KR101893340B1 - System for site feasibility analysis of solar energy generation facility - Google Patents

System for site feasibility analysis of solar energy generation facility Download PDF

Info

Publication number
KR101893340B1
KR101893340B1 KR1020180038950A KR20180038950A KR101893340B1 KR 101893340 B1 KR101893340 B1 KR 101893340B1 KR 1020180038950 A KR1020180038950 A KR 1020180038950A KR 20180038950 A KR20180038950 A KR 20180038950A KR 101893340 B1 KR101893340 B1 KR 101893340B1
Authority
KR
South Korea
Prior art keywords
area
power generation
input address
calculated
development
Prior art date
Application number
KR1020180038950A
Other languages
Korean (ko)
Inventor
윤인택
Original Assignee
에너지코리아 주식회사
(재)한국에너지재단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에너지코리아 주식회사, (재)한국에너지재단 filed Critical 에너지코리아 주식회사
Priority to KR1020180038950A priority Critical patent/KR101893340B1/en
Application granted granted Critical
Publication of KR101893340B1 publication Critical patent/KR101893340B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06F17/30241
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Landscapes

  • Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Disclosed is a system for site suitability analysis of a photovoltaic power generation facility. The system for site suitability analysis of a photovoltaic power generation facility comprises: a database server to store geographic information including a lot area of a facility corresponding to an address location or a land area of a specific region; and an information processing server to receive geographic information for an inputted address location from the database server when information for the address location is inputted, economic feasibility of a site of a photovoltaic power generation facility is evaluated based on the received geographic information, and determine whether a permission standard in accordance with a law, ordinance, regulation, or instruction for the photovoltaic power generation facility is suitable to calculate a development possibility or an installation area for the inputted address location in a number. Accordingly, site, location, and economic analyses are performed to evaluate the feasibility for a photovoltaic power generation facility and search for a suitable region without directly inputting information for a region where the photovoltaic power generation facility is to be installed or directly checking whether the region where the photovoltaic power generation facility is to be installed has any conflicting laws, ordinances, regulations, or instructions for the photovoltaic power generation facility. Also, a photovoltaic power generation facility development possibility or an installation area for an address location inputted by a user can be calculated in a number. Appearance with an installed photovoltaic power generation facility can be presented to be outputted or a predicted power generation amount in accordance with the appearance with the installed photovoltaic power generation facility can be calculated.

Description

태양광발전시설 부지 타당성 분석 시스템{System for site feasibility analysis of solar energy generation facility}[Background Art] [0002] System for site feasibility analysis of a solar energy generation facility [

본 발명은 태양광발전시설 부지 타당성 분석 시스템에 관한 것으로, 더욱 상세하게는 태양광발전시설의 부지분석, 입지분석, 경제성분석 등을 수행하여 태양광발전에 대한 타당성을 평가하고, 적정지역을 검색할 수 있는 태양광발전시설 부지 타당성 분석 시스템에 관한 것이다. The present invention relates to a site feasibility analysis system for a photovoltaic power generation facility. More particularly, the present invention relates to a site feasibility analysis system for evaluating feasibility of photovoltaic power generation by performing site analysis, location analysis, and economic analysis of a photovoltaic power generation facility, And to a site feasibility analysis system for a photovoltaic power generation facility.

태양광발전은 태양이 비추는 지역이라면 장소 제한이 가장 적으며, 또한 소형의 시설에서부터 대형의 시설까지 운영자가 원하는 형태로 다양하게 제작이 가능하기 때문에 더욱 선호되고 있다.Photovoltaic power generation is preferred because it has the least space limitation if the sun is shining, and because it can be manufactured in a variety of shapes from the small size facility to the large size facility.

이러한 태양광발전시설의 설치 및 운용하기 위해, 적지 않은 비용이 필요하기 때문에, 설치에 앞서 자신이 설치하고자 하는 태양광발전에 따른 발전량이라던가 수익 등을 미리 알고, 타당성을 검토할 필요가 있다.In order to install and operate such a solar power generation facility, it is necessary to check the feasibility of the solar power generation to be installed prior to installation.

이와 관련하여, 한국등록특허 제10-1663369호와 같이 태양광발전소의 경제성을 검토할 수 있는 방안이 마련되었으나, 이러한 종래 기술은 타당성을 검토하기 위한 정보들을 사용자가 직접 입력해야 하는 번거로움이 존재하며, 태양광발전시설을 설치하고자 하는 지역이 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 저촉되는지 여부를 사용자가 직접 확인해야 하는 불편함이 존재한다.In this connection, although a method for examining the economical efficiency of a solar power plant is provided as in Korean Patent No. 10-1663369, it is troublesome for the user to directly input information for examining the feasibility And there is the inconvenience that the user must manually confirm whether the area where the PV installation is to be installed is in conflict with laws, regulations, rules or ordinances regarding PV facilities.

따라서, 사용자가 태양광발전시설을 설치하고자 하는 지역에 대한 정보를 직접 입력하거나 태양광발전시설을 설치하고자 하는 지역이 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 저촉되는지 여부를 직접 확인하지 않고도 타당성 검토가 가능한 방안의 모색이 요구된다. Therefore, the user directly inputs information about the area where he wants to install the solar power generation facility, or directly confirms whether the area where he / she intends to install the solar power generation facility is in conflict with laws, regulations, rules or ordinances It is necessary to search for ways to make feasibility study possible.

한국등록특허 제10-1663369호(발명의 명칭: 분산형 태양광발전소의 경제성 검토 장치 및 방법)Korean Patent No. 10-1663369 (entitled " Apparatus and Method for Examining Economic Feasibility of Distributed Solar Power Plant)

본 발명은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 본 발명의 목적은, 사용자가 태양광발전시설을 설치하고자 하는 지역에 대한 정보를 직접 입력하거나 태양광발전시설을 설치하고자 하는 지역이 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 저촉되는지 여부를 직접 확인할 필요없이 주소지에 대한 정보만 직접 입력하여 태양광발전시설의 부지분석, 입지분석, 경제성분석 등을 수행하여 태양광발전에 대한 타당성을 평가하고, 적정지역을 검색할 수 있는 태양광발전시설 부지 타당성 분석 시스템을 제공함에 있다. SUMMARY OF THE INVENTION The present invention has been made in order to solve the above problem, and it is an object of the present invention to provide a solar power generation facility, in which a user directly inputs information about an area for installing a solar power generation facility, By directly inputting only information about the address, it is possible to analyze the site of the photovoltaic power generation facility, analyze the location of the photovoltaic power generation facility, and analyze the economical efficiency of the photovoltaic power generation facility without having to directly check whether it violates laws, regulations, And to provide a site feasibility analysis system for a photovoltaic power generation facility capable of searching the appropriate area.

또한, 본 발명의 다른 목적은 사용자에 의해 입력된 주소지에 관한 태양광발전 개발가능성을 수치로 산출하며, 태양광발전시설이 설치된 모습이 재연하여 출력하거나 또는 태양광발전시설의 설치된 모습에 따른 예상발전량을 산출하는 태양광발전시설 부지 타당성 분석 시스템을 제공함에 있다. Another object of the present invention is to provide a solar power generating system for a solar power generating system, which is capable of numerically calculating the possibility of solar power generation related to the address input by a user, And to provide a site feasibility analysis system for a photovoltaic power generation facility that calculates the amount of generated electricity.

상기 목적을 달성하기 위한 본 발명의 일 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템은 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 저장하는 데이터베이스 서버; 및 주소지에 대한 정보가 입력되면, 상기 입력된 주소지에 대한 지리정보를 상기 데이터베이스 서버로부터 수신하고, 상기 수신된 지리정보를 기반으로 태양광발전시설 부지의 경제적 타당성을 평가하고, 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부를 판단하여, 상기 입력된 주소지에 대한 개발가능성 또는 설치가능면적을 수치로 산출하는 정보처리 서버;를 포함한다.According to an aspect of the present invention, there is provided a system for analyzing a site feasibility of a photovoltaic power generation facility, comprising: a database server for storing geographical information including a site area of a facility corresponding to an address location or a land area of a specific area; And receiving the geographical information on the addressee from the database server, evaluating the economic feasibility of the photovoltaic power generation site based on the received geographical information, And an information processing server for judging whether or not the permission criterion conforms to the law, ordinance, rule or instruction, and calculating the development possibility or the installable area for the input address by numerical values.

그리고 상기 정보처리 서버는, 상기 입력된 주소지에 대한 지리정보가 수신되면, 상기 수신된 지리정보에 따라 태양광발전시설에 관한 조례, 규칙 또는 훈령을 선별하고, 상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에 따른 허가기준에 적합한 지역인지 여부를 판단하여, 상기 입력된 주소지에 대한 개발가능성을 수치로 산출하되, 상기 개발가능성은, 상기 입력된 주소지가 법률에 의해 제한되거나 불리한 지역인지 여부에 대한 제1 개발가능성, 상기 입력된 주소지의 진입도로에 대한 제2 개발가능성, 상기 입력된 주소지의 평균경사도에 대한 제3 개발가능성 및 상기 입력된 주소지의 음영면적에 대한 제4 개발가능성을 각각 산출하고, 상기 산출된 제1 내지 제4 개발가능성을 모두 곱하여 산출할 수 있다. When the geographical information of the input address is received, the information processing server selects a by-law, rule or instruction regarding the photovoltaic power generation facility according to the received geographical information, And the development possibility is calculated by numerically determining whether or not the input address is an area that meets the permission criteria according to the facility law and the selected regulations, rules or ordinances, A first development possibility of whether or not the area is restricted by law or a disadvantageous area, a second development possibility of an entry road of the input address, a third development possibility of an average inclination of the input address, The fourth development possibility for each area can be calculated, and the first to fourth development possibilities can be calculated .

또한, 상기 정보처리 서버는, 상기 입력된 주소지에 대한 지리정보가 수신되면, 상기 수신된 지리정보에 따라 상기 입력된 주소지가 속하는 지방행정구역의 조례, 규칙 또는 훈령을 선별하고, 상기 입력된 주소지가 상기 선별된 조례, 규칙 또는 훈령에 따른 도로, 특정 시설물 또는 특정 지역과의 이격거리에 대한 허가기준에 적합한 지역인지 판단하여, 상기 입력된 주소지가 상기 허가기준에 적합한 지역인 것으로 판단되면, 상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에서 규정하는 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것인지 여부를 판단하고, 상기 입력된 주소지가 상기 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것으로 판단되면, 상기 입력된 주소지가 태양광발전시설 부지로 부적합한 사실을 알리는 메시지가 출력되도록 할 수 있다.When the geographical information on the input address is received, the information processing server selects an order, a rule, or an instruction of the local administrative area to which the input address belongs according to the received geographical information, Determines whether the address is an area that is suitable for the permit standard for the distance from the road, the specific facility, or the specific area according to the selected rule, rule or instruction, and if it is determined that the inputted address is an area suitable for the permission criterion, If the address entered is in any of the conservation areas, development restricted areas, restricted areas for development permits, cultural property protected areas, and agricultural promotion areas / areas specified in the above PV Act and the selected bylaws, rules or ordinances Judging whether or not the inputted address is a corresponding one of the preservation district, development restriction zone, development activity permission zone, If it is determined that the fire protection equivalent to one of the zones and agriculture promotion area / zone can be the input address is output, a message indicating the improper fact solar power facility grounds.

그리고 상기 정보처리 서버는, 상기 입력된 주소지가 상기 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하지 않는 것으로 판단되면, 상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에서 규정하는 제1 검토지역인 관리지역, 자연환경보전지역, 관광지, 백두대간보호지역, 습지보호지역, 산업보호구역 및 야생동식물보호구역 중 적어도 하나에 해당하는 경우, 상기 입력된 주소지가 상기 제1 검토지역의 전체항목 중 해당하는 제1 해당항목의 수를 산출하고, 상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에서 규정하는 제2 검토지역인 산사태 위험지도 내 1등급 지역, 재해위험지구, 급경사재해예방지역 중 적어도 하나에 해당하는 경우, 상기 입력된 주소지가 상기 제2 검토지역의 전체항목 중 해당하는 제2 해당항목의 수를 산출하며, 상기 입력된 주소지에 대한 제1 개발가능성은, 제1 개발가능성=(1-(제1 해당항목의 수/제1 전체항목의 수))×(1-(제2 해당항목의 수/제2 전체항목의 수))×100으로 산출되도록 할 수 있다. If it is determined that the input address does not correspond to any one of the preservation district, the development restriction zone, the development activity permission zone, the cultural property protection zone, and the agricultural promotion zone / zone, the information processing server Is the first review area in the above-mentioned photovoltaic power generation facilities Act and the selected bylaws, rules or ordinances, the management area, the natural environment preservation area, the tourist spot, the Baekdudaegan protection area, the wetland protection area, Plant and animal sanctuary, the input address field is used to calculate the number of first corresponding items among all the items of the first review area, and if the input address is in accordance with the Act on Photovoltaic Power Facilities And a first-level area in a landslide hazard map, a second hazardous area designated by the selected ordinance, rule or ordinance, a disaster hazard area, a steep slope prevention A first development possibility for the input address is calculated based on the first development possibility of the first development area and the second development possibility for the input address, Probability = (1- (number of first relevant items / number of first total items)) x (1- (number of second related items / number of second total items)) 100.

또한, 상기 정보처리 서버는, 상기 제1 개발가능성이 산출되면, 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에 따른 진입도로에 대한 허가기준에 적합한 것인지 여부를 판단하여, 상기 입력된 주소지에 마련된 진입도로의 폭에 따라 제2 개발가능성을 수치로 산출할 수 있다. When the first development possibility is calculated, the information processing server determines whether the solar power generation facility is suitable for the solar power generation facility and the permission criteria for the entrance road according to the selected regulations, rules, or instructions, The second development possibility can be calculated numerically according to the width of the entry road provided at the input address.

그리고 상기 정보처리 서버는, 상기 제2 개발가능성을 산출하는 경우, 상기 진입도로의 폭이 4m 이상이면, 상기 제2 개발가능성을 100%로 산출하고, 상기 진입도로의 폭이 3.5m 이상 4m 미만이면, 상기 제2 개발가능성을 90%로 산출하며, 상기 진입도로의 폭이 3.0m 이상 3.5m 미만이면, 상기 제2 개발가능성을 80%로 산출하며, 상기 진입도로의 폭이 2.5m 이상 3m 미만이면, 상기 제2 개발가능성을 70%로 산출하며, 상기 진입도로의 폭이 2.0m 이상 2.5m 미만이면, 상기 제2 개발가능성을 60%로 산출하며, 상기 진입도로가 마련되지 않는 경우, 상기 제2 개발가능성을 50%로 산출할 수 있다. In the case where the second development possibility is calculated, the information processing server calculates the second development possibility as 100% when the width of the entry road is 4 m or more and the width of the entry road is 3.5 m or more and less than 4 m , The second development possibility is calculated as 90%, and if the width of the entry road is 3.0 m or more and less than 3.5 m, the second development possibility is calculated as 80%, the width of the entry road is 2.5 m or more and 3 m , The second development possibility is calculated to be 70%. If the width of the entry road is 2.0 m or more and less than 2.5 m, the second development possibility is calculated to be 60%. If the entryway is not provided, The second development possibility can be calculated as 50%.

또한, 상기 정보처리 서버는, 상기 제2 개발가능성이 산출되면, 상기 입력된 주소지에 대한 지리정보에 포함된 상기 입력된 주소지의 평균경사도에 따라 제3 개발가능성을 수치로 산출할 수 있다. When the second development possibility is calculated, the information processing server may calculate the third development possibility numerically based on the average inclination of the input address included in the geographical information on the input address.

그리고 상기 정보처리 서버는, 상기 제3 개발가능성을 산출하는 경우, 상기 입력된 주소지의 평균경사도가 5° 미만이면, 상기 제3 개발가능성을 100%로 산출하고, 상기 입력된 주소지의 평균경사도가 5° 이상 10° 미만이면, 상기 제3 개발가능성을 90%로 산출하고, 상기 입력된 주소지의 평균경사도가 10° 이상 15° 미만이면, 상기 제3 개발가능성을 80%로 산출하고, 상기 입력된 주소지의 평균경사도가 15° 이상 20° 미만이면, 상기 제3 개발가능성을 70%로 산출하고, 상기 입력된 주소지의 평균경사도가 20° 이상 25° 이하이면, 상기 제3 개발가능성을 60%로 산출하고, 상기 입력된 주소지의 평균경사도가 25°를 초과하면, 상기 제3 개발가능성을 50%로 산출할 수 있다. In the case where the third development possibility is calculated, the information processing server calculates the third development possibility as 100% if the average inclination of the input address is less than 5 degrees, and if the average inclination of the input address is The third development possibility is calculated to be 80% when the average inclination of the input address is not less than 10 degrees and not more than 15 degrees, and if it is less than 10 degrees, The third development possibility is calculated to be 70%, and if the average inclination of the input address is 20 or more and 25 or less, the third development possibility is reduced to 60% , And if the average inclination of the input address exceeds 25 DEG, the third development possibility can be calculated as 50%.

또한, 상기 정보처리 서버는, 상기 제3 개발가능성이 산출되면, 상기 입력된 주소지에 대한 지리정보에 포함된 상기 입력된 주소지의 전체면적 대비 음영면적의 비율에 따라 제4 개발가능성을 수치로 산출할 수 있다. When the third development possibility is calculated, the information processing server calculates the fourth development possibility as a numerical value according to the ratio of the shade area to the total area of the input address included in the geographic information about the input addressee can do.

그리고 상기 정보처리 서버는, 상기 제4 개발가능성을 산출하는 경우, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 10% 미만이면, 상기 제4 개발가능성을 100%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 10% 이상 15% 미만이면, 상기 제4 개발가능성을 90%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 15% 이상 20% 미만이면, 상기 제4 개발가능성을 80%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 20% 이상 25% 미만이면, 상기 제4 개발가능성을 70%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 25% 이상 30% 미만이면, 상기 제4 개발가능성을 60%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 30% 이상이면, 상기 제4 개발가능성을 50%로 산출할 수 있다.In the case where the fourth development possibility is calculated, the information processing server calculates the fourth development possibility as 100% when the ratio of the shade area to the total area of the input address is less than 10% If the ratio of the shade area to the total area of the address area is 10% or more and less than 15%, the fourth development possibility is calculated to be 90%, and if the ratio of the shade area to the total area of the input address is less than 20% , The fourth development possibility is calculated as 80%, and if the ratio of the shade area to the total area of the input address is less than 20% and less than 25%, the fourth development possibility is calculated as 70% The fourth development possibility is calculated to be 60%, and if the ratio of the shade area to the total area of the input address is 30% or more, Developability to 50% Can be calculated.

또한, 상기 정보처리 서버는, 상기 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 상기 입력된 주소지에 대한 태양광발전시설 설치경관의 시뮬레이션 명령이 요청되면, 상기 입력된 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보 및 예상발전량 정보가 생성되도록 하되, 상기 태양광발전시설의 설치방향이 변경되어 시뮬레이션 명령이 재차 요청될 때마다, 상기 태양광발전시설이 설치된 모습이 재연된 이미지정보 및 예상발전량 정보가 갱신되도록 할 수 있다.In addition, the information processing server may be configured such that, when a simulation command of a photovoltaic facility installation landscape for the input address is requested, after the development possibility for the input address is calculated, The solar power generation facility is installed in the vicinity of the solar power generation facility, and the generated image information and the estimated power generation amount information are generated. In addition, whenever the installation direction of the solar power generation facility is changed and a simulation command is requested again, Information and estimated generation amount information can be updated.

그리고 상기 정보처리 서버는, 상기 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부, 진입도로의 존재 여부 및 폭, 평균경사도, 전체면적 대비 음영면적의 비율 중 적어도 하나 이상의 선택조건에 대한 정보가 입력되면, 상기 입력된 선택조건에 적합한 후보군을 선별하며, 상기 선별된 후보군의 태양광발전시설의 설치가능면적 및 예상발전량을 산출할 수 있다. And the information processing server has at least one of the suitability of permission standards in accordance with laws, ordinances, rules or ordinances regarding the solar power generation facility, the presence and width of entry roads, the average slope, When the information on the above selection condition is input, a candidate group suitable for the input selection condition is selected, and the installable area and estimated power generation amount of the solar power generation facility of the selected candidate group can be calculated.

이에 의해, 태양광발전시설을 설치하고자 하는 지역에 대한 정보를 직접 입력하거나 태양광발전시설을 설치하고자 하는 지역이 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 저촉되는지 여부를 직접 확인할 필요없이 태양광발전시설의 부지분석, 입지분석, 경제성분석 등을 수행하여 태양광발전에 대한 타당성을 평가하고, 적정지역을 검색할 수 있다.Therefore, it is necessary to directly input information about the area where the photovoltaic power generation facility is to be installed, or to directly check whether the area where the photovoltaic power generation installation is to be installed is in conflict with laws, regulations, rules or ordinances regarding the photovoltaic power generation facilities It is possible to evaluate the feasibility of photovoltaic power generation by conducting site analysis, location analysis, and economic analysis of the photovoltaic power generation facility, and search for a suitable region.

또한, 사용자에 의해 입력된 주소지에 관한 태양광발전 개발가능성 또는 설치가능면적을 수치로 산출할 수 있으며, 태양광발전시설이 설치된 모습이 재연하여 출력하거나 또는 태양광발전시설의 설치된 모습에 따른 예상발전량을 산출할 수 있다. In addition, it is possible to calculate the solar power generation potential or the installable area of the address inputted by the user as a numerical value, and it is also possible to reproduce the solar power generation facility installed or reproduce the solar power generation facility The power generation amount can be calculated.

도 1은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템의 구성을 설명하기 위해 도시된 도면이다.
도 2는 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 진입도로에 대한 개발가능성을 산출하는 과정을 설명하기 위해 도시된 도면이다.
도 3은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 진입도로에 대한 개발가능성을 산출하는 과정에서 이용되는 산출기준을 설명하기 위해 도시된 도면이다.
도 4는 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 평균경사도에 대한 개발가능성을 산출하는 과정에서 이용되는 산출기준을 설명하기 위해 도시된 도면이다.
도 5는 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 평균경사도를 산출하는 과정을 설명하기 위해 도시된 도면이다.
도 6은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 전체면적 대비 음영면적의 비율에 대한 개발가능성을 산출하는 과정에서 이용되는 산출기준을 설명하기 위해 도시된 도면이다.
도 7은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지에 태양광시설이 설치된 모습을 재연하고, 예상발전량을 산출하는 과정을 설명하기 위해 도시된 도면이다.
도 8은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템을 이용하여 부지 타당성 분석을 수행하는 방법을 설명하기 위해 도시된 도면이다.
FIG. 1 is a view for explaining a configuration of a solar power generation facility site feasibility analysis system according to the present embodiment.
FIG. 2 is a diagram illustrating a process of calculating the development possibility of an entrance road at a place where a photovoltaic power generation facility is to be installed, according to a site feasibility analysis system according to the present embodiment.
3 is a view for explaining a calculation criterion used in the process of calculating the development possibility for the entrance road of the address where the PV power plant site feasibility analysis system according to the present embodiment is to be installed .
4 is a view for explaining a calculation criterion used in the process of calculating the development probability of the average slope of a place where a solar power generation facility is to be installed, according to the site feasibility analysis system of the present embodiment .
FIG. 5 is a diagram illustrating a process of calculating an average slope of a location where a solar power generation facility is to be installed, according to the site feasibility analysis system of the present embodiment.
FIG. 6 is a graph illustrating a calculation result of a solar power generation site feasibility analysis system according to an embodiment of the present invention. Lt; / RTI >
FIG. 7 is a flowchart illustrating a process of reproducing a state in which a photovoltaic facility is installed at a place where a photovoltaic power generation facility is to be installed, and calculating a predicted power generation amount, according to a site feasibility analysis system of the photovoltaic power generation facility according to the present embodiment to be.
FIG. 8 is a view for explaining a method of performing site validity analysis using the solar power generation facility site feasibility analysis system according to the present embodiment.

이하에서는 도면을 참조하여 본 발명에 대해 보다 상세히 설명하기로 한다 이하에 소개되는 실시예들은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 본 발명의 사상이 충분히 전달될 수 있도록 하기 위해 예로서 제공되는 것이다 본 발명은 이하 설명되는 실시예들에 한정되지 않고 다른 형태로 구체화될 수도 있다.Hereinafter, the present invention will be described in detail with reference to the drawings. The following embodiments are to be considered as illustrative and not restrictive, in order to enable those skilled in the art to fully understand the concept of the present invention. The present invention is not limited to the embodiments described below and may be embodied in other forms.

도 1은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템의 구성을 설명하기 위해 도시된 도면이다. FIG. 1 is a view for explaining a configuration of a solar power generation facility site feasibility analysis system according to the present embodiment.

본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템은 사용자가 태양광발전시설을 설치하고자 하는 지역에 대한 정보를 직접 입력하거나 태양광발전시설을 설치하고자 하는 지역이 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 저촉되는지 여부를 직접 확인할 필요없이 주소지에 대한 정보만 직접 입력하여 태양광발전시설의 부지분석, 입지분석, 경제성분석 등을 수행하여 태양광발전에 대한 타당성을 평가하고, 적정지역을 검색하기 위해 마련된다. The site feasibility analysis system according to the embodiment of the present invention is a system in which a user directly inputs information about a region where a solar power generation facility is to be installed or a region in which a solar power generation facility is to be installed, It is necessary to directly input information only on the address of the place without directly checking whether it violates the bylaws, regulations, or ordinances, to evaluate the feasibility of the photovoltaic power generation by performing site analysis, location analysis and economic analysis of the photovoltaic power generation facilities, It is prepared for searching the area.

또한, 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템의 다른 목적은 사용자에 의해 입력된 주소지에 관한 태양광발전 개발가능성 또는 설치가능면적을 수치로 산출하며, 태양광발전시설이 설치된 모습이 재연하여 출력하거나 또는 태양광발전시설의 설치된 모습에 따른 예상발전량을 산출하는 것이다. Another object of the solar power generation site validity analysis system according to the present embodiment is to calculate the solar power generation potential or the installable area of the address input by the user numerically, And reproduce the output of the solar power generation system or calculate the expected generation amount of the installed state of the solar power generation facility.

이를 위해, 본 태양광발전시설 부지 타당성 분석 시스템은 데이터베이스 서버(100)와 정보처리 서버(200)로 구성된다.To this end, the present PV plant site feasibility analysis system comprises a database server 100 and an information processing server 200.

데이터베이스 서버(100)는, 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 저장하기 위해 마련되며, 이를 위해, 제1 통신부(110), 제1 저장부(120) 및 제1 제어부(130)를 포함할 수 있다.The database server 100 is provided to store geographical information including a site area of a facility corresponding to a street address or a land area of a specific area. For this purpose, the first communication unit 110, the first storage unit 120, And a first controller 130.

제1 통신부(110)는, 정보처리 서버(200)와 유선 또는 무선 네트워크로 연결되어, 제1 저장부(120)에 저장된 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 정보처리 서버(200)에 전달할 수 있다. The first communication unit 110 is connected to the information processing server 200 through a wired or wireless network and is connected to the first storage unit 120 through a geographical area Information to the information processing server 200.

제1 저장부(120)는, 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 저장하기 위해 마련된다. 또한, 제1 저장부(120)는, 전국 토지 이용현황, 공시지가, 국토 환경성 평가지도와 같은 국가 공간정보들을 저장할 수 있다. The first storage unit 120 is provided to store geographical information including a site area of a facility corresponding to an address or a land area of a specific area. In addition, the first storage unit 120 may store national spatial information such as national land use status, official land price, and national environmental evaluation map.

제1 제어부(130)는, 정보처리 서버(200)로부터 특정 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보가 요청되는 경우, 제1 저장부(120)에 저장된 정보들 중 특정 주소지에 대응되는 정보들을 선별하여 정보처리 서버(200)에 제공할 수 있다. When the geographical information including the site area of a facility corresponding to a specific address or the land area of a specific area is requested from the information processing server 200, the first controller 130 transmits the information stored in the first storage unit 120 The information processing server 200 can selectively provide information corresponding to a specific address.

첨언하면, 데이터베이스 서버(100)는, 대한민국 국토해양부가 운영하는 브이월드(Vworld)와 같은 국가 공간정보 서비스 운영 서버와 같은 정보 서비스 운영 서버로 구현될 수 있다. Incidentally, the database server 100 may be implemented as an information service operating server such as a national spatial information service operating server such as Vworld operated by the Ministry of Land, Transport and Maritime Affairs of the Republic of Korea.

정보처리 서버(200)는, 주소지에 대한 정보가 입력되면, 입력된 주소지에 대한 지리정보를 데이터베이스 서버(100)로부터 수신하고, 수신된 지리정보를 기반으로 태양광발전시설 부지의 경제적 타당성을 평가하고, 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부를 판단하여, 입력된 주소지에 대한 개발가능성 또는 설치가능면적을 수치로 산출하기 위해 마련되며, 이를 위해 제2 통신부(210), 제2 저장부(220) 및 제2 제어부(230)를 포함할 수 있다.The information processing server 200 receives the geographical information of the input address and receives the geographical information from the database server 100 and evaluates the economic feasibility of the photovoltaic power generation site based on the received geographical information And to determine the applicability of the permit standards in accordance with the laws, ordinances, rules or ordinances of the photovoltaic power generation facilities, and to calculate the development potential or the installable area for the input address, A communication unit 210, a second storage unit 220, and a second control unit 230.

제2 통신부(210)는 제1 통신부(110)와 무선 또는 유선으로 연결되어, 특정 주소지에 대한 정보가 입력되면, 데이터베이스 서버(100)에 특정 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 요청하거나 데이터베이스 서버(100)로부터 주소지에 대응되는 시설물의 3차원 이미지정보와 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 수신할 수 있다.The second communication unit 210 is connected to the first communication unit 110 in a wireless or wired manner. When information on a specific address is input, the second communication unit 210 transmits the information about the specific area to the database server 100, The geographical information including the area may be requested or the geographical information including the land area of the facilities corresponding to the address area or the land area of the specific area may be received from the database server 100 .

제2 저장부(220)는 정보처리 서버(200)를 운용하는데 필요한 프로그램 및 데이터를 저장하기 위해 마련된다. 구체적으로 제2 저장부(220)는, 대한민국을 비롯한 국가별 태양광발전시설에 관한 법률과 대한민국의 지방자치단체별 조례, 규칙 또는 훈령에 따른 허가기준에 대한 정보를 저장할 수 있다. The second storage unit 220 is provided for storing programs and data necessary for operating the information processing server 200. Specifically, the second storage unit 220 may store information on the photovoltaic power generation facilities of each country including the Republic of Korea and the permission standards of the Republic of Korea according to the regulations, ordinances or ordinances of local governments.

제2 제어부(230)는 주소지에 대한 정보가 입력되면, 입력된 주소지에 대한 지리정보를 데이터베이스 서버(100)로부터 수신하고, 수신된 지리정보를 기반으로 태양광발전시설 부지의 경제적 타당성을 평가하고, 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부를 판단하여, 입력된 주소지에 대한 개발가능성 또는 설치가능면적을 수치로 산출로 산출할 수 있다. When the information on the address is inputted, the second controller 230 receives the geographical information about the address of the input location from the database server 100, evaluates the economical feasibility of the photovoltaic power generation site based on the received geographical information, , Photovoltaic power generation facilities, laws, ordinances, rules, or ordinances, and can calculate the development potential or the installable area of the input address by numerical calculation.

이를 위해, 제2 제어부(230)는, 허가기준 판단모듈(231), 이격거리 판단모듈(232), 불가지역 판단모듈(233), 개발가능성 산출모듈(234), 예상발전량 산출모듈(235), 시뮬레이션 수행모듈(236), 태양광발전시설 후보지 검색모듈(237) 및 경제성 분석모듈(238)을 구비할 수 있다. The second control unit 230 includes a permission reference determination module 231, a separation distance determination module 232, an unreachable region determination module 233, a development possibility calculation module 234, an expected power generation amount calculation module 235, A simulation execution module 236, a photovoltaic power generation facility candidate search module 237, and an economics analysis module 238.

허가기준 판단모듈(231)은 입력된 주소지에 대한 지리정보가 수신되면, 수신된 지리정보에 따라 태양광발전시설에 관한 조례, 규칙 또는 훈령을 선별할 수 있다.When the geographical information on the input address is received, the permission criterion determination module 231 can select an ordinance, rule or instruction regarding the photovoltaic power generation facility according to the received geographical information.

구체적으로, 허가기준 판단모듈(231)은, 사용자에 의해 주소지가 텍스트정보로 입력되거나, 현재 출력되는 화면영역 중 사용자가 태양광발전시설을 설치하고자 하는 영역을 드래그하여 특정영역이 설정되면, 사용자에 의해 주소지에 대한 정보가 입력된 것으로 판단하여, 해당 주소지가 속하는 지방행정구역의 조례, 규칙 또는 훈령을 선별할 수 있다.Specifically, the permission criterion determination module 231 determines whether or not the user is allowed to enter the photovoltaic power generation facility by inputting textual information of the address by the user, , It is possible to select the regulations, rules or ordinances of the local administrative districts to which the relevant address belongs.

또한, 허가기준 판단모듈(231)은, 해당 주소지의 토지면적이 5,000㎡ 이상인 경우, 국토의 계획 및 이용에 관한 법률, 자연환경보전법, 자연공원법, 습지보호법, 수도법, 소하천정비법 및 지하수법에 관한 법률을 선별하고, 해당 주소지의 토지면적이 10,000㎡ 이상인 경우, 국토의 계획 및 이용에 관한 법률, 산지관리법, 습지보호법, 하천법에 관한 법률을 선별할 수 있다. In addition, when the land area of the address is more than 5,000m2, the permission criteria judgment module 231 judges whether or not the land area of the address is 5,000m2 or more, according to the Act on the Planning and Use of the Land, the Natural Environment Conservation Act, the Natural Parks Act, When the law is selected and the land area of the addressed area is over 10,000 square meters, laws concerning the planning and use of the land, the Mountain Management Act, the Wetland Protection Act, and the River Act can be selected.

이때, 조례, 규칙 또는 훈령은 태양광발전시설의 허가기준에 관한 것으로, 태양광발전시설을 설치하고자 하는 부지, 즉 주소지가 직선거리로부터 이격거리가 200m 이상인지 여부, 주거 밀집지역으로부터의 이격거리가 500m 이상인지 여부 등 국가 및 국가의 지방행정구역을 관할하는 지방자치단체에서 제정한 것을 의미한다.At this time, the regulations, rules or ordinances refer to permission standards of photovoltaic power generation facilities, and the site where the photovoltaic power generation facility is to be installed, ie, whether the address is 200 m or more from the straight line distance, And whether it is more than 500m from the local government.

이격거리 판단모듈(232)은 허가기준 판단모듈(231)에 의해, 입력된 주소지에 따라 태양광발전시설에 관한 조례, 규칙 또는 훈령이 선별되면, 선별된 태양광발전시설에 관한 조례, 규칙 또는 훈령에 따라 입력된 주소지가, 입력된 주소지와 도로, 특정 시설물 또는 특정 지역과의 이격거리에 대한 허가기준에 적합한 지역인지 여부를 판단할 수 있다. When the regulations, rules or ordinances regarding the photovoltaic power generation facilities are selected by the permission criterion determination module 231 in accordance with the input address, the separation distance determination module 232 determines that the photovoltaic power generation facilities, According to the instruction, it is possible to judge whether or not the inputted address is an area that meets the permission criteria for the distance between the inputted address and the road, the specific facility or the specific area.

불가지역 판단모듈(233)은 이격거리 판단모듈(232)에 의해, 입력된 주소지가 이격거리에 대한 허가기준에 적합한 지역인 것으로 판단되면, 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에서 규정하는 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것인지 여부를 판단할 수 있다.If it is determined by the separation distance determination module 232 that the input address is an area suitable for the permission criterion for the separation distance, the impossible area determination module 233 determines whether the input address is a PV It is possible to judge whether it falls under any one of conservation districts, development restricted areas, development activity permission restricted areas, cultural property protection areas and agricultural promotion areas / districts specified by the ordinances, rules or ordinances.

구체적으로, 불가지역 판단모듈(233)은 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에서 규정하는 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것인지 여부를 판단하여, 입력된 주소지가 불가지역 중 하나에 해당하는 것으로 판단되면, 입력된 주소지가 태양광발전시설 부지로 부적합한 사실을 알리는 메시지가 정보처리 서버(200) 또는 별도로 마련되어 정보처리 서버(200)와 유선 또는 무선 네트워크와 연결된 사용자 단말을 통해 출력되도록 할 수 있다. Specifically, the unreachable area determination module 233 determines whether or not the input address is a storage area, a development restriction area, a development activity permission area, a cultural property protection area, and a cultural property protection area defined by laws and regulations on photovoltaic power generation facilities and selected bylaws, If the input address is found to be one of the non-available areas, a message informing that the input address is not suitable as a photovoltaic power generation site is processed as information processing And may be output through the server 200 or separately provided to the information processing server 200 and the user terminal connected to the wired or wireless network.

개발가능성 산출모듈(234)은 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에 따른 허가기준에 적합한 지역으로 판단되면, 입력된 주소지에 대한 개발가능성 또는 설치가능면적을 수치로 산출할 수 있다. If the input address is judged to be an area suitable for the photovoltaic power generation facilities and the permission standards in accordance with the selected bylaws, rules or ordinances, the module 234 for developmentability may determine the development potential or the installable area for the input address It can be calculated numerically.

구체적으로, 개발가능성 산출모듈(234)은 불가지역 판단모듈(233)에 의해, 입력된 주소지가 불가지역 중 하나에 해당하지 않는 것으로 판단되면, 입력된 주소지가 법률에 의해 제한되거나 불리한 지역인지 여부에 대한 제1 개발가능성, 입력된 주소지의 진입도로에 대한 제2 개발가능성, 입력된 주소지의 평균경사도에 대한 제3 개발가능성 및 입력된 주소지의 음영면적에 대한 제4 개발가능성을 각각 산출하고, 산출된 제1 내지 제4 개발가능성을 모두 곱하여 산출할 수 있다. 이와 관련하여 더욱 상세한 설명은 도 2 내지 도 6을 참조하여 후술하기로 한다. Specifically, if the impossible area determining module 233 determines that the inputted address is not one of the impossible areas, the development possibility calculating module 234 determines whether the inputted address is limited or disadvantageous by law The second development possibility for the entry road of the input address, the third development possibility for the average inclination of the input address, and the fourth development possibility for the shade area of the input address are respectively calculated, And can be calculated by multiplying all of the first to fourth developed possibilities. A more detailed description will be given later with reference to Figs. 2 to 6.

또한, 개발가능성 산출모듈(234)은 입력된 주소지에 대한 개발가능성이 수치로 산출하되, 산출된 개발가능성이 기설정된 값 이상이 되도록 하는 입력된 주소지의 일부 또는 전부에 대한 설치가능면적을 수치로 산출할 수 있다. Also, the development possibility calculation module 234 calculates the development possibility for the input address area as a numerical value, and sets the installable area for a part or all of the input address field such that the calculated development possibility is equal to or greater than a predetermined value Can be calculated.

예상발전량 산출모듈(235)은 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 입력된 주소지의 면적, 해당 주소지에 설치하고자 하는 태양광발전시설의 설비 타입 및 패널설치 방향, 해당 주소지의 평균경사도, 해당 주소지의 전체면적 대비 음영면적의 비율, 해당 주소지의 지난 10년간 평균 일조시간, 일사량, 월별 또는 일별 평균기온, 평균풍속 등을 고려하여 예상발전량을 산출할 수 있다.The estimated power generation amount calculation module 235 calculates an expected power generation amount calculation module 235 based on the area of the input address, the equipment type of the photovoltaic power generation facility to be installed at the address, the panel installation direction, the average Estimated power generation can be calculated by taking into consideration the slope, the ratio of the shaded area to the total area of the address, the average sunshine hours, the solar or monthly or daily average temperature, and the average wind speed in the past 10 years.

시뮬레이션 수행모듈(236)은 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 입력된 주소지에 대한 태양광발전시설 설치경관의 시뮬레이션 명령이 요청되면, 입력된 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보를 생성할 수 있다. When the simulation execution module 236 requests the simulation command of the photovoltaic facility installation landscape for the input address, the photovoltaic power generation facility is installed at the input address Thereby generating the reproduced image information.

이와 관련하여 더욱 상세한 설명은 도 7을 참조하여 후술하기로 한다. A more detailed description will be given later with reference to FIG.

태양광발전시설 후보지 검색모듈(237)은 상기 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부, 진입도로의 존재 여부 및 폭, 평균경사도, 전체면적 대비 음영면적의 비율 중 적어도 하나 이상의 선택조건에 대한 정보가 입력되면, 입력된 선택조건에 적합한 후보군을 선별하며, 선별된 후보군의 태양광발전시설의 설치가능면적 및 예상발전량을 산출할 수 있다. The photovoltaic power generation facility candidate search module 237 determines whether or not the permission standards conform to the laws, ordinances, rules, or ordinances regarding the photovoltaic power generation facilities, the presence and width of entry roads, the average slope, The candidate area is selected according to the inputted selection condition, and the installable area of the photovoltaic generation facility of the selected candidate group and the expected power generation amount can be calculated.

경제성 분석모듈(238)은 태양광발전시설의 경제성 분석을 수행할 수 있다. 구체적으로 경제성 분석모듈(238)은, 입력된 주소지의 토지면적과, 토지가격, 태양광발전시설의 설비 타입, 패널 타입, 보증기간, 전력판매형태, 발전예상량, 효율저하율 등을 고려하여 해당 태양광발전시설의 경제성을 분석할 수 있다. The economic efficiency analysis module 238 can perform economic analysis of the photovoltaic generation facility. Specifically, the economic efficiency analysis module 238 analyzes the land area of the addressee, the land price, the type of solar power facility, the type of panel, the warranty period, the type of power sales, the expected amount of power generation, The economic efficiency of photovoltaic facilities can be analyzed.

첨언하면, 데이터베이스 서버(100) 및 정보처리 서버(200)는, 상기에서 상술한 구성요소 이외에도, 개인용 또는 서버용 컴퓨터에 마련되는 다양한 구성요소들이 추가로 마련될 수 있으나, 이는 본 발명의 기술적 요지와 상이하여 이와 관련된 기재는 생략하기로 한다. In addition, the database server 100 and the information processing server 200 may additionally include various components provided in a personal computer or a server computer, in addition to the components described above, And description related thereto will be omitted.

도 2는 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 진입도로에 대한 개발가능성을 산출하는 과정을 설명하기 위해 도시된 도면이고, 도 3은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 진입도로에 대한 개발가능성을 산출하는 과정에서 이용되는 산출기준을 설명하기 위해 도시된 도면이다. FIG. 2 is a diagram illustrating a process of calculating a development possibility of an entrance road of an address where a solar power generation facility is to be installed by the solar power generation site feasibility analysis system according to the present embodiment, and FIG. FIG. 5 is a diagram illustrating a calculation standard used in the process of calculating the development possibility of the entrance road of the address where the PV power plant site feasibility analysis system according to the embodiment is to be installed.

이하에서는 도 2 내지 도 3을 참조하여 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 입력된 주소지가 법률에 의해 제한되거나 불리한 지역인지 여부에 대한 제1 개발가능성 및 주소지의 진입도로에 대한 제2 개발가능성을 산출하는 과정을 더욱 상세히 설명하기로 한다. Hereinafter, referring to FIG. 2 to FIG. 3, a solar power generation site feasibility analysis system according to the present embodiment may include a first development to determine whether an input address for installing a solar power generation facility is limited by a law or an unfavorable region The process of calculating the likelihood and the second possibility of development on the entry roads will be described in more detail.

개발가능성 산출모듈(234)은 불가지역 판단모듈(233)에 의해, 입력된 주소지가 불가지역 중 하나에 해당하지 않는 것으로 판단되면, 입력된 주소지에 대한 개발가능성을 수치로 산출하기 위해, 우선 입력된 주소지가 법률에 의해 제한되거나 불리한 지역인지 여부에 대한 제1 개발가능성을 산출할 수 있다. If it is judged by the impossibility judgment module 233 that the inputted address is not one of the impossible areas, the development possibility calculation module 234 calculates the possibility of development for the inputted address in numerical form, The first development possibility of whether the address is limited or unfavorable by law can be calculated.

구체적으로, 개발가능성 산출모듈(234)은, 입력된 주소지가 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하지 않는 것으로 판단되면, 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에서 규정하는 제1 검토지역인 관리지역, 자연환경보전지역, 관광지, 백두대간보호지역, 습지보호지역, 산업보호구역 및 야생동식물보호구역 중 적어도 하나에 해당하는 경우, 입력된 주소지가 제1 검토지역의 전체항목 중 해당하는 제1 해당항목의 수를 산출하고, 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에서 규정하는 제2 검토지역인 산사태 위험지도 내 1등급 지역, 재해위험지구, 급경사재해예방지역 중 적어도 하나에 해당하는 경우, 입력된 주소지가 제2 검토지역의 전체항목 중 해당하는 제2 해당항목의 수를 산출할 수 있다.Specifically, the development possibility calculation module 234 determines that the inputted address is not one of the preservation district, the development restriction zone, the development activity permission zone, the cultural asset protection zone, and the agricultural promotion zone / zone, Of the first reviewing area specified by the Law on Photovoltaic Facilities and Selected Regulations, Regulations or Ordinances, the Natural Environment Conservation Area, the Tourist Area, the Baekdudaegan Protected Area, the Wetland Protection Area, the Industrial Protection Area and the Wild If the input address meets at least one of the protected areas of animals and plants, it shall calculate the number of the first applicable item among all the items in the first review area, and the address entered shall comply with the laws on photovoltaic power generation facilities, , At least one of the first-level area, hazard hazard area, or steep slope prevention area in the landslide hazard map, which is the second review area prescribed by the Regulations or the Ordinance, The address can calculate the number of the second item corresponding to the total item area of the second review.

이때, 입력된 주소지에 대한 제1 개발가능성은, 제1 개발가능성=(1-(제1 해당항목의 수/제1 전체항목의 수))×(1-(제2 해당항목의 수/제2 전체항목의 수))×100으로 산출될 수 있다. In this case, the first development possibility with respect to the input address is: (1 - (number of first corresponding items / number of first overall items)) (1- (number of second related items / 2 total number of items))) × 100.

여기서 관리지역은 도시지역의 인구와 산업을 수용하기 위하여 도시지역에 준하여 체계적으로 관리하거나 농림업의 진흥, 자연환경 또는 산림의 보전을 위하여 농림지역 또는 자연환경보전지역에 준하여 관리할 필요가 있는 지역을 의미한다.In order to accommodate the population and industry in the urban area, the management area should be systematically managed in accordance with the urban area, or the area needed to be managed in accordance with the agricultural and forestry area or the natural environment preservation area for promotion of agriculture and forestry industry, it means.

또한, 개발가능성 산출모듈(234)은, 제1 개발가능성이 산출되면, 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에 따른 진입도로에 대한 허가기준에 적합한 것인지 여부를 판단하여, 입력된 주소지에 마련된 진입도로의 폭에 따라 제2 개발가능성을 수치로 산출할 수 있다.Further, the development possibility calculation module 234 determines whether the first development possibility is calculated, and if the first development possibility is calculated, it is judged whether it is suitable for the PV authority and the permission criteria for the entrance road according to the selected ordinance, rule or instruction, The second development possibility can be calculated numerically according to the width of the entry road provided at the input address.

구체적으로, 개발가능성 산출모듈(234)은, 제2 개발가능성을 산출하는 경우, 도 3에 도시된 산출기준에 따라 진입도로의 폭이 4m 이상이면, 제2 개발가능성을 100%로 산출하고, 진입도로의 폭이 3.5m 이상 4m 미만이면, 제2 개발가능성을 90%로 산출하며, 진입도로의 폭이 3.0m 이상 3.5m 미만이면, 제2 개발가능성을 80%로 산출하며, 진입도로의 폭이 2.5m 이상 3m 미만이면, 제2 개발가능성을 70%로 산출하며, 진입도로의 폭이 2.0m 이상 2.5m 미만이면, 제2 개발가능성을 60%로 산출하며, 진입도로가 마련되지 않는 경우, 제2 개발가능성을 50%로 산출할 수 있다. Specifically, when calculating the second development possibility, the development possibility calculation module 234 calculates the second development possibility as 100% when the width of the entry road is 4 m or more according to the calculation standard shown in FIG. 3, If the width of the entryway is 3.5 m or more and less than 4 m, the second development possibility is calculated as 90%. If the width of the entryway is 3.0 m or more and less than 3.5 m, the second development possibility is calculated as 80% If the width is 2.5 m or more and less than 3 m, the second development possibility is calculated as 70%. If the width of the entry road is 2.0 m or more and less than 2.5 m, the second development possibility is calculated as 60% , The second development possibility can be calculated as 50%.

첨언하면, 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에 따르면, 태양광발전시설은 진입도로(현황도로)가 마련되지 않으면, 태양광발전시설의 허가를 받지 못해, 태양광발전시설 주변의 토지를 매입하여 진입도로를 마련해야 하기 때문에, 진입도로가 마련되지 않거나 짧게 마련되면 개발가능성이 감소한다. 따라서, 개발가능성 산출모듈(234)은, 도 3에 도시된 바와 같은 산출기준을 통해 보다 명확하게 진입도로와 관련된 개발가능성을 수치로 산출할 수 있다. Incidentally, according to the law on photovoltaic power generation facilities and selected bylaws, regulations or ordinances, if the photovoltaic power generation facility is not equipped with the entry road (current road) If you do not have access roads or if you do not have access roads, the possibility of development will decrease because you have to purchase land around the facilities to provide access roads. Accordingly, the development possibility calculation module 234 can numerically calculate the development possibility associated with the entry road more clearly through the calculation standard as shown in Fig.

도 4는 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 평균경사도에 대한 개발가능성을 산출하는 과정에서 이용되는 산출기준을 설명하기 위해 도시된 도면이고, 도 5는 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 평균경사도를 산출하는 과정을 설명하기 위해 도시된 도면이다. 이하에서는 도 4 내지 도 5를 참조하여 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 평균경사도를 산출하는 과정을 더욱 상세히 설명하기로 한다. 4 is a diagram for explaining a calculation standard used in the process of calculating the development possibility of the average inclination of a street address for installing a solar power generation facility according to the site feasibility analysis system according to the present embodiment And FIG. 5 is a view for explaining a process of calculating an average slope of a place where a solar power generation facility is to be installed, according to the site feasibility analysis system of the present embodiment. Hereinafter, the process of calculating the average slope of the address of the PV power generation facility according to the present embodiment will be described in more detail with reference to FIGS. 4 to 5. FIG.

개발가능성 산출모듈(234)은 제2 개발가능성이 산출되면, 입력된 주소지에 대한 지리정보에 포함된 입력된 주소지의 평균경사도에 따라 제3 개발가능성을 수치로 산출할 수 있다.When the second development possibility is calculated, the development possibility calculating module 234 can calculate the third development possibility numerically based on the average inclination of the input address included in the geographical information about the input address.

구체적으로, 개발가능성 산출모듈(234)은 도 4에 도시된 산출기준에 따라 제3 개발가능성을 산출하는 경우, 입력된 주소지의 평균경사도가 5° 미만이면, 제3 개발가능성을 100%로 산출하고, 입력된 주소지의 평균경사도가 5° 이상 10° 미만이면, 제3 개발가능성을 90%로 산출하고, 입력된 주소지의 평균경사도가 10° 이상 15° 미만이면, 제3 개발가능성을 80%로 산출하고, 입력된 주소지의 평균경사도가 15° 이상 20° 미만이면, 제3 개발가능성을 70%로 산출하고, 입력된 주소지의 평균경사도가 20° 이상 25° 이하이면, 제3 개발가능성을 60%로 산출하고, 입력된 주소지의 평균경사도가 25°를 초과하면, 제3 개발가능성을 50%로 산출할 수 있다. Specifically, when calculating the third development possibility according to the calculation standard shown in FIG. 4, the development possibility calculation module 234 calculates the third development possibility as 100% if the average inclination of the input address is less than 5 degrees The third development possibility is calculated as 90%, and if the average inclination of the input address is less than 10 degrees and less than 15 degrees, the third development possibility is reduced to 80%, and if the average inclination of the input address is less than 10, The third development possibility is calculated as 70%, and if the average inclination of the input address is not less than 20 degrees and not more than 25 degrees, the third development possibility is calculated 60%, and if the average inclination of the input address exceeds 25 degrees, the third development possibility can be calculated as 50%.

여기서, 개발가능성 산출모듈(234)은, 데이터베이스 서버(100)로부터 수신된 지리정보에 해당 주소지의 평균경사도에 대한 정보가 포함되어 있는 경우, 이를 기반으로 제3 개발가능성을 수치로 산출하되, 지리정보에 해당 주소지의 평균경사도에 대한 정보가 포함되지 않은 경우, 도 5에 도시된 바와 같이 해당 주소지의 평균경사도를 분석하여 산출할 수 있다. Here, the development possibility calculation module 234 calculates the third development possibility based on the information on the average degree of inclination of the corresponding address in the geographical information received from the database server 100, If the information does not include information on the average slope of the address, the average slope of the address can be calculated and analyzed as shown in FIG.

즉, 개발가능성 산출모듈(234)은 전체면적을 복수의 경사도 구간으로 분할하여, 전체면적 대비 해당 경사도 구간의 면적을 곱하여 평균경사도를 산출할 수 있다.That is, the development possibility calculation module 234 can divide the entire area into a plurality of slope sections, and calculate the average slope by multiplying the area of the slope sections by the total area.

도 6은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 전체면적 대비 음영면적의 비율에 대한 개발가능성을 산출하는 과정에서 이용되는 산출기준을 설명하기 위해 도시된 도면이다. 이하에서는 도 6을 참조하여 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지의 전체면적 대비 음영면적의 비율에 대한 개발가능성을 산출하는 과정을 더욱 상세히 설명하기로 한다. FIG. 6 is a graph illustrating a calculation result of a solar power generation site feasibility analysis system according to an embodiment of the present invention. Lt; / RTI > Hereinafter, with reference to FIG. 6, the process of calculating the development probability of the ratio of the total area to the shade area of the address where the solar power generation facility is to be installed, according to the site feasibility analysis system according to the present embodiment, will be described in more detail .

개발가능성 산출모듈(234)은, 제3 개발가능성이 산출되면, 입력된 주소지에 대한 지리정보에 포함된 입력된 주소지의 전체면적 대비 음영면적의 비율에 따라 제4 개발가능성을 수치로 산출할 수 있다.When the third development possibility is calculated, the development possibility calculation module 234 can calculate the fourth development possibility numerically based on the ratio of the shade area to the total area of the input address included in the geographic information about the input addressee have.

구체적으로, 개발가능성 산출모듈(234)은, 도 6에 도시된 산출기준에 따라 제4 개발가능성을 산출하는 경우, 입력된 주소지의 전체면적 대비 음영면적의 비율이 10% 미만이면, 제4 개발가능성을 100%로 산출하고, 입력된 주소지의 전체면적 대비 음영면적의 비율이 10% 이상 15% 미만이면, 제4 개발가능성을 90%로 산출하고, 입력된 주소지의 전체면적 대비 음영면적의 비율이 15% 이상 20% 미만이면, 제4 개발가능성을 80%로 산출하고, 입력된 주소지의 전체면적 대비 음영면적의 비율이 20% 이상 25% 미만이면, 제4 개발가능성을 70%로 산출하고, 입력된 주소지의 전체면적 대비 음영면적의 비율이 25% 이상 30% 미만이면, 제4 개발가능성을 60%로 산출하고, 입력된 주소지의 전체면적 대비 음영면적의 비율이 30% 이상이면, 제4 개발가능성을 50%로 산출할 수 있다. Specifically, when the fourth development possibility is calculated in accordance with the calculation standard shown in FIG. 6, the development possibility calculation module 234 calculates the fourth development possibility according to the fourth development If the ratio of the shading area to the total area of the input address is less than 10% and less than 15%, the fourth possibility is calculated as 90%, and the ratio of the shading area to the total area of the input address Is less than 20%, the fourth development possibility is calculated as 80%. If the ratio of the shade area to the total area of the input address is not less than 20% and less than 25%, the fourth development possibility is calculated as 70% , And if the ratio of the shading area to the total area of the input address is less than 30%, the fourth development possibility is calculated as 60%. If the ratio of the shading area to the total area of the input address is more than 30% 4 Development potential can be calculated as 50%.

여기서, 입력된 주소지의 전체면적 대비 음영면적은, 입력된 주소지가 복수의 층으로 이뤄진 건축물인 경우, 건축물의 지붕, 옥상 등 태양광발진시설의 패널이 설치 가능한 지역의 전체면적 대비 음영면적을 의미한다. Here, the shaded area compared to the total area of the input address means the shaded area relative to the total area of the area where the panel of the photovoltaic facility such as the roof and the roof of the building can be installed, when the input address is a multi- do.

정리하면, 개발가능성 산출모듈(234)은 입력된 주소지가 법률에 의해 제한되거나 불리한 지역인지 여부, 입력된 주소지의 진입도로 상황, 평균경사도, 전체면적 대비 음영면적 등을 고려하여 보다 객관적이고 정확한 개발가능성을 산술적 수치로 산출하여, 태양광발진시설을 설치하고자 하는 사용자에게 도움을 줄 수 있다. In summary, the development possibility calculation module 234 can provide more objective and accurate development considering the input address is limited or unfavorable by law, entry road situation of input address, average slope, shaded area relative to total area, Calculate the probability as an arithmetic value, which can help users who want to install a solar eruption facility.

도 7은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지에 태양광시설이 설치된 모습을 재연하고, 예상발전량을 산출하는 과정을 설명하기 위해 도시된 도면이다. 구체적으로, 도 7a는 태양광발전시설을 설치하고자 하는 주소지가 도시된 도면이고, 도 7b는 태양광발전시설을 설치하고자 하는 주소지에 태양광발전시설이 설치된 모습이 도시된 도면이며, 도 7c는 정보처리 서버(200)가 태양광발전시설을 설치하고자 하는 주소지에 태양광시설이 설치된 모습을 재연한 이미지정보를 기반으로 예상발전량을 산출한 결과가 도시된 도면이다. FIG. 7 is a flowchart illustrating a process of reproducing a state in which a photovoltaic facility is installed at a place where a photovoltaic power generation facility is to be installed, and calculating a predicted power generation amount, according to a site feasibility analysis system of the photovoltaic power generation facility according to the present embodiment to be. 7B is a view showing a state in which a solar power generation facility is installed at a place where a solar power generation facility is to be installed, and FIG. 7C is a diagram The estimated power generation amount is calculated on the basis of the image information reproduced by the information processing server 200 in the state where the solar power facility is installed at the address where the solar power generation facility is to be installed.

이하에서는 도 7a 내지 도 7c를 참조하여 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템이 태양광발전시설을 설치하고자 하는 주소지에 태양광시설이 설치된 모습을 재연하고, 예상발전량을 산출하는 과정을 더욱 상세히 설명하기로 한다. Hereinafter, referring to FIGS. 7A to 7C, a site feasibility analysis system of a photovoltaic power generation facility according to the present embodiment reproduces a state in which a photovoltaic facility is installed at a place where a photovoltaic power generation facility is to be installed, Will be described in more detail.

예상발전량 산출모듈(235)은 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 입력된 주소지의 면적, 해당 주소지에 설치하고자 하는 태양광발전시설의 설비 타입 및 패널설치 방향, 해당 주소지의 평균경사도, 해당 주소지의 전체면적 대비 음영면적의 비율, 해당 주소지의 지난 10년간 평균 일조시간, 일사량, 월별 또는 일별 평균기온, 평균풍속 등을 고려하여 예상발전량을 산출할 수 있으며, 입력된 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보가 생성되면, 생성된 이미지정보를 기반으로 입력된 주소지에 대한 예상발전량 정보를 생성할 수 있다.The estimated power generation amount calculation module 235 calculates an expected power generation amount calculation module 235 based on the area of the input address, the equipment type of the photovoltaic power generation facility to be installed at the address, the panel installation direction, the average Estimated power generation can be calculated by taking into consideration the slopes, the ratio of the shaded area to the total area of the address, the average sunshine hours, the average sunshine hours, the monthly or daily average temperature and the average wind speed in the past 10 years, When the reproduced image information of the installed state of the photovoltaic power generation facility is generated, the estimated power generation amount information for the input address can be generated based on the generated image information.

시뮬레이션 수행모듈(236)은 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 입력된 주소지에 대한 태양광발전시설 설치경관의 시뮬레이션 명령이 요청되면, 입력된 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보를 생성할 수 있으며, 태양광발전시설의 설치방향이 변경되어 시뮬레이션 명령이 재차 요청될 때마다, 태양광발전시설이 설치된 모습이 재연된 이미지정보를 갱신할 수 있다. When the simulation execution module 236 requests the simulation command of the photovoltaic facility installation landscape for the input address, the photovoltaic power generation facility is installed at the input address The renewed image information can be generated. When the installation direction of the solar power generation facility is changed and the simulation command is requested again, the image information in which the solar power generation facility is installed can be renewed.

여기서, 예상발전량 산출모듈(235)은, 평균경사도와 전체면적 대비 음영면적의 비율 등을 고려하여 해당 주소지에 설치하고자 하는 태양광발전시설의 패널설치 방향에 따른 예상발전량을 개별적으로 산출할 수 있으며, 구체적으로 예를 들면, 태양광발전시설의 설치방향이 변경되어 시뮬레이션 명령이 재차 요청되어, 태양광발전시설이 설치된 모습이 재연된 이미지정보가 갱신되면, 갱신된 이미지정보에 따라 예상발전량 정보를 갱신할 수 있어, 해당 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보를 생성하는 시뮬레이션을 수행하는 경우, 사용자에게 최적의 패널배치 구조를 제공할 수 있다. Here, the estimated power generation amount calculation module 235 can individually calculate the expected power generation amount according to the panel installation direction of the PV facility to be installed at the addressee, considering the average slope, the ratio of the shade area to the total area, and the like Specifically, for example, when the installation direction of the solar power generation facility is changed, a simulation command is requested again, and the reproduced image information of the solar power generation facility is updated, the estimated generation amount information is updated according to the updated image information And a simulation is performed to generate image information in which the photovoltaic power generation facility is installed at the address of the user, the optimum panel layout structure can be provided to the user.

도 8은 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템을 이용하여 부지 타당성 분석을 수행하는 방법을 설명하기 위해 도시된 도면이다. 이하에서는 도 8을 참조하여 본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템을 이용하여 부지 타당성 분석을 수행하는 방법을 정리하여 설명하기로 한다. FIG. 8 is a view for explaining a method of performing site validity analysis using the solar power generation facility site feasibility analysis system according to the present embodiment. Hereinafter, a method for performing site validity analysis using the photovoltaic facility site feasibility analysis system according to the present embodiment will be described with reference to FIG.

본 실시예에 따른 태양광발전시설 부지 타당성 분석 시스템은 사용자에 의해, 정보처리 서버(200)에 주소지에 대한 정보가 입력되면, 정보처리 서버(200)가 데이터베이스 서버(100)로부터 지리정보를 수신할 수 있다(S210). The site feasibility analysis system according to the present embodiment is a system for analyzing the site feasibility of a photovoltaic power generation facility where the information processing server 200 receives geographical information from the database server 100 (S210).

그리고 정보처리 서버(200)는, 데이터베이스 서버(100)로부터 지리정보가 수신되면, 수신된 주소지에 대한 지리정보를 기반으로 법률, 조례, 규칙 또는 훈령 등에 포함된 허가기준을 선별하고(S220), 선별된 법률, 조례, 규칙 또는 훈령 등에 포함된 허가기준에 입력된 주소지가 적합한 지역인지 여부를 판단할 수 있다.When the geographical information is received from the database server 100, the information processing server 200 selects a permission criterion based on the geographical information of the received address, You may determine whether the address entered in the permit criteria contained in the selected law, ordinance, rule, or order is a suitable area.

구체적으로, 정보처리 서버(200)는, 입력된 주소지에 따라 태양광발전시설에 관한 조례, 규칙 또는 훈령이 선별되면, 선별된 태양광발전시설에 관한 조례, 규칙 또는 훈령에 따라 입력된 주소지가, 입력된 주소지와 도로, 특정 시설물 또는 특정 지역과의 이격거리에 대한 허가기준에 적합한 지역인지 여부를 판단할 수 있으며(S230), 입력된 주소지와 도로, 특정 시설물 또는 특정 지역과의 이격거리에 대한 허가기준에 적합한 지역이 아닌 것으로 판단되면(S230-No), 입력된 주소지가 도로, 특정 시설물 또는 특정 지역과의 이격거리에 허가기준을 위반을 이유로 태양광발전시설 부지로 부적합한 사실을 알리는 제1 부적합 메시지를 정보처리 서버(200) 또는 별도로 마련되어 정보처리 서버(200)와 유선 또는 무선 네트워크와 연결된 사용자 단말을 통해 출력할 수 있다(S240). Specifically, when the regulations, rules or ordinances regarding the photovoltaic power generation facilities are selected in accordance with the input address, the information processing server 200 displays the address entered in accordance with the regulations, rules or ordinances of the selected photovoltaic power generation facilities , It is possible to judge whether or not it is an area that meets the permission criterion for the distance between the input address and the road, the specific facility or the specific area (S230). If the distance between the input address and the road, the specific facility, (S230-No), it is determined that the input address is not suitable for the photovoltaic power generation site due to the violation of the permission standard at the distance from the road, the specific facility or the specific area 1 non-conforming message is output through the information processing server 200 or separately from the information processing server 200 and the user terminal connected to the wired or wireless network It is (S240).

또한, 정보처리 서버(200)는, 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에서 규정하는 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것인지 여부를 판단하여(S250), 입력된 주소지가 불가지역 중 하나에 해당하는 것으로 판단되면(S250-Yes), 입력된 주소지가 (허가)불가지역에 해당함을 이유로 태양광발전시설 부지로 부적합한 사실을 알리는 제2 부적합 메시지가 정보처리 서버(200) 또는 별도로 마련되어 정보처리 서버(200)와 유선 또는 무선 네트워크와 연결된 사용자 단말을 통해 출력되도록 할 수 있다(S255).In addition, the information processing server 200 can notify the information processing server 200 that the address entered in the address book is in a conservation area, a development restriction area, a development activity permission area, a cultural property protection area, and an agriculture protection area, which are specified by laws and regulations on photovoltaic power generation facilities and selected bylaws, (S250). If it is determined that the input address corresponds to one of the disabled areas (S250-Yes), the input address corresponds to the unallowable area A second unsuitable message indicating that the photovoltaic power generation site is unsuitable may be output through the information processing server 200 or a user terminal connected to the information processing server 200 and the wired or wireless network separately ).

그리고 정보처리 서버(200)는, 입력된 주소지가 태양광발전시설에 관한 법률 및 선별된 조례, 규칙 또는 훈령에 따른 허가기준에 적합한 지역으로 판단되면, 입력된 주소지에 대한 개발가능성을 수치로 산출할 수 있다(S260). If the input address is judged to be an area suitable for the photovoltaic power generation facilities and the permit standards according to the selected regulations, rules or ordinances, the information processing server 200 calculates the development possibility for the input address (S260).

또한, 정보처리 서버(200)는, 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 입력된 주소지에 대한 태양광발전시설 설치경관의 시뮬레이션 명령이 요청되면, 입력된 주소지에 태양광발전시설 설치경관의 시뮬레이션을 수행할 수 있다(S270).After the development processing of the input address is computed, the information processing server 200 requests the input address of the photovoltaic generation facility Simulation of installation scenery can be performed (S270).

구체적으로, 정보처리 서버(200)는, 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 입력된 주소지에 대한 태양광발전시설 설치경관의 시뮬레이션 명령이 요청되면, 입력된 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보를 생성할 수 있으며, 태양광발전시설의 설치방향이 변경되어 시뮬레이션 명령이 재차 요청될 때마다, 태양광발전시설이 설치된 모습이 재연된 이미지정보를 갱신할 수 있다. Specifically, after the development possibility of the input address is calculated as a numerical value, when the simulation command of the photovoltaic facility installation landscape for the input address is requested, the information processing server 200 transmits the photovoltaic power generation The installed image of the installed facility can be reproduced, and the installed direction of the photovoltaic power generation facility is changed, so that whenever the simulation command is requested again, the installed image of the photovoltaic power generation facility can be renewed have.

또한, 정보처리 서버(200)는, 평균경사도와 전체면적 대비 음영면적의 비율 등을 고려하여 해당 주소지에 설치하고자 하는 태양광발전시설의 패널설치 방향에 따른 예상발전량을 개별적으로 산출할 수 있으며, 태양광발전시설의 설치방향이 변경되어 시뮬레이션 명령이 재차 요청되어, 태양광발전시설이 설치된 모습이 재연된 이미지정보가 갱신되면, 갱신된 이미지정보에 따라 예상발전량 정보를 갱신할 수 있다. Also, the information processing server 200 can individually calculate the estimated power generation amount according to the panel installation direction of the photovoltaic power generation facility to be installed at the addressee in consideration of the average slope, the ratio of the shade area to the total area, When the installation direction of the solar power generation facility is changed, a simulation command is requested again, and the reproduced image information of the installed state of the solar power generation facility is updated, the estimated generation amount information can be updated according to the updated image information.

그리고 정보처리 서버(200)는, 입력된 주소지에 태양광발전시설 설치경관의 시뮬레이션이 완료되면, 태양광발전시설의 경제성 분석을 수행할 수 있다. 구체적으로 정보처리 서버(200)는 입력된 주소지의 토지면적과, 토지가격, 태양광발전시설의 설비 타입, 패널 타입, 보증기간, 전력판매형태, 발전예상량, 효율저하율 등을 고려하여 해당 태양광발전시설의 경제성을 분석할 수 있다(S280). Then, the information processing server 200 can perform the economical analysis of the photovoltaic power generation facility when simulation of the scenery for installing the photovoltaic power generation facility is completed at the input address. Specifically, the information processing server 200 calculates the solar power of the photovoltaic power generation system in consideration of the land area of the input address, the land price, the type of equipment, the type of panel, the warranty period, the type of power sales, The economic efficiency of the power generation facility can be analyzed (S280).

첨언하면, 정보처리 서버(200)는, 태양광발전시설 부지의 타당성 분석 이외에 추가로 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부, 진입도로의 존재 여부 및 폭, 평균경사도, 전체면적 대비 음영면적의 비율 중 적어도 하나 이상의 선택조건에 대한 정보가 입력되면, 입력된 선택조건에 적합한 후보군을 선별하며, 선별된 후보군의 태양광발전시설의 설치가능면적 및 예상발전량을 산출하는 방식으로 태양광발전시설의 적정지역을 검색할 수 있다.Incidentally, in addition to the analysis of the feasibility of the site of the photovoltaic power generation facility, the information processing server 200 determines whether or not the permission standards conform to the laws, ordinances, rules or ordinances regarding the photovoltaic power generation facilities, , The average slope, and the ratio of the shaded area to the total area, the candidate group suitable for the inputted selection condition is selected, and the installable area and estimated power generation amount of the photovoltaic power generation facility of the selected candidate group The optimum area of the photovoltaic power generation facility can be searched.

이를 통해, 태양광발전시설을 설치하고자 하는 지역에 대한 정보를 직접 입력하거나 태양광발전시설을 설치하고자 하는 지역이 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 저촉되는지 여부를 직접 확인할 필요없이 태양광발전시설의 부지분석, 입지분석, 경제성분석 등을 수행하여 태양광발전에 대한 타당성을 평가하여 사용자에 의해 입력된 주소지에 관한 태양광발전 개발가능성을 수치로 산출할 수 있으며, 태양광발전시설이 설치된 모습이 재연하여 출력하거나 또는 태양광발전시설의 설치된 모습에 따른 예상발전량을 산출할 수 있다.This allows you to directly enter information about the area where you want to install the solar power generation facility or to directly check whether the area where you want to install the solar power generation facility is in conflict with laws, regulations, rules or ordinances The site analysis, the location analysis, and the economic analysis of the photovoltaic power generation facility are performed to evaluate the feasibility of the photovoltaic power generation, so that the possibility of the photovoltaic power generation related to the address inputted by the user can be calculated numerically, It is possible to reproduce the installed state of the power generation facility or to calculate the expected power generation amount depending on the installed state of the photovoltaic power generation facility.

이상 첨부된 도면을 참조하여 본 발명의 실시예를 설명하였지만, 본 발명의 기술적 사상을 효과적으로 설명하기 위한 특정의 실시예를 위주로 도시하고 설명한 것에 불과하다. 따라서, 본 발명은 상기한 실시예에만 한정되지는 않으며 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 이하의 청구범위에 기재된 발명의 기술적 사상의 요지를 벗어남이 없이 얼마든지 다양하게 변경 실시할 수 있을 것이다. 아울러, 본 발명의 범위는 상기의 상세한 설명보다는 후술하는 청구범위에 의하여 나타내어진다. 또한, 특허청구범위의 의미 및 범위 그리고 그 등가 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.While the embodiments of the present invention have been described with reference to the accompanying drawings, it is to be understood that the present invention is not limited by the specific embodiments for effectively explaining the technical idea of the present invention. Therefore, it is intended that the present invention covers the modifications and variations of this invention provided they come within the scope of the appended claims and their equivalents. You can do it. Further, the scope of the present invention is indicated by the following claims rather than the above detailed description. Also, all changes or modifications derived from the meaning and scope of the claims and their equivalents should be construed as being included within the scope of the present invention.

100 : 데이터베이스 서버 110 : 제1 통신부
120 : 제1 저장부 130 : 제1 제어부
200 : 정보처리 서버
210 : 제2 통신부 220 : 제2 저장부
230 : 제2 제어부 231 : 허가기준 판단모듈
232 : 이격거리 판단모듈 233 : 불가지역 판단모듈
234 : 개발가능성 산출모듈 235 : 예상발전량 산출모듈
236 : 시뮬레이션 수행모듈
237 : 태양광발전시설 후보지 검색모듈
238 : 경제성 분석모듈
100: database server 110: first communication unit
120: first storage unit 130: first control unit
200: Information processing server
210: second communication unit 220: second storage unit
230: second control unit 231: permission criterion determination module
232: separation distance determination module 233: impossible area determination module
234: Development possibility calculation module 235: Estimated power generation amount calculation module
236: Simulation module
237: Photovoltaic power plant candidate search module
238: Economic Analysis Module

Claims (12)

제1 통신부와 주소지에 대응되는 시설물의 대지면적 또는 특정지역의 토지면적이 포함되는 지리정보를 저장하는 제1 저장부가 마련되는 데이터베이스 서버; 및
상기 제1 통신부와 무선 또는 유선으로 연결되어, 주소지에 대한 정보가 입력되면, 상기 입력된 주소지에 대한 지리정보를 상기 데이터베이스 서버로부터 수신하는 제2 통신부와 상기 수신된 지리정보를 기반으로 태양광발전시설 부지의 경제적 타당성을 평가하고, 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부를 판단하여, 상기 입력된 주소지에 대한 개발가능성 또는 설치가능면적을 수치로 산출하는 제2 제어부가 마련되는 정보처리 서버;를 포함하고,
상기 제2 제어부는,
상기 입력된 주소지에 대한 지리정보가 수신되면, 상기 수신된 지리정보에 따라 태양광발전시설에 관한 조례, 규칙 또는 훈령을 선별하는 허가기준 판단모듈; 및
상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에 따른 허가기준에 적합한 지역인지 여부를 판단하여, 상기 입력된 주소지에 대한 개발가능성을 수치로 산출하는 개발가능성 산출모듈;을 포함하고,
상기 개발가능성은,
상기 입력된 주소지가 법률에 의해 제한되거나 불리한 지역인지 여부에 대한 제1 개발가능성, 상기 입력된 주소지의 진입도로에 대한 제2 개발가능성, 상기 입력된 주소지의 평균경사도에 대한 제3 개발가능성 및 상기 입력된 주소지의 음영면적에 대한 제4 개발가능성을 각각 산출하고, 상기 산출된 제1 내지 제4 개발가능성을 모두 곱하여 산출하며,
상기 허가기준 판단모듈은,
상기 입력된 주소지에 대한 지리정보가 수신되면, 상기 수신된 지리정보에 따라 상기 입력된 주소지가 속하는 지방행정구역의 조례, 규칙 또는 훈령을 선별하고,
상기 제2 제어부는,
상기 입력된 주소지가 속하는 지방행정구역의 조례, 규칙 또는 훈령이 선별되면, 상기 입력된 주소지가 상기 선별된 조례, 규칙 또는 훈령에 따른 도로, 특정 시설물 또는 특정 지역과의 이격거리에 대한 허가기준에 적합한 지역인지 판단하는 이격거리 판단모듈; 및
상기 입력된 주소지가 상기 허가기준에 적합한 지역인 것으로 판단되면, 상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에서 규정하는 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것인지 여부를 판단하여, 상기 입력된 주소지가 상기 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하는 것으로 판단되면, 상기 입력된 주소지가 태양광발전시설 부지로 부적합한 사실을 알리는 메시지가 출력되도록 하는 불가지역 판단모듈;을 더 포함하고,
상기 개발가능성 산출모듈은,
상기 입력된 주소지가 상기 보존지구, 개발제한구역, 개발행위허가제한지역, 문화재보호구역 및 농업진흥지역/구역 중 어느 하나에 해당하지 않는 것으로 판단되면, 상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에서 규정하는 제1 검토지역인 관리지역, 자연환경보전지역, 관광지, 백두대간보호지역, 습지보호지역, 산업보호구역 및 야생동식물보호구역 중 적어도 하나에 해당하는 경우, 상기 입력된 주소지가 상기 제1 검토지역의 전체항목 중 해당하는 제1 해당항목의 수를 산출하고,
상기 입력된 주소지가 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에서 규정하는 제2 검토지역인 산사태 위험지도 내 1등급 지역, 재해위험지구, 급경사재해예방지역 중 적어도 하나에 해당하는 경우, 상기 입력된 주소지가 상기 제2 검토지역의 전체항목 중 해당하는 제2 해당항목의 수를 산출하며,
상기 입력된 주소지에 대한 제1 개발가능성은,
제1 개발가능성=(1-(제1 해당항목의 수/제1 전체항목의 수))×(1-(제2 해당항목의 수/제2 전체항목의 수))×100으로 산출되도록 하고,
상기 개발가능성 산출모듈은,
상기 제1 개발가능성이 산출되면, 상기 태양광발전시설에 관한 법률 및 상기 선별된 조례, 규칙 또는 훈령에 따른 진입도로에 대한 허가기준에 적합한 것인지 여부를 판단하여, 상기 입력된 주소지에 마련된 진입도로의 폭에 따라 제2 개발가능성을 수치로 산출하되,
상기 제2 개발가능성을 산출하는 경우, 상기 진입도로의 폭이 4m 이상이면, 상기 제2 개발가능성을 100%로 산출하고, 상기 진입도로의 폭이 3.5m 이상 4m 미만이면, 상기 제2 개발가능성을 90%로 산출하며, 상기 진입도로의 폭이 3.0m 이상 3.5m 미만이면, 상기 제2 개발가능성을 80%로 산출하며, 상기 진입도로의 폭이 2.5m 이상 3m 미만이면, 상기 제2 개발가능성을 70%로 산출하며, 상기 진입도로의 폭이 2.0m 이상 2.5m 미만이면, 상기 제2 개발가능성을 60%로 산출하며, 상기 진입도로가 마련되지 않는 경우, 상기 제2 개발가능성을 50%로 산출하고,
상기 개발가능성 산출모듈은,
상기 제2 개발가능성이 산출되면, 상기 입력된 주소지에 대한 지리정보에 포함된 상기 입력된 주소지의 평균경사도에 따라 제3 개발가능성을 수치로 산출하되,
상기 입력된 주소지에 대한 지리정보에 평균경사도에 대한 정보가 포함되지 않은 경우, 상기 입력된 주소지의 전체면적 대비 해당 경사도 구간의 면적을 곱하여 평균경사도를 산출하여 제3 개발가능성을 수치로 산출하며,
상기 제3 개발가능성을 산출하는 경우, 상기 입력된 주소지의 평균경사도가 5° 미만이면, 상기 제3 개발가능성을 100%로 산출하고, 상기 입력된 주소지의 평균경사도가 5° 이상 10° 미만이면, 상기 제3 개발가능성을 90%로 산출하고, 상기 입력된 주소지의 평균경사도가 10° 이상 15° 미만이면, 상기 제3 개발가능성을 80%로 산출하고, 상기 입력된 주소지의 평균경사도가 15° 이상 20° 미만이면, 상기 제3 개발가능성을 70%로 산출하고, 상기 입력된 주소지의 평균경사도가 20° 이상 25° 이하이면, 상기 제3 개발가능성을 60%로 산출하고, 상기 입력된 주소지의 평균경사도가 25°를 초과하면, 상기 제3 개발가능성을 50%로 산출하고,
상기 개발가능성 산출모듈은,
상기 제3 개발가능성이 산출되면, 상기 입력된 주소지에 대한 지리정보에 포함된 상기 입력된 주소지의 전체면적 대비 음영면적의 비율에 따라 제4 개발가능성을 수치로 산출하되,
상기 제4 개발가능성을 산출하는 경우, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 10% 미만이면, 상기 제4 개발가능성을 100%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 10% 이상 15% 미만이면, 상기 제4 개발가능성을 90%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 15% 이상 20% 미만이면, 상기 제4 개발가능성을 80%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 20% 이상 25% 미만이면, 상기 제4 개발가능성을 70%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 25% 이상 30% 미만이면, 상기 제4 개발가능성을 60%로 산출하고, 상기 입력된 주소지의 전체면적 대비 음영면적의 비율이 30% 이상이면, 상기 제4 개발가능성을 50%로 산출하고,
상기 정보처리 서버는,
상기 입력된 주소지에 대한 개발가능성이 수치로 산출된 이후, 상기 입력된 주소지에 대한 태양광발전시설 설치경관의 시뮬레이션 명령이 요청되면, 상기 입력된 주소지에 태양광발전시설이 설치된 모습이 재연된 이미지정보가 생성되도록 하는 시뮬레이션 수행모듈;
상기 입력된 주소지에 태양광발전시설이 설치되는 경우의 예상발전량 정보가 산출되도록 하는 예상발전량 산출모듈; 및
상기 예상발전량 정보가 산출되면, 상기 산출된 발전예상량 정보와 상기 입력된 주소지에 대한 지리정보에 포함된 입력된 주소지의 토지면적과, 토지가격, 상기 입력된 주소지에 대한 태양광발전시설의 설비 타입, 패널 타입, 보증기간, 전력판매형태 및 효율저하율이 고려되어 상기 입력된 주소지에 대한 경제성 분석을 수행하는 경제성 분석모듈;을 더 포함하고,
상기 예상발전량 산출모듈은,
상기 태양광발전시설의 설치방향이 변경되어 시뮬레이션 명령이 재차 요청될 때마다, 상기 태양광발전시설의 설치방향이 변경된 모습이 재연된 이미지정보에 대응되는 예상발전량 정보가 산출되도록 함으로써, 상기 태양광발전시설이 설치된 모습이 재연된 이미지정보 및 예상발전량 정보가 갱신되도록 하는 것을 특징으로 하는 태양광발전시설 부지 타당성 분석 시스템.
A database server having a first storage unit for storing geographical information including a first communication unit and a land area of a facility corresponding to the addressee or a land area of a specific area; And
A second communication unit connected to the first communication unit through a wireless or wired connection and receiving information on the addressee from the database server, and a second communication unit for receiving geographical information on the input addressee from the database server, Assess the economic feasibility of the facility site, determine whether the permission criteria conform to the laws, ordinances, rules or ordinances related to photovoltaic power generation facilities, and calculate the development potential or the installable area of the addressee And an information processing server provided with a second control unit,
Wherein the second control unit comprises:
A permission criterion module for selecting a regulation, rule, or instruction regarding the photovoltaic power generation facility according to the received geographical information when the geographical information on the input address is received; And
A development possibility for determining whether the input address is an area that meets the PV standard for the photovoltaic power generation facility and the permission standard according to the selected regulations, rules or ordinances, and numerically calculating the development possibility for the input address An output module,
The development potential,
A third development possibility with respect to the first development possibility as to whether the input address is limited by a law or an adverse area, a second development possibility with respect to an entry road of the input address, a third development possibility with respect to an average inclination of the input address, Calculating a fourth development possibility for the shaded area of the input address area, multiplying the calculated first to fourth development possibilities,
The permission criterion determination module includes:
Rules, or instructions of the local administrative district to which the input address belongs, according to the received geographical information,
Wherein the second control unit comprises:
When the regulations, rules or ordinances of the local administrative districts to which the input address belongs are selected, the input address is set to a permission standard for the distances from the road, the specific facility or the specific area in accordance with the selected ordinance, A separation distance judgment module for judging whether the area is an appropriate area; And
If it is determined that the input address is an area suitable for the permission criterion, the inputted address may be a conservation area, a development restricted area, a development activity The designated area is judged as belonging to any one of the permission area, the permission area, the cultural property protection area and the agricultural promotion area / area, And an unreachable area determination module for outputting a message informing that the input address is not suitable as a site of the photovoltaic power generation facility,
Wherein the development possibility calculation module comprises:
If it is determined that the input address does not correspond to any one of the conservation area, the development restriction zone, the development activity permission zone, the cultural property protection zone, and the agricultural promotion zone / zone, At least one of the first review area, the protected area, the natural environment preservation area, the tourist area, the Baekdudaegan protection area, the wetland protection area, the industrial protection area and the wildlife protection area, The input address field may calculate the number of corresponding first corresponding items among all the items of the first review area,
The input address is inputted to at least one of the first-level region, the hazard risk region, and the steep slope prevention area in the landslide hazard map, which is the second review area defined by the Act on Photovoltaic Power Facilities and the selected bylaws, rules or ordinances The input address field may calculate the number of corresponding second corresponding items among all the items of the second review area,
The first development possibility for the input address is,
First development possibility = (1- (number of first corresponding items / number of first total items)) x (1- (number of second corresponding items / number of second total items)) 100 ,
Wherein the development possibility calculation module comprises:
When the first development possibility is calculated, it is judged whether the solar power generation facility is suitable for the solar power generation facility and the permission standard for the entrance road according to the selected regulations, rules or ordinances, and the entrance road The second development possibility is calculated numerically,
The second development possibility is calculated to be 100%, and if the width of the entry road is 3.5 m or more and less than 4 m, if the width of the entry road is 4 m or more, Is 90%. If the width of the entry road is 3.0 m or more and 3.5 m or less, the second development possibility is calculated as 80%. If the width of the entry road is 2.5 m or more and less than 3 m, If the width of the entry road is less than 2.5 m, the second development possibility is calculated to be 60%. If the entry road is not provided, the second development possibility is calculated to be 50 %,
Wherein the development possibility calculation module comprises:
If the second development possibility is calculated, the third development possibility is numerically calculated according to the average inclination of the input address included in the geographical information about the input address,
Wherein if the geographical information of the input address does not include information on the average gradient, the third gradient is calculated by multiplying an area of the gradient field by the total area of the input address field to calculate an average gradient,
When the third development possibility is calculated, the third development possibility is calculated to be 100% when the input slope has an average slope less than 5 degrees, and if the average slope of the input address is less than 5 degrees and less than 10 , The third development possibility is calculated to be 90%, and if the average inclination of the input address is not less than 10 and less than 15, the third development possibility is calculated to be 80%, and the average inclination of the input address is 15 The third development possibility is calculated to be 70%, and if the average inclination of the input address is not less than 20 and not more than 25, the third development possibility is calculated to be 60% If the average inclination of the address exceeds 25 DEG, the third development possibility is calculated as 50%
Wherein the development possibility calculation module comprises:
If the third development possibility is calculated, calculating the fourth development possibility as a numerical value according to a ratio of a shade area to an entire area of the input address included in the geographic information about the input addressee,
Calculating the fourth development possibility as 100% if the ratio of the shade area to the total area of the input address is less than 10%, and calculating the shade area The fourth development possibility is calculated as 90%, and if the ratio of the shade area to the total area of the input address is less than 15% and less than 20%, the fourth development possibility The fourth development possibility is calculated as 70%, and if the ratio of the shade area to the total area of the input address is less than 25%, the fourth development possibility is calculated as 70% The fourth development possibility is calculated to be 60% when the ratio is not less than 25% and less than 30%, and the fourth development possibility is calculated to be 50% when the ratio of the shade area to the total area of the input address is not less than 30% and,
The information processing server,
When a simulation command of a photovoltaic power generation facility installation landscape for the input address is requested, the photovoltaic power generation facility installed in the input address is reproduced A simulation execution module for generating information;
An estimated power generation amount calculation module for calculating estimated power generation amount information when the photovoltaic power generation facility is installed at the input address; And
If the predicted power generation amount information is calculated, the calculated power generation expected amount information, the land area of the input address included in the geographical information on the input address, the land price, the facility type of the photovoltaic power generation facility And an economics analysis module for performing economics analysis on the input address by considering the panel type, the warranty period, the type of power sale, and the rate of efficiency decrease,
The expected power generation amount calculating module calculates,
The estimated power generation amount information corresponding to the reproduced image information is calculated every time the installation direction of the photovoltaic power generation facility is changed so that the installation direction of the photovoltaic power generation facility is changed every time a simulation command is requested again, And the renewed image information and the estimated generation amount information are renewed when the power generation facility is installed.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 정보처리 서버는,
상기 태양광발전시설에 관한 법률, 조례, 규칙 또는 훈령에 따른 허가기준의 적합 여부, 진입도로의 존재 여부 및 폭, 평균경사도, 전체면적 대비 음영면적의 비율 중 적어도 하나 이상의 선택조건에 대한 정보가 입력되면, 상기 입력된 선택조건에 적합한 후보군을 선별하며, 상기 선별된 후보군의 태양광발전시설의 설치가능면적 및 예상발전량을 산출하는 것을 특징으로 하는 태양광발전시설 부지 타당성 분석 시스템.
The method according to claim 1,
The information processing server,
Information on at least one of a selection condition of compliance with the permission standards in accordance with laws, regulations, rules or ordinances regarding the above solar power generation facility, the presence and width of entry roads, the average slope, and the ratio of shaded area to total area Wherein the candidate area is selected based on the input selection condition and the allowable area of the photovoltaic power generation facility of the selected candidate group and the expected power generation amount are calculated.
KR1020180038950A 2018-04-04 2018-04-04 System for site feasibility analysis of solar energy generation facility KR101893340B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180038950A KR101893340B1 (en) 2018-04-04 2018-04-04 System for site feasibility analysis of solar energy generation facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180038950A KR101893340B1 (en) 2018-04-04 2018-04-04 System for site feasibility analysis of solar energy generation facility

Publications (1)

Publication Number Publication Date
KR101893340B1 true KR101893340B1 (en) 2018-09-04

Family

ID=63598284

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180038950A KR101893340B1 (en) 2018-04-04 2018-04-04 System for site feasibility analysis of solar energy generation facility

Country Status (1)

Country Link
KR (1) KR101893340B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101965191B1 (en) 2018-11-02 2019-04-05 에너지코리아 주식회사 System for automatic placement simulation of solar panels using geographic information
KR102059296B1 (en) * 2019-06-18 2020-02-20 최승기 Analyzing method and system for behavior limitation of land development
KR20200065879A (en) * 2018-11-30 2020-06-09 신나라에너지 주식회사 System for determining whether a site is suitable for solar energy generation facility
KR102511931B1 (en) * 2022-11-15 2023-03-20 이온어스(주) Method for solar power installation and management
CN117495137A (en) * 2023-11-14 2024-02-02 东北大学 Photovoltaic equipment loading prediction method based on big data technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101269587B1 (en) * 2012-12-27 2013-06-05 권오현 Economic analysis and intermediation system for pv-system based on geographic information system
KR101663369B1 (en) 2014-08-20 2016-10-07 한국전력공사 Apparatus and method for checking economics of sunlight power station
KR101733671B1 (en) * 2015-10-30 2017-05-08 장영상 System and Method for Solar Power Online Design and Licensing Document

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101269587B1 (en) * 2012-12-27 2013-06-05 권오현 Economic analysis and intermediation system for pv-system based on geographic information system
KR101663369B1 (en) 2014-08-20 2016-10-07 한국전력공사 Apparatus and method for checking economics of sunlight power station
KR101733671B1 (en) * 2015-10-30 2017-05-08 장영상 System and Method for Solar Power Online Design and Licensing Document

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
비특허문헌1* *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101965191B1 (en) 2018-11-02 2019-04-05 에너지코리아 주식회사 System for automatic placement simulation of solar panels using geographic information
KR20200065879A (en) * 2018-11-30 2020-06-09 신나라에너지 주식회사 System for determining whether a site is suitable for solar energy generation facility
KR102317261B1 (en) * 2018-11-30 2021-10-27 신나라에너지 주식회사 System for determining whether a site is suitable for solar energy generation facility
KR102059296B1 (en) * 2019-06-18 2020-02-20 최승기 Analyzing method and system for behavior limitation of land development
KR102511931B1 (en) * 2022-11-15 2023-03-20 이온어스(주) Method for solar power installation and management
CN117495137A (en) * 2023-11-14 2024-02-02 东北大学 Photovoltaic equipment loading prediction method based on big data technology
CN117495137B (en) * 2023-11-14 2024-05-10 东北大学 Photovoltaic equipment loading prediction method based on big data technology

Similar Documents

Publication Publication Date Title
KR101893340B1 (en) System for site feasibility analysis of solar energy generation facility
KR101269587B1 (en) Economic analysis and intermediation system for pv-system based on geographic information system
AU2020356806A1 (en) Historical city protection and development cooperative control scheme aided design system
Ramírez-Rosado et al. Promotion of new wind farms based on a decision support system
Atkinson et al. Implementation of quantitative bushfire risk analysis in a GIS environment
Değirmenci et al. MCDM analysis of wind energy in Turkey: decision making based on environmental impact
Saint-Drenan et al. An approach for the estimation of the aggregated photovoltaic power generated in several European countries from meteorological data
Bles et al. Climate change risk assessments and adaptation for roads–results of the ROADAPT Project
Ahmadi Sani et al. Integrated use of GIS, remote sensing and multi-criteria decision analysis to assess ecological land suitability in multi-functional forestry
KR20210084184A (en) Planting location analysis device and method
Mel'kumov et al. Modelling of structure of engineering networks in territorial planning of the city
Lumbreras et al. Design of district heating networks in built environments using GIS: A case study in Vitoria-Gasteiz, Spain
Alaei Moghadam et al. Simulating urban growth in a megalopolitan area using a patch‐based cellular automata
Freitag et al. Dealing with established reserve networks and incomplete distribution data sets in conservation planning
Heyns et al. Decision support for the selection of optimal tower site locations for early‐warning wildfire detection systems in South Africa
Belda et al. Reviewing challenges and limitations of energy modelling software in the assessment of PEDs using case studies
Havrylenko et al. Geoinformation support for urban green space planning in the conditions of climate change (by the case of Kyiv)
KR102317261B1 (en) System for determining whether a site is suitable for solar energy generation facility
Kumar et al. GIS-based locational evaluation of infrastructure facilities in hilly regions: a case study of an institute campus
Mazzeo et al. Design of an air-quality surveillance system for buenos aires city integrated by a NO x monitoring network and atmospheric dispersion models
Prato et al. An integrated conceptual framework for adapting forest management practices to alternative futures
Marshall et al. Strategic routeing and environmental impact assessment for overhead electrical transmission lines
Das et al. GIS based multi-criteria land suitability assessment for future urban development in the Country Park peripheries of Hong Kong
Ramandi et al. Possess of locating the elementary schools using combined FAHP-Fuzzy logic in the GIS
Manzke et al. The URBIS project: identification and characterization of potential urban development areas as a web-based service

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
R401 Registration of restoration