KR101881351B1 - System And method for reviewing the serviceability of concrete track at railway bridge end - Google Patents

System And method for reviewing the serviceability of concrete track at railway bridge end Download PDF

Info

Publication number
KR101881351B1
KR101881351B1 KR1020170137314A KR20170137314A KR101881351B1 KR 101881351 B1 KR101881351 B1 KR 101881351B1 KR 1020170137314 A KR1020170137314 A KR 1020170137314A KR 20170137314 A KR20170137314 A KR 20170137314A KR 101881351 B1 KR101881351 B1 KR 101881351B1
Authority
KR
South Korea
Prior art keywords
bridge
coupler
load
value
physical properties
Prior art date
Application number
KR1020170137314A
Other languages
Korean (ko)
Inventor
황희석
성덕룡
장성규
김두기
Original Assignee
주식회사 글로텍
대원대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 글로텍, 대원대학교 산학협력단 filed Critical 주식회사 글로텍
Priority to KR1020170137314A priority Critical patent/KR101881351B1/en
Application granted granted Critical
Publication of KR101881351B1 publication Critical patent/KR101881351B1/en

Links

Classifications

    • G06F17/5004
    • G06F2217/16

Abstract

The present invention relates to a system and a method for calculating usability of a concrete track at an end part of a railway bridge, which comprises a step in which a calculation unit receives physical properties and specification of the bridge and the rail, physical properties of a coupler, and an interval value of the coupler from an input unit; a step in which the calculation unit uses the physical properties and specification of the bridge and the rail, the physical properties of the coupler, and the interval value of the coupler received to calculate force imposed on the coupler, thereby calculating a unit rotation amount, unit displacement and a vehicle wheel load; a step in which the calculation unit calculates rotation of the end part caused by long-term sagging of a bridge deck (creep and drying shrinkage), a static operating load, and a dynamic operating load; a step of applying a partial safety coefficient to the calculated values of the static load and the dynamic load to calculate a maximum value at each point; and a step of adding the combination value of the dynamic loads to a static load combination value, with which the static load is combined, to compare the resulting value with an allowable reference value and then review upward force. Additionally, a format of a bridge, arrangement of spans and the like are reviewed in planning and designing a railway bridge in order to secure usability of a concrete track at the end part of the railway bridge during interaction of a railway structure in which the concrete track is installed.
KR1020170137314A 2017-10-23 2017-10-23 System And method for reviewing the serviceability of concrete track at railway bridge end KR101881351B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170137314A KR101881351B1 (en) 2017-10-23 2017-10-23 System And method for reviewing the serviceability of concrete track at railway bridge end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170137314A KR101881351B1 (en) 2017-10-23 2017-10-23 System And method for reviewing the serviceability of concrete track at railway bridge end

Publications (1)

Publication Number Publication Date
KR101881351B1 true KR101881351B1 (en) 2018-07-25

Family

ID=63058732

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170137314A KR101881351B1 (en) 2017-10-23 2017-10-23 System And method for reviewing the serviceability of concrete track at railway bridge end

Country Status (1)

Country Link
KR (1) KR101881351B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113609565A (en) * 2021-08-16 2021-11-05 中国铁道科学研究院集团有限公司 Acceptance method and device for static long-wave irregularity of railway bridge track
CN117435852A (en) * 2023-12-20 2024-01-23 成都大学 Method for evaluating quality of output signals of bridge of measuring wheel set of railway vehicle

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101338770B1 (en) * 2012-06-11 2013-12-06 현대건설주식회사 Method for designing structural system considering nonlinear behavior
KR101589977B1 (en) * 2015-03-10 2016-01-29 한국철도기술연구원 Measuring Method and Apparatus of Train Running-Stopping Load regarding Girder of Bridge
KR20170024651A (en) * 2015-08-25 2017-03-08 동우기술(주) Automatic rail path creative apparatus for train simulating drive and automatic rail path creative method and storage medium to store automatic rail path creative program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101338770B1 (en) * 2012-06-11 2013-12-06 현대건설주식회사 Method for designing structural system considering nonlinear behavior
KR101589977B1 (en) * 2015-03-10 2016-01-29 한국철도기술연구원 Measuring Method and Apparatus of Train Running-Stopping Load regarding Girder of Bridge
KR20170024651A (en) * 2015-08-25 2017-03-08 동우기술(주) Automatic rail path creative apparatus for train simulating drive and automatic rail path creative method and storage medium to store automatic rail path creative program

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"철도교량 단부의 레일지지점 간격 변화에 따른 콘크리트궤도의 상향력 평가에 관한 연구", 서울과학기술대학교 철도전문대학원 학위논문, 2014년 08월* *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113609565A (en) * 2021-08-16 2021-11-05 中国铁道科学研究院集团有限公司 Acceptance method and device for static long-wave irregularity of railway bridge track
CN113609565B (en) * 2021-08-16 2024-04-16 中国铁道科学研究院集团有限公司 Acceptance method and device for static long wave irregularity of railway bridge track
CN117435852A (en) * 2023-12-20 2024-01-23 成都大学 Method for evaluating quality of output signals of bridge of measuring wheel set of railway vehicle
CN117435852B (en) * 2023-12-20 2024-03-29 成都大学 Method for evaluating quality of output signals of bridge of measuring wheel set of railway vehicle

Similar Documents

Publication Publication Date Title
KR101881351B1 (en) System And method for reviewing the serviceability of concrete track at railway bridge end
Yan et al. Beam-track interaction of high-speed railway bridge with ballast track
Wallin et al. Strengthening of a steel railway bridge and its impact on the dynamic response to passing trains
WO2009146960A3 (en) Method and device for determining loads on bridges
Kang et al. Experimental and numerical investigations of rail behaviour under compressive force on ballastless track systems
Adam et al. Dynamic effect of high-speed trains on simple bridge structures
Yan et al. Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks
Shoghijavan et al. Structural robustness of long-span cable-supported bridges in a cable-loss scenario
Strauss et al. Monitoring‐based performance assessment of rail‐bridge interaction based on structural reliability
Dar et al. Experimental investigations on the structural behaviour of a distressed bridge
Stamatopoulos Fatigue assessment and strengthening measures to upgrade a steel railway bridge
Song et al. Dynamic impact analysis of double-tower cable-stayed maglev bridges using a simple model
Liu et al. Prediction of vibration and noise from steel/composite bridges based on receptance and statistical energy analysis
Srinivas et al. Health assessment of a plate girder railway bridge under increased axle loads
Alencar et al. Fatigue assessment of approach viaducts of the new Sado River railway crossing
Pelayo et al. Failure and repair analysis of a runway beam: Influence of the standard applied to lifetime prediction
Dyachenko et al. Regulation of the dynamic live load factor for calculation of bridge structures on high-speed railway mainlines
Pandey Factors Affecting Bond between New and Old Concrete. Paper by Pedro Miguel Duarte Santos and Eduardo Nuno Brito Santos Julio
CN204125846U (en) Fatigue Consolidation structure is out of shape outward based on the Steel Bridge Deck pasting angle steel
원석최 et al. Behavior analysis of fast hardening track on the bridge
Yun et al. Study on response according to longitudinal track-bridge interaction analysis methods with respect to various type of bridge
Yoon et al. Computation of impact factor of high-speed railway bridge by KTX train riding test
Samanipour et al. Congestion effect on maximum dynamic stresses of bridges
杨新文 et al. Influence of curve superelevation of heavy haul railway on rail wear based on revised wheel/rail non-hertz contact
Sundaram et al. Condition assessment of a prestressed concrete girder and slab bridge for increased axle loadings

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant