KR101827210B1 - A spread anchor bolt - Google Patents

A spread anchor bolt Download PDF

Info

Publication number
KR101827210B1
KR101827210B1 KR1020170068038A KR20170068038A KR101827210B1 KR 101827210 B1 KR101827210 B1 KR 101827210B1 KR 1020170068038 A KR1020170068038 A KR 1020170068038A KR 20170068038 A KR20170068038 A KR 20170068038A KR 101827210 B1 KR101827210 B1 KR 101827210B1
Authority
KR
South Korea
Prior art keywords
sleeve
anchor bolt
hole
delete delete
expanded
Prior art date
Application number
KR1020170068038A
Other languages
Korean (ko)
Inventor
신은경
Original Assignee
신은경
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신은경 filed Critical 신은경
Application granted granted Critical
Publication of KR101827210B1 publication Critical patent/KR101827210B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0846Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements engaging holes or grooves in the side faces of the covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a spread anchor bolt. More specifically, according to the present invention, after a sleeve (2) fitted into a tip of a pipe expansion portion (1a) of a spread anchor bolt (100) is inserted into a hole (w1) formed in a concrete wall (w), the pipe expansion portion (1a) is inserted and fixed into the sleeve (2) when the sleeve (2) is lightly hit by a hammer, etc., so the entire inner and outer diameter surfaces of the sleeve (2) are tightly fixed to the hole (w1) of the concrete wall (w) and the pipe expansion portion (1a), and thus, the spread anchor bolt (100) can be installed very quickly, easily and firmly. Therefore, according to the present invention, the spread anchor bolt (100) is firmly and stably installed without shaking, thereby maximizing reliability.

Description

스프레드 앵커블트{A spread anchor bolt}A spread anchor bolt

본 발명은 스프레드 앵커볼트에 관한 것으로, 특히 콘크리트 벽에 천공한 구멍에 앵커볼트를 삽입 장착하였을 때, 축봉 선단에 구비된 확관부가 슬리브 내경면 전체에 고르게 또 안정적으로 밀착 설치될 수 있게 구성함으로서, 콘크리트 벽면 또는 바닥면이나 천정면에 설치하였을 때 축봉의 흔들림이나 요동이 전혀 없이 매우 견고하게 고정 설치될 수 있게 하고, 더불어 매우 신속 간편하게 설치될 수 있게 하기 위한 것이다.The present invention relates to a spread anchor bolt, particularly, when an anchor bolt is inserted into a hole formed in a concrete wall, an expansion portion provided at the end of the shaft can be uniformly and stably installed on the entire inner circumferential surface of the sleeve A concrete wall, a bottom surface, or a front surface of the ceiling so that the shaft can be firmly and securely installed without swinging or rocking at all, and can be installed very quickly and easily.

상기 본체의 길이를 더 길게 연장할 수 있게 하기 위해 후단부에 나사봉을 가진 연장봉을 더 구비함을 특징으로 한다.And an extension rod having a threaded rod at the rear end thereof to further extend the length of the main body.

또, 상기 스프레드 앵커볼트의 버팀판 표면에 고무나 연질합성수지로 된 미끄럼방지패드를 부착하거나 또는 고무나 합성수지재로 후로킹(Flocking)하거나, 또는 표면을 엠보싱 처리하여 ㄴ형 석재앵글 장착시 미끄럼이 예방될 수 있게 함으로서 안정성과 신뢰성을 극대화시킬 수 있게 하기 위한 것이다.In addition, a slip prevention pad made of rubber or soft synthetic resin is attached to the surface of the sprue plate of the spread anchor bolt, or the sponge is flocked with rubber or synthetic resin, or the surface is embossed to prevent slip when the angle is installed. In order to maximize stability and reliability.

또, 상기 스프레드 앵커볼트를 구성하는 축봉을 확관부만으로 이루어지도록 구성하되, 후미 중앙부에 암나사구멍을 형성하고, 상기 암나사 구멍에 볼트를 체결할 수도 있게 하여 설치시 안전성과 더불어 외관이 깔끔하게 유지될 수 있게 하기 위한 것이다.Further, it is possible to form the spread anchor bolt by only the expanding portion, and by forming a female screw hole in the rear center portion and bolts to be fastened to the female screw hole, it is possible to maintain the appearance in addition to safety during installation .

상기 스프레드 앵커볼트를 구성하는 축봉을 확관부만으로 구성하되, 상기 확관부 외주면에 수나사를 형성하고, 머리부에는 십자홈을 형성하여 슬리브에 확관부를 때려 박은 뒤 필요에 따라 드라이버로서 확관부를 돌려 돌출길이를 조절할 수 있게 하기 위한 것이다.Wherein the shaft anchor bolt is formed by only an expanding portion, a male screw is formed on the outer periphery of the expanding portion, a cross groove is formed in the head portion, the expanding portion is slid into the sleeve, So that the protruding length can be adjusted.

또한, 상기 확관부 만으로 이루어진 축봉 후미에 버팀판을 일체로 형성하고, 상기 버팀판 표면에 고무나 연질합성수지 패드를 부착구성하거나, 고무나 연질합성 수지로 후로킹하거나, 또는 엠보싱처리하여 구성함으로서 ㄴ형 석재앵글이 미끄러짐 없이 안정적으로 설치될 수 있게 하기 위한 것이다.Further, it is also possible to form the shaft trailing sheathing plate made up only of the above-mentioned expansion portion integrally, and to attach the rubber or soft synthetic resin pad to the surface of the sheave plate, or to construct the rubber sheeting with a rubber, soft synthetic resin, or by embossing, So that it can be stably installed without slippage.

또한, 상기 스프레드 앵커볼트의 버팀판의 하부를 길게 연장 형성하여 이 곳에 버팀봉을 장착하거나, 또는 버팀판에 별도 구성의 버팀조절대를 장착함으로서 ㄴ형 석재앵글 및 석재패널의 수평조절과 더불어 석재패널의 하중을 안정적으로 받쳐 지지할 수 있게 하기 위한 것이다.In addition, the bottom of the spread anchor bolt of the spread anchor bolt may be elongated and a strut rod may be mounted on the strut anchor bolt, or a strut adjusting bed may be mounted on the strut board to adjust the angle of the stonewall stone and the level of the stone panel, So that it is possible to stably support the load.

주지된 바와 같이 앵커볼트의 사전적 의미는, 구조물과 기초부분을 연결하기 위해 사용하는 볼트로서 인장력이 작용할 때도 뽑혀나갈 수 없게 하기 위해 볼트 일단부가 굽어져 있거나, 또는 끝단이 테이퍼진 확관뭉치를 구비하여 벽면이나 바닥면 등에 설치 후 앵커볼트 끝에 너트를 체결하였을 때 확관뭉치가 외주면에 다수의 슬릿홈을 가진 슬리브 끝을 강제로 벌리도록 함으로서 앵커볼트가 콘크리트 기초 또는 벽면에 형성한 구멍 속에서 빠지지 않도록 구성된 볼트를 말한다.As is well known, an anchor bolt is a bolt used for connecting a structure and a base portion. In order to prevent the bolt from being pulled out even when a tensile force acts, the anchor bolt may be bent at one end or may have a bundle of tapered ends When the nut is fastened to the end of the anchor bolt after it is installed on the wall or the floor surface, the expansion bundle is forced to open the end of the sleeve having a plurality of slit grooves on the outer circumferential surface so that the anchor bolt does not fall out from the hole formed in the concrete foundation or wall surface Refers to a configured bolt.

한편, 건물의 내외벽면에 석재패널을 설치 시공할 때 사용되는 종래 석재패널 장착용 앵커볼트를 살펴보면, 선단부에 외주면이 테이퍼진 확관뭉치가 구비됨과 동시에 후단부에 나사봉이 구비된 축봉과, 상기 축봉에 삽입되어 확관뭉치에 의해 강제로 벌어질 수 있게 하기 위한 3~4개의 슬릿홈 및 ㄴ형 석재앵글이 견고하게 밀착 고정되게 한 버팀판이 형성된 슬리브와, 상기 축봉 끝에 구비된 나사봉에 끼워 버팀판에 밀착시킨 다음 너트로 체결 고정되게 한 ㄴ형 석재앵글, 상기 ㄴ형 석재앵글 선단에 연결 장착되어 석재패널의 위치조절을 유도하는 조정판으로 구성되며, 상기 ㄴ형 석재앵글과 조정판은 볼트 및 너트로 체결 고정되고, 조정판의 선단에는 석재패널을 지지 고정하기 위한 핀이 구비되어 있다.The present invention relates to an anchor bolt for mounting a stone panel on an inner wall and an outer wall of a building, A sleeve having three to four slit grooves and a c-type stone angle for firmly fixing the slit grooves and for tightening the slit grooves to allow the slit grooves to be opened forcibly by the expanding bundle, Type stone angle angle and a control plate for connecting and fixing the stone panel to the end of the angle type bangle, the angle of the b-type stone and the adjustment plate being fastened and fixed by bolts and nuts, The front end of the adjustment plate is provided with a pin for supporting and fixing the stone panel.

그러나 위와 같은 종래의 석재패널 장착용 앵커볼트는 다음과 같은 문제점으로 인해 안전성과 시공성, 그리고 이로 인한 신뢰성이 크게 떨어질 수밖에 없었던 것이다.However, the above-mentioned conventional anchor bolts for mounting a stone panel were inevitably deteriorated in safety, workability, and reliability due to the following problems.

즉, 상기한 종래의 앵커볼트로 석재패널을 시공 장착하고자 할 때는, 먼저 콘크리트벽에 상하 좌우 일정한 간격으로 소정크기의 구멍을 천공하고, 상기 구멍에 축봉 선단, 즉 슬리브가 끼워진 부분을 삽입시킨 다음 나사봉에 ㄴ형 석재앵글을 끼운 상태에서 너트를 체결하게 되면 슬리브를 관통하여 축봉이 강제로 당겨지게 되면서 확관뭉치가 슬리브 선단을 강제적으로 벌리는 구조로 되어 있으며, 상기 슬리브의 벌어진 부분이 구멍의 내벽에 밀착되게 되어 고정되게 되는데, 이때 상기 슬리브는 외경 선단부는 구멍 내벽에 고정되지만 볼트는 선단의 확관뭉치 부분만 슬리부 선단에 걸려 빠져나오지 못하게 될 뿐 확관뭉치를 제외한 부분은 슬리브 안에서 헐거운 상태로 유지되게 된다.That is, when a stone panel is to be installed with the conventional anchor bolt, holes of a predetermined size are vertically and horizontally spaced at predetermined intervals on the concrete wall, and a shaft end, that is, a portion where the sleeve is inserted is inserted into the hole When the nut is fastened with the d-shaped stone angle in the nail bar, the shaft rod is forcibly pulled through the sleeve and the expanding bundle forcibly opens the end of the sleeve. The open part of the sleeve is inserted into the inner wall of the hole The outer diameter front end portion of the sleeve is fixed to the inner wall of the hole but only the expansion bundle portion of the tip end of the sleeve is prevented from coming out of the end of the slip portion and the portion except the expansion bundle is kept loose in the sleeve. do.

다시 말하면 앵커볼트 선단부분을 콘크리트벽 구멍에 삽입 고정하였을 때, 슬리브의 선단부분은 축봉 선단의 확관뭉치에 의해 확장되어 자연적으로 구멍에 밀착 고정되지만 확장부를 제외한 나머지 부분은 구멍에 헐거운 상태를 그대로 유지한 상태에서 삽입되어 있게 되고, 또 슬리브 내부를 관통하는 축봉도 확관뭉치를 제외한 나머지 부분이 슬리브 구멍 내경에 헐겁게 조립되는 구성이기에 외부의 진동이나 하중이 작용할 때 축관이 흔들리게 되므로 안전성이 크게 떨어지게 됨은 물론 석재패널을 장착할 때 축봉이 상하좌우로 유동되기 때문에 흔들림이 발생될 수밖에 없어 석재패널을 정확하면서도 견고하게 설치 시공하기는 어려운 등의 많은 문제점이 따랐다는 것이다.In other words, when the tip portion of the anchor bolt is inserted and fixed in the concrete wall hole, the tip portion of the sleeve is extended by the widening bundle of the end of the shaft rod and is naturally fixed tightly to the hole, but the remaining portion except for the extension portion remains loose in the hole And the other part of the shaft rod passing through the inside of the sleeve is loosely assembled to the inside of the sleeve hole except for the widening sleeve, so that when the external vibration or load is applied, the shaft tube is shaken, Of course, when the stone panel is installed, the shaft rod moves up and down and left and right. Therefore, there is a lot of problems such as the difficulty of installing the stone panel accurately and firmly.

따라서 이를 해결하기 위해 여러 가지 구성으로 개발된 앵커볼트가 선 출원 및 선 등록되었지만 전술한 바와 같은 문제점을 해결지는 못하였던 것이다.In order to solve this problem, the anchor bolts developed in various configurations have been filed and registered in advance, but the above problems have not been solved.

또한 종래의 석재패널 장착용 앵커볼트는 선단에 구비된 버팀판에 ㄴ형 석재앵글을 끼우고 수평을 맞추기 위해 버팀판과 석재앵글 사이에 심패드를 끼워 고정할 때 버팀판과 석재앵글이 모두 동일한 금속 소재임과 동시에 합성수지로 된 심패드도 경질 소재이기 마찰력이 최소화될 수밖에 없어 쉽게 미끄러짐이 발생하여 심패드가 쉽게 이탈되는 경향성이 크게 발생하였고, 이에 따라 시공에 따른 시간과 인력이 많이 듦은 물론 안전하고도 견고한 시공이 어려운 문제점도 따랐다.In addition, in the conventional anchor bolt for mounting a stone panel, when a double-type stone angle is fitted on a brace plate provided at the front end, and a pad is interposed between the brace plate and the stone angle to fix the brace plate, Simultaneously with the material, the synthetic padding is also a hard material. Since the friction force is minimized, slippage easily occurs, and the tendency of the pad to be easily detached is large. Thus, the time and manpower required for construction are increased, But also the difficult construction was difficult.

그리고 종래의 석재패널 장착용 앵커볼트는 축봉 후미가 모두 수나사봉으로 형성되어 있기 때문에 건물의 내벽이나 바닥면, 또는 천장면에 최대한 가깝게 설치하고자 할 때 돌출된 수나사봉으로 인해 장애가 따르게 되는 문제점이 있었고, 상기 세트앵커볼트를 바닥에 설치되는 각종 기구나 장비에 이용할 경우에는 돌출된 수나사봉으로 인해 외관이 단정해보이지 못할 뿐만 아니라 발끝이 걸리기도 하여 보행자 또는 관리자의 안전을 위협하기도 하는 등의 문제점도 따른다.In addition, the conventional anchor bolts for mounting a stone panel have a problem in that obstacles are caused due to protruding water or barbs when the anchor bolts are all formed of a male or a female rod and are to be installed as close as possible to the inner wall, , When the set anchor bolt is used for various apparatuses and equipment installed on the floor, the appearance is not apparent due to the protruding water or the barb, but also the safety of the pedestrian or the manager is threatened Follow.

① 특허등록 제0990440호(2010.10.21.등록) "석재고정용 앵커볼트"① Patent registration No. 0990440 (Registered on October 21, 2010) "Anchor bolt for fixing stone" ② 특허등록 제1669597호(2016.10.20.등록) "건축용 세트 앵커형 지지구"② Patent registration No. 1669597 (Registered on October 20, 2016) "Construction set anchor type earth" ③ 실용신안등록 제0125347호(1998.06.23.등록) "건축용 앵커볼트"③ Registered utility model No. 0125347 (registered on June 23, 1998) "Building anchor bolt" ④ 실용신안등록 제0271367호(2002.03.28.등록) "앵커볼트"④ Registered Utility Model No. 0271367 (Registered on March 28, 2002) "Anchor bolt" ⑤ 실용신안등록 제0303223호(2003.01.22.등록) "앵커볼트"⑤ Utility Model Registration No. 0303223 (Registered on February 22, 2003) "Anchor bolt" ⑥ 실용신안등록 제0456403호(2011.10.24.등록) "앵커볼트"⑥ Utility Model Registration No. 0456403 (Registered on 24 October 2011.) "Anchor bolt"

본 발명은 전술한 종래의 제반문제점을 해결하기 위해 발명한 것으로, 특히 콘크리트 벽면에 형성한 구멍에 삽입하여 망치 등의 공구로 가볍게 타격하면 앵커볼트가 흔들림 없이 견고하게 설치 고정되게 함으로서 작업성이 극대화되고, 또, 축봉의 본체 후미에 구비한 버팀판의 표면에 미끄럼방지부를 구비하여 석재앵글의 설치가 안정적으로 이루어질 수 있게 한 석재패널장착용 스프레드 앵커볼트를 제공하려는데 그 목적이 있다.The present invention has been made to solve the above-mentioned problems of the related art. In particular, when an impact bolt is lightly struck by a tool such as a hammer inserted into a hole formed in a concrete wall surface, the anchor bolt is securely installed and fixed without shaking, It is another object of the present invention to provide a spread anchor bolt for mounting a stone panel, which is provided with a non-slip portion on the surface of a brace plate provided at the rear of the main body of the shaft bar,

상기 스프레드 앵커볼트의 본체 후미에 구비된 나사봉에 체결 연장할 수 있는 연장봉을 구비하여 필요에 따라 본체길이를 더 길게 연장 사용할 수 있게 하려는 데도 목적이 있다.And an extension rod that can be fastened and extended to a threaded rod provided at the back of the main body of the spread anchor bolt, so that the length of the body can be extended as needed.

상기 스프레드 앵커볼트를 구성하는 축봉을 확관부만으로 구성하되, 상기 확관부 외주면에 수나사를 형성하고, 머리부에는 십자홈을 형성함으로서 슬리브에 확관부를 때려 박은 뒤 필요에 따라 드라이버로서 확관부를 돌려 축봉의 돌출길이를 조절할 수 있게 하려는 데도 목적이 있다.Wherein the shaft anchor bolt is formed by only an expanding portion, a male screw is formed on the outer periphery of the expanding portion, a cross groove is formed in the head portion, the expanding portion is slid into the sleeve, It is also aimed to be able to adjust the projecting length of the shaft rod.

또 앵커볼트의 축봉에 장착 고정된 버팀판의 하부를 길게 연장하고, 상기 연장부에 버팀봉을 체결하여 조절할 수 있게 함으로서, 앵커볼트 및 석재앵글이 석재패널의 하중을 안정적으로 지지하게 할 뿐만 아니라 석재앵글 및 석재패널의 수평조절도 원활하게 할 수 있게 되어 시공 안정성을 극대화시킬 수 있게 하려는 데도 목적이 있다.The anchor bolt and the stone angle can stably support the load of the stone panel by extending the lower part of the support plate fixedly attached to the shaft rod of the anchor bolt and by tightening the support rod to the extended part. It is also aimed to maximize the stability of the construction since it is possible to smoothly adjust the horizontal angle of the stone angle and the stone panel.

또, 버팀판과 석재앵글 사이에 석재패널의 하중 지지와 수평조절을 원활하게 할 수 있도록 버팀봉과 지지판으로 이루어진 별도의 버팀조절대를 구비하여 본 발명의 스프레드 앵커볼트는 물론 기존에 사용하는 앵커볼트에도 간단하게 설치 사용할 수 있게 하려는 데도 목적이 있다.In order to smoothly support the load and horizontal adjustment of the stone panel between the support plate and the stone angle, a separate support bar made up of a support bar and a support plate is provided so that not only the spread anchor bolt of the present invention, It is also aimed at making it easy to install and use.

상기 축봉을 확관부 만으로 형성하되, 확관부 후미에 암나사구멍을 형성함으로서 볼트체결이 이루어질 수 있게 하고, 이에 따라 석재패널 시공시 단열재를 사용하지 않고 벽면에 최대한 가깝게 시공하여야 하거나, 또는 도로변 또는 도로중앙선에 설치 고정하는 중앙분리대 등의 장비를 바닥에 설치할 때 안전성을 극대화시킨 스프레드 앵커볼트를 제공하려는 데도 목적이 있다.The bolt fastening can be performed by forming a female screw hole in the rear of the expansion part, so that the installation of the stone panel should be performed as close as possible to the wall without using the heat insulating material, It is also aimed to provide a spread anchor bolt that maximizes safety when installing equipment such as a center separator that is installed and fixed on the floor.

본체(1c) 선단부에는 슬리브(2)의 구멍에 삽입되어 슬리브(2)를 확장시킬 수 있도록 소정의 직경으로 확관부(1a)를 형성하되, 상기 확관부(1a)는 외주면이 민자형태, 또는 외주면에 다수의 환형홈이 구비되도록 형성하고, 본체(1c) 후단부에는 타격부(1b')를 가진 나사봉(1b)으로 형성한 축봉(1)과,A tube portion 1a is formed at a distal end of the main body 1c with a predetermined diameter so as to be inserted into a hole of the sleeve 2 so as to expand the sleeve 2. The tube portion 1a has an outer circumferential surface A shaft rod 1 formed of a screw rod 1b having a striking portion 1b 'at the rear end of the main body 1c,

외주면 일 측에 길이방향으로 절개부(22)를 형성하여 상기 확관부(1a)의 삽입과 동시에 벌어져 콘크리트벽(w)의 구멍(w1) 내경과 확관부(1a) 외주면을 전체적으로 동시에 꽉 물어 견고하게 고정시킬 수 있는 슬리브(2)로 이루어짐을 특징으로 한다.A cutout 22 is formed on one side of the outer circumferential surface in the longitudinal direction so that the widening of the hole w1 of the concrete wall w and the outer circumferential surface of the expanded portion 1a are simultaneously firmly engaged with the concave portion 1a, And a sleeve (2) that can be fixed to the base.

또, 타격부(1b')를 가진 나사봉(1b)과 확관부(1a)가 본체(1c)의 양 끝에 구비된 축봉(1)과,The threaded rod 1b having the striking portion 1b 'and the expanding portion 1a are provided at both ends of the main body 1c,

상기 확관부(1a)의 삽입에 의해 벌어져 콘크리트벽의 구멍(w1)에 견고하게 고정되는 슬리브(2)로 스프레드 앵커볼트(100)를 구성하되,The spread anchor bolt (100) is constituted by a sleeve (2) which is opened by the insertion of the bulging portion (1a) and fixed firmly to the hole (w1) of the concrete wall,

상기 확관부(1a) 외주면에는 일정한 간격으로 환형의 돌출부(13)를 다수 형성하고, 선단에는 환형의 걸림요부(11')를 형성하는데, 상기 다수의 돌출부(13)는 선단에 위치한 돌출부(13)의 직경이 작고 후방으로서 갈수록 직경이 커지도록 구성함으로서 슬리브(2)에 조립되었을 때 슬리브(2)와 구멍(w1) 내경 및 슬리브(2) 내경과 돌출부(13) 외경이 견고하게 조립될 수 있게 하며, 슬리브(2)는 외주면 일 측에 길이방향으로 개방된 절개부(22)를 형성하고, 선단 및 후미 내경에 상기 걸림요부(11')에 걸리도록 걸림돌부(21')를 형성함으로서, 슬리브(2) 후미를 확관부(1a) 선단에 결합시킨 상태에서 상기 슬리브(2)를 콘크리트벽면(w)의 구멍(w1)에 삽입시킨 뒤 타격부(1b')를 쳐서 박아 고정시킬 수 있게 함을 특징으로 한다.A plurality of annular protrusions 13 are formed at regular intervals on the outer circumferential surface of the bulging portion 1a and an annular recessed portion 11 'is formed at the tip thereof. The plurality of protrusions 13 are protrusions 13 The inner diameter of the sleeve 2 and the inner diameter of the hole w1 and the outer diameter of the sleeve 2 and the outer diameter of the protruding portion 13 can be firmly assembled when the sleeve 2 is assembled with the sleeve 2, The sleeve 2 is formed with a cut-out portion 22 opened longitudinally on one side of the outer circumferential surface, and a locking protrusion 21 'is formed on the inner circumference of the front end and the rear end to engage with the engaging recess 11' , The sleeve 2 is inserted into the hole w1 of the concrete wall surface w and then the striking portion 1b 'is struck to be fixed in a state where the rear end of the sleeve 2 is coupled to the tip of the expanded portion 1a .

상기 축봉(1)의 확관부(1a)는 소정 직경으로 되어 외주면에 스크래치나 미세한 돌기 또는 미세한 요철부를 형성하고, 선단은 테이퍼부(11)와 함께 직경이 작은 선단부(12)를 형성하되, 상기 선단부(12)에는 후술하는 슬리브(2)의 후미 걸림부(21)가 끼워지도록 걸림요홈(11')을 형성하며,Wherein the expanded portion 1a of the shaft rod 1 has a predetermined diameter to form a distal end portion 12 having a small diameter together with the tapered portion 11 at the tip thereof with scratches, fine protrusions or fine irregularities formed on the outer circumferential surface thereof, The front end portion 12 is formed with a latching groove 11 'so that the rear engaging portion 21 of the sleeve 2 to be described later is fitted,

상기 축봉(1)의 나사봉(1b) 선단에는 앵커볼트(100)를 콘크리트벽(w)에 형성한 구멍(w1)에 끼워 망치로 타격할 수 있도록 타격부(1b')가 구비되고,A striking portion 1b 'is provided at the tip end of the threaded rod 1b of the shaft rod 1 so that the anchor bolt 100 is inserted into the hole w1 formed in the concrete wall w and can be hit by a hammer,

길이방향으로 개방된 절개부(22)가 구비된 슬리브(2)의 외주면에는 일정한 간격 또는 불규칙한 간격으로 외향돌부(23) 및 내향돌부(23')를 반복형성함과 동시에 후미에 걸림요홈(11')에 끼워지도록 걸림부(21)를 형성하며,The outward protruding portion 23 and the inward protruding portion 23 'are repeatedly formed at regular intervals or irregular intervals on the outer circumferential surface of the sleeve 2 provided with the cut-out portion 22 opened in the longitudinal direction, The engaging portion 21 is formed so as to be fitted in the engaging portion 21,

상기 축봉(1)의 선단부(12)에 형성된 걸림요홈(11')에 슬리브(2)의 후미에 형성된 걸림부(21)가 끼워진 상태에서 콘크리트 벽(w) 구멍(w1)에 슬리부(2)를 완전히 밀어 넣고, 이 상태에서 망치로 타격부(1b')를 가볍게 타격하면 확관부(1a)가 진입하면서 슬리브(2) 내경을 강제로 확관시켜 슬리브(2) 외경이 구멍(w1)에 밀착 고정시킴으로서 슬리브(2)의 내 외경 모두 구멍(w1) 및 확관부(1a)를 전체적으로 견고하게 고정시킬 수 있게 함을 특징으로 한다.The slit portion 2 is formed in the hole w1 of the concrete wall w in a state in which the engaging portion 21 formed at the back of the sleeve 2 is fitted in the engaging groove 11 'formed in the front end portion 12 of the shaft rod 1, The inner diameter of the sleeve 2 is forcibly expanded while the expanded portion 1a enters and the outer diameter of the sleeve 2 is closely contacted with the hole w1, So that the hole w1 and the expanded portion 1a can be firmly fixed to the entire inner and outer diameters of the sleeve 2 by fixing them.

상기 스프레드 앵커볼트의 본체(1c) 후미에 구비된 나사봉(1b)에 체결할 수 있는 연장봉(1c')을 더 구비하되, 상기 연장봉(1c')의 후미에 나사봉(1b)을 형성하여 버팀판(3)과 ㄴ형 석재앵글(5) 등을 조립 설치할 수 있게 하고, 이에 따라 본체(1c)의 길이를 더 길게 연장 사용할 수 있게 함에도 특징이 있다.And an extension rod 1c 'which can be fastened to a threaded rod 1b provided at the back of the body 1c of the spread anchor bolt. The threaded rod 1b is formed at the back of the extended rod 1c' It is possible to assemble and install the support plate 3 and the d-shaped stone angles 5, thereby making it possible to extend the length of the main body 1c.

상기 스프레드 앵커볼트의 본체(1) 후미에 암나사구멍(1h)을 형성하고, 상기 암나사구멍(1h)에 전후부에 나사봉(1b)을 구비한 연장봉(1c')을 연결 조립할 수 있게 함에도 특징이 있다.It is possible to form a female screw hole 1h at the back of the main body 1 of the spread anchor bolt and to connect and assemble an extension rod 1c 'having a threaded rod 1b to the front and rear portions of the female screw hole 1h, .

상기 스프레드 앵커볼트를 구성하는 축봉(1)을 확관부(1a)만으로 구성하되, 상기 확관부(1a) 외주면에 수나사를 형성하고, 머리부(1d)에는 십자홈(1d')을 형성함으로서 슬리브(2)에 확관부(1a)를 때려 박은 뒤 필요에 따라 드라이버로서 확관부(1a)를 돌려 확관부(1a)의 돌출길이를 조절할 수 있게 함에도 특징이 있다.The male thread 1 constituting the spread anchor bolt is formed only of the expanded portion 1a and the male thread is formed on the outer peripheral face of the expanded portion 1a and the cross groove 1d 'is formed in the head portion 1d, And the protruding length of the expanding portion 1a can be adjusted by turning the expanding portion 1a as a driver if necessary after the expanding portion 1a is pushed into the opening portion 2 of the opening portion 1a.

상기 축봉(1)은 본체(1c)의 후미에 버팀판(3)을 구비하고, 상기 버팀판(3)의 후면에 ㄴ형 석재앵글(5)을 장착하기 전에 버팀조절대(4)를 개재시키되, 상기 버팀조절대(4)는 상부에 나사봉(1b)에 끼우는 구멍(41)을, 하부에는 나사봉의 형태로 된 버팀봉(42)을 구비하여 버팀봉(42)을 시계방향 또는 반시계방향으로 회전시켜 수평조절과 더불어 석재패널(6)의 하중을 안정적으로 지탱할 수 있게 함을 특징으로 한다.The shaft rod 1 is provided with a support plate 3 at the rear of the main body 1c and the support lever 4 is interposed before the bent angle stone 5 is mounted on the rear surface of the support plate 3, The pawl control rod 4 is provided with a hole 41 at the upper portion thereof for inserting the threaded rod 1b and a pawl bar 42 at the lower portion in the form of a screw rod so as to rotate the pawl rod 42 clockwise or counterclockwise So that the load of the stone panel 6 can be stably sustained in addition to the horizontal adjustment.

상기 버팀판(3)의 하부를 길게 연장하여 연장부에 버팀봉(42)을 체결함으로서 버팀판(3)이 버팀조절대로서의 기능도 수행할 수 있게 함을 특징으로 한다.The bottom of the supporting plate 3 is elongated and the supporting rod 42 is fastened to the extending portion of the supporting plate 3 so that the supporting plate 3 can perform a function as a supporting lever.

상기 버팀판(3)의 표면에 고무 또는 연질합성수지로 된 패드를 부착하거나, 또는 고무 또는 연질합성수지로 후로킹하거나, 또는 엠보싱하여서 된 미끄럼방지부(3a)를 형성함을 특징으로 한다.And a pad made of rubber or soft synthetic resin is adhered to the surface of the support plate 3, or a rubber or soft synthetic resin is hooked or embossed to form a non-slip portion 3a.

상기 슬리브(2)의 내경 또는 외경에 형성된 내향돌부(23') 또는 외향돌부(23)는 선단부로 갈수록 단계적으로 더 돌출되도록 형성함을 특징으로 한다.The inward protruding portion 23 'or the outward protruding portion 23 formed on the inner or outer diameter of the sleeve 2 is formed to protrude step by step toward the distal end portion.

상기 슬리브(2)의 내 외면에 스크래치를 형성하거나 또는 도트 모양의 돌기를 형성함을 특징으로 한다.A scratch is formed on the inner and outer surfaces of the sleeve 2 or a dot-shaped protrusion is formed.

상기 슬리브(2)의 선단에 2~3개의 슬릿홈(22')을 더 형성함을 특징으로 한다.And two to three slit grooves 22 'are further formed at the tip of the sleeve 2.

상기 축봉(1)의 선단에 형성된 확관부(1a)에 환형의 돌출부(13)를 다수 형성하고, 선단에 2~3개의 슬릿홈(22')이 구비된 슬리브(2)의 선단 내경, 또는 선단 및 후단부 내경에 내향돌부(23')를 형성함을 특징으로 한다.A tip inner diameter of a sleeve 2 having a plurality of annular protruding portions 13 formed in an expanded portion 1a formed at the tip of the shaft 1 and having two to three slit grooves 22 ' And an inward protruding portion 23 'is formed in the inner diameter of the front end and the rear end.

확관부(1a) 만으로 축봉(1)을 형성하되, 상기 축봉(1)의 머리부(1d)를 평판형 또는 반구형으로 형성함을 특징으로 한다.The shaft portion 1 is formed by only the tube portion 1a, and the head portion 1d of the shaft rod 1 is formed into a flat plate shape or a hemispherical shape.

확관부(1a) 만으로 축봉(1)을 형성하되, 상기 축봉(1) 후미에 암나사구멍(1h)을 천공하고, 이 곳에 볼트(b)를 체결할 수 있게 함으로서 석재패널을 단열재 없이 시공할 때 벽면에 최대한 가깝게 시공할 수 있게 함을 특징으로 한다.When the shaft panel 1 is formed by only the expanded portion 1a and the female screw hole 1h is drilled at the tail end of the shaft rod 1 and the bolt b is fastened thereto, So that the construction can be performed as close as possible.

삭제delete

버팀판(3)을 축봉(1)과 분리 구성하되, 상기 버팀판(3)에는 암나사구멍을 형성하여, 상기 버팀판(3)을 축봉(1) 후단부에 구비된 나사봉(1b)에 체결할 수 있게 하고, 이에 따라 버팀판(3)의 설치위치를 조절할 수 있게 함을 특징으로 한다.The support plate 3 is separated from the shaft rod 1 and a female screw hole is formed in the support plate 3 so that the support plate 3 is connected to the screw rod 1b provided at the rear end of the shaft rod 1 So that the installation position of the support plate 3 can be adjusted.

이와 같이 구성된 본 발명의 스프레드 앵커볼트(100)는 슬리브(2)가 확관부(1a) 선단에 형성된 걸림요홈(11')에 끼워진 상태에서 조립 유통시키는데, 이를 콘크리트벽(w) 구멍(w1)에 스프레드 앵커볼트(100)를 박아 설치하고자 할 때는 먼저 구멍(w1)에 슬리브(2)를 밀어 넣어 완전히 삽입시킨 상태에서 망치로 타격부를 가법게 타격하면 확관부(1a)가 슬리브(2) 내경으로 점차 삽입되면서 슬리브(2)가 확관 됨으로 자연적으로 슬리브(2)의 외경, 특히 외향돌기(23) 부분은 구멍(w1)의 내벽에 견고하게 밀착되게 되고, 내경, 특히 내향돌기(23')부분은 확관부(1a)를 전체적으로 물어 고정시키는 상태로 되기 때문에 스프레드 앵커볼트(100)가 흔들림 없이 견고하면서도 안정적으로 설치되어 신뢰성이 극대화되는 효과가 따르게 된다.The spread anchor bolt 100 according to the present invention constructed as described above is assembled and circulated in a state in which the sleeve 2 is fitted in the engagement groove 11 'formed at the tip of the expanded portion 1a. The spread anchor bolt 100 is inserted into the hole w1 of the concrete wall w, The spread anchor bolt 100 is inserted into the hole 2 and the sleeve 2 is fully inserted into the hole w1. When the hitting portion is hammered by the hammer, The outer diameter of the sleeve 2 and particularly the portion of the outwardly projecting portion 23 are firmly brought into close contact with the inner wall of the hole w1 and the inner diameter of the sleeve 2 is increased by the inward protrusion 23 ' The spread anchor bolt 100 can be firmly and stably installed without shaking and reliability can be maximized.

또한, 석재패널(p) 시공을 위해 앵커볼트(100)의 후미 나사봉(1b)에 ㄴ형 석재앵글(5)을 장착할 때 버팀판(3)과의 사이에 버팀봉(42)을 가진 버팀조절대(4)를 설치함으로서, 버팀봉(42)을 시계방향 또는 반시계방향으로 돌려 수평조절을 원활하게 할 수 있을 뿐만 아니라, 중량이 제법 나가는 석재패널(p)의 하중도 안정적으로 받쳐주게 됨으로서 시공의 안정성을 유도할 수 있는 등 많은 효과가 따르게 된다.In addition, when installing the cube stone angle 5 on the rear or boss bar 1b of the anchor bolt 100 for the installation of the stone panel p, It is possible to smoothly adjust the level by turning the padding rod 42 in the clockwise or counterclockwise direction by installing the adjustable pedestal 4 as well as to stably support the load of the stone panel p exiting the weight And the stability of the construction can be induced.

또한 버팀판(3) 표면에 형성된 미끄럼방지부(3a)에 의해 안정된 시공을 할 수 있고 더불어 안전성을 극대화시킬 수 있는 효과도 따른다.In addition, the anti-slip portion 3a formed on the surface of the support plate 3 can stabilize the construction and maximize the safety.

또한 버팀판(3)을 축봉(1)과 분리 구성하되, 상기 버팀판(3)에는 암나사구멍을 형성하여 축봉(1) 후단부에 구비된 나사봉(1b)에 체결할 수 있게 구성하였음으로, 석재패널 등을 설치할 때 벽면과의 간격, 석재패널의 수평, 수직을 조절할 때 매우 정확하면서도 신속하게 조절할 수 있는 효과도 따른다.The support plate 3 is separated from the shaft rod 1 so that a female screw hole is formed in the support plate 3 so as to be fastened to the screw rod 1b provided at the rear end of the shaft rod 1 When installing the stone panels, it is very accurate and quick to adjust the distance between the walls and the horizontal and vertical of the stone panel.

또한, 상기 본체(1c) 끝에 나사봉(1b) 또는 암나사구멍(1h)을 형성하고, 상기 나사봉(1b) 또는 암나사구멍(1h)에 대응하는 나사구멍 또는 나사봉(1b)을 가짐과 동시에 다양한 길이의 연장봉(1c')을 연결구성할 수 있게 하였음으로 시공현장에 따라 다양하게 선택 사용할 수 있는 효과도 있다.A screw rod 1b or a female screw hole 1h is formed at the end of the main body 1c and has a threaded hole or threaded rod 1b corresponding to the threaded rod 1b or the female threaded hole 1h It is possible to connect the extension rods 1c 'having various lengths so that various options can be used depending on the construction site.

도1은 본 발명의 제1실시예를 나타낸 분해사시도.
도2는 본 발명의 제1실시예에 따른 일부단면도로서 콘크리트벽의 구멍에 슬리브를 삽입한 상태를 나타낸 예시도.
도3은 본 발명의 제1실시예에 따른 일부단면도로서 콘크리트벽의 구멍에 앵커볼트를 박아 고정시킨 상태를 나타낸 예시도.
도4는 확관부 외주면에 다수의 환형홈이 형성된 상태를 나타낸 예시도.
도5은 본 발명의 제2실시예를 나타낸 분해사시도.
도6은 본 발명의 제2실시예에 따른 일부단면도로서 콘크리트벽의 구멍에 슬리브를 삽입한 상태를 나타낸 예시도.
도7은 본 발명의 제2실시예에 따른 일부단면도로서 콘크리트벽의 구멍에 앵커볼트를 박아 고정시킨 상태를 나타낸 예시도.
도8은 본 발명의 제3실시예로서 조립된 상태를 나타낸 앵커볼트의 사시도.
도9는 본 발명의 제3실시예로서 앵커볼트의 분해 사시도.
도10은 본 발명의 제3실시예를 나타낸 요부단면예시도.
도11은 본 발명의 제3실시예에 따른 정면예시도로서 슬리브는 단면상태임.
도12는 본 발명의 제3실시예에 따른 슬리브의 확대단면예시도.
도13은 본 발명의 제3실시예로서 슬리브에 대한 종단면예시도.
도14는 본 발명의 제4실시예로서 슬리브에 대한 다른 실시예를 나타낸 사시도.
도15는 본 발명의 사용상태도로서 콘크리트벽 구멍에 슬리브를 밀어 넣은 상태를 나타낸 것이고,
도16은 본 발명의 사용상태도로서 망치로 타격부를 쳐서 콘크리트벽 구멍에 앵커볼트를 고정 설치한 상태를 나타낸 것임.
도17은 본 발명의 사용상태도로서 석재패널을 시공한 상태를 나타낸 예시도.
도18은 본 발명의 제5실시예를 나타낸 것으로 버팀조절대의 사시도를 나타낸 것임.
도19는 본 발명의 제5실시예로서 버팀조절대가 적용된 앵커볼트의 조립사시도.
도20은 본 발명의 제5실시예로서 버팀조절대가 적용된 앵커볼트의 사용상태도.
도21은 본 발명의 제6실시예로서 버팀판을 버팀조절대로 구성한 상태의 사용상태도.
도22는 본 발명의 제7실시예로서 슬리브의 다른 구성을 나타낸 사시도.
도23은 본 발명의 제7실시예로서 슬리브의 정면예시도.
도24는 본 발명의 제8실시예를 나타낸 것으로 일부를 절개한 분해 정면예시도.
도25는 본 발명의 제8실시예로서 조립된 상태를 나타낸 정면예시도.
도26A 및 도26B는 본 발명의 제9실시예를 나타낸 일부 단면예시도.
도27은 본 발명의 제10실시예를 나타낸 종단면예시도.
도28A 및 도28B는 본 발명의 제11실시예를 나타낸 일부 단면예시도.
도29는 본 발명의 제12실시예로서 분해된 상태를 나타낸 측면예시도.
도30은 본 발명의 제13실시예를 나타낸 것으로 버팀판의 조절가능성을 보여주는 측면예시도.
도31은 본 발명의 제13실시예를 나타낸 분해사시도.
도32는 본 발명의 제14실시예를 나타낸 요부 분해 사시도.
도33은 본 발명의 제14실시예로서 조립상태를 나타낸 종단면예시도.
도34는 본 발명의 제15실시예를 나타낸 요부 분해사시도.
도35는 본 발명의 제15실시예를 나타낸 종단면예시도.
도36은 본 발명의 제16실시예를 나타낸 요부 분해사시도.
도37은 본 발명의 제17실시예를 나타낸 종단면예시도.
1 is an exploded perspective view showing a first embodiment of the present invention.
FIG. 2 is a partial sectional view according to the first embodiment of the present invention, showing an example in which a sleeve is inserted into a hole of a concrete wall. FIG.
3 is a partial sectional view according to the first embodiment of the present invention, showing an example in which an anchor bolt is fixedly inserted into a hole of a concrete wall.
4 is an exemplary view showing a state in which a plurality of annular grooves are formed on the outer peripheral surface of the expansion portion.
5 is an exploded perspective view showing a second embodiment of the present invention.
6 is a partial cross-sectional view according to a second embodiment of the present invention, in which a sleeve is inserted into a hole of a concrete wall.
FIG. 7 is a partial cross-sectional view according to a second embodiment of the present invention, in which an anchor bolt is fixedly inserted into a hole of a concrete wall; FIG.
8 is a perspective view of an anchor bolt in a assembled state as a third embodiment of the present invention.
9 is an exploded perspective view of an anchor bolt according to a third embodiment of the present invention.
FIG. 10 is a cross-sectional exemplary view showing a third embodiment of the present invention. FIG.
FIG. 11 is a frontal view according to the third embodiment of the present invention, in which the sleeve is in a sectional state; FIG.
12 is an enlarged cross-sectional exemplary view of a sleeve according to a third embodiment of the present invention;
13 is a longitudinal sectional view of a sleeve according to a third embodiment of the present invention.
14 is a perspective view showing another embodiment of a sleeve according to a fourth embodiment of the present invention.
Fig. 15 is a view showing the state of use of the present invention, in which the sleeve is pushed into the concrete wall hole,
FIG. 16 is a view showing the state of use of the present invention, in which an anchor bolt is fixed to a concrete wall hole by hitting a striking part with a hammer.
17 is an exemplary view showing a state in which a stone panel is applied as a state diagram of use of the present invention.
18 shows a fifth embodiment of the present invention, and shows a perspective view of a paddle control unit.
19 is an assembled perspective view of an anchor bolt to which a strut adjusting bar is applied according to a fifth embodiment of the present invention;
20 is a view illustrating a state of use of an anchor bolt to which a strut adjusting bar is applied according to a fifth embodiment of the present invention.
FIG. 21 is a view showing a state of use in a state in which a brace plate is constructed as a brace adjustment according to a sixth embodiment of the present invention. FIG.
22 is a perspective view showing another structure of a sleeve according to a seventh embodiment of the present invention.
23 is a front view of a sleeve as a seventh embodiment of the present invention.
Fig. 24 is an exploded frontal view showing an eighth embodiment of the present invention in which a part thereof is cut. Fig.
25 is a front view showing an assembled state as an eighth embodiment of the present invention.
26A and 26B are partial cross-sectional exemplary views showing a ninth embodiment of the present invention.
27 is a longitudinal sectional view showing a tenth embodiment of the present invention.
28A and 28B are partial cross-sectional exemplary views showing an eleventh embodiment of the present invention.
29 is a side elevational view illustrating a disassembled state as a twelfth embodiment of the present invention.
Fig. 30 is a side elevational view showing a thirteenth embodiment of the present invention showing the adjustability of the buckle plate. Fig.
31 is an exploded perspective view showing a thirteenth embodiment of the present invention.
32 is an exploded perspective view showing a fourteenth embodiment of the present invention.
FIG. 33 is a longitudinal sectional view illustrating an assembled state as a fourteenth embodiment of the present invention. FIG.
34 is an exploded perspective view showing a fifteenth embodiment of the present invention.
35 is a longitudinal sectional view showing a fifteenth embodiment of the present invention.
36 is an exploded perspective view showing a sixteenth embodiment of the present invention.
37 is a longitudinal sectional view showing a seventeenth embodiment of the present invention.

본 발명의 석재패널 장착용 스프레드 앵커볼트(100)는 콘크리트벽(w)의 구멍(w1)에 슬리브(2)를 완전히 밀어 넣은 상태에서 축봉(1) 선단에 구비된 타격부(1b')를 망치로 가볍게 타격하는 단순한 행위에 의해 콘크리트벽(w)에 스프레드 앵커볼트(100)가 전혀 흔들림 없이 견고하게 설치 고정될 수 있게 구성한 것으로, 특히, 슬리브(2)가 콘크리트벽(w)의 구멍(w1)에 삽입 장착되었을 때 슬리브(2)의 내 외경 모두가 각각 확관부(1a) 외경과 구멍(w1) 내경에 꽉 끼이게 되어 앵커볼트(100)가 흔들림 없이 견고하게 설치 고정되게 되는 것이다.The spread anchor bolt 100 for mounting a stone panel according to the present invention has a striking portion 1b 'provided at the tip of the shaft 1 in a state in which the sleeve 2 is completely pushed into the hole w1 of the concrete wall w The sleeve 2 is structured such that the spread anchor bolt 100 can be firmly installed and fixed on the concrete wall w by a simple act of hitting lightly with a hammer. both of the inner and outer diameters of the sleeve 2 are tightly fitted to the outer diameter of the expanded portion 1a and the inner diameter of the hole w1 so that the anchor bolt 100 is firmly fixed without being shaken.

또 버팀판(3)과 석재앵글(5) 사이에 지지판(41)과 버팀봉(42)으로 이루어진 버팀조절대(4)를 개재시킨 뒤 버팀봉(42)을 시계방향 또는 반시계방향으로 조절할 수 있게 함으로서 ㄴ형 석재앵글(5)의 수평조절과 더불어 중량물인 석재패널을 안정적으로 받쳐 지지할 수 있게 한 것이다.A strut adjusting bar 4 composed of a supporting plate 41 and a strut bar 42 is interposed between the strut 3 and the stone angle 5 and then the strut 42 is adjusted clockwise or counterclockwise Thereby making it possible to stably support the stone panel, which is a heavy material, in addition to the horizontal adjustment of the b-type stone angle 5.

따라서 본 발명은 시공성 증대 및 안전성과 신뢰성 극대화를 이룰 수 있게 하기 위한 것으로 이를 첨부된 도면에 의거 상세하게 설명하면 다음과 같다.Accordingly, the present invention is intended to increase the workability and maximize safety and reliability, and will be described in detail with reference to the accompanying drawings.

첨부도면 도1~도4는 본 발명의 제1실시예로서 환봉형태로 된 본체(1c) 선단부에 외주면이 민자형태, 또는 환형의 요홈이 다수 형성된 확관부(1a)가 구비되고, 후미에 타격부(1b')를 가진 나사봉(1b)이 구비된 축봉(1)과, 외주면 일 측에 길이방향으로 개방된 절개부(22)가 형성된 슬리브(2)로 이루어져 상기 슬리브(2)를 콘크리트벽면(w)의 구멍(w1)에 삽입시킨 상태에서 타격부(1b')를 쳐서 박아 고정시킬 수 있게 구성된 것이다.1 to 4 show a first embodiment of the present invention in which a tube portion 1a having an annular outer shape or a plurality of annular grooves is provided at the distal end of a body 1c in the form of a round bar, And a sleeve 2 formed with a shaft rod 1 having a threaded rod 1b having a first end 1b 'and a cutout 22 opened longitudinally on one side of the outer circumferential surface, (1b ') in a state of being inserted into the hole (w1) of the wing (w).

따라서 콘크리트벽면(w)의 구멍(w1)에 슬리브(2)를 밀어 넣은 상태에서 축봉(1) 선단의 확관부(1a)를 슬리브(2)의 구멍 선단에 대고 망치로 타격부(1')를 가볍게 타격하면 확관부(1a)가 슬리브(2) 구멍(w1) 내부로 삽입되면서 슬리브(2)를 확장시키게 됨으로 구멍(w1) 내경과 확관부(1a)가 슬리브(2)에 의해 흔들림 없이 견고하게 장착 고정될 수 있게 되는 것이며, 따라서 앵커볼트에 고하중이 작용하더라도 안정적으로 하중을 지지해 줄 뿐만 아니라 잡아 빼는 인장력에도 안정적으로 장착 고정된 상태를 유지하게 되고, 더 나아가 타격부(1b)를 타격하는 단순한 행위에 의해 앵커볼트가 흔들림 없이 견고하게 고정됨으로서 시공성과 더불어 신뢰성을 극대화시킬 수 있는 것이다.Therefore, in the state where the sleeve 2 is pushed into the hole w1 of the concrete wall surface w, the expanded portion 1a of the end of the shaft rod 1 is pushed against the tip of the hole of the sleeve 2 and the impact portion 1 ' The expanded portion 1a is inserted into the hole w1 of the sleeve 2 to expand the sleeve 2 so that the inner diameter of the hole w1 and the expanded portion 1a are not shaken by the sleeve 2 Therefore, even if a heavy load acts on the anchor bolt, the load is stably supported, and the striking force can be stably maintained even when the anchor bolt is pulled out. Further, The anchor bolt can be firmly fixed without shaking to maximize the reliability in addition to the workability.

본 발명의 제2실시예인 첨부도면 도5~도7은, 환봉형태로 된 본체(1c) 선단부에 외주면에 일정한 간격으로 환형의 돌출부(13)가 다수 형성되고, 선단에는 환형의 걸림요부(11')가 형성된 확관부(1a)가 구비되며, 후미에 타격부(1b')를 가진 나사봉(1b)이 구비된 축봉(1)과, 외주면 일 측에 길이방향으로 개방된 절개부(22)가 형성되고, 선단 및 후미 내경에 상기 걸림요부(11')에 걸리도록 걸림돌부(21')가 형성된 슬리브(2)로 이루어져 슬리브(2) 후미가 확관부(1a) 선단에 결합된 상태에서 상기 슬리브(2)를 콘크리트벽(w)의 구멍(w1)에 삽입시킨 상태에서 타격부(1b')를 쳐서 박아 고정시킬 수 있게 함을 특징으로 한다.5 to 7 show a second embodiment of the present invention in which a plurality of annular protrusions 13 are formed at regular intervals on the outer circumferential surface at the tip end of the main body 1c in the form of a round bar and an annular recessed portion 11 A shaft rod 1 provided with a screw rod 1b having a striking part 1b 'at the back and a cut part 22 opened longitudinally at one side of the outer circumferential surface, And a sleeve 2 having a locking protrusion 21 'formed on the inside and rear end of the sleeve 2 so as to engage with the locking protrusion 11' so that the rear end of the sleeve 2 is engaged with the distal end of the expanding portion 1a The hitting portion 1b 'can be hammered and fixed while the sleeve 2 is inserted into the hole w1 of the concrete wall w.

특히 본 발명은, 슬리브(2)에 상기 확관부(1a)가 삽입되기 전에는 걸림요홈(11')에 슬리브(2)의 후미 내측에 형성된 걸림돌부(21')가 끼워진 상태에서 절개부(22) 및 자체탄성에 의해 오므러져 있는 상태로 있다가 확관부(1a)가 삽입되면 바깥쪽으로 확관되도록 구성된 슬리브(2)로 이루어진 석재패널 장착용 스프레드 앵커볼트(100)이다.Particularly, according to the present invention, before the expanded portion 1a is inserted into the sleeve 2, the engagement portion 21 'formed on the inner side of the rear of the sleeve 2 is inserted into the engagement groove 11' And a sleeve 2 that is in a state of being in a state of being contracted by the self-elasticity and is expanded outward when the expanded portion 1a is inserted.

또한, 상기 다수의 돌출부(13)는 선단에 위치한 돌출부(13)의 직경이 작고 후방으로서 갈수록 단계적으로 직경이 커지도록 구성함으로서 벽면에 형성한 구멍(w1)에 슬리브(2)를 끼운 상태에서 축봉 후미에 구비된 타격부(1b)를 망치 등의 공구로 가볍게 쳐주면 확관부(1a)가 슬리브(2) 내부로 강제 삽입되면서 슬리브(2)와 구멍(w1) 내경 및 슬리브(2) 내경과 돌출부(13) 외경을 한 번에 견고하게 조립 고정시키게 된다.The plurality of projections 13 are formed such that the diameter of the protrusion 13 located at the front end is small and the diameter is gradually increased toward the rear side so that the sleeve 2 is inserted into the hole w1 formed in the wall surface, When the striking portion 1b provided at the rear end is lightly pushed by a tool such as a hammer or the like, the expanded portion 1a is forcibly inserted into the sleeve 2 so that the inner diameter of the sleeve 2, the inner diameter of the hole w1, (13) The outer diameter is firmly assembled and fixed at one time.

따라서 콘크리트벽(w)에 소정 크기로 형성된 구멍(w1)에 상기 앵커볼트(100)의 선단에 구비된 슬리브(2)를 밀어 넣어 완전히 삽입시킨 상태<이때 슬리브(2)는 오므러든 상태이기에 구멍(w1)에 무리 없이 쉽게 삽입됨>에서 타격부(1b')를 가볍게 타격하게 되면 축봉(1)이 전진하면서 확관부(1a)가 슬리브(2) 내경으로 들어가게 되면서 환형의 돌출부(13)에 의해 슬리브(2)가 확장되어 구멍(w1) 내경에 견고하게 밀착되게 되고, 슬리브(2)의 내경에는 돌출부(13)가 견고하게 밀착되게 되어 흔들리거나 빠지지 않고 요지부동하게 설치되므로 안전성과 신뢰성을 극대화시킬 수 있게 되는 것이다.Therefore, the sleeve (2) provided at the tip of the anchor bolt (100) is pushed into the hole (w1) formed at a predetermined size in the concrete wall (w) when the striking part 1b 'is lightly struck in the annular protruding part 13 while being easily inserted into the annular protruding part 13 while being easily inserted into the annular protruding part 13' The sleeve 2 is expanded and tightly adhered to the inner diameter of the hole w1 and the protruding portion 13 is tightly adhered to the inner diameter of the sleeve 2 so that the sleeve 2 can be stably fixed without being shaken or pulled out. So that it can be maximized.

도8~도17은 환봉형태로 된 본체(1c) 선단부에 확관부(1a)가 구비되고, 후미에 타격부(1b')를 가진 나사봉(1b)이 구비된 축봉(1)과, 상기 확관부(1a)가 삽입되기 전에는 걸림요홈(11')에 걸림부(21)가 끼워진 상태에서 절개부(22)에 의해 오므러져 있는 상태로 있다가 확관부(1a)가 삽입되면 바깥쪽으로 벌어지도록 구성된 슬리브(2)로 이루어진 스프레드 앵커볼트(100)이다.Figs. 8 to 17 are diagrams showing a state in which the rod 1 having the expanding portion 1a at the tip end of the main body 1c in the form of a round bar and the screw rod 1b having the striking portion 1b ' Before the tube portion 1a is inserted, the engaging portion 21 is fitted in the engaging groove 11 'and is in a state of being caught by the incising portion 22, so that when the tube portion 1a is inserted, Is a spread anchor bolt (100) made up of a configured sleeve (2).

따라서 콘크리트벽(w)에 소정 크기로 형성된 구멍(w1)에 상기 앵커볼트(100)의 선단에 구비된 슬리브(2)를 밀어 넣어 완전히 삽입시킨 상태<이때 슬리브(2)는 오므러든 상태이기에 구멍(w1)에 무리 없이 쉽게 삽입됨>에서 타격부(1b')를 가볍게 타격하게 되면 축봉(1)이 전진하면서 확관부(1a)의 선단에 위치한 테이퍼부(11)가 슬리브(2) 내경으로 들어가게 되면서 슬리브(2)를 자연스럽게 확장시켜 구멍(w1) 내경에 견고하게 밀착시키게 되고, 슬리브(2)의 내경은 확관부(1a) 외경에 견고하게 밀착되게 되어 요지부동하게 설치되는 것이다.Therefore, the sleeve (2) provided at the tip of the anchor bolt (100) is pushed into the hole (w1) formed at a predetermined size in the concrete wall (w) the tapered portion 11 located at the front end of the expanded portion 1a is moved toward the inner diameter of the sleeve 2 by advancing the shaft rod 1 when the impacted portion 1b ' The sleeve 2 is naturally expanded so as to firmly adhere to the inner diameter of the hole w1 and the inner diameter of the sleeve 2 is tightly adhered to the outer diameter of the expanded portion 1a.

특히, 상기 축봉(1)의 선단에 위치한 확관부(1a)는 외주면에 스크래치나 미세한 돌기 또는 미세한 요철부가 형성되어 있는데다가, 상기 확관부(1a) 선단은 테이퍼부(11)와 함께 직경이 작은 선단부(12)가 형성되어 있으며, 또 상기 선단부(12)에는 후술하는 슬리브(2)의 후미 걸림부(21)가 끼워지도록 걸림요홈(11')이 형성되어 있고, 슬리브(2)는 외경 및 내경에 외향돌부(23) 및 내향돌부(23')를 번갈아 가며 반복형성한 상태이기에 확관부(1a)가 삽입되었을 때 외향돌부(23)는 구멍(w1) 내경에 작용하여 견고하게 고착되고, 동시에 내향돌부(23')는 다수의 요철부가 구비된 확관부(1a) 외주면에 작용하게 되는데, 이때 슬리브(2) 내외경 전체면이 확관부(1a)와 구멍(w1)에 균일하면서도 견고하게 밀착되게 됨에 따라 삽입 설치된 앵커볼트(100)가 전혀 빠져나올 수 없게 될 뿐만 아니라 나아가 앵커볼트(100)가 상하좌우 어느 쪽으로도 미동도 없이 안정적으로 설치되게 되어 신뢰성이 극대화될 수 있게 되는 것이다.Particularly, the expanded portion 1a located at the distal end of the shaft rod 1 has scratches, fine protrusions or fine irregularities formed on the outer peripheral surface thereof, and the distal end of the expanded portion 1a is formed with a tapered portion 11, And the front end portion 12 is formed with a latching groove 11 'so that the rear engaging portion 21 of the sleeve 2 to be described later is inserted. The sleeve 2 has an outer diameter and an outer diameter The outward protruding portion 23 and the inward protruding portion 23 'are alternately repeatedly formed on the inner circumference of the hole. When the expanded portion 1a is inserted, the outward protruding portion 23 acts on the inner diameter of the hole w1, At the same time, the inward protruding portion 23 'acts on the outer circumferential surface of the expanded portion 1a having a plurality of protruding and recessed portions. At this time, the entire inner and outer diameter surfaces of the sleeve 2 are uniformly and firmly attached to the expanded portion 1a and the hole w1 As a result, the anchor bolt 100 inserted therein can not escape Furthermore, as the anchor bolt 100 is installed to be stable without any fine movement toward up, down, left, and right will be reliably can be maximized.

그리고 본 발명에 있어서 스프레드 앵커볼트(100)의 주 구성품 중 하나인 축봉(1)의 나사봉(1b) 선단에는 세트앵커볼트(100)를 콘크리트벽(w)에 형성한 구멍(w1)에 끼워 안정적으로 타격할 수 있도록 타격부(1b')가 구비됨으로서, 타격부(1b')를 가볍게 타격하는 단순한 작업에 의해 스프레드 앵커볼트(100)를 흔들림이나 유격이 전혀 없게끔 설치 고정할 수 있게 되는 것이며, 본 발명에 있어서 중요 구성품 중 하나인 슬리브(2)는 외주면 일 측에 길이방향으로 개방된 개방부(22)가 구비되어 있는데다가 외경 및 내경면에 일정한 간격 또는 불규칙한 간격으로 외향돌부(23) 및 내향돌부(23')를 반복형성한 구성이기 때문에 슬리브(2) 내외경부분이 구멍(w1)과 확관부(1a) 사이에서 유기적으로 작용하여 앵커볼트(100)가 콘크리트벽(w)에 견고하게 고정 설치되게 하는 것이다.In the present invention, the set anchor bolt 100 is inserted into the hole w1 formed in the concrete wall w at the tip of the threaded rod 1b of the shaft rod 1 which is one of the main components of the spread anchor bolt 100 The striking portion 1b 'is provided so as to stably strik the striking portion 1b' so that the spread anchor bolt 100 can be installed and fixed without any swinging or clearance by a simple operation of hitting the striking portion 1b ' The sleeve 2, which is one of the important components of the present invention, is provided with an opening portion 22 which is open in the longitudinal direction on one side of the outer peripheral surface, and has an outward protruding portion 23 The inner and outer diameter portions of the sleeve 2 act between the hole w1 and the expanded portion 1a and the anchor bolt 100 acts on the concrete wall w To be firmly fixed .

또한, 상기 슬리브(2)는 후미에 걸림요홈(11')에 끼워지도록 걸림부(21)가 형성되어 있기 때문에 시공전에는 항상 확관부(1a)의 선단에 위치한 걸림요홈(11')에 끼워져 있는 상태에서 유통, 운반, 보관하게 되며, 간혹 취급과정 중에 슬리브(2)가 걸림요홈(11')으로부터 이탈되는 경우에는 슬리브(2)에 개방부(22)가 구비되어 있어 항상 자체탄성이 존재하기 때문에 벌려 끼우면 된다.Since the sleeve 2 is formed with the engaging portion 21 so as to fit into the rear engaging groove 11 ', the sleeve 2 is always inserted into the engaging groove 11' The sleeve 2 is provided with the opening portion 22 when the sleeve 2 is disengaged from the engaging groove 11 'during the handling process, so that the self-elasticity always exists You can open it.

따라서 슬리브(2) 후미에 형성한 걸림부(21)를 확관부(1a)의 선단부(12)에 형성된 걸림요홈(11')에 끼운 상태에서 운반, 보관, 시공 등 취급을 하게 되며, 이때 선단부(12)의 외경이 확관부(1a)의 외경 보다 작게 형성되어 있어 슬리브(2)도 외경이 최소화된 상태에서 걸림요홈(11')에 연결되어 있게 되며, 석재패널 시공을 위해 콘크리트 벽(w)에 스프레드 앵커볼트(100)를 시공하고자 할 때는 구멍(w1)에 슬리부(2)를 완전히 밀어 넣은 상태에서 망치로 타격부(1b')를 가볍게 때려 박음으로서 확관부(1a)가 진입하면서 자연스럽게 슬리브(2) 내경을 확관시켜 주게 되어 구멍(w1)에 밀착 고정시키게 되고, 따라서 슬리브(2)의 내외경 모두 구멍(w1) 및 확관부(1a)를 전체적으로 고정시킬 수 있게 된다는 것이다.Therefore, the engaging portion 21 formed at the back of the sleeve 2 is handled, stored, and installed in a state where it is sandwiched in the engaging groove 11 'formed at the distal end portion 12 of the expanded portion 1a. At this time, 12 are formed to be smaller than the outer diameter of the expanded portion 1a so that the sleeve 2 is connected to the retaining groove 11 'with the outer diameter minimized. When the spread anchor bolt 100 is to be installed, the impact portion 1b 'is lightly pinched by a hammer while the slit portion 2 is fully inserted into the hole w1, The inner diameter of the sleeve 2 is enlarged and tightly fixed to the hole w1 so that the hole w1 and the expanded portion 1a can be entirely fixed to the inner and outer diameters of the sleeve 2. [

도18~도20은 본체(1c) 후미에 버팀판(3)이 장착 고정된 스프레드 앵커볼트(100)에 있어서, 상기 버팀판(3)의 후면에 ㄴ형 석재앵글(5)을 장착할 때 버팀판(3)과 ㄴ형 석재앵글(5) 사이에 하부에 나사봉의 형태로 된 버팀봉(42)이 구비된 버팀조절대(4)를 개재시킴으로서, 석재패널(p) 시공시 석재앵글(5)의 수평조절과 고 중량의 석재패널(p)을 안정적으로 받쳐 지지해 줄 수 있게 한 것이다.18 to 20 show a spread anchor bolt 100 in which a brace plate 3 is mounted and fixed to the rear of the main body 1c and a brace plate 3 is attached to the brace plate 3, A stone clamping bar 4 provided with a strut bar 42 in the form of a screw rod at the bottom is interposed between the stone angle 5 and the stone angle p of the stone angle p Leveling and heavy-weight stone panel (p).

특히, 위와 같은 본 발명은 버팀봉(42)을 시계방향 또는 반시계방향으로 돌려가며 석재앵글(5)의 수평조절을 할 수 있기 때문에 미세조절이 용이하여 수평조절을 매우 정확하게 할 수 있는 특징이 따르게 되고, 더 나아기 고하중의 석재패널(p)을 매우 안정적으로 지지할 수 있게 되어 안전시공과 더불어 시공의 신뢰성과 안전성을 극대화시킬 수 있는 특징이 따르게 된다.Particularly, the present invention as described above is characterized in that it is possible to adjust the horizontal angle of the stone angle 5 by turning the padding rod 42 clockwise or counterclockwise, And it is possible to support the stone panel (p) of the baby heavy load very stably, so that the safety construction and the reliability and safety of the construction can be maximized.

도21은 버팀판(3)의 하부를 길게 연장하여 연장부에 버팀봉(42)를 설치함으로서 버팀판(3)이 상기와 같은 버팀조절대로서의 기능을 수행할 수 있게 한 것이며, 이 경우에는 수평조절의 개념은 다소 작지만 고하중의 석재패널(p)은 매우 안정적으로 지탱할 수 있다.FIG. 21 is a perspective view showing a state in which the support plate 42 is provided on the extended portion of the support plate 3 by extending the lower portion of the support plate 3 so that the support plate 3 can perform the function as the above- The concept of leveling is somewhat small, but the high-load stone panel (p) can withstand very steadily.

그리고, 본 발명에 있어서 슬리브(2)는 내경 또는 외경면에 돌출된 내향돌부(23') 또는 외향돌부(23)를 선단부로 갈수록 단계적으로 더 돌출되게 형성할 수도 있으며, 이 경우 확관부(1a)가 진입하면 할수록 앵커볼트(100)가 더욱 더 견고하게 장착될 수 있다.In the present invention, the sleeve 2 may be formed such that the inward protruding portion 23 'or the outward protruding portion 23 protruding from the inner or outer diameter surface is protruded step by step toward the distal end portion. In this case, The more the anchor bolt 100 can be mounted more firmly.

또한, 상기 슬리브(2)의 외주면과 내주면에 규칙적 또는 불규칙적으로 도트형식의 돌기나 스크래치를 형성할 수 있으며, 이 외에도 슬리브(2)가 확관부(1a)와 구멍(w1) 견고하게 장착되어 스프레드 앵커볼트(100)가 요지부동하도록 장착시키기 위한 다양한 구성도 선택적으로 적용할 수 있을 것이다.It is also possible to form protrusions or scratches in a regular or irregular fashion on the outer and inner circumferential surfaces of the sleeve 2 and the sleeves 2 are firmly attached to the widening portions 1a and the w1, Various arrangements for mounting the anchor bolt 100 so as to float the anchor bolt 100 may be selectively applied.

도22~도23은 본 발명의 슬리브(2)에 대한 다른 실시예를 나타낸 것으로, 이는 절개부(22)를 가진 슬리브(2)의 선단부에 2~3개의 슬릿홈(22')을 더 형성함으로서 앵커볼트의 확관부(1a)가 삽입되었을 때 구멍(w1) 내경에 더욱 더 원활하게 확장 결합될 수 있게 한 것이다.22 to 23 show another embodiment of the sleeve 2 of the present invention in which two or three slit grooves 22 'are further formed in the distal end of the sleeve 2 having the cutout 22 So that when the expanded portion 1a of the anchor bolt is inserted, the inner diameter of the hole w1 can be more smoothly expanded and coupled.

본 발명의 제8실시예인 도24~도25는, 축봉(1)의 선단에 형성된 확관부(1a)에 환형의 돌출부(13)를 다수 형성하고, 선단에 2~3개의 슬릿홈(22')이 구비된 슬리브(2)의 선단 내경, 또는 선단 및 후단부 내경에 내향돌부(23')를 형성한 것으로, 이는 축봉(1)의 선단 확관부(1a)가 슬리브(2)에 삽입되면서 슬리브(2)를 확장시키다가 확관부(1a)가 완전히 삽입되면 확관부(1a) 선단에 형성된 환형의 돌출부(13)가 슬리브(2)의 내향돌부(23')와 유기적으로 작용하게 되어 슬리브(2)의 선단을 더욱 확관시키게 됨을 따라 앵커볼트(100)가 콘크리트 벽(w)에 매우 견고하게 설치 고정되는 것이다.24 to 25 each show an eighth embodiment of the present invention in which a large number of annular protrusions 13 are formed in the expanded portion 1a formed at the tip of the shaft rod 1 and two or three slit grooves 22 ' The inward protruding portion 23 'is formed at the distal end inner diameter or the inner diameter of the distal end and the rear end of the sleeve 2 provided with the sleeve 2 and the distal end expanding portion 1a of the shaft 1 is inserted into the sleeve 2 The annular protruding portion 13 formed at the tip of the expanded portion 1a acts organically with the inward protruding portion 23 'of the sleeve 2 when the expanded portion of the sleeve 2 is fully inserted, The anchor bolt 100 is installed and fixed to the concrete wall w very firmly as the leading end of the anchor bolt 100 is further expanded.

본 발명의 제9실시예를 나타낸 도26A 및 도26B에 도시된 앵커볼트는 확관부(1a) 만으로 축봉(1)을 형성하되, 상기 축봉(1)의 머리부(1d)를 평판형 또는 반구형으로 형성함으로서 벽면에 중량물을 걸거나 각종 물품을 설치할 때 매우 견고하면서도 깔끔하게 설치할 수 있다.The anchor bolts shown in Figs. 26A and 26B showing the ninth embodiment of the present invention are characterized in that the shaft rod 1 is formed by only the expanded portion 1a and the head portion 1d of the shaft rod 1 is formed into a plate- So that it can be installed very firmly and neatly when hanging heavy objects on the wall or installing various articles.

본 발명의 제10실시예를 나타낸 도27은 축봉(1)을 확관부(1a)만으로 형성하되, 상기 확관부(1a) 후미에 암나사구멍(1h)을 천공하고, 이 곳에 볼트(b)를 체결할 수 있게 하면, 단열재 없이 석재패널을 시공함과 동시에 실내벽면과 같이 석재패널을 벽체에 최대한 가깝게 설치할 수 있는 특징이 따르게 된다.27 showing a tenth embodiment of the present invention, the shaft rod 1 is formed only of the expanded portion 1a, and the female screw hole 1h is drilled at the rear of the expanded portion 1a, and the bolt (b) It is possible to install a stone panel without insulation and, at the same time, to install a stone panel as close as possible to a wall, such as an interior wall.

또한, 상기한 앵커볼트는 석재패널 시공뿐만 아니라 각종 시설물의 설치 시에도 사용할 수 있는데, 이 경우 수나사 부분이 돌출되지 않아 외관이 깔끔하게 유지될 뿐만 아니라 안전성이 뛰어나게 된다.In addition, the anchor bolt can be used not only for the construction of a stone panel but also for the installation of various facilities. In this case, the anchor bolt is not protruded, so that the appearance of the anchor bolt is not only clean but also excellent in safety.

본 발명의 11실시예인 도28A 및 도28B는 축봉(1)에 구비되는 버팀판(3)의 표면에 고무나 연질합성수지패드를 부착시키거나 또는 고무나 연질합성수지로 후로킹하여 미끄럼방지부(3a)를 구비한 것으로, 이 경우 ㄴ형 석재앵글(5)이 버팀판(3)으로 미끄러지거나 또는 버팀판(3)과 ㄴ형 석재앵글(5) 사이에 개재되는 심패드가 미끄러져 빠져나오게 되는 등의 문제점이 일소되어 체결력을 증대시킬 수 있게 되며, 더 나아가 더욱 안정적이면서도 신속 정확한 시공이 이루어질 수 있게 된다.28A and 28B, which are eleven embodiments of the present invention, show that the anti-slip portion 3a is formed by attaching a rubber or soft synthetic resin pad to the surface of the support plate 3 provided on the shaft rod 1, or by hooking the rubber or soft synthetic resin pad with rubber or soft synthetic resin. In this case, problems such as slipping of the c-shaped stone angle 5 to the support plate 3 or slipping out of the padding pad 3 interposed between the support plate 3 and the d-shaped stone angle 5 So that the fastening force can be increased, and furthermore, the more stable and quick accurate construction can be achieved.

또한 도29에서 보는 바와 같이 버팀판(3)의 표면과 ㄴ형 석재앵글(5)의 바깥쪽 세로면(5')을 엠보싱 처리하여도 앵커볼트 조립 시공시 미끄럼이 예방되기 때문에 한층 더 안정적인 조립이 이루어질 수 있게 된다.29, even when the surface of the support plate 3 and the outer vertical surface 5 'of the d-shaped stone angle 5 are embossed, sliding is prevented during assembly of the anchor bolt, .

이와 같이 구성된 본 발명의 석재패널 장착용 스프레드 앵커볼트(100)는 슬리브(2)가 확관부(1a) 선단에 형성된 걸림요홈(11')에 끼워진 상태로 조립 유통되며, 이를 콘크리트벽(w) 구멍(w1)에 박아 설치하고자 할 때는 먼저 구멍(w1)에 슬리브(2)를 밀어 넣어 완전히 삽입시킨 상태에서 망치로 타격부(1b')를 가볍게 타격하면 되며, 타격과 동시에 확관부(1a)가 슬리브(2) 내경으로 점차 삽입되면서 슬리브(2)가 확관되게 됨으로서 자연적으로 슬리브(2)의 외경, 특히 외향돌부(23) 부분은 구멍(w1)의 내벽에 밀착되고, 내경, 특히 내향돌부(23')부분은 확관부(1a)를 전체적으로 물어 고정시키는 상태로 되기 때문에 스프레드 앵커볼트(100)가 흔들림 없이 견고하면서도 안정적으로 설치되어 신뢰성이 극대화되게 되는 것이다.The spread anchor bolt 100 for mounting a stone panel according to the present invention is assembled and circulated so that the sleeve 2 is inserted into the groove 11 ' When the sleeve 1 is to be inserted into the hole w1, the sleeve 2 is first inserted into the hole w1, and the hitting portion 1b 'is lightly hit with the hammer in a fully inserted state. The outer diameter of the sleeve 2 and particularly the portion of the outward projecting portion 23 are naturally brought into close contact with the inner wall of the hole w1 and the inner diameter of the sleeve 2 is gradually increased, The spread anchor bolt 100 is firmly and stably installed without shaking and reliability is maximized since the portion of the spread anchor bolt 100 '

또한, 석재패널(p) 시공을 위해 스프레드 앵커볼트(100)의 후미 나사봉(1b)에 ㄴ형 석재앵글(5)을 장착할 때 버팀판(3)과의 사이에 버팀봉(42)을 가진 버팀조절대(4)를 설치함으로서, 버팀봉(42)을 시계방향 또는 반시계방향으로 돌려 수평조절을 원활하게 할 수 있을 뿐만 아니라, 중량이 제법 나가는 석재패널(p)의 하중도 안정적으로 받쳐주게 됨으로서 시공의 안정성을 유도할 수 있는 것이다.It is also possible to provide a stiffener bar 42 with the support plate 3 when the bent angle stone 5 is mounted on the rear or boss bar 1b of the spread anchor bolt 100 for the installation of the stone panel p It is possible to smoothly adjust the level by rotating the strut bar 42 clockwise or counterclockwise by installing the strut adjusting bar 4 and also to stably support the load of the stone panel p which exerts weight This can lead to the stability of construction.

도30~도31은 본 발명의 제13실시예로서, 이는 버팀판(3)을 축봉(1)과 분리 구성하되, 상기 버팀판(3)에는 암나사구멍을 형성함으로서 축봉(1) 후단부에 구비된 나사봉(1b)에 체결할 수 있게 한 것이다.30 to 31 illustrate a thirteenth embodiment of the present invention in which the support plate 3 is separated from the shaft rod 1 and a female screw hole is formed in the support plate 3, So that it can be fastened to the screw rod 1b provided.

따라서 본 발명은 버팀판(3)을 너트 체결방식으로 회전시켜가며 조절할 수 있어 석재패널 등을 설치할 때 벽면과의 간격, 석재패널의 수평, 수직 등을 매우 신속정확하게 조절할 수 있게 된다.Accordingly, the present invention can be adjusted by rotating the brace plate 3 in a nut tightening manner, so that the interval between the brace plate 3 and the wall surface, the horizontal and vertical of the stone panel can be adjusted very quickly and accurately when the stone panel or the like is installed.

도32~도33은 스프레드 앵커볼트의 본체(1c) 후미에 구비된 나사봉(1b)에 체결할 수 있는 연장봉(1c')을 더 구비하되, 상기 연장봉(1c')의 후미에 나사봉(1b)을 형성함으로서, 석재패널을 비롯한 건축물의 외장재 등을 시공 설치할 때 단열재의 두께를 더 두꺼운 것으로 사용해야만 하는 경우나, 외장재나 내장재를 설치 시공하는 과정에서 상기 외장재나 내장재를 벽면에서 상당한 거리를 두고 설치해야만 하는 경우에 연결 설치하여 사용할 수 있게 된다.32 to 33 further include an extension rod 1c 'which can be fastened to the threaded rod 1b provided at the back of the main body 1c of the spread anchor bolt, and the extension rod 1c' 1b), it is necessary to use a thicker insulation material when installing the exterior material of the building including the stone panel, or when the exterior material or the interior material is installed at a considerable distance If you have to install it, you can install it and use it.

또한, 상기 연장봉(1c)의 길이를 다양한 길이로 구비하게 되면, 현장 상황이나 작업자 또는 사용자의 의도에 따라 취사 선택이 가능해져 더욱 원활하게 사용할 수 있다.In addition, if the length of the elongated rod 1c is varied, it is possible to select a cooking course according to the situation of the user or the intention of the operator or the user.

도34~도35는 상기 스프레드 앵커볼트의 본체(1) 후미에 암나사구멍(1h)을 형성하고, 상기 암나사구멍(1h)에 전후부에 나사봉(1b)을 구비한 연장봉(1c')을 연결 조립할 수 있게 한 것으로, 이 또한 시공현장의 특성에 따라 다양한 길이의 연장봉(1c')을 선택 사용할 수 있게 한 것이다.34 to 35 show a state in which a female screw hole 1h is formed at the back of the main body 1 of the spread anchor bolt and an extension rod 1c 'having a threaded rod 1b at the front and rear portions is formed in the female screw hole 1h And it is also possible to selectively use the extension rods 1c 'of various lengths according to the characteristics of the construction site.

도36~도37은 상기 스프레드 앵커볼트를 구성하는 축봉을 확관부(1a)만으로 구성하되, 상기 확관부(1a)는 외주면에 머리부(1d)에 십자홈(1d')이 형성된 수나사를 형성함으로서, 벽면 구멍에 상기 확관부(1a) 끝에 연결된 슬리브(2)를 삽입시킨 상태에서 확관부(1a)의 머리부(1d)를 때려 박으면 되고, 이때 설치하고자 하는 기구나 물품에 따라 드라이버로서 슬리브(2)에 박은 확관부(1a)를 반시계방향으로 돌려 빼거나 인출 길이를 조절할 수 있어, 설치하고자 하는 물품이나 기구에 따라 손쉽게 조절하여 편리하게 사용할 수 있는 것이다.36 to 37 show that the shank anchor bolt is constituted by only the expanded portion 1a and the expanded portion 1a is formed with a male thread having a cross groove 1d 'formed on the outer periphery of the head portion 1d The head portion 1d of the expanded portion 1a can be pushed into the hole of the wall while the sleeve 2 connected to the end of the expanded portion 1a is inserted into the wall hole. It is possible to adjust the withdrawal length by adjusting the withdrawal length by turning the expanded portion 1a caught in the sleeve 2 in a counterclockwise direction.

미설명부호 6은 조정판이고, 7은 석재지지핀이다.Reference numeral 6 denotes a control panel, and 7 denotes a stone supporting pin.

이와 같이 구성된 본 발명은 권리범위가 상기한 실시예에 한정되는 것은 아니며 따라서 발명의 목적과 사상의 범위 안에서 다양하게 변형 실시할 수 있는 것이다.The scope of the present invention is not limited to the above-described embodiments, and various modifications may be made within the scope and spirit of the invention.

1 : 축봉 1a : 확관부 1b : 나사봉
1b' : 타격부 1c : 본체 2 : 슬리브
3 : 버팀판 4 : 버팀조절대 5 : 석재앵글
11 : 테이퍼부 11': 걸림요홈 12 : 선단부
21 : 걸림부 22 : 절개부 23 : 외향돌부
23' : 내향돌부 41 : 구멍 42 : 버팀봉
p : 석재패널 w : 콘크리트벽 w1 : 구멍
100 : 스프레드 앵커볼트
1: shaft rod 1a: expansion part 1b:
1b ': striking portion 1c: main body 2: sleeve
3: Support plate 4: Support adjustment lever 5: Stone angle
11: tapered portion 11 ': engagement groove 12:
21: latching portion 22: incision portion 23: outwardly projecting portion
23 ': inward protrusion 41: hole 42:
p: stone panel w: concrete wall w1: hole
100: Spread anchor bolt

Claims (17)

삭제delete 삭제delete 본체(1c)의 선단에 외주면이 민자형태 또는 외주면에 다수의 환형홈이 구비되어 슬리브 구멍에 삽입되면서 슬리브를 확장시킬 수 있도록 된 확관부(1a)가 형성되고, 본체(1c) 후단에는 타격부(1b')를 가진 나사봉(1b)을 형성된 축봉(1)과,
외주면에 길이방향으로 절개부(22)와 2~3개의 슬릿홈(22')을 형성하여 상기 확관부(1a)가 삽입될 때 벌어져 콘크리트벽의 구멍(w1) 내경 전체와 확관부(1a) 외주면 전체를 동시에 꽉 물어 견고하게 고정시키는 슬리브(2)로 스프레드 앵커볼트를 구성하되,
상기 축봉(1)의 확관부(1a)는 소정직경으로 되어 외주면에 스크래치나 미세한 돌기 또는 미세한 요철부가 구비되고, 선단은 테이퍼부(11)와 함께 직경이 작은 선단부(12)가 형성되며, 상기 선단부(12)에는 후술하는 슬리브(2)의 후미 걸림부(21)가 끼워지도록 걸림요홈(11')을 형성하고,
슬리브(2)는 내외주면에 일정한 간격 또는 불규칙한 간격으로 외향돌부(23) 및 내향돌부(23')를 반복형성함과 동시에 후미에 걸림요홈(11')에 끼워지도록 걸림부(21)를 형성하며,
상기 축봉(1)의 선단부(12)에 형성된 걸림요홈(11')에는 슬리브(2)의 후미에 형성된 걸림부(21)가 끼워진 상태에서 콘크리트 벽(w) 구멍(w1)에 슬리부(2)를 완전히 밀어 넣고, 이 상태에서 망치로 타격부(1b')를 가볍게 타격하면 확관부(1a)가 진입하면서 슬리브(2) 내경을 강제로 확관시켜 슬리브(2) 외경이 구멍(w1)에 밀착 고정시킴으로서 슬리브(2)의 내 외경 모두 구멍(w1) 및 확관부(1a)를 전체적으로 견고하게 고정시킬 수 있게 함을 특징으로 하는 스프레드 앵커볼트.
An annular groove (1a) is formed in the front end of the main body (1c) so that the outer periphery of the main body (1c) is in the form of a pin or a plurality of annular grooves are formed in the outer circumferential surface of the main body (1b) formed with a threaded rod (1b) having a threaded portion (1b '),
A slit 22 and two or three slit grooves 22 'are formed on the outer circumferential surface in the longitudinal direction so that when the expanded portion 1a is inserted, the entire inner diameter of the hole w1 of the concrete wall, A spread anchor bolt is constituted by a sleeve (2) which tightly fixes the entire circumferential surface at the same time,
The expanded portion 1a of the shaft rod 1 has a predetermined diameter and is provided with scratches, fine protrusions or fine irregularities on the outer circumferential surface thereof, a distal end portion 12 having a small diameter along with the tapered portion 11 is formed at the distal end thereof, The front end portion 12 is formed with a latching groove 11 'so that the rear engaging portion 21 of the sleeve 2 to be described later is fitted,
The sleeve 2 forms the engaging portion 21 so as to form the outward protruding portion 23 and the inward protruding portion 23 'repeatedly on the inner and outer circumferential surfaces at regular intervals or at irregular intervals and to fit into the back engaging recess 11'
The slit portion 2 is formed in the hole w1 of the concrete wall w in a state where the engagement portion 21 formed at the back of the sleeve 2 is fitted in the engagement groove 11 'formed in the front end portion 12 of the shaft rod 1, The inner diameter of the sleeve 2 is forcibly expanded while the expanded portion 1a enters and the outer diameter of the sleeve 2 is closely contacted with the hole w1, So that the hole (w1) and the expanded portion (1a) can be firmly fixed on the entire inner and outer diameters of the sleeve (2).
삭제delete 삭제delete 제3항에 있어서,
상기 슬리브(2)의 내경 또는 외경에 형성된 내향돌부(23') 또는 외향돌부(23)는 선단부로 갈수록 단계적으로 더 돌출되도록 형성함을 특징으로 하는 스프레드 앵커볼트.
The method of claim 3,
Wherein the inward protruding portion (23 ') or the outward protruding portion (23) formed on the inner or outer diameter of the sleeve (2) is formed to protrude step by step toward the front end portion.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020170068038A 2017-04-07 2017-05-30 A spread anchor bolt KR101827210B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20170046078 2017-04-07
KR1020170046078 2017-04-07

Publications (1)

Publication Number Publication Date
KR101827210B1 true KR101827210B1 (en) 2018-02-08

Family

ID=61232370

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170068038A KR101827210B1 (en) 2017-04-07 2017-05-30 A spread anchor bolt

Country Status (1)

Country Link
KR (1) KR101827210B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102255364B1 (en) 2020-12-24 2021-05-24 정진용 Anchor Assembly for Installation of Building Interior Materials

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200464097Y1 (en) * 2010-10-04 2012-12-11 김순찬 set anchor
KR101575099B1 (en) * 2014-08-07 2015-12-07 김이태 Anchor bolt
KR101706307B1 (en) * 2016-07-28 2017-02-13 강민영 Wall fixing device for stone connecting and construction method using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200464097Y1 (en) * 2010-10-04 2012-12-11 김순찬 set anchor
KR101575099B1 (en) * 2014-08-07 2015-12-07 김이태 Anchor bolt
KR101706307B1 (en) * 2016-07-28 2017-02-13 강민영 Wall fixing device for stone connecting and construction method using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102255364B1 (en) 2020-12-24 2021-05-24 정진용 Anchor Assembly for Installation of Building Interior Materials

Similar Documents

Publication Publication Date Title
KR100998072B1 (en) Expanded ground pressure type anchor structure
KR102307193B1 (en) Set anchor bolt
KR101827210B1 (en) A spread anchor bolt
US6254325B1 (en) Anchor assembly for a wall, floor or like supporting structure
KR101575239B1 (en) A fixing structure of heat insulating material for building and constructing method thereof
KR20170003523U (en) Anchor bolt unit having expandable fastening parts
JPH09310411A (en) Concrete fastener
KR100625534B1 (en) Anchor bolt assembly
US4415299A (en) Anchoring retainer for threaded fasteners
KR101303007B1 (en) Anchor bolt
JP2021535973A (en) Improved anchor bolt assembly and ceiling finish panel fixing device including it
KR20200040643A (en) Improved anchor bolt assembly and ceiling finish panel fastener comprising same
KR101882658B1 (en) A spread anchor bolt
US4397595A (en) Anchoring retainer for threaded fasteners
KR101808172B1 (en) Anchor Structure with Dual Spreading Structure, and Construction Method of the Anchor Structure
US10088135B2 (en) Mounting base for work light
KR102004655B1 (en) A spread anchor bolt
JP4611879B2 (en) Mounting method of bracket
KR20150073587A (en) Anchor bolt
KR20170090257A (en) the ground fixed device of rear wing is opened when front hit and the Installation method using the the ground fixed device
JP2791791B2 (en) Anchor for concrete
KR200352238Y1 (en) Set anchor bolt
US20020124371A1 (en) Anchor driver tool for power hammer apparatus
KR200487599Y1 (en) Ancor Apparatus For Fixing Stone Plate On The Concrete Wall
US20170114507A1 (en) System for securing semi-rigid foam members, and related devices, components, and methods

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant