KR101700941B1 - Flat type Sheet Molding Compound cover and assemble the structure using the same - Google Patents

Flat type Sheet Molding Compound cover and assemble the structure using the same Download PDF

Info

Publication number
KR101700941B1
KR101700941B1 KR1020160116766A KR20160116766A KR101700941B1 KR 101700941 B1 KR101700941 B1 KR 101700941B1 KR 1020160116766 A KR1020160116766 A KR 1020160116766A KR 20160116766 A KR20160116766 A KR 20160116766A KR 101700941 B1 KR101700941 B1 KR 101700941B1
Authority
KR
South Korea
Prior art keywords
assembled
panel
groove
smc
cover
Prior art date
Application number
KR1020160116766A
Other languages
Korean (ko)
Inventor
정지호
Original Assignee
(주)우강엔텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=58154923&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR101700941(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by (주)우강엔텍 filed Critical (주)우강엔텍
Priority to KR1020160116766A priority Critical patent/KR101700941B1/en
Application granted granted Critical
Publication of KR101700941B1 publication Critical patent/KR101700941B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/54Gates or closures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • E04B7/022Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
    • E04B7/024Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames the trusses or frames supporting load-bearing purlins, e.g. braced purlins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/12Roofing elements shaped as plain tiles or shingles, i.e. with flat outer surface
    • E04D1/20Roofing elements shaped as plain tiles or shingles, i.e. with flat outer surface of plastics; of asphalt; of fibrous materials

Abstract

The present invention relates to a flat sheet molding compound (SMC) cover and an easy-to-assemble structure using the same. The flat SMC cover is installed in a place such as a wastewater treatment plant, a sewage treatment plant, a water purification plant, or the like to fundamentally block water from leaking or foreign substances such as fallout, yellow dust, pollutants, and the like due to water leakage from flowing inwardly, and to prevent odors, toxic gases, and the like from emitting outwardly. The present invention has effects on forming a simple and solid structure, not requiring a wide space in working, and consuming relatively less time required for assembly; significantly reducing the failure rate of a field assembly since a completed structure is assembled; quickly building a structure such as the entirety of an upper part with simple operations in relatively less time even when the structure is large; and reducing the occurrence of an odor and blocking odors at the same time since the height of the dome arch is significantly lower than that of a geodesic dome, and thus, a closed space becomes relatively small. Therefore, the present invention may have an excellent economical effect.

Description

플랫형 SMC 덮개 및 이를 이용한 조립형 구조물 {Flat type Sheet Molding Compound cover and assemble the structure using the same}TECHNICAL FIELD [0001] The present invention relates to a flat type SMC cover and an assembled structure using the same,

본 발명은 플랫형 SMC(Sheet Molding Compound) 덮개 및 이를 이용한 조립형 구조물에 관한 것으로서, 더욱 상세하게는 폐수처리장, 하수처리장, 정수장 등과 같은 곳에 설치하여 누수 또는 누수로 인한 낙진, 황사, 오염물질 등의 이물질이 내부로 유입되는 것을 원천 차단하고 악취 및 유독가스 등의 외부 방출을 방지하기 위한 플랫형 SMC 덮개 및 이를 이용한 조립형 구조물에 관한 것이다.
The present invention relates to a flat type SMC (Sheet Molding Compound) cover and an assembled structure using the same. More particularly, the present invention relates to a flat mold SMC (Sheet Molding Compound) The present invention relates to a flat type SMC lid for preventing the foreign material from entering into the interior and preventing external emission such as odor and toxic gas, and an assembly type structure using the same.

종래에 폐수처리장, 하수처리장, 정수장과 같은 곳에 설치되는 덮개 또는 구조물들은 다양한 공법이나 설계로 시공되고 있는 실정이다.Conventionally, lids or structures installed at places such as wastewater treatment plants, sewage treatment plants, and water treatment plants are being constructed by various methods and designs.

이와 같은, 덮개 또는 구조물은 다수의 프레임을 각각의 거셋플레이트와 체결하고, 그 위에 판넬을 덮고 클램프 체결을 하여 조립하고 이의 체결부를 거셋카바로 막고 실리콘을 도포하여 마무리하는 시공으로써 작업이 복잡하고 조립에 필요한 장소를 많이 필요로 하며 조립시간이 많이 걸리는 문제점이 있었다.Such a cover or structure is a complex construction in which a plurality of frames are fastened to respective gusset plates, a panel is covered thereon, a clamp is assembled by clamping, a fastening portion is covered with a gusset cover, A lot of necessary space is required and the assembling time is long.

대표적으로, 대한민국 등록특허공보 제10-1049004호인 돔 구조물의 시공방법 및 이를 이용한 돔 구조물은 상부메인거셋과 하부메인거셋을 한 쌍으로 하는 메인거셋과, 상기 상부메인거셋과 하부메인거셋 사이에 조립되되, H빔형태로 형성되어 상부에 2개의 돌출부가 길이방향으로 형성되고 상기 2개의 돌출부 사이에 홈이 형성됨과 동시에 상부 한 측에 제 1 구멍이 형성되고 상부 다른 한 측에 제 2 구멍이 형성되고 하부 한 측에 제 3 구멍이 형성되며, 하부 다른 한 측에 제 4 구멍이 형성되어 상기 제 1 구멍을 통하여 상기 상부메인거세과 볼트결합하고 상기 제 3 구멍을 통해 상기 하부메인거셋과 볼트결합하는 다수의 제 1 스트럿과, 상기 다수의 제 1 스트럿 각각이 상기 메인거셋과 조립되는 반대측 각각에 상부보조거셋과 하부보조거셋을 한 쌍으로 조립되되, 상기 제 2 구멍과 상기 상부보조거셋이 조립되고 상기 제 4 구멍과 하부보조거셋이 조립되는 제 1 보조거셋과, 상기 제 1 보조거셋과 이웃한 다른 제 1 보조거셋 사이 각각에 조립되되, 상기 제 1 스트럿과 동일한 구조를 갖는 다수의 제 2 스트럿과, 상기 제 1 보조거셋에 조립되되, 상기 메인거셋이 배치된 반대측 하향으로 조립되고 상기 제 1, 2 스트럿과 동일한 구조를 갖는 다수의 제 3 스트럿과, 상기 제 3 스트럿 각각이 상기 제 1 보조거셋과 조립되는 반대측 각각에 조립되되, 상기 제 1 보조거셋과 동일한 구조를 갖는 제 2 보조거셋과, 상기 제 2 보조거셋과 이웃한 다른 제 2 보조거셋 사이 각각에 조립되되, 상기 제 1, 2, 3 스트럿과 동일한 구조를 갖는 제 4 스트럿과, 상기 제 1 스트럿, 제 1 보조거셋, 제 3 스트럿, 제 2 보조거셋, 제 4 스트럿과 같은 구성에 의해서 방사형으로 돔구조 끝단의 제 n 번째 보조거셋에 조립되는 다수의 슈와, 상기 다수의 슈와 조립됨과 동시에 돔구조물이 덮어지는 건축물 상부와 조립되는 다수의 슈베이스와, 상기 돔 구조물 뼈대에 의해서 형성된 제 1 공간을 덮기 위하여 끝단이 절곡되게 형성된 돔덮개와, 상기 슈베이스와 조립된 슈 각각의 사이에 건축물과 스트럿에 의해서 형성되는 제 2 공간을 덮기 위해 끝단이 절곡된 측면덮개와, 상기 돔덮개 상부 또는 측면덮개 상부에 적층되게 배치하고 볼트결합되기 위한 제 5 구멍이 형성된 배턴, 상기 돔덮개와 배턴 사이 또는 측면덮개와 배턴에 방수되게 하는 가스켓, 및 상기 배턴에 형성된 제 5 구멍을 통과하여 상기 제 1 스트럿에 형성된 홈과 결합되는 볼트로 구성되되, 상기 다수의 돔덮개와, 다수의 배턴, 다수의 가스켓 및 다수의 볼트로 상기 다수개 형성되는 제 1 공간을 모두 덮고 다수의 측면덮개와, 다수의 배턴, 다수의 가스켓 및 다수의 볼트로 상기 다수개 형성된 제 2 공간 모두를 덮는 구성으로 이루어진다.Typically, Korean Patent Registration No. 10-1049004, a method of constructing a dome structure and a dome structure using the same, includes a main gusset which pairs an upper main gusset and a lower main gusset, And two projections are formed in the longitudinal direction and grooves are formed between the two projections, a first hole is formed on the upper one side, and a second hole is formed on the other side of the upper side. And a third hole is formed on the lower one side and a fourth hole is formed on the other side of the lower portion so as to be bolted to the upper main coercion through the first hole and to be bolted to the lower main main body through the third hole A plurality of first struts and a plurality of first struts each having a pair of upper auxiliary gussets and lower auxiliary gussets on opposite sides of which are assembled with the main gusset, A first auxiliary gusset assembled with the second hole and the upper auxiliary gusset and assembled with the fourth hole and the lower auxiliary gusset, and a first auxiliary gusset adjacent to the first auxiliary gusset, A plurality of second struts having the same structure as the first strut and a plurality of second assemblies assembled to the first subsidiary gusset and assembled downward on the opposite side where the main gusset is disposed, 3 struts and a second auxiliary gusset having the same structure as that of the first auxiliary gusset and each of the third struts being assembled to each of the opposite sides of the third auxiliary gusset to be assembled with the first auxiliary gusset, A third strut, a second strut, a second strut, a fourth strut, and a fourth strut, each of the first strut, the second strut, the second strut, the second strut, Same A plurality of shoe assemblies assembled to the n th subsidiary gusset at the end of the dome structure in a radial manner, a plurality of shoe bases assembled with an upper part of the structure where the dome structure is covered while being assembled with the shoe, A side cover which is bent at an end to cover a second space formed by the building and the strut between the shoe base and each of the shoe assembled; A baton having a fifth hole to be bolted to the upper part of the dome cover or the side cover, a gasket to be waterproofed between the dome cover and the baton or between the dome cover and the baton, and a fifth hole formed in the baton And a bolt engaged with a groove formed in the first strut, wherein the plurality of dome covers, a plurality of batts, Jacket and a plurality of bolt covering both a first space which is formed the plurality comprises a plurality of side covers, and a plurality of the baton, a plurality of gaskets, and consist of a number of bolts which covers both the second space are formed a plurality of the.

또한, 상부메인거셋과 하부메인거셋을 한 쌍으로 하는 메인거셋과, 상기 상부메인거셋과 하부메인거셋 사이에 조립되되, H빔형태로 형성되어 상부에 제 10 돌출부와, 제 11 돌출부가 길이방향으로 형성되고 상기 제 10 돌출부와 제 11 돌출부 사이에 제 12 돌출부와 제 13 돌출부가 형성됨과 동시에 상기 상부 한 측에 10 구멍이 형성되고 상부 다른 한 측에 제 11 구멍이 형성되며 하부 한 측에 제 12 구멍이 형성되고 하부 다른 한 측에 제 13 구멍이 형성되어 상기 10구멍을 통해 상부메인거셋과 볼트결합되고 상기 제 12 구멍을 통해 상기 하부메인거셋과 볼트결합하는 다수의 제 10 스트럿과, 상기 다수의 제 10 스트럿 각각이 상기 메인거셋과 조립되는 반대측 각각에 상부보조거셋과 하부보조거셋을 한 쌍으로 조립되되, 상기 제 11 구멍과 상기 상부보조거셋이 조립되고 상기 제 13 구멍과 하부보조거셋이 조립되는 제 10 보조거셋과, 상기 제 10 보조거셋과 이웃한 다른 제 10 보조거셋 사이 각각에 조립되되, 상기 제 10 스트럿과 동일한 구조를 갖는 다수의 제 20 스트럿과, 상기 제 10 보조거셋에 조립되되, 상기 메인거셋이 배치된 반대측 하향으로 조립되고 상기 제 1, 2 스트럿과 동일한 구조를 갖는 다수의 제 30 스트럿과, 상기 제 30 스트럿 각각이 상기 제 10 보조거셋과 조립되는 반대측 각각에 조립되되, 상기 제 10 보조거셋과 동일한 구조를 갖는 제 40 스트럿과, 상기 제 20 보조거셋과 이웃한 다른 제 20 보조거셋 사이 각각에 조립되되, 상기 제 10, 20, 30 스트럿과 동일한 구조를 갖는 제 40 스트럿과, 상기 제 10 스트럿, 제 10 보조거셋, 제 30 스트럿, 제 20 보조거셋, 제 40 스트럿과 같은 구성에 의해서 방사형으로 돔구조 끝단의 제 n 번째 보조거셋에 조립되는 다수의 슈와, 상기 다수의 슈와 조립됨과 동시에 돔 구조물이 덮어지는 건축물 상부와 조립되는 다수의 슈베이스와, 상기 돔 구조물 뼈대에 형성된 제 10 공간을 덮기 위하여 끝단이 절곡되게 형성되고 상기 제 10 돌출부와 제 12 돌출부 사이에 배치되는 제 1 돔덮개와, 상기 돔 구조물 뼈대에 형성된 제 10 공간을 덮기 위하여 끝단이 절곡되게 형성되고 상기 제 10 돌출부와 제 12 돌출부 사이에 배치되는 제 1 돔덮개와, 상기 돔 구조물 뼈대에 형성된 제 10 공간을 덮기 위하여 끝단이 절곡되게 형성되고 제 11 돌출부와 제 13 돌출부 사이에 배치되는 제 2 돔덮개와, 상기 슈베이스와 조립된 슈 각각의 사이에 건축물과 스트럿에 의해서 형성되는 제 20 공간을 덮기 위해 끝단이 절곡된 측면덮개와, 상기 제 1, 2 돔덮개 상부 또는 측면덮개 상부에 적층되게 배치하고 볼트결합되기 위한 제 14 구멍이 형성된 배턴, 상기 제 1, 2 돔덮개와 배턴 사이 또는 측면덮개와 배턴에 방수되게 하는 가스켓, 및 상기 배턴에 형성된 제 14 구멍을 통과하여 상기 제 1 스트럿에 형성된 제 12 돌출부와 제 13 돌출부 사이에 결합되는 볼트로 구성되되, 상기 다수의 제 1, 2 돔덮개와, 다수의 배턴, 다수의 가스켓 및 다수의 볼트로 상기 다수개 형성되는 제 10 공간을 모두 덮고, 다수의 측면덮개와, 다수의 배턴, 다수의 가스켓, 및 다수의 볼트로 상기 다수개 형성된 제 20 공간 모두를 덮는 구성으로 이루어진다.The main gusset is assembled between the upper main gusset and the lower main gusset. The upper gusset is formed as an H beam and has a tenth tongue and an eleventh tongue, A twelfth projection and a thirteenth projection are formed between the tenth projection and the eleventh projection, ten holes are formed in the upper one side, an eleventh hole is formed in the other side and the eleventh hole is formed in the lower one side, And a plurality of tenth struts formed on the other side of the lower portion by a thirteenth hole and bolted to the upper main gusset through the hole 10 and bolted to the lower main gusset through the hole 12, The upper auxiliary gusset and the lower auxiliary gusset are assembled into a pair on opposite sides of each of the plurality of tenth struts to be assembled with the main gusset, A tenth auxiliary gusset to which the thirteenth hole and the lower auxiliary gusset are assembled and a tenth auxiliary gusset which is assembled to each other between the tenth auxiliary gusset and the tenth auxiliary gusset adjacent to the tenth auxiliary gusset, 20 th strut, a plurality of thirtieth struts assembled to the tenth auxiliary gusset, assembled downwardly opposite to the main gusset, and having the same structure as the first and second struts, 10th auxiliary gusset and the 20th auxiliary gusset adjacent to the 20th auxiliary gusset and the 20th auxiliary gusset adjacent to the 20th auxiliary gusset, 20th and 30th struts and a 40th strut having the same structure as that of the 10th strut, the 10th auxiliary gusset, the 30th strut, the 20th auxiliary gusset, the 40th strut, A plurality of shoe assemblies assembled to an nth auxiliary gusset at the end of the structure, a plurality of shoe bases assembled with an upper portion of the structure where the dome structure is assembled with the plurality of shoos, and a tenth space formed in the skeleton of the dome structure A first dome cover formed to be bent at an end thereof so as to cover the tenth structure and disposed between the tenth protrusion and the twelfth protrusion; a bending end formed to cover a tenth space formed in the skeleton of the dome structure; A second dome cover formed between the eleventh projection and the thirteenth projection so as to cover the tenth space formed in the skeleton of the dome structure; A side cover having an end bent to cover a twenty space defined by the building and the strut between the assembled shoe and the first and second dome covers A baton having a fourteenth hole for being bolted to the top or side cover and a gasket for watertightness between the first and second dome covers and the baton or between the bat and the bat, A plurality of first and second dome covers, a plurality of batts, a plurality of gaskets, and a plurality of bolts, the plurality of first and second dome covers, the plurality of gaskets, and the plurality of bolts, A plurality of side covers, a plurality of batts, a plurality of gaskets, and a plurality of bolts to cover all of the plurality of the twenty-first spaces.

이와 같은, 종래의 기술은 조립에 필요한 장소가 매우 넓어야 하고 조립하기 위한 구성이 매우 다양하기 때문에 작업이 복잡하고 조립하기 위한 시간이 오래 걸리는 문제점이 있었다.Such a conventional technique has a problem that a space required for assembly is very wide and a configuration for assembling is very various, which complicates the operation and takes a long time to assemble.

또한, 상기 종래의 기술은 조립이 완성된 이후에 악취, 누수에 대한 불량 여부를 검사할 수 있기 때문에 불량이 발생된 곳을 찾는데 시간이 오래 걸릴 뿐만 아니라 불량 발생시 조립된 부분을 보수하는데 매우 복잡하고 시간이 오래 걸리는 문제점이 있었다.In addition, since the above-described conventional technique can check whether malfunctions or leaks are caused after the assembly is completed, it takes a long time to find a place where defects occur, and it is very complicated to repair the assembled parts in the event of defects There was a time-consuming problem.

또한, 하수처리장 같은 곳에서 악취 등이 외부로 유출되는 것을 방지하고자 밀폐하는 기술이 있는데 대표적으로 대한민국 등록특허공보 제10-1353279호인 하수처리장용 덮개 어셈블리는 하수처리장 수로를 덮으면서 외향플렌지가 형성된 다수의 암 덮개부재와, 상기 수로를 덮으면서 상기 다수의 암 덮개부재 사이에 배치됨과 동시에 상기 외향플렌지 상부에 놓이는 내향플렌지가 형성된 다수의 수 덮개부재와, 상기 다수의 암 덮개부재와 상기 다수의 수 덮개부재를 지지하도록 하수처리장 구조물 벽면을 따라 고정되는 제 1 지지부재와, 상기 제 1 지지부재와 결합되는 제 1 날개가 구성되고 상기 다수의 암 덮개부재 또는 다수의 수 덮개부재 각각과 결합되는 제 2 날개가 구성되며 상기 제 1 날개와 제 2 날개가 회전에 의해 구동되는 회전축이 구성됨에 따라 회전에 의해서 제 2 날개와 결합된 다수의 암/수 덮개부재의 반대편이 개방되도록 하는 다수의 연결부재, 및 상기 수로를 두고 제 1 지지부재와 마주하게 배치되되 상기 다수의 암/수 덮개부재 각각이 다수의 연결부재에 결합된 반대편에서 다수의 암/수 덮개부재를 지지하는 제 2 지지부재로 이루어진다.In addition, there is a sealing technology to prevent odor and the like from leaking out to a place such as a sewage disposal plant. Typically, the cover assembly for a sewage treatment plant, which is Korean Patent Registration No. 10-1353279, comprises a sewage treatment plant, A plurality of water lid members disposed between the plurality of female lid members while covering the water channel and having an inward flange placed on the outward flange and a plurality of water lid members, A first support member that is fixed along the wall surface of the sewage treatment plant structure to support the lid member; a first support member that is coupled to the first support member and that is coupled to the plurality of the lid members or the plurality of water- The first wing and the second wing are constituted by two wings and the rotating shaft is driven by the rotation of the first wing and the second wing A plurality of connecting members for opening the opposite sides of the plurality of female / male lid members coupled with the second wing by rotation of the female / male lid member, and a plurality of female / And a second support member for supporting a plurality of female / male lid members on opposite sides coupled to the plurality of link members.

이와 같은, 상기 종래의 기술은 하수처리장과 같이 규모가 큰 곳 전체를 덮을 경우에 구조적인 문제로 덮개를 구축하는데 곤란한 문제점이 있고 또한, 안정성에 문제가 발생하기 때문에 하수처리장 중에서 수로만 일부 덮는 어셈블리를 구축한 것이고 하수처리장용 덮개 어셈블리 시공시 일부 수로만 구성하기 때문에 누수, 누수로 인한 낙진, 황사 등의 오염물질이 내부로 유입되는 문제점과 악취 또는 유독가스 등이 외부로 방출되는 것을 완벽히 차단하지 못하는 문제점이 있었다.
The conventional technique described above has a problem in that it is difficult to construct a lid due to a structural problem when covering a large area such as a sewage treatment plant, and also there is a problem in stability. Therefore, in the sewage treatment plant, And the construction of the lid assembly for the sewage treatment plant is composed of only a few channels. Therefore, it prevents the leakage of pollutants such as leaks, leaks due to leaks, and dusts into the inside and completely prevents the release of bad odor or toxic gas to the outside There was a problem.

특허문헌1. 대한민국 등록특허공보 제10-1049004호 '돔 구조물의 시공방법 및 이를 이용한 돔 구조물'Patent Document 1. Korean Patent Registration No. 10-1049004 'Method of constructing a dome structure and dome structure using the same' 특허문헌2. 대한민국 등록특허공보 제10-1353279인 '하수처리장용 덮개 어셈블리'Patent Document 2. Korean Patent Registration No. 10-1353279 entitled " Lid for Sewage Treatment Plant "

따라서, 본 발명은 상술한 문제점을 해결하기 위하여 안출된 것으로서, 본 발명은 플랫형 SMC 덮개와 트러스 각각을 공장에서 완성품으로 생산하여 현장에서 쉽게 조립하고, 설치 후 누수를 안정적 차단하고 설치비용을 경제적으로 절감하고자 하는데 그 목적이 있다.
SUMMARY OF THE INVENTION Accordingly, the present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide a flat SMC lid and a truss, The goal is to save money.

상기 목적을 달성하기 위한 본 발명의 일실시예에 따르면, 플랫형 SMC 덮개는 상부에 제 1 홈이 형성되고 하부에 수 체결부가 형성되는 제 1 판넬과, 상부에 제 2 홈이 형성되고 하부에 암 체결부가 형성되는 제 2 판넬과, 상기 제 1, 2 홈과 함께 조립되어 결합되되, 상기 제 1, 2 홈에 끼워 조립되기 위한 제 1 날개가 형성되고 상부가 돔 형태로 형성되는 덮개판넬과, 상기 제 1, 2 판넬과 덮개판넬에 의해서 개방된 양측 중에서 어느 한 측에 끼워 조립되되, 상부에 상기 덮개판넬과 조립 결합되기 위한 제 3 홈이 형성되고 하부에 제 2 날개가 형성되는 제 3 판넬, 및 상기 제 1, 2 판넬과 덮개판넬에 의해서 개방된 양측 중에서 상기 제 3 판넬에 의해서 폐쇄된 반대측에 끼워 조립되되, 상부에 상기 덮개판넬과 조립 결합되기 위한 제 4 홈이 형성되고 하부에 제 3 날개가 형성되는 제 4 판넬로 이루어진 것을 해결 수단으로 한다. According to an aspect of the present invention, there is provided a flat type SMC lid comprising: a first panel having a first groove formed at an upper portion thereof and a male coupling portion formed at a lower portion thereof; A cover panel formed with a first wing for being assembled into the first and second grooves and formed in a dome shape, and a second panel formed with the first and second grooves, A third groove formed in the upper portion of the cover panel to be assembled with the cover panel and a second groove formed in the lower portion of the cover panel, And a fourth groove for assembling with the cover panel is formed at an upper portion of the first groove and the second groove is formed at a lower portion of the lower panel, Day 3 And a fourth panel on which a plurality of openings are formed.

본 발명의 다른 일실시예에 따르면, 플랫형 SMC 덮개를 이용한 조립형 구조물은 상기 일실시예에 따른 플랫형 SMC 덮개와; 상부 프레임의 좌우측이 하부 프레임의 좌우측과 각각 결합되면서 상기 상부 프레임이 아치형으로 형성되고 상기 하부 프레임이 직선형으로 형성되며 상기 상부 프레임과 하부 프레임 사이에 다수의 살이 결합되고 상기 하부 프레임 하부에 상기 다수의 플랫형 SMC 덮개와 조립 결합되는 제 4 날개가 형성되면서 일정 길이마다 조립 결합되는 플랜지가 구성된 다수의 트러스로 이루어진 것을 해결 수단으로 한다.
According to another embodiment of the present invention, an assembled structure using a flat type SMC cover includes a flat type SMC cover according to the above embodiment; The left and right sides of the upper frame are coupled with the left and right sides of the lower frame, the upper frame is formed in an arcuate shape, the lower frame is formed in a straight line, a plurality of fingers are coupled between the upper frame and the lower frame, And a plurality of trusses constituted by flanges which are assembled and connected to each other at predetermined lengths while a fourth wing to be assembled with the flat SMC lid is formed.

이상 설명한 바와 같이, 본 발명은 매우 심플하고 견고한 구조물을 형성하면서도 작업시 넓은 공간을 필요로 하지 않고 조립에 소요되는 시간 또한 상대적으로 적게 드는 효과가 있고 완성된 구조물을 조립하기 때문에 현장 조립의 불량률을 최소화하는 효과가 있으며 큰 규모도 상부 전체를 상대적으로 적은 시간에 간단한 작업으로 빠르게 구조물을 구축하는 효과가 있고 돔 아치 높이가 지오데식 돔에 비하여 현저히 낮으므로 밀폐공간이 상대적으로 협소하게 되어 악취의 발생을 줄임과 동시에 차단하는 효과가 매우 높고 이로 인한 경제적 효과가 뛰어나다.
As described above, according to the present invention, a very simple and robust structure is formed, but a large space is not required during operation and the time required for assembling is relatively small, and since the completed structure is assembled, It has the effect of minimizing the size and the effect of building the structure quickly with a simple operation in a relatively short time in a large scale, and the dome arch height is significantly lower than that of the geodetic dome, so that the closed space is relatively narrow, And at the same time, the effect of blocking is very high and the economical effect is excellent.

도 1은 본 발명의 일실시예에 따른 플랫형 SMC 덮개 분해 사시도
도 2는 본 발명의 일실시예에 따른 플랫형 SMC 덮개 조립 상태도
도 3은 본 발명의 일실시예에 따른 제 1, 2 판넬과 덮개판넬이 조립되고 누수방지부재가 구비된 예시도
도 4는 본 발명의 일실시예에 따른 제 1, 2 판넬 배열 예시도
도 5는 본 발명의 일실시예에 따른 플랫형 SMC 덮개를 이용한 조립형 구조물 개념도
도 6은 본 발명의 일실시예에 따른 플랫형 SMC 덮개와 트러스 결합 예시도
도 7은 본 발명의 일실시예에 따른 트러스 사이의 플랜지 결합 예시도
도 8은 본 발명의 일실시예에 따른 원형 구조물에 설치된 플랫형 SMC 덮개를 이용한 조립형 구조물 예시도
1 is an exploded perspective view of a flat type SMC cover according to an embodiment of the present invention;
2 is a plan view of a flat SMC lid assembly according to an embodiment of the present invention.
FIG. 3 is a view illustrating an example in which first and second panels and a cover panel according to an embodiment of the present invention are assembled and a leakage preventing member is provided
FIG. 4 is a view illustrating an example of a first and a second panel arrangement according to an embodiment of the present invention.
5 is a conceptual diagram of an assembled structure using a flat type SMC cover according to an embodiment of the present invention.
FIG. 6 is a view showing an example of a flat type SMC cover and a truss joint according to an embodiment of the present invention. FIG.
FIG. 7 is an exemplary illustration of flange engagement between trusses according to an embodiment of the present invention. FIG.
8 is an illustration of an assembled structure using a flat SMC lid installed in a circular structure according to an embodiment of the present invention

이하, 본 발명의 최적 실시예에 대하여 첨부된 도면을 참조하여 그 구성 및 작용을 설명한다.Best Mode for Carrying Out the Invention Hereinafter, a configuration and an operation of a preferred embodiment of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 일실시예에 따른 플랫형 SMC 덮개 분해 사시도로써, 상기 플랫형 SMC 덮개(100)는 제 1 판넬(110), 제 2 판넬(120), 덮개판넬(130), 제 3 판넬(140) 및 제 4 판넬(150)로 이루어진다.FIG. 1 is an exploded perspective view of a flat type SMC cover according to an embodiment of the present invention. The flat type SMC cover 100 includes a first panel 110, a second panel 120, a cover panel 130, A panel 140 and a fourth panel 150.

더욱 상세하게, 상기 제 1 판넬(110)은 상부에 제 1 홈(111)이 형성되고 하부에 수 체결부(112)가 형성된다.More specifically, the first panel 110 has a first groove 111 formed at an upper portion thereof and a male coupling portion 112 at a lower portion thereof.

상기 제 2 판넬(120)은 상부에 제 2 홈(121)이 형성되고 하부에 암 체결부(122)가 형성된다.The second panel 120 has a second groove 121 formed at an upper portion thereof and an arm fastening portion 122 at a lower portion thereof.

상기 제 1 판넬(110)과 제 2 판넬(120)에 대하여 살펴보는 바, 상기 제 1 판넬(110)의 제 1 홈(111)과 상기 제 2 판넬(120)의 제 2 홈(121)은 상기 덮개판넬(130)이 끼워 조립되도록 형성된다.The first grooves 111 of the first panel 110 and the second grooves 121 of the second panel 120 are formed in the first panel 110 and the second panel 120, The cover panel 130 is formed to be fitted and assembled.

또한, 상기 제 1, 2, 3, 4 판넬(110, 120, 140, 150)과 상기 덮개판넬(130)이 조립 결합된 플랫형 SMC 덮개(100) 다수개가 상기 수 체결부(112)와 암 체결부(122)가 조립되는 방식으로 연속되게 조립하는 것이 바람직하다.A plurality of flat type SMC covers 100 assembled with the first, second, third and fourth panels 110, 120, 140 and 150 and the cover panel 130 are connected to the male coupling portions 112, It is preferable that the fastening portions 122 are assembled successively in such a manner that they are assembled.

즉, 상기 제 1 판넬(110)과 제 2 판넬(120)은 도 2에 도시된 (a)와 같이, 서로 접하면서 상기 수 체결부(112)가 암 체결부(122)에 끼워 조립되는 구조가 됨에 따라 도 2에 도시된 (b)와 같이, 본 발명 플랫형 SMC 덮개가 연속적으로 조립된다.That is, the first panel 110 and the second panel 120 are structured such that the male fastening part 112 is fitted to the female fastening part 122 while being in contact with each other, as shown in FIG. 2 (a) The flat SMC lid of the present invention is assembled continuously as shown in Fig. 2 (b).

한편, 상기 제 1 판넬(110)과 제 2 판넬(120)은 제 1 판넬(110)에 제 1 홈(111)과 수체결부(112)가 형성되게 일정길이 압출로 제작되고 제 2 판넬(120)에 제 2 홈(121)과 암 체결부(122)가 형성되게 일정길이 압출로 제작되며 재질은 다양한 금속으로 사용할 수 있지만, 가장 대표적으로 알루미늄이 바람직하다.The first panel 110 and the second panel 120 are formed by extruding a predetermined length so that the first grooves 111 and the male fastening portions 112 are formed on the first panel 110, 120 are formed by extruding a predetermined length so as to form the second groove 121 and the arm fastening part 122. The material may be various metals, but aluminum is most preferable.

아울러, 상기 제 1 홈(111)과 제 2 홈(121)은 누수방지부재(160)가 더 구비되는 것이 바람직하다.Further, it is preferable that the first groove 111 and the second groove 121 include a leakage preventing member 160.

예컨대, 상기 누수방지부재(160)는 도 3의 (b)에 도시된 부분 확대도에 도시된 바와 같이, 비, 눈 등과 비, 눈 등을 통해서 오염물질이 내부로 침투하거나 악취 등이 외부로 방출되는 등 여러 방면에서 문제가 발생하게 되는데 이를 방지하기 위한 것이고 대표적으로 고무패킹이 있다.For example, as shown in the partially enlarged view of FIG. 3 (b), the leakage preventing member 160 may be configured such that contaminants penetrate into the interior through rain, snow, rain, snow, The problem is caused by various problems such as the release of the rubber packing.

상기 덮개판넬(130)은 상기 제 1, 2 홈(111, 121) 함께 조립 결합되되, 상기 제 1, 2 홈(111, 121)에 끼워 조립되기 위한 제 1 날개(131)가 형성되고 상부가 돔 형태로 형성된다.The cover panel 130 is assembled together with the first and second grooves 111 and 121 and has a first wing 131 for being fitted to the first and second grooves 111 and 121, Dome shape.

예컨대, 상기 덮개판넬(130)은 도 4에 도시된 바와 같이, 제 1, 2 판넬(110, 120)을 나란히 배열한 이후에 도 3에 도시된 (a)와 같이, 좌우측에 형성된 제 1 날개(131) 부분을 상기 제 1, 2 홈(111, 121)에 함께 끼워 조립한다.For example, as shown in FIG. 3, after the first and second panels 110 and 120 are arranged side by side, as shown in FIG. 4, the cover panel 130 includes first and second wings (131) are fitted together in the first and second grooves (111, 121).

이때, 상기 제 1 날개(131)는 상기 제 1, 2 홈(111, 121)에 보다 잘 끼워 조립되게 모서리 부분을 절단하여 형성하는 것도 바람직하다.In this case, it is preferable that the first wing 131 is formed by cutting the corner portions so as to be more easily fitted into the first and second grooves 111 and 121.

또한, 상기 덮개판넬(130)은 상부가 돔 형태로 형성되는 것이 바람직한 바, 예컨대, 상기 덮개판넬(130)은 상부면을 평평하게 구성할 수도 있지만, 도 3의 (a)와 같이, 상부를 돔 형태로 볼록하게 위로 돌출된 형태로 구성하면 평평하게 형성한 것보다 강도가 높아지는 작용을 한다.For example, the upper surface of the cover panel 130 may be flat. However, as shown in FIG. 3 (a), the upper surface of the cover panel 130 may be flat If it is formed as a dome-shaped convexly protruding shape, it acts to have a higher strength than a flat-shaped one.

한편, 상기 덮개판넬(130)은 내식성과 내후성이 우수한 SMC(Sheet Molding Compound)재질을 사용하는데 이때, SMC재질은 여러 가지 문양을 표현할 수 있기 때문에 덮개판넬(130)의 상부를 본 발명과 같이 돔 형태로 구성할 수 있을 뿐만 아니라 다양한 형태로 형성하여 구조적으로 안정되면서 누수되지 않게 밀폐하거나 악취가 분출되지 않게 차폐하는 작용을 한다.Since the cover panel 130 is made of SMC (Sheet Molding Compound) material having excellent corrosion resistance and weather resistance, the upper part of the cover panel 130 is covered with the dome But it is formed in various forms and structurally stable so that it does not leak so as to seal it or to shield the odor from being sprayed.

상기 제 3 판넬(140)은 상기 제 1, 2 판넬(110, 120)과 덮개판넬(130)에 의해서 개방된 양측 중 어느 한 측에 끼워 조립되되, 상부에 상기 덮개판넬(130)과 조립 결합되기 위한 제 3 홈(141)이 형성되고 하부에 제 2 날개(142)가 형성된다.The third panel 140 is assembled by being fitted to either one of the first and second panels 110 and 120 and both sides opened by the cover panel 130, And a second wing 142 is formed at a lower portion thereof.

예컨대, 상기 제 3 판넬(140)은 도 3의 (b)에 도시된 바와 같이 제 1, 2 판넬(110, 120)과 덮개판넬(130)에 의해서 양측이 개방된 형태가 되는 바, 상기 개방된 양측 중 어느 한 측을 폐쇄하기 위해서 조립되는 것이다.For example, as shown in FIG. 3 (b), the third panel 140 is opened at both sides by the first and second panels 110 and 120 and the cover panel 130, Which is assembled in order to close either of the two sides.

즉, 상기 제 3 판넬(140)은 상부에 형성된 제 3 홈(141)과 덮개판넬(130)의 어느 한 측이 조립되고 상기 제 2 날개(142)는 하수처리장과 같은 콘크리트 구조물과 강제 결합하기 위해서 형성된 것이고 상기 강제 결합은 볼트 결합이 바람직하고 볼트 결합하기 위한 구멍이 형성되는 것도 바람직하다.That is, the third panel 140 is assembled with the third groove 141 formed on the upper part and the lid panel 130, and the second wing 142 is assembled with the concrete structure such as the sewage treatment plant It is preferable that the forcible coupling is formed by a bolt coupling and a hole for bolt coupling is formed.

또한, 상기 제 2 날개(142)는 이하 설명되는 다수의 트러스(200)와 강제 결합되고 상기 강제 결합은 볼트 결합이 바람직하고 볼트 결합하기 위한 구멍이 형성되는 것도 바람직하다.Also, it is preferable that the second wing 142 is forcibly engaged with a plurality of trusses 200 described below, and the forcible coupling is preferably bolted and formed with a hole for bolt connection.

이때, 상기 제 3 홈(141)은 덮개판넬(130)이 제 1 홈(111)에 끼워지기 위한 부분 즉, 도 2의 (a)에 도시된 A부분을 제외하고, 덮개판넬(130)의 제 2 홈(121)에 끼워지기 위한 부분 즉, 도 4의 (a)에 도시된 B부분을 제외하고 끼워지도록 형성된다.The third groove 141 may be formed in a portion of the cover panel 130 other than the portion of the cover panel 130 that is to be fitted into the first groove 111, Except for the portion to be fitted in the second groove 121, that is, the portion B shown in Fig. 4 (a).

상기 제 4 판넬(150)은 상기 제 1, 2 판넬(110, 120)과 덮개판넬(130)에 의해서 개방된 양측 중에서 상기 제 3 판넬(140)에 의해서 폐쇄된 반대측에 끼워 조립되되, 상부에 상기 덮개판넬(130)과 조립되기 위한 제 4 홈(151)이 형성되고 하부에 제 3 날개(152)가 형성된다.The fourth panel 150 is assembled by being fitted to the opposite side closed by the third panel 140 from both sides opened by the first and second panels 110 and 120 and the cover panel 130, A fourth groove 151 for assembling with the cover panel 130 is formed and a third wing 152 is formed at the lower portion.

예컨대, 상기 제 4 판넬(150)은 도 3의 (b)에 도시된 바와 같이, 제 1, 2 판넬(110, 120)과 덮개판넬(130)에 의해서 양측이 개방된 형태가 되는 바, 상기 개방된 양측 중에서 상기 제 3 판넬(140)에 의해서 폐쇄된 반대측에 끼워 조립되는 것이다.For example, as shown in FIG. 3 (b), the fourth panel 150 is opened at both sides by the first and second panels 110 and 120 and the cover panel 130, And is assembled to the opposite side closed by the third panel 140 among the open sides.

즉, 상기 제 4 판넬(150)은 상부에 형성된 제 4 홈(151)과 덮개판넬(130)의 제 3 판넬(140)에 의해서 폐쇄된 반대측이 조립되고 상기 제 3 날개(152)는 하수처리장과 같은 콘크리트 구조물과 강제 결합하기 위해서 형성된 것이고 상기 강제 결합은 볼트 결합이 바람직하고 볼트 결합하기 위한 구멍이 형성되는 것이 바람직하다.That is, the fourth panel 150 is assembled on the opposite side closed by the third panel 140 of the cover panel 130 and the fourth groove 151 formed on the upper panel. And it is preferable that the forcible coupling is formed by a bolt connection and a hole for bolt connection is formed.

또한, 상기 제 3 날개(152)는 이하 설명되는 다수의 트러스(200)와 강제 결합되고 상기 강제 결합은 볼트 결합이 바람직하고 볼트 결합하기 위한 구멍이 형성되는 것도 바람직하다.Also, it is preferable that the third wing 152 is forcibly engaged with a plurality of trusses 200 described below, the forcible coupling is preferably a bolt coupling, and a hole for bolt coupling is formed.

이때, 상기 제 4 홈(151)은 덮개판넬(130)이 제 1 홈(111)에 끼워지기 위한 부분 즉, 도 2의 (a)에 도시된 A부분을 제외하고, 덮개판넬(130)의 제 2 홈(121)에 끼워지기 위한 부분 즉, 도 2의 (a)에 도시된 B부분을 제외하고 끼워지도록 형성된다.The fourth groove 151 may be formed in a portion of the cover panel 130 other than the portion of the cover panel 130 that is to be fitted into the first groove 111, Except for the portion to be fitted in the second groove 121, that is, the portion B shown in Fig. 2 (a).

한편, 상기 제 3 판넬(140)과 제 4 판넬(150)은 제 3 판넬(140)에 제 3 홈(141)과 제 2 날개(142)가 형성되게 일정길이 압출로 제작되고 제 4 판넬(150)에 제 4 홈(151)과 제 3 날개(152)가 형성되게 일정길이 압출로 제작되며 재질은 다양한 금속으로 사용할 수 있지만, 가장 대표적으로 알루미늄이 바람직하다.Meanwhile, the third panel 140 and the fourth panel 150 are formed by extruding a predetermined length so that the third grooves 141 and the second blades 142 are formed on the third panel 140, 150 may be formed by extruding a predetermined length so as to form a fourth groove 151 and a third wing 152, and may be made of various metals, but aluminum is most preferable.

아울러, 상기 제 3 홈(141)과 제 4 홈(151)은 누수방지부재(도시하지 않음)가 더 구비되는 것이 바람직하다.In addition, it is preferable that the third groove 141 and the fourth groove 151 are further provided with a leakage preventing member (not shown).

예컨대, 상기 누수방지부재는 상기 제 1, 2 홈(111, 121)에 구성된 누수방지부재에서 설명한 바와 같이, 동일 또는 유사하게 구성하여 비, 눈 등과 비, 눈 등을 통해서 오염물질이 내부로 침투하거나 악취 등이 외부로 방출되는 등 여러 방면에서 문제가 발생하게 되는데 이를 방지하기 위한 것이고 대표적으로 고무패킹이 있다.For example, the water leakage preventing member may be configured to have the same or similar structure as described in the first and second grooves 111 and 121, so that contaminants may penetrate through the rain, snow, rain, Or bad odor is discharged to the outside. In order to prevent this problem, rubber packing is typically used.

상기, 제 1, 2, 3, 4 판넬(110, 120, 140, 150)과 덮개판넬(130)은 조립시 누수방지부재(160)를 구성하기 때문에 상부에서 누수될 우려가 없지만 측면 즉, 제 1, 2 판넬(110, 120)과 제 3, 4판넬(140, 150)이 접하는 부분은 이음새 처리를 용접과 같은 방식으로 강제 결합하는 것이 바람직하다.Since the first, second, third and fourth panels 110, 120, 140 and 150 and the cover panel 130 constitute the leakage preventing member 160 when assembled, there is no fear of leakage from the upper part, It is preferable that the portions where the first and second panels 110 and 120 contact with the third and fourth panels 140 and 150 are forcibly joined in the same manner as the welding process.

따라서, 본 발명 플랫형 SMC 덮개(100)는 공장에서 하나의 독립된 구조체를 다수개 생산하여 도 2에 도시된 (b)와 같이 수 체결부(112)와 암 체결부(122)가 조립되는 방식으로 연속되게 조립하여 직접 하수처리장 상부를 덮는다.Accordingly, the flat type SMC lid 100 of the present invention can be manufactured by manufacturing a plurality of independent structures in a factory, and by using the method of assembling the male fastening portions 112 and the female fastening portions 122 as shown in FIG. 2 (b) To directly cover the upper part of the sewage treatment plant.

또한, 본 발명은 하나의 독립된 구조체를 공장에서 생상하여 제작 검수하기 때문에 종래에 현장에서 이루어지던 프레임 구조물의 연결 작업이 불필요하게 되고 현장에서 조립시 불량률을 최소화하며 현장의 작업 시간이 월등하게 줄어드는 작용을 한다.In addition, since the present invention creates and inspects a single independent structure in a factory, it is unnecessary to connect the frame structure, which was conventionally performed in the field, to minimize the defect rate in assembling in the field, .

도 5는 본 발명의 일실시예에 따른 플랫형 SMC 덮개를 이용한 조립형 구조물 개념도로써, 상기 플랫형 SMC 덮개를 이용한 조립형 구조물(200)은 다수의 플랫형 SMC 덮개(100)와 다수의 트러스(200)로 이루어진다.FIG. 5 is a conceptual view of an assembled structure using a flat type SMC cover according to an embodiment of the present invention. The assembled structure 200 using the flat type SMC cover includes a plurality of flat type SMC covers 100, (200).

더욱 상세하게, 상기 다수의 플랫형 SMC 덮개(100)는 상기 도 1 내지 도 4를 토대로 상세히 설명한 바, 더 이상의 설명은 생략한다.More specifically, the plurality of flat type SMC covers 100 have been described in detail with reference to FIGS. 1 to 4, and a further description thereof will be omitted.

상기 다수의 트러스(200)는 상부 프레임(210)의 좌우측이 하부 프레임(220)의 좌우측과 각각 결합되면서 상기 상부 프레임(210)이 아치형으로 형성되고 상기 하부 프레임(220)이 직선형으로 형성되며 상기 상부 프레임(210)과 상기 하부 프레임(220) 사이에 다수의 살(230)이 결합되고 상기 하부 프레임(220) 하부에 상기 다수의 플랫형 SMC 덮개(100)와 조립 결합되는 제 4 날개(221)가 형성되면서 일정 길이마다 조립 결합되는 플랜지(240)가 구성된다.The left and right sides of the upper frame 210 are connected to the left and right sides of the lower frame 220 so that the upper frame 210 is formed in an arcuate shape and the lower frame 220 is formed in a straight line. A plurality of bones 230 are coupled between the upper frame 210 and the lower frame 220 and a fourth wing 221 And the flange 240 is assembled at a predetermined length.

예컨대, 상기 아치형으로 상부 프레임(210)이 형성되고 다수의 살(230)이 구성되는 이유는 시공할 하수처리장의 폭이 큰 경우에 상부 프레임(210) 없이 하부 프레임(220)만 구성하게 되면 하부 프레임(220)의 중심 부분이 아래로 처지는 현상이 발생하기 때문에 구조적으로 안정성을 유지하기 위하여 아치형으로 상부 프레임(210)을 형성하고 다수의 살(230)이 구성된 것이다.For example, the upper frame 210 is formed in an arcuate shape and a plurality of pieces 230 are formed. When the width of the sewage treatment plant to be constructed is large, if only the lower frame 220 is formed without the upper frame 210, The central portion of the frame 220 may be sagged downward, so that the upper frame 210 is formed in an arcuate shape in order to maintain structural stability.

또한, 두 개의 트러스로 예를 든 도 6에 도시된 바와 같이, 다수의 플랫형 SMC 덮개(100)가 서로 조립되는 것을 트러스와 트러스 사이에 고정하기 위해서 제 4 날개(221)가 형성된 것인 바, 더 구체적으로 살펴보면 도 6에 도시된 확대도와 같이, A트러스에 형성된 제 4 날개(221)는 도 1 또는 도 2에 도시된 플랫형 SMC 덮개(100)의 제 2 날개(142)와 결합되며, B트러스 측은 도시하지 않았지만, B트러스에 형성된 제 4 날개(221)는 도 1 또는 도 2에 도시된 플랫형 SMC 덮개(100)의 제 3 날개(152)와 결합된다.Further, as shown in FIG. 6, which is an example of two trusses, a fourth wing 221 is formed to fix a plurality of flat type SMC covers 100 between the trusses and the trusses. 6, the fourth wing 221 formed on the A truss is engaged with the second wing 142 of the flat SMC lid 100 shown in FIG. 1 or 2 The fourth wing 221 formed on the B truss is engaged with the third wing 152 of the flat SMC lid 100 shown in Fig. 1 or Fig. 2, although the B truss side is not shown.

이때, 상기 다수의 트러스(200)의 제 4 날개(221)와 플랫형 SMC 덮개(100)의 제 2 날개(142), 다수의 트러스(200)의 제 4 날개(221)와 플랫형 SMC 덮개(100)의 제 3 날개(152) 사이에 누수방지부재(161)를 더 구비하는 것이 바람직하다.At this time, the fourth wing 221 of the plurality of trusses 200, the second wing 142 of the flat SMC lid 100, the fourth wing 221 of the plurality of trusses 200, It is preferable to further include the water leakage preventing member 161 between the third wings 152 of the water supply unit 100.

즉, 본 발명 구조물은 악취, 누수 등으로부터 밀폐, 차폐하기 위한 것인데 다수의 트러스(200)와 플랫형 SMC 덮개(100) 조립시 제 4 날개(221)와 제 2 날개(142), 제 4 날개(221)와 제 3 날개(152)에 조립시 발생하는 기계적 오차에 의해서 틈이 발생하여 악취나 누수 등이 발생할 수 있음으로 누수방지부재(161)를 더 구비하는 것이다.That is, the structure of the present invention is for sealing and shielding from malodor, leakage and the like. In assembling the truss 200 and the flat type SMC lid 100, the fourth wing 221 and the second wing 142, A gap may be generated due to a mechanical error occurring when the first and second blades 221 and 152 are assembled, thereby causing a malodor, a leakage, and the like.

이와 같이, 본 발명은 다수의 트러스(200)와 다수의 플랫형 SMC 덮개(100)를 현장에서 조립하는데 종래 기술에 비하여 상대적으로 상당히 많은 시공시간이 단축되고 작업이 간단하여 불량률을 최소화하는 작용을 한다.As described above, the construction of the truss 200 and the plurality of flat type SMC lids 100 in the field is relatively short compared to the prior art, and the construction time is shortened and the operation is simple, thereby minimizing the defect rate do.

아울러, 상기 다수의 트러스(200)는 상부 프레임(210)이 아치형이면서 하부 프레임(220)이 아치형인 것이 바람직하다.In addition, the plurality of trusses 200 may have an arcuate shape in the upper frame 210 and an arcuate shape in the lower frame 220.

즉, 상기 상부 프레임(210)이 아치형이고 하부 프레임(220)이 수평형인 것도 구조적으로 안정되지만 더욱 구조적으로 안정되게 하기 위해서 하부 프레임(220) 역시도 아치형으로 구성하는 것이다.That is, although the upper frame 210 is arcuate and the lower frame 220 is structurally stable, the lower frame 220 is also arcuate in order to more structurally stabilize.

특히, 상기 플랜지(240)는 공장에서 독립된 하나의 완성품으로 생산하는데 이때, 트러스 전체를 하나의 완성품으로 구축하면 생산하기 위한 공간이 많이 필요함은 물론이고 시공 현장으로 이동할 때 이동수단의 크기에 제약이 있기 때문에 이동에 어려운 문제점이 발생한다. Particularly, the flange 240 is produced as a single finished product independent from the factory. In this case, when the truss is constructed as a single finished product, a lot of space is required to produce the product. In addition, There is a difficult problem in moving.

따라서, 상기 플랜지(240)는 도 7에 도시된 (a)의 A, B, C, D, E와 같이 일정 길이로 구분하고 구분된 A, B, C, D, E에 대해서 가, 나, 다, 라에 설치하는 것이다.Therefore, the flange 240 can be divided into a predetermined length A, B, C, D and E, as shown in A, B, C, D and E in FIG. In addition,

예컨대, 상기 플랜지(240)는 도 7의 (b)에 도시된 바와 같이, 도 7의 (a)에 도시된 A부분과 B부분을 사시도로 표현한 것으로서, A부분은 상하부프레임(210, 220)과 살(230)이 플랜지(240)에 결합되고 또한, B부분도 A부분과 연속되게 상부프레임(210, 220)과 살(230)이 플랜지(240)에 결합된다.For example, as shown in FIG. 7 (b), the flange 240 is a perspective view of a portion A and a portion B shown in FIG. 7 (a), and the portion A includes upper and lower frames 210 and 220, The upper and lower frames 210 and 220 and the fingers 230 are coupled to the flange 240. The flanges 240 and 240 are coupled to the flange 240 and the flange 240, respectively.

이와 같이, 상기 다수의 트러스(200)는 도 7의 (b)와 같이 플랜지(240)로 구분되게 구성하면 시공 현장으로 이동시 이동수단에 제약을 받지 않고 A, B, C, D, E 부분별로 시공 현장에 이동하여 플랜지(240) 조립을 통해서 시공이 간편하며 이로 인한 작업 시간이 종래 기술에 비해 대폭 단축하고 불량 여부를 시공하기 전에 공장에서 확인할 수 있는 작용을 한다.7 (b), the plurality of trusses 200 may be divided into a plurality of trusses 200, each of which is divided into a plurality of trusses 200, It moves to the construction site and is easily assembled through the assembly of the flanges 240, and the operation time due to the operation is significantly shortened compared to the conventional technology, and the operation can be confirmed at the factory before the defect is installed.

또한, 상기 플랜지(240)는 플랜지(240)와 플랜지(240) 사이의 결합을 다양하게 구현할 수 있지만 대표적으로 ??트 결합이 바람직하고 상기 볼트 결합을 위해서 다수의 구멍이 형성되는 것도 바람직하다.Also, the flange 240 may be variously formed between the flange 240 and the flange 240, but it is preferable that the flange 240 is formed by a plurality of holes.

이상 설명한, 상기 다수의 트러스(200)를 하수처리장 구조물에 설치하고 다수의 트러스(200)에 사이에 플랫형 SMC 덮개(100)를 연속하여 조립하여 본 발명 구조물을 구성하는 것이다.The plurality of trusses 200 are installed in the sewage treatment plant structure and the flat SMC lid 100 is continuously assembled between the trusses 200 to constitute the structure of the present invention.

한편, 상기 다수의 플랫형 SMC 덮개(100)와 다수의 트러스(200)는 사각 형태, 삼각 형태, 오각 형태와 같은 다각형 형태, 원 형태, 타원 형태 중 어느 하나의 구조물에 시공되는 것이 바람직하다.The plurality of flat SMC lids 100 and the plurality of trusses 200 may be formed in any one of a polygonal shape such as a square shape, a triangular shape, a pentagonal shape, a circular shape, and an elliptical shape.

예컨대, 상기 구조물은 도 5에 도시된 바와 같이, 사각형 구조물 위에 다수의 플랫형 SMC 덮개(100)와 다수의 트러스(200)를 이용하여 구성되고 또한, 도 8에 도시된 바와 같이, 원형 구조물 위에 다수의 플랫형 SMC 덮개(100)와 다수의 트러스(200)를 이용하여 시공되며 타원 구조물에도 구성되는 등 다양한 구조물에 시공이 용이하다.For example, as shown in FIG. 5, the structure may be constructed using a plurality of flat type SMC covers 100 and a plurality of trusses 200 on a rectangular structure, and may be formed on a circular structure It is easy to construct various structures such as a plurality of flat SMC lids 100 and a plurality of trusses 200 and an elliptical structure.

아울러 본 발명 플랫형 SMC 덮개를 이용한 조립형 구조물은 라운드구조, 돔구조로 시공되는 것도 바람직하다.It is also preferable that the assembled structure using the flat SMC lid of the present invention is constructed in a round structure or a dome structure.

이상 설명한, 본 발명은 도면과 상세한 설명에서 최적 실시예들이 개시되고, 이상에서 사용된 특정한 용어는 단지 본 발명을 설명하기 위한 목적에서 사용된 것일 뿐, 의미 한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것이 아니다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, It is not used to limit the scope.

그러므로 본 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하고, 본 발명의 진정한 기술적 보호 범위는 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.
Therefore, it is intended that the present invention covers the modifications and variations of this invention provided they come within the scope of the appended claims and their equivalents.

100 : 플랫형 SMC 덮개 110 : 제 1 판넬
111 : 제 1 홈 112 : 수 체결부
120 : 제 2 판넬 121 : 제 2 홈
122 : 암 체결부 130 : 덮개판넬
131 : 제 1 날개 140 : 제 3 판넬
141 : 제 3 홈 142 : 제 2 날개
150: 제 4 판넬 151 : 제 4 홈
152 : 제 3 날개 160, 161 : 누수방지부재
200 : 다수의 트러스 210 : 상부 프레임
220 : 하부 프레임 221 : 제 4 날개
230 : 다수의 살 240 : 플랜지
100: Flat SMC cover 110: First panel
111: first groove 112: water tightening part
120: second panel 121: second groove
122: arm fastening part 130: cover panel
131: first wing 140: third panel
141: third groove 142: second wing
150: fourth panel 151: fourth groove
152: third wing 160, 161: leak preventing member
200: multiple trusses 210: upper frame
220: lower frame 221: fourth wing
230: Multiple Fours 240: Flange

Claims (8)

삭제delete 삭제delete 삭제delete 상부에 제 1 홈이 형성되고 하부에 수 체결부가 형성되는 제 1 판넬과, 상부에 제 2 홈이 형성되고 하부에 암 체결부가 형성되는 제 2 판넬과, 상기 제 1, 2 홈과 함께 조립되어 결합되되, 상기 제 1, 2 홈에 끼워 조립되기 위한 제 1 날개가 형성되고 상부가 돔 형태로 형성되는 덮개판넬과, 상기 제 1, 2 판넬과 덮개판넬에 의해서 개방된 양측 중에서 어느 한 측에 끼워 조립되되, 상부에 상기 덮개판넬과 조립 결합되기 위한 제 3 홈이 형성되고 하부에 제 2 날개가 형성되는 제 3 판넬, 상기 제 1, 2 판넬과 덮개판넬에 의해서 개방된 양측 중에서 상기 제 3 판넬에 의해서 폐쇄된 반대측에 끼워 조립되되, 상부에 상기 덮개판넬과 조립 결합되기 위한 제 4 홈이 형성되고 하부에 제 3 날개가 형성되는 제 4 판넬로 이루어진 다수의 플랫형 SMC 덮개와;
상부 프레임의 좌우측이 하부 프레임의 좌우측과 각각 결합되면서 상기 상부 프레임이 아치형으로 형성되고 상기 하부 프레임이 직선형으로 형성되며 상기 상부 프레임과 하부 프레임 사이에 다수의 살이 결합되고 상기 하부 프레임 하부에 상기 다수의 플랫형 SMC 덮개와 조립 결합되는 제 4 날개가 형성되면서 일정 길이마다 조립 결합되는 플랜지가 구성된 다수의 트러스로 이루어진 것을 특징으로 하는 플랫형 SMC 덮개를 이용한 조립형 구조물.
A first panel having a first groove formed at an upper portion thereof and a male coupling portion formed at a lower portion thereof, a second panel having a second groove formed on the upper portion thereof and an arm fastening portion formed on the lower portion thereof, A cover panel formed with a first wing to be assembled into the first and second grooves and having an upper portion formed in a dome shape, and a cover panel provided on either side of the first and second panels and both sides opened by the cover panel A third panel having a third groove formed at an upper portion thereof to be assembled with the cover panel and having a second blade formed at a lower portion thereof, A plurality of flat type SMC lid assembled by being fitted to the opposite side closed by the panel, wherein a fourth groove is formed at an upper portion to be assembled with the lid panel and a fourth panel is formed at a lower portion;
The left and right sides of the upper frame are coupled with the left and right sides of the lower frame, the upper frame is formed in an arcuate shape, the lower frame is formed in a straight line, a plurality of fingers are coupled between the upper frame and the lower frame, And a plurality of trusses constituted by flanges that are assembled and connected to each other at a predetermined length while forming a fourth wing to be assembled with the flat SMC lid.
청구항 4에 있어서,
상기 제 1, 2, 3, 4 판넬과 상기 덮개판넬이 조립 결합된 다수개의 플랫형 SMC 덮개 다수개가 상기 수 체결부와 암 체결부가 조립되는 방식으로 연속되게 조립하는 것을 특징으로 하는 플랫형 SMC 덮개를 이용한 조립형 구조물.
The method of claim 4,
Wherein a plurality of flat type SMC shrouds in which the first, second, third and fourth panels and the cover panel are assembled are assembled successively in such a manner that the male fastening portions and the female fastening portions are assembled. Assembly type structure using.
청구항 4에 있어서,
상기 제 1 홈, 제 2 홈, 제 3 홈, 제 4 홈 중 어느 하나는 누수방지부재가 더 구비되는 것을 특징으로 하는 플랫형 SMC 덮개를 이용한 조립형 구조물.
The method of claim 4,
Wherein one of the first groove, the second groove, the third groove, and the fourth groove is further provided with a leakage preventing member.
청구항 4에 있어서, 상기 다수의 트러스는
상기 상부 프레임이 아치형이면서 하부 프레임이 아치형인 것을 특징으로 하는 플랫형 SMC 덮개를 이용한 조립형 구조물.
5. The apparatus of claim 4, wherein the plurality of trusses
Wherein the upper frame is arcuate and the lower frame is arcuate.
청구항 4에 있어서, 상기 다수의 플랫형 SMC 덮개와 다수의 트러스는
사각 형태, 삼각 형태, 오각 형태와 같은 다각형 형태, 원 형태, 타원 형태 중 어느 하나의 구조물에 시공되는 것을 특징으로 하는 플랫형 SMC 덮개를 이용한 조립형 구조물.
5. The method of claim 4, wherein the plurality of flat SMC covers and the plurality of trusses
Wherein the flat type SMC lid is constructed in one of a polygonal shape such as a square shape, a triangular shape, and a pentagonal shape, a circular shape, and an elliptical shape.
KR1020160116766A 2016-09-09 2016-09-09 Flat type Sheet Molding Compound cover and assemble the structure using the same KR101700941B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160116766A KR101700941B1 (en) 2016-09-09 2016-09-09 Flat type Sheet Molding Compound cover and assemble the structure using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160116766A KR101700941B1 (en) 2016-09-09 2016-09-09 Flat type Sheet Molding Compound cover and assemble the structure using the same

Publications (1)

Publication Number Publication Date
KR101700941B1 true KR101700941B1 (en) 2017-02-08

Family

ID=58154923

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160116766A KR101700941B1 (en) 2016-09-09 2016-09-09 Flat type Sheet Molding Compound cover and assemble the structure using the same

Country Status (1)

Country Link
KR (1) KR101700941B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894695A (en) * 2018-08-07 2018-11-27 中国人民解放军军事科学院国防工程研究院 SMC glass fibre reinforced composite material dangles formula explosion wave prevention active door
KR101950145B1 (en) * 2018-08-21 2019-02-19 정지호 The cover for preventing bad smell and pollutants
CN113463694A (en) * 2021-05-27 2021-10-01 北京建工环境修复股份有限公司 Modular horizontal blocking device, blocking system and blocking method for polluted site
KR20230139468A (en) 2022-03-28 2023-10-05 이재권 A Sliding enclosure for water treatment plant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101049004B1 (en) 2010-05-20 2011-07-13 알루텍 주식회사 Dome structure and method for construction the same
KR101301066B1 (en) * 2013-05-30 2013-08-28 주식회사 일강케이스판 Lighting structure for roof
JP2013170351A (en) * 2012-02-17 2013-09-02 Sharp Corp Frame body, solar cell module having the frame body, installation structure of solar cell module, and installation method of solar cell module
KR101353279B1 (en) 2013-10-22 2014-01-23 알루텍 주식회사 Cover assembly for sewage disposalplants

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101049004B1 (en) 2010-05-20 2011-07-13 알루텍 주식회사 Dome structure and method for construction the same
JP2013170351A (en) * 2012-02-17 2013-09-02 Sharp Corp Frame body, solar cell module having the frame body, installation structure of solar cell module, and installation method of solar cell module
KR101301066B1 (en) * 2013-05-30 2013-08-28 주식회사 일강케이스판 Lighting structure for roof
KR101353279B1 (en) 2013-10-22 2014-01-23 알루텍 주식회사 Cover assembly for sewage disposalplants

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894695A (en) * 2018-08-07 2018-11-27 中国人民解放军军事科学院国防工程研究院 SMC glass fibre reinforced composite material dangles formula explosion wave prevention active door
KR101950145B1 (en) * 2018-08-21 2019-02-19 정지호 The cover for preventing bad smell and pollutants
CN113463694A (en) * 2021-05-27 2021-10-01 北京建工环境修复股份有限公司 Modular horizontal blocking device, blocking system and blocking method for polluted site
CN113463694B (en) * 2021-05-27 2022-07-08 北京建工环境修复股份有限公司 Modular horizontal blocking device, blocking system and blocking method for polluted site
KR20230139468A (en) 2022-03-28 2023-10-05 이재권 A Sliding enclosure for water treatment plant

Similar Documents

Publication Publication Date Title
KR101700941B1 (en) Flat type Sheet Molding Compound cover and assemble the structure using the same
US9546485B2 (en) Roof curb
US4703596A (en) Grid skylight system
KR100903988B1 (en) Tubular structure and modular building assembly using the same
KR20190047564A (en) Modular assembly house and connection structure between modular assembly houses
US20060174951A1 (en) Liquid collection basin connection assembly
KR20230062778A (en) Assembled structures with plates to prevent the ingress of contaminants, leaks, or odor gas leaks
KR20230059125A (en) plate assembled cover structures
JPH0122421B2 (en)
JP4928183B2 (en) Cover member
KR200296668Y1 (en) A structure of fabricated panel
KR101912219B1 (en) Parapet modular architecture and its constructing method
KR102615432B1 (en) Externally reinforced earthquake-resistant composite water tank
JP4854572B2 (en) Building unit and unit building using the same
KR101606181B1 (en) Parapet modular architecture and its constructing method
RU2196420C2 (en) Assembled greenhouse
JPS6133120Y2 (en)
CN217399945U (en) Steel construction box building waterproof node
JP7038174B2 (en) Outdoor structure
JP5723755B2 (en) Clean room ceiling structure and construction method
CN212335936U (en) Assembled gate based on aluminum alloy section
JP2002349003A (en) Curtain wall system
JP2005097980A (en) Unit structure and renewal construction method in unit building
SU850861A1 (en) Tower
JP2021116919A (en) Seal mechanism, seal member, and seal mechanism construction method

Legal Events

Date Code Title Description
A201 Request for examination
J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL NUMBER: 2022100000375; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20220211

Effective date: 20220609