KR101695390B1 - Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer - Google Patents

Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer Download PDF

Info

Publication number
KR101695390B1
KR101695390B1 KR1020160006085A KR20160006085A KR101695390B1 KR 101695390 B1 KR101695390 B1 KR 101695390B1 KR 1020160006085 A KR1020160006085 A KR 1020160006085A KR 20160006085 A KR20160006085 A KR 20160006085A KR 101695390 B1 KR101695390 B1 KR 101695390B1
Authority
KR
South Korea
Prior art keywords
power
time
power supply
electricity
supply
Prior art date
Application number
KR1020160006085A
Other languages
Korean (ko)
Other versions
KR20160014738A (en
Inventor
김정희
Original Assignee
김정희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김정희 filed Critical 김정희
Priority to KR1020160006085A priority Critical patent/KR101695390B1/en
Publication of KR20160014738A publication Critical patent/KR20160014738A/en
Application granted granted Critical
Publication of KR101695390B1 publication Critical patent/KR101695390B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/08Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to excess current
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • Y04S10/525
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Abstract

본 발명은 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치 및 방법에 관한 것으로, 전력공급계통의 전력부하 단에서 각 부하별로 전기를 분배하는 분전반에 공급되는 상용 전원(10); 상기 상용전원(10)과 접지선와 전원공급 단자선으로 연결되고, 과부하 및 단락(short circuit)으로부터 전류 흐름이 증가되는 것을 보호하는 배선용 차단기(20); 상기 배선용 차단기(20)와 접지선과 전원공급 단자선이 각각 연결되며, 여러 종류의 전기 제품이 접속되는 복수의 멀티 콘센트(41-1, 41-1-N); 일측은 상기 배선용 차단기(20)와 상기 2선이 각각 연결되고 타측은 각각의 상기 시분할 전력제어 장치(Delay Timer)(30-1,.. 30-n)와 상기 2선이 각각 연결되는 복수의 전자접촉 개폐기(Breaker, 차단기)(40-1,.. 40-n); 및 상기 복수의 전자접촉개폐기(40-1,.. 40-n)에 각각 연결된 복수의 멀티 콘센트(41-1, 41-1-N)를 포함하는 전력공급계통의 전력부하 단에서 구비된 분전반에서, 일측은 상기 배선용 차단기(20)와 접지선과 전원공급단자선의 각각 연결되고 타측은 상기 전자접촉 개폐기(40-1,.. 40-n)와 상기 2선이 각각 연결되며, 각각 멀티 콘센트에 전원 인입시 타이머 구동 시분할 전력 제어방식으로 설정시간 만큼 시간 지연(time delay) 동작 후에 차단시 복귀 접점에 원상 복구되는 복수의 시분할 전력제어 장치(Delay Timer)(30-1,.. 30-n);을 포함한다. The present invention relates to an apparatus and method for sequentially charging a low power contracted power saving dial time relay, comprising: a commercial power supply (10) supplied to a distribution board for distributing electricity for each load at a power load stage of the power supply system; A circuit breaker 20 connected to the commercial power source 10, a ground line, and a power supply terminal line to protect an increase in current flow from overload and short circuit; A plurality of multi-outlets (41-1, 41-1-N) connected to the wiring breaker (20), a ground wire and a power supply terminal line respectively and to which various kinds of electrical products are connected; One of which is connected to the wiring breaker 20 and the other of which is connected to each of the time division power control units 30-1 to 30-n and a plurality of An electronic contact breaker (40-1, ..., 40-n); And a plurality of electrical outlets (41-1, 41-1-N) connected to the plurality of electromagnetic contact switches (40-1, ..., 40-n) The other end of the circuit breaker 20 is connected to the grounding line and the power supply terminal line, and the other end of the circuit breaker 20 is connected to the multi-receptacle 40-1 through 40- (30-1,... 30-n) that are restored to the return contact at the time of shutdown after a time delay operation by a predetermined time in a timer driven time division power control mode at power-on, Lt; / RTI >

Description

저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치{Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sequential power injection apparatus using a dial-time relay,

본 발명은 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치에 관한 것으로, 전력공급계통의 전력부하 단에서 형성되는 소비전력 피크의 크기를 저감시키는 방법으로 시분할 전력제어장치(Delay Timer)와 전자접촉개폐기를 사용하여 부하 동시기동 방지와 타이머 구동 시분할 전력 제어방식으로 멀티 콘센트마다 설정 시간 만큼 지연시켜 전원이 인가되게 하여 복수의 멀티 콘센트에 접속된 복수의 전기 제품들의 소비전력 최대 전력 피크치의 크기를 저감시키는, 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a sequential power-on apparatus using a low-power contract power saving dial time relay, and more particularly, to a power- The power consumption of a plurality of electrical appliances connected to a plurality of electrical outlets is maximized by delaying the power supply by a set time for each of the multi-outlets by using the contact switch to prevent simultaneous start of the load and the timer driven time- And more particularly, to a power-saving dial-time relay utilizing sequential power-on device.

이와 관련된 선행기술은 실용신안출원번호 20-1999-0012885에 의하면 '첨두전력 감소장치'가 개시되어 있다. 종래에는 고부하 장비의 작동시에 요구되는 대전력의 공급을 위하여 연축전지나 커패시터 뱅크를 사용하였으며, 축전지는 교류전원이 사용되는 시스템에는 적용이 곤란하였으며, 커패시터 뱅크는 정밀도가 저하되고 큰 공간을 요구하는 문제점이 있었으나, 본 고안의 첨두전력 감소장치는 회전변환기와 제어수단으로 구성된 첨두전력 감소장치를 채택함으로써, 저부하시에는 에너지를 저장하고, 피크부하 인가시는 저장에너지를 순간적으로 큰 전력으로 변환시켜 부하에 공급하여 큰 첨두전력을 안정적으로 공급할 수 있다.The prior art related thereto discloses a 'peak power reduction device' according to utility model application No. 20-1999-0012885. Conventionally, a sparking battery or a capacitor bank is used for supply of a large power required in the operation of the high load equipment, and it is difficult to apply the battery to a system in which an AC power source is used, and a capacitor bank is required to have a high precision The peak power reduction device of the present invention adopts the peak power reduction device composed of the rotation converter and the control means to store the energy at the lower load and to convert the stored energy into the momentarily large power when the peak load is applied So that a large peak power can be stably supplied.

또한, 특허공개번호 10-2011-0138812에 의하면 '네트워크 시스템 및 에너지 소비부'가 개시되어 있다. 일 측면에 따른 에너지 소비부는, 에너지 정보를 수신하기 위한 통신수단; 에너지정보와 작동상태정보를 디스플레이할 수 있는 디스플레이부; 및 작동 모드를 입력할 수 있는 입력부가 포함되고, 상기 입력부에 의해서 작동 모드가 선택되면, 상기 디스플레이부에서 선택된 모드와 관련한 에너지 정보가 디스플레이될 수 있는 것을 특징으로 한다. In addition, according to Patent Publication No. 10-2011-0138812, a 'network system and an energy consumption unit' are disclosed. An energy consuming unit according to one aspect includes communication means for receiving energy information; A display unit capable of displaying energy information and operating state information; And an input unit for inputting an operation mode. When the operation mode is selected by the input unit, energy information related to the mode selected on the display unit can be displayed.

네트워크 시스템은 화력이나 수력 또는 원자력으로 전기를 생산하는 발전소(Power plant), 전력소, 변전소, 에너지관리장치(EMS, Energy Management System), 가전제품(Appliance), 스마트 미터, 축전기, 계측장치(AMI, Advanced Metering infrastructure), 홈 서버 등이 네트워크 시스템의 컴포넌트 들이다. The network system is a power plant, a power plant, a substation, an energy management system (EMS), an appliance, an appliance, a smart meter, a capacitor, a measuring device (AMI, Advanced Metering infrastructure, and home server are components of the network system.

발전소에서 발생된 전기는 송전선을 통하여 전력소로 송전되고, 전력소(substation)에서는 배전용 변전소로 전기를 송전하며, 변전소에서는 배전선로를 따라 주상 변압기를 통해 전기가 가정이나 빌딩, 공장 등의 전기 사용 수용가로 분배되도록 한다. Electricity generated in a power plant is transmitted to a power station through a transmission line, and electricity is transmitted to a substation in a substation. In a substation, electricity is supplied to a household, a building, a factory, .

전력 공급회사는 수용가에게 전기를 공급할 때 전기 공급규정에 의한 공급 조건을 결정하며, 계약 전력은 자가 용수 변전설비를 가진 수용가에게 적용되고, 정전 및 재가동상황에 동시에 모든 전기 설비의 구동 전압을 고려하여 산출된다. The power supply company determines the supply condition according to the electricity supply regulation when supplying electricity to the customer, and the contract power is applied to the customer having the electric water supply facility, and at the same time, .

가정, 빌딩, 공장은 주상 변압기와 분전반을 통해 전기를 인입받는다. Houses, buildings, and factories receive electricity through pillar transformers and distribution boards.

분전반은 전기를 인입받아 각 부하 별로 전기를 분배하는 전기 설비이다. 분전반은 상용전원과 접지선(어스)와 공급 단자의 2선으로 연결되는 메인 배선용 차단기를 설치하고, 그 아래에 좌우 방향으로 여러 개의 용량이 작은 차단기(breaker, 전자접촉 개폐기)를 설치하여 각 설비별 전등, 전열 부하로 나누어 사용함으로써 한 회로가 고장이나 이상 발생시에도 그 회로만을 차단하도록 하여 다른 전기설비는 안전하게 사용하게 한다. The distribution board is an electrical equipment that receives electricity and distributes electricity to each load. The distribution board is equipped with a main circuit breaker connected to two lines of commercial power, ground wire (ground) and supply terminal, and a breaker (electronic contact breaker) with several small capacity in the left and right direction is installed beneath it. It can be divided into electric lamp and electric heating load, so that if a circuit breaks down or malfunctions, only the circuit is cut off and other electric equipment is used safely.

예를 들면, 가정 댁내의 계약 전력이 3kW 수용가 또는 5kW 수용가가 있을 경우, 주상 변압기로부터 가정집1, 가정집2의 댁내에 설치된 분전반으로 각각 3kW, 5kW의 전기가 공급된다. For example, when the contracted power in the home is 3 kW or 5 kW, 3 kW and 5 kW of electricity are supplied from the pillar transformer to the domestic panel 1 and the panel panel installed in the house 2, respectively.

일반적으로, 분전반과 연결된 멀티 콘센트에 전기 제품이 접속되는 경우, 전기제품의 전원은 초기에 최대 전력 피크치(순시치) 후에 일정 시간이 경과하면 평균치 전원이 인가되게 된다. Generally, when an electrical product is connected to a multi-outlet connected to a distribution board, the average power is supplied to the electrical product when a predetermined time elapses after the initial maximum power peak value (instantaneous value).

그러나, 분전반에 연결된 모든 멀티 콘센트에 전기 수용가의 모든 전기 제품이 동시에 접속되어 동시에 전원이 인가되게 되면, 해당 모든 전기제품들이 최대 전력 피크치(순시치)의 합산된 값이 갑자기 증가하게 되어 모든 전기제품들의 소비 전력이 공급계통의 전력공급양으로 설정된 계약 전력을 초과하게 되어 정전 등의 안전사고 발생하는 문제점이 있다. However, if all the electrical appliances of the electrical household are simultaneously connected and powered on to all the electrical outlets connected to the distribution board, the total value of the maximum electrical power peaks (instantaneous values) suddenly increases suddenly, There is a problem that a safety accident such as a power failure occurs because the power consumption of the power supply system exceeds the contract power set as the power supply amount of the supply system.

그러므로, 전기 수용가의 모든 전기 제품들의 소비전력은 공급 계통의 전력공급 양보다 항상 적게 될 수 있도록 전력계통을 안정하게 관리해야 한다. 정전 등 어느 순간이든 개별부하에서 형성되는 멀티 콘센트에 연결된 전기 수용가의 모든 전기 제품의 최대 전력 피크치(순시치)가 동시에 합산되지 않도록 해야 한다.
Therefore, the power system must be stably managed so that the electric power consumption of all electric appliances of the electric consumer is always lower than the electric power supply amount of the supply system. The maximum power peak value (instantaneous value) of all appliances of an electrician connected to the multi-outlet formed at the individual load at any moment, such as power failure, should not be summed simultaneously.

특허출원번호 20-1999-0012885Patent Application No. 20-1999-0012885 특허공개번호 10-2011-0138812Patent Publication No. 10-2011-0138812

종래 기술의 문제점을 해결하기 위한 본 발명의 목적은 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치를 제공한다. It is an object of the present invention to solve the problems of the prior art, and it is an object of the present invention to provide a sequential power-on device using a low-power-consumption contract power saving dial time relay.

계약전력을 설정할 때 전력공급 측은 차단기의 안전치를 최대한 반영하는 반면 소비자 측은 최소한의 계약전력치를 설정하여 관리코자 한다. 여기서, 설정된 계약전력 치는 한 측에는 예비전력 의무보유 양을 증가시키는 요인인 반면, 한 측에는 계약전력 유지비용을 상승시키는 요인으로 각기 연동 되므로 양측 모두에 있어 경제적 손익분기점 산정 시 그 값의 선택은 중요하다. 그러므로, 적정한 계약전력 치의 선정을 도모하기 위해 본 발명품을 개발은 유용하고 필요하다.
When setting the contract power, the power supply side should maximize the safety value of the breaker while the consumer side should set the minimum contract power value. In this case, the set contract power value is a factor that increases the amount of reserve power reserve on one side, while it is linked to the factor that raises the contract power maintenance cost on one side, so it is important to select the value when calculating the economic breakeven point for both sides . Therefore, development of the present invention is useful and necessary in order to select an appropriate contract power value.

본 발명의 목적을 달성하기 위해, 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치는 전력공급계통의 전력부하 단에서 각 부하별로 전기를 분배하는 분전반에 공급되는 상용 전원; 상기 상용전원과 접지선와 전원공급 단자선으로 연결되고, 과부하 및 단락(short circuit)으로부터 전류 흐름이 증가되는 것을 보호하는 배선용 차단기; 상기 배선용 차단기와 접지선과 전원공급 단자선이 각각 연결되며, 여러 종류의 전기 제품이 접속되는 복수의 멀티 콘센트; 일측은 상기 배선용 차단기와 상기 2선이 각각 연결되고 타측은 각각의 상기 시분할 전력제어 장치(Delay Timer)와 상기 2선이 각각 연결되는 복수의 전자접촉 개폐기(Breaker, 차단기); 및 상기 복수의 전자접촉개폐기(40-1,.. 40-n)에 각각 연결된 복수의 멀티 콘센트를 포함하는 전력공급계통의 전력부하 단에서 구비된 분전반에서, In order to accomplish the object of the present invention, a low power contract power saving dial time relay using sequential power input device is provided with a commercial power supply for distributing electricity for each load at a power load stage of the power supply system; A circuit breaker connected to the commercial power source, the ground line, and the power supply terminal line to protect an increase in current flow from overload and short circuit; A plurality of multi-outlets to which the wiring breaker, the ground wire, and the power supply terminal wire are respectively connected and to which various kinds of electrical products are connected; A plurality of electronic contact breakers (breakers) having one side connected to the wiring breaker and the two wires respectively and the other side connected to each of the time division power controllers (Delay Timer) and the two wires; And a plurality of electrical outlets connected to the plurality of electronic contact switches (40-1, ..., 40-n), respectively,

일측은 상기 배선용 차단기와 접지선과 전원공급단자선의 각각 연결되고 타측은 상기 전자접촉 개폐기와 상기 2선이 각각 연결되며, 각각 멀티 콘센트에 전원 인입시 타이머 구동 시분할 전력 제어방식으로 설정시간 만큼 시간 지연(time delay) 동작 후에 차단시 복귀 접점에 원상 복구되는 복수의 시분할 전력제어 장치(Delay Timer);를 포함한다.
And the other side of the circuit breaker is connected to the grounding line and the power supply terminal line, and the other side is connected to the two contactors by the timer. and a plurality of time division power controllers (Delay Timers) that are restored to the return contacts upon shutdown after a time delay operation.

본 발명은 전력공급 내지 소비계통 상호 간 또는 일방에서 설계 또는 관리오류로 소비전력이 계약전력 양을 일순간이라도 초과하는 상황을 예방하기 위해 충분한 여유율이 확보되어야 하는데 본 발명품의 추가 부착만으로도 전원 인가시 최대 전력 피크치를 관리할 수 있게 하며, 계약전력 유지비용과 국가 블랙아웃현상도 효과적으로 대응할 수 있다.
The present invention requires a sufficient margin to prevent situations where the power consumption exceeds the contracted power even momentarily due to a design or management error between the power supply and the power supply system or one side. It is possible to manage the power peak value and effectively cope with the contract power maintenance cost and the national blackout phenomenon.

도 1은 전체를 조립한 평면도로써, 시분할 전력제어장치(Delay Timer)와 전자접촉개폐기를 활용 부하 동시기동 방지와 순차기동 기능을 구현한 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치의 구성도이다.
도 2는 시분할 전력제어장치(Delay Timer)와 전자접촉개폐기를 활용 부하 동시기동 방지와 순차기동 기능을 나타낸 알고리즘이다.
FIG. 1 is a plan view of the whole assembly. FIG. 1 is a top view of a whole assembly of a low-voltage power supply unit employing a time-sharing power control unit (Delay Timer) and an electronic contact switch. .
FIG. 2 is an algorithm showing a time-sharing power control unit (Delay Timer) and an electronic contact breaker to prevent simultaneous start-up and sequential start-up of an application load.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 설명한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

상용전원과 자가발전설비 등으로 전력을 공급하거나 전력을 설계시공하는 자 내지 전력을 소비하는 자가 본 발명품을 소기 목적 달성 부위에 부착함으로써, 계약전력 설정치를 최소화하여 전력관리 지출비용을 절감하는 동시에 국가의 발전소 송전력이 부족한 블랙아웃 현상을 효과적으로 예방할 수 있는 장치로서 동작한다.By attaching the present invention to the target site of the present invention by supplying electric power to the commercial power source and the self power generation facility, or by those who consume power or design the electric power, the contract power set value can be minimized to reduce the power management expenditure cost, As a device capable of effectively preventing a blackout phenomenon in which a power transmission power of a power plant is insufficient.

블랙 아웃은 빌딩, 공장, 가정에서 전력 과잉 소비로 전기 사용량이 발전소의 공급량보다 많아지면 전력망 전체의 전압과 주파수가 크게 떨어지고, 그 결과 전략망을 관리하는 시스템마저 전체적으로 정지하여 결국 모든 발전기들이 전기를 공급하지 못하게 되므로 전력난에 의해 전체적으로 정전되는 현상을 말한다. If blackout is overpowered in buildings, factories, and households, if the electricity usage exceeds the supply of the power plant, the voltage and frequency of the entire power grid will drop significantly. As a result, the system that controls the strategic network will stop altogether, This is a phenomenon in which electricity is totally lost due to power failure.

수급계통에서 소비전력은 공급계통의 전력공급 양보다 항상 적게 될 수 있도록 전력계통을 안정하게 관리해야 한다. 정전 등 어느 순간이든 개별부하에서 형성되는 전력 피크치(순시치)가 동시 합산되지 않도록 전자접촉개폐기(Breaker)와 시분할 전력제어장치(Delay Timer)의 조합을 통한 순차기동 장치를 제작하였다.In the supply system, the power system must be stably managed so that the power consumption is always lower than the power supply amount of the supply system. A sequential starter with a combination of an electronic contact breaker and a time-sharing power control device (Delay Timer) was built so that the power peak value (instantaneous value) formed at the individual load at any moment such as power failure can not be added simultaneously.

도 1은 전체를 조립한 평면도로써, 시분할 전력제어장치(Delay Timer)와 전자접촉개폐기를 활용 부하 동시기동 방지와 순차기동 기능을 구현한 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치의 구성도이다. FIG. 1 is a plan view of the whole assembly. FIG. 1 is a top view of a whole assembly of a low-voltage power supply unit employing a time-sharing power control unit (Delay Timer) and an electronic contact switch. .

가정, 빌딩, 공장은 주상 변압기와 분전반을 통해 전기를 인입받는다. Houses, buildings, and factories receive electricity through pillar transformers and distribution boards.

본 발명의 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치는 주상 변압기로부터 전기를 인입받아 전력공급계통의 전력부하 단에서 각 부하별로 전기를 분배하는 분전반에 공급되는 상용 전원(10); 상기 상용전원(10)과 접지선(어스)과 전원공급 단자선으로 연결되고, 과부하 및 단락(short circuit)으로부터 전류 흐름이 증가되는 것을 보호하기 위한(예, 교류 600V 이하 또는 직류 250V 이하의 저압 옥내 전압의 보호) 배선용 차단기(molded case circuit breaker)(20); 상기 배선용 차단기(20)와 접지선(어스)과 전원공급 단자선으로 각각 연결되며, 여러 종류의 전기 제품이 접속되는 복수의 멀티 콘센트(41-1, 41-1-N); 일측은 상기 배선용 차단기(20)와 상기 2선이 각각 연결되고 타측은 각각의 상기 시분할 전력제어 장치(Delay Timer)(30-1,.. 30-n)와 상기 2선이 각각 연결되는 복수의 전자접촉 개폐기(Breaker, 차단기)(40-1,.. 40-n); 및 상기 복수의 전자접촉개폐기(40-1,.. 40-n)에 각각 연결된 복수의 멀티 콘센트(41-1, 41-1-N)를 포함하는 전력공급계통의 전력부하 단에서 구비된 분전반에서, The present invention provides a commercial power source 10 for supplying electricity to a pillar-type transformer and distributing electricity to each load at a power load terminal of the power supply system. (For example, an AC voltage of 600 V or less or a DC voltage of 250 V or less), which is connected to the commercial power supply 10 through a ground line (earth) and a power supply terminal line and which prevents an increase in current flow from an overload and a short circuit Protection of voltage) molded case circuit breaker 20; A plurality of multi-outlets (41-1, 41-1-N) connected to the wiring breaker (20), a ground line (earth) and a power supply terminal line respectively and to which various kinds of electrical products are connected; One of which is connected to the wiring breaker 20 and the other of which is connected to each of the time division power control units 30-1 to 30-n and a plurality of An electronic contact breaker (40-1, ..., 40-n); And a plurality of electrical outlets (41-1, 41-1-N) connected to the plurality of electromagnetic contact switches (40-1, ..., 40-n) in,

일측은 상기 배선용 차단기(20)와 접지선(어스)과 전원공급단자선이 각각 연결되고 타측은 상기 전자접촉 개폐기와 상기 2선이 각각 연결되며, 일부 부하의 멀티 콘센트에 전원 인입시 타이머 구동 시분할 전력 제어방식으로 설정시간 만큼 시간 지연(time delay) 동작 후에 차단시 복귀 접점에 원상 복구되는 복수의 시분할 전력제어 장치(Delay Timer)(30-1,.. 30-n);를 포함한다. And the other side is connected to the electromagnetic contactor and the two wires respectively. When the power is supplied to the multi-outlet of some load, the timer-driven time division power And a plurality of time division power control units (Delay Timers) 30-1 to 30-n that are restored to the return contact at the time of shutdown after a time delay operation by a set time by a control method.

복수의 멀티 콘센트(41-1, 41-1-N)는 전기 수용가의 TV, 컴퓨터, 세탁기 등의 여러 종류의 전기 제품이 콘센트에 접속될 때, 각각 복수의 전자접촉개폐기(40-1,.. 40-n)에 연결된 각각의 시분할 전력제어 장치(Delay Timer)에 의해 일정 시간(예,10초, 20초) 만큼 시간 지연을 하여 동시에 전원이 인입되지 않고 멀티 콘센트마다 시간 지연을 두고 전원이 인가되는 것을 특징으로 한다.
The plurality of multi-outlets 41-1 and 41-1-N are connected to a plurality of electronic contact switches 40-1,..., 40-1-N, respectively, when various types of electrical products such as TVs, computers, (For example, 10 seconds, 20 seconds) by the respective time-sharing power control units (Delay Timer) connected to the power source 40-n, Is applied.

도 2는 시분할 전력제어장치(Delay Timer)와 전자접촉개폐기를 활용 부하 동시기동 방지와 순차기동 기능을 나타낸 알고리즘이다. FIG. 2 is an algorithm showing a time-sharing power control unit (Delay Timer) and an electronic contact breaker to prevent simultaneous start-up and sequential start-up of an application load.

공장 또는 가정집에서 정전 후 복수의 멀티 콘센트(41-1, 41-1-N)에 접속된 모든 전기제품에 전원을 공급하는 경우 공장 또는 가정집의 복수의 멀티 콘센트(41-1, 41-1-N)에 접속된 모든 전기제품들의 순시치(최대 피크치)를 합산한 계약 전력으로 산정되며, 시분할 전력제어장치(Delay Timer)(30-1,.. 30-n)와 전자접촉개폐기(40-1,.. 40-n)를 사용하여 부하가 동시기동 방지와 순차기동 기능을 나타낸 알고리즘이다. When electric power is supplied to all the electric appliances connected to the plurality of multi-outlet (s) 41-1, 41-1-N after a power outage in a factory or a house, a plurality of multi-sockets 41-1, 41-1- N and the instantaneous value (maximum peak value) of all the electric appliances connected to the electric contact switches 40-n, and is calculated by summing the time-division power controllers (Delay Timers) 30-1, 1, .., 40-n), the load shows the simultaneous start prevention function and the sequential start function.

예를 들면, 최초 기동시 제1 멀티 콘센트는 10초 후에 기동되고, 제n 멀티 콘센트는 20초 후에 기동되므로, 각각의 멀티 콘센트에 접속된 부하가 동시에 전기 제품의 최대 전력 피크치가 증가하지 않게 되어 동시에 기동되는 것을 방지한다. For example, since the first multi-outlet is started after 10 seconds and the n-th multi-outlet is started after 20 seconds at the time of initial startup, the loads connected to the respective multi-outlets simultaneously do not increase the maximum power peak value of the appliance It is prevented from starting at the same time.

본 발명은 전력공급계통의 전력부하 단에서 형성되는 멀티 콘센트에 접속된 전기 제품들의 소비전력 최대 전력 피크치(순시치)의 크기를 저감시키는 방법으로 시분할 전력제어장치(Delay Timer)(30-1,.. 30-n)와 전자접촉개폐기(40-1,.. 40-n)를 사용하여 부하 동시기동 방지와 타이머 구동 시분할 전력 제어방식으로 멀티 콘센트마다 연결된 전기 제품들에 설정 시간 만큼 지연시켜 전원이 인가되게 하여 복수의 멀티 콘센트에 접속된 복수의 전기 제품들의 소비전력 최대 전력 피크치의 크기를 저감시키게 한다. The present invention is applicable to a time-division power control apparatus (Delay Timer) 30-1, 30-2, 30-3, 30-3, 30-3, 30-3, 30-3, 30-3, And the electronic contact switches 40-1 to 40-n are used to prevent the simultaneous start of the load and the timer driven time division power control method, So that the magnitude of the maximum power consumption peak value of the plurality of electric appliances connected to the plurality of multi-outlet sockets can be reduced.

시분할 전력제어장치(Delay Timer)(30-1,.. 30-n)는 계약전력 시분할 감쇠기(Peak-power Time-sharing Attanuator)로 사용되며, 발전소-전력소-변전소-주상변압기-빌딩/공장/가정 분전반의 전력계통에 있어서, 전력부하 전단 또는 그 후단 소기 목적 달성부에 부착(예: 플러그 및 그 전후단, 분전반 및 그 전후단), Delay Timer에 의해 시간 지연되어 전원이 인가되므로 전기 수용가의 멀티 콘센트들에 접속되는 모든 전기 제품들의 동기 기동을 방지하고 소비전력 피크 치의 크기를 완화하여 전기 수용가의 모든 전기 제품들의 소비전력은 공급 계통의 전력공급 양보다 항상 적게 될 수 있도록 전력계통을 안정하게 관리하게 되며, 계약전력 관리비용을 절감하게 한다.
Time-division power controllers (Delay Timers) 30-1 to 30-n are used as a contracted power time-sharing attenuator, and are used in a power plant, a power station, a substation, a pillar transformer, a building, In the power distribution system of the household distribution panel, since the electric power is applied to the power load front end or the rear end target attainment part (for example, the plug and the front and rear ends thereof, the distribution board and the front and rear ends thereof) By preventing the synchronous start of all electric appliances connected to the multi-outlet and alleviating the magnitude of the power consumption peak, it is possible to stabilize the power system so that the electric power consumption of all the electric appliances of the electric household is always lower than the power supply amount of the supply system And reduce contract power management costs.

이상에서 설명한 바와 같이, 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진자가 하기의 특허청구범위에 기재된 본 발명의 기술적 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 또는 변형하여 실시할 수 있다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is clearly understood that the same is by way of illustration and example only and is not to be taken in conjunction with the present invention. The present invention can be variously modified or modified.

10: 상용 전원
20: 배선용 차단기
30-1, ... 30-n : 시분할 전력제어 장치
40-1, ... 40-n : 전자접촉 개폐기
41-1-1, 41-1-N: 멀티 콘센트
10: Commercial power supply
20: Circuit Breaker
30-1, ..., 30-n: Time-sharing power control device
40-1, ..., 40-n:
41-1-1, 41-1-N: Multi-outlet

Claims (1)

전력 과잉 소비로 전기 사용량이 발전소의 공급량보다 많아져 전력망 전체의 전압과 주파수가 떨어지고, 그 결과 전략망을 관리하는 시스템이 정지되어 모든 발전기들이 전기를 공급하지 못함에 따라 정정된 블랙아웃 이후에 개별부하에 형성되는 전력피크치가 동시에 합산됨에 따라 합산된 값이 증가하게 되어 모든 전기제품들의 소비 전력이 공급계통의 전력공급양으로 설정된 계약 전력을 초과하게 됨으로 인해 생기는 재 정전을 방지하기 위해, 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치를 설치함에 따라, 전기가 최초로 공급될시 계약전력이 3kW 또는 5kW 저압수용가에 복수의 멀티콘센트에 복수의 전기제품이 동시에 접속된 구조에서, 전자접촉개폐기의 일종인 MCB와 다이얼 타임 릴레이만의 접점 구성을 통해 상기 멀티 콘센트에서 시간지연기능에 의해 전원이 순차적으로 공급될 수 있도록 하는 구성을 갖춘 구조를 갖춘상태로서, 다시말해 전력공급계통의 전력부하 단에서 형성되는 소비전력 피크의 크기를 저감시키는 방법으로 시분할 전력제어장치(Delay Timer)와 전자접촉개폐기를 사용하여 부하 동시기동 방지와 타이머 구동 시분할 전력 제어방식으로 멀티 콘센트마다 설정 시간 만큼 지연시켜 전원이 인가되게 하여 복수의 멀티 콘센트에 접속된 복수의 전기 제품들의 소비전력 최대 전력 피크치의 크기를 저감시키는, 저압수용가 계약전력 절감 다이얼 타임 릴레이 이용 순차적 전력 투입 장치로서, 이때 네트워크 시스템과 전기의 분배는 전기를 생산하는 발전소(Power plant)와 전력소와 변전소와 에너지관리장치(EMS, Energy Management System)와 가전제품을 포함하여 구성되며, 발전소에서 발생된 전기는 송전선을 통하여 전력소로 송전되고, 전력소(substation)에서는 배전용 변전소로 전기를 송전하며, 변전소에서는 배전선로를 따라 주상 변압기를 통해 전기가 가정이나 빌딩, 공장에 분배되고, 전력 공급회사는 가정이나 빌딩, 공장에 전기를 공급할 때 전기 공급규정에 의한 공급 조건을 결정하되, 계약 전력은 자가 용수 변전설비를 가진 수용가에게 적용되고, 정전 및 재가동상황을 포함하여 전기 설비의 구동 전압을 고려하여 산출함에 따라, 상기 블랙아웃에 의해 상기 저압수용가의 전원이 모두 차단된 이후 전원의 공급이 재개되는 기동 초기시에 있어서,
재 기동시 어느순간이든 개별부하에서 형성되는 멀티 콘센트에 연결된 전기 수용가의 모든 전기 제품의 최대 전력 피크치가 동시에 합산되지 않도록 하기 위해, 상기 저압수용가에 설치된 분전반의 전자접촉개폐기후단에는 복수의 멀티 콘센트가 연결되며, 상기 복수의 멀티 콘센트에 복수의 전기제품이 연결되고, 상기 멀티 콘센트에는 시간지연기능에 의해 전원이 순차적으로 공급될 수 있도록, 전자접촉개폐기의 일종인 MCB와 다이얼 타임 릴레이만의 접점 구성을 통해 전원 공급이 이루어지되, 상기 전기제품들에 블랙아웃에 의해 전원이 모두 차단된 이후 전원 인입 재개시 시, 상기 복수의 멀티 콘센트에 연결된 모든 전기제품의 최대전력 피크치가 동시에 합산되지 않도록 하기위해, 상기 복수의 멀티 콘센트에 전원 인입 시, 타임 릴레이를 적용한 타이머 구동 시분할 전력 제어방식으로 설정시간 만큼 시간 지연(time delay) 동작 후에 복귀 접점에 원상 복구되는 복수의 다이얼 타임릴레이 방식의 시분할 전력제어 장치(Delay Timer)(30-1,.. 30-n);를 구비하고,
전력공급계통의 전력부하단에서 각 부하별로 전기를 분배하는 분전반에 공급되는 상용 전원(10);과
상기 상용전원(10)과 접지선와 전원공급 단자선으로 연결되고, 과부하 및 단락(short circuit)으로부터 전류 흐름이 증가되는 것을 보호하는 배선용 차단기(20);와
상기 배선용 차단기(20)와 접지선과 전원공급 단자선이 각각 연결되며, 여러 종류의 전기 제품이 접속되는 상기 복수의 멀티 콘센트(41-1, 41-1-N);을 구비하며,
일측에는 상기 배선용 차단기(20)와 2선으로 연결되고, 타측에는 상기 다이얼 타임 릴레이 방식의 시분할 전력제어 장치(Dial Delay Timer)(30-1,.. 30-n)가 상기 2선으로 연결되는 전자접촉개폐기의 일종인 복수의 MCB(40-1,.. 40-n);를 더 구비하여,
상기 다이얼 타임 릴레이 방식의 시분할 전력제어장치(Delay Timer)와 상기 전자접촉개폐기의 일종인 MCB를 사용하여 상기 블랙아웃에 의해 상기 저압수용가에서의 전원이 모두 차단된 이후, 외부에서의 전원이 인입되는 기동초기에 전기부품들의 동시기동을 방지하기 위해, 상기 시분할 전력제어장치인 타이머를 구비하여, 상기 복수의 멀티 콘센트마다 연결된 상기 전기제품들이 설정시간 만큼 지연되어 기동시킴에 따라, 상기 블랙아웃이후 기동초기에 동시 기동을 방지하고 순차기동기능을 부여하여 상기 블랙아웃 이후에 전원이 공급되는 기동초기의 최대 전력 피크치의 합산값 크기를 저감시키는 것을 특징으로 하는 저압수용가 계약전력 절감 다이얼 타임 릴레이를 이용한 순차적 전력 투입 장치.
As a result of excess power consumption, the electricity consumption exceeds the supply of the power plant, so that the voltage and frequency of the entire power grid are lowered. As a result, the system for managing the strategic network is stopped and all the generators can not supply electricity. In order to prevent re-powering caused by the fact that the total power consumption of all electrical appliances exceeds the contract power set by the power supply amount of the supply system as the sum of the power peak values formed in the load are simultaneously summed up, Contract Electricity Saving Dial-Time Relay In the structure in which a plurality of electric appliances are simultaneously connected to a plurality of multi-receptacles in a low-pressure receptacle at a contract power of 3 kW or 5 kW when electricity is supplied for the first time by installing a sequential power input device, Through the contact configuration of only the MCB and the dial time relay, A state in which the power supply can be sequentially supplied by the time delay function in the multi-outlet, that is, a state in which the power consumption peak of the power supply system is reduced, A plurality of electric appliances connected to a plurality of multi-receptacles are connected to a plurality of multi-receptacles by delaying the power for each multi-receptacle by a preset time by using a control device (Delay Timer) and an electronic contact breaker Power consumption Reduced peak power level Contract power consumption Reduced dial-time relay Used as a sequential power input device, where the distribution of electricity between the network system and the power plant, the power plant, the substation and the energy management Equipment (EMS, Energy Management System) and household appliances The electric power generated by the power plant is transmitted to the electric power plant through the transmission line, the electric power is transmitted to the substation of the substation, and the electricity is distributed to the home, the building and the factory through the pile transformer, When a power supply company supplies electricity to a home, a building or a factory, the supply condition is determined according to the electricity supply regulation. The contract power is applied to a customer having a self-watering power supply facility, At the time of initial startup in which the supply of power is resumed after the power supply of the low voltage power supply is shut off by the blackout,
In order to prevent simultaneous summing of the maximum power peaks of all the electric appliances connected to the multi-outlet formed in the individual load at the time of restart, a plurality of multi-outlets are provided at the rear end of the electromagnetic contact switch of the distribution board installed in the low- A plurality of electrical appliances are connected to the plurality of multi-receptacles, and a power source is sequentially supplied to the multi-receptacles by a time delay function. The MCB, which is one kind of the electronic contact breakers, In order to prevent the maximum power peaks of all the electric appliances connected to the plurality of multi-outlets from being summed together at the time of the power-on restart after the electric products are completely cut off by the blackout, , Time relay is applied when power is applied to the above multiple outlets (30-1,... 30-n) of a plurality of dial time relay type apparatuses restored to the return contact point after a time delay operation by a set time by a timer driven time division power control system, ; And,
A commercial power supply (10) supplied to a distribution board for distributing electricity for each load at a lower end of the power supply of the power supply system;
A circuit breaker 20 connected to the commercial power source 10, a ground line, and a power supply terminal line to protect an increase in current flow from overload and short circuit;
The plurality of multi-outlets (41-1, 41-1-N) are connected to the wiring breaker (20), a ground wire, and a power supply terminal line, and are connected to various kinds of electrical products.
Divisional power control units (Dial Delay Timers) 30-1, ..., 30-n of the dial time relay type are connected to the other side by the two wires A plurality of MCBs (40-1, ..., 40-n), which are one kind of an electronic contact breaker,
After the power is turned off in the low-voltage receptacle by the blackout using the time-sharing power control unit (Delay Timer) of the dial time relay system and the MCB, which is one kind of the electronic contact breaker, And a timer which is the time-sharing power control device is provided to prevent simultaneous start of the electric parts at the start of the start, so that, after the electric appliances connected to each of the plurality of multi-outlets are delayed and started up by the set time, Wherein the initial value of the maximum value of the power peak value at the start of the power supply after the blackout is reduced by preventing the simultaneous starting at the beginning and by giving the sequential starting function. Power input device.
KR1020160006085A 2016-01-18 2016-01-18 Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer KR101695390B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160006085A KR101695390B1 (en) 2016-01-18 2016-01-18 Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160006085A KR101695390B1 (en) 2016-01-18 2016-01-18 Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR20140175138A Division KR20150003142A (en) 2014-12-08 2014-12-08 Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer

Publications (2)

Publication Number Publication Date
KR20160014738A KR20160014738A (en) 2016-02-11
KR101695390B1 true KR101695390B1 (en) 2017-01-23

Family

ID=55351727

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160006085A KR101695390B1 (en) 2016-01-18 2016-01-18 Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer

Country Status (1)

Country Link
KR (1) KR101695390B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001197661A (en) * 1999-11-01 2001-07-19 Kazuo Miwa Power saving and control apparatus and energy saving system
JP2004187424A (en) * 2002-12-04 2004-07-02 Densei Lambda Kk Distribution board system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3540152B2 (en) 1998-04-17 2004-07-07 本田技研工業株式会社 Engine driven generator
KR100974823B1 (en) * 2008-03-10 2010-08-09 (주)지엠지시스템 Apparatus for reducing standby power consumption
KR100934970B1 (en) * 2009-06-19 2010-01-06 김창호 Apparatus and method for reducing power consumption of electronic products
KR101636085B1 (en) 2010-06-22 2016-07-04 엘지전자 주식회사 Network system and energy consumption component

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001197661A (en) * 1999-11-01 2001-07-19 Kazuo Miwa Power saving and control apparatus and energy saving system
JP2004187424A (en) * 2002-12-04 2004-07-02 Densei Lambda Kk Distribution board system

Also Published As

Publication number Publication date
KR20160014738A (en) 2016-02-11

Similar Documents

Publication Publication Date Title
US9966795B2 (en) Intelligent electric grid management system and method
US8600573B2 (en) System and method for managing cold load pickup using demand response
CN106688155B (en) System and method for switching electrical system to standby power in a utility power outage
RO118506B1 (en) Process and circuitry to cover peak energy demands in electrical alternating or three-phase current networks
CA3125301A1 (en) Methods and systems for connecting and metering distributed energy resource devices
JP5755191B2 (en) Inverter system
KR101223670B1 (en) Switchgear installed power control unit with commercial-emergency power supply control function and method for operating thereof
JP6104061B2 (en) Inverter system
KR101203148B1 (en) Maximum demand control system in conjunction with back-up power source and operating method therefor
US20230361574A1 (en) Load control architecture of an energy control system
KR101695390B1 (en) Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer
KR20150003142A (en) Sequential power injection apparatus using dial time relay for reducing the contract power of low voltage consumer
US8941269B1 (en) System and method to reduce electrical transients
Khederzadeh Frequency control of microgrids by demand response
JP6738074B1 (en) Power feeding control system, power feeding control method, and power feeding control program
CN103138292A (en) Method and system for dynamic management of electricity distribution grid
EP4285454A1 (en) A multiphaser device and method for uninterrupted ac power switching between sources of same or different phases
AU2015100624A4 (en) Domestic Electrical Demand Limiting Controller
Parise et al. Safety of domestic dwellings in stressed electrical grids: A case of backfeed hazard
Fedotov et al. The use of electrochemical energy storages to limit the effects of short-term power outages
WO2009152534A2 (en) Electrical demand controller
US20230093980A1 (en) Electricity Distribution System for a Domestic Installation, Method for Managing such an Electricity Distribution System
KR101433046B1 (en) Smart switchgear installed standby-power energy-saving controller equipped with multichannel load current sensitivity and timer trip function
TWI750806B (en) Power consumption detection and distribution system
CN110071521B (en) Power distribution equipment and power distribution method

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment