소음, 진동 및/또는 지진에 따라 건물 차원에서의 전력량 조절 또는 전력 차단 등의 전력 제어를 위한 원격 제어신호를 발생하여 전력 계량장치(100)로 전송한다. 이러한 제어신호는, 적어도 한 명 이상의 전력 사용자에 대하여 전송될 수 있다. 예를 들어, 적어도 한 명 이상의 전력 사용자가 전력요금 및/또는 전력요금 외 요금 납부를 체납하고 있는 경우, 그리고 적어도 한 명 이상의 전력 사용자에 관련하여 화재 또는 진동 등 비상상황이 발생하였을 경우, 그 비상상황이 발생된 전력 사용자에 대한 전력 제어가 수행되면 될 것이다. In one embodiment, the control center 200 performs power control such as power amount adjustment or power cut-off for a power user based on the power charge processing information shared with the power metering control apparatus 100 and the charge processing information Remote control signals for peak power set for a power user for which power regulation is performed and remote control signals for power control or power interruption at the building level in response to fire and / or noise, vibration and / Generates a remote control signal for power control, and transmits it to the power metering apparatus 100. Such a control signal may be transmitted to at least one or more power users. For example, when at least one power user delays payment of electricity charges and / or charges other than electric power charges, and an emergency situation such as a fire or vibration occurs in connection with at least one electric power user, The power control for the power user in which the situation occurred will be performed.

일실시예에서 관제센터(200)는 또한, 전력 계량제어장치(100)로부터 전송되어 오는 영상신호를 토대로 침입자 여부를 판단하여 그에 적절하게 대응하도록 원격 제어신호를 전력 계량제어장치(100)로 전송한다. 침입자에 대응하도록 발생하는 제어신호는, 예를 들어 경보음 발생, 안내방송 등이 있을 수 있으며, 그 외에도 가능한 범위에서 다양하게 설정할 수 있다. 예를 들어, 제어신호로는 칩입자가 호실에서 사물을 정확하게 식별할 수 없도록 그 호실에 대한 전력 공급을 차단하는 신호가 있을 수 있을 것이다. In one embodiment, the control center 200 also determines whether an intruder is present based on the video signal transmitted from the power metering control apparatus 100 and transmits a remote control signal to the power metering control apparatus 100 so as to appropriately correspond thereto do. The control signal generated so as to correspond to the intruder may be, for example, an alarm sound, an announcement broadcast, or the like. For example, in a control signal, there may be a signal to interrupt the power supply to the room so that the intruder can not accurately identify the object in the room.

일실시예에서 관제센터(200)는 또한, 전력 계량제어장치(100)를 제어하여 측정된 전력 품질 측정신호를 전송받아 공급 전력 레벨을 조절할 수 있다. 또한, 전력 품질을 바탕으로 일정 단위 전력 사용자에 대한 전력 공급을 분산할 수 있다. In one embodiment, the control center 200 may also control the power metering control device 100 to receive the measured power quality measurement signal and adjust the supply power level. In addition, it is possible to distribute the power supply to a certain number of power users based on the power quality.

일실시예에서 관제센터(200)는 또한, 예를 들어, 최소 단위의 전력 사용자, 상기 전력 사용자가 복수로 거주 또는 근무하는 공동주택 또는 빌딩, 상기 복수의 공동주택 또는 빌딩이 그룹화되는 지역 등을 일정 관리 단위로 하여 그 단위별로 전력 공급량 및 전력 사용량을 확인하고, 이를 바탕으로 공급 전력을 이들 단위간에 적절하게 분산하거나 또는 전력 요금체계, 전력 사용시간, 계절, 발전량 등을 결부시켜 단위별로 공급 전력을 적절하게 분산함으로써 효율적인 전력 공급이 가능하도록 한다. In one embodiment, the control center 200 may also include, for example, a power user with a minimum unit, a co-residence or building where the power user resides or works in a plurality, a plurality of co- The power supply amount and the power consumption amount of each unit are confirmed as a schedule management unit, and the power supply is appropriately distributed among these units based on the power supply amount and power consumption amount, or the power supply system, power usage time, So that efficient power supply is enabled.

이를 도 3을 참조로 설명하면, 지역 단위로 복수 개의 건물들이 속하는 경우, 그 복수 개의 빌딩에서 사용하는 전력량이 지역 단위로 계량되어 관제센터(200)로 전송되면, 관제센터(200)에서는 각 지역 단위별로 필요한 전력량과 공급 전력량 그리고 사용 전력량을 각각 판단하여, 그 판단 결과에 따라 지역 단위별로 공급 전력을 줄이거나 늘리게 된다. 이러한 제어는 전력 계량제어장치로부터 실시간 전송되어 오는 전력 사용량을 바탕으로 이루어짐은 물론이다. 즉 관제센터(200)는 전력 계량제어장치 및 그 전력 계량제어장치가 속해 있는 빌딩 그리고 그 빌딩이 속하는 지역 단위를 서로 연관하여 관리하므로 각 전력 계량제어장치를 통한 전력 사용량은 물론, 빌딩별 전력 사용량 그리고 더 나아가 지역 단위별 전력 사용량을 판단할 수 있는 것이다.3, when a plurality of buildings belong to a plurality of buildings, the amount of electric power used in the plurality of buildings is measured in units of areas and transmitted to the control center 200. In the control center 200, The required power amount, the supplied power amount and the used power amount are determined for each unit, and the supply power is decreased or increased according to the result of the determination. Of course, this control is based on the amount of power that is transmitted in real time from the power metering control apparatus. That is, the control center 200 manages the power metering control device, the building to which the power metering control device belongs, and the area unit to which the building belongs, so that the power usage amount through each power metering control device, Furthermore, it is possible to judge the power consumption of each region.

일실시예에서 관제센터(200)는 또한, 전력 사용자에 대하여 부과된 관리비, 임대료, 수도료 및 가스료 등 전력요금 외 요금 처리 정보를 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단 등의 전력 제어가 수행되도록 할 수 있다. In one embodiment, the control center 200 also controls power control such as power amount adjustment or power cutoff for the power user based on the charge processing information other than the power charge such as the management fee, rent, water, and gas charge imposed on the power user .

한편, 상기 전력 계량제어장치(100)와 관제센터(200)는 전력 사용자에게 부과된 각종 요금 처리 정보를 서로 공유하되, 이들 공유되는 정보들을 토대로 한 전력 사용자에 대한 전력량 조절 또는 전력 차단 등의 전력 제어 수행은, 전력 계량제어장치(100)에서 먼저 요청할 수도 있고, 관제센터(200)에서 먼저 제어신호를 발생하여 전력 계량제어장치(100)로 전송할 수도 있다. Meanwhile, the power metering control apparatus 100 and the control center 200 share the various charge processing information imposed on the electric power users, and the electric power such as the power amount adjustment or the electric power cutoff for the electric power user based on the shared information The control execution may be requested first by the power metering control apparatus 100 or may be generated first by the control center 200 and then transmitted to the power metering control apparatus 100. [

그러나 상기에서 언급한 공급 전력의 효율적인 분산은, 일정 지역 단위로 전체적인 공급 전력을 판단하고, 전력 사용 상황을 판단한 후, 예를 들어 그 지역 단위에 포함된 공동주택 또는 빌딩간에 서로 적절하게 전력이 분산되어 공급되도록 하는 것이므로, 전력 계량제어장치(100)로부터 이에 대한 선요청이 없이도 관제센터(200)에서 자체적으로 판단한 후 수행될 수 있을 것이다. 전력 품질을 바탕으로 한 전력 공급 분산도 마찬가지이다. However, the efficient distribution of the power supply mentioned above can be performed by determining the overall power supply in a certain area and judging the power consumption situation. For example, when power is distributed appropriately among the apartments or buildings included in the area unit So that it can be performed after it is judged by the control center 200 itself without requesting from the electric power metering control apparatus 100. [ The same is true for power supply distribution based on power quality.

일실시예에서 관제센터(200)는 또한, 상기와 같은 전력량 조절 또는 전력 차단 등의 전력 제어 원인이 소멸되는 경우, 즉 전력 사용자가 전력요금 및/또는 그 외 요금을 납부하거나, 화재, 소음, 진동, 지진 등이 소멸하는 등 전력 공급이 원활하게 이루어지는 상황으로 복귀되는 경우에는 본래 설정된 바에 따라 전력 사용자에 대한 전력 공급이 정상적으로 이루어지도록 전력 계량제어장치(100)를 제어한다. In one embodiment, the control center 200 may also be configured to determine if power control causes such as power regulation or power cut-off are terminated, that is, when a power user pays a power charge and / The power meter control unit 100 controls the power metering control unit 100 so that power supply to the power user is normally performed according to the original setting when the power supply is smoothly returned.

상기 관제센터(200)의 원격 제어에 의해 수행되는 전력량 조절 또는 전력 차단 등의 전력 제어에 따라 동작되는 전력 계량제어장치(100)의 계량값은 실시간으로 관제센터(200)로 전송된다. 따라서 관제센터(200)는 이를 전력량 조절 또는 전력 차단 등 전력 제어의 원인이 된 전력 요금 및 그 외 요금 처리 정보, 전력 계량장치 감지정보 등과 연계하여 처리한다.The metering value of the power metering control apparatus 100 operated in accordance with the power control such as the power amount adjustment or the power cutoff performed by the remote control of the control center 200 is transmitted to the control center 200 in real time. Accordingly, the control center 200 processes this in connection with the electric power charge, other charge processing information, power meter device detection information, etc., which cause power control such as power amount adjustment or power cutoff.

도 4는 본 발명의 전력 계량제어장치의 구성도이다.4 is a configuration diagram of the electric power metering control apparatus of the present invention.

일실시예에서 제어부(110)는, 전력 사용자에 대한 요금 처리 정보를 처리하고, 이를 관제센터(200)와 공유하며, 이들 정보들을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단 등의 전력 제어와, 정상 전력 공급을 관제센터(200)의 제어에 의해 수행한다.In one embodiment, the control unit 110 processes charge processing information for a power user, shares it with the control center 200, and based on the information, controls power such as power control or power cutoff for the power user , And the normal power supply is performed under the control of the control center (200).

일실시예에서 제어부(110)는 또한, 전력 계량제어장치(100) 자체 및 그 설치 구역에 대한 온도를 판단함은 물론, 이를 바탕으로 화재를 판단하며, 전력 계량제어장치(100) 자체 및 그 설치 구역에 대한 소음, 진동을 판단함은 물론, 이를 바탕으로 지진을 판단하여 이들 판단된 정보들을 관제센터(200)와 공유하며, 관제센터(200)의 제어에 의해 최소 단위의 전력 사용자에 대한 전력량 조절 또는 전력 차단이나 건물 차원에서의 전력량 조절 또는 전력 차단을 선택적으로 수행한다. The controller 110 also determines the temperature of the power meter 100 itself and the installation area of the power meter 100, determines the fire based on the temperature, It is possible to judge an earthquake on the basis of the noise and the vibration of the installation area and to share the determined information with the control center 200. The control center 200 controls the control unit 200 Selectively adjusts the amount of power or cuts power or adjusts the amount of power at the building level or cuts off power.

일실시예에서 제어부(110)는 또한, 전력 조절이 수행되는 상태에서 전력 사용량이 피크전력을 초과하는 경우, 즉시 전력 차단을 수행한다. 상기 피크전력 설정값은 관제센터(200)로부터 전송된다. In one embodiment, the control unit 110 also performs the power cut-off immediately when the power usage exceeds the peak power in the state where the power regulation is performed. The peak power setting value is transmitted from the control center 200.

일실시예에서 정보입력부(120)는, 상기에 언급한 바와 같이 각 호실에 대한 요금 처리 정보를 입력하는 수단이다. 이와 같이 입력되는 정보의 종류는 청구액, 납부기한, 납부여부, 납부일, 연체기간 등이 있을 수 있으나 이러한 특정 정보로 한정할 필요는 없으며, 이들 정보들이 각 호실에 대한 전력량 조절 또는 전력 차단을 위한 조건으로서 서로 연관 처리된다. In one embodiment, the information input unit 120 is means for inputting charge processing information for each room as mentioned above. The type of information to be input may be a bill amount, a due date, a payment date, a payment date, a delinquency period, etc. However, it is not necessary to limit the information to such specific information. Respectively.

상기 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위해 연관 처리되는 조건은 다양하게 설정될 수 있다. 예를 들어, 청구액 및 그에 대한 연체기간, 전력량 등이 모두 별도로 고려되어 설정될 수도 있고, 이들 정보들이 모두 연관되어 처리될 수도 있다. The conditions to be associated with the power user for power control or power cut-off may be variously set. For example, the bill amount and the delinquency period, the amount of power, etc. may all be set separately, and all of the information may be processed in association with each other.

일실시예에서 정보입력부(120)는 또한, 전력 사용자에 부과된 각종 요금, 예를 들어, 관리비, 임대료, 수도료 및 가스료 등의 요금 처리 정보를 입력하는 수단이다. 이들 정보들 역시, 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 조건으로서 서로 연관 처리된다. In one embodiment, the information input unit 120 is also a means for inputting various rates charged to a power user, for example, charge processing information such as management fee, rent, water, and gas. These pieces of information are also related to each other as conditions for power consumption adjustment or power cut-off for the power user.

일실시예에서 온도센서(130)는, 전력 계량제어장치(100) 자체 및 그 설치 구역, 더 크게는 건물의 소정 구역 온도를 감지하는 수단이다. 그리고 온도센서(130)는, 전력라인의 온도를 감지하여 전력공급이 정상적으로 이루어지도록 하기 위한 수단으로 제공될 수 있다. 이를 위하여 온도센서(130)는, 전력 계량제어장치(100)의 내부 및/또는 외부에 적어도 하나 이상 설치될 수 있다.In one embodiment, the temperature sensor 130 is a means for sensing the power metering control device 100 itself and its installation area, or more specifically, the predetermined area temperature of the building. The temperature sensor 130 may be provided as a means for sensing the temperature of the power line to allow the power to be normally supplied. To this end, at least one temperature sensor 130 may be installed inside and / or outside the power metering control apparatus 100.

일실시예에서 소음 진동센서(140)는, 전력 계량제어장치(100) 자체 및 그 설치 구역, 더 크게는 건물의 소음 및 진동을 감지하는 수단이다. 소음 진동센서(140)는, 건물의 진동을 바탕으로 지진을 판단하는 수단으로 제공될 수 있다. 이를 위하여 소음 진동센서(140)는, 전력 계량제어장치(100)의 내부 및/또는 외부에 적어도 하나 이상 설치될 수 있다. In one embodiment, the noise vibration sensor 140 is a means for sensing the power meter control device 100 itself and its installation area, or more generally, the noise and vibration of the building. The noise vibration sensor 140 can be provided as a means for determining an earthquake based on vibration of a building. For this purpose, at least one noise and vibration sensor 140 may be installed inside and / or outside the power metering control apparatus 100.

일실시예에서 CCTV(150)는, 전력 계량제어장치(100)가 설치된 소정 구역, 더 크게는 건물의 소정 구역의 상황을 촬영하는 수단이다. CCTV(150)는, 전력 계량제어장치(100)에 대하여 위해를 가하는 상황, 각 호실에 대한 칩입 상황, 더 나아가서는 건물의 소정 구역에 대한 침입자를 촬영하는 수단으로 제공될 수 있다. 이를 위하여 CCTV(150)는, 전력 계량제어장치(100)의 내부 및/또는 외부에 적어도 하나 이상 설치될 수 있다.In one embodiment, the CCTV 150 is a means for photographing a predetermined zone where the power metering control apparatus 100 is installed, or more specifically, a situation of a predetermined zone of the building. The CCTV 150 may be provided as a means for taking risks against the electric power metering control apparatus 100, an intrusion situation for each room, and a means for shooting an intruder on a predetermined area of the building. To this end, the CCTV 150 may be installed at least one inside and / or outside the electric power metering control apparatus 100.

일실시예에서 통신부(160)는, 전력 계량제어장치(100)에서 처리된 전력 사용자에 대한 전력요금 및 전력요금 외 요금 처리 정보와, 온도센서(130), 진동센서(140), CCTV(150)를 통해 각각 감지되어 판단된 온도, 화재, 소음, 진동, 지진 및 칩입 정보들을 관제센터(200)로 전송하고, 이들 정보들을 바탕으로 발생된 전력량 조절 및 전력 차단 제어신호와 피크전력 제어신호를 관제센터(200)로부터 수신하는 수단이다.In one embodiment, the communication unit 160 is configured to transmit the electric power charge and the electric-charge-to-charge charge processing information processed by the electric power metering control apparatus 100, the temperature sensor 130, the vibration sensor 140, the CCTV 150 Fire, noise, vibration, earthquake, and intrusion information to the control center 200, and controls the power amount control and power cutoff control signals and peak power control signals generated based on the information, From the control center (200).

일실시예에서 통신부(160)는, TCP/IP 통신 등 일반 인터넷 통신과 전력선 통신(PLC)을 포함하는 유선 통신망, 3G, 4G, 4G LTE, 5G 등 일반적으로 통신사 망에서 서비스되는 무선 통신망을 포함하는 원거리 통신망과, 블루투스, 지그비, RF, Wi-Fi 등의 근거리 통신망으로 구성된다.In one embodiment, the communication unit 160 includes a wired communication network including general internet communication such as TCP / IP communication and a power line communication (PLC), and a wireless communication network generally provided in a communication company network such as 3G, 4G, 4G LTE and 5G , And a local area network (LAN) such as Bluetooth, ZigBee, RF, and Wi-Fi.

따라서 온도센서(130), 진동센서(140), CCTV(150)가 각각 전력 계량제어장치(100)와 이격되어 설치될 경우, 이들을 통한 감지신호 및 영상신호는 근거리 통신망을 통해 전송받고, 그 처리신호들은 원거리 통신망을 통해 관제센터(200)로 전송하게 된다.Accordingly, when the temperature sensor 130, the vibration sensor 140, and the CCTV 150 are installed separately from the power metering control apparatus 100, the sensing signal and the video signal through them are received through the LAN and received The signals are transmitted to the control center 200 via the telecommunication network.

한편, 상기 통신부(160)는, 보안 기능이 탑재되어 전력 계량제어장치(100) 및 관제센터(200)에 관련된 자들 이외에는 전송 정보를 알 수 없도록 할 수도 있다.Meanwhile, the communication unit 160 may not be able to know the transmission information other than those related to the power metering control apparatus 100 and the control center 200 by installing a security function.

일실시예에서 전력량 조절부(170)는, 전력 계량제어장치(100)와 관제센터(200)가 서로 공유하는 전력 사용자에 대한 요금 처리 정보를 바탕으로 관제센터(200)에서 발생한 제어신호에 의해 전력 사용자에 대한 전력량을 조절하는 수단이다. 전력 사용자에 대한 요금 처리 정보는, 전력 요금 처리 정보 및 예를 들어, 관리비, 임대료, 수도료 및 가스료 등의 요금 처리 정보이다. In one embodiment, the power amount control unit 170 controls the power amount control unit 100 based on the control signal generated in the control center 200 based on the charge processing information for the power user shared by the power metering control apparatus 100 and the control center 200 And is a means for adjusting the amount of power for the power user. The charge processing information for the power user is charge processing information such as charge processing information such as management fee, rent, water, and gas.

일실시예에서 전력량 조절부(170)는 또한, 감지된 온도, 화재, 소음, 진동, 지진정보와, 촬영된 영상정보 등을 바탕으로 관제센터(200)에서 발생한 제어신호에 의해 최소 전력 사용자 단위 또는 건물 차원에서 전력량을 조절하는 수단이다. 이는 지진, 화재 등 대형 사고발생시 많은 인적 및 물적 피해를 예방하기 위한 것이다.In one embodiment, the electric power control unit 170 also controls the electric power consumption of the electric power unit by a control signal generated in the control center 200 based on sensed temperature, fire, noise, vibration, seismic information, Or at the building level. This is to prevent many human and material damage in the event of a major accident such as earthquake or fire.

일실시예에서 전력차단부(180)는, 전력 계량장치(100)와 관제센터(200)가 서로 공유하는 전력 사용자에 대한 요금 처리 정보를 바탕으로 관제센터(200)에서 발생한 제어신호에 의해 사용자에 대한 전력을 차단하는 수단이다. 전력 사용자에 대한 요금 처리 정보는, 전력 요금 처리 정보 및 예를 들어, 관리비, 임대료, 수도료 및 가스료 등의 요금 처리 정보이다. In one embodiment, the power cutoff unit 180 is configured to control the power consumption of the power user by the control signal generated in the control center 200 based on the charge processing information for the power user shared by the power metering apparatus 100 and the control center 200 Lt; / RTI > The charge processing information for the power user is charge processing information such as charge processing information such as management fee, rent, water, and gas.

일실시예에서 전력차단부(180)는 또한, 상기 피크전력을 바탕으로 전력 사용자에 대한 전력을 차단하는 수단이다. 여기서, 피크전력은 실제 전력 제어가 수행되는 전력 사용자에 대하여 평상시 피크전력보다 낮게 설정되는 것으로, 관제센터(200)에서 설정된다. In one embodiment, the power cutoff unit 180 is also means for shutting off power to the power user based on the peak power. Here, the peak power is set at the control center 200, which is set lower than the normal peak power for the power user in which actual power control is performed.

일실시예에서 전력차단부(180)는 또한, 감지된 온도, 화재, 진동, 지진신호와, 촬영된 영상신호 등을 바탕으로 관제센터(200)에서 발생한 제어신호에 의해 최소 전력 사용자 단위 또는 건물 차원에서 전력을 차단하는 수단이다. 이는 지진, 화재 등 대형 사고발생시 많은 인적 및 물적 피해를 예방하기 위한 것이다.In one embodiment, the power cut-off unit 180 may also be configured to detect a minimum power user unit or building (not shown) by a control signal generated in the control center 200 based on the sensed temperature, fire, vibration, seismic signal, It is a means to block power in the dimension. This is to prevent many human and material damage in the event of a major accident such as earthquake or fire.

일실시예에서 전력품질측정부(190)는, 각 호실 및/또는 건물 차원으로 공급되는 전력의 품질을 측정하는 수단이다. In one embodiment, the power quality measurement unit 190 measures the quality of power supplied to each room and / or building dimension.

도 4에 도시하지는 않았으나, 정전시 또는 비상상황 발생시에도 동작 및 데이터 보관에 이상이 없도록 전력 저장장치를 구성할 수도 있다.Although not shown in FIG. 4, the power storage device may be configured to operate and maintain data in the event of a power failure or an emergency.

도 5는 본 발명의 관제센터의 구성도이다. 5 is a configuration diagram of a control center of the present invention.

일실시예에서 서버(210)는, 전력 사용자에 대한 요금 처리 정보가 전력 계량장치(100)로부터 전송되어 오면, 이들 정보를 전력 계량제어장치(100)와 공유하도록 처리하며, 전력 계량제어장치(100) 자체 및/또는 그 설치 구역에 대한 온도정 보 및 화재정보와, 전력 공급 라인의 온도정보와, 전력 계량제어장치(100) 자체 및/또는 그 설치 구역에 대한 소음, 진동정보와, CCTV를 통한 침입자 등의 영상정보를 전력 계량제어장치(100)로부터 수신하여 제어신호를 발생하는 수단으로, 이들 정보들을 처리한 결과에 따라 최소 단위의 전력 사용자에 대한 전력량 조절 또는 전력 차단과, 건물 차원에서의 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치(100)를 제어하기 위한 제어신호를 발생한다.In one embodiment, the server 210 processes such information to be shared with the power metering control apparatus 100 when the charge processing information for the power user is transmitted from the power metering apparatus 100, The temperature information and the fire information for the power meter 100 itself and / or its installation area, the temperature information of the power supply line, the noise and vibration information for the power meter control device 100 itself and / or its installation area, And a control unit 100. The control unit 100 receives the image information of an intruder or the like from the power metering control apparatus 100 and generates a control signal. A control signal for controlling the power metering control apparatus 100 is generated so that the power amount adjustment or the power cut-off is performed.

일실시예에서 서버(210)는 또한, 현실적으로 전력 제어의 대상이 된 전력 사용자에 대한 피크전력을 설정하여 이를 바탕으로 전력 계량제어장치(100)가 전력 사용자에 대한 전력 공급이 피크전력까지만 공급되도록 한다.In one embodiment, the server 210 also sets the peak power for the power user that is actually the subject of the power control so that the power metering control apparatus 100 determines that the power supply to the power user is only supplied to the peak power do.

일실시예에서 서버(210)는 또한, 전력 계량제어장치(100)로부터 실시간 전송되어 오는 전력 계량값을 바탕으로 일정 단위로 전력 공급 상황을 분석하고, 그 분석 결과에 따라 일정 단위로 전력 공급을 분산하기 위한 제어신호를 발생한다.In one embodiment, the server 210 also analyzes the power supply status in a predetermined unit based on the power metering value transmitted in real time from the power metering control apparatus 100, and supplies power in a predetermined unit according to the analysis result And generates a control signal for dispersion.

일실시예에서 서버(210)는 또한, 예를 들어 1달 이상 전력요금 납부를 연체할 경우 전력 사용자 개별 DB로부터 연체정보를 확인하고, 먼저 전력 사용자에게 SMS, 자동응답, 안내 전화 및 문자, 메일 등 다양한 통신수단을 통해 연체 사실을 인지시킨 후, 즉시 또는 그에 합당한 조치가 소정 기간내에 없을 경우, 전력량 조절 또는 전력 차단이 수행되도록 제어할 수 있다.In one embodiment, the server 210 also checks the delinquent information from the power user's individual DB, for example, if the user is overdue for one month or more, and first provides the power user with an SMS, an automated response, The control unit can control the amount of power to be controlled or the power cut-off to be performed if the delayed fact is recognized immediately or if there is no appropriate measure within a predetermined period.

일실시예에서 정보처리부(220)는, 전력 계량제어장치(100)로부터 전송되어 오는 전력 사용자에 대한 요금 처리 정보와, 온도, 화재, 소음, 진동, 지진정보와, 영상정보를 처리하여, 전력 사용자에 대한 전력량 조절 또는 전력 차단과, 건물 차원에서의 전력량 조절 또는 전력 차단을 위한 최종 판단이 이루어지도록 처리된 데이터를 제어부(210)에 제공한다. 정보처리부(220)는 실시간 전력 계량값과, 각종 감지정보 및 요금 처리 정보를 바탕으로 전력량 조절 또는 전력 차단을 위한 기본데이터를 구하는 수단으로서 연산부일 수 있다.In one embodiment, the information processing unit 220 processes the charge processing information for the power user, temperature, fire, noise, vibration, seismic information, and image information transmitted from the power metering control apparatus 100, And provides the processed data to the control unit 210 so that the final determination for the power amount adjustment or power cutoff for the user, the power amount adjustment at the building level, or the power cutoff is performed. The information processing unit 220 may be a computing unit as a means for obtaining basic data for adjusting the amount of power or cutting off the power based on the real-time power metering value, various sensing information, and the charge processing information.

일실시예에서 정보처리부(220)는 또한, 요금 처리 정보는 물론, 각종 요금제, 계절, 사용시간대 등 전력 요금이 가변적일 수 있는 요소들을 서로 연관 처리하여 서버(210)에 제공함으로써 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 할 수 있다. In one embodiment, the information processing unit 220 also associates and processes factors that may be variable in the electric power charges, such as various charge plans, seasons, and time of day, as well as charge processing information, to the server 210, Power amount adjustment or power cut-off can be performed.

일실시예에서 정보처리부(220)는 또한, 전력 사용자에 관련된 각종 요금, 예를 들어, 관리비, 임대료, 수도료 및 가스료 등의 요금 처리 상황을 처리하여 서버(210)에 제공함으로써 전력 사용자에 대한 전력 차단 또는 전력량 조절이 수행되도록 할 수 있다. In one embodiment, the information processing unit 220 also processes and processes the charge processing conditions such as various fees associated with the power user, such as management fees, rent, water and gas charges, to the server 210, Power cutoff or power control can be performed.

일실시예에서 정보처리부(220)는 또한, 전력 계량제어장치(100)로부터 실시간 전송되어 오는 전력 계량값을 바탕으로 일정 단위로 전력 공급 상황을 분석하여 서버(210)에 제공함으로써 일정 단위에 대한 전력 공급 분산이 이루어지도록 할 수 있다.In one embodiment, the information processing unit 220 also analyzes the power supply status in a predetermined unit based on the power metering value transmitted from the power metering control apparatus 100 in real time, and provides the analyzed power supply status to the server 210, Power distribution can be achieved.

일실시예에서 저장부(230)는, 전력 계량제어장치(100)와 관제센터(200)가 서로 공유하는 전력 사용자에 대한 요금 처리 정보와, 온도, 화재, 진동, 지진정보와, 영상신호를 통한 침입자 정보 등을 저장하는 수단이다.In one embodiment, the storage unit 230 stores charge processing information for a power user shared by the power metering control apparatus 100 and the control center 200, temperature, fire, vibration, seismic information, And intruder information through the Internet.

일실시예에서 저장부(230)는 또한, 전력 사용자에 대한 각종 요금정보, 청구, 납부 정보 등의 처리정보, 피크전력 정보 등을 포함할 수 있다. In one embodiment, the storage 230 may also include processing information such as various charge information, billing, payment information, peak power information, etc. for the power user.

일실시예에서 통신부(250)는, 전력 계량제어장치(100)로부터 전송되어 오는 전력 사용자에 대한 요금 처리 정보와, 온도, 화재, 소음, 진동, 지진정보와, 영상촬영을 통한 침입자 영상정보를 수신하는 수단이다. In one embodiment, the communication unit 250 receives the charge processing information for the power user transmitted from the power metering control apparatus 100, the temperature, fire, noise, vibration, seismic information, and intruder image information Lt; / RTI >

일실시예에서 통신부(250)는 또한, 전력 계량제어장치(100)로부터 전송되어 온 상기 각종 요금 처리 정보와 감지정보들을 바탕으로 발생한 제어신호를 전력 계량장치(100)로 전송하는 수단이다. In one embodiment, the communication unit 250 is a means for transmitting a control signal generated based on the various charge processing information and detection information transmitted from the power metering control apparatus 100 to the power metering apparatus 100.

통신부(250)는, 송수신되는 신호의 보안을 위하여 디크립션(데이터 복호화)과 인크립션(데이터 암호화) 등의 기능을 수행하는 하드웨어 또는 소프트웨어 모듈이 내장되어 신호의 왜곡, 위조 및 변조와 해킹을 차단하도록 구성할 수 있다. The communication unit 250 includes a hardware or software module for performing functions such as decryption (data decryption) and encryption (data encryption) for the security of signals transmitted and received, thereby preventing distortion, falsification, .

이와 같이 구성된 본 발명의 전력 제어를 위한 관제시스템 및 이를 이용한 서비스 제공시스템의 동작을 상세히 설명한다.The operation of the control system for power control and the service providing system using the system will be described in detail.

도 6은 본 발명의 실시예에 따라 전력 사용자에 대한 각종 요금 처리 정보를 바탕으로 전력 제어가 수행되는 동작 흐름도이다.FIG. 6 is a flowchart illustrating an operation in which power control is performed based on various charge processing information for a power user according to an embodiment of the present invention.

먼저, 정보입력부(120)를 통해 제어부(110)에 전력 사용자에 대한 요금 처리 정보가 입력되면, 이들 정보가 처리된다(S10).First, when the charge processing information for the power user is input to the control unit 110 through the information input unit 120, these information are processed (S10).

전력 사용자에 대한 정보는 상술한 바와 같이, 전력 사용자 신상 정보, 전력 요금, 관리비, 임대료, 가스료, 수도료 등이 있을 수 있다. 즉 이들 요금이 얼마인가와 청구일, 납부여부, 납부일, 연체기간 등이 있을 수 있고, 일부만 납부되었을 경우에는 미납액, 미납액 납부기한, 연체기간 등이 있을 수 있다. As described above, the information on the electric power users may include electric power user information, electric power charges, management fees, rents, gas charges, water charges, and the like. In other words, there may be a charge, a billing date, a payment date, a payment date, a delinquency period, etc., and in the case of partial payment, there may be an unpaid amount, an unpaid payment due date and a delinquency period.

이와 같이 처리된 전력 사용자에 대한 요금 처리 정보는 통신부(160)를 통해 관제센터(200)로 전송되어 공유된다(S20).The charge processing information for the power user thus processed is transmitted to the control center 200 via the communication unit 160 and is shared (S20).

따라서 관제센터(200)는 전력 계량제어장치(100)로부터 전송받은 전력 사용자에 대한 요금 처리 정보를 바탕으로 전력 사용자에 대한 전력 제어가 필요한지를 판단한다(S30).Accordingly, the control center 200 determines whether power control is required for the power user based on the charge processing information for the power user received from the power metering control apparatus 100 (S30).

상기 전력 제어 판단은 전력 요금 처리를 바탕으로 한 판단과, 전력 요금 외 관리비, 임대료, 수도료 및 가스료 등의 처리를 바탕으로 한 판단과, 이들 요금들을 서로 연관시킨 데이터를 바탕으로 한 판단이 있을 수 있으며, 이에 대해 설명하면 다음과 같다.The power control judgment may be based on a judgment based on the electric power charge processing, a judgment based on the processing of the electric power charge management fee, the rent, the water and the gas charge, and the data associating the charges with each other And can be described as follows.

먼저, 전력 요금 처리 상황을 바탕으로 한 판단에 대해 설명한다.First, the judgment based on the electric power charge processing situation will be described.

이 판단에서는, 판단 요소로서 전력요금(청구액) 및 그에 대한 연체기간, 사용 전력량을 이용하고, 이들 정보들을 선택적으로 연관시켜 판단할 수 있다.In this determination, it is possible to determine the power factor (charge amount), the delinquency period and the used power amount as the determination factor by selectively relating these information.

청구액과 그에 대응하는 연체허용 기간 그리고 전력량 조절 기간이 상호 연관되어 처리되며, 최종적으로 전력량 조절 기간이 경과할 때까지 청구액이 납부되지 않을 경우 전력 차단을 수행한다. 즉 단계적인 전력 제어인 것이다.The billing amount, the corresponding overdue period, and the power adjustment period are interrelated, and power cutoff is performed if the bill is not paid until the final power adjustment period elapses. That is, stepwise power control.

상기 전력량 조절은, 전력 요금이 연체되고 있는 상황에서 수행되는 것으로, 전력 요금 연체 허용 기간에 소정 기간을 추가한 기간동안 수행된다.The power amount adjustment is performed in a state in which the electric power charge is delayed, and is performed for a period in which a predetermined period is added to the electric power charge delay permission period.

예를 들어, 연체 허용 기간이 전력 요금 납부기한으로부터 3개월이라면, 3개월을 경과한 시점부터 전력량 조절이 1개월간 수행되고, 1개월간 전력량 조절이 완료될 때까지 전력 요금이 납부되지 않으면, 최종적으로 전력을 차단하는 것이다. For example, if the allowance period for delinquency is three months from the deadline for payment of electric power charges, the electricity amount adjustment is performed for one month from the end of three months, and if the electricity amount is not paid until the electricity amount adjustment for one month is completed, Power is cut off.

다음에, 전력 요금외 요금 처리 상황을 바탕으로 한 판단에 대해 설명한다.Next, a judgment based on the charge processing state outside the electric power charge will be described.

전력 요금외 요금은, 예를 들어 관리비, 임대료, 수도료 및 가스료 등으로서 이들 요금들 역시 상기 전력 요금에 대한 전력 사용자의 처리 상황을 바탕으로 한 전력량 조절 및 전력 차단을 응용하되, 이들 요금들이 통상 한꺼번에 청구됨을 고려하여 그 요금의 과다를 판단하고, 그에 따라 전력량 조절 또는 전력 차단을 수행한다.The charges other than the electric power charges include, for example, management fees, rents, water and gas charges, etc. These charges are also applied to the electric power charges based on the power user's processing condition, It is judged that the charges are overcharged in consideration of being charged at once, and the power amount adjustment or the power cutoff is performed accordingly.

예를 들면, 한달 요금의 기준요금을 100만원으로 설정하고, 그 요금을 초과하는 경우에는 연체 허용기간을 늘려주고, 그 이하인 경우에는 연체 허용기간을 짧게 설정한다. 또한, 이 요금 처리상황을 상기 전력 요금 처리상황과 연관시켜, 예를 들어 전력 요금이 납부되지 않은 상태에서 연체 허용기간을 경과하더라도, 요금이 상기 기준요금을 초과할 경우에는 추가 연체 허용기간을 설정하고, 추가 연체 허용기간이 경과한 후에야 전력량 조절을 수행하도록 할 수 있다. For example, the standard rate of one month's rate is set at one million won, and if it exceeds the rate, the delinquent allowance period is increased, and if it is less than the standard rate, the delinquent permission period is set short. Further, by associating the charge processing status with the power charge processing status, for example, even if the overdue permit period has elapsed without the power charge being paid, when the charge exceeds the reference charge, an additional overdue permission period is set , And the electricity amount adjustment can be performed only after the additional overdue permission period has elapsed.

이와 같이 전력 사용자에 대한 전력 제어의 필요성이 판단되면 전력 사용자에 대한 전력 제어가 수행된다(S40). 전력 제어는 관제센터(200)의 서버(210)에서 발생된 제어신호가 통신부(250)를 통해 전력 계량제어장치(100)로 전송되어, 전력 계량제어장치(100)가 각 전력 사용자의 호실에 설치된 계량기를 제어하는 식으로 구현된다. When it is determined that power control is required for the power user, power control for the power user is performed (S40). The power control is performed such that the control signal generated in the server 210 of the control center 200 is transmitted to the power metering control apparatus 100 through the communication unit 250 so that the power metering control apparatus 100 It is implemented by controlling installed meter.

한편, 상기 전력량 조절 또는 전력 차단은 해당 전력 사용자에 대한 피크전력을 설정되면, 전력 사용량이 상기 피크전력을 초과하는 즉시 전력 차단이 수행되도록 할 수 있다. 이와 같이 전력 차단을 하는 경우에는, 예를 들어 전력량이 조절되어 공급되는 상태에서 전력 사용량이 피크전력을 초과하는 경우 즉시 전력 차단을 수행할 수도 있고, 요금 납부 등이 연체되더라도 전력량을 조절하지 않고, 피크전력만을 설정하여 놓고, 피크전력 초과시 즉시 전력 차단을 수행하도록 할 수도 있다.On the other hand, when the peak power for the corresponding power user is set, the power cutoff or power cutoff can be performed immediately after the power usage exceeds the peak power. When the power is cut off, for example, when the amount of power used exceeds the peak power in a state in which the amount of power is adjusted and supplied, the power cutoff can be performed immediately. Even if the charge amount is delayed, Only the peak power may be set, and the power cutoff may be performed immediately when the peak power is exceeded.

도 7은 본 발명의 실시예에 따라 전력 계량제어장치의 감지 신호를 바탕으로 전력 제어가 수행되는 동작 흐름도이다.FIG. 7 is a flowchart illustrating an operation in which power control is performed based on a sensing signal of a power metering control apparatus according to an embodiment of the present invention.

먼저, 온도센서(130), 진동센서(140), CCTV(150)를 통해 제어부(110)에 각종 감지신호가 입력되면, 이들 신호가 처리된다(S10). First, when various sensing signals are input to the controller 110 through the temperature sensor 130, the vibration sensor 140, and the CCTV 150, these signals are processed (S10).

이와 같이 처리된 각종 감지정보는 통신부(160)를 통해 관제센터(200)로 전송되어 공유된다(S20).Various kinds of sensed information thus processed are transmitted to the control center 200 through the communication unit 160 and shared (S20).

따라서 관제센터(200)는 전력 계량제어장치(100)로부터 전송받은 각종 감지정보를 바탕으로 전력 사용자 및/또는 건물 차원에서의 전력 제어가 필요한지를 판단한다(S30).Accordingly, the control center 200 determines whether power control is required at the power user and / or building level based on the various types of detection information transmitted from the power metering control apparatus 100 (S30).

상기 전력 제어 판단은 온도센서와 진동센서의 감지신호를 바탕으로 한 판단이 있을 수 있으며, 이에 대해 설명하면 다음과 같다.The power control determination may be based on the detection signals of the temperature sensor and the vibration sensor.

먼저, 온도센서와 진동센서는 전력 계량제어장치 내외부에 선택적으로 설치될 수 있으므로, 내부에 설치될 경우에는 전력 공급라인을 포함하여 전력 계량제어장치의 온도 및 소음, 진동이 먼저 감지될 것이다. 물론, 전력 계량제어장치 자체가 아니라, 설치 구역 주변에서 변화하는 온도와 발생하는 소음, 진동을 전력 계량제어장치 내부에 설치된 온도센서와 소음, 진동센서를 이용하여 감지할 수도 있으며, 온도 및 소음, 진동 범위를 구분하여 전력 계량제어장치 자체에서 발생하는 과열 또는 소음, 진동으로 판단하거나 또는 건물 차원에서 발생하는 소음, 진동임을 판단할 수 있을 것이다.First, since the temperature sensor and the vibration sensor can be selectively installed inside and outside the power metering control device, the temperature, noise, and vibration of the power metering control device including the power supply line will be detected first. Of course, it is possible to detect not only the power meter control device itself, but also the temperature, noise and vibration generated around the installation area by using a temperature sensor, a noise sensor and a vibration sensor installed in the power meter control device, The vibration range can be classified to determine whether it is overheat, noise, or vibration generated in the electric power meter control device itself or noise or vibration generated in the building dimension.

전력 계량제어장치 자체에서 과열되는 것일 경우 그리고 전력 계량제어장치 자체의 소음, 진동일 경우 그 온도값과 소음, 진동값에 따라 해당 호실에 대해서만 전력을 제어할 수 있다.In the case of overheating in the electric power meter control device and noise and vibration of the electric power meter control device itself, power can be controlled only for the room corresponding to the temperature value, noise and vibration value.

또한, 진동의 경우 예를 들어 지진으로 판단할 수 있는 기준진동범위를 초과하지 않을 경우에는 해당 호실에 한정된 전력 제어로 판단하고, 기준진동범위를 초과할 경우에는 건물 차원에서의 전력 제어가 수행되도록 한다. In the case of vibration, for example, if the reference vibration range that can be determined by an earthquake is not exceeded, it is determined that the power control is limited to the room. If the vibration exceeds the reference vibration range, do.

이와 같이 전력 계량장치에 설치된 온도센서와 진동센서의 감지신호를 처리한 감지정보를 바탕으로 전력 제어의 필요성이 판단되면, 일정 단위의 전력 사용자에 대한 전력 제어가 수행된다(S40). 전력 제어는 관제센터(200)의 제어부(210)에서 발생된 제어신호가 통신부(250)를 통해 전력 계량제어장치(100)로 전송되어, 전력 계량제어장치(100)가 각 전력 사용자의 호실에 설치된 계량기를 제어하는 식으로 구현된다. 건물 차원에서의 전력 제어가 필요하다고 판단되면, 건물에 전력을 인입하는 부분에 설치된 계량기를 제어하면 될 것이다. When the necessity of the power control is determined based on the sensing information of the sensing signal of the temperature sensor and the vibration sensor installed in the power metering device, power control is performed for the power user in a predetermined unit (S40). The power control is performed such that the control signal generated in the control unit 210 of the control center 200 is transmitted to the power metering control apparatus 100 through the communication unit 250 and the power metering control apparatus 100 It is implemented by controlling installed meter. If it is determined that power control is required at the building level, it may be necessary to control the meter installed at the portion where power is supplied to the building.

도 8은 본 발명의 실시예에 따라 일정 단위별 전력 사용량을 토대로 전력 공급 분산 제어가 수행되는 동작 흐름도이다.FIG. 8 is a flowchart illustrating an operation in which power supply dispersion control is performed based on power consumption per unit of a unit according to an embodiment of the present invention.

전력 계량제어장치(100)를 통해 계량되는 전력량은 실시간으로 제어부(110)에서 처리되어 관제센터(200)로 전송된다(S10).The amount of power metered through the power metering control apparatus 100 is processed by the control unit 110 in real time and transmitted to the control center 200 (S10).

따라서 관제센터(200)에서는 이들 전력량들을 일정단위를 기준으로 계산하여 그 단위의 전력 사용량을 분석한다(S20). Therefore, the control center 200 calculates these power quantities based on a certain unit and analyzes the power consumption of the unit (S20).

즉 지역 단위로 복수 개의 건물들이 속하는 경우, 그 복수 개의 빌딩에서 사용하는 전력량이 지역 단위로 계량되어 관제센터(200)로 전송되면, 관제센터(200)에서는 각 지역 단위별로 필요한 전력량과 공급 전력량 그리고 사용 전력량을 각각 판단하여, 그 판단 결과에 따라 지역 단위별로 공급 전력을 줄이거나 늘리게 된다.That is, in the case where a plurality of buildings belong to a local area, the amount of electric power used in the plurality of buildings is measured in the area unit and transmitted to the control center 200. In the control center 200, And the supply power is decreased or increased in accordance with the result of the determination.

이러한 제어는 전력 계량제어장치(100)로부터 실시간 전송되어 오는 전력 사용량을 바탕으로 이루어짐은 물론이다. 즉 관제센터(200)는 전력 계량장치 및 그 전력 계량제어장치(100)가 속해 있는 빌딩 그리고 그 빌딩이 속하는 지역 단위를 서로 연관하여 관리하므로 각 전력 계량제어장치(100)를 통한 전력 사용량은 물론, 빌딩별 전력 사용량 그리고 더 나아가 지역 단위별 전력 사용량을 판단할 수 있는 것이다.It goes without saying that such control is based on the amount of electric power that is transmitted in real time from the electric power metering control apparatus 100. That is, the control center 200 manages the electric power metering apparatus, the building to which the electric power metering control apparatus 100 belongs, and the area unit to which the building belongs, so that the power consumption through each electric power metering control apparatus 100 , The electricity consumption by each building, and furthermore, the power consumption per area.

이를 좀 더 구체적으로 설명하면, 일정 단위의 전력 사용자의 전력 계량값은 단순 누적뿐만 아니라, 계절별 및/또는 사용시간대별로도 구분되어 처리된다. To be more specific, the power meter values of the power users of a certain unit are classified not only by simple accumulation but also by season and / or time of use.

따라서 관제센터(200)는 예를 들어, 일정 단위의 전력 사용자가 속하는 건물의 전력 사용량에 대한 데이터를 관리하게 되며, 공급 전력량 대비 사용 전력량을 판단하게 된다. 더 구체적으로는 계절별 및/또는 사용시간대별 사용 전력량을 판단하게 된다. Therefore, the control center 200 manages data on power consumption of a building to which a power user belongs, for example, and determines the amount of power to be used in relation to the amount of power supplied. More specifically, the amount of power used for each season and / or the usage time is determined.

따라서 관제센터는 이와 같이 판단된 사용 전력량을 토대로 일정 단위의 전력 사용자가 속한 건물 또는 지역별로 전력을 분산하여 공급하게 된다. Accordingly, the control center distributes the power to the building or the area to which the power user belongs based on the power consumption thus determined.

여기서 관제센터의 제어에 의해 분산되어 공급되는 전력은, 도 3에 도시된 바와 같이 우선 지역별로 분산된 후 각 건물별로 다시 분산될 수 있다. Here, as shown in FIG. 3, the power distributed and controlled by the control center can be dispersed for each area and then distributed again for each building.

이와 같이 전력을 일정 단위로 분산 공급함으로써 예를 들어 전력 사용 피크기시 전력 차단없이 원활한 전력 공급이 가능하게 된다.By distributing and supplying the power in a predetermined unit, for example, it is possible to smoothly supply power without interrupting the power when the size of the power is used.

한편, 도면으로 도시하지는 않았으나, 전력 품질을 바탕으로 한 전력 공급 분산은, 예를 들어 전력 품질이 상대적으로 좋지 않은 빌딩의 경우에는 공급 전력량을 늘리고, 그렇지 않은 경우에는 줄이거나 또는 그 반대의 경우도 있을 수 있다. On the other hand, although not shown in the drawing, power supply dispersion based on power quality can be achieved by increasing the amount of power supplied, for example, in buildings where the power quality is relatively poor, and decreasing the power supply if not, or vice versa Can be.

다음에, 본 발명의 제2 실시예에 대하여 설명한다.Next, a second embodiment of the present invention will be described.

도 9는 본 발명의 제2 실시예에 따른 전력 제어를 위한 시스템의 구성도, 도 10은 본 발명의 제2 실시예에 따라 전력 사용자에 대한 요금정보를 바탕으로 임대인에 의해 전력 제어가 수행되는 동작 흐름도이다.FIG. 9 is a configuration diagram of a system for power control according to a second embodiment of the present invention. FIG. 10 is a flowchart illustrating a method for controlling power by the landlord based on the charge information for a power user according to a second embodiment of the present invention Fig.

도 9에 도시한 바와 같이, 본 발명의 제2 실시예에 따른 전력 제어를 위한 시스템은 전력 계량제어장치(100), 관제센터(200), 임대인(300)으로 구성된다.As shown in FIG. 9, the system for power control according to the second embodiment of the present invention comprises a power metering control apparatus 100, a control center 200, and a landlord 300.

임대인(300)은 전력 사용자의 전력 요금 외 요금 처리 정보를 바탕으로 전력사용자에 대한 전력량 조절 및/또는 전력 차단 등의 전력 제어를 스마트폰 또는 웹을 통해 수행할 수 있다.The landlord 300 can perform power control such as power amount adjustment and / or power cut-off for the power user through the smart phone or the web based on the power user charge process fee information.

따라서 임대인의 스마트폰 또는 웹은 전력 계량제어장치(100) 또는 관제센터(200)에서 처리한 정보를 전송받고, 그에 따라 전력 사용자에 대한 전력량 조절 및 전력 차단 등의 전력 제어를 위한 프로그램이 저장된다. Therefore, the landlord's smartphone or web receives information processed by the power metering control apparatus 100 or the control center 200, and a program for power control such as power amount adjustment and power cut-off for the power user is stored .

따라서 도 10에 도시한 바와 같이, 임대인(300)은 스마트폰 또는 웹을 통해 전력 사용자, 즉 임차인의 전력요금 외 요금, 예를 들어 관리비, 임대료, 가스료 및 수도료 등의 요금 및 그 처리정보를 전력 계량제어장치(100) 또는 관제센터(200)로부터 전송받고(S10), 전송받은 처리정보를 바탕으로 전력 사용자에 대한 전력략 조절 또는 전력 차단 등의 전력 제어가 필요한지를 판단한 후(S20), 전력 제어 동작을 수행한다(S30). Therefore, as shown in FIG. 10, the landlord 300 can receive the electric power charges, such as the management fee, the rent, the gas fee and the water charge, and the processing information of the electric power user, that is, the tenant, (S20), it is determined whether power control such as power regulation or power cut-off is necessary for the power user based on the received process information (S10). Then, the power control unit 100 or the control center 200 Power control operation is performed (S30).

이와 같이 본 발명의 제2 실시예는, 제1 실시예에 나타낸 바와 같이 관제센터(200)의 제어하에 전력 계량제어장치(100)를 통해 전력 제어가 수행되던 것을, 임대인에게도 동일한 전력 제어 권한을 부여하여 필요에 따라 여러 주체에 의해 전력 제어가 수행되도록 한 것이다.As described above, according to the second embodiment of the present invention, the power control is performed through the power metering control device 100 under the control of the control center 200, and the same power control authority is given to the landlord And power control is performed by various subjects as necessary.

한편, 상기 관제센터(200)와 임대인(300) 중 어느 주체가 전력 제어를 할 것인가에 대한 조정이 없을 경우, 관제센터(200)와 임대인(300) 양쪽에서 전력 제어 동작이 수행되는 등 불합리한 점이 있을 수 있으므로, 예를 들어 전력 사용자에 대한 전력 제어가 필요하다고 판단된 경우, 관제센터(200)에서 임대인(300)에게 해당 전력 사용자에 대한 전력 제어를 수행할 것인지를 확인하고, 임대인(300)이 이러한 관제센터(200)의 제안에 동의하는 경우 스마트폰 또는 웹을 통해 전력을 제어할 수 있도록 권한을 부여받는 등의 방법으로도 구현 가능할 것이다.On the other hand, when there is no adjustment as to which of the control center 200 and the landlord 300 is to perform the power control, the power control operation is performed in both the control center 200 and the landlord 300, The control center 200 confirms whether or not to perform power control for the power user to the landlord 300. When the landlord 300 receives the power control request from the landlord 300, If the user agrees with the proposal of the control center 200, the control center 200 may be authorized to control the power through the smartphone or the web.

본 발명의 제2실시예에 따르면, 전력 제어 조건에 해당되면 관제센터의 제어하에 자동으로 임차인에 대한 전력 제어가 수행되던 것을, 임대인의 자율적인 판단하에 임차인에 대한 전력 제어가 융통성있게 이루어질 수 있게 된다.According to the second embodiment of the present invention, when the power control condition is met, the power control for the tenant is automatically performed under the control of the control center, and the power control for the tenant can be flexibly performed under the autonomous determination of the landlord do.

다음에, 본 발명의 제3실시예에 대해 설명한다. Next, a third embodiment of the present invention will be described.

도 11은 본 발명의 제3 실시예에 따라 금융회사를 통한 전력 사용자의 전력요금 외 요금 처리 구성도, 도 12는 본 발명의 제3 실시예에 따라 전력 사용자의 전력요금 외 요금 처리 가 수행되는 동작 흐름도이다. FIG. 11 is a block diagram of a power user fee charge processing of a power user through a financial company according to a third embodiment of the present invention, and FIG. 12 is a flowchart of a power user fee charge processing of a power user according to a third embodiment of the present invention Fig.

본 발명의 제3실시예는, 금융회사가 전력 사용자인 임차인의 전력요금 외 요금, 예를 들어 임대료 또는 관리비를 임대인측에 먼저 대납하고, 이를 수수료를 더하여 보험료로서 임차인측에 청구하는 것을 기본 발명으로 한다.In a third embodiment of the present invention, a financial company prepays a rent charge fee to a lessee, for example, a rental fee or a management fee for a tenant who is a power user, and charges the tenant as a premium .

이와 같은 발명을 구현하기 위해서는 도 11에 도시한 바와 같이, 전력 계량제어장치(100), 관제센터(200), 임대인(300), 금융회사(400) 및 임차인(500)이 서로 유무선 통신망으로 연결되어야 한다. 여기서 상기 금융회사(400)는 대납해야 할 비용을 미리 알 필요가 있으므로 전력 계량제어장치(100) 또는 관제센터(200)로부터 이러한 정보를 수신하도록 구성된다. 11, the power metering control apparatus 100, the control center 200, the landlord 300, the financial company 400, and the tenant 500 are connected to each other via a wired / wireless communication network . Here, the financial company 400 is configured to receive such information from the power metering control apparatus 100 or the control center 200 because it needs to know the cost to be paid in advance.

즉 전력 계량제어장치(100)와 관제센터(200)가 임차인에 관련된 요금 관련정보를 공유하므로 이들 중 어느 하나로부터 정보를 수신하면 되는 것이다. 상기 금융회사(400)는 보험사일 수 있다.That is, since the electric power metering control apparatus 100 and the control center 200 share the charge related information related to the tenant, information can be received from any one of them. The financial company 400 may be an insurer.

따라서 도 12에 도시한 바와 같이, 금융회사(400)는 스마트폰 또는 웹을 통해 전력 사용자, 즉 임차인의 전력요금 외 요금, 예를 들어 관리비, 임대료, 가스료 및 수도료 등의 요금 및 그 처리정보를 전력 계량제어장치(100) 또는 관제센터(200)를 통해 전송받고(S10), 전송받은 처리정보를 바탕으로 임대인에게 비용을 이체한다(S20). 이후, 금융회사(400)는 임차인에게 상기 임대인에게 대납한 비용에 수수료를 더하여 청구한다(S30). Accordingly, as shown in FIG. 12, the financial company 400 can receive a charge of a power user, that is, a tenant's charge, such as a fee for management fee, rent, gas fee, (S10), and transfers the fee to the landlord based on the received processing information (S20). Thereafter, the financial company 400 requests the lessee to add the fee charged to the landlord (S30).

임차인의 전력요금 외 요금 처리 정보도 전력량 조절 또는 전력 차단 등의 전력 제어에 이용되므로 임차인이 억울하게 전력 제어를 당하지 않도록 상기 금융회사(400)로 전송되는 임차인의 전력요금 외 요금 정보는 납부기한 전에 반드시 전송되어야 할 것이다.The charge information of the tenant other than the electric power charge is also used for power control such as the control of the electric power amount or the electric power shutdown so that the lessee's electricity charge charge information transmitted to the financial company 400 so that the tenant does not receive unauthorized power control, Lt; / RTI >

상기 수수료가 임차인의 전력요금 외 요금을 금융회사가 임대인에게 미리 대납해주는데 대한 대가이며, 금융회사는 임대인과 별도의 약정에 의해 수수료를 받을 수도 있다. 상기 금융회사에서 대납하는 임차인의 요금은 임차인이 부담함으로써 보험성격의 금융상품으로 대체될 수 있다. The above fee is for the financial institution to pay the lessee the electricity charge in advance, and the finance company may receive the fee by a separate arrangement with the landlord. The tenderer's fee paid by the financial institution may be replaced by a financial instrument of an insurance nature by being borne by the tenant.

본 발명의 제3실시예에 따르면, 제1실시예 및 제2실시예에서 구체화된 임차인의 전력요금 외 요금 미납에 따른 전력량 조절 또는 전력차단 등의 전력 제어가 적용되지 않으므로 그만큼 임차인에게 이득이 될 수 있다. 임대인 또한, 임차인의 전력요금 외 요금 미납은 발생하지 않으므로 전력 제어에 따른 임차인과의 분쟁을 방지할 수 있게 된다. According to the third embodiment of the present invention, since the power control such as the power amount adjustment or the power cutoff due to the non-payment of the electricity charges of the tenants specified in the first and second embodiments is not applied, . The landlord can also avoid disputes with the tenant due to the power control because the tenant does not incur any charges other than the electricity bill.

100 : 전력 계량제어장치 110, 210 : 제어부
120 : 정보입력부 130 : 온도센서
140 : 진동센서 150 : CCTV
160, 250 : 통신부 170 : 전력차단부
180 : 전력량 조절부 190 : 전력품질측정부
200 : 관제센터 220 : 정보처리부
230 : 저장부 300 : 임대인
400 : 금융회사 500 : 임차인
100: electric power metering control device 110, 210:
120: information input unit 130: temperature sensor
140: Vibration sensor 150: CCTV
160, 250: communication unit 170:
180: electric power adjusting unit 190: electric power quality measuring unit
200: control center 220: information processing unit
230: storage unit 300:
400: Financial company 500: Tenant

Claims (24)

전력 사용자에 대한 요금 및 그에 관련된 정보를 처리하고, 전력의 품질을 측정하여 그 처리정보를 관제센터와 공유하며, 관제센터의 제어에 의해 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하도록
전력 사용자에 대한 요금 및 그에 관련된 정보와, 전력 품질을 처리한 정보를 관제센터로 전송하여 공유하며, 관제센터의 제어에 의해 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하도록 제어하는 제어부;
전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 판단 신호를 상기 제어부에 입력하는 정보입력부;
상기 정보입력부를 통해 입력되어 제어부에서 처리된 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 관제센터로 전송하고, 관제센터로부터 전송되어 오는 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 제어신호를 수신하는 통신부;
상기 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력량을 조절하는 전력량 조절부;
상기 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력을 차단하는 전력 차단부;
전력 계량제어장치와 그 설치된 구역, 건물의 임의의 구역에 대한 온도를 감지하는 온도센서;
전력 계량제어장치와 그 설치된 구역, 건물에 대한 소음, 진동을 감지하는 소음, 진동센서; 및
전력 계량제어장치와 그 설치된 구역, 건물의 임의의 구역에 대한 침입자를 촬영하는 촬영수단이 구성되는 전력 계량제어장치; 및
상기 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 관제센터로 이루어지고,
상기 전력 사용자에 대한 요금 처리 정보는,
전력 요금, 관리비, 임대료, 수도료 및 가스료, 납부기한, 납부여부, 납부일, 연체기간으로서 이들 정보들이 서로 연관 처리되어 전력량 조절 또는 전력 차단을 위한 정보로서 제공되고,
상기 전력 사용자에 대한 전력량 조절 또는 전력 차단은, 화재, 진동, 지진 및 침입자 감지정보를 바탕으로 각 전력 사용자 또는 건물 차원에서 수행되며,
상기 침입자 감지시에는 칩입자가 호실에서 사물을 정확하게 식별할 수 없도록 그 호실에 대한 전력 공급이 차단되는 것,
상기 전력량 조절은 사용시간이 제한되도록 공급시간대를 조절하는 것,
상기 전력 제어는 전력량 조절을 거친 후 전력 차단이 수행되는 것을 특징으로 하는 전력 제어를 위한 관제시스템.
It is necessary to process the charge for the power user and information related thereto, to measure the quality of the power, to share the processing information with the control center, and to control the power amount or cut off power to the power user under the control of the control center
A control unit for transmitting a charge and information related to the electric power user and information processing the electric power quality to a control center for sharing and controlling the electric power to the power user or controlling the electric power by controlling the control center;
An information input unit for inputting a judgment signal for adjusting the amount of power to the power user or cutting off the power to the control unit;
And transmits to the control center the charge processing information and the power quality information for the power user that are input through the information input unit and processed by the control unit and receives a control signal for controlling the power amount or power cutoff for the power user transmitted from the control center ;
A power amount adjusting unit for adjusting a power amount for a power user according to a control signal transmitted from the control center;
A power cutoff unit for cutting off power to a power user according to a control signal transmitted from the control center;
A temperature sensor for sensing the temperature of the electric power metering control device and its installed area, and an arbitrary area of the building;
Power meter control device and its installed area, noise to building, noise to detect vibration, vibration sensor; And
A power metering control device constituted by a power metering control device and a zone where the power metering control device is installed and a photographing device which takes an image of an intruder to an arbitrary area of the building; And
And a power meter for controlling the power amount of the power user or the power cutoff for the power user based on the charge process information and the power quality, And a control center for remotely controlling the control device,
The charge processing information for the power user includes:
These information are related to each other as electric power charges, management fees, rents, water and gas charges, due dates, payment dates, payment dates, and delinquency periods,
The power control or power cutoff for the power user is performed at each power user or building level based on fire, vibration, earthquake, and intruder detection information,
When the intruder is detected, the power supply to the room is blocked so that the intruder can not accurately identify the object in the room,
The amount of power adjustment may be adjusted by adjusting the supply time zone to limit the use time,
Wherein the power control is performed after the amount of power is adjusted.
제1항에 있어서, 상기 전력 사용자에 대한 요금 처리 정보는 실시간으로 입력되어 관제센터와 공유하며, 전력량 조절 또는 전력 차단 해제 조건에 도달하면, 전력 사용자에 대해 정상전력이 공급되도록 관제센터가 전력 계량제어장치를 제어하는 것을 특징으로 하는 전력 제어를 위한 관제시스템. The method of claim 1, wherein the charge processing information for the power user is input in real time and shared with the control center. When the power control or power cut off condition is reached, And the control device is controlled based on the control signal. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 전력 사용자에 대한 요금 및 그에 관련된 정보와 전력 품질 정보를 처리하ㅇ여 관제센터와 공유하며, 관제센터의 제어에 의해 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하도록 제어하는 제어부;
전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 판단 신호를 상기 제어부에 입력하는 정보입력부;
상기 정보입력부를 통해 입력되어 제어부에서 처리된 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 관제센터로 전송하고, 관제센터로부터 전송되어 오는 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 제어신호를 수신하는 통신부;
상기 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력량을 조절하는 전력량 조절부; 및
상기 관제센터로부터 전송되어 오는 제어신호에 따라 전력 사용자에 대한 전력을 차단하는 전력 차단부로 구성된 전력 계량제어장치; 및
상기 전력 계량제어장치와 공유하는 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 바탕으로 전력량 조절 또는 전력 차단을 위한 제어신호를 발생하는 서버;
상기 전력 계량제어장치부터 전송되어 오는 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 처리하는 정보처리부;
상기 전력 계량제어장치로부터 전송되어 처리된 전력 사용자에 대한 요금 처리 정보 및 전력 품질 정보와, 전력 사용자에 대한 전력량 조절 또는 전력 차단을 위한 제어정보를 저장하는 저장부; 및
상기 전력 계량제어장치로부터 전송되어 오는 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보를 수신하고, 요금 처리 정보와 저녁 품질 정보를 바탕으로 서버에서 발생하는 제어신호를 전력 계량제어장치로 전송하는 통신부로 구성된 관제센터로 이루어지고,
상기 전력 사용자에 대한 요금 처리 정보는,
전력 요금, 관리비, 임대료, 수도료 및 가스료, 납부기한, 납부여부, 납부일, 연체기간으로서 이들 정보들이 서로 연관 처리되어 전력량 조절 또는 전력 차단을 위한 정보로서 제공되고,
상기 전력 사용자에 대한 전력량 조절 또는 전력 차단은, 화재, 진동, 지진 및 침입자 감지신호를 바탕으로 각 전력 사용자 또는 건물 차원에서 수행되며,
상기 침입자 감지시에는 칩입자가 호실에서 사물을 정확하게 식별할 수 없도록 그 호실에 대한 전력 공급이 차단되는 것,
상기 전력량 조절은 사용시간이 제한되도록 공급시간대를 조절하는 것,
상기 전력 제어는 전력량 조절을 거친 후 전력 차단이 수행되는 것을 특징으로 하는 전력 제어를 위한 관제시스템.
A control unit for controlling the charge amount of the power user and the power related information and the power quality information to be shared with the control center and controlling the power amount to the power user under the control of the control center;
An information input unit for inputting a judgment signal for adjusting the amount of power to the power user or cutting off the power to the control unit;
And transmits to the control center the charge processing information and the power quality information for the power user that are input through the information input unit and processed by the control unit and receives a control signal for controlling the power amount or power cutoff for the power user transmitted from the control center ;
A power amount adjusting unit for adjusting a power amount for a power user according to a control signal transmitted from the control center; And
And a power cutoff unit for cutting off power to the power user according to a control signal transmitted from the control center; And
A server for generating a control signal for power control or power cutoff based on charge processing information and power quality information for a power user shared with the power metering control device;
An information processing unit for processing charge processing information and power quality information of a power user transmitted from the power metering control apparatus;
A storage unit for storing charge processing information and power quality information for a power user transmitted from the power metering controller and storing control information for power consumption adjustment or power shutdown for a power user; And
A communication unit for receiving charge processing information and power quality information for a power user transmitted from the power metering control apparatus and transmitting a control signal generated in the server to the power metering control apparatus based on the charge processing information and the evening quality information Consisting of a centralized control center,
The charge processing information for the power user includes:
These information are related to each other as electric power charges, management fees, rents, water and gas charges, due dates, payment dates, payment dates, and delinquency periods,
The power control or power cutoff for the power user is performed at each power user or building level based on fire, vibration, earthquake, and intruder detection signal,
When the intruder is detected, the power supply to the room is blocked so that the intruder can not accurately identify the object in the room,
The amount of power adjustment may be adjusted by adjusting the supply time zone to limit the use time,
Wherein the power control is performed after the amount of power is adjusted.
제10항에 있어서, 상기 전력 사용자에 대한 요금 처리 정보와 전력 품질 정보는 실시간으로 입력되어 관제센터와 공유하며, 전력량 조절 또는 전력 차단 해제 조건에 도달하면, 전력 사용자에 대해 정상전력이 공급되도록 관제센터가 전력 계량제어장치를 제어하는 것을 특징으로 하는 전력 제어를 위한 관제시스템. The method of claim 10, wherein the charge processing information and the power quality information for the power user are input in real time and shared with the control center. When the power amount adjustment or power cutoff cancellation condition is reached, And the center controls the power metering control device. 삭제delete 삭제delete 삭제delete 삭제delete 제10항에 있어서, 상기 전력 사용자에 대하여 조절되는 전력량은 피크전력으로 설정될 수 있으며, 전력 사용량이 피크전력 초과시 전력 차단이 수행되는 것을 특징으로 하는 전력 제어를 위한 관제시스템. 11. The system of claim 10, wherein the amount of power regulated for the power user can be set to peak power, and the power shutdown is performed when the power usage exceeds the peak power. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 전력 사용자에 대한 요금 및 그에 관련된 정보를 처리하고, 전력의 품질을 측정하여 그 처리정보를 관제센터와 공유하며, 임대인 또는 관제센터의 제어하에 전력 사용자에 대한 전력량 조절 또는 전력 차단을 수행하는 전력 계량제어장치;
상기 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 관제센터;
상기 전력 사용자에 대한 요금 처리 정보와, 전력 품질 측정 처리정보를 전력 계량제어장치 또는 관제센터로부터 전송받아 공유하고, 상기 요금 처리 정보와 전력 품질을 바탕으로 전력 사용자에 대한 전력량 조절 또는 전력 차단이 수행되도록 전력 계량제어장치를 원격 제어하는 임대인 장치; 및
상기 임대인 장치로부터 전력 사용자의 전력요금 외 요금 정보를 전송받고, 임대인에게 납부기한 전에 선납하며, 전력 사용자에 대하여는 요금에 수수료를 더한 비용을 청구하는 금융회사 장치로 이루어지고,
상기 금융회사 장치는 전력요금 외 요금 납부지연에 따른 전력 사용자에 대한 전력 제어가 수행되지 않도록 전력 제어가 수행되는 기준일 전에 임대인에게 요금을 선납하고,
상기 금융회사에서 대납하는 전력 사용자의 요금은 보험으로 대체되고,
상기 전력 사용자에 대한 요금 처리 정보는,
전력 요금, 관리비, 임대료, 수도료 및 가스료, 납부기한, 납부여부, 납부일, 연체기간으로서 이들 정보들이 서로 연관 처리되어 전력량 조절 또는 전력 차단을 위한 정보로서 제공되고,
상기 전력 사용자에 대한 전력량 조절 또는 전력 차단은, 화재, 진동, 지진 및 침입자 감지신호를 바탕으로 각 전력 사용자 또는 건물 차원에서 수행되며,
상기 침입자 감지시에는 칩입자가 호실에서 사물을 정확하게 식별할 수 없도록 그 호실에 대한 전력 공급이 차단되는 것,
상기 전력량 조절은 사용시간이 제한되도록 공급시간대를 조절하는 것,
상기 전력 제어는 전력량 조절을 거친 후 전력 차단이 수행되는 것을 특징으로 하는 전력 제어를 위한 관제시스템
A power meter for processing the charge and related information of the power user, measuring the quality of the power, sharing the processing information with the control center, and controlling the power amount or power cutoff for the power user under the control of the landlord or the control center A control device;
And a power meter for controlling the power amount of the power user or the power cutoff for the power user based on the charge process information and the power quality, A control center for remotely controlling the control device;
And the power control unit or control center transmits and receives the charge processing information and the power quality measurement processing information to the power user and controls the power amount or power cutoff for the power user based on the charge processing information and the power quality A landlord apparatus for remotely controlling the electric power metering control apparatus; And
And a financial institution device for receiving charge information of the electric power user from the landlord apparatus and receiving charge information of the electric power user from the landlord apparatus in advance and paying the electric power user a charge of adding the fee to the charge,
The financial institution apparatus prepares a fee to the landlord before the power control is performed so that the power control for the power user is not performed due to the delay in payment of the charge other than the electric power charge,
The charge of the power user to be paid by the financial company is replaced by insurance,
The charge processing information for the power user includes:
These information are related to each other as electric power charges, management fees, rents, water and gas charges, due dates, payment dates, payment dates, and delinquency periods,
The power control or power cutoff for the power user is performed at each power user or building level based on fire, vibration, earthquake, and intruder detection signal,
When the intruder is detected, the power supply to the room is blocked so that the intruder can not accurately identify the object in the room,
The amount of power adjustment may be adjusted by adjusting the supply time zone to limit the use time,
Characterized in that the power control is performed after the amount of power is adjusted and the power cutoff is performed.
삭제delete 삭제delete
KR1020160129123A 2016-09-07 2016-10-06 Control system for controlling power and service system thereusing KR101917926B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/KR2017/002874 WO2018048045A2 (en) 2016-09-07 2017-03-17 Control system for electric power control and service system using same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20160115150 2016-09-07
KR1020160115150 2016-09-07

Publications (2)

Publication Number Publication Date
KR20180027983A KR20180027983A (en) 2018-03-15
KR101917926B1 true KR101917926B1 (en) 2018-11-12

Family

ID=61659989

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160129123A KR101917926B1 (en) 2016-09-07 2016-10-06 Control system for controlling power and service system thereusing

Country Status (1)

Country Link
KR (1) KR101917926B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200094438A (en) 2019-01-30 2020-08-07 한국전력공사 Control apparatus for power situation control system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102573036B1 (en) * 2022-11-24 2023-08-31 주식회사 그리다에너지 Ai optimal trading control system for reducing electricity bills

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003153466A (en) * 2001-11-12 2003-05-23 Hitachi Ltd Method and system for supplying energy
KR101336162B1 (en) * 2013-08-08 2013-12-05 주식회사 금성종합기술단 Management system of electric power distribution for automation of electric power control and electric power distribution
KR101597096B1 (en) * 2015-08-17 2016-02-24 (주)세풍전기 Real-time remote measurement of vibration and leakage currents and switchboards with external intrusion prevention and data storage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003153466A (en) * 2001-11-12 2003-05-23 Hitachi Ltd Method and system for supplying energy
KR101336162B1 (en) * 2013-08-08 2013-12-05 주식회사 금성종합기술단 Management system of electric power distribution for automation of electric power control and electric power distribution
KR101597096B1 (en) * 2015-08-17 2016-02-24 (주)세풍전기 Real-time remote measurement of vibration and leakage currents and switchboards with external intrusion prevention and data storage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200094438A (en) 2019-01-30 2020-08-07 한국전력공사 Control apparatus for power situation control system

Also Published As

Publication number Publication date
KR20180027983A (en) 2018-03-15

Similar Documents

Publication Publication Date Title
US8145361B2 (en) System and method for manipulating controlled energy using devices to manage customer bills
CN100557592C (en) Be used to manage the method and system of this locality control that WLAN inserts
JP5887534B2 (en) Charging system
CN103729893B (en) A kind of parking resource management and parking self-help serving system
CN102184485A (en) Internet of things-based public rental housing management system
KR101917926B1 (en) Control system for controlling power and service system thereusing
KR101900609B1 (en) Demand Response Management Server and Demand Response Management System Including That Server
CN110348890A (en) A kind of method and apparatus calculating Parking Fee
CN111161103A (en) Property management system based on comprehensive account equipment linkage
CN109255681A (en) A kind of intelligent house trustship leasing system
JP7232694B2 (en) Prepaid management device and gas management system
JP4614889B2 (en) Electricity rate management system, method and program
US20110071951A1 (en) System and method for monitoring occupency of a rental property
KR101942154B1 (en) Smart meter and remote power control ssytem using smart meter
KR20200130103A (en) Integrated Smart Metering System and Collection Server Therefor
JP2001356025A (en) Prepaid meter, system and method for meter reading
JP2003153466A (en) Method and system for supplying energy
CN103824386B (en) Internet of Things sells water management system
CN109727340A (en) Access control system method for running, apparatus and system
JP3945179B2 (en) Energy selling method and processing device for controlling energy selling method
KR20190133388A (en) Study cafe unmannde management apparatus
WO2003046787A1 (en) Rental machine management system and rental machine
KR102092036B1 (en) A Remote Meter Reading System
JPH09319575A (en) On-line use approving system for pay program
JP2020042432A (en) Prepaid management terminal and gas management system with prepaid function

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant